1 July, 05 Mr. Kenneth Wright, P.E., Lead Engineer HDR Engineering, Inc. Stanwix St., Suite 00 Pittsburgh, PA Re: S.R. 007, Section A03 JV-044 Bridge Replacement S.R. 007 (Blue Ball Road) over Laurel Run Boggs Township, Clearfield County Streamlined Type, Size and Location Submission Dear Mr. Wright: L.R. Kimball is pleased to submit copy of the Streamlined Type, Size and Location (TS&L) Submission for the proposed S.R. 007 (Blue Ball Road) over Laurel Run. The Streamlined TS&L Submission is in accordance with RBRP Modified Design Manual, Part 4, PP Type, Size and Location approval is requested for this structure. Enclosed for your review and approval are the following items: Type, Size and Location Drawings ( sheets) Design Calculations The following information for the proposed structure TS&L is provided in accordance with RBRP Modified Design Manual, Part 4, Section PP.9.3.3: ) Location: S.R. 007, Section A03 Segment 030 Offset 06 Station S.R. 007 (Blue Ball Road) over Laurel Run Boggs Township, Clearfield County ) Recommended Structure: Single cell precast concrete box culvert with a 6-0 x -0 opening and post-tensioned longitudinally. 9-0 (along centerline of culvert) precast end segment with integral wingwalls at the upstream end and an -9 (along centerline of culvert) precast end segment with integral wingwalls at the downstream end. Culvert is at grade with a variable depth bituminous overlay. 3) Span Lengths: One (), 6-0 clear span (6-0 clear span along centerline of roadway) ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION CIVIL CONSTRUCTION SERVICES DATA SYSTEMS ENVIRONMENTAL FACILITIES ENGINEERING GEOSPATIAL NETWORKS PUBLIC SAFETY TRANSPORTATION Frick Building Suite 437 Grant Street Pittsburgh, PA 59 Phone: Fax:

2 JV044 Bridge Replacement S.R. 007, Section A03 Boggs Township, Clearfield County Page 4) Roadway Width: Out-to-out: 3-6 ½, includes two -9 ¼ wide structure mounted guiderail barriers. Barrel extends 6 past back face of structure mounted guiderail. Curb-to-curb: -0, includes two -0 lanes and two -0 shoulders. 5) Skew Angles: 90 00' 00" 6) Vertical and Horizontal Clearance: Minimum Required Effective Opening Height: 3-0 (BD-63M) Existing Opening Height: Not Available Provided Effective Opening Height Under Bridge: 7-0 7) Type of Substructure Recommended: N/A ) Deck Joints: None 9) Bearing Type and Location: N/A 0) Deck and Off Structure Drainage: On Structure: None required (natural) Off Structure: None required (natural) ) Design Methodology for Superstructure: Load and Resistance Factor Design in accordance with AASHTO LRFD Bridge Design Specifications, 5th Edition, 00, as Supplemented by RBRP Modified Design Manual Part 4. Live load distribution is based on AASHTO live load distribution methods as modified by RBRP Modified Design Manual Part 4. Additional information from QA Form D-5:. Project Information S-Number: S Design ADT: 466 Design ADTT: 59 Design Year: 037. Culvert Type and Geometry Fill Height: 0.4 Min. Max Length: 3-6 ½ (along centerline of culvert) Fish Passage: Yes

3 JV044 Bridge Replacement S.R. 007, Section A03 Boggs Township, Clearfield County Page 3 3. General Backfill Unit Density: 0 pcf Railroad Live Load: No ph Foundation Material: N/A ph Water: 5. Method of Corrosion Protection: Epoxy Coated Rebar and Type II Cement Anticipated Removal of Unsuitable Material: Based on the boring, unsuitable material is not anticipated at bottom of excavation. However, bottom of excavation shall be inspected for any unforeseen unsuitable material. If unsuitable material is encountered, overexcavate and backfill with No. coarse aggregate. Anticipated Settlement: <.0 Inlet End Wall Provided: Precast end segment with flared wingwalls and apron Inlet Scour Protection Provided: Alternative cutoff wall with grouted rock. R-6 min, 5-0 beyond wingwalls Outlet End Wall Provided: Precast end segment with flared wingwalls and apron Outlet Scour Protection Provided: Alternative cutoff wall with grouted rock. R-6 min, 5-0 beyond wingwalls 4. Design Requirements Design Life: Greater than 00 years Box Culvert Type: Precast Why C.I.P: N/A Computer Program Used: BXLRFD Method of Abrasion Protection: None If you have any questions regarding this submission, please contact me, at (4) Thank you. Sincerely yours, L.R. Kimball Geoffrey S. Holmes, P.E. Chief Bridge Engineer Enclosures REGISTERED PROFESSIONAL GEOFFREY STEPHEN HOLMES ENGINEER PE-07335

4 D-900 CADD (0-90) REVISED (05-97) PRECAST END SECTION (TYP.) BOX CULVERT 3'-0" GROUTED CUTOFF WALL (TYP.) R-6 ROCK LINING (TYP.) POTENTIAL RELOCATION POLE 3-3 (BY OTHERS) '-3 " 3'-6 " OUT-TO-OUT '-0" CURB-TO-CURB '-3 " '-0" MIN. (TYP.) 3-3 LEGAL RIGHT-OF-WAY HEADWALL (TYP.) '-0" SHLDR. '-0" LANE.0% P.G. '-0" LANE.0% '-0" SHLDR. USER:STIFFK0 PLOT DRIVER:PennDOT_PDF_Mono.pltcfg PLOT DATE: 7/3/05 :0:4 AM PATH: MODEL:Default FILE: RBRP-JV044-GPEL0culvertSUB.dgn POTENTIAL RELOCATION GAS LINE (BY OTHERS) S.R. 007 CONSTR. STA. AHEAD BIT. P.G. DATUM 505 WING B B STRUCTURE MOUNTED GUIDE RAIL (TYP.) EXISTING GROUND LINE FINISHED GROUND LINE (TYP.) R-6 ROCK LINING BEGIN STRUCTURE STA EL WING A TRUNK LAUREL RUN FLOW 50 MULTI- 4" PRECAST BOX CULVERT 7 90 STRUCTURE STA '-0" RISE BEDDING MATERIAL 3'-6 " OUT TO OUT 6" '-0" CURB TO CURB 6" PLAN '-0" SHLDR. '-0" SHLDR. ' 0 ' 4' 6' STRUCTURE MOUNTED GUIDE RAIL 7'-0" EFF REGISTERED PROFESSIONAL GEOFFREY STEPHEN HOLMES ENGINEER PE '-0" CLEAR 50 '-0" LANE '-0" LANE STREAMBED ' 0 ' 4' 6' PREPARED BY: L. R. KIMBALL VPT FRICK BUILDING - SUITE 50 WING C 55 " 437 GRANT STREET, PITTSBURGH, PA 59 4" 55 END STRUCTURE STA EL PC STA 7+3. EXISTING STRUCTURE TO BE REMOVED WING D BAFFLE BOTTOM OF CULVERT ELEVATION INLET EL OUTLET EL TEMPORARY RELOCATION OVERHEAD WIRE (BY OTHERS) HEADWALL PERMANENT RELOCATION POLE (BY OTHERS) GUIDERAIL (TYP.) (ROADWAY ITEM) Q00 EL = 5.5 Q5 EL = 5.3 PRECAST END SECTION (TYP.) HDR ENGINEERING, INC. STANWIX STREET SUITE 00 PITTSBURGH, PA 5 55 PA STRUCTURE MOUNTED GUIDE RAIL BARRIER ANCHOR SYSTEMS B- POTENTIAL RELOCATION WATER LINE (BY OTHERS) LEGAL RIGHT-OF-WAY WALL CONSTR & EXP JOINT DETAILS REINFORCEMENT BAR FABRICATION DETAILS BRIDGE DRAINAGE BOX INVERT EL PRECAST END SECTION (TYP.) TYPICAL WATERPROOFING AND EXPANSION DETAILS 3" x 3" CHAMFER '-0" DEPRESSION BC-706M BC-735M BC-736M BC-7M 7'-0" EFF * * MIN VERTICAL CLEARANCE REQUIRED = 3'-0" MIN VERTICAL CLEARANCE PROVIDED = 7'-0" B- B- BORING TABLE BORING STATION OFFSET HYDRAULIC DATA RETURN PERIOD - 5 YR FLOOD RETURN PERIOD - 00 YR FLOOD LEGEND: LAUREL RUN WATER SURFACE EL = 5.3 Q = 667 CFS V = 9.00 FPS WATER SURFACE EL = 5.5 Q = 955 CFS V = 9.5 FPS DRAINAGE AREA 4.74 SQ. MILES WATERWAY OPENING SQ. FEET '-0" SECTION ALONG OF CULVERT 6.5 LT. 6.5 LT. FLOOD OF RECORD - UNKNOWN WATER SURFACE ELEVATION (FLOOD)-UNKNOWN SOIL BORING INDICATES TRAFFIC DIRECTION EXISTING CONTOURS PROPOSED CONTOURS -6-3 BC-734M BC-75M % ' 0 ' 4' 6' Mark Description By Chk'd. App'd. Date COMMONWEALTH OF PENNSYLVANIA RECOMMENDED FISH BAFFLE BEDDING MATERIAL ('-0" MINIMUM) HORIZONTAL CURVE DATA S.R. 007 CONSTR. PI STA ` = 6 4'00" LT. T = 35.97' L = 67.00' R = 57.96' E = 5.9' VERTICAL CURVE DATA PVI STA EL= 56.3' Vc = 00' G = -.7% G = +0.50% REVISIONS JV 044 BRIDGE KEY 69 BMS MPMS 357 DEPARTMENT OF TRANSPORTATION CLEARFIELD COUNTY S.R. 007 ALTERNATE CUTOFF WALL WITH GROUTED ROCK (TYP.) SECTION A03 SEG. 030 OFF. 06 S.R. 007 STA OVER LAUREL RUN BOX INVERT EL '-0" x '-0" PRECAST CONCRETE BOX CULVERT TYPE, SIZE AND LOCATION Q00 EL = 5.5 Q5 EL = 5.3 VERTICAL CURVE DATA PVI STA EL= 57.46' Vc = 0' G = +0.50% G = +.53% SHEET OF MECHANICAL CONNECTION DETAILS BC-79M -6-3 SIGNATURE & DATE DESCRIPTION DWG. NO. APP. DATE DES: JMW DWG: KAS CKD: GSH S- SUPPLEMENTAL DRAWINGS 34937

5 D-900 CADD (0-90) REVISED (05-97) GENERAL NOTES FOUNDATION NOTES PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH SPECIFICATIONS, RBRP MODIFIED PUB NO 40, AND THE CONTRACT SPECIAL PROVISIONS. DESIGN SPECIFICATIONS: AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 00, AND AS SUPPLEMENTED BY RBRP MODIFIED DM4. LIVE LOAD DISTRIBUTION TO THE CULVERT IS BASED UPON RBRP MODIFIED DM-4 DISTRIBUTION FACTOR METHOD. DESIGN IN ACCORDANCE WITH THE LRFD METHOD. DEAD LOAD INCLUDES AN ADDITIONAL 30 LB/SF FOR FUTURE WEARING SURFACE. DESIGN LIVE LOADS: PHL-93 OR P- (04 KIP PERMIT LOAD) USE A CONCRETE STRENGTH (f'c) OF 5000 PSI MINIMUM AT DAYS FOR PRECAST BOX AND PRECAST WING SECTIONS. REINFORCEMENT BAR Fy = PSI USE CLASS A CEMENT CONCRETE FOR BAFFLES. USE CLASS AA CEMENT CONCRETE FOR CURB AND HEADWALL. USE TYPE II SULFATE RESISTANT CEMENT AND WATER/CEMENT RATIO OF 0.45 FOR ALL PRECAST AND CAST-IN-PLACE ELEMENTS. COORDINATE, LOCATE AND CONDUCT ALL WORK RELATED TO PUBLIC AND PRIVATE UTILITIES IN ACCORDANCE WITH RBRP MODIFIED PUB NO 40, SECTIONS AND 07.. FOR CAST-IN-PLACE CONCRETE, PROVIDE GRADE 60 REINFORCING STEEL THAT MEETS THE REQUIREMENTS OF ASTM A 65/A 65M, A 996/A 996M OR A 706/A 706M. DO NOT WELD GRADE 60 REINFORCING STEEL BARS UNLESS SPECIFIED. DO NOT USE RAIL STEEL A 996/A 996M REINFORCEMENT BARS IN CURBS, BAFFLES OR CUT-OFF WALLS, OR WHERE BENDING OR WELDING OF THE REINFORCEMENT BARS IS INDICATED. PRIOR TO FOUNDATION CONSTRUCTION, THE DEVELOPMENT ENTITY REPRESENTATIVE WILL EVALUATE THE BEARING MATERIAL. REPLACE ALL SOFT OR OTHERWISE INCOMPETENT MATERIAL WITH EITHER NO. A OR NO. COARSE AGGREGATE, " MINIMUM THICKNESS. THE DEVELOPMENT ENTITY REPRESENTATIVE MAY CHANGE THE FOOTING ELEVATION OR ANY DIMENSIONS NECESSARY TO PROVIDE A PROPER FOUNDATION. SOIL IS CORROSIVE. USE TYPE II CEMENT WITH A MAXIMUM WATER/CEMENT RATIO OF 0.45 AND EPOXY COATED REINFORCING STEEL IN ALL SUBSTRUCTURES. DO NOT USE ADDITIVES CONTAINING CHLORIDES IN THE SUBSTRUCTURE CONCRETE. DEWATER EXCAVATIONS EXTENDING BELOW GROUNDWATER LEVEL. PLACE ALL CONCRETE ON A FOUNDATION SURFACE FREE OF DEBRIS, LOOSE MATERIAL, AND SURFACE WATER. PROVIDE SUFFICIENT DRAINAGE AND PUMPING AS NECESSARY. REMOVE THE EXISTING FOUNDATION ELEMENTS IN THEIR ENTIRETY IN THE LOCATIONS WHERE THE EXISTING FOUNDATION ELEMENTS INTERFERE WITH THE PROPOSED STRUCTURE AND TO A MINIMUM OF TWO () FEET BELOW BEDDING. BACKFILL WITH EITHER NO. A OR NO. COARSE AGGREGATE. DESIGN TEMPORARY EXCAVATIONS IN ACCORDANCE WITH THE SOIL AND ROCK PARAMETERS PROVIDED IN THE STRUCTURE FOUNDATION REPORT, INCLUDING ISSUED ADDENDUMS TO THE REPORT, AND IN ACCORDANCE WITH CURRENT OSHA REQUIREMENTS (9 CFR PART , SUBPART P). IF THE CONTRACTOR ELECTS TO NOT USE THE SOIL AND ROCK PARAMETERS PROVIDED IN THE STRUCTURE FOUNDATION REPORT FOR DESIGN OF THE TEMPORARY EXCAVATION SUPPORT SYSTEM, ASSUME TYPE C SOILS (UNLESS SOIL TYPE IS CONFIRMED BY DEVELOPMENT ENTITY REPRESENTATIVE). DO NOT EXCEED A FT. DIFFERENCE IN FILL ELEVATION ON THE SIDES OF THE BOX CULVERT DURING PLACEMENT OF A BACKFILL. DO NOT ALLOW THE WHEELS OF ROLLERS TO COME CLOSER THAN FT. TO THE FACES OF THE STRUCTURE DURING COMPACTION OF THE BACKFILL. PROVIDE MINIMUM LAP AND EMBEDMENT LENGTH OF REINFORCEMENT IN ACCORDANCE WITH STANDARD DRAWING BC-736M, UNLESS NOTED OTHERWISE. USER:STIFFK0 PLOT DRIVER:PennDOT_PDF_Mono.pltcfg PLOT DATE: 7//05 5:50:35 AM PATH: MODEL:Default FILE: RBRP-JV044-GNT0culvert.dgn PROVIDE " CONCRETE COVER ON REINFORCEMENT BARS EXCEPT AS NOTED. CHAMFER EXPOSED CONCRETE EDGES "X" EXCEPT AS NOTED. USE OF CONCRETE ADDITIVES CONTAINING CHLORIDES IS PROHIBITED. USE EPOXY-COATED REINFORCEMENT BARS IN ALL CAST-IN-PLACE CONCRETE AND PRECAST CONCRETE. REFER TO THE WATERWAY PERMIT FOR TIME PERIODS IN WHICH WORK IS PROHIBITED. VERIFY THAT THE EXISTING STRUCTURAL MEMBERS DO NOT CONTAIN LEAD OR OTHER TOXIC MATERIAL. NOTIFY THE REGIONAL HEADQUARTERS OF THE PA FISH AND BOAT COMMISSION PRIOR TO CONSTRUCTION AND COOPERATE WITH THE FISH COMMISSION DURING CONSTRUCTION. LOAD RATING SUMMARY (ADTT = 59) PRECAST BOX CULVERT (W/FWS) H0 HS0 ML-0 TK-57 PHL-93 P- ELEMENT TOP SLAB TOP SLAB TOP SLAB TOP SLAB TOP SLAB --- INVENTORY LOCATION 0.L 0.L 0.9L 0.9L 0.L --- RATING (IR) LIMIT STATE STR I STR I STR I STR I STR I --- RATING FACTOR.97 (V).55 (V).7 (V).36 (V). (V) --- ULTIMATE CAPACITY ELEMENT TOP SLAB TOP SLAB TOP SLAB TOP SLAB TOP SLAB TOP SLAB OPERATING LOCATION 0.L 0.L 0.9L 0.9L 0.L 0.L RATING (OR) LIMIT STATE STR-II STR-II STR-II STR-II STR-IA STR-II RATING FACTOR.55 (V).0 (V).65 (V).77 (V).9 (V). (V) ULTIMATE CAPACITY RATING NOTES:. RATINGS IN THIS TABLE ARE BASED ON LOAD AND RESISTANCE FACTOR DESIGN (LRFD).. THE ULTIMATE CAPACITY RELATES TO THE GOVERNING RATING. SHEAR RATINGS PROVIDE CAPACITY IN KIPS. MOMENT RATINGS PROVIDE CAPACITY IN KIP-FEET. 3. V INDICATES RATING CONTROLLED BY SHEAR. M INDICATES RATING CONTROLLED BY MOMENT. Mark Description By Chk'd. App'd. Date REVISIONS JV 044 BRIDGE KEY 69 BMS MPMS 357 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION CLEARFIELD COUNTY S.R. 007 SECTION A03 SEG. 030 OFF. 06 S.R. 007 STA OVER LAUREL RUN 6'-0" x '-0" PRECAST CONCRETE BOX CULVERT REGISTERED PROFESSIONAL TYPE, SIZE AND LOCATION GEOFFREY STEPHEN HOLMES ENGINEER RECOMMENDED SHEET OF PE DES: JMW DWG: KAS CKD: GSH S

6 PRECAST BOX CULVERT DESIGN CALCULATIONS & ANALYSIS RATINGS CLEAR SPAN x CLEAR HEIGHT x FILL 6.000' x.000' x 0.47' Designer: JMW Date: 6/9/05 Checker: JHM Date: 6/9/05

7 TABLE OF CONTENTS DESCRIPTION ASSUMPTIONS PAGE BXLRFD DATA SUMMARY BXLRFD INPUT SUMMARY BXLRFD BARRIER DEAD LOAD STEEL REINFORCEMENT LAP LENGTH CALCULATIONS BXLRFD RATING SUMMARY BXLRFD OUTPUT FILE

8 L.R. Kimball Computation Project: PENNDOT P3 Computed: JMW Date: 6/9/05 Subject: PRECAST BOX CULVERT DESIGN - JV-044 Checked: JHM Date: 6/9/05 Task: PRECAST CULVERT DESIGN ASSUMPTIONS Sheet: Of: 6 ASSUMPTIONS Single cell precast box culvert. See Sheet /6 for details of precast culvert and roadway geometry. No shear reinforcement. Vertical wall barrier is used for all analyses. " x " Haunches. Material properties per BD-63M (Sheet 4 of 3) and per these calculations (Sheet of 6). Concrete clear cover per BD-63M, Sheet 4 of 3: Top bars in top slab:.5" clear cover (all cases considered). Top bars in bottom slab:.0" clear cover. All other bars:.5" clear cover. Additional 30 PSF included for future wearing surface per PennDOT DM-4, Section... and BD-63M, Sheet 4 of 3, Note #6. Refer to "BXLRFD Input" summary for additional assumptions.

9 L.R. Kimball Computation Project: PENNDOT P3 Computed: JMW Date: 6/9/05 Subject: PRECAST BOX CULVERT DESIGN - JV-044 Checked: JHM Date: 6/9/05 Task: BXLRFD DATA SUMMARY Sheet: Of: 6 6' x ' Opening f'c (ksi) Clear Span (ft) Clear Height (ft) ROADWAY DATA STRUCTURE OUT-TO-OUT DISTANCE = 3.54 FT CURB-TO-CURB DISTANCE =.000 FT PA TYPE 0M BARRIER WIDTH =.0 IN NUMBER OF SEGMENTS = CONTINUITY SLAB THICKNESS = IN UPSTREAM INVERT EL = -- DOWNSTREAM INVERT EL = -- SLOPE OF CULVERT FLOOR = -- FT/FT MINIMUM PAVEMENT EL = -- MIN PAVE EL HORIZ OFFSET FROM U.S. INVERT = -- FT MAXIMUM PAVEMENT EL = -- MAX PAVE EL HORIZ OFFSET FROM U.S. INVERT = -- FT MAXIMUM PAVEMENT EL AT CURB = -- MINIMUM PAVEMENT THICKNESS = 0.00 IN Total depth of asphalt above the top of the continuity slab. MAXIMUM PAVEMENT THICKNESS = 0.00 IN Max. pavement thickness = M pavement thickness = Constant pavement thickness TOTAL THEORETICAL FILL = 5.00 IN Theoretical total fill (continuity slab thickness + pavement thickness) Segment Width (ft) Top Slab Thick () Top Slab - Bot. Steel Area (T3) (in /ft) Bot. Slab Thick () Top Steel Area (B3) (in /ft) - Wall Thickness (in) Wall Left Steel Area (in /ft) Walls Wall Right Steel (W) Area (in /ft) Wall Left Steel (W) Area (in /ft) Wall Right Steel Area (in /ft) Horizontal Dimension (in) " 5" 5" 5" 5" 5" Top Steel Area Bottom Steel Area T Reinf =.96 in /ft B Reinf =.96 in /ft Left T Reinf = 5" B Reinf = 5" T Range = 5.0 ft B Rang = 5.0 ft T Reinf = in /ft B Reinf = in /ft Middle T Reinf = 5" B Reinf = 5" T Range = 0.0 ft B Rang = 0.0 ft T Reinf 3 =.96 in /ft B Reinf 3 =.96 in /ft Right T Reinf 3 = 5" B Reinf 3 = 5" T Range 3 = 6.00 ft B Rang 3 = 6.00 ft Note: Transverse reinforcement for slabs and walls are defined in the "Rebar Checks" sheet. STRUCTURE DATA Bottom Slab Haunches Vertical Dimension (in) BXLRFD Version:.6.0.0

10 L.R. Kimball Computation Project: PENNDOT P3 Computed: JMW Date: 6/9/05 Subject: PRECAST BOX CULVERT DESIGN - JV-044 Checked: JHM Date: 6/9/05 Task: BXLRFD INPUT SUMMARY Sheet: 3 Of: 6 FILE: C-STR_P x.000x0.47.dat COMMAND PARAMETER INPUT UNITS CODE / COMMENTS TTL Line Line Line 3 See right See right See right Standard Precast Concrete Box Culvert Design Culvert Size: 6.000' x.000' x 0.47' (Clear Span x Clear Height x Fill) Computed: JMW (Date: 06/9/05); Checked: JHM (Date:06/9/05) CTL System of Units Structure Type Type of Run Precast or Cast-in-place Bottom Slab Top Slab Support Frame Support AR P Y Default: US Customary Units Box culvert has cell Analyze, spec.check, and rate members. Geometry and reinforcement are known. Precast structure Bottom slab is present Leave blank for precast culverts. Leave Blank for culverts with bottom slabs. MAT f'c for All Members f'c for Top Slab Reinforcement Grade Reinforcement Type Alpha Rebar Size or Wire Diam. Epoxy Coated Bars Concrete Unit Weight for DL Concrete Unit Weight for E B ksi ksi ksi degrees # 50.0 lb/ft lb/ft 3 Default = 5.0 ksi (in accordance with BD-63M, Sheet 4 of 3). Leave blank for precast culverts. Default = 60 ksi (in accordance with BD-63M, Sht. 4 of 3). Reinforcement bars used. Leave blank for designs that exclude shear reinf. (per D-0 preferences) Leave blank for analysis runs. N/A (Not used for precast culverts). See AASHTO LRFD Table & C3.5.. For f'c < 5.0 ksi, Unit Weight = k/ft 3 = 0.50 k/ft 3 = 50 lb/ft 3 For 5.0 < f'c < 5.0 ksi, Unit Weight = (0.00)(f'c) k/ft 3 = 45 + (.0)(f'c) lb/ft 3. See AASHTO LRFD Table For f'c < 5.0 ksi, Unit Weight = 0.45 k/ft 3 = 45 lb/ft 3 For 5.0 < f'c < 5.0 ksi, Unit Weight = (0.00)(f'c) k/ft 3 = 40 + (.0)(f'c) lb/ft 3. DIM Clear Span 6.00 ft Clear Height.00 ft Top Slab Thickness 5.00 Bottom Slab Thickness Left Wall Thickness Right Wall Thickness Interior Wall Thickness Fill Grade Top Slab Grade U-channel Left Wall Height U-channel Right Wall Height % % ft ft Based on hydraulic requirements. Based on hydraulic requirements. As required by design. Minimum thickness for precast culverts (S > ft): M = in for S > ' (per BXLRFD Users's Manual, Table 5.-). M = 3 in for S > ' (per BD-63M, Sheet 4 of 3). Controlling M = 3 in As required by design. Minimum thickness for precast culverts (S > ft): M =.5 in for S > ' (per BXLRFD Users's Manual, Table 5.-). M = 3 in for S > ' (per BD-63M, Sheet 4 of 3). Controlling M = 3 in As required by design. Minimum thickness for precast culverts (S > ft): M = in for S > ' (per BXLRFD Users's Manual, Table 5.-). M = 3 in for S > ' (per BD-63M, Sheet 4 of 3). Controlling M = 3 in As required by design. Minimum thickness for precast culverts (S > ft): M = in for S > ' (per BXLRFD Users's Manual, Table 5.-). M = 3 in for S > ' (per BD-63M, Sheet 4 of 3). Controlling M = 3 in Leave blank for a one cell culvert. Leave blank for a culverts at grade. Default = 0.0%. Top slab thickness does not vary. Leave blank for a box culvert. Leave blank for a box culvert. LDC Earth Weight/Density lb/ft 3 Height of Fill 0.47 ft Number of Lanes Live Load Surcharge 3.0 ft Live Load Overlay Weight/Density A 0.00 lb/ft 3 Overlay Thickness 0.00 in Future Wearing Surface lb/ft Max LL Distr Length ft Segment Length 3.66 ft Mult Presence Reduction PA Traffic Factor Fatigue Dynamic Load Allow Ductility Factor Redundancy Factor Importance Factor P- Max Dynamic Load Allow Live Load Override Min Equiv. Fluid Press Max Equiv Fluid Press Barrier Dead Load Approach Slab DL Left Wall Approach Slab LL Left Wall Approach Slab DL Right Wall Approach Slab LL Right Wall Ratings without FWS Backfill Type lb/ft 3 lb/ft kips/ft Wt. avg. of 5" continuity slab (50 pcf) & 0" constant overlay thickness (40 pcf). Theoretical fill = continuity slab thickness + minimum pavement thickness ' curb-to-curb / ' per lane =.33 lanes --> use lanes Per DM-4, Section , 3.0 for box culverts PHL-93,P-, ML-0, TK57, HS0 and H0 Set = 0.00 since fill is defined in Parameters # & # Set = 0.00 since fill is defined in Parameters # & # PennDOT DM-4, Section...; BD-63M, Note #6. Curb-to-curb distance. Refer to BXLRFD User's Manual - Fig Segments at 3.66' = 3.54' Default =.0 (only value allowed by BXLRFD) This parameter is no longer used and should be left blank. This parameter is no longer used and should be left blank. Default =.0 (DM-4, Section.3.3) Default =.0 (DM-4, Section.3.4) Default =.0 (DM-4, Section.3.5) Default =. (DM-4, Section 3.6..) Default = 0 (the program determines when live load is applicable) Default = 45 lb/ft 3 (the m specified in DM-4 Table ) Default = 70 lb/ft 3 (the max. specified in DM-4 Table ) See separate calcs: 0.3 klf per PennDOT BD-67M, Sht. of 7 + extra barrier No approach slab per D-0. No approach slab per D-0. No approach slab per D-0. No approach slab per D-0. Default = N Default = O (Conservative assumption for LL through fill, BXLRFD Manual )

11 L.R. Kimball Computation Project: PENNDOT P3 Computed: JMW Date: 6/9/05 Subject: PRECAST BOX CULVERT DESIGN - JV-044 Checked: JHM Date: 6/9/05 Task: BXLRFD INPUT SUMMARY Sheet: 4 Of: 6 FILE: C-STR_P x.000x0.47.dat COMMAND PARAMETER INPUT UNITS CODE / COMMENTS HCH Top Left x.00 Minimum allowed per PennDOT District 0-0 = " Minimum allowed per DM-4, Section.. = 6". Use " as the standard for all culverts. Top Left y.00 Minimum allowed per PennDOT District 0-0 = " Minimum allowed per DM-4, Section.. = 6". Use " as the standard for all culverts. Top Right x Top Right y Bottom Left x Bottom Left y Bottom Right x Bottom Right y Top Interior x Top Interior y Bottom Interior x Bottom Interior y Leave Blank. Uses "Top Left x" value by default. Leave Blank. Uses "Top Left y" value by default. Leave Blank. Uses "Top Left x" value by default. Leave Blank. Uses "Top Left y" value by default. Leave Blank. Uses "Top Left x" value by default. Leave Blank. Uses "Top Left y" value by default. Leave blank. No interior wall. Leave blank. No interior wall. Leave blank. No interior wall. Leave blank. No interior wall. CVR Top Slab Top Cover.50 Top Slab Bottom Cover.50 Bottom Slab Top Cover.00 Bottom Slab Bot Cover.50 All Wall Covers Footing Top Cover Footing Bottom Cover.50 TSR Slab Number T Range Distance 5.00 ft Reinforcement Size Spacing 5 Range Distance Reinforcement Size Spacing Range Distance 3 Reinforcement Size 3 Spacing TSR Slab Number B Range Distance 6 ft Reinforcement Size Spacing 5 BSR Slab Number T Range Distance 6 ft Reinforcement Size Spacing 5 BSR Slab Number B Range Distance 5.00 ft Reinforcement Size Spacing 5 Range Distance 0.00 ft Reinforcement Size Spacing 5 5 Range Distance ft Reinforcement Size 3 Spacing 3 5 WLR Wall Number L Range Distance.000 ft Reinforcement Size Spacing 5 WLR Wall Number R Range Distance.000 ft Reinforcement Size Spacing 5 5 WLR Wall Number L Range Distance.000 ft Reinforcement Size Spacing 5 5 Default:.50 (See BD-63M, Sheet 4 of 3 or BXLRFD User's Manual Table 5.5-) Default:.50 (See BD-63M, Sheet 4 of 3 or BXLRFD User's Manual Table 5.5-) Default:.00 (See BD-63M, Sheet 4 of 3 or BXLRFD User's Manual Table 5.5-) Default:.50 (See BD-63M, Sheet 4 of 3 or BXLRFD User's Manual Table 5.5-) Default:.50 (See BD-63M, Sheet 4 of 3 or BXLRFD User's Manual Table 5.5-) Leave blank (no footing). Leave blank (no footing). Single cell culvert. Top slab, top reinforcment. Over full width. Range Reinforcement: 5" Range Reinforcement: 5" Range 3 Reinforcement: 5" Single cell culvert. Top slab, bottom reinforcment. Over full width. Reinforcement: 5" Single cell culvert. Bottom slab, top reinforcment. Over full width. Reinforcement: 5" Single cell culvert. Bottom slab, bottom reinforcment. Over full width. Range Reinforcement: 5" Range Reinforcement: 5" Range 3 Reinforcement: 5" Left wall. Left face of wall. Over full height. Should equal clear height in "DIM" parameters. Reinforcement: 5" Left wall. Right face of wall. Over full height. Should equal clear height in "DIM" parameters. Reinforcement: 5" Right wall. Left face of wall. Over full height. Should equal clear height in "DIM" parameters. Reinforcement: 5"

12 L.R. Kimball Computation Project: PENNDOT P3 Computed: JMW Date: 6/9/05 Subject: PRECAST BOX CULVERT DESIGN - JV-044 Checked: JHM Date: 6/9/05 Task: BXLRFD INPUT SUMMARY Sheet: 5 Of: 6 FILE: C-STR_P x.000x0.47.dat COMMAND PARAMETER INPUT UNITS CODE / COMMENTS WLR Wall Number R Right wall. Right face of wall. Range Distance.000 ft Over full height. Should equal clear height in "DIM" parameters. Reinforcement Size Spacing 5 Reinforcement: 5" OIN Input File Echo Input Commands Input Summary Print echo of input file. Print the input commands. Leave Blank. Default:. See BXLRFD User's Manual Table 6.6- OUR Section Properties Live Load Rating Rating Summary DL Effects and Capacities Flexural Reinforcement Shear Design Foundation Pressure Quantities Serviceability Table Serviceability Summary Foundation Pressure Summary Leave blank. Default: 0 (BXLRFD Table 6.7-). Do not print section properties Use "" to print capacities in the output file Leave blank. Default: (BXLRFD Table 6.7-). Print Rating Summary Leave blank. Default: (BXLRFD Table 6.7-). Print DL effects and capacities Leave blank. Default: N/A for Analysis Run (BXLRFD Table 6.7-). Leave blank. Default: N/A for Analysis Run (BXLRFD Table 6.7-). Leave blank. Default: 0 (BXLRFD Table 6.7-). Do not print foundation pressure Leave blank. Default: (BXLRFD Table 6.7-). Print Quantities Print serviceability table Leave blank. Default: (BXLRFD Table 6.7-). Print serviceability summary table. Leave blank. Default: (BXLRFD Table 6.7-). Print foundation pressure summary table INPUT FILE (Analysis) TTL Standard Precast Concrete Box Culvert Design TTL Culvert Size: 6.000' x.000' x 0.47' (Clear Span x Clear Height x Fill) TTL Computed: JMW (Date: 06/9/05); Checked: JHM (Date:06/9/05) CTL,,AR,P,Y,, MAT,,,B,,,,50,45 DIM 6,,5,3.5,7,7,,,,, LDC ,0.47,,3,A,0,0,30,,3.66,,,,,,,,,,,0.593,,,,,, HCH,,,,,,,,,,, CVR.5,.5,,.5,.5,, TSR,T,5.,,5,0.,5,5,6,,5 TSR,B,6,,5 BSR,T,6,,5 BSR,B,5.,,5,0.,5,5,6,,5 WLR,L,,,5 WLR,R,,5,5 WLR,L,,5,5 WLR,R,,,5 OIN,, OUR,,,,,,,,,,

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 1085.2(k) SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 DESCRIPTION This work is the manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

ABC and Innovative Bridge Construction for Minnesota Local Roads

ABC and Innovative Bridge Construction for Minnesota Local Roads ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918

More information

Construction Tolerances - The following tolerances apply to cast-in-place structures:

Construction Tolerances - The following tolerances apply to cast-in-place structures: 00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard

More information

SECTION G ESTIMATE OF QUANTITIES

SECTION G ESTIMATE OF QUANTITIES PROJECT STATE OF SOUTH DAKOTA NH 2115(45)87 SHEET G2 TOTAL SHEETS G27 SECTION G ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 560E0068 7'x3' Precast Concrete

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

TYPE 4-C TYPE 6 TYPE 7 TYPE 8

TYPE 4-C TYPE 6 TYPE 7 TYPE 8 ````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown

More information

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846 PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y Proposal P.O. Box 846 Baker, MT 59313 P R E C A S T R E I N F O R C E D C O N C R E T E B O X C U L V E R T F O R W E S T M O

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees General 1. When detailing substructures, it is preferable not to use series bars unless necessary. The first

More information

Foundation Specifications for 7.6-Meter Modular Earth Station Antennas

Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO. FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following. SAMPLING AND TESTING. The Sampling and Testing requirements contained in -03 shall apply. MARKING. The Marking requirements contained in -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production

More information

24" B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3 " X501 Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOT

24 B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3  X501 Y301 (Typ.)  A PLAN (reinforced casting option shown) A  dia. Hinge Bar (Typ.) NOT B B Joint Joint See MARKINGS Note PCB-RXX-350-TL3 " Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOTES GENERAL: This barrier may be manufactured with reinforcing steel

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

LETTING : CALL : 029 COUNTIES : GOODHUE

LETTING : CALL : 029 COUNTIES : GOODHUE PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO

More information

AASHTO/NSBA Steel Bridge Collaboration G Design Drawing Presentation Guidelines. AASHTO/NSBA Steel Bridge Collaboration

AASHTO/NSBA Steel Bridge Collaboration G Design Drawing Presentation Guidelines. AASHTO/NSBA Steel Bridge Collaboration AASHTO/NSBA Steel Bridge Collaboration G 1.2-2003 Design Drawing Presentation Guidelines AASHTO/NSBA Steel Bridge Collaboration Preface This document is a standard developed by the AASHTO/NSBA Steel Bridge

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials. SECTION 02082 PUBLIC UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Modular precast concrete manholes with tongue-and-groove joints, transition to cover frame, covers,

More information

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved: To: New York State Department of Transportation ENGINEERING INSTRUCTION Title: PRECAST CONCRETE PAVEMENT SLAB SYSTEMS STANDARD SPECIFICATION Distribution: Manufacturers (18) Local Govt. (31) Agencies (32)

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone Precast Bridge Built in only Eight Days by Peter E. Stamnas and Mark D. Whittemore. New Hampshire Department of Transportation Minimizing construction-related traffic delays and improving workzone safety

More information

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

Bridge Design and Drafting Manual Oregon Department of Transportation

Bridge Design and Drafting Manual Oregon Department of Transportation Bridge Design and Drafting Manual - 2005 SECTION 2: DRAFTING PRACTICES 2.1 COMPUTER AIDED DRAFTING (CAD) 2.1.1 Standard File Format The standard file format for submission of electronic CAD files to the

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Page 500-20, subsection 502.2.

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE

More information

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard

More information

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG 1 Segmental Bridge Technology Established and Evolving W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG 2 Segmental Bridge Topics Addressed Definition of concrete segmental

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø

PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D  NAILS/ SPACING  o.c. SILL BOLT SPACING 1 2  36 O.C. 1 2  Ø PANEL NOTATION (3) D2 X2 SHEATHING THICKNESS (IN.) 32 " NAILS/ SPACING 32 " 8d @3" o.c. SILL BOLT SPACING 2 " Ø @ 36" O.C. 2 " Ø @ 2" O.C. 2 " Ø @ O.C. 2 " Ø @ 6" O.C. 2 " Ø @ '-0" O.C. 980 PLF D2X2 32

More information

CONTRACT PLANS READING

CONTRACT PLANS READING CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

THE ONTARIO CONCRETE PIPE ASSOCIATION

THE ONTARIO CONCRETE PIPE ASSOCIATION THE ONTARIO CONCRETE PIPE ASSOCIATION PRECAST BOX & CULVERT GUIDELINE Table of Contents 1 INTRODUCTION... 6 1.1 Background... 6 1.2 Existing Handbook and Drawings... 6 1.3 Distribution... 6 1.4 Revisions...

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

ENGINEERING STRUCTURES MADE OF PRECAST ELEMENTS

ENGINEERING STRUCTURES MADE OF PRECAST ELEMENTS ENGINEERING STRUCTURES MADE OF PRECAST ELEMENTS CON/SPAN Innovation in bridges Engineering structures made of precast elements of CON/SPAN are used for roads, railways and industrial applications: bridges

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

Clarifications in italics added July 2018

Clarifications in italics added July 2018 SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,

More information