PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø
|
|
- Jared Moses Carr
- 5 years ago
- Views:
Transcription
1
2
3
4
5
6
7
8
9
10
11 PANEL NOTATION (3) D2 X2 SHEATHING THICKNESS (IN.) 32 " NAILS/ SPACING 32 " o.c. SILL BOLT SPACING 2 " 36" O.C. 2 " 2" O.C. 2 " O.C. 2 " 6" O.C. 2 " '-0" O.C. 980 PLF D2X2 32 " 2" o.c. N/A 2 " 9" O.C. 280 PLF NOTES: SUMMARY OF WORK: LOCATION: KOZAR'S MEADOW LOT 6 PORTLAND, OREGON LATERAL ANALYSIS AND DESIGN FOR SINGLE FAMILY RESIDENCE DESIGN LOADS: CODE: 20 OSSC USE OR OCCUPANCY OF BUILDINGS AND STRUCTURES RISK CATEGORY (ASCE TABLE.-): II WIND SPEED Vult: 20 MPH EXPOSURE 'B', Vasd = 93 MPH (OSSC EQUATION 6-33) SEISMIC DESIGN CATEGORY: 'D' GROUND SNOW LOAD: 2 PSF (ROOF SNOW LOAD: 2 PSF) ROOF DEAD LOAD: PSF FLOOR LIVE LOAD: 0 PSF FLOOR DEAD LOAD: 0 PSF SOIL BEARING PRESSURE: 00 PSF SOIL PASSIVE SOIL PRESSURE: 200 PSF () WALL STUDS TO BE 2X6 6" O.C., TYPICAL U.N.O. (2) ROOF SHEATHING TO BE 32" APA RATED CDX SHEATHING OR OSB. INSTALL PANELS HORIZONTALLY. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS, SPACE 8d NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. (3) TYPICAL WALL SHEATHING (TSN) TO BE 32" APA RATED CDX SHEATHING OR OSB. ALL PANEL EDGES TO BE BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING. INSTALL PANELS HORIZONTALLY OR VERTICALLY. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS AND PANEL THICKNESSES, SPACE 8d NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. () FLOOR SHEATHING TO BE APA RATED CDX SHEATHING OR OSB. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS, SPACE 8d NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. () FOR NAIL SIZES REFER TO BELOW. (6) SILL PLATE TO BE 2X P.T. U.N.O. (REFER TO SILL BOLT SPACING IN SCHEDULE BELOW). (3) (3) FRAMING REQUIREMENTS: 32 " 32 " 32 " SHEAR WALL SCHEDULE: 6" o.c. " o.c. 3" o.c. 2" o.c. (6) E2 32 " 2" o.c. (6) (7) (6) (7) 2 " " O.C. NAIL 6d 8d 0d 6d Ø.3".3"..62" () SHEATHING TO BE APA RATED SHEATHING OR OSB (GRADE C-C OR C-D STRUCTURAL LENGTH 2" 2 2" 3" 3 2" II OR BETTER). (9) COMMON OR GALVANIZED BOX (2) ALL PANEL EDGES TO BE BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING (DFL-#2). INSTALL PANELS EITHER HORIZONTALLY OR VERTICALLY. SPACE NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES FOR STUDS SPACED 2" O.C. FOR OTHER CONDITIONS AND PANEL THICKNESSES, SPACE NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. (3) FRAMING AT ADJOINING PANEL EDGES SHALL BE A SINGLE 3" NOMINAL MEMBER OR (2) 2-INCH NOMINAL MEMBER FASTENED TOGETHER WITH 6d NAILS (SPACING ABOVE) TYPICAL ENTIRE HEIGHT OF DBL. STUD. NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED 2" O.C. () AT SHEAR WALL LOCATIONS, REFER RW/ AND FF/ FOR ROOF TO WALL AND FLOOR TO FLOOR FRAMING. () INSTALL 3" SQUARE X " STEEL PLATE WASHER. (6) FRAMING AT ADJOINING PANEL EDGES SHALL BE SINGLE 3X NOMINAL FRAMING MEMBERS AT EACH END OF THE PANEL. NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED 2" O.C. INSTALL 3X P.T. SILL PLATE, U.N.O. (7) PLYWOOD TO BE INSTALLED ON BOTH SIDES OF PANEL. (8) IF 7 6" NOMINAL THICK PLYWOOD OR OSB IS USED, STUDS TO BE SPACED AT '-" O/C, TYPICAL. (9) GALVANIZED NAILS SHALL BE HOT-DIPPED OR TUMBLED. HOLDOWN NOTATION NOTES: 'SIMPSON' HOLDOWN TYPE HDU2 HDU HDU HDU8 MSTC28 MSTC0 HOLD-DOWN SCHEDULE: INSTALLATION INSTRUCTIONS INSTALL STRAP ACROSS FLOOR LINE, INSTALL (8) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. INSTALL STRAP ACROSS FLOOR LINE, INSTALL (6) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. () IN LIEU OF SIMPSON 'SSTB' BOLTS ANCHOR BOLTS TO BE A307 OR 'A36' THREADED ROD WITH STD. NUT AND 2" X 2" X 3 6" STEEL PLATE WASHER ON BOTTOM OF BOLT. (2) HOLDOWNS TO BE FASTENED TO DOUBLE STUDS (CONTINUOUS FROM SILL PLATE TO DOUBLE TOP PLATE) AT PANEL ENDS. WALL STUDS SHOULD HAVE PANEL EDGE NAILING FROM SHEAR WALL SHEATHING. (3) IF HOLDOWNS 2,, 6, AND 8 ARE INSTALLED FROM FLOOR TO FLOOR, REFER TO DETAIL FF/. () U.N.O., INSTALL ()-# CONTINUOUS HORIZONTAL TOP BAR 3" DOWN FROM TOP OF WALL AT ALL HOLDOWN ANCHORS. EXTEND BAR '-0" PAST HOLDOWN IN BOTH DIRECTIONS (BEND BAR AROUND AT CORNER CONDITION). FOR THIS 0'-0" INSTALL ()-# VERTICAL 2" O.C. TIE HOLDOWN ANCHOR TO HORIZONTAL TOP BAR. SHEAR WALL / HOLDOWN NOTATION DIAGRAM EDGE OF WINDOW, DOOR OR CORNER each face each face (307#) (6#) (6#) MINIMUM CONTINUOUS PANEL LENGTH HLDN. AT END OF PANEL (2) rows (2) rows (980#,6970#, 7870#) 'HDU' (93#) 'HDU' (#) 2 MSTC2 66 MSTC66 (6) DBL. STUD CONN. (FACE NAIL) 9" o.c. 6" o.c. " o.c. 3" o.c. N/A N/A D# # HLDN. AT END OF PANEL (6) () SHEAR WALL PANEL HOLDOWN TYPE EDGE OF WINDOW, DOOR OR CORNER (), (2), () SHEAR CAPACITY (SEISMIC) 260 PLF 380 PLF 90 PLF 60 PLF 770 PLF (2), (3), () SDPWS TABLE.3A SHEAR CAPACITY (WIND) 36 PLF 32 PLF 68 PLF 89 PLF 077 PLF 370 PLF 790 PLF STD. 'SB 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. 'SB 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. 'SB 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. 'SB 7 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (3)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. "Ø ANCHOR BOLT OR ALTERNATIVE TO BE EMBEDDED INTO CONCRETE FOOTING ( 2"). ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF 6X6 DFL-#2 ( 2 3 " EDGE DISTANCE). INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. "Ø ANCHOR BOLT OR ALTERNATIVE TO BE EMBEDDED INTO CONCRETE FOOTING (PER 2/). ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF 6X6 DFL-#2 ( 2 3 " EDGE DISTANCE). INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. INSTALL STRAP ACROSS FLOOR LINE, INSTALL (2) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. INSTALL STRAP ACROSS FLOOR LINE, INSTALL (3) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. SIMPSON 'A3' 2'-0" O/C 2X BLOCK SIMPSON 'H2.' MANUFACTURED TRUSS (BY OTHERS) DBL. TOP PLATE RW ROOF SHEATHING PER ARCH. PLANS 2X DOUBLE TOP PLATE, TYPICAL PER PLAN 2X STUDS PER PLAN RW SILL PLATE 'SP' NAILING PER SCHEDULE BELOW SIMPSON 'A3' CLIP (SPACING PER SCHEDULE BELOW), EACH CLIP WITH TOTAL OF (2) 8d 2" NAILS, (2) ROWS PER SCHEDULE FLOOR SHEATHING PER PLAN FLOOR JOISTS PER PLAN FF PANEL TYPE D2 E2 X2 D2X2 2 " EDGE DISTANCE FROM STEM WALL FACE TO EDGE OF SILL PLATE WASHER P.T. SILL PLATE AND ANCHOR BOLT PER SHEAR WALL SCHEDULE CONCETE WALL FSP ROOF TO SHEAR WALL FLOOR TO FLOOR AT SHEAR WALL. IN LIEU OF CLIPS, BREAK SHEAR WALL PANELS AT BLOCKING OR RIM JOIST (INSTALL PANEL EDGE NAILING AT BREAK). 'SP' NAIL SPACING O.C. " O.C. 3" O.C. 3" O.C. 2" O.C. 3" O.C. (2) ROWS 2" O.C. (2) ROWS SIMPSON CLIP SPACING '- O.C. '-2" O.C. 0'-" O.C. O.C. 7" O.C. '-0" O.C. (2) ROWS 0" O.C. (2) ROWS FDN. SILL PLATE PANEL EDGE NAILING ROOF TO SHEAR WALL RAISED HEEL OPTION SHEAR WALL SHEATHING, BREAK ON DBL. TOP PLATE PANEL EDGE NAILING TRUSS HANGER BY OTHERS SIMPSON 'A3' CLIP (SPACING PER SCHEDULE BELOW), EACH CLIP WITH TOTAL OF (2) 8d 2" NAILS, (2) ROWS PER SCHEDULE) ROOF EDGE 'RE' NAILING PER SCHEDULE BELOW (2ND ROW PER SCHEDULE) EXTENDED EAVES PER ARCH. PLANS 2X BLOCK (DBL. BLOCK PER SCHEDULE) SHEAR WALL SHEATHING AND PANEL EDGE NAILING PER PLAN 2X WALL STUDS PER PLAN, DBL. 2X WALL STUDS AT HOLD-DOWN LOCATIONS BOLTED OR STRAP HOLDOWN PER PLAN FOR FLOOR-TO-FLOOR CONNECTION UPPER SHEAR WALL SHEATHING AND PANEL EDGE NAILING PER PLAN SILL PLATE NAILING (2ND ROW PER SCHEDULE) NOTE # BELOW 2X BLOCKING OR RIM JOIST (DBL. BLOCK PER SCHEDULE) LOWER SHEAR WALL SHEATHING AND PANEL EDGE NAILING PER PLAN 2X WALL STUDS PER PLAN, DBL. 2X WALL STUDS AT HOLDOWN LOCATIONS HOLDOWN, SAME TYPE AS ABOVE 'RE' NAIL SPACING O.C. " O.C. 3" O.C. 2 2" O.C. 2" O.C. 3" O.C. (2) ROWS 2" O.C. (2) ROWS S S (NOTE #) HLDN. (NOTE #) HLDN. HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) 2'-6" 9'-0" F F 8'- '- 6'-" 28 3'-3" ROOF 7 6 '-9" 28 ALIGN FOR DRAG STRUT ATTACHMENT ROOF ROOF 3'-3" UPPER FLOOR SHEARWALL PLAN. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING AND NAILING (TSN), ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND NAILING REQUIREMENTS. FOUNDATION NOTES. REFER TO MAIN FLOOR SHEAR WALL PLAN FOR HOLDOWN SIZE. 2. THIS DRAWING IS FOR LATERAL INFORMATION ONLY, REFER TO ARCHITECTURAL PLANS FOR ALL OTHER INFORMATION. 9'-0" 22'-" F2 ALIGN TRUSS FOR SHEAR ATTACHMENT ALIGN FOR DRAG STRUT ATTACHMENT MATERIALS: CONCRETE: 28-DAY CONCRETE STRENGTH = 200 psi. GRADE BEAMS, PIERS, AND SPREAD FOOTINGS SHALL BE POURED ONTO UNDISTURBED, NATIVE SOIL WHICH IS FREE FROM ANY MATERIAL THAT WILL ADVERSELY AFFECT THE SOIL DESIGN BEARING PRESSURE REFERENCED ABOVE. ALL NON-STRUCTURAL WEATHER PROOFING AND FINISH MATERIAL TO BE DETERMINED "BY OTHERS". SLAB CONTROL JOINTS: PER OWNERS REQUIREMENTS OR DIRECTION: MISC. SITE PREPARATIONS: OBTAIN AND OBEY ALL APPLICABLE REGULATIONS REGARDING GRADING AND EXCAVATION. IDENTIFY, MARK, AND PROTECT FROM DAMAGE ALL EXISTING UNDERGROUND PIPES, CONDUITS, AND CABLE (WATER SUPPLY, SANITARY SEWER, STORM SEWER, GAS, STEAM, ELECTRICAL AND COMMUNICATION CABLE). REMOVE SOIL WITH ORGANIC MATTER. PERFORM BACKFILL AND COMPACTION IN A SYSTEMATIC PATTERN, TO ASSURE COMPLETE AND CONSISTENT WORK. IF ANY OVER-EXCAVATION ACCIDENTALLY OCCURS, CORRECT IT WITH WELL-COMPACTED BACKFILL. PROVIDE TESTING AND INSPECTION OF BACKFILL AND COMPACTION. LAYER BACKFILL IN 6 IN. TO 2 IN INCREMENTS. COMPACT ALL FILL. USE STABLIZED FILL MATERIAL OF AN APPROVED TYPE AND FROM AN APPROVED SOURCE. TEST AND APPROVE MATERIAL DELIVERED FROM OTHER SITES. DO NOT ALLOW ANY DEBRIS TO BE MIXED WITH FILL. CURE CONCRETE TO FULL REQUIRED STRENGTH BEFORE BACKFILLING. PROVIDE DRAINAGE CATCHERS PER ARCHITECTURAL DRAWINGS. SPECIAL INSPECTION: NONE RET. WALL, SIM. 3 PARETIAL FOUNDATOION PLAN HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) RET. WALL, SIM. HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) F2 HLDN. (NOTE #) RET. WALL HLDN. (NOTE #) S S 0 0 DTT2Z PER 8/ 7'-0" 6'-0" '-6" 9'-0" '-6" 2 F '-" 20'-0" WALL 0 '- 2 3'-" '-" 0 3'-3" SIMPSON MSTC 28 FROM TOP PLATE TO BEAM 28 3'-3" '-2" 0 '-6" 2 9'-6" '-" 0 3'-3" WALL MAIN FLOOR SHEARWALL PLAN. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING AND NAILING (TSN), ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND NAILING REQUIREMENTS. F 8 DECK DTTZ 8 DECK 3'-3" WALL LOWER FLOOR SHEARWALL PLAN. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING AND NAILING (TSN), ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND NAILING REQUIREMENTS. '-3" 2'-3" F2 0'-0" F EXP. DATE:
12 EXTERIOR SHEATHING AND NAILING PER PLAN 2X STUD ROOF SHEATHING AND NAILING 8d 6" O.C., TYP. ENTIRE LENGTH OF TRUSS TYPICAL ROOF SHEATHING AND NAILING DECK JOIST AND HANGER PER PLAN 2X DECKING FLOOR JOIST AND SHEATHING PER PLAN DBL. TOP PLATE WALL STUDS PER PLAN 2X6 X BLOCK, FACE NAIL TO TRUSS BOTTOM CHORD WITH (2) 6d NAILS AT '-0" O/C SIMPSON 'DSCR/L-SD' FROM DBL. TOP PLATE TO TRUSS WITH BLOCKING ATTACHED MANUFACTURED TRUSS BY OTHERS SIMPSON 'L0' 2'-0" O.C, TYP. ENTIRE LENGTH OF SHEAR WALL (IF SHEAR WALL IS EXTENDED TO ROOF SHEATHING, CLIPS NOT REQUIRED) DOUBLE TOP PLATE TRUSS TO TRANSFER HORIZONTAL LOAD OF 3000# FROM TOP CHORD TO BOTTOM CHORD, OR EXTEND THE SHEAR WALL SHEATHING AND NAILING TO TOP CHORD OF TRUSS SHEAR WALL SHEATHING AND NAILING PER PLAN SIMPSON 'DTT2Z' (2) Ø A307 THRU- 2" O.C. ENTIRE LENGTH OF DECK 2 2" ". THIS DETAIL DESIGNED FOR LATERAL FORCES ONLY, REFER TO ARCHITECTURAL PLANS FOR VERTICAL CONNECTION. 2. FLASHING BY OTHERS. 2X0 P.T. LEDGER 2X WALL STUDS PER PLAN 6 ROOF SCALE: NONE 7 WALL SCALE: " = '-0" 8 WALL SCALE: " = '-0" STRAP HOLDOWN PER PLAN 2X STUD FLOOR JOIST AND SHEATHING PER PLAN 2X STUD ASSUMPTIONS: MAX DESIGN PRESSURE = 0 PSF ALLOWABLE SOIL BEARING PRESSURE = 00 PSF COEFFICIENT OF FRICTION = (SLAB TO RESIST SLIDING) PASSIVE SOIL PRESSURE = 0 PSF SEISMIC Kh = Sds/2. (MONONOBE-OKABE) F'C = 200 PSI AT 28 DAY STRENGTH, " SLUMP. Fy (STEEL) 60 KSI SOIL WEIGHT = 0 PCF 2. CONCRETE FOUNDATION WALL DESIGNED TO CARRY SOIL LOAD ONLY. TOP OF CONCRETE WALL PONY WALL 3. COMPACTED BACKFILL TO BE INSTALLED BEFORE INSTALLING WOOD FLOOR.. SHORE WALL BEFORE COMPACTING WITH BACKFILL.. REINFORCING BARS TO BE ASTM A6, GRADE 60, DEFORMED BARS ( LAP SPLICE 0 BAR DIAM.). 6. DEFORMED WELDED WIRE TO BE ASTM A8. 7. GW/GP: WELL GRADED OR POORLY GRADED GRAVEL OR GRAVEL WITH SAND. SW/SP: WELL GRADED OR POORLY GRADED SANDY OR SAND WITH GRAVEL. 't' P.T. SILL PLATE WITH 2" J-TYPE BOLT, EMBED 7" INTO STEM WALL FREE-DRAINING MATERIAL (GW, GP, SW, OR SP, NOTE #7 ABOVE) SHEAR WALL SHEATHING AND NAILING PER PLAN SIMPSON 'MSTC28' STRAP AT EACH END OF BEAM SILL PLATE AND CLIP INFORMATION PER SHEAR WALL SCHEDULE HEADER OVER WINDOW/DOOR STAIR FRAMING PER ARCH. FLOOR JOIST AND SHEATHING PER PLAN SIMPSON CLIP AND NAILING PER SHEAR WALL SCHEDULE SHEAR WALL SHEATHING AND NAILING PER PLAN 'HEIGHT' WALL SCALE: " = '-0" WALL SCALE: " = '-0" 'DEPTH' FOOTING BOTTOM REINFORCING PER SCHEDULE # DOWEL AT 3'-0" O/C, TYP. SLAB TO STEM WALL " SLAB WITH 6X6 W.XW. WELDED WIRE MESH OR # BARS EACH O.C. AT CENTER OF SLAB, ALLOW SLAB TO CURE 7 DAYS BEFORE BACKFILLING WALL RETAINING WALL/FTG. SCHEDULE HEIGHT 't' TOE HEEL DEPTH '-0" 2'-6" 0'- 0" 6'-0" '-9" 0'- 0" 8'-0" 7'-6" 0'- 0" 'TOE' RETAINING WALL LAP SPLICE 'WIDTH' WALL REINFORCEMENT WALL VERT. REINF. WALL HOR. REINF. '-0" O.C. 2" O.C. 0'-0" O.C. 2" O.C. 6" O.C. 2" O.C. 'HEEL' WALL HORIZONTAL AND VERTICAL REINFORCING PER SCHEDULE ABOVE (VERTICAL BAR WITH STD. HOOK) CONTINUOUS DRAIN BY OTHERS REFER TO VERTICAL REINFORCING FOOTING REINFORCEMENT TOE BTM. HORIZONTAL 2" O.C. 2" O.C. 2" O.C. '-0" ANCHOR EMBEDMENT. FOOTING TO BE PLACED ON UNDISTURBED NATIVE SOIL. 2. DRIVEWAY SURFACE NOT SHOWN. 2 PANEL FRAMING ABOVE 3" CLR. '-6" FOOTING SCALE: " = '-0" SLAB (THICKNESS PER ARCHITECTURAL DRAWINGS) WITH 6X6 -W. X W. WIRE MESH, 6" LAP SPLICE HOLD-DOWN PER SHEAR WALL SCHEDULE DETAIL NOT USED (2)-# CONTINUOUS BAR AT CENTER OF FOOTING (EXTEND REBAR AROUND CORNERS '-0") SIMPSON SHEAR WALL, REFER TO PLAN AND SHEET, SSW, SSW2 EXTERIOR SHEAR WALL SHEATHING AND NAILING PER SHEAR WALL PLAN SIMPSON ANCHOR PER PLAN () - # VERTICAL 2" O.C. WITH 6" HOOK AT EACH END '-". FOOTING TO BE PLACED ON UNDISTURBED NATIVE SOIL. 2. REFER TO SHEAR WALL SCHEDULE SILL BOLT SPACING AT SHEAR WALL LOCATIONS. 3 3" CLR. FOOTING SCALE: NONE P.T. SILL PLATE WITH 2" J-TYPE BOLT, EMBED 7" INTO STEM WALL '-6" VENT, BLOCKOUT, OR BEAM POCKET (2)-# CONTINUOUS BAR AT BOTTOM OF FOOTING AND ()-# AT TOP OF STEM WALL (EXTEND REBAR AROUND CORNERS '-0") EXP. DATE:
13 . ASSUMPTIONS: MAX DESIGN PRESSURE = 0 PSF MAX SURCHARGE LOAD = 0 PSF ALLOWABLE SOIL BEARING PRESSURE = 00 PSF COEFFICIENT OF FRICTION =.3 PASSIVE SOIL PRESSURE = 0 PSF SEISMIC Kh = Sds/2. (MONONOBE-OKABE) F'C = 200 PSI AT 28 DAY STRENGTH, " SLUMP. Fy (STEEL) 60 KSI SOIL WEIGHT = 0 PCF 2. CONCRETE FOUNDATION WALL DESIGNED TO CARRY SOIL LOAD ONLY. 3. COMPACTED BACKFILL TO BE INSTALLED BEFORE INSTALLING WOOD FLOOR.. SHORE WALL BEFORE COMPACTING WITH BACKFILL.. REINFORCING BARS TO BE ASTM A6, GRADE 60, DEFORMED BARS ( LAP SPLICE 0 BAR DIAM.) " CONC. SLAB OUTLINE OF STEM WALL BEYOND FLOOR SHEATHING PER PLAN FLASHING (BY OTHERS) DRIVEWAY (BY OTHERS) '-6" MAX. 8'-0" MAX. END OF SHEAR WALL PANEL 7'-0" MAX. FLOOR/ROOF FRAMING ABOVE X6 DFL-#2 NAILER SHEAR WALL SHEATHING AND NAILING PER PLAN TYPICAL EXTERIOR SHEATHING AND NAILING SIMPSON 'MSTC0' STRAP, FILL ALL HOLES BEAM PER ARCHITECTURAL PLAN, CONTINUE BEAM TO END OF SHEAR WALL PANEL SIMPSON LTP (2) ON FRONT SIDE (2) ON THE OTHER (() TOTAL) DOUBLE 2X STUD AT EACH END OF PANEL, FACE NAIL STUDS TOGETHER WITH 6d 6" O.C. (STAGGER NAILS), U.N.O. 2X STUD WALL " SLAB PER ARCH. PLANS P.T. 2X LEDGER WITH Ø J-TYPE 2'-0" O/C, TYP. ENTIRE LENGTH OF WALL () - # VERTICAL 2" O.C. WITH 6" HOOK AT EACH END 3'-0" EXTERIOR SHEAR WALL SHEATHING AND NAILING PER SHEAR WALL PLAN P.T. SILL PLATE WITH 2" J-TYPE BOLT, EMBED 7" INTO STEM WALL 'H' 'DEPTH' JOISTS AND HANGERS PER PLAN 3X P.T. RIM JOIST WITH 2 " J-TYPE BOLT AT '-0" O/C, EMBED 3" INTO STEM WALL REINFORCING TO MATCH VERT. REINFORCING 'D' SOIL 3" CLR. LAP SPLICE " CLR. FREE-DRAINING MATERIAL (COMPACTED BACKFILL, 3 " MINUS IN LIFTS) WALL HORIZONTAL AND VERTICAL REINFORCING PER SCHEDULE ABOVE (VERTICAL BAR WITH STD. HOOK) CONTINUOUS DRAIN BY OTHERS HEEL TOP REINFORCING PER SCHEDULE HEEL TOP HORIZONTAL REINFORCING PER SCHEDULE 2" CLR. '-0" SILL PLATE PER SHEAR WALL SCHEDULE 3" CLR. '-6". FOOTING TO BE PLACED ON UNDISTURBED NATIVE SOIL. 2. REFER TO SHEAR WALL SCHEDULE SILL BOLT SPACING AT SHEAR WALL LOCATIONS. (2)-# CONTINUOUS BAR AT BOTTOM OF FOOTING ()-# BAR AT TOP OF STEM WALL (EXTEND REBAR AROUND CORNERS '-0") TOE BOTTOM HOR. REINFORCING PER SCHEDULE RETAINING WALL/FOOTING SCHEDULE 'TOE' WALL REINFORCEMENT FOOTING TO SIT ON COMPACTED 3 "+/- GRAVEL FOOTING REINFORCEMENT HEIGHT 't' TOE HEEL DEPTH 'D' SOIL WALL VERT. REINF. WALL HOR. REINF. HEEL TOP HORIZ. HEEL TOP TOE BTM. HORIZ. '-0" '-0" 3'-3" 0'-0" 0'-6" '-6" O.C. '-6" O.C. '-6" O.C. '-6" O.C. '-6" O.C. 6'-0" '-6" '-0" 0'-0" 0'-6" 0'-0" O.C. '-0" O.C. 0'-0" O.C. '-6" O.C. '-0" O.C. 'HEEL' EXP. DATE: SHEAR WALL ELEVATION VIEW SCALE: NONE 3 FOOTING SCALE: " = '-0" RETAINING WALL
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE
More information24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2
NOTE: All exposed lumber to be pressure treated (P.T.) or decay resistant. Fasteners for P.T. wood shall be hot-dipped galv. or stainless steel, typical. see pages 2 & 5 for footings 8'-0" -10'-0" Beam
More information24 X32 3 CAR GARAGE POLE BARN STYLE FRAME
24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationE-Blueprints. Children s Backyard Playhouse 8 x sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height
SDS-CAD - Specialized Design Systems E-BLUEPRINTS C ABINS G ARAGES Children s Backyard Playhouse 8 x 10 80 sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height Plan sets contain the following:
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More information3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?
Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:
More informationAccessory Dwelling Unit Prototype 4 Plan Sets. Prototype 4: Detached 1- Story ADU using alternate materials and techniques
Accessory Dwelling Unit Prototype 4 Plan Sets Prototype 4: Detached 1- Story ADU using alternate materials and techniques Prototype Design Firm Prototype 4: Detached Singly Story ADU Alternative Materials
More informationKOLO SHELTER Installation Instructions Parts List
Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationT-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY
August 10, 2010 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY ST - T-BRACE 2 R MiTek Industries, Chesterfield, MO Page 1 of 1 Note: T-Bracing / I-Bracing to be used when continuous lateral bracing is impractical.
More informationSECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.
PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationShearwall System Installation Guide
Shearwall System Installation Guide Complete HFX product listing with dimensions, weights, connectors, typical installations and accessories. Also includes Hardy Frame Moment Frame information. Easy as
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationFoundation Specifications for 5.6-Meter Modular Earth Station Antennas
Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationFoundation Specifications for 7.6-Meter Modular Earth Station Antennas
Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationDeck Design Guide. One and Two Family Residential Dwellings
Deck Design Guide One and Two Family Residential Dwellings The City of Lake Oswego is providing this information to help you design your deck, obtain a building permit and pass inspections. The standards
More informationKO LO SH E LT E R. High Capacity and Flexibility
KO LO SH E LT E R High Capacity and Flexibility The unique styling of our redesigned Dero Kolo Shelter will help beautify your facility and provide secure, covered bike parking for cyclists. The Kolo is
More informationAPA Performance Rated Rim Boards
D a t a F i l e APA Performance Rated Rim Boards A Rim Board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationOhlson Project Property Owner: Kathy Ohlson Property Address: Deer Lake Rd. Derwood MD 20855
Ohlson Project Property Owner: Kathy Ohlson Property Address: 16116 Deer Lake Rd. Derwood MD 20855 Trademark LLC Prepared By: Travis Murphy Drawing Index 1. Cover 2. Rear Elevation 3. Top View 4. Dimensions
More informationLoad Tables, Technical Data and Installation Instructions
W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting
More informationFeaturing TJ Rim Board and TimberStrand LSL
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load
More informationPOST FRAME CONSTRUCTION MANUAL
POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade
More informationS001 LOWER LEVEL ISO SECOND FLOOR ISO S001 FULL ISO FIRST FLOOR ISO. O="Katahdin Engineering, LLC",
1 LOWER LEVEL ISO 3 SECOND FLOOR ISO Elizabeth Woolf No. Digitally signed by Elizabeth Woolf DN: C=US, E=ewoolf@katadineng.com, O="", CN=Elizabeth Woolf 01.1.30 1:30:53-05'00' Revision / issue Date 0 10/1/1
More informationExterior Wall Fastener Schedule
City of Republic Community Development Department Exterior Wall Fastener Schedule REVISION DATE: JANUARY 2017 Design and construction (2012 IRC Section R602.3): Exterior walls of wood frame construction
More informationTypical Deck Details
Botetourt County guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachment to existing house s footing beam -to-beam connection post-to-beam connection
More informationDECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.
DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing
More informationA. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More informationTypical Deck Details
Based on the 2009 Michigan Statewide Building Code guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachement to existing house s footing beam
More informationLateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later
Lateral Support Decks over 24 above grade require lateral support* *Exceptions to be discussed later Decking Types of Decking: -2x4s & 2x6s -five quarter span rated decking boards -Wood plastic composite
More informationVERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA
INSTALLATION GUIDE VERSA-LAM BCI LIMIT STATES DESIGN CANADA The information in this document pertains use in the CANADA ONLY, Limit States Design. Refer the appropriate Specifier Guide US for use in the
More informationBuilding for High Wind Resistance in Light-Frame Wood Construction
Building for High Wind Resistance in Light-Frame Wood Construction DESIGN GUIDE Meeting the Challenge of High Wind Design Designing a structure to withstand the devastating forces of tornados is one of
More informationSteel Strong-Wall Shearwall Installations
Steel Strong-Wall Shearwall Installations Connector Training for Contractors Series Name: (800) 999-5099 www.strongtie.com Industry Terms Steel Strong-Wall Every day we work hard to earn your business,
More informationUNDER-FLOOR PLAN SCALE: 3/16"=1'-0"
KEY: NOTE # SEE PLAN NOTES OR DETAIL NOTES FOR CORRESPONDING # 5 8 " DIAMETER ANCHOR BOLTS X "L90" "LTP" "HORIZONTAL 5 8" DIAMETER ANCHOR BOLT" '0" INDICATES # OF ANCHOR BOLTS OR "UFP10" 1'10" "L90" "HDU5"
More informationIntroducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA
The SIMPLE FRAMING SYSTEMSM INSTALLATION GUIDE USA for Floors This Installation Guide is intended to provide general information for the designer and end-user. For further information, please refer to
More informationGlasRoc Sheathing Type X
Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity
More informationSections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES
2 Sections & Details WOOD SILL and FLOOR CONSTRUCTION NOTES 1 Commonly Used Lumber Common LENGTHS include: 8, 10, 12, 14, 16 NOMINAL SIZES 2 x 4 2 x 6 2 x 8 2 x 10 2 x 12 ACTUAL SIZES 1 ½ x 3 ½ 1 ½ x 5
More informationGENERAL NOTES ABBREVIATIONS DRAWING THEME STRUCTURAL DRAWING LIST SUBMITTALS S101 GENERAL NOTES SOUTH DYKE RIVERFRONT WALKWAY
GENERAL NOTES ABBREVIATIONS DRAWING THEME SUBMITTALS STRUCTURAL DRAWING LIST GENERAL NOTES S0 LETTERS OF ASSURANCE TENDER DOCUMENTS DESIGN BY CONTRACTORS TEMPORARY AND ANCILLARY WORKS AND SITE SAFETY FIELD
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationVertical Offset Base and Safety Rail System Installation Instructions
Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationSHEARMAXTM INSTALLATION
WWW.SHEARMAX.COM SHEARMAXTM INSTALLATION 05-27-2014 ICC-ES ESR-1727 Shear Transfer Systems, Inc. 9845 Santa Fe Avenue East P.O. Box 402563 Hesperia, CA 92340-2563 ph 760. 949. 4191 fax 760. 948. 5330 GENERAL
More informationChapter 7 - Porch Framing
Chapter 7 - Porch Framing Contents Chapter 7 - Porch Framing... 7-1 Timing & Prerequisites... 7-2 Concrete Porches Caps (Contractor)... 7-3 Organize the Porch Framing Lumber... 7-3 Types of Porch Roofs...
More informationUse the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7
www.garyklinka.com page 1 of 16 Truss Joist I-Joist Quiz Instructions: www.garyklinka.com 1. Print these pages. 2. Print referencing manual from my site at http://garyklinka.com/manuals/tj-4000.pdf or
More informationSDWH TIMBER-HEX Screw
Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections, Including Ledgers Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More information8x8 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationMidwest Roadside Safety Facility
28 Spaces @ 75"=2100" 100' 3:1 Cut 40' 75" (TYP.) 3:1 Soil Cut 3:1 1 2 3 4 5 6 7 8 9 10 25 12 13 11 14 15 16 17 18 19 20 21 22 23 24 25 26 75" 300" or Two 12'-6" Section End Section 300" or Two 12'-6"
More informationMidwest Roadside Safety Facility
28 Spaces @ 75"=175'-0" 6'-3" (TYP.) 8'-0" Soil Cut 1 2 3 4 5 6 7 8 9 10 12 13 11 14 15 16 17 18 19 20 21 22 23 24 25 25 C.I.P. 26 6'-3" 25'-0" or Two Section End Section 25'-0" or Two Section End Section
More informationSECTION ROUGH CARPENTRY
SECTION 06100 ROUGH CARPENTRY PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. The work includes furnishing all labor, materials and equipment required to complete the Rough Carpentry work as shown on the Drawings
More informationHOLLOW CORE PRODUCTS GROUNDED IN STRENGTH
HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationTYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:
City of Aliso Viejo Building Division 12 Journey, Suite 100 Aliso Viejo, CA 92656 (949)425-2540 Fax (949)425-3899 www.cityofalisoviejo.com TYPICAL PATIO COVERS 111 I. GENERAL Patio covers are one-story,
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationA - 1 ELEVATIONS ELEVATION 1/A1 ELEVATION 2/A1 PROJECT TITLE: CALLENDER HANDCRAFTED LOG HOME PREPARED FOR:
'-" 0" -0'-4" TROY ELEVATION /A '-" 9'-" ELEVATIONS ELEVATION /A A - TROY ELEVATION /A '-" 8'-" 0" ELEVATIONS -0'-4" ELEVATION /A A - 4 6'-0" 6'-0" 6'-0" 8'-0" 6'-0" 6'-0" 0'-0" 8'-0" 8'-0" '-8 /8" '-"
More informationBeam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE
U.S. Technical Guide U.S. TECHNICAL GUIDE LP SolidStart LVL & Header Technical Guide 2900F b -2.0E Please verify availability with the LP SolidStart Engineered Wood Products distributor in your area prior
More informationCity of Los Angeles RR Values for Connectors in Shear Walls and Wall Anchorage Assemblies
for Connectors in Shear Walls and Wall Anchorage Assemblies The City of Los Angeles Building Code (LABC) has different requirements for holdowns used in shear wall applications than those used in wall
More information10x10 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationWood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1
Wood structures Copyright G G Schierle, 2001-02 press Esc to end, for next, for previous slide 1 Wood Types: Balloon framing (rare) Platform framing Heavy timber framing Advantages: The only renewable
More informationSamples from
ANCHOR BOLT CORNER LOCATION 1-2x4 or 1-2x6=4 1/4" 1-3/4 or 1-3x6=5 1/4" 2-2x4 or 2-2x6=5 3/4",------------2-3x4 or 2-3x6=7 3/4" 1-4x6 or 1-6x6=8 1/4" 1-4x8 or 1-6x8=1 A" 1-4x10 or 1-6x10=12" I ------1er-----
More informationTRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load capacity of 2x
More informationTHE ENGINEERED WOOD ASSOCIATION
D A T A F I L E APA Performance Rated Rim Boards A rim board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationFine Homebuilding. Cottage Shed Plans
Fine Homebuilding Cottage Shed Plans 1 Front Elevation Designed with a cottage look, this small shed has clapboard siding on the front, a double door, a ramp to allow access for motorized yard equipment,
More informationESR-2403 Reissued October 1, 2009 This report is subject to re-examination in one year.
ICC-ES Evaluation Report ESR-403 Reissued October, 009 This report is subject to re-examination in one year. www.icc-es.org (800) 43-6587 (56) 699-0543 A Subsidiary of the International Code Council DIVISION:
More information6x6 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 061000 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The General Conditions, any Supplementary General Conditions and Division 1, General Requirements, are hereby made a part of
More informationAttachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016
Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder Installation Instructions Revised 9/2/2016 SBCA has been the voice of the structural building components industry
More information12x12 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationCollins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY
PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationMidwest Roadside Safety Facility
28 Spaces @ 75"=175'-0" 100'-0" 3:1 Cut 40'-0" 6'-3" (TYP.) 3:1 Soil Cut 3:1 1 2 3 4 5 6 7 8 9 10 25 12 13 11 14 15 16 17 18 19 20 21 22 23 24 25 26 6'-3" 25'-0" or Two Section 12-gauge End Section 25'-0"
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationSTRATUS SHELTER. Take bike parking to new heights
Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationHurricane Shutter Designs Refer to Form No. T460 for design considerations for Florida
Hurricane Shutter Designs Refer to Form No. T460 for design considerations for Florida One of the best ways to protect a home from damage in windstorms is to install shutters over all large windows and
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationPLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.
TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE
More informationTypical Deck Details Based on the City of Nixa Residential Deck Ordinance
Typical Deck Details Based on the City of Nixa Residential Deck Ordinance The use of this package in lieu of submitted drawings applies to Single Span, Single Level, Residential Decks ONLY. Decks must
More informationFoundation Specifications
Installation Instructions Bulletin 237746 Foundation Specifications for High-Wind 4.5-Meter Earth Station Antennas Revision C 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics,
More informationMain Floor Revisions: 38' 0" Rm1 H3 50' 0" Bk1 B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 Bk1 B1 (5)-5 Rm4 Bk1 Rm3 Bk1 24' 0" 6' 0" 20' 0" START FRAMIN
Main Floor Revisions: 38' 0" Rm1 H3 50' 0" B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 B1 (5)-5 Rm4 Rm3 24' 0" 6' 0" 20' 0" START FRAMING HERE 18" BCI 90'S @ 16"OC Products PlotID Net Qty Product Length
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More information5 5 8 " 60" 53 8 " " 7" 5 1 2" 7" " FIVE MODELS TO MEET YOUR DESIGN REQUIREMENTS.
Installation Manual GIRT LAMINATEDATED WOOD COLUMN 1/4" SCREW 1/2" BOLT STRUCTURAL REINFORCING BRACKET SKIRT BOARD 10,000 PSI PRECAST CONCRETE CONTINUOUS STEEL REINFORCEMENT GALV VANIZED STEEL UPLIFT ANCHORS
More informationDeck Evaluation Checklist
Date: Reported By: Project Name/Client: Year Deck was Built: I. Stairs A. Not Applicable B. Are there any visible signs of cracks, decay or over-notching? No Yes 1. If yes, where? C. Stairway width: (Hint:
More informationMODERN PERGOLA INSTALLATION GUIDE. When only the best will do.
MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationPrescriptive Residential Wood Deck Construction Guide Based on the 2006 International Residential Code
Prescriptive Residential Wood Deck Construction Guide Based on the 2006 International Residential Code Where applicable, provisions and details contained in this document are based on the International
More informationUnit 9. Wall and Ceiling Framing
Unit 9 Wall and Ceiling Framing Wall construction Wall framing includes the assembly of horizontal and vertical members that make up exterior walls and interior partitions. Theses walls support the ceilings
More informationWood Connections. Concepts of Well Designed Connections
Wood Connections Sam Hensen, P.E. Branch Engineering Manager Concepts of Well Designed Connections Must provide sufficient capacity to transfer loads to supporting members Utilize fastener spacing which
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationAndrew Morrison s Straw Bale Special Reports. Installing Toe Ups. Structural, interior toe up ready for installation
Andrew Morrison s Straw Bale Special Reports Installing Toe Ups Structural, interior toe up ready for installation Toe ups are the wood members that hold the bales off of the floor, and I strongly recommend
More informationHeartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)
141 E 1450 Rd. Lawrence, KS 66044 (75) 594-5696 Perma-Column Installation Instructions i Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete
More information