1 SECTION FUEL OIL SYSTEM (PLUMBING) PART 1 GENERAL 1.01 SUMMARY A. Related Sections: Excavating, Backfilling, and Compaction for Utilities Cast-In-Place Concrete Piping (Plumbing). 4. Division 16 - Electrical SUBMITTALS A. Submit properly identified manufacturer's catalog cuts and technical data before starting work, including, but not limited to, the following: 1. Storage Tanks: Manufacturer's data, catalog cuts. 2. Accessories, Appurtenances, and Controls: Catalog cuts. 3. Pumps: Catalog cuts and performance characteristics. B. Shop Drawings: Submit complete shop drawings for A/E's review showing necessary plans, details, sections, manufacturer's recommendations, and explanatory notes to indicate compliance with the requirements of this section QUALITY ASSURANCE A. Tank Installer: Recognized by the tank manufacturer as proficient in fuel systems installation. B. Tank Manufacturer: Approve, in writing, the designation of the aboveground tank installer. C. Tank and tie downs shall be able to withstand wind velocity pressures according to American Society of Civil Engineers (ASCE) D. Rigidly anchor units to roof slab to withstand wind velocities determined By American Society of Civil Engineers (ASCE) Project No. SPECIFICATION GUIDELINES

2 1. Comply with calculations, signed and sealed by a Florida registered professional engineer, establishing wind velocity pressure values for the specific project according to ASCE 7-98 using a map wind speed of 146 mph, exposure category "C", and a wind load importance factor of WARRANTY A. Aboveground Storage Tank: Guarantee period of 30 years against internal or external corrosion effects. PART 2 PRODUCTS 2.01 EQUIPMENT A. Aboveground Storage Tanks: 1. Steel reinforced 6 inch concrete between two 10 gage steel walls. UL primary tank, bladder enclosed, and weather resistant coating at outer tank with tie downs. Label tanks with product, size, manufacturer, and FLAMMABLE. By B.R.E. Products Inc., Guardian Containment, Inc., or Convault. B. Packaged Day Tank and Pump System: 1. Day tank system Model SFT50A with press-to-test button, inside epoxy coating, pre-piped plumbing, pre-connected wiring, 1/3 hp bronze gear pump, heavy gage steel tank and cover, float switch, control panel with fuel level gage and hand pump. Use where transfer pumps are not required. 2. Day tank system Model SFT50A with press to test button, inside epoxy coating, pre-piped plumbing, heavy gage steel tank and cover, float switch, control panel with fuel level gage. Use where transfer pumps are required. 3. Approved Manufacturers: Simplex, Inc. or PYCO, Inc. C. Fuel Oil Pumps: 1. Preferred utilities or equivalent light oil pump sets, size, and characteristics as shown on drawings. 2. Pumps shall be of the positive displacement, gear type with cast iron bodies. Mount on a heavy, 1 piece structural steel channel base and connected through a Project No. SPECIFICATION GUIDELINES

3 flexible coupling, provided with a steel guard. Pump model number: L Controller shall be enclosed in a NEMA-1 cabinet and shall contain HAND-OFF-AUTOMATIC switches, magnetic starters, circuit breakers, pump running and alarm indicator lights, and alternator with malfunction lag pump control for intermittent operation. D. Fuel Oil System Valves: 1. Gate Valves: a. All bronze construction with union bonnet, rising stem, double wedge disc and threaded ends, 200 psi WOG. b. Manufacturers: Crane 430UB, or accepted equivalent. 2. Check Valves: a. Vertical: 1) Iron body, bronze trim, threaded ends, springloaded 250 psi WOG, non-shock. 2) Manufacturers: Mueller 203AP, or accepted equivalent. b. Horizontal: E. Liquid Level Gage: 1) Swing check, all bronze construction, regroundable bronze disc, Y pattern, threaded ends, 200 psi WOG, non-shock. 2) Manufacturers: Crane 3C, or accepted equivalent. 1. Gaging System: a. Hydraulic type, UL listed, remote reading, temperature compensated, fully automatic and calibrated at 100 gallon increments, complete with the following: 1) Dial indicator. 2) Adjustable check pointer. 3) Connecting tubing. 4) Mounting bracket. Project No. SPECIFICATION GUIDELINES

4 5) High-low level indicating switch for audible alarm on low oil level. b. Manufacturers: Preferred Utilities Series TG-HY, or accepted equivalent. F. Piping Details, Venting, and Valving: 1. Supply Pipe: Provide in-line filter. 2. Refer to drawings for additional detail requirements. G. Preferred Utilities or accepted equivalent tank level control No.LC-40-4 float operated, 24 inch differential setting, 150 pressure rating, UL listed all brass parts with Buna-N floats. Level control shall provide both low and high level control and alarm functions. Integrate level control with control center for fuel pumps. Use where transfer pumps are required. H. Tank Fittings: 1. Vent Protectors: Preferred Utilities or accepted equivalent galvanized cast iron, threaded, 2 inches for underground tank. 2. Preferred Utilities or accepted equivalent fill connection type W, watertight cast iron hot dipped galvanized, composition gasket, 4 inch size. Furnish 1 operating tool. PART 3 EXECUTION 3.01 INSTALLATION A. Anchorage: According to applicable building codes and in consideration of local ground conditions, as shown on the accepted shop drawings, as specified in this section, and as detailed on drawings. B. Required Tank Openings: Locate on centerline of shell according with manufacturer's recommendations and accepted Shop Drawings FIELD QUALITY CONTROL A. Tank Leak Test: Test pressure 5 psi. B. Piping System Leak Test: Project No. SPECIFICATION GUIDELINES

5 1. Apply R-22 to piping system before concealing pipe and connecting equipment. 2. Test system to 120 psig with electronic type detector having a maximum leak rate of 1 ounce per year. END OF SECTION Project No. SPECIFICATION GUIDELINES

SECTION BASIC MATERIALS AND METHODS

SECTION BASIC MATERIALS AND METHODS SECTION 15050 BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and Fittings. 1.02 RELATED SECTIONS A. Basic Mechanical Requirements: Section 15010. B. Supports, Anchors, and Seals:

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. FUEL GAS PIPING SECTION 15355 PART 1 GENERAL 1.1 DESCRIPTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. B. This specification covers both interior and exterior

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections. Issued 2006/08/01 Section 15183 Hydronic Systems: Steel Page 1 of 6 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes..1 Materials and installation for steel piping, valves and fittings for hydronic systems

More information

Project: # Solano Community College District

Project: # Solano Community College District ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

SECTION CHAIN LINK FENCING AND GATES

SECTION CHAIN LINK FENCING AND GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide chain link fencing and gates as Shown on the Contract Drawings

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to

More information

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable

More information

Section Heavy Duty Slide Gates Tender No. [ ] Page 1

Section Heavy Duty Slide Gates Tender No. [ ] Page 1 Tender No. [ ] Page 1 1.0 GENERAL 1.1 REFERENCES.1 Provide heavy duty slide gates in accordance with the following standards (latest revision) except where specified otherwise..2 American Society for Testing

More information

Rodney Hunt. A GA Industries Company Glydaseal Gates

Rodney Hunt. A GA Industries Company Glydaseal Gates Rodney Hunt A GA Industries Company Glydaseal Gates GUIDE BRONZE GUIDE BAR FRAME NUT POCKET SEAT FACING RESILIENT INVERT SEAT DISC GUIDE BAR ADJUSTMENT BOLT WITH LOCK NUT GUIDE BAR ATTACHING BOLT The Glydaseal

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES SECTION 224000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes 1. Faucets for lavatories and sinks. 2. Flushometers. 3. Toilet seats. 4. Protective shielding guards. 5. Fixture

More information

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of

More information

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe. PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under

More information

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing. SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

A. This Section includes plumbing fixtures and related components.

A. This Section includes plumbing fixtures and related components. SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition. SECTION 10800 TOILET ROOM ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic Tile. 4. 10170 - Solid Plastic Toilet Partition.

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

SECTION PRECAST CONCRETE STRUCTURES

SECTION PRECAST CONCRETE STRUCTURES SECTION 02605 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required

More information

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

VARIABLE FREQUENCY DRIVE SPECIFICATION

VARIABLE FREQUENCY DRIVE SPECIFICATION VARIABLE FREQUENCY DRIVE SPECIFICATION 1.0. SUMMARY The use of variable frequency drives (VFDs) in conjunction with wastewater lift stations has been identified as a means improve efficiency and to moderate

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

PENSTOCK VALVES. Performance through Excellence

PENSTOCK VALVES. Performance through Excellence VALVES & MANUFACTURING (1988) LTD. PENSTOCK VALVES Performance through Excellence SLIDEGATES WEIR GATES STOP LOGS SLIDEGATES PRECISION FACE SEALING VALVES WEIR GATES STOP LOGS SLIDEGATES Actuation Installation

More information

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

CS3 represents manufacturers of products for use in the municipal waterworks industry.

CS3 represents manufacturers of products for use in the municipal waterworks industry. Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

1.04 QUALITY ASSURANCE

1.04 QUALITY ASSURANCE SECTION 07312 ARCHITECTURAL ASPHALT SHINGLES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

The transducer component converts the measured signal and displays the actual value.

The transducer component converts the measured signal and displays the actual value. Digital inductive conductivity transmitter System Integration Provides low Total Cost of Ownership PEEK/PPA version for CIP applications TEACH IN and SIMULATION Function Approval PVDF Version PEEK Version

More information

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

SECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR

SECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR SECTION 084229.33 SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR PART 1-GENERAL 1.01 DESCRIPTION A. This section describes

More information

SECTION EQUIPMENT WIRING

SECTION EQUIPMENT WIRING PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 26 27 17 EQUIPMENT WIRING A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General Provisions,

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures. SECTION 22 05 16 LOOPS FOR PLUMBING PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CUSTOM FABRICATED EQUIPMENT

SECTION CUSTOM FABRICATED EQUIPMENT SECTION 11401 CUSTOM FABRICATED EQUIPMENT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 05500 - Metal Fabrications. 2. 10100 - Chalkboards, Markerboards, Tackboards, and Bulletin Board Cabinets.

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION LOW PRESSURE DUCTWORK

SECTION LOW PRESSURE DUCTWORK SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION CARPENTRY

SECTION CARPENTRY SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative

More information

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

General Information. Ball Curb Valve

General Information. Ball Curb Valve General Information 1. All Jones Curb Valves are manufactured in accordance with the AWWA Standard C-800-latest revision. 1. Copper Alloy CDA No. C83600 (85-5-5-5) 2. Copper Alloy CDA No. 89520 (Low Lead)

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)

More information

Heckmann Building Products Inc. DOVETAIL SLOT AND ANCHORS SPECIFICATION SECTION MASONRY ANCHORS AND ACCESSORIES PART 1 GENERAL

Heckmann Building Products Inc. DOVETAIL SLOT AND ANCHORS SPECIFICATION SECTION MASONRY ANCHORS AND ACCESSORIES PART 1 GENERAL Heckmann Building Products Inc. DOVETAIL SLOT AND ANCHORS SPECIFICATION MASONRY ANCHORS AND ACCESSORIES PART 1 GENERAL SECTION 04085 1.1 SECTION INCLUDES NOTE: Delete items below not required for project.

More information

thoroughly tried and tested! EWE Tapping Valves A single system for all types of pipes

thoroughly tried and tested! EWE Tapping Valves A single system for all types of pipes thoroughly tried and tested! EWE Tapping Valves A single system for all types of pipes www.ewe-armaturen.de EWE Tapping Fittings high-quality products from Germany EWE tapping fittings are the product

More information

FAIRBANKS NIJHUIS 1590 SERIES SINGLE STAGE VERTICAL INLINE PUMP.

FAIRBANKS NIJHUIS 1590 SERIES SINGLE STAGE VERTICAL INLINE PUMP. FAIRBANKS NIJHUIS 0 SERIES SINGLE STAGE VERTICAL INLINE PUMP www.fairbanksnijhuis.com FAIRBANKS NIJHUIS 0 Series Single Stage Vertical Inline Pump Capacities to 00 GPM (,00 m/hr) Heads to 0 Feet ( m) Temperatures

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COMMON WORK RESULTS FOR HVAC SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section

More information

Product Guide Specification

Product Guide Specification HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-33 34 13 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-33 34 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

Thru Wall Floor Seals For New Installation

Thru Wall Floor Seals For New Installation The O-Z/Gedney Thruwall and Floor Seals provide a positive means of sealing pipe, conduit or tube where they pass through a concrete foundation of a structure below grade or below ground water level or

More information

HYDRONIC PIPING

HYDRONIC PIPING SECTION 23 21 13 HYDRONIC PIPING PART 1 GENERAL 1.01 SECTION INCLUDES A. Hydronic system requirements. B. Heating water piping, above grade. C. Chilled water piping, above grade. D. Condenser water piping,

More information

New Product Release: October 2014 Boone Racks

New Product Release: October 2014 Boone Racks New Product Release: October 2014 Boone Racks Double Fido Fountain Mounting: Surface NOTE: THESE ROUGH-IN DIMENSIONS MAY VARY ½: (13 mm) PLUS OR MINUS NOTE: All dimensions subject to manufacturing variance

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCING SECTION 32 31 13 CHAIN LINK FENCING PART 1 - GENERAL 1.01 SECTION INCLUDES A. The Work specified in this Section consists of furnishing and installing permanent chain link fences and gates in accordance

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

Echotel Model 910 Ultrasonic Level Switch

Echotel Model 910 Ultrasonic Level Switch Echotel Model 910 Ultrasonic Level Switch D E S C R I P T I O N Echotel Model 910 Level Switches utilize ultrasonic contact technology for measuring level in clean liquid applications. The dual conduit

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube MODEL 240I SECTION 08120 FLUSH ALUMINUM DOORS AND FRAMES PART I GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to deliver and install aluminum doors, frames,

More information

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System. SECTION 15910 DUCT ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15890 - Ductwork. 2. 15900 - Controls and Instrumentation. 3. 15940 - Outlets (HVAC). 4. 15970 - HVAC Control System.

More information

General Information...SA1-SA4

General Information...SA1-SA4 SECTION S INDEX Product Description Page Number General Information................................................................SA1-SA4 Type FSK Thruwall & Floor Seal For Conduit, Pipe or Tubing............................

More information

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5 operation Instructions manual MUELLER E-5TM and D-5TM TAble of contents PAGE E-5 General Information 2 Drilling Machines D-5 General Information 3 Operating Instructions 4-5 E-5 Parts 6 D-5 Parts 7! WARNING:

More information

Products catalogue (I-P Edition)

Products catalogue (I-P Edition) Products catalogue (I-P Edition) Products catalogue (I-P Edition) FROM QUALITY OUR NATURAL DEVELOPMENT Active in the industry of Refrigeration and Air Conditioning for fifty-five years, Castel is well-established

More information

B. Related Sections: The following Sections contain requirements that relate to this Section:

B. Related Sections: The following Sections contain requirements that relate to this Section: SECTION 07311 - ASPHALT SHINGLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax: 6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01

More information

ADDENDUM 4 BID OPPORTUNITY NO

ADDENDUM 4 BID OPPORTUNITY NO ` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER

More information

Product Guide Specification

Product Guide Specification Halfen USA, Inc. July 2014 8521 FM 1976 PO Box 547 Converse, Texas 78109 Toll Free 800-423-9140 Fax 877-683-4910 Website www.halfenusa.com Email info@halfenusa.com Product Guide Specification Specifier

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

Walz & Krenzer, Inc.

Walz & Krenzer, Inc. 08 39 19/WAL BuyLine 9365 Walz & Krenzer, Inc. Watertight Door and Window Watertight Hatch Removable Lip Seal Flood Barrier System 3 Lip Seal Gasket Flood Barriers Flood Barriers and Watertight Closures

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125

More information

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER ANNEXURE-C TO TENDER BAP/FGD/2012/OT-1 BONGAIGAON 3X250 MW FLUE GAS DESULFURIZATION SYSTEM TECHNICAL SPECIFICATION LEVEL CONTROL VALVE HANDLING WATER CUSTOMER : NATIONAL THERMAL POWER CORPORATION LIMITED

More information

Figure 3. 1 ½ Nutating Disc with R-10 register

Figure 3. 1 ½ Nutating Disc with R-10 register Principle of Operation Liquid enters a precision-machined chamber containing a disc which nutates (wobbles). The position of the disc divides the chamber into compartments containing an exact volume. Liquid

More information

SECTION CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY

SECTION CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY SECTION 26 05 36 CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY PART 1 -GENERAL 1.1 SUMMARY A. Section includes cable tray. 1.2 REFERENCES A. ASTM A 123 Standard Specification for Zinc (Hot-Dip Galvanized)

More information

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES SECTION 08 1213.17 PART 1 - GENERAL 1.01 SECTION INCLUDES A. Prefinished steel door frames. B. [Sidelites] [, borrowed lites] [, and transom] assemblies. 1.02 RELATED REQUIREMENTS A. Section 06 2000 Finish

More information

AGUB Instrument and Meter Enclosures Explosionproof, Dust-Ignitionproof Furnished with aluminum body and solid or window cover.

AGUB Instrument and Meter Enclosures Explosionproof, Dust-Ignitionproof Furnished with aluminum body and solid or window cover. AGUB Instrument and Meter Enclosures Furnished with aluminum body and solid or window cover. Class I, Division 1 and, Groups B, C, D Application To pull or splice wires and/or to mount and enclose electrical

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation