1 Utility Application Procedures for District Cooling, Gas and Pneumatic/Traditional Waste Management Document No.: LUS-CPALL-MAQ-PRC-UT P a g e

2 CONTENTS 1. INTRODUCTION Definitions General Nomenclature 6 2. REGISTRATION AND REQUEST FOR INFORMATION 8 3. DISTRICT COOLING ENERGY TRANSFER STATION (ETS) ETS Preliminary Design ETS Detailed Design ETS Material Submittals ETS Method Statement ETS Installation and Inspection GAS DISTRIBUTION SYSTEM Gas Preliminary Design Stage Gas Detailed Design Stage Gas Material Submittals Gas Method Statement Gas Installation and Inspection PNEUMATIC & TRADITIONAL WASTE MANAGEMENT PWC Preliminary Design Stage PWC Detailed Design Stage PWC Material Submittals PWC Method Statement PWC Installation and Inspection APPENDICES 18 2 P a g e

3 1. INTRODUCTION 1.1 Definitions Client CAC Marafeq Contractor Customer Building Consultant The Master Developer - Lusail Real Estate Development Company (LREDC) or its appointed representative. City Administration Complex. The Utility Company which provides District Cooling, Gas Supply and Pneumatic/Traditional Waste Management Services. The Organization or its appointed representative, responsible for execution of the works. The Owner of building or his representative. The Consultant employed by the owner and who is responsible for design development. 1.2 General This document describes the procedures for connecting the Customer s building to Marafeq utilities (District Cooling, Gas and Pneumatic/Traditional Waste Management Systems). The Customer to follow the procedures of this documents in compliance with Marafeq guidelines and technical requirements listed in the below table. The full responsibility for the design and installation of each sub-development stays with the Customer for that sub-development. 3 P a g e

4 Document No. Description District Cooling DC) LUS-CPALL-MAQ-SPE-UT LUS-CPALL-MAQ-SPE-UT LUS-CPALL-MAQ-SPE-UT LUS-CPALL-MAQ-SPE-UT District Cooling Distribution System Design Guidelines for Pre-insulated Pipes for Mega-development District Cooling Distribution System Design Guidelines for Civil Works for Mega-development District Cooling Distribution System Design Guidelines for Mechanical Works for Mega-development Marafeq s Design Guidelines for the connection of ETS(s) to the District Cooling System Gas (GAS) LUS-CPALL-MAQ-SPE-UT LUS-CPALL-MAQ-SPE-UT LUS-CPALL-MAQ-SPE-UT Gas Distribution System Design Guidelines for Megadevelopment & Sub-development Gas Distribution System Design Guidelines for Pressure Reducing Station (Primary Customer Meter) Gas Distribution System Risk Assessment Guidelines for Mega-development Pneumatic and Traditional Waste Collection LUS-CPALL-MAQ-SPE-UT Pneumatic and Traditional Waste Management System Design Guidelines for Sub-development The Customer must coordinate with Marafeq in all of the following stages for the three utilities DC, Gas and Pneumatic/Traditional Waste Management. The detailed requirements of each stage are covered in the next pages. Registration and Request for Information Preliminary Design Detailed Design Material Submittals Method Statement Equipment Installation and Inspection A workflow diagram showing the sequence of submittals and stages of Marafeq review is seen below. Communication to CAC at the respective stages of approval as indicated in the work flow diagram shall be followed accordingly. The Customer should submit all submittals in soft copy (CD) unless otherwise specified. Marafeq review status will be issued to the assigned address provided by the Customer. Marafeq is holding a technical consultation on Sunday. One half hour allocated for each Customer and the Customer shall send a meeting request with the agenda of meeting to customer.service@marafeq.com.qa by latest two working days before holding the meeting. 4 P a g e

5 5 P a g e

6 1.3 Nomenclature This document describes the guidelines to the nomenclature to be followed while providing a document number to a document, like Technical Submittals or Inspection Requests that are to be submitted to Marafeq Qatar. The customer has to strictly follow the guidelines as listed out in the table below and described further. Sl. No. Document Number (Nomenclature) Type of Document 1 LUS-MAQ-(CUSTOMER ID)-INR-(UTILITY)-00XX-RevXX Inspection Request 2 LUS-MAQ-(CUSTOMER ID)-SDW-(UTILITY)-00XXRevXX Shop Drawing 3 LUS-MAQ-(CUSTOMER ID)-PDS-(UTILITY)-00XXRevXX Preliminary Design 4 LUS-MAQ-(CUSTOMER ID)-DDS-(UTILITY)-00XXRevXX Detailed Design 6 LUS-MAQ-(CUSTOMER ID)-MTS-(UTILITY)-00XXRevXX Material Submittal 7 LUS-MAQ-(CUSTOMER ID)-MOS-(UTILITY)-00XXRevXX Method Statement 8 LUS-MAQ-(CUSTOMER ID)-SPE-(UTILITY)-00XXRevXX Specifications 9 LUS-MAQ-(CUSTOMER ID)-WPS-(UTILITY)-00XXRevXX Welding Procedure 11 LUS-MAQ-(CUSTOMER ID)-GEN-(UTILITY)-00XXRevXX General (All other submittals like design conformance application etc.) 6 P a g e

7 The values mentioned within the closed brackets will change according to the customer and the requirement whereas the 00XX represents the number of the document which will start from 0001 and then move on in the ascending order. The revision number (RevXX) has to be maintained depending on how many times the document has been resubmitted. The first submission will always have a revision, Rev00. [For example, if a customer with customer ID MQ100, wants to raise a Welding Inspection Request for DC, for a joint that was rejected once in the first INR, the document number should be as follows: LUS-MAQ-MQ100-INR-DC-0001-Rev01] The customer should also ensure that for each type of submittal the numbering starts from 0001, irrespective of whether 0001 has already been used for another type of submittal. [For example; a customer has to raise his first Inspection Request as LUS-MAQ-MQ100-INR-DC Rev00, even if he already has a submittal for Shop Drawing as LUS-MAQ-MQ100-SDW-DC Rev00, because they are two separate types of documents.] The customer has to always ensure that when an already commented document is resubmitted, it should contain the same Nomenclature as the original document with the only change being in the revision number. If an already commented document is resubmitted as a new document, with new number, the document will be rejected at that point itself. 7 P a g e

8 2. REGISTRATION AND REQUEST FOR INFORMATION The Customer should complete the registration form as provided in Appendix (A) with specifying the applicable utility and submit to Marafeq by . The registration is essential for the Customer to access any further services from Marafeq. For the purpose of design calculations, the Customer may request the allocated utility (District Cooling, Pneumatic Waste Collection and Gas) pipe sizes and estimated load for the building by completing Appendix (B) and submitting to Marafeq Customer Service by . Marafeq shall provide the required information within five working days from the date of receiving the application. 8 P a g e

9 3. DISTRICT COOLING ENERGY TRANSFER STATION (ETS) 3.1 ETS Preliminary Design Marafeq review only the ETS room location after receiving the following submittals from the Customer: 1. Application No. 3 as provided in Appendix (C) to be completed by the Customer. 2. Building site plan drawing. 3. Architectural layout drawing showing the ETS room location. 4. ETS design conformance application duly signed and stamped by the Customer. Cooling demand mentioned on the application shall be the basis of Cooling Supply Agreement. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format (AutoCAD, MS Word, Excel, etc.). Marafeq will provide the review status on Preliminary Design submittal within ten working days from the date of receiving the submittal. After final Preliminary Design approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq s stamp. 3.2 ETS Detailed Design The Customer should submit the ETS submittal for Marafeq s review comprising of following: 1. Application No. 3 as provided in Appendix (C) to be completed by the Customer. 2. ETS room piping and instrumentation diagram. This drawing shall be developed based on Marafeq Design Guideline for ETS connection. 3. DC primary piping layout inside the plot boundary/basement. Piping layout shall show tie-in points with co-ordinates and invert level. 4. Detailed ETS layout and section drawing showing all equipment inside the ETS room. 5. Secondary side chilled water equipment schedule and schematic drawings. (For information only) 6. Compliance statement to Marafeq s guidelines signed and stamped by the Customer. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format. 9 P a g e

10 Marafeq will provide the review status on Detailed Design submittal within ten working days from the date of receiving the submittal. After final Detailed Design approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq s stamp. 3.3 ETS Material Submittals In this stage the Customer should submit the following: 1. Application No. 3 as provided in Appendix (C) to be completed by the Customer. 2. Material submittal for the major materials i.e. plate heat exchanger, primary chilled water pipes with the insulation, pressure independent control valve (PICV), isolation valves and PLC. Material submittal should be provided with selection sheets, detailed calculation of equipment, shop drawings and compliance statement. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format. Marafeq will provide the review status on Material Submittals submittal within ten working days from the date of receiving the submittal. After final Material Submittals approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq s stamp. 3.4 ETS Method Statement In this stage the Customer should submit the following: 1. Application No. 3 as provided in Appendix (C) to be completed by the Customer. 2. External utilities layout showing the interfacing between infrastructure and building services provided with the coordinates and invert levels. 3. Shop drawings duly approved by the Building Consultant in compliance with Detail Design Approval. (For reference and record only) 4. All welding documents: Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), Welder Qualification Test (WQT), welding certificates, weld maps, etc. 5. Method statement for the installation and testing/commissioning of primary side of equipment inside ETS room. 6. Method statement for flushing the primary chilled water pipes. 10 P a g e

11 Drawings and documents must be submitted in softcopy (CD) both PDF and editable format. Marafeq will provide the review status on Shop Drawings and Method Statement submittal within ten working days from the date of receiving the submittal. After final Shop Drawings and Method Statement approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq s stamp. 3.5 ETS Installation and Inspection The Customer shall complete the Inspection Request Form as provided in Appendix (F) for every inspection to be made and submit to Marafeq by latest five working days before the inspection date. Three weeks before the pipe installation inside the ETS room is completed, the Customer should request for Marafeq equipment (energy meter, flow meter, temperature transmitters and pressure differential transmitter). The inspection must be verified by the Building Consultant prior to Marafeq s inspection. Marafeq may inspect the installation at any stage but particularly to the following stages. Initial inspection: 1. Major materials delivery inspection. 2. After plate heat exchangers are put in place. 3. Welding of pipes. 4. Radiographic testing for weld joints. Final inspection: 1. Marafeq will conduct a final inspection after equipment, components and piping are installed and connected. A snag list will be issued to the Customer. 2. Pressure test. 3. After flushing is done, cleaning test results are available. 4. Passivation test results are available. 5. The Customer is responsible to maintain chemicals in the pipeline until finally connected to the network. 6. The Customer should submit the following to Marafeq: Signed pressure test documents. Signed flushing documents with satisfactory water analysis report. Installation compliance statements signed by equipment suppliers. As-built drawings. Marafeq will issue an ETS Conformance Certificate after final inspection is satisfied. 11 P a g e

12 4. GAS DISTRIBUTION SYSTEM 4.1 Gas Preliminary Design Stage Marafeq review only the Pressure Reducing and Metering Station (PRMS) location after receiving the following submittals from the Customer. 1. Application No. 4 as provided in Appendix (D) to be completed by the Customer. 2. Building site plan drawing. 3. Architectural layout drawing showing the PRMS location. 4. PRMS design conformance application duly signed and stamped by the Customer. Gas demand mentioned on the application shall be the basis of Gas Supply Agreement. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format (AutoCAD, MS Word, Excel, etc.). Marafeq will provide the review status on Preliminary Design submittal within ten working days from the date of receiving the submittal. After final Preliminary Design approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq stamp. 4.2 Gas Detailed Design Stage The Customer should submit the submittal for Marafeq s review comprising of following: 1. Application No. 4 as provided in Appendix (D) to be completed by the Customer. 2. PRMS detail and section drawing showing all components inside the PRMS cabinet includes the cabinet details along with shop drawings. 3. Compliance statement to Marafeq s guidelines signed and stamped by the Customer. 4. Building gas piping details and section drawing showing all components and routing in the building includes details of gas shaft, gas meter room, risers, droppers, pipe in pipe, sleeving, gas leak detection system, supply pressure, air vent, and etc. 5. Specifications for building gas piping system. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format (AutoCAD, MS Word, Excel, etc.). Marafeq will provide the review status on Detailed Design submittal within ten working days from the date of receiving the submittal. 12 P a g e

13 After final detailed design approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq stamp. Marafeq will stamp on building gas piping details design drawings and documents (item 4 and 5) for Consultant to submit to Qatar Civil Defense approval. 4.3 Gas Material Submittals In this stage the Customer should submit the following: 1. Application No. 4 as provided in Appendix (D) to be completed by the Customer. 2. Material submittal for PRMS components showing size & material, capacity, pressure rating, standard, manufacturing standard, material mill certificate, material certificates, International Standard Organization (ISO 9000) certificate, manufacturer and country of origin. 3. Material submittal for building gas piping. 4.4 Gas Method Statement In this stage the Customer should submit the following: 1. Application No. 4 as provided in Appendix (D) to be completed by the Customer. 2. External utilities layout drawings showing the interfacing between infrastructure and building services provided with the coordinates and invert levels. 3. Shop drawings duly approved by the Building Consultant in compliance with Detail Design Approval. (For reference and record only) 4. Method statement for the installation, testing, pre-commissioning and commissioning of PRMS. 5. Method statement for the installation, testing, pre-commissioning and commissioning of building gas piping system. 6. All welding documents: Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), Welder Qualification Test (WQT), welders certificate, weld maps, etc. 13 P a g e

14 4.5 Gas Installation and Inspection The Customer shall complete the Inspection Request Form as provided in Appendix (F) for every inspection to be made and submit to Marafeq by latest five working days before the inspection date. The inspection must be verified by the Building Consultant prior to Marafeq s inspection. Marafeq may inspect the installation at any stage but particularly to the following stages. Initial inspection: A. Material delivery inspection based on the approved materials submittal. B. All welding documents: Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), Welder Qualification Test (WQT), welders certificate, weld maps, etc. C. Relevant Non Destructive Test, e.g. Radiographic testing, Dye Penetrant Test, Magnetic Particles Test for weld joints. D. Test package documents, then shall conduct Pneumatic Pressure Test on PRMS pipe spools and witness by MQ. E. After PRMS cabinet is put in place (installed at site). F. After service line piping and building piping are installed but before piping is connected to the PRMS. Final inspection: 1. Marafeq will conduct a final inspection after equipment components and piping are installed and connected. A snag list will be issued to the Customer. 2. The Customer shall conduct Site Acceptance Test for operational of the PRMS equipment and system witness by Marafeq. 3. The Customer should submit to Marafeq: Signed pressure test documents. Installation compliance statements signed by equipment suppliers. As-built drawings. Marafeq will issue a PRMS Conformance Certificate after final inspection is satisfied and to stamp on the building gas piping as built drawings and documents for submission to Qatar Civil Defense approval. 14 P a g e

15 5. PNEUMATIC & TRADITIONAL WASTE MANAGEMENT 5.1 PWC Preliminary Design Stage Marafeq review only the Discharge Valve (DV) room location after receiving the following submittals from the Customer. 1. Application No. 5 as provided in Appendix (E) to be completed by the Customer. 2. Building site plan drawing. 3. Architectural layout drawing showing the DV room location. 5. PWC design conformance application duly signed and stamped by the Customer. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format (AutoCAD, MS Word, Excel, etc.). Marafeq will provide the review status on Preliminary Design submittal within ten working days from the date of receiving the submittal. After final Preliminary Design approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq stamp. 5.2 PWC Detailed Design Stage The Customer should submit the Pneumatic/Traditional Waste Management submittal for Marafeq s review comprising of following: 1. Application No. 5 as provided in Appendix (E) to be completed by the Customer. 2. PWC piping detailed layout and section drawing including pipe network, compressed air system, control cable system and DV room details. The drawing should indicate the limit of works at the plot boundary connection. 3. Garbage chute detail drawing indicating waste inlet volume control hopper door and chute diameter. (For information only) 4. Compliance statement to Marafeq s guidelines signed and stamped by the Customer. Drawings and documents must be submitted in softcopy (CD) both PDF and editable format (AutoCAD, MS Word, Excel, etc.). Marafeq will provide the review status on Detailed Design submittal within ten working days from the date of receiving the submittal. 15 P a g e

16 After final Detailed Design approval, the Customer should submit for record purposes one hardcopy A1 size for Marafeq stamp. 5.3 PWC Material Submittals In this stage the Customer should submit the following: 1. Application No. 5 as provided in Appendix (E) to be completed by the Customer. 2. Material submittal for PWC pipes and fittings. 5.4 PWC Method Statement In this stage the Customer should submit the following: 1. Application No. 5 as provided in Appendix (E) to be completed by the Customer. 2. External utilities layout showing the interfacing between infrastructure and building services provided with the coordinates and invert levels. 3. Shop drawings including pipe network, compressed air system, control cable system and DV room details duly approved by the Building Consultant in compliance with Detail Design Approval. (For reference and record only) 4. Method statement for the installation of pipes and fittings (from tie-in point up to DV room). 5. Method statement for CCTV inspection and pressure testing of complete internal pipe (from tie-in point up to DV room). 6. All welding documents: Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), Welder Qualification Test (WQT), welding certificates, weld maps, etc. 5.5 PWC Installation and Inspection The Customer shall complete the Inspection Request Form as provided in Appendix (F) for every inspection to be made and submit to Marafeq by latest five working days before the inspection date. The inspection must be verified by the Building Consultant prior to Marafeq s inspection. Marafeq may inspect the installation at any stage but particularly to the following stages. 16 P a g e

17 Initial inspection: 1. Material delivery inspection. 2. Welding of pipes. 3. Radiographic testing for weld joints. 4. Installation of DV room components. 5. After CCTV inspection is done and report is available. 6. Pressure test inspection and report is available. Final inspection: 1. Marafeq will conduct a final inspection after equipment, components and piping are installed and connected. A snag list will be issued to the Customer. 2. The Customer shall submit to Marafeq the following: Compressed air test results for pressure loss. I/O test results for individual components to the control box. Installation compliance statement signed by equipment suppliers. As-built drawings. Marafeq will issue a PWC Conformance Certificate after final inspection is satisfied. 17 P a g e

18 6. APPENDICES Appendix A Application No. 1 Registration Form Appendix B Application No. 2 Request for Information Appendix C Application No. 3 District Cooling Appendix D Application No. 4 Gas Appendix E Application No. 5 Pneumatic & Traditional Waste Management Appendix F Application No. 6 Inspection Request Form 18 P a g e

19 Customer Registration Form Land Details Application Date Municipality Application Number Plot Number Plot Type and Use Requested Utility APPENDIX A MQID: طلب تسجيل عميل معلومات العقار تاريخ الطلب رقم طلب بلدية الظعاين رقم القطعة نوع القطعه واإلستخدام الخدمة المطلوبة DC PWC GAS Expected Connection Date DC: PWC: GAS: التاريخ المتوقع لتوصيل الخدمة Type of Customer: Company Individual Information Update نوع العميل: شركة شخصي تحديث معلومات عميل Owner Name اسم المالك C.R NO. OR Owner ID No. رقم السجل التجاري أو الرقم الشخصي C.R Expiry Date OR Owner ID Expiry Date تاريخ انتهاء السجل التجاري أوالبطاقة الشخصية للمالك Authorized Person Name Mobile Land Line Phone Number P.O. Box اسم المخول بالتوقيع الهاتف الجوال رقم الهاتف األرضي صندوق البريد البريد اإللكتروني Owner OR Authorized Signature توقيع المالك أو المخول بالتوقيع Company Stamp ختم الشركة CONSULTANT Company Name C.R No. C.R Expiry Date Name Authorized Person Contact Person Mobile Land Line Phone Number P.O. Box Authorized Person Signature اإلستشاري اسم الشركة رقم السجل التجاري تاريخ انتهاء السجل التجاري اسم المخول بالتوقيع اسم المسؤول الهاتف الجوال رقم الهاتف األرضي صندوق البريد البريد اإللكتروني توقيع المخول بالتوقيع Company Stamp ختم الشركة Attachment: A. Individual: 1. ID Copy both sides 2. Proof of ownership B. Companies: 1. C.R Copy 2. Computer ID Copy 3. ID of Authorized Signatory Note: If the consultant was changed or terminated prior to the completion of the project, the owner shall update Marafeq Qatar immediately. مالحظه: في حال تم انهاء خدمات اإلستشاري المذكور أعاله من أعمال المشروع أو تغييره على المالك إخطار شركة مرافق قطر وتحديث البيانات الخاصة باإلستشاري الجديد Marafeq Qatar L.L.C P.O. Box 5651, Doha, State of Qatar T: F: DL: Mobile: customer.service@marafeq.com.qa Website: Doc. /Form No.: MQ LD CS-INSP M 02 Rev.2

20 APPENDIX B APPLICATION NO.2 REQUEST FOR UTILITIES INFORMATION CUSTOMER ID: DATE: PLEASE TICK FOR REQUIRED INFORMATION FOR MARAFEQ USE DISTRICT COOLING Total cooling load: Pipe size: GAS Total Gas load: Pipe size: PWC Pipe size: Date: Date: (Signature and Stamp of Consultant) (Signature and stamp of Marafeq Qatar) 1 P age Document Name: Application No.2 Request for Utilities Information - Rev. 0

21 APPENDIX C APPLICATION NO.3 DISTRICT COOLING APPLICATION FOR MARAFEQ UTILITIES TO BE COMPLETED BY THE CONSULTANT CUSTOMER ID DATE: DOCUMENT NUMBER: CONSULTANT INFORMATION Name: Contact Person: Address: Telephone: Fax: Mobile: STAGE Preliminary Design Detailed Design ETS Material Submittals Method Statements and Other Documents DOCUMENTS CHECK LIST Preliminary Design: Building site plan drawing. Architectural layout drawing showing the ETS room location. ETS design conformance application duly signed and stamped by the Customer/Consultant. Index sheet for the contents of the submittal. Detailed Design: ETS design conformance application. ETS Room Piping and Instrumentation Diagram. DC primary piping layout inside the plot boundary/basement.piping layout shall show tie-in point with co-ordinates and invert level. Detailed ETS layout and section drawing showing all equipment, piping and instruments inside ETS room. ETS Material Submittals: Material submittal for plate heat exchanger, primary DC pipes, PICV, strainer, isolation valves and PLC. Index sheet for the contents of the submittal. Method Statements and Other Documents: External utilities layout showing the interfacing between infrastructure and building services provided with the coordinates and invert levels. etc.). Welding documents (WPS, PQR, Welding certificates, weld maps, Method statement for the installation and testing/commissioning of equipment inside ETS room. Method statement for flushing the primary chilled water pipes. Index sheet for the contents of the submittal. Chilled water Equipment schedule and schematic diagram for secondary side. (For Information). Compliance statement to Marafeq s guidelines. Index sheet for the contents of the submittal (Signature, Date and Stamp of Consultant) (Checked and Received by MQ Customer Service) 1 P a g e Document Name: Application No.3 District Cooling - Rev. 2

22 APPENDIX D APPLICATION NO.4 GAS APPLICATION FOR MARAFEQ UTILITIES TO BE COMPLETED BY THE CONSULTANT CUSTOMER ID DATE: DOCUMENT NUMBER CONSULTANT INFORMATION Name: Contact Person: Address: Telephone: Fax: Mobile: STAGE Preliminary Design Detailed Design PRMS Material Submittals Method Statement and Other Documents DOCUMENTS CHECK LIST Preliminary Design Stage: Building site plan drawing. Architectural layout drawing showing the PRMS location. PRMS design conformance application. Index sheet for the contents of the submittal. Detailed Design Stage: PRMS detailed drawing and section showing all components inside PRMS cabinet. Compliance statement to Marafeq s guidelines. PRMS Material Submittals: Material submittal for PRMS components. Index sheet for the contents of the submittal. Method Statement and Other Documents: External utilities layout showing the interfacing between infrastructure and building services provided with the coordinates and invert levels. Method statement for the installation, precommissioning and commissioning. Index sheet for the contents of the submittal. Index sheet for the contents of the submittal (Signature, Date and Stamp of Consultant) (Checked and Received by MQ Customer Service) 1 P a g e Document Name: Application No.4 Gas - Rev. 2

23 APPENDIX E APPLICATION NO.5 PNEUMATIC AND TRADITIONAL WASTE MANAGEMENT APPLICATION FOR MARAFEQ UTILITIES TO BE COMPLETED BY THE CONSULTANT CUSTOMER ID DATE: DOCUMENT NUMBER CONSULTANT INFORMATION Name: Contact Person: Address: Telephone: Fax: Mobile: STAGE Preliminary Design Detailed Design PWC Material Submittals Method Statement and Other Documents DOCUMENTS CHECK LIST Preliminary Design Stage: Building site plan drawing. Architectural layout drawing showing the DV room location and space for bulky waste. Access to bulk waste room by waste truck. PWC design conformance application. Index sheet for the contents of the submittal. Detailed Design Stage: PWC piping detailed layout and section drawing indicating the limit of works at the plot boundary connection as per Design Guidelines. Garbage chute detail drawing indicating waste inlet volume control hopper door, chute diameter and DV room. panel. Indicate chute cleaning and fire alarm signal to PWC control PWC Material Submittals: Material submittal for PWC pipes and fittings. Index sheet for the contents of the submittal. Method Statement and other documents: External utilities layout showing the interfacing between infrastructure and building services provided with the coordinates and invert levels. Method statement for the installation of pipes and fittings (from tie-in point up to DV room). Method statement for CCTV inspection and pressure testing of complete internal pipe (from tie-in point up to DV room). etc.). Welding documents (WPS, PQR, Welding certificates, weld maps, Index sheet for the contents of the submittal. Compliance statement to Marafeq s guidelines. Index sheet for the contents of the submittal (Signature, Date and Stamp of Consultant) (Checked and Received by MQ Customer Service) 1 P a g e Document Name: Application No.5 Pneumatic and Traditional Waste Management - Rev. 0

24 APPENDIX F APPLICATION NO.6 INSPECTION REQUEST FORM APPLICATION FOR MARAFEQ UTILITIES CUSTOMER ID: DATE: District Cooling Pneumatic & Traditional Waste Management Gas INR NO: Type of Inspection: Location and Quantity of Works: Attached Reference Documents: Requested Inspection Date: Inspection Time: COMMENTS: Approved: Yes No CONTRACTOR BUILDING CONSULTANT INSPECTOR MARAFEQ QATAR PROJECT MANAGER Name: Name: Name: Name: Signature: Signature: Signature: Signature: Date Date Date Date Stamp: Stamp: Stamp: Stamp: 1 P a g e Document Name: Application No.6 Inspection Request Form - Rev. 0

25 APPENDIX G APPLICATION NO.7 INSPECTION REQUEST FOR CONNECTION WITH INFRASTRUCTURE PIPES APPLICATION FOR MARAFEQ UTILITIES CUSTOMER ID: DATE: District Cooling Pneumatic & Traditional Waste Management Gas INR NO: Type of Inspection: Location and Quantity of Works: The consultant to provide approval reference number for the following submittals: Pipe Material Submittal Method Statement for Flushing of Primary Pipes Shop Drawing Passivation Test Results Requested Inspection Date: Comments: Inspection Time: STATUS: NO OBJECTION REJECTED CONTRACTOR BUILDING CONSULTANT MARAFEQ QATAR Inspector Project Manager Network Contractor Name: Name: Name: Name: Name: Signature: Signature: Signature: Signature: Signature: Date: Date: Date: Date: Date: Stamp: Stamp: Stamp: Stamp: Stamp: 1 P a g e Document Name: Application No.7 Connection Inspection - Rev. 0

LUSAIL DEVELOPMENT UTILITY APPLICATION PROCEDURES FOR PNEUMATIC/TRADITIONAL WASTE MANAGEMENT DOCUMENT NO.: LUS-CPALL-MAQ-PRC-UT-20561

LUSAIL DEVELOPMENT UTILITY APPLICATION PROCEDURES FOR PNEUMATIC/TRADITIONAL WASTE MANAGEMENT DOCUMENT NO.: LUS-CPALL-MAQ-PRC-UT-20561 UTILITY APPLICATION PROCEDURES FOR PNEUMATIC/TRADITIONAL WASTE MANAGEMENT DOCUMENT NO.: LUS-CPALL-MAQ-PRC-UT-20561 REV. NO DATE ISSUED REASON FOR ISSUE DOCUMENT HISTORY Prepared By Checked By Approved

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

INSPECTION AND TEST PLAN

INSPECTION AND TEST PLAN BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Inspection and Test Plan for Water Tube Boiler

Inspection and Test Plan for Water Tube Boiler www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING

More information

APPLICATION FORM FOR INFRASTRUCTURE NOC

APPLICATION FORM FOR INFRASTRUCTURE NOC APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Section XV - PER, Design, and Construction Submittal Requirements

Section XV - PER, Design, and Construction Submittal Requirements Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

FIT-OUT PERMIT REQUEST (GENERAL WORKS) Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0. SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett

More information

PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION

PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION TG 61 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION WELDING & WELDING PROCEDURE QUALIFICATION Issued

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR THE ISRAEL ELECTRIC CORPORATION LTD. ENGINEERING PROJECTS GROUP SPECIFICATION No. 01-1E/S STANDARD SPECIFICATION FOR STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015

More information

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting. Number: BD-020 Title: Electronic Plan Submittal and Review Effective Keywords: Permits, Plan Review, Plan Submittal Date: April 3, 2013 Revision Date: vember 4, 2015 Approved By: Thomas Hogarth Contact

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD) DOCUMENT 01105 FOR PRELIMINARY REVIEW/APPROVAL PART I: SUBMITTAL 1.1 CITY OF FRIENDSWOOD (COF) A. Submit four (4) copies of drawings. B. Submit by 5:00 PM a minimum of fourteen calendar days (14 cd) prior

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

SUBMITTAL REVIEW COVERSHEET

SUBMITTAL REVIEW COVERSHEET SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

Waste Treatment Plant Project Supply Chain Collaboration Event. QVD How To Get Started

Waste Treatment Plant Project Supply Chain Collaboration Event. QVD How To Get Started Waste Treatment Plant Project 2016 Supply Chain Collaboration Event QVD How To Get Started Quality Verification Documentation (QVD) Discussion Topics Lessons Learned Start With The End In Mind (G-321-V

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip: Central Lyon County Fire Protection District 246 Dayton Valley Rd Suite 106 Dayton, NV 89403 Rich Harvey, Chief Office (775) 246-6209, Fax (775)246-6204 TTY 7-1-1 APPLICATION FOR COMMERCIAL CONSTRUCTION

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

TYPE OF PIPING PRESSURE TESTING. For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded).

TYPE OF PIPING PRESSURE TESTING. For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded). ATTACHMENT A (1/1) TYPE OF PIPING PRESSURE TESTING TEST TYPE TEST MEDIUMS APPLIED (As per Block Dia.) WORK SEQUENCE HYDROSTATIC Water * For SS/HA piping Max. Cl. 40 ppm General CASE-1 (Base Case) CASE-2

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

Inspection and Test Plan for Battery Charger

Inspection and Test Plan for Battery Charger Inspection and Test Plan for Battery Charger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Remark Manuf. TPI Client 1 Pre Inspection Meeting Spec. Spec.

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal. SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

CLARK COUNTY FIRE CODE AMENDMENTS

CLARK COUNTY FIRE CODE AMENDMENTS CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio

More information

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT 209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101835-MEC-QW-E-2002 Senior QA/QC Welding Engineer Holds a B. Sc. in Mechanical Power Engineering and has about 15 years hands-on experience working as QA/QC Engineer & Welding Inspector in several industrial

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

Connection Impact Assessment Application Form

Connection Impact Assessment Application Form Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER ANNEXURE-C TO TENDER BAP/FGD/2012/OT-1 BONGAIGAON 3X250 MW FLUE GAS DESULFURIZATION SYSTEM TECHNICAL SPECIFICATION LEVEL CONTROL VALVE HANDLING WATER CUSTOMER : NATIONAL THERMAL POWER CORPORATION LIMITED

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS... 4 3.0 DRAWING CONTROL... 4 4.0 PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 5.0 GUIDELINES FOR PREPARATION OF DRAWINGS... 5 6.0 CONTENTS

More information