SEI Certification Program Manual
|
|
- Jeffery Hamilton
- 6 years ago
- Views:
Transcription
1 Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6
2 SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Programs Date of Issue: NFPA Protective Clothing and Equipment Program Standards NFPA Flash Fire Garments 29.1 Certification Submittal Package A Certification Submittal Package shall include an SEI Certification Submittal form (see Section 29A: SEI Certification Submittal Form), a Components & Materials Description Checklist form (see Section 29B: General Components & Materials Description Checklist) and if applicable a User Guide and Label Checklist form (see Section 29C: User Guide and Label Checklist) for each product model, variant or accessory being submitted. Completion of the submittal package serves four primary purposes: 1. The submittal package provides SEI and the SEI Quality Assurance Auditor with a description of new, modified or products to be selected for annual certification. 2. The information provided by the manufacturer in the submittal package confirms to SEI the product design and components. 3. Receipt of the submittal package by the testing laboratory, from SEI, serves as the laboratory s authorization to begin testing the product(s) and allows laboratory personnel to verify that the correct product samples have been received. 4. The return of a signed copy of the submittal form from the testing laboratory provides SEI with a record of the date testing was completed on the product model. Over the life of the product, subsequent submittal packages shall document that the product model submitted for certification testing is identical to samples previously tested, except where Class I model changes have been tested and documented through the submission of additional SEI submittal packages or documented Class II changes have been made. It is therefore necessary that each submittal to SEI include sufficient product description information, which is achieved by a complete components and materials listing to uniquely and unambiguously identify the product model in question (see Section 14: Product Changes). SEI Certification Submittal Form Each submittal must be identified on the submittal form as either (1) initial certification, (2) annual recertification, (3) Class I change, or (4) Class II change. Finished product manufacturing facilities (assembly) located at a different address (i.e. suppliers or company-owned factories) shall be identified in Section 3 of the submittal form. The SEI Certification Submittal Form shall 1 of 6
3 SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Programs Date of Issue: be signed by the authorized manufacturer representative within the participating company having the authority to authorize expenditures for testing. Components & Materials Description List The product description information may be (a) listed on the Component and Materials Description Checklist form, (b) provided as a separate listing by the manufacturer (i.e. Bill of Materials), or (c) appropriate engineering drawings/ specification sheets. Use of Section 29B: General Components and Materials Description Checklist form is recommended. The following information is to be included on each Components & Materials Description Checklist. Brief examples are provided for guidance. A. Description of Major Components All major components and materials shall be identified and described. Where possible, include brand name and part number, supplier name and location. B. Primary Materials Materials used in the construction of major components shall be identified. Identification shall include trade names, if applicable. All changes shall be reported to SEI for evaluation and possible action. C. Manufacturing Locations All locations in which the product model is manufactured or assembled must be identified on the SEI Certification Submittal Form. If major components are manufactured by another company and purchased by the SEI participants, the name and address of the manufacturing facility and contact name shall be identified on the Components & Materials Description Checklist. D. Specification Sheets or Technical Bills of Materials Product specification sheets or technical bills of materials (BOM) may be included with the SEI Certification Submittal Form in addition to the Components & Materials description checklist to fulfill some or all other requirements noted above. In the case of annual recertification, the appropriate documents (i.e., submittal form and components and materials listing or BOM) shall be prepared prior to the sample selection audit and available to the auditor during the audit for reference and confirmation of product. E. Confidentiality All product information received by SEI staff, the SEI Quality Assurance Auditor, or the SEI testing laboratory shall be considered confidential and shall not be released to any third party without written authorization to do so (with the exceptions noted Section 3: Manufacturer s Agreement for response to a subpoena, court order or other compulsory process). 2 of 6
4 SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Programs Date of Issue: User Guide and Label Checklist If applicable, a User Guide and Label are required for protective ensemble and ensemble elements. The standards specify the minimum information that must be presented, and each manufacturer may provide as much information about the products as they deem necessary to use the products safely. However, the standard does not specify or require a set format for presenting this information. As a result, there are many ways a User Guide or Label can be arranged and presented, which is up to the discretion of each manufacturer. Use of Section 29C: User Guide and Label Checklist form is recommended to be completed so an accurate review and evaluation can be conducted Definition of a Model Model is the collective term used to identify a group of protective devices of the same basic design and components from a single applicant produced by the same manufacturing and quality assurance procedures that are covered by the same certification. Any characteristic that affects the device s performance under the limits of the current certification standards constitutes a different model. For purposes of the SEI Certification Program, the above definition of the term model uses performance characteristics as the basic criteria Application & Annual Certification Fees Testing shall be performed annually. When an initial submittal package is submitted to SEI, the Application Fees and Annual Participation Fees (See Section 7: Annual Participation Fees) are due. Upon completion of initial testing, Annual Model Certification Fees are due. The following is a schedule of application fees and annual model certification fees that apply to the industrial PPE products program: Model Type Submittal Type Application Fee Annual Model Certification Fees Initial $250 $425 Base Model Class I Change $50 N/A Class II Change $50 N/A Initial $60 $130 Variant Model Class I Change $50 N/A Class II Change $50 N/A Initial $60 $60 Accessory Model Class I Change $50 N/A Class II Change $50 N/A 3 of 6
5 SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Programs Date of Issue: NFPA Flash Fire Garments A. Definition of Model Characteristics that should affect the model s ability to meet the performance requirements of the certification standard and therefore require a new model designation: 1. Material, composition, thickness or design 2. Seam construction, techniques and design 3. Garment configuration 4. Thread material and composition Characteristics that should not affect the model s ability to meet the performance requirements of the certification standard and therefore would not require a new model designation: 1. Color 2. Trim 3. Clothing design options (e.g., pockets, if made from same base material) 4. Size B. Examples of Major Components Not applicable for this product C. Laboratory Testing Fees/ Attributes & Variables SEI currently has approved one (1) laboratory that may conduct testing to this standard. The following information should be used as guide. The schedule of rates can be used to estimate the total cost of testing for all the models that are to be certified. 4 of 6
6 SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Programs Date of Issue: Test Paragraph; Pass/Fail Criteria Intertek NFPA Initial Preconditioning Procedure Fee Samples Needed Category of N/C Label Content 5.1; Specific content and height. None Checklist SEI/$35 1 copy English. Minor User Info 5.2; specific content None Checklist SEI/$35 1 copy Major B Design Criteria 6.1 ; 6.2 & 6.3; construction None Checklist $50 1 garment Major B 7.1.1; spaced HTP Rating not less than Before & after squares of all Heat Transfer 25 J/cm 2 (6.0 cal/cm 2 ); contact HTP cycles of laundering Section 8.2; layers Performance (HTP) rating not less than 12.6 J/cm 2 (3.0 or dry cleaning (as ASTM F2700 stitched Critical cal/cm 2 ) label designates) perimeter around the Flame Resistance; all fabric and reflective striping Flame Resistance; all fabric and reflective striping Thermal Shrinkage; all fabric layers Thermal Shrinkage; cold weather insulation Heat Resistance; fabric, other textile material and reflective striping other than those items described in & Manikin Test Thread Heat Resistance Hardware Heat Resistance; buttons, fasteners and closures 7.1.2; char length <100 mm (4 in.), afterflame <2 sec., no melt or drip; each layer tested separately 7.1.2; char length <100 mm (4 in.), afterflame <2 sec., no melt or drip; each layer tested separately 7.1.3; shall not shrink more than 10% in any direction; each layer tested separately ; shall not shrink more than 20% in any direction 7.1.4; shall not melt, drip, separate or ignite; each layer tested separately 7.1.5; average predicted body burn rating of <50 % 7.2; shall not melt Ambient 7.3; shall not melt, drip, separate or ignite, shall remain functional Before and after 100 cycles of laundering (designated by label) Before & after 100 cycles of dry cleaning (as design. by label) Before and after 3 cycles of laundering or dry cleaning (as label designates) Before and after 3 cycles of laundering or dry cleaning (as label designates) Before and after 3 cycles of laundering or dry cleaning (as label designates) After 1 cycle of laundering or dry cleaning (as label designates) Section 8.3; ASTM D6413 Section 8.3; ASTM D6413 Section 8.4 Section 8.4 Section 8.4 Section 8.5; ASTM F1930 Section 8.6; Fed Test Method 191A Ambient Section 8.4 $1900/ layer $2100/ layer $250/ layer $250/ layer $250/ test TBD $150/ thread $150/ test 1 square yard of each layer 1 square yard of each layer 1 square yard of each layer 1 square yard of each layer 1 square yard of each layer 3 whole garments 1 yard of each thread 3 pieces of each hardware Major A Major A Critical Critical Major A Critical Major A Major B 5 of 6
7 SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Programs Date of Issue: Test Paragraph; Pass/Fail Criteria Intertek NFPA Initial Label Durability 7.4; label shall remain legible Before and after 100 cycles of laundering - designated by label TE: SEI adds a 10% surcharge to all testing when invoiced to the participant. Preconditioning Procedure Fee Samples Needed Category of N/C Section 8.7 $ labels Major B 6 of 6
8 29A. SEI General Certification Submittal Form 1307 Dolley Madison Blvd, Suite 3A, McLean, VA Phone: (703) Fax: (703) Issue 1 (1) Submittal Date: SEI Ref. No.: (2) Manufacturer: Legal Status (Inc., LLC, etc.) Street Address: City/State/Zip: Tel: Fax: Web: (3) If model is manufactured at different location(s) than stated in Section (2), list all manufacturing locations: (4) Type of Submittal: (select one) Initial: Product has not previously been tested by SEI.* Annual: Product is currently certified by SEI, is being submitted for annual recertification and no changes have been made to product since last test date. * Standard Product is currently certified by SEI. Standard has been revised and this will also serve as an annual Rev/Annual: recertification.* Class I: Product is currently SEI certified and a change in materials, construction, manufacturing location, etc. has been made to the product. * Class II: Product is currently SEI certified and the proposed change is believed to not affect the product s form, fit or function. (5) Category of Product: (select one) Basic model: Protective device of the same basic design and components, produced by the same manufacturing location. * Variant: Variation of basic model distinguished by a single component (i.e., lens shades, suspension systems, reverse headbands, closures, etc.)* Accessory: Product that is for use with a specific SEI certified model, designed in such a manner to be removable from model without affecting the performance of that model in accordance with the applicable standard. * * Definitions are not all inclusive and do not apply to all SEI product certifications. Refer to the SEI Certification Program Manual for additional detailed information and descriptions. (6) Standard Testing To: Type of Product: Model Number(s): Brand Name: (7) Product Description. Briefly describe below. Attach applicable Components & Materials Description Checklist, and if applicable, test plan matrix/configurations, Bill of Materials, product literature) (8) Test samples shall be: Returned to manufacturer Destroyed by laboratory If fail, return to manufacturer We request certification or continuation of certification of the above model to the referenced standard in accordance with the program established by the Safety Equipment Institute. We certify that the unit(s) of the above model, as submitted for testing and certification, represents the product(s) that will be offered for sale. Samples of this product are being sent to the laboratory. Please complete all nine (9) sections of the SEI certification submittal form and include any necessary attachments. Incomplete submittal paperwork may lead to delays in the processing and performance testing. (9) Authorized Manufacturer Signature: Representative:
9 29B. General Components & Materials Description Checklist Issue 2 Upon completion of this checklist, submit it along with the SEI Certification Submittal Form. Please refer to the Examples of Major Components for suggested product components for which a description is required. Any additional component found in the product shall also be described. 1. SEI Reference Number: 2. Manufacturer (SEI Participant): 3. Model Series/Brand Name (one model per checklist): 4. Standard: 5. Certification Submittal Type (Select one): Initial Annual Change: Class 1: Testing required Class 2: No testing expected to be required For all initial and annual submittals, all sections shall be completed. For changes, complete all sections; mark in BOLD that which has been changed. 6.. List all assembly locations, sub-assembly & final product (use separate sheet if needed): 7. List all Model Numbers Description (i.e. color, size, type)
10 29B. General Components & Materials Description Checklist Issue 2 8. COMPONENT Material Type, Trade Name, Part Number, Grade, Weight, Dimensions, Density, Bead, Color, etc. SOURCE(S) OF SUPPLY (provide complete address/contact info. for all sources) The above information regarding the model is correct to the best of my knowledge. If this model is being submitted for annual testing, I confirm that no known changes that could affect the models ability to meet the performance requirements of the applicable standard have taken place since the last SEI annual test series, which have not been communicated to SEI. Signed By: Company: Name: Date:
11 29C. LABEL, USER INFORMATION, AND TECH DATA PACKAGE CHECKLIST NFPA Flash Fire Garments PARTICPANT NAME: SEI REFERENCE NUMBER: NAME/MODEL/DESCRIPTION: Section Sections 5.1 Product Label Requirements All flame-resistant garments shall have a product label or labels permanently and conspicuously attached to each flame-resistant garment. Participant Checklist SEI Compliant Checklist At least one product label shall be conspicuously located inside each flame-resistant garment when the item is properly assembled with all layers and components in place Multiple label pieces shall be permitted in order to carry all statements and information required to be on the product label The certification organization s label, symbol, or identifying mark shall be permanently attached to the product label or shall be part of the product label All worded portions of the required product label shall be printed in English. Supplementary languages, in addition to English, shall be permitted Symbols and other pictorial graphic representations shall be permitted to be used to supplement worded statements on the product label or labels Graphic representations shall be consistent to clearly communicate the intended message. The following statement shall be printed legibly on the product label in letters at least 2.5 mm (0.10 in.) high: Measurement: THIS GARMENT MEETS THE REQUIREMENTS OF NFPA 2112, STANDARD ON FLAME RESISTANT GARMENTS FOR PROTECTION OF INDUSTRIAL PERSONNEL AGAINST FLAS FIRE, 2012 EDITION. NFPA 2113 REQUIRES UPPER AND LOWER BODY COVERAGE.
12 29C. LABEL, USER INFORMATION, AND TECH DATA PACKAGE CHECKLIST NFPA Flash Fire Garments Section Sections 5.1 Product Label Requirements Participant Checklist SEI Compliant Checklist The following information shall also be printed legibly on the product label in letters at least 1.6 mm (0.063 in.) high. Measurement: (1) Model name, number, or design (2) Manufacturer s name, identification, or designation (3) (4) Manufacturer s address Country of manufacture (5) (6) (7) (8) Manufacturer s garment identification number, lot number, or serial number Size Fiber content DO T REMOVE The product label shall also include the international symbol for Read user instructions before use, as shown in Figure The manufacturer shall be permitted to exclude the international symbol for Read user instruction s before use, as described in , when all of the information specified in is provided on the product label or other labels adjacent to the product label Garments with multiple layers, including an outer layer and removable cold weather insulation material layer, shalll specify the certified wearable configuration on the label.
13 29C. LABEL, USER INFORMATION, AND TECH DATA PACKAGE CHECKLIST NFPA Flash Fire Garments Section Section 5.2 User Information Requirements Participant Checklist (Please include Page Number and/or Paragraph Number) SEI Compliant Checklist The flame-resistant garment manufacturer shall provide information including, but not limited to, warnings, information, and instructions with each flame-resistant garment. A The garment manufacturer should provide, at a minimum, the following instructions and information with each flame-resistant garment. A (1) Pre-use information Safety Considerations A.5.2.1(1a) A.5.2.1(1b) Limitations of use A.5.2.1(1c) Garment marking recommendations and restrictions A.5.2.1(1d) Warranty information A.5.2.1(2) Preparation for use A.5.2.1(2a) Sizing / adjustment A.5.2.1(2b) Recommended storage practices A.5.2.1(3) Inspection frequency and details A.5.2.1(4) Donning and doffing procedures A.5.2.1(5) A.5.2.1(6) Proper use consistent with NFPA 2113, Standard on Selection, Care, Use and Maintenance of Flame-Resistant Garments for Protection of Industrial Personnel Against Flash Fire Maintenance and cleaning A.5.2.1(6a) Cleaning instruction and precautions A.5.2.1(6b) Maintenance criteria and methods of repair where applicable A.5.2.1(7) Retirement and disposal criteria Manufacturers shall provide a sizing chart that indicates the range of key wearer measurements that are accommodated by each specific size of garment offered.
14 INITIAL LABEL REVIEW COMPLY / T COMPLY COMMENTS: 29C. LABEL, USER INFORMATION, AND TECH DATA PACKAGE CHECKLIST NFPA Flash Fire Garments FOR SEI USE ONLY Prepared by & Date: Reviewed by & Date: Measuring Device ID Number: INITIAL USER INFORMATION REVIEW COMPLY / T COMPLY COMMENTS: Prepared by & Date: Reviewed by & Date: SUBSEQUENT REVIEW (LABEL / USER INFORMATION) COMPLY / T COMPLY COMMENTS: Prepared by & Date: Reviewed by & Date: Measuring Device ID Number:
TO MANUFACTURERS OF RESPIRATORY PROTECTIVE DEVICES:
October 2, 2017 TO MANUFACTURERS OF RESPIRATORY PROTECTIVE DEVICES: Initiation of Certification Program for Respiratory Equipment for Tactical and Technical Operations The Safety Equipment Institute (SEI)
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationINDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:
INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationNEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017
NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon
More information[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]
SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationCopyright 2009 Fairchild Books
2/20/12 Copyright 2009 Fairchild Books Beyond Design By Sandra J. Keiser and Myrna B. Garner All rights reserved. No part of this presentation covered by the copyright hereon may be reproduced or used
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More information(R) Aerospace First Article Inspection Requirement FOREWORD
AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationSolid Surface Countertops
USE THIS SECTION FOR COUNTERTOPS. USE SECTION 06 61 16 FOR OTHER SOLID SURFACING APPLICATIONS INCLUDING WALL CLADDING AND MISCELLANEOUS FABRICATIONS. GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.
More information2015 NFPA 70E. SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation
2015 NFPA 70E SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation Introduction Jeffrey A. Pugh, P.E. Pugh Engineering LLC Bachelor of Science Degrees in Electrical Engineering and Computer
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More informationSolid Surface Fabrications
USE THIS SECTION F WALL CLADDING AND MISCELLANEOUS FABRICATIONS OTHER THAN COUNTERTOPS. USE SECTION 06 61 18 F COUNTERTOPS. GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST
More informationSECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More informationCity of Boynton Beach Art in Public Places Artwork by Artist Name Final Artwork Information
Art in Public Places Artwork by Artist Name Final Artwork Information Completed by Owner Building Name Building Permit Number Public Art Name Building Street Address Building Owner s Name Owner s Contact
More informationBAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement
1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationCode Compliance Research Report CCRR-0155
Code Compliance Research Report CCRR-0155 Issue Date: 03-25-2011 Revision Date: 04-18-2018 Renewal Date: 03-26-2019 DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES Section: 06 63 00 Plastic Railings REPORT
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-10 51 13 (May 2011) ------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 51 13 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are
More informationFiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines
Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third
More informationProduct Guide Specification
VT Industries, Inc. April 2014 890 Central Court New Albany, Indiana 47150 Toll Free (800) 626-6271 Fax (712) 368-4111 Website www.vtindustries.com E-mail door_info@vtindustries.com Product Guide Specification
More informationThe surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called
More informationAN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY
The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC
More informationCITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)
CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission
More informationChecklist for Minor Plan Modification
Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationTown of Holly Springs Sign Installation Packet
Town of Holly Springs Sign Installation Packet Department of Planning & Zoning 128 S. Main Street P.O. Box 8 Holly Springs, NC 27540 (919) 557-3908 HSPlanning@hollyspringsnc.us GENERAL INFORMATION: If
More informationChapter 1 General Design Information
Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationChevy Chase Club June 30, 2008 Bowie Gridley Architects
SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationAPPLICATION FOR SITE PLAN REVIEW
APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124
More informationProduct Guide Specification
Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification
More informationArc Flash Analysis and Documentation SOP
Arc Flash Analysis and Documentation SOP I. Purpose.... 2 II. Roles & Responsibilities.... 2 A. Facilities Maintenance (FM).... 2 B. Zone Supervisors/ Shop Foremen... 2 C. PMCS & CPC... 2 III. Procedures...
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationSECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.
SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.
More informationPITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION
PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationDILLARD S TEST PROTOCOL FOR DILR US CANDLE HOLDER AND ACCESSORIES (INDOOR & OUTDOOR) (V14)
Test Date: Reviewed By/Date: SCOPE: Accessories include: Rings, Jar Shades, Jar Toppers, Jar Sleeves & Jar Plates SUPPLEMENTAL PROTOCOLS * Candle DILR-HL-PTCL-09400- US * CA Prop 65 CPSD-AN-PTCL- 06572-US
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation
More informationListing Report: AB Reissue Date: 01/21/16 This report is subject to annual review
Reissue Date: 01/21/16 CSI 06 05 23 PRODUCT: Threaded Fasteners DIVISION: Wood, Plastics, and Composites (06) SECTION: Wood, Plastic, and Composite Fastenings (05 23) Report Holder American Bolt and Screw
More informationB. Division-16 Basic Materials and Methods section apply to work specified in this section.
Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification
More informationSUBMITTAL PROCEDURES
SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective
More informationSECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY
SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationApplication for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID
Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified
More informationSECTION CABLE TRAYS
SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationUnofficial Translation
Notification of the National Broadcasting and Telecommunications Commission on Criteria and Procedures for Granting A Permit to Manufacture, Import, Sell, or Offer for Sale or Install Receiver, Apparatus
More informationProduct Guide Verizon Delaware LLC. Section 31 Delaware LLC Original Sheet 1. Connection With Certain Facilities of Others
Delaware LLC Original Sheet 1 A. GENERAL Part 68 of the Federal Communications Commission's Rules and Regulations applies to customer premises equipment, with specified exceptions. Accordingly, regulations
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationNAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure
NAVSEA STANDARD ITEM ITEM NO: 009-05 DATE: 18 JUL 2014 CATEGORY: I 1. SCOPE: 1.1 Title: Temporary Accesses; provide 2. REFERENCES: 2.1 Standard Items 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More informationDRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS
DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS HOW TO USE EWCAP DRAWING/DRAFTING REQUIREMENTS This document is to be used to check newly-released drawings for use by EWCAP. Confirm compliance by confirming
More informationSPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work
2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,
More informationFAST TRACK WORKSHOP OBJECTIVES
1 FAST TRACKING FAST TRACK WORKSHOP OBJECTIVES TO UNDERSTAND: 1. WHY ARE CRITICAL PATH ( FAST TRACK ) DESIGN SUBMITTAL PACKAGES ALLOWED 2. WHEN IS FAST TRACK ALLOWED 3. WHEN IS THE CONTRACTOR ALLOWED TO
More information1 SERVICE DESCRIPTION
DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:
More informationInstallation Instructions for TruWood Reversible Trim
Installation Instructions for TruWood Reversible Trim Important: Read and understand all pages of the installation instructions before starting the trim application. For TruWood care and maintenance information,
More informationProduct Guide Specification
Extrutech Plastics, Inc. September 2012 5902 West Custer Street Manitowoc, Wisconsin 54220 Toll Free 888-818-0118 Phone 920-684-9650 Fax 920-684-4344 Website www.epiplastics.com E-mail info@epiplastics.com
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationManually verifiable area calculations; and BC Land Surveyor certified area calculations (typically practical only for large development proposals).
City of Vancouver Planning - By-law Administration Bulletins Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 604.873.7060 planning@city.vancouver.bc.ca AREA CALCULATION AND
More informationMIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590
More informationSECTION FASCIA INTERIOR FRAMED SIGNS & DIRECTORIES
Corporate Office: ASI Signage Innovations. 8181 Jetstar Drive Dallas, Texas 76053 (214) 352-9140 voice (214) 352-9741 facsimile (800) 274-7732 www.asisignage.com marketing@asisignage.com GUIDE SPECIFICATION
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationJ O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011
J O I N T I N D U S T R Y S T A N D A R D Requirements for Soldering Pastes J Standard 005A December 2011 Requirements for Soldering Pastes 1.0 SCOPE 1.1 Scope This standard prescribes general requirements
More informationUFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 55 80.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE
More informationAir Monitoring Directive Chapter 9: Reporting
Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program
More informationSupplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011
Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 16 March 2011 Approved David Copeland, Manager Supply Chain Quality Suppliers may view this document via the Internet at:
More informationBovard Studios Inc. Section April 6, 2004 Page 1
April 6, 2004 Page 1 This section includes solid flush and surface articulated wood doors, may have veneer facing, solid or glazed (stained glass) design, factory pre-fit, may be factory finished or site
More informationBEDSPREADS BEDSPREADS
12653 - BEDSPREADS 12653-1 PART ONE: GENERAL 1.1 Description BEDSPREADS 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationSHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog
More informationSECTION WOOD SHINGLES
SECTION 07 31 29.13 WOOD SHINGLES SPEC WRITER NOTES: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. This guide specification does not include requirements
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationSECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL
More informationInstallation Instructions for Standard Lap and Self-Aligning Lap Siding
Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More information(AMMA) American Maritime Modernization Association
(AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT
More informationSATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007
BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission
More information