1 1 Segmental Bridge Technology Established and Evolving W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

2 2 Segmental Bridge Topics Addressed Definition of concrete segmental bridge construction methods and related design considerations. The evolution of concrete segmental bridge technology over the past 30 years in the U.S. Design principles and practices that provide the economic and durability value for this structure type. Continuing evolution of the segmental bridge construction technology and related design concepts.

3 3 Definition of Segmental Bridges Bridges, that are typically concrete box structure types, constructed using repetitive elements that are progressively connected together to form a completed structure. Construction Load Cases are particularly critical considerations in developing the design and building methods for segmental bridges.

4 4 SEGMENTAL BRIDGE APPLICATIONS URBAN BRIDGES LONG SPAN BRIDGES ENVIRONMENTALLY SENSITIVE LONG BRIDGES OVER WATER ARCHES CABLE STAYED BRIDGES RAIL BRIDGES

5 5 Segmental Bridge Methods, Components and Evolution of the Technique

6 6 Segmental Construction Methods SPAN-by-SPAN (Precast) CANTILEVER (Precast or Cast-in-Place) > Balanced > Uni-Directional INCREMENTAL LAUNCH (Typically an Inefficient use of materials, so Not commonly used need tangent or constant curvature)

7 7 Segmental Construction Methods Span by Span JFK AirTrain, NY City

8 8 Segmental Construction Methods Balanced Cantilever Sagadahoc Bridge, ME

9 9 Segmental Construction Methods Uni-Directional Cantilever (shown) Mixed Methods Garcon Point Bridge, FL

10 10 Precast Joints Keys (i.e. no reinforcing across joints) Epoxy Temporary Clamping Temperature

11 11 Cast-in-Place Joints Reinforcing Bars Joint Preparation Bulkheads

12 12 Post-Tensioning (PT) Arrangements Placement Type Internal Tendons External Tendons Layout Orientation Longitudinal Span by Span Cantilever Transverse Vertical

13 13 Post-Tensioning (PT) Arrangements Internal Tendons Transverse Longitudinal (Cantilever)

14 14 Internal Transverse Pre-Stressing Pre-Tensioning Post-Tensioning

15 15 Post-Tensioning (PT) Arrangements External Tendons, Longitudinal Single Point Deviators

16 16 Post-Tensioning (PT) Arrangements External Tendons, Longitudinal Multi-Point Deviators

17 17 Post-Tensioning (PT) Arrangements Vertical Tendons (in Precast Piers)

18 18 Construction Engineering Camber Geometry Control Prestressing Parameters Erection Loads Erection Equipment Casting and Erection Manuals Integrated Shop Drawings

19 19 Precasting Yard Operations Pre-Tied Reinforcing Cage Jigs Casting Beds > Long Line > Short Line Storage & Delivery

20 Long Line Segment Casting 20

21 Short Line Segment Casting 21

22 22 TYPICAL CASTING YARD LAYOUT Segments in Storage Possible Double Stack Casting Beds Segment Storage Rebar Jigs Batch Plant

23 23 9 Miles of Elevated Precast Segmental Bridge JFK AirTrain, NY, NY

24 24 Precasting Facility - JFK AirTrain 5,500 Segments 14 Casting Cells

25 25 Precasting Facility - JFK AirTrain

26 26 Precasting Facility - JFK AirTrain Segment Delivery

27 27 I-93 Viaducts & Ramps, Boston, MA

28 28 Precasting Facility I-93 Viaducts, Boston Precast plant 85 miles away by truck 85 Miles

29 29 Precasting Facility I-93 Viaducts, Boston Precast plant in Sanford, ME 15 Acres 1250 Segments Casting Cells 4 Typ., 1 Combined

30 30 Precasting Facility I-93 Viaducts, Boston Central concrete delivery - casting 3 beds / day

31 31 Precasting Facility Susquahanna River, PA Total Segments (958 Typical, 82 Specialty) 3 - Typical Casting Cells 1 - Specialty Casting Cell

32 32 Assembly Line Reinforcing Cage Jig Susquehanna River Bridge, PA

33 33 Assembly Line Casting Bed Set-Up Susquehanna River Bridge, PA

34 34 Match Cast Segment Wet Cast Segment

35 Assembly Line Segment Pour 35

36 36 Assembly Line Steam Cured Segments Susquehanna River Bridge, PA

37 37 Segment Storage Handling, Lifting with Strap under Wing Susquehanna River Bridge, PA

38 38 Segment Handling Lifting with Bars through Lifting Holes

39 39 Segment Storage Three Point Supports

40 40 Segment Storage Double Stacking

41 41 PRECAST SUPERSTRUCTURE Comparison Table Project: Susq. I-93 JFK Victory Sagadahoc (Pa.) (Ma.) (NY) (NJ) (Maine) No. Segments Max. Wt. (Tons) No. Typical Beds Casting Yard Size - 20 A 15 A N/A N/A 12 A Cast 1 Segment / Day / Bed

42 42 Precast Segmental Span-by-Span Construction

43 43 Typical Span-by-Span Erection A SECTION A-A A

44 44 Typical Span-by-Span Erection Advance Truss to Next Span

45 45 Typical Span-by-Span Erection Deliver Segments Set Segments

46 46 Typical Span-by-Span Erection Deliver Segments Set Segments

47 47 Typical Span-by-Span Erection Deliver Segments Set Segments Epoxy Joints Join Segments

48 48 Typical Span-by-Span Erection Deliver Segments Set Segments Epoxy Joints Align Pier Segm.

49 49 Typical Span-by-Span Erection Deliver Segments Set Segments Epoxy Joints Align Pier Segm. Thread Tendons Cast Closure

50 50 Typical Span-by-Span Erection Stress Tendons Lower Truss and Repeat Process A SECTION A-A A

51 51 Precast Span-by-Span Segments Erected using: - Underslung Trusses - Overhead Gantry - Falsework Supports

52 52 ERECTION TRUSSES Under Bottom Soffit

53 53 ERECTION TRUSSES Under Wings Deck Designed for Support Condition

54 54 ERECTION with OVERHEAD GANTRY

55 ERECTION TRUSS SUPPORTS Tower on Foundation 55

56 ERECTION TRUSS SUPPORTS Pier Bracket 56

57 57 Specialized Erection Equipment Delivery of Segments from Above WMATA, VA

58 58 SPAN-BY-SPAN CONSTRUCTION EXAMPLE May 2007 Susquehanna River Bridge, PA

59 59 Pennsylvania Turnpike Commission Casting Yard Bridge East Approach Susquehanna River Bridge, PA

60 60 East End Calver Island West End Existing Bridge New EB New WB Casting Yard Twin Bridges with each: 5,910 Long by 57 Wide 40 Spans 150, River Piers 18 Land Piers Susquehanna River Bridge, PA

61 61 TWO ONE THREE ERECTION PHASES Susquehanna River Bridge, PA

62 62 Casting Yard Access Road Segment Erection Susquehanna River Bridge, PA

63 63 Segments Delivered from Storage Susquehanna River Bridge, PA

64 64 Segments Delivered from Above Susquehanna River Bridge, PA

65 65 Susquehanna River Bridge, PA

66 66 Susquehanna River Bridge, PA

67 67 Susquehanna River Bridge, PA

68 68 Segment Alignment Susquehanna River Bridge, PA

69 69 Susquehanna River Bridge, PA

70 70 Susquehanna River Bridge, PA

71 71 ELEVATION SECTION VIEWS Susquehanna River Bridge, PA

72 72 Susquehanna River Bridge, PA

73 73 Activities Off the Critical Path Susquehanna River Bridge, PA

74 74 Achieved Typical Span x Span Erection Rate of 2 Spans per Week Susquehanna River Bridge, PA

75 75 VERTICAL CLEARANCES RAILROAD LINES LOCAL AIRPORT Susquehanna River Bridge, PA

76 76 November NTP May New Bridge Complete Susquehanna River Bridge, PA

77 77 ADVANTAGES OF SPAN-BY-SPAN Quick, Simple Erection (2-3 Spans / Week) Easy Geometry Control Savings from less MOT Minimum User Delays Cost Effective Simple Design Durable Structures Beautiful Bridges

78 78 Precast Segmental Balanced Cantilever Construction

79 79 Balanced Cantilever Erection ERECTION SEQUENCE I

80 80 Balanced Cantilever Erection ERECTION SEQUENCE II

81 81 Balanced Cantilever Erection ERECTION SEQUENCE III ERECTION SEQUENCE IV

82 82 Precast Balanced Cantilever Segments Erected using: - Barge-mounted cranes - Ground based cranes - Beam and Winch - Overhead Gantry

83 83 BALANCED CANTILEVER EXAMPLE September 2007 Twin 3,971 Long Bridges Main Span Unit 330, 440, Tall Precast Piers SxS Appr., B.C. Main Span Unit Victory Bridge, NJ

84 84 Victory Bridge, NJ

85 85 Victory Bridge, NJ

86 86 Victory Bridge, NJ

87 87 Victory Bridge, NJ

88 88 Victory Bridge, NJ

89 89 Victory Bridge, NJ

90 90 Victory Bridge, NJ

91 91 Balanced Cantilever Erection Average production: 4 to 6 segments/day (45 ft) Victory Bridge, NJ

92 92 1st Bridge Open to Traffic in 15 mo. 2nd Bridge Completed in 9 mo. Victory Bridge, NJ

93 93 Cast-in-Place Segmental Balanced Cantilever Construction

94 94 1,248 Long Twin Bridges with 398 Main Spans Wabasha Street Bridge, MN

95 95 Wabasha Street Bridge, MN

96 96 Continue through the Winter Wabasha Street Bridge, MN

97 97 Blending shapes, texture and color Wabasha Street Bridge, MN

98 98 Segmental Bridges Mixing Construction Erection Methods

99 99 3,000 Bridge with 420 Main Span over Kennebec River Sagadahoc Bridge, ME

100 Roadway with 2 Cell Box Girder Cast-in-Place Approach Units, with Precast Main Span Unit Sagadahoc Bridge, ME

101 ,000 sf of Structures - Completed Nov I-93 Ramps & Viaducts, Boston MA

102 102 Span-by-Span Construction I-93 Ramps & Viaducts, Boston MA

103 103 Balanced Cantilever Construction I-93 Ramps & Viaducts, Boston MA

104 104 Span-by-Span Approaches One-Directional Cantilever Main Span CIP low level piers P/C high level piers Mid-Bay Bridge, FL

105 105 Precast Segmental Piers

106 106 Precast Piers Erect 1 Segment an Hour, Approximately 1 Pier per Day Direction of Erection

107 107 Victory Bridge, NJ

108 108 Precast Piers First segment cast 6 weeks after NTP Victory Bridge, NJ

109 109 Precast Piers Casting Bed Victory Bridge, NJ

110 110 Typical Precast Pier Details

111 111 Precast Pier Erection Victory Bridge, NJ

112 112 Precast Pier Erection Victory Bridge, NJ

113 113 Precast Pier Erection Victory Bridge, NJ

114 114 Precast Pier Erection Victory Bridge, NJ

115 115 Precast Pier Erection Victory Bridge, NJ

116 116 Precast Pier Erection Victory Bridge, NJ

117 117 Completed Precast Piers First pier erected 5 months after NTP Victory Bridge, NJ

118 118 Cable Stayed Segmental Superstructure

119 119 1st concrete cable-stayed bridge in the Northeast 1995 U.S. Senator William V. Roth Jr. Bridge over C&D Canal, DE

120 120 Entirely Precast Segmental Bridge U.S. Senator William V. Roth Jr. Bridge over C&D Canal, DE

121 121 Segmental Cable-Stay Bridges I-280 Veterans Glass City Skyway, Ohio 1,225 main span ) Open June 2007 Open Dec Penobscot Narrows Bridge & Observatory, Maine (1,161 main span)

122 122 Veterans Glass City Skyway Precast Superstructure Completed in 8 Months New Penobscot Narrows Bridge Cast-in-Place Superstructure Completed in 15 Months

123 123 Penobscot Narrows Bridge & Observatory, ME

124 124 CIP Balanced Cantilever Construction Form Traveler Form Traveler Penobscot Narrows Bridge & Observatory, ME

125 125 Penobscot Narrows Bridge & Observatory, ME

126 126 Penobscot Narrows Bridge & Observatory, ME

127 127 Carbon Fiber Composite Strand Demonstration Project Penobscot Narrows Bridge & Observatory, ME

128 128 Veteran s Glass City Skyway, Ohio Veteran s Glass City Skyway, OH

129 129 Typical Pre-Cast Cross-Sections: Main Span Veteran s Glass City Skyway, OH

130 130 Main Span Precast Segmental Construction Backspans: Span-by Span Mainspan: One-Directional Cantilever Veteran s Glass City Skyway, OH

131 131 3 pairs of segments erected in cantilever Epoxied segment joints Segments post-tensioned Veteran s Glass City Skyway, OH

132 132 Segmental Bridge Construction Benefits Rapid Construction Segments Delivered over Completed Spans No Need for Barge Delivery Maintained Shipping Lanes at All Times Access to Port of Toledo Veteran s Glass City Skyway, OH

133 133 Review Questions Define a segmental concrete bridge structure type? List 3 methods for constructing segmental bridges? List benefits during construction that result from using a segmental bridge construction technique? List permanent bridge site layout benefits resulting from using a segmental box girder bridge type? What structural benefits apply to using a closed cell box girder for a segmental bridge? What segmental bridge technological advances offer the most immediate benefits?

134 134 Open-ended Assignment Questions Can you identify a viable candidate location for a segmental bridge given your understanding of the potential benefits from using this structure type? What new innovative applications of the segmental bridge construction technique can you envision?

135 135 America Deserves Beautiful Bridges

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute Accelerated With Bridge Construction Bridges Concrete Segmental William R. (Randy) Cox, P.E. American Segmental Bridge Institute Outline Introduction Precast Segmental Bridges Balanced Cantilever Span-by-Span

More information

The $13.2 billion Central Artery/Tunnel Project (CA/

The $13.2 billion Central Artery/Tunnel Project (CA/ PART 2 Central Artery/Tunnel Project: Innovative Use of Precast Segmental Technology Paul J. Towell, P.E. Senior Bridge Engineer Bechtel/Parsons Brinckerhoff New York, New York Part 1 of this series of

More information

Segmental Bridge Construction. Segmental Bridges It s a Construction Technique with Design Implications. Plans Review Group

Segmental Bridge Construction. Segmental Bridges It s a Construction Technique with Design Implications. Plans Review Group Structures g Design Plans Review Group Segmental Bridge Construction Segmental Bridges It s a Construction Technique with Design Implications 2010 FDOT/FTBA Construction Conference February 23-24 Orlando,

More information

BRIDGE TYPE CONCEPT EVALUATION

BRIDGE TYPE CONCEPT EVALUATION SD44/PLATTE-WINNER BRIDGE CORRIDOR STUDY AND ENVIRONMENTAL ASSESSMENT Agreement No. 410583, Work Order PD-19-16 Project Nos. HP5596(19); P0044()290, PCN 05X0 PROJECT MEMORANDUM BRIDGE TYPE CONCEPT EVALUATION

More information

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST SUBSTRUCTURE COMPONENTS ADVANTAGES SCHEDULE INCREASES CONSTRUCTION

More information

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Kentucky Society of Professional Engineers May 23 rd, 2014 Lexington KY Milton Madison Bridge Slide Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Project Partners The Challenge Milton, KY Existing Bridge

More information

Name: Kimio SAITO. 1. General Information (10min.) 2. History and Applications in U.S. (15min.) 3. Recent Applications in Japan (10min.

Name: Kimio SAITO. 1. General Information (10min.) 2. History and Applications in U.S. (15min.) 3. Recent Applications in Japan (10min. PRECAST SEGMENTAL BRIDGE SPEAKER Name: Kimio SAITO Affiliation: Kajima Corporation December 6, 2005 Academic Background: Master of Engineering from Waseda Univ. SPEAKER April 1989 August 1992: Design Engineer

More information

Dauphin Island Bridge

Dauphin Island Bridge Design/Construction Feature Dauphin Island Bridge Presents the major design/construction highlights of the Dauphin Island Bridge a 17,814-ft (5430 m) long prestressed concrete structure located near Mobile,

More information

TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD. Introduction. Segmental Bridge Span Assembly

TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD. Introduction. Segmental Bridge Span Assembly COMPUTERS AND STRUCTURES, INC., MARCH 2015 TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD Introduction This document describes the use of the segmental bridge wizard, including functionality, options, and terminology.

More information

ABC and Innovative Bridge Construction for Minnesota Local Roads

ABC and Innovative Bridge Construction for Minnesota Local Roads ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918

More information

Jointed Precast Concrete Pavement

Jointed Precast Concrete Pavement NATIONAL PRECAST CONCRETE ASSOCIATION Manual for Jointed Precast Concrete Pavement 3rd Edition Authors Peter Smith, P.E. Mark B. Snyder, Ph.D., P.E. Graphic Designer Deborah Templeton NPCA Precast Concrete

More information

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001 Precast Concrete Pavement Background Concepts Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001 Project Background CTR contracted by FHWA/TxDOT to investigate the feasibility of using precast

More information

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition Successes in Accelerated Bridge Construction Mary Lou Ralls, P.E. Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer) 1 Accelerated Bridge Construction (ABC) Definition Structural & geotechnical

More information

Welcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR

Welcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR Welcome Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR HKSAR Government, Highways Department s Contract HY/2011/09 Hong Kong Zhuhai Macao Bridge Hong Kong Link Road 1 Contents

More information

adopted in Hong Kong

adopted in Hong Kong Prefabricated Construction Systems for Building and Civil works adopted in Hong Kong Presented by Raymond W M Wong Division of Building Science & Technology City University of Hong Kong The presentation

More information

Value Engineering Design Build MODULAR INFRASTRUCTURE

Value Engineering Design Build MODULAR INFRASTRUCTURE Value Engineering Design Build MODULAR INFRASTRUCTURE VALUE ENGINEERING When infrastructure projects find themselves in densely populated areas, or occur on a site with poor conditions, the opportunity

More information

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone Precast Bridge Built in only Eight Days by Peter E. Stamnas and Mark D. Whittemore. New Hampshire Department of Transportation Minimizing construction-related traffic delays and improving workzone safety

More information

Unit 8 Precast Concrete

Unit 8 Precast Concrete Part ⅠIllustrated Words and Concepts Figure 8-1 Precast Slabs on a Frame of Precast Columns Figure 8-2 Hollow-core Slabs Supported on Precast Concrete Wall Panels Part Ⅱ Passages Passage A Precast Concrete

More information

California Department of Transportation

California Department of Transportation California Department of Transportation Caltrans Precast Concrete Committee Update Jim Ma, P.E. Prestressed Concrete Specialist, Caltrans Nov. 3 rd, 2010 2010 Caltrans/PCMAC/Consultants Bridge Workshop

More information

Amajor transportation infrastructure undertaking, billed

Amajor transportation infrastructure undertaking, billed PART 6 Central Artery/Tunnel Project: Boston s Engineering Marvel Where We Are Now Vijay Chandra, P.E. Senior Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, New York This article is

More information

Double Storey HC Precast System Drawing - 3D

Double Storey HC Precast System Drawing - 3D Double Storey HC Precast System Drawing - 3D Superstructure ( Frame & Wall ) : - By HC Precast System Sub- Structure By Other : - Appointed By Client 77 % 23 % INDUSTRIALISED BUILDING SYSTEM ( IBS ) is

More information

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives. APPENDIX C: MAIN RIVER BRIDGE PLANS The graphics in this appendix depict the Practical Alternatives. NO. DESCRIPTION BY 4:36:17 PM 10/3/2007 STA.10+843.000 \ PYLON 6.000 5.000 (TYP) PYLON ELEVATION 210.000

More information

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures

More information

In Denver, a recently completed flyover

In Denver, a recently completed flyover ASCENT CASE STUDY 36 A Fast Learning Curve Colorado flyover provides strong example of the concept of curved U-girders for use in a variety of bridge projects In Denver, a recently completed flyover ramp,

More information

Precast Concrete Pavement

Precast Concrete Pavement Precast Concrete Pavement Phillip Sturdivant, P.E. Louisiana Department of Transportation and Development www.dotd.la.gov What is Precast Concrete Pavement? Precast concrete pavement is what it says it

More information

PANEL CRIB PIERS AND TOWERS

PANEL CRIB PIERS AND TOWERS CHAPTER 17 PANEL CRIB PIERS AND TOWERS Panel crib piers are made of trusses with panels set horizontally or vertically and are normally braced with transoms, sway bracing, rakers, bracing frames, and tie

More information

Construction Tolerances - The following tolerances apply to cast-in-place structures:

Construction Tolerances - The following tolerances apply to cast-in-place structures: 00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:

More information

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA ) State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA -01-1911) Vince Campbell Former president of Bayshore Concrete Products Corporation, VA This presentation is developed

More information

Accelerated Bridge Construction (ABC) and the Utah Experience

Accelerated Bridge Construction (ABC) and the Utah Experience Accelerated Bridge Construction (ABC) and the Utah Experience by Kris Peterson, P.E., UDOT Mary Lou Ralls, P.E., Ralls Newman, LLC AASHTO Subcommittee on Construction Annual Meeting Computers and Technology

More information

Innovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz

Innovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz Innovative composite dowel for steel concrete composite bridges Neil Westmacott, Wolfram Schwarz At a glance Cost effective alternative to prestressed bridge girders Introduction New to Australia although

More information

PRECAST CONCRETE STRUCTURES

PRECAST CONCRETE STRUCTURES PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Project Reference Catalogue

Project Reference Catalogue Reference Catalogue www.wiecon.com.tw Reference Catalogue. West Coast Freeway No. 61, Fangli to Da-an, Taichung Coastal Area, Taiwan. Precast Segmental Bridges. : Ta-Chen Construction & Engineering Coorporation.

More information

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its

More information

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix A A 1 APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix

More information

Chapter 6: SHOP DRAWINGS AND OTHER SUBMITTALS

Chapter 6: SHOP DRAWINGS AND OTHER SUBMITTALS Chapter 6: SHOP DRAWINGS AND OTHER SUBMITTALS A GUIDE FOR SHOP DRAWING ENGINEERS, AGENCIES, PRECASTERS AND CONTRACTORS Shop drawings are detailed working drawings, usually Starting The Shop Drawing Process

More information

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM contents Introduction Owner s Statement Architect s Statement Contractor s Statement Cast in Place Coordination Structural Steel Working Within the Site

More information

SUBSTATION SECURITY WALL INSTALLATION MANUAL

SUBSTATION SECURITY WALL INSTALLATION MANUAL SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended

More information

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures 1 Highlights WisDOT s ABC Development of PBES Piers Road of Development, Implementation, and Institutionalization Lessons Learned

More information

HC Precast System ( 100 % Malaysia Technology With 6 IPs ) IBS Concept

HC Precast System ( 100 % Malaysia Technology With 6 IPs ) IBS Concept HC Precast System ( 100 % Malaysia Technology With 6 IPs ) Economical. Eco Friendly. Quality IBS Concept In the construction of a building, there are always 4 types of joint namely L-shape T-shape Cross

More information

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

Sun Sculpture. By Scott L. Melnick

Sun Sculpture. By Scott L. Melnick Sun Sculpture By Scott L. Melnick Is it a bridge or a sculpture? The Turtle Bay Sundial Bridge, designed by the worldrenowned Spanish architect/engineer Santiago Calatrava is both. The first steel inclined-pylon,

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

Proven precast solutions for every application

Proven precast solutions for every application Proven precast solutions for every application Seventy five years of UNDISPUTED LEADERSHIP HP shell roof, bowstring girders and trussed gantry girders for L&T Bengaluru Works Larsen & Toubro is a major

More information

THE TRANSPORTATION ISSUE

THE TRANSPORTATION ISSUE Precast Pavement Perfection // Banking on Precast // California s Precast Express WINTER 2018 THE TRANSPORTATION ISSUE Banking on Precast A variety of precast concrete products will offer the new Bonner

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

Bridge Design and Drafting Manual Oregon Department of Transportation

Bridge Design and Drafting Manual Oregon Department of Transportation Bridge Design and Drafting Manual - 2005 SECTION 2: DRAFTING PRACTICES 2.1 COMPUTER AIDED DRAFTING (CAD) 2.1.1 Standard File Format The standard file format for submission of electronic CAD files to the

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Breadth: Change CIP Structural Walls and Beams to Precast

Breadth: Change CIP Structural Walls and Beams to Precast Breadth: Change CIP Structural Walls and Beams to Precast Issue: One of the biggest problems facing construction companies in Richmond, Virginia is the lack of skilled labor. Currently, there are approximately

More information

Phase 2 Silver Line Update

Phase 2 Silver Line Update Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017 Safety Since Notice to Proceed: Manpower Hours: 3,280,898

More information

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM)

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) FINAL REPORT On Project 25-34 Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX A Structure Reflected Noise and Expansion Joint Noise Prepared for: National Cooperative

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1

WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1 WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-2017 - Industrialised Building System ( IBS ) is a system not a machine or component. Open System and Proprietary System is a Technology.

More information

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF Through inherited experience of its personnel and through its own projects, DNEC have accumulated over 30 years of precast concrete expertise.

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

NEW METHOD FOR THE PRODUCTION OF DECK SLABS OF STEEL-CONCRETE-COMPOSITE BRIDGES

NEW METHOD FOR THE PRODUCTION OF DECK SLABS OF STEEL-CONCRETE-COMPOSITE BRIDGES NEW METHOD FOR THE PRODUCTION OF DECK SLABS OF STEEL-CONCRETE-COMPOSITE BRIDGES Kerstin Fuchs 1 and Johann Kollegger 2 1 PhD candidate, 2 Professor Institute for Structural Engineering, TU Wien Abstract

More information

Total precast solution for large stadium projects meet tight schedule

Total precast solution for large stadium projects meet tight schedule Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy

More information

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 1085.2(k) SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 DESCRIPTION This work is the manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane Overview of Precast ABC Projects in the Pacific Northwest Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane 1 Techniques Additional prefabrication of units to reduce field timeline Simplify deck installation

More information

OpenBridge Modeler: What is it and how can I use it today?

OpenBridge Modeler: What is it and how can I use it today? 2015 Bentley Systems, Incorporated OpenBridge Modeler: What is it and how can I use it today? Steve Willoughby, Senior Application Engineer Agenda: Introducing OpenBridge Modeler OpenBridge Modeler Features

More information

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect

More information

Experience the Hi-Lite Advantage

Experience the Hi-Lite Advantage Experience the Hi-Lite Advantage 12K Aluminum Shoring System INTRODUCTION The 12K Shoring System is primarily a hand-set system. It can also be handled with a crane, and may also be used quite successfully

More information

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8. PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED

More information

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 INSTALLATION GUIDE 2009-2017 PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 Table of Contents Project Overview Forward, Acceptability Criteria, Safety,

More information

Design and Construction of Highway Pavement Joint Systems

Design and Construction of Highway Pavement Joint Systems Design and Construction of Highway Pavement Joint Systems Troubleshooting Joint Design and Construction Issues Mark B. Snyder, Ph.D., P.E. Engineering Consultant to the American Concrete Pavement Association

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

NZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns

NZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns Page 1 of 6 Title Manufacture precast concrete beams and columns Level 3 Credits 25 Purpose People credited with this unit standard are able to: prepare, set up moulds and storage areas, carry out the

More information

1. Architectural precast concrete cladding units.

1. Architectural precast concrete cladding units. SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference

More information

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved: To: New York State Department of Transportation ENGINEERING INSTRUCTION Title: PRECAST CONCRETE PAVEMENT SLAB SYSTEMS STANDARD SPECIFICATION Distribution: Manufacturers (18) Local Govt. (31) Agencies (32)

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

Module 10 : Improvement of rock mass responses. Content

Module 10 : Improvement of rock mass responses. Content IMPROVEMENT OF ROCK MASS RESPONSES Content 10.1 INTRODUCTION 10.2 ROCK REINFORCEMENT Rock bolts, dowels and anchors 10.3 ROCK BOLTING MECHANICS Suspension theory Beam building theory Keying theory 10.4

More information

Precast Multistorey Highrise Residential & Commercial Buildings. Buildings & Factories IC

Precast Multistorey Highrise Residential & Commercial Buildings. Buildings & Factories IC Precast Multistorey Highrise Residential & Commercial Buildings Buildings & Factories IC LARSEN & TOUBRO LIMITED It s all about Imagineering L&T at a Glance India s largest E&C company, with interests

More information

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

Name two reasons why bridges are built. Name two places where you would find a bridge?

Name two reasons why bridges are built. Name two places where you would find a bridge? Name two reasons why bridges are built. Name two places where you would find a bridge? Before bridges were invented how would an individual travel across a large span of land or huge masses of water Objectives:

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

Application of Advanced Materials and New Detailing for ABC Column Connections

Application of Advanced Materials and New Detailing for ABC Column Connections Application of Advanced Materials and New Detailing for ABC Column Connections Mostafa Tazarv, PhD Assistant Professor Department of Civil and Environmental Engineering South Dakota State University (SDSU)

More information

For. Precast Concrete Segmental Bridges America s Beautiful and Affordable Icons HISTORICAL-TECHNICAL SERIES

For. Precast Concrete Segmental Bridges America s Beautiful and Affordable Icons HISTORICAL-TECHNICAL SERIES could the HISTORICAL-TECHNICAL SERIES Precast Concrete Segmental Bridges America s Beautiful and Affordable Icons How did precast concrete segmental construction become a major player in the modern American

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

INDEX. Initial SOL Approval. 1. Evergreen Retaining Wall System (Deleted) 3. Sound Barrier Walls (Deleted) Standard Details

INDEX. Initial SOL Approval. 1. Evergreen Retaining Wall System (Deleted) 3. Sound Barrier Walls (Deleted) Standard Details INDEX Product 1. Evergreen Retaining Wall System (Deleted) 2. Precast Barlok Parapet 431-92-05 Drawing No. PADOT # 92-051-PE 3. Sound Barrier Walls (Deleted) Standard Details 4. Sound Zero Panel-Noise

More information

Big expertise. Real convenience. Concrete commitment. stem

Big expertise. Real convenience. Concrete commitment. stem 1300 659 830 www.formdirect.com.au Big expertise. Real convenience. Concrete commitment. Stee l Pre-e P n g i n eere ly Fo conc d rete form, factory rmin ing s ystem built, re-u g sy sable stem Steel-Ply

More information

24" B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3 " X501 Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOT

24 B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3  X501 Y301 (Typ.)  A PLAN (reinforced casting option shown) A  dia. Hinge Bar (Typ.) NOT B B Joint Joint See MARKINGS Note PCB-RXX-350-TL3 " Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOTES GENERAL: This barrier may be manufactured with reinforcing steel

More information

AASHTO TIG Promoting the use of Precast Concrete Pavement Systems. Highways for Life PCPS Showcase NJDOT, Mt. Arlington NJ Timothy J.

AASHTO TIG Promoting the use of Precast Concrete Pavement Systems. Highways for Life PCPS Showcase NJDOT, Mt. Arlington NJ Timothy J. AASHTO TIG Promoting the use of Precast Concrete Pavement Systems Highways for Life PCPS Showcase NJDOT, Mt. Arlington NJ Timothy J. LaCoss AASHTO TIG Lead States Team Our Mission To promote the use of

More information

JVI Vector Connector

JVI Vector Connector The JVI Vector Connector User Guidelines 1 of 11 INTRODUCTION JVI designed the Vector Connector for use as shear and alignment connections between precast concrete elements such as double-tee flanges,

More information

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements Larry Scofield, P.E. International Grooving and Grinding Association 1 Big Preservation Everybody Wins

More information

Historic Bridge Foundation Facebook Archives

Historic Bridge Foundation Facebook Archives Historic Bridge Foundation Facebook Archives Did You Know That Florida has a cast and wrought iron swing bridge? December 2014 Crossing the Suwannee River in a rural location northeast of Mayo, this bridge

More information

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO. FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88

More information

General Guidelines:

General Guidelines: ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please

More information

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following. SAMPLING AND TESTING. The Sampling and Testing requirements contained in -03 shall apply. MARKING. The Marking requirements contained in -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard

More information

CEMCON Tekla Structures. Cast In Place (Reinforced Concrete) Precast. Prithviraj CM

CEMCON Tekla Structures. Cast In Place (Reinforced Concrete) Precast. Prithviraj CM CEMCON-2013 Tekla Structures Cast In Place (Reinforced Concrete) Precast Prithviraj CM Disclaimer The information presented regarding future product features and functionalities is for informational purposes

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

Section Downloads. Terminology Outline. Industry Standards/ Publications. American Softwood Lumber Standard ANSI/TPI 1. Section 02: Terminology

Section Downloads. Terminology Outline. Industry Standards/ Publications. American Softwood Lumber Standard ANSI/TPI 1. Section 02: Terminology Section Downloads Download & Print TTT I Sec 02 Slides TTT I Sec 02 Handouts Version 2.1 Section 02: Terminology 1 2 Terminology Outline Industry Standards/Publications Truss Terms Bracing Terms Design

More information

Reinforceme. Photo courtesy of Fort Miller and Sold by ALP Supply. Rethinking

Reinforceme. Photo courtesy of Fort Miller and Sold by ALP Supply. Rethinking Reinforceme Photo courtesy of Fort Miller and Sold by ALP Supply Rethinking 26 PRECAST SOLUTIONS I SUMMER 2017 nt Alternative reinforcement technologies create opportunities for precasters and specifiers.

More information

Concrete Connections. MeadowBurke

Concrete Connections. MeadowBurke FX-14 Ferrule Insert Thin Slab NC Threaded Inserts Our comprehensive line of NC threaded inserts is designed for versatility and manufactured to efficiently distribute bolt stresses into the concrete.

More information

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process

More information