VIRGINIA RAILWAY EXPRESS AMENDMENT OF SOLICITATION INVITATION FOR BIDS (IFB) ADDENDUM No. 3. Issued: February 23, 2016

Size: px
Start display at page:

Download "VIRGINIA RAILWAY EXPRESS AMENDMENT OF SOLICITATION INVITATION FOR BIDS (IFB) ADDENDUM No. 3. Issued: February 23, 2016"

Transcription

1 VIRGINIA RAILWAY EXPRESS AMENDMENT OF SOLICITATION INVITATION FOR BIDS (IFB) ADDENDUM No. 3 Issued: February 23, 2016 IFB No.: Caption: Drop Table System Contact: Gerri Hill ghill@vre.org Telephone/Fax: (703) DESCRIPTION OF AMENDMENT The above numbered solicitation is amended as follows: 1. ATTACHMENT W.3 DELETE: Pages 6, 7, 12, 13, 14, 22, 33 and 48 of 52 REPLACE WITH: Pages 6R, 7R, 12R, 13R, 14R, 22R, 33R and 48R of 52 attached herewith Except as specifically amended herein, all other terms and conditions of this solicitation remain unchanged and in full force and effect. Bidders must acknowledge receipt of this amendment by returning a signed original with the Bid package prior to the hour and date specified in the solicitation. Company Address City State Zip Code Name of Person Authorized to Sign Print Signature Date Page 1 of 1

2 F. Division of Work: 1. The Manufacturer of the Drop Table System shall furnish the following materials for the Construction Contractor to install: a. Service top locking bar pockets b. Release track rail seats c. Release top guide post pocket assemblies d. Receptacle and back box for wireless control e. Shop drawings of curb angles for pit edges around service and release tops. f. Progression system runway embedments g. Shop drawings of pits with embedments per SECTION 1.06F The Manufacturer shall furnish and install all equipment including, but not limited to, the following: a. Service top b. Transfer table c. Bascule release top and posts d. Load beams e. Body supports f. Traction motor dolly g. Main electrical enclosure h. Master control console i. Power and control cable j. Power and control cable reels k. Wireless control stations l. Limit switches m. Pit rails with anchorage n. Shims o. Pit-Level Progression System Page 6R of 52

3 3. The Construction Contractor will be responsible for: a. Coordinating the testing and commissioning of the equipment by the Manufacturer, including but not limited to, making arrangements with VRE for employees, rail vehicles and classroom space, based upon requests from the Manufacturer. This is to ensure that testing and commissioning activities do not conflict with other LOU Facility construction activities. b. Constructing the equipment pit, installing embedded items and providing all required electrical-mechanical and connectivity services in the LOU Facility per the Manufacturer s requirements, to ensure that the equipment offers an optimal performance. c. Coordinating with the Manufacturer, taking into account the dates for completion of scheduled manufacturing milestones, the delivery of the equipment in order to meet the Construction Contractor s obligations and ensuring that the required pit, embedments and utilities are complete and ready for installation of the equipment. d. The Manufacturer or its representative shall provide a licensed surveyor to verify the location, sizes, distances, squareness, etc. before the Construction Contactor places concrete on installed forms and at other key intervals as described in SECTIONS 1.06E.2., 1.06G.1., 1.10C., 3.02D. and 3.05D. The surveyor shall develop drawings for the Manufacturer s and engineer s review and acceptance of the dimensions measured. All construction modifications needed, based on the dimensional information provided, are the responsibility of the Construction Contractor. 4. The Construction Contractor will furnish and install the following (based upon the Drop Table Manufacturer s design): a. Embedded shop rail up to the edge of pit, to be installed after machine rails are installed b. Anchor bolts for load beams c. Conduit with pull-wires for power and control wiring (embedded conduit only) d. 480V electrical power to a main panel/disconnect as designated by the Manufacturer on the shop drawings e. Galvanized steel curb angles for pit edges of the surrounding concrete shop floor that will be installed by the Construction Contractor to provide the specified gaps between Drop Table equipment and the shop floor. The edge angle shall be 2 x 2 x ¼ with welded Nelson studs spaced as required for durability. The Manufacturer shall provide detailed shop drawings of the curb angles REFERENCES A. All equipment shall be manufactured and set up in accordance with all industrial and safety standards that apply to the work, to include the following. B. Standards and Regulations: 1. AAR - Association of American Railroads 2. ABMA - American Bearing Manufacturers Association 3. AFBMA - Anti-Friction Bearing Manufacturers Association 4. AISC - American Institute of Steel Construction Page 7R of 52

4 the specific model of the selected Manufacturer. The Drop Table System Manufacturer shall provide VRE with information and details associated with the specific Drop Table System to be provided. This detail and information includes, but is not limited to, the following: 1. All of the components required for the proper operation of the Drop Table System. 2. The Manufacturer s installation requirements needed for the design of all supporting infrastructure such as concrete foundations, structural steel supports, electrical service and grounding, other utility connections, safety guarding and any temporary or permanent fixtures of the facility necessary to allow installation, operation and maintenance to take place. 3. Inserts and anchoring device requirements that must be set in concrete or built into the construction by the Construction Contractor for the installation of the Drop Table System. B. Design and manufacture the system for a minimum thirty (30) year life span given that scheduled maintenance will be performed in accordance with the Manufacturer s instructions. C. Employ a quality assurance program that meets the requirements of ANSI and that satisfies all safety-related quality assurance requirements imposed by applicable government regulatory agencies. D. Assembled components purchased by the Manufacturer for this Contract, such as motors, pumps and electrical devices, shall be the standard products of qualified manufacturers. 1. A qualified manufacturer is defined as a firm having a minimum of five (5) years documented experience in the manufacture of the component. 2. All similar items shall be the products of a single manufacturer. E. The Drop Table System Manufacturer shall coordinate the following with the Construction Contractor: 1. The design of systems, sub-systems and components with the building structure and in matters of building and life/safety. 2. The equipment to be located within the spaces allocated for such equipment and the Construction Contractor shall verify that all dimensions and utility services are adequate for the equipment. 3. The design of inserts and anchoring devices, which must be set in concrete or built into the construction for installation of the system. Page 12R of 52

5 F. The Drop Table System Manufacturer shall: 1. Operate an installation and repair department and shall maintain an adequate supply of spare parts. 2. Provide equipment of high quality and workmanship, which will perform specified functions reliably and safely, and shall permit required maintenance procedures with minimum interference of service or degradation of reliability. 3. Provide shop drawings and design calculations that pertain to the structural design of the equipment required by this Section shall be sealed by the Drop Table System Manufacturer's Professional Engineer licensed to practice in the Commonwealth of Virginia. G. The Drop Table System Manufacturer s Field Representative shall: 1. Be on site, for a minimum of two (2) days, to supervise the measurement of the embedded items listed in SECTION 1.03F.3.b., including all embedments, pipes and conduits related to the Drop Table System, prior to placing in concrete. 2. Supervise the installation of the equipment, conduct acceptance testing and train VRE personnel and VRE s contract-maintenance personnel in the proper operation and maintenance of the equipment. 3. Work with the Construction Contractor and be present at the site for all of the installation work of the equipment being furnished SUBMITTALS A. For each package, include an electronic copy (Adobe Acrobat PDF) on CD-ROM or flash drive. Scanned items shall be legible at normal one hundred percent (100%) display. Color originals shall be scanned in color. B. Incomplete, partial or piecemeal submittals will be returned without review. C. Sequence of Approval: 1. Conditional Approval of Equipment: Before submitting shop drawings, the Manufacturer shall submit to the Engineer for conditional approval drawings, specifications and lists of equipment to be incorporated in the work. This list shall include catalog numbers, cuts, and other descriptive data as may be required to ensure compliance with requirements specified. No consideration will be given to partial lists. Conditional approval of equipment based on this submittal will be subject to submission of complete shop drawings indicating compliance with the Contract Documents prior to final approval. Page 13R of 52

6 2. Final Approval of Equipment: After receiving conditional approval of the equipment lists, submit shop drawings, product data and installation instructions for final approval. D. Submit product data for all non-consumable purchased components, including: 1. Catalog cuts, pamphlets, brochures, color samples and descriptive literature 2. Equipment and specifications 3. Performance and test data 4. Country of origin. 5. Components not falling under this requirement are shop-fabricated items, and items that appear on the list of spare parts for routine maintenance under SECTION 1.07J. herein and/or items having a list unit price less than one thousand dollars ($1,000). 6. Specific items included in this work shall be indicated on the Manufacturer's product data sheets. Excluded items may be crossed out if this configuration is more logical. 7. The Manufacturer shall ensure that product data addressing the following items is submitted along with all other requested product data: a. Hydraulic power unit for motor dolly, including performance curves that indicate rate of delivery b. Programmable Logic Controller (PLC) (if utilized) c. Operator interface d. All motors e. Electrical starters, breakers and panels f. Transducers and sensors E. Detailed information on locations where fabrication and/or assembly operations for the equipment to be furnished as part of this Contract are to take place. F. Submit Shop Drawings: Shop drawings and diagrams shall be prepared using and showing scales and dimensions in the United States Customary Units (nonmetric). Metric conversions may be provided in parenthesis. Shop drawings may include exploded-view diagrams and shall include but not be limited to the following as applicable: Page 14R of 52

7 5. All material shall be in the English language. 6. Chapter 7 ( Illustrated Parts Catalog ) of each manual shall also contain a list of nearest local suppliers of all equipment parts, as well as contact information for the nearest factory-authorized service location. 7. Chapter 8 ( Miscellaneous ) shall also contain copies of start-up and acceptance test procedures and results/reports. E. Operating Diagrams: 1. Piping diagrams, electrical wiring diagrams, fuel oil, lubricating oil, water capacity diagrams, and other diagrams necessary for operation of machinery and equipment shall be furnished and installed where designated by the Engineer. 2. No single diagram shall show more than one (1) system, or parts thereof. 3. Diagrams shall be reproduced by photographic process to a size no to exceed eighteen (18) inches by twenty-four (24) inches and shall be complete and legible in all respects. Systems shall be subdivided into portions, which are operable from location where diagrams are installed, and to provide intelligible information within specified size. They shall be made on white paper and vacuum-sealed in transparent plastic material impervious to moisture and oil, and resistant to abrasion. Other formats, which are equal in clarity, sharpness, durability, and permanence, will be considered VERIFICATION OF DIMENSIONS A. Verify the dimensions and vehicle/truck/wheel characteristics of VRE s fleet of locomotives and coaches to ensure proper operations of the equipment and avoid clearance conflicts. The VRE revenue vehicle fleet to be serviced at the LOU Facility will consist of the following: 1. Locomotives: Twenty (20) MotivePower MP36PH-3C 2. Coaches: One Hundred (100) Nippon Sharyo Gallery-Style B. The Manufacturer shall be responsible for coordination and proper relation of all work to the equipment installation and to the work of all trades for the installation of the equipment in the pit. C. The Manufacturer shall verify all dimensions of the site, as measured by the Construction Contractor s surveyor that relate to fabrication and delivery of the Drop Table System and notify the engineer of any discrepancy before delivery of the equipment to the site. Page 22R of 52

8 8. Provide stainless steel cables, tensioned to 5,000 pounds, across and under the top of the spacer posts, on each end of the Drop Table, to provide fall-arrest connection points (two (2) persons per cable) in the release track area. 9. Provide a rolling cart with foot brake and flanged wheels that can be placed on the shop tracks and pushed to the unloading position of the wheelset on the auxiliary top at the release track position. This cart shall be constructed of aluminum components to be light weight. The walking surface of the cart shall be non-slip expanded planking, with a channel frame. Handrails shall be provided on the sides with a slot in the center to allow the traction motor to be supported by a Drop Table dolly. Provide a dimensioned shop drawing for the cart. 10. Furnish galvanized steel curb angles around all edges of the surrounding concrete shop floor that will be installed by the Contractor to provide the specified gaps between Drop Table equipment and the shop floor. Edge angle shall be 2 x 2 x ¼ with welded Nelson studs spaced as required for durability. Provide detailed installation drawing in shop drawings. D. Body Support Beam: 1. Designed to support the loads of the body supports and vehicle. 2. Body support beams shall be designed to permit the removal of the body supports at one (1) end of the beam. Beams shall have removable end stops to prevent accidental over-travel of the body supports. The slot for the removal of the body support shall be filled with a solid structural section with welded on cover and screw insert. 3. Provide solid, non-skid diamond plate steel with silica epoxy grit coating to the top surface of the beams (except where the body support flanged wheels travel). 4. Place anchor bolts no closer than 1 foot to the edge of the Drop Table pit. 5. The top of the body support beam shall be at the same level as the depressed side floor of the service top 6. The field side of the floor shall not be widened in the area of the anchor bolts for bolting them down. 7. Provide continuous ½ -16 expanded galvanized metal sheets supported by intermediate framing at a minimum 4 feet on center to fill the field side gap between the top of the body support beams and the underside of the adjacent concrete shop floor. Page 33R of 52

9 C. Pre-Installation Conference: VRE, the Construction Contractor and the Manufacturer shall meet at least one (1) week in advance of the scheduled date for installation of the equipment, and after submittals have been approved. The requirements for the equipment installation and conditions which could possibly interfere with successful performance of the work will be reviewed at this time. All individuals concerned with the equipment installation, or required to coordinate with it or to protect it thereafter, are required to attend the conference. D. Prior to installation of Drop Table equipment, inspect the pit for proper installation of anchor bolts and conduits as indicated on the approved drawings. Field check for clearance and interferences before installation and relocate material and equipment furnished as required (if approved by the engineer) to eliminate interferences. E. Fit equipment and appurtenances to the space provided and make readily serviceable. The Construction Contractor and Manufacturer shall coordinate work with other trades. F. Furnish and install additional supports and hangers as may be required for the proper installation of the equipment. G. The Drop Table System and all appurtenances shall be installed by the Manufacturer or its authorized agent in accordance with the drawings and approved Manufacturer's instructions. H. Make power connections to the main electrical panel, power and control connections in the pit, control connections to the Master Control Console and at each of the receptacles, and connections to the limit switches in the pit. I. Field Touch Up-Painting: Re-touch surfaces where the shop coat has been damaged, using the same paint film thickness as the original shop coat. J. Furnish common and skilled labor, tools, rigging equipment, scaffolding, shims and other materials necessary to make complete installation of equipment indicated. K. All personnel provided by the Manufacturer during the course of the Contract that require access to VRE s property shall be Railroad Safety Trained (RST) through mandatory completion of the VRE Roadway Worker Protection Class, and wear required personal protective equipment and company photo ID at all times while on the property. L. Receive, unload, check and store equipment in suitable facilities. All equipment should be kept clean, dry and free from damage and be marked and tagged with equipment item numbers. M. Examine equipment for concealed damage and report any damage. N. Be responsible for safety and protection from loss or damage of equipment received until work is complete. O. Pay demurrage charges and claims for damage resulting from unloading operations. Page 48R of 52

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

SECTION OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT

SECTION OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT SECTION 01832 OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. Furnish SEPTA with comprehensive Operations and Maintenance Manuals of all equipment

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO MEDICAL EQUIPMENT SUPPORTS SECTION 05600 1. GENERAL

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

1.1 RELATED DOCUMENTS

1.1 RELATED DOCUMENTS SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS PROJECT: Painting of the Signal Poles, Mast Arms and Decorative Bases OWNER: City of Goose Creek, Department of Public Works RECEIPT OF PROPOSALS: Separate sealed proposals for the

More information

Booster Pumping Station 115 Booster Pump Procurement

Booster Pumping Station 115 Booster Pump Procurement Madison Water Utility Tom Heikkinen General Manager 119 E. Olin Avenue Alan L. Larson PE, BCEE Principal Engineer Madison, Wisconsin 53713 Telephone: 608 266-4653 FAX: 608 266-4426 email: allarson@cityofmadison.com

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information

SECTION THERAPEUTIC POOL ACCESSORIES

SECTION THERAPEUTIC POOL ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-27 05 28.36 40 (August 2011) ----------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax: 6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

SECTION WIRELESS CLOCK/TONE GENERATOR SYSTEM

SECTION WIRELESS CLOCK/TONE GENERATOR SYSTEM SECTION 13805 WIRELESS CLOCK/TONE GENERATOR SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Satellite based, synchronized wireless clock/tone generator system, including clocks, tone generator,

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SECTION INTERIOR SIGNAGE

SECTION INTERIOR SIGNAGE SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by

More information

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT Page 1 IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COMMON WORK RESULTS FOR HVAC SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

St. Monica Food Pantry

St. Monica Food Pantry St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

Product Guide Specification

Product Guide Specification Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

OPERATION AND MAINTENANCE MANUAL. mcr TLB ECO GATES

OPERATION AND MAINTENANCE MANUAL. mcr TLB ECO GATES ASSA ABLOY Mercor Doors sp. z o.o. ul. Arkońska 6, bud. A2 80-387 Gdańsk tel. +48 58 732 63 00 fax +48 58 732 63 02/03 www.mercordoors.com.pl e-mail: mercordoors@assaabloy.com OPERATION AND MAINTENANCE

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE:

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE: SECTION 05100 STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE: A. The WORK of this SECTION shall consist of furnishing all the labor, materials, and equipment necessary for installation of structural

More information

PATHWAY 3G MODULAR ACCESS SYSTEM

PATHWAY 3G MODULAR ACCESS SYSTEM PATHWAY 3G MODULAR ACCESS SYSTEM TECHNICAL & ARCHITECTURAL SPECIFICATIONS Manufactured in the USA Homecare Products, Inc. All rights reserved. All text and images contained in this document are proprietary

More information

SIGNALS AND LIGHTING FIELD GUIDE

SIGNALS AND LIGHTING FIELD GUIDE CHAPTER 16 SIGNAL AND LIGHT POLES SIGNAL AND LIGHT POLES The standards and requirements for installing traffic control signal and light poles are presented in this chapter. 16.1 Traffic Control Signal

More information

SECTION PRE-MANUFACTURED CABINETS

SECTION PRE-MANUFACTURED CABINETS SECTION 12390 PRE-MANUFACTURED PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. The work includes furnishing all labor, materials and equipment required to complete the Pre-Manufactured Cabinet work as shown

More information

Installation Instructions

Installation Instructions Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information