1 ADDENDUM NO. 2 March 15, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be a part of the Contract Documents. Receipt of this Addendum shall be acknowledged on the Bid Form. PROJECT MANUAL Section Carpeting Revise paragraph 2.1.A.1.a to read as follows 2.1.A.1.a Shaw, No Rules Diffuse Tile Revise paragraph 2.1.A.1.c to read as follows 2.1.A.1.c Mohawk, QB 384 Awareness Tile Add the following paragraph A.2.2.C A.2.2.C Carpet Base with binding and cap 1. Shaw, Diffuse / Disperse Precoat 6, to be used as 4 high base. 2. Patcraft, Color Choice Ultraloc, to be used as 4 high base. 3. Mohawk, BC309 In the Loop, to be used as 4 high base Section Aluminum framed entrances and storefronts Revise paragraph 2.1.A.3 to read as follows: 2.1.A.3 a. Kawneer North America / 500 Heavy Wall, wide stile. b. Oldcastle (Vistawall) / 500 Heavy Wall, wide stile. AMBER VAN OCKER BROOK THORNTON - WAYNE THOWLESS 2400 E. Riverwalk, BOISE, IDAHO PHONE FAX

2 DRAWINGS Sheet A1.2 Sheet A3.2 Sheet SL1.1 Sheet A8.4 Sheet A8.5 Sheet A11.1 Revise keyed note F1 to read, Aluminum Faced Cladding Panel with Concealed Fasteners. At Toilet A113 provide (1) Changing station, Koala Kare, KB200-SS at south wall, provide all backing in stud wall for attachment. Add the following to Reference Note 2: Provide new single ply TPO membrane and associated roofing assemblies at existing mechanical well as shown on Addendum Drawings ADD through ADD 02-06, attached. At detail 2, revise exterior keyed note to be B2 in lieu of A1 Revise detail 5/A8.5 as shown on Addendum Drawing ADD and provide all items shown on associated Addendum Drawing ADD 02-02, attached. Revise the reflected ceiling plan at Library B119 location per Addendum Drawing ADD 02-07, attached. ELECTRICAL ADDENDUM ITEMS Refer to Payne Engineering Inc letter titled Electrical Addendum dated March 15, 2018, attached, along with associated sketches, shall be part of this Addendum and part of the Contract Documents for this project. MECHANICAL ADDENDUM ITEMS Refer to Engineered Systems Associates letter title Addendum No. 2 dated March 15, 2018, attached along with associated sketches, shall be part of this Addendum and part of the Contract Documents for this project. END OF ADDENDUM NO. 2 AMBER VAN OCKER BROOK THORNTON - WAYNE THOWLESS 2400 E. Riverwalk, BOISE, IDAHO PHONE FAX

3 ATTACHMENTS Addendum Drawings ADD through ADD Payne Engineering, Electrical Addendum Engineered Systems Associates, Addendum No. 2 AMBER VAN OCKER BROOK THORNTON - WAYNE THOWLESS 2400 E. Riverwalk, BOISE, IDAHO PHONE FAX

4

5

6

7

8

9

10

11 ELECTRICAL ADDENDUM March 15, 2018 Brook Thornton LKV Architects 2400 E. Riverwalk Dr. Boise, Idaho RE: Mt. View Elementary School Remodel Sheet E1.1 & E3.1: 1. Ceiling in half of the Library changed to a Gyp. Board Sloped Ceiling, lighting and Special Systems in this portion of the Library has modified. See Attached Sketch Sheets SK-E1,E2,E3 & E4. Sheet E2.0: 1. The new 400A disconnect for new Air Handler AH-5 shall be a Fused Type disconnect. Fused per equipment nameplate rating East Center Street Pocatello, Idaho (208) Fax (208)

12 END OF ELECTRICAL ADDENDUM 1823 East Center Street Pocatello, Idaho (208) Fax (208)

13 6 7 F4 F4 J 1 F11 F12 B-2 1 F12E F1 SPD F8E F12 F11 CD1 S F11 CD3 S F Library B119 F12 F11 F11E NL H F3E F8 (TYP) CD1 S KEY NOTES: # 1 1 UTILIZE EXISTING LIGHTING CIRCUIT THAT ORIGINATED IN AREA; FIELD VERIFY HOMERUN LOCATON AND PROVIDE NEW CONTROLS AS INDICATED. 2 E.C. SHALL FIELD COORDINATE INSTALLATION OF FIXTURES WITH EXPOSED MECHANICAL DUCTWORK. E.C. SHALL ALSO FIELD COORDINATE SUSPENSION LENGTHS OF FIXTURES WITH ARCHITECT PRIOR TO FINAL INSTALLATION TO PROVIDE ARCHITECTURAL LOOK OF FIXTURES WITH SPACE. 3 E.C. SHALL RELOCATE ALL EXISTING J-BOXES IN CEILING SPACE OF LIBRARY AREA AS REQUIRED FOR INSTALLATION OF NEW GYP. BOARD CEILING AND IN ORDER TO MEET NEC REQUIREMENTS FOR ACCESSIBILITY OF ELECTRICAL BOXES. PE#: Engineering Inc. Consulting Engineers 1823 E. Center Pocatello, Idaho tel (208) fax (208) Mt. View Elementary School Floor Plan - Area B Lighting Sheet Reference: Project number Date Drawn by Revision #: E1.1 SK-E1 03/13/18 SAM 1 Scale: 1/8" = 1'-0"

14 PARTIAL LIGHTING FIXTURE SCHEDULE TYPE FIXTURE DESCRIPTION MOUNTING VOLTS LAMPS MFGR. CATALOG # NOTES F11 4FT STRIP FIXTURE, ROUND DIFFUSE LENS, AIRCRAFT CABLE SUSPENSION SUSPENDED 120 LED-3000LM- 4000K LITHONIA CLX-L LM-SEF-RLD-120-GZ10-40K-80CRI- SCBA-ZACFPD120 1,3 F11E F12 F12E 4FT STRIP FIXTURE, ROUND DIFFUSE LENS, AIRCRAFT CABLE SUSPENSION, EMERG. BATTERY PACK 8FT STRIP FIXTURE, ROUND DIFFUSE LENS, AIRCRAFT CABLE SUSPENSION 8FT STRIP FIXTURE, ROUND DIFFUSE LENS, AIRCRAFT CABLE SUSPENSION, EMERG. BATTERY PACK LIGHT FIXTURE SCHEDULE NOTES: SUSPENDED 120 LED-3000LM- 4000K SUSPENDED 120 LED-6000LM- 4000K SUSPENDED 120 LED-6000LM- 4000K LITHONIA LITHONIA LITHONIA CLX-L LM-SEF-RLD-120-GZ10-40K-80CRI- PS1050-SPD-SCBA-ZACFPD120 CLX-L LM-SEF-RLD-120-GZ10-40K-80CRI- SCBA-ZACFPD120 CLX-L LM-SEF-RLD-120-GZ10-40K-80CRI- PS1050-SPD-SCBA-ZACFPD REFER TO DRAWINGS FOR FIXTURES DESIGNATED TO BE DUAL-LEVEL SWITCHED OR 0-10V DIMMING. PROVIDE REQUIRED SWITCH-LEGS AND CONDUCTORS FOR CONTROL AS SHOWN ON DRAWINGS. 2. FIXTURE TO BE CONTINUOUS ROW MOUNTED LENGTH AS INDICATED ON DRAWINGS, PROVIDE ACCESSORIES REQUIRED FOR CONTINUOUS MOUNTING. 3. COORDINATE COLOR WITH ARCHTITECT PRIOR TO ORDERING. 4. FIELD ADJUST PENDANT LENGTH AS REQUIRED, VERIFY LENGTH WITH COUNTER AS DIRECTED BY ARCHITECT. 5. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR PLACEMENT AND MOUNTING HEIGHT OF FIXTURES. 1,3 1,3 1,3 PE#: Engineering Inc. Consulting Engineers 1823 E. Center Pocatello, Idaho tel (208) fax (208) Mt. View Elementary School Partial Light Fixture Schedule Sheet Reference: E1.2 Project number Date Drawn by Revision #: 03/13/18 Author SK-E2 Scale: See Drawing

15 6 7 8 J FIELD VERIFY EXACT MTG LOCATION WITH OWNER 1 TV 2D-4 +60" TS 2D-4 CP 1D-3 C3R Library B119 WAP 1D-3 H WAP 1D-3 1 W2R C4R Stor. B120 IP-P1 2D-4 2D-4 CAM Toilet A113 PT CS1R 2D-4 1 PE#: Engineering Inc. Consulting Engineers 1823 E. Center Pocatello, Idaho tel (208) fax (208) Mt. View Elementary School Floor Plan - Area B Special Systems Sheet Reference: Project number Date Drawn by Revision #: E3.1 SK-E3 03/13/18 Author 1 Scale: 1/8" = 1'-0"

16 INTERCOM/CLOCK/BELL SYSTEM SCHEDULE ID MANUFACTURER DESCRIPTION MOUNTING QTY NOTES 1 CEILING SPEAKER C1R VALCOM ANALOG ONE-WAY CEILING MOUNTED SPEAKER W/ RECESSED BACKBOX RECESSED - GYP. CEILING 7 C2R VALCOM ANALOG ONE-WAY CEILING MOUNTED SPEAKER W/ RECESSED BACKBOX RECESSED - LAY IN 3 C3R VALCOM IP TALK-BACK 8" CEILING MOUNTED SPEAKER W/ RECESSED BACKBOX RECESSED - GYP. CEILING 1 C4R VALCOM IP TALK-BACK 8" CEILING MOUNTED SPEAKER W/ RECESSED BACKBOX RECESSED - LAY IN 1 CLOCK/SPEAKER COMBO CLK1S VALCOM WALL MOUNTED IP SPEAKER/CLOCK COMBO 2-WAY SPEAKER W/ SURFACE 10 BACKBOX AND WIREGUARD CS1R VALCOM WALL MOUNTED IP SPEAKER/CLOCK COMBO 2-WAY SPEAKER W/ BACKBOX RECESSED 25 MISC. COMPONENTS PT VALCOM PUSH TO TALK CALL BUTTON RECESSED, 1-GANG BOX 32 WALL SPEAKER W1S VALCOM ONE-WAY FLEX HORN, WEATHERPROOF W/ WEATHERPROOF BACKBOX SURFACE 10 W2R VALCOM ANALOG ONE-WAY WALL MOUNTED SPEAKER W/ RECESSED BACKBOX RECESSED 10 W2S VALCOM ANALOG ONE-WAY WALL MOUNTED SPEAKER W/ SURFACE BACKBOX SURFACE 4 1 PE#: Engineering Inc. Consulting Engineers 1823 E. Center Pocatello, Idaho tel (208) fax (208) Mt. View Elementary School Intercom/Clock/Bell System Schedule Sheet Reference: E3.1 Project number Date Drawn by Revision #: SK-E4 03/13/18 Author 1 Scale: See Drawing

17 Engineered Systems Associates 1355 East Center Pocatello, ID ADDENDUM NO.2 March 15, 2018 PROJECT NAME: Mountain View Elementary Specifications: 1. Add attached Specification Plumbing Fixtures. Drawings: 1. Make Ductwork Changes as noted in sketches M1.2A and M2.1A Attached. Prior Approvals: Rooftop HVAC Units: Please stay with Seasons 4 or Annexair as specified under base bid. Engineered Air, Energy Labs and Venmar may also provide alternate pricing to be evaluated by the School District. Include Alternate Equipment Form attached with your bid. END OF ADDENDUM Addendum 2

18 ALTERNATE EQUIPMENT PROPOSED SUBSTITUTE MATERIALS The total sum of the Bidder's proposal shall include the furnishing and installing of all materials, equipment, and labor as called for in the contract documents as a base bid. Hereafter give the total amount to be added or deducted for a complete installation of equipment or materials other than those specified and those approved by addendum are submitted for the Owner's consideration. All materials and equipment proposed for substitution shall be listed below and must meet the requirements of the contract documents. During the time of consideration of the proposals, complete information shall be submitted immediately to the Architect and Owner's Representative. Proposed Substitute Manufacturer and Catalog Numbers $ Add $ Deduct

19

20

21 SECTION PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General Provisions of Contract, including General and Supplementary Conditions and Section apply to this Section. 1.2 SUMMARY A. Furnish and install plumbing fixtures as described in Contract Documents. B. Before fixtures are ordered, the Contractor shall submit a complete list of plumbing fixtures, giving the catalog number, cut and make, for approval. Fixtures shall not be ordered until this list is approved. PART 2 - PRODUCTS 2.1 GENERAL A. Interior exposed pipe, valves, and fixture trim shall be chrome plated. B. Do not use flexible water piping. C. Flow Control Fittings: 1. Vandal proof type and fit faucet spout of fixture used. Flow shall be controlled as required by local codes. D. Furnish and install the necessary plumbing fixtures in quantity as shown on plans. Provide all necessary valves, chrome plated 17 gauge or cast "P" traps, stops with risers, fittings, and accessories to make the job complete with the fixtures specified on the drawings. Exposed stops to be equal to Brasscraft with compression inlet, chrome plated nipples, cross handles, ¼ turn ball valves and flexible risers. E. Fixtures shall be PROFLO, Kohler, Crane, Briggs, Eljer, American Standard, or an approved equal. Specialties shall be Zurn, Josam, MiFab, J. R. Smith, Wade, or Watts. F. Toilet seat manufacturers shall be Beneke, Church, Olsonite, or Bemis. G. Carrier and wall hydrant manufacturers shall be Smith, Zurn, Wade, Josam, or Watts. H. Mop sink manufacturers shall be Stern-Williams or Fiat. I. Stainless steel sink manufacturers shall be Elkay or Just. J. Drinking fountain manufacturers shall be Elkay, Halsey Taylor, Haws, Cordley, Sunroc, or Oasis. K. Pressure balance mixing valves shall be Powers, Lawler, Leonard, or Symmons. L. Stainless steel showers and wash fountains shall be Bradley or Acorn. M. Thermostatic mixing valves shall be Powers. Mountain View Elementary School PLUMBING FIXTURES

22 N. Provide GSR "Fuseseal" flame retardant acid resisting pipe and fittings where shown. Provide slip joint union connections on all traps and connections to equipment. PART 3 - EXECUTION 3.1 INSTALLATION A. Install fixtures including traps and accessories with accessible stop or control valve in each hot and cold water branch supply line. B. Mounting Refer to Architectural Elevations: 1. Urinals: a. Standard - 20 inches from floor to bottom lip. b. Handicap - 17 inches from floor to bottom lip. C. Make fixture floor connections with approved brand of cast iron floor flange, soldered or calked securely to waste pipe. D. Make joints between fixtures and floor flanges tight with approved fixture setting compound or gaskets. E. Caulk between fixtures and wall and floor with white butyl rubber non-absorbent caulking compound. Point edges. F. Cleanouts: Provide and set full size cleanouts at foot of each riser, and ends of branches from toilets, at points where a change of direction occurs, on exposed and accessible traps, at points where required to remove rust accumulation or other obstructions and as shown on plans. Set screw cap in cleanout with graphite paste. Location of all cleanouts subject to approval of inspector. G. Traps: Install "P" traps in branch lines from floor drains or where required. Traps installed in connection with threaded pipe shall be recess drainage pattern. Traps installed in connection with cast iron pipe shall be of the same quality and grade as the pipe. Traps installed in connection with fixtures shall have a seal of not less than 2" nor more than 4". Exposed traps shall be chrome plated cast brass or chrome plated 17 gauge tubular type. Provide trap primers as required by Code. 3.2 FIXTURE INSTALLATION A. Provide stop valves and 18" minimum air chambers on all water connections to fixtures. Furnish and install wall carriers for wall mounted fixtures, wood backing, where necessary, to be installed by General Contractor at the direction of this Contractor. Provide exact locations, including proper mounting heights, obtained from details on drawings and from manufacturer's specifications. Provide hudee rims for countertop installations. B. Interior exposed pipe, valves, and fixtures trim shall be chrome plated. C. Complete installation of each fixture including trap and accessories with accessible stop or control valve in each hot and cold water branch supply line. Make fixture floor connections with approved brand of cast iron floor flange, soldered or caulked securely to waste pipe. Make joint between fixture and floor flange tight with approved fixture setting compound or gaskets. D. Polish chrome finish at completion of project. Caulk between fixtures and wall and floor with white butyl rubber non-absorbent caulking Mountain View compound. Paint all edges. E. Install fixtures and fittings as per local codes and manufacturer's instructions. END OF SECTION Mountain View Elementary School PLUMBING FIXTURES

A. This Section includes plumbing fixtures and related components.

A. This Section includes plumbing fixtures and related components. SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PLUMBING - FIXTURES AND TRIM

2016 CDM Smith All Rights Reserved July 2016 SECTION PLUMBING - FIXTURES AND TRIM PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 22 40 00 PLUMBING - FIXTURES AND TRIM A. Furnish all labor and materials required and install the following Plumbing Fixtures and companion Fixture Trim complete

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES SECTION 224000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes 1. Faucets for lavatories and sinks. 2. Flushometers. 3. Toilet seats. 4. Protective shielding guards. 5. Fixture

More information

WADE 2-1. Universal Carrier. Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains.

WADE 2-1. Universal Carrier. Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains. Universal Carrier Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains. The 400 series carrier accommodates most urinal, water-cooler or hanger plate lavatory

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

New Product Release: October 2014 Boone Racks

New Product Release: October 2014 Boone Racks New Product Release: October 2014 Boone Racks Double Fido Fountain Mounting: Surface NOTE: THESE ROUGH-IN DIMENSIONS MAY VARY ½: (13 mm) PLUS OR MINUS NOTE: All dimensions subject to manufacturing variance

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 4000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations. Addendum No. 3 Re / Objet: Phase Two Espanola High School Redevelopment Project 147 Spruce Street Espanola, ON YBA Project No.: 1323 `The following information, amendments and revisions shall constitute

More information

St. Monica Food Pantry

St. Monica Food Pantry St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.: Addendum No.: 1 Date: 3/15/216 Project: Canyon ISD City View Elementary Additions Project No.: 15-48.1 From: To: Dekker/Perich/Sabatini 5 South Taylor St., Suite 75 Amarillo, TX 7911 All Prospective Bidders

More information

HALL 1 & HALL 4 RESTROOM FINISH UPGRADE 100 SOUTH WEST TEMPLE, SLC, UT QUOTE # SLP42848 AUGUST 29, 2017 CONSTRUCTION DOCUMENTS ABBREVIATIONS

HALL 1 & HALL 4 RESTROOM FINISH UPGRADE 100 SOUTH WEST TEMPLE, SLC, UT QUOTE # SLP42848 AUGUST 29, 2017 CONSTRUCTION DOCUMENTS ABBREVIATIONS DRAWING INDEX HALL 1 & HALL 4 BID INFORMATION RESTROOM 100 SOUTH WEST TEMPLE, SLC, UT 84111 QUOTE # SLP42848 AUGUST 29, 2017 CONSTRUCTION DOCUMENTS ABBREVIATIONS CONSULTANTS OWNER SYMBOL LEGEND VICINITY

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe Markers. 1.02 SUBMITTALS A. Submit valve chart and schedule,

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

SECTION LIGHTING

SECTION LIGHTING SECTION 16500 - LIGHTING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

A. It is preferred that all submittals to be submitted electronically in PDF format.

A. It is preferred that all submittals to be submitted electronically in PDF format. June 20 2013, Rev 00 10 2800 Toilet, Bath, and Laundry Accessories PART 1. GENERAL 1.01 This Section includes: A. Toilet room accessories: 1.02 Submittals 1. Grab bars 2. Metal framed mirrors 3. Sanitary

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS SECTION 10520: FIRE EXTINGUISHERS AND CABINETS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS: A. This section specifies fire extinguishers, cabinets for fire extinguishers, fire and other accessories. Their

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

MALEKO WALL-MOUNT FAUCET INSTALLATION

MALEKO WALL-MOUNT FAUCET INSTALLATION SKU(s): 934146 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the

More information

SECTION DOMESTIC WATER AND SANITARY DRAINAGE PIPING PART 1 GENERAL

SECTION DOMESTIC WATER AND SANITARY DRAINAGE PIPING PART 1 GENERAL 15140.1 SECTION 15140 DOMESTIC WATER AND SANITARY DRAINAGE PIPING PART 1 GENERAL 1.1 SECTION INCLUDES A. Furnish and install sanitary drainage and vent piping systems, and domestic water piping, including

More information

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A

More information

PLASTIC BALLCOCK Includes: Vinyl Refill Tube, Float Rod, Flange Nut, Washer, 5/8 or 1/2 Coupling Nut and Water Level Adjustable Screw.

PLASTIC BALLCOCK Includes: Vinyl Refill Tube, Float Rod, Flange Nut, Washer, 5/8 or 1/2 Coupling Nut and Water Level Adjustable Screw. Flush Valves PLASTIC BALLCOCK Includes: Vinyl Refill Tube, Float Rod, Flange Nut, Washer, 5/8 or 1/2 Coupling Nut and Water Level Adjustable Screw. Toilet Flappers 51005 10 Anti siphon 5 50 6.25 P51005

More information

Installation and Maintenance Instructions

Installation and Maintenance Instructions Installation and Maintenance Instructions Bradley Barrier-Free HN-300 In-Wall Shower Table of Contents Pre-Installation Information................2 Warranty...............................2 Components

More information

SECTION MEDICAL AND SURGICAL LIGHTING FIXTURES

SECTION MEDICAL AND SURGICAL LIGHTING FIXTURES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 55 71 MEDICAL AND SURGICAL LIGHTING FIXTURES SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

System 3000 specifications

System 3000 specifications System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

DIVISION 26 ELECTRICAL SECTION ELECTRICAL

DIVISION 26 ELECTRICAL SECTION ELECTRICAL DIVISION 26 ELECTRICAL SECTION 26 1000 ELECTRICAL PART 1 - GENERAL 1.1 WORK INCLUDED A. Furnish all labor, material and equipment necessary for the complete installation of the Electrical System as shown

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

Product Guide Specification

Product Guide Specification Zurn Industries, LLC November 2014 1801 Pittsburgh Avenue Erie, PA 16502 Toll Free (855) 663-9876 Phone (814) 455-0921 Fax (814) 871-6141 Website www.zurn.com Product Guide Specification Specifier Notes:

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

BALANTINE WALL-MOUNT FAUCET INSTALLATION

BALANTINE WALL-MOUNT FAUCET INSTALLATION SKU(s): 911574, 911575 BALANTINE WALL-MOUNT FAUCET INSTALLATION BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

ESCUTCHEONS & NIPPLES THREAD CODE CHART UNIVERSAL

ESCUTCHEONS & NIPPLES THREAD CODE CHART UNIVERSAL ESCUTCHEONS & NIPPLES THREAD CODE CHART ID # SIZE MANUFACTURER 1 1/2" - 24 Thread Sayco 2 9/16" - 20 Thread American Standard, Central Brass 3 5/8" - 18 Thread Price Pfister, Repcal 4 5/8" - 24 Thread

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain

Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain EDFP217FPC Installer To assure you install this model easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION.

More information

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1 A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10

More information

www.wildmanconstruction.com Changing your toilet is an easy project that should take half a day or less. The most common toilet has a separate tank that mounts on top of the bowl. These instructions apply

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

Acrylic Claw Foot Tub

Acrylic Claw Foot Tub Acrylic Claw Foot Tub Wrench or socket Drill & Bits Parts Recommended 2-2 x12 boards 4 Lag Bolts 4 Flat Washers Be sure to re-inforce the floor before securing tub. We recommend 2-2 x12 s securely fastened

More information

Moveable Workstations. Enterprise KEWAUNEE. encouraging new discovery...worldwide

Moveable Workstations. Enterprise KEWAUNEE. encouraging new discovery...worldwide Enterprise Moveable Workstations KEWAUNEE encouraging new discovery...worldwide Movable Workstations Self-supporting workstations Single and double sided Adjustable height worksurfaces Integrated shelving

More information

Specifications & Measurements

Specifications & Measurements Specifications & Measurements For Catalog No. 1701 Effective July 1, 2016 Prices are subject to change without notice. Unless price is protected in writing, shipments will be at the prevailing prices.

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. FUEL GAS PIPING SECTION 15355 PART 1 GENERAL 1.1 DESCRIPTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. B. This specification covers both interior and exterior

More information

I-VICFLEX.VS1. Victaulic VicFlex Style VS1 Dry Sprinkler WARNING WARNING TECHNICAL DATA BEND CHARACTERISTICS INSTALLATION INSTRUCTIONS SIDEWALL

I-VICFLEX.VS1. Victaulic VicFlex Style VS1 Dry Sprinkler WARNING WARNING TECHNICAL DATA BEND CHARACTERISTICS INSTALLATION INSTRUCTIONS SIDEWALL INSTALLATION INSTRUCTIONS I-VICFLEX.VS1 Victaulic VicFlex Style VS1 Dry Sprinkler SIDEWALL Y Read and understand all instructions before attempting to install any Victaulic VicFlex Style VS1 Dry Sprinklers.

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

GLENBROOK/GLENGUARD VITREOUS CHINA DRINKING FOUNTAIN/CUSPIDOR

GLENBROOK/GLENGUARD VITREOUS CHINA DRINKING FOUNTAIN/CUSPIDOR GLENBROOK/GLENGUARD VITREOUS CHINA DRINKING FOUNTAIN/CUSPIDOR BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

S.NO Description Quantity Rate Amount

S.NO Description Quantity Rate Amount INTERIOR WORKS NANDIMANDALAM BRANCH S.NO Description Quantity Rate Amount 1 Full height partition with laminate finish and glass. Providing & fixing partly glazed partly paneled Dry Wall Partition with

More information

ADDENDUM NO. 3. Ellis County Elections Building

ADDENDUM NO. 3. Ellis County Elections Building AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION LIGHTING PART 1- GENERAL

SECTION LIGHTING PART 1- GENERAL SECTION 16500 LIGHTING PART 1- GENERAL 1.01 WORK INCLUDED A. The Contractor shall provide all lighting fixtures, panelboards, labor, material, etc., in accordance with the preceding specifications, the

More information

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

B. Samples: For color, letter style, and graphic representation required for each identification material and device. PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Low Base 3, 4 and 5-Piece Showers with SnapJoint 3/4/5 LBS SJ

Low Base 3, 4 and 5-Piece Showers with SnapJoint 3/4/5 LBS SJ ARCHITECTURALS INC. Architectural Products for Barrier Free Living Barrier Free Architecturals 2788 Bathurst Street Toronto, On Canada M6B3A3 1(877) 717-7027 or visit: www.barrierfree.org EMAIL: info@barrierfree.org

More information

SECTION COMMERCIAL PLUMBING FIXTURES

SECTION COMMERCIAL PLUMBING FIXTURES SECTION 22 4200 COMMERCIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install plumbing fixtures as described in Contract Documents. B. Related Sections:

More information

A. Submit manufacturer's technical data and installation for each type of sign required.

A. Submit manufacturer's technical data and installation for each type of sign required. SECTION 10425 PART ONE GENERAL 1.1 SECTION INCLUDES A. Interior Building Signage. B. Handicapped parking signs. C. Permanent Project Sign. 1.2 DESCRIPTION A. Signage shall consist of room number and room

More information

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2 FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions

More information

WILLIS WALL-MOUNT FAUCET INSTALLATION

WILLIS WALL-MOUNT FAUCET INSTALLATION SKU(s): 924620 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the

More information

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and

More information

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE 231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE

More information

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

ZIP CLOUD SUSPENDED INSTALLATION MANUAL

ZIP CLOUD SUSPENDED INSTALLATION MANUAL ZIP CLOUD SUSPENDED INSTALLATION MANUAL www.delviro.com info@delviro.com 1.877.502.3434 SAFETY NOTE: Follow the Electrical Codes of the Country where this fixture will be installed. For Canada follow the

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Nameplates. B. Tags. C. Stencils. D. Pipe Markers. 1.2 RELATED REQUIREMENTS A. Section 099123 - Interior

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Ford Water Meter Couplings & Accessories

Ford Water Meter Couplings & Accessories Section H 2/2001 Ford Water Meter Couplings & Accessories The Ford Meter Box Co., Inc. 775 Manchester Avenue, P.O. Box 443, Wabash, Indiana, USA 46992-0443 Telephone: 260/563-3171 FAX: 1-800-826-3487 Overseas

More information

Pressure Balance Shower Only Dual Control (Volume & Temperature) Ceramic Disc Cartridge Platinum Shower Trim Kit

Pressure Balance Shower Only Dual Control (Volume & Temperature) Ceramic Disc Cartridge Platinum Shower Trim Kit Shower Only PL8900-00 & TR-SH Pressure Balance Shower Only Dual Control (Volume & Temperature) Ceramic Disc Cartridge Platinum Shower Trim Kit - Installation Instructions Before Your Installation Read

More information

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8 Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18 Manual 40100X35-8 3 2 4 Access covers with bolts supplied with Interceptor 1 5 14 6 11 15 Sampling Port/Cleanout cap supplied with Interceptor 12

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition. SECTION 10800 TOILET ROOM ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic Tile. 4. 10170 - Solid Plastic Toilet Partition.

More information

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet Waynetown Water System Improvements Division A -New Water Treatment Plant Town of Waynetown, IN Submittal Review Sheet Attached is the submittal for the Lavatory for the Waynetown Water Systems Improvements

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet Waynetown Water System Improvements Division A -New Water Treatment Plant Town of Waynetown, IN Submittal Review Sheet Attached is the submittal for the Utility Sink for the Waynetown Water Systems Improvements

More information

YSD 400 Sliding Door System Installation Manual

YSD 400 Sliding Door System Installation Manual System Installation Manual 2006 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION

More information

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt ADDENDUM Project: Des Plaines Public Library Renovations Addendum No. 01 Project No: 13300 Date: 02 September 2015 To: The Des Plaines Public Library Issued by: Lisa Schmidt ATTN: ALL FFE BIDDERS Senior

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information