TYPE OF PIPING PRESSURE TESTING. For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded).

Size: px
Start display at page:

Download "TYPE OF PIPING PRESSURE TESTING. For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded)."

Transcription

1 ATTACHMENT A (1/1) TYPE OF PIPING PRESSURE TESTING TEST TYPE TEST MEDIUMS APPLIED (As per Block Dia.) WORK SEQUENCE HYDROSTATIC Water * For SS/HA piping Max. Cl. 40 ppm General CASE-1 (Base Case) CASE-2 (When app. by NIOEC) check/ Dry out PNEUMATIC * Oil free air for IA to air-operated valves and N2 for unit 02 Large Dia Piping - line - Flare - Gas CASE-1 (Base Case) CASE-2 (When app. by NIOEC) check/ blowing blowing IN SERVICE Service Fluid Only Approved by NIOEC check/ Flushing/ Blowing Service test Note for line For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded).

2 ATTACHMENT B (1/2) PIPING TEST PACKAGE (TP) FLOW CHART REVIEW / LINE CHECK / PUNCH LIST EXECUTION (PUNCH OUT/ LINE CLEANING/ PRESS. TEST/ POST TEST) DOCUMENTATIO N (FINAL DOCUMENT CONFIRMATION) RECORD EMPLOYER (NIOEC) - Review -line check QC Gr. Piping Gr. -Review -Register - Review QC items -Review -line check Working copy TP Copy Keep by contractor (&NIOEC) Working copy CONST. TP Copy TP Original Keep by CC -Execution TP Original Keep by CC & finally submit to NIOEC - CC will prepare original TP and one copy for working LEGEND: Working copy TP flow Original TP flow Original TP (*) working copy TP flow

3 ATTACHMENT B (2/2) DETAIL WORK FLOW FOR A/G TEST PACKAGE DOCUMENT HANDLING/ LINE CLEANING/ PRESS. TEST/ POST TEST ACTIVITY TEST PACKAGE LINE CHECK NIOEC//PUNCH OUT LINE CLEANING PRESS. TEST POST TEST TIME/PERIOD Three Weeks Before ing One Week Immediately after testing EMPLOYER (NIOEC) - check - QC document review Confirmation of Witness Witness Check Copy of test pack. - check - QC document review Confirmation of Witness Witness Check Copy of test pack. Two Copies Notice No Ok Notice No Ok CONST. Package preparation Follow up Punch Item -Preparation of line (R)* -Preparation of line (R)* -Drain out -(Drying) - Post (R)* - Finalize test package * (R) Inspection record required. TEST PACKAGE : - Contents Refer to Package Contents T TO INSTALL - PSV - Control valve - Thermwell - Strainer element - Orifice plate - All instruments - Disconnect all inst. - Lead pipings INSTALLATION - Control valve - Thermwell - Strainer element - Level Instrument REMOVE - Temporary blind - Other temp. part INSTALLATION T TO INSTALL - PSV - Orifice plate * Spring Hanger set pin do not remove Note 1: NIOEC / Contractor conformation is required.

4 ATTACHMENT C (9/16) PIPING SPOOLS SHOP FABRICATED ISO DRG : INSPECTION SPOOL : Relase Report LINE : CHECK ITEMS 1 CONFORMITY WITH ISO DRG (CONFIGURATION, DIMENSIONS, SIZE, ) 2 PIPE MATERIAL & THIKNESS. CORRECT 3 FLANGE MATERIAL & RATING. CORRECT 4 TYPE & MATERIAL OF FITTINGS, VALVES & OTHER COMPONENTS (if any) CORRECT 5 WELDING COMPLETED, VISUALLY INSPECTED. EXT. & INT (if possible) & ACCEPTED 6 NDE (RT,PT,MT) COMPLETED AND RESULTS STATIS FACTORY 7 PWHT AND HARDNESS TEST COMPLETED SATIS FACTORILY 8 OLETS FOR INSTRUMENTS CONNECTIONS CORRECTLY INSTALLED (LOCATION & ORIENTATION) 9 INSTRUMENT FLANGES TO PIPE WELDED JOINTS ARE INTERNALLY FLUSHED. (SMOOTHED) 10 INTERNAL PARTS OF VALVES & OTHER COMPONENTS PRONE TO DAMAGE WERE REMOVED BEFORE WELDING OR OTHERWISE PROPERLY PROTECTED. 11 VISUAL INSPECTION OF SPOOL FOR DAMAGE (SPECIALLY FLANGE FACES) 12 CLEANINESS OF THE SPOOL EXTERNALLY & INTERNALLY ACCEPTED OTHERS: CONS. CONT. NIOEC FABRICATION & INSPECTION COMPLETED PIPE SPOOL RELEASED FROM WORK SHOP CONS. TOTAL SHOP PREFAB. WEIGHT (kg) = NIOEC

5 LINE ISOMETRIC JOINT NATIONAL IRANINAN OIL ENGINEERING AND CONSTRUCTION COMPANY SIZE INCH WELD TYPE WELDER LOCATION DATE WELDED LINE HISTORY SHEET VISUAL RT PT MT P.W.H.T Report DATE Rep1 Rep2 Rep3 ACCEPT RJ1 RJ2 ACCEPT No. ATTACHMENT C (10/16).: TEST PACKAGE No.: TEST BLOCK No.: P&ID No.: HARDNESS P.M.I Construction Contractor Q/C Contractor NIOEC NAME: NAME: NAME: SIGN & DATE: SIGN & DATE: SIGN & DATE:

CORPORATE QUALITY SYSTEM PROCEDURE

CORPORATE QUALITY SYSTEM PROCEDURE Number: JVICQC-14.0 03/07/2016 Revision: 5 Page: Page 1 of 6 Approvals Author Director of Quality Assurance Name: Gary Corley Doyle Cassity Signature: Date: 03/07/2016 03/07/2016 Electronic versions of

More information

Inspection and Test Plan for Water Tube Boiler

Inspection and Test Plan for Water Tube Boiler www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING

More information

INSPECTION AND TEST PLAN

INSPECTION AND TEST PLAN BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)

More information

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101835-MEC-QW-E-2002 Senior QA/QC Welding Engineer Holds a B. Sc. in Mechanical Power Engineering and has about 15 years hands-on experience working as QA/QC Engineer & Welding Inspector in several industrial

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

NCCER Progress Blvd, Alachua, Florida Phone: (888)

NCCER Progress Blvd, Alachua, Florida Phone: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the

More information

Introduction to Piping Material Activities

Introduction to Piping Material Activities A description of the current practices within the Materials Section of the By Dr M. A. Meshkot 25 October -30 November 1997 8/11/97 First Draft for Comment 24/11/97 Final Draft for Basic Approval Table

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014 National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL BOILERMAKER - MAINTENANCE V4 October 2014 Focus Statement A journey level industrial boilermaker in maintenance

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements.

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements. SPEC-3017 1/8 1.0 PURPOSE This specification describes the minimum requirements for the installation of breathing air distribution systems (indoor and outdoor) up to the connection to the breathing air

More information

for industry.com

for industry.com Inspection and Test Plan for Shell and Tube Heat Exchanger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Manuf. TPI Client Remark 1 Pre Inspection Meeting

More information

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back HSF 250 Patriot Heavy Duty Line Stop Fitting - 4, 6, 8 inch Nominal Sizes Line Stop Fitting Installation Instructions Push and Pin Completion Plug Installation Instructions IMPORTANT: Read installation

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S BOILERMAKER PRESSURE VESSEL V2 BLMK34_02 October 2014 Focus Statement A journey level boilermaker is skilled in all aspects

More information

ANSI ORIFICE FLANGES METAL-KOREA

ANSI ORIFICE FLANGES METAL-KOREA METAL-KOREA ANSI ORIFICE FLANGES ORIFICE FLANGES are widely used in conjunction with orifice meters for measuring the rate of flow of liquids and gases. They are basically the same as standard welding

More information

MTS AND MTS PR¼ 16 OUTPUT SEQUENTIAL TIMER PENTAIR CLEAN AIR SYSTEMS

MTS AND MTS PR¼ 16 OUTPUT SEQUENTIAL TIMER PENTAIR CLEAN AIR SYSTEMS MTS AND MTS PR¼ 16 OUTPUT PENTAIR CLEAN AIR SYSTEMS MTS DESCRIPTION The Model MTS sequencer has been designed to guarantee the control of diaphragm valves mounted on pulse-jet dust collector filters containing

More information

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings. 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)

More information

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines. STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1

More information

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Trade of Metal Fabrication Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 5 Pipe Fabrication... 7 Unit

More information

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. FUEL GAS PIPING SECTION 15355 PART 1 GENERAL 1.1 DESCRIPTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. B. This specification covers both interior and exterior

More information

Products catalogue (I-P Edition)

Products catalogue (I-P Edition) Products catalogue (I-P Edition) Products catalogue (I-P Edition) FROM QUALITY OUR NATURAL DEVELOPMENT Active in the industry of Refrigeration and Air Conditioning for fifty-five years, Castel is well-established

More information

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM Technical Specification of Back Clamp for LT Cross Arm (MS) Back clamp for LT Cross Arm made out of 50 x 6mm MS Flat suitable for 8m X 300 Kg PSC poles. After fabrication the cross arm shall be painted

More information

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines. STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1

More information

Product Guide Specification

Product Guide Specification HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier

More information

DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN )

DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN ) ORIGINAL INSTRUCTIONS DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN 1606312-1) Instruction Sheet 0425-034-0000 15 JAN 18 Rev H NOTE All numerical values are in metric units

More information

No September, Char-Lynn. Power Steering. Repair Information. 20 Series Steering Control Unit 001

No September, Char-Lynn. Power Steering. Repair Information. 20 Series Steering Control Unit 001 Char-Lynn Power Steering No. 7-313 September, 1997 Repair Information 20 Series Steering Control Unit 001 Bearing Race Retaining Ring Needle Thrust Bearing Bearing Race Seal Ring Backup Washer Seal (3

More information

TABLE OF CONTENTS A-1

TABLE OF CONTENTS A-1 TABLE OF CONTENTS PAGE NUMBER: DETAIL DESCRIPTION A-1...TABLE OF CONTENTS A-2...GENERAL NOTES B-1...GENERAL INFORMATION C-1...EAVE DRIP DETAIL C-2...EAVE DRIP with GUTTER DETAIL C-3 & C-4...FIXED RIDGE

More information

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us Table Of Contents Casing Head 02 Christmas Tree & Tubing Head 03 Tubing Spool 04 Contact Us 05 1 www.sapwellsglobal.com Casing Head Specialized large-diameter pipe lowered into an open hole and cemented

More information

Fisher 667 Diaphragm Actuators Size 80 and 100

Fisher 667 Diaphragm Actuators Size 80 and 100 Instruction Manual 667 Size 80 and 100 Actuators Fisher 667 Diaphragm Actuators Size 80 and 100 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Maximum Pressure Limitations...

More information

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove WARNING Read and understand all instructions before attempting to install any Victaulic piping products. These products must be used only on pipe that is prepared to Victaulic Advanced Groove System (AGS)

More information

Specifications for EA31002 U Tube Bundle for CDU 3

Specifications for EA31002 U Tube Bundle for CDU 3 Specifications for EA31002 U Tube Bundle for CDU 3 Tube Bundle Specificatio Tube Bundle for Heat Exchanger EA31002A/B/C/D Quantity required : One with Dummy shell Exchanger Type: BEU Horizontal No of U

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to

More information

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

No November, Char-Lynn. Hydraulic Motor. Repair Information. R Series General Purpose Geroler Motor

No November, Char-Lynn. Hydraulic Motor. Repair Information. R Series General Purpose Geroler Motor Char-Lynn Hydraulic Motor No. 7-142 November, 1996 Repair Information General Purpose Geroler Motor 001 002 2 Geroler Motors Parts Drawing Bearing Race Needle Thrust Bearing Key Output Shaft Cap Screw

More information

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS LAST UPDATED 25-10-2017 DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS COURSE DURATION: 5 DAYS REACH US Today for Greater Safety, Quality, Reliability, Productivity, Profitability HRD Approved Class A

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow PIPING COMPONENTS Piping components are mechanical elements suitable for joining or assembly into pressure-tight fluid containing piping systems. Components include pipe, tubing, fittings, flanges, gaskets,

More information

PRODUCT CATALOGUE. Major Features: Arc Bends Manufactured to: Pipestar now offering full-line of flanged Arcbends

PRODUCT CATALOGUE. Major Features: Arc Bends Manufactured to: Pipestar now offering full-line of flanged Arcbends PRODUCT CATALOGUE Pipestar now offering full-line of flanged Arcbends Pipestar offers a range of seamless long radius Arc HDPE sweep bends made to the highest quality standards. Pipestar offers a range

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

Pump Replacement Manual. Bill Wallace by Wallace Marine Services, Inc.

Pump Replacement Manual. Bill Wallace by Wallace Marine Services, Inc. by Wallace Marine Services, Inc. Maintain Your Equipment The Easy Way Bill Wallace 843-693-4336 info@willyvac.com www.willyvac.com Pump Replacement Manual 1 How to change the water pump on the Willy Vac

More information

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections. Issued 2006/08/01 Section 15183 Hydronic Systems: Steel Page 1 of 6 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes..1 Materials and installation for steel piping, valves and fittings for hydronic systems

More information

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.

More information

Lockformer / 16 Gauge Speednotch

Lockformer / 16 Gauge Speednotch Lockformer / 16 Gauge Speednotch INSTALLATION PRELIMINARY: After uncrating, locate unit, with or without base skid, to area of operation. Unbind foot switch cord and cylinder hoses and remove gauge pin

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

The DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly.

The DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly. The DeltaGrip System Safety and Operating Instructions Trigger Air Supply Connection Handle Assembly Air Line Assembly Punch Die Pneumatic Diaphragm Assembly Shackle, Pin & Jam Nut Jaw Frame Shoulder Screw

More information

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing

More information

Drawings & Documentation Rotary Compressors

Drawings & Documentation Rotary Compressors Drawings & Documentation Rotary Compressors Effective Date: 2/4/11 Cancels: All Previous Standard Drawings and Docs - Certified Only Standard Drawings and Docs - Print Approval PDF format: CCN 39657051

More information

Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya

Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya ABSTRACT Offshore and subsea wells present multiple challenges

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

Appendix E Part Details for the PT20 with Standard Bypass Valve

Appendix E Part Details for the PT20 with Standard Bypass Valve Appendix E Part Details for the PT0 with Standard Bypass Valve 8 ( ft lb) Part Number Locknut Wrench ( ft lb) 0 8 0 Note: The PT0 is shown below. All parts for the PT0 are the same except for the rotor

More information

Select, wear adjust, use and maintain personal protective equipment

Select, wear adjust, use and maintain personal protective equipment ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and

More information

Sheet Metal Worker A Guide to Course Content

Sheet Metal Worker A Guide to Course Content Sheet Metal Worker A Guide to Course Content Sheet Metal Workers use metal of 10 gauge or lighter to make and repair products and buildings. Training Requirements: To graduate from each level of the apprenticeship

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL PIPEFITTER V4 September 2013 Focus Statement An advanced pipefitter: Masters mathematical functions and knows

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:

More information

SAMAMAT FLOW CONTROL L.L.C.

SAMAMAT FLOW CONTROL L.L.C. SAMAMAT FLOW CONTROL L.L.C. SFC-MK-LS-001 Rev.: 03 COMPANY PROFILE Company Location Company Information Company Size Nearest Transportation Company Name SAMAMAT FLOW CONTROL L.L.C Company Address Plot

More information

SECTION THERAPEUTIC POOL ACCESSORIES

SECTION THERAPEUTIC POOL ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable

More information

Sight glass (Low pressure) Types SG, SGI, SGN, SGR, SGRI and SGRN

Sight glass (Low pressure) Types SG, SGI, SGN, SGR, SGRI and SGRN Data sheet Sight glass (Low pressure) s SG, SGI, SGN, SGR, SGRI and SGRN SG is sight glasses for low pressure application (Max Working Pressure 35 bar / 500 psig). SG is available with flare, solder and

More information

CONSTRUCTION STANDARD FOR PLANT PIPING SYSTEM

CONSTRUCTION STANDARD FOR PLANT PIPING SYSTEM CONSTRUCTION STANDARD FOR PLANT PIPING SYSTEM SECOND REVISION NOVEMBER 2008 This standard specification is reviewed and updated by the relevant technical committee on July 2015. The approved modifications

More information

STANDARD SPECIFICATION FOR FABRICATION & ERECTION OF PIPING

STANDARD SPECIFICATION FOR FABRICATION & ERECTION OF PIPING Doc. No: 254625-300-SP-PIP-007 Rev: B Page 1 of 15 STANDARD SPECIFICATION FOR FABRICATION & ERECTION OF PIPING Mott MacDonald Consultants (India) Pvt. Ltd. Kothari House, CTS No. 185 Off Andheri - Kurla

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PLD-E-2007 Piping Design & Technical Office Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

PLD-E-2007 Piping Design & Technical Office Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101484-PLD-E-2007 Piping Design & Technical Office Engineer Holds a B. Sc. in Mechanical Power Engineering and has over 10 years hands-on experience working as Piping Design and Technical Office Engineer

More information

4-Way Servo Valve Model 4 WS. 2 E , (Series 2X) with Mounting Pattern to DIN or CETOP RP 115 H PSI (315 bar) H/A 3012 H/A 3013

4-Way Servo Valve Model 4 WS. 2 E , (Series 2X) with Mounting Pattern to DIN or CETOP RP 115 H PSI (315 bar) H/A 3012 H/A 3013 4-Way Servo Valve Model 4 WS. 2 E. 16..., (Series 2X) with Mounting attern to DIN 24 3 or CETO R 11 H Size 16... 40 SI (31 bar)... 3 GM (0 L/min) R 29 91/06.98 R 29 91/06.98 Replaces: 0.94 2 stage servo

More information

Scope/Purpose of SI Training:

Scope/Purpose of SI Training: manufactured equipment and materials at the supplierfacility, and, confirming that the supplier s quality management system is being utilizedeffectively. There is no specific minimum experience requirement

More information

Hospital Grade Welded Ceiling System

Hospital Grade Welded Ceiling System MANUAL INSTALLATION Hospital Grade Welded Ceiling System HGWC Series v001 Issue Date: 08/14/18 2018 Price Industries Limited. All rights reserved. TABLE OF CONTENTS Product Overview Before You Start...1

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc

More information

Comparison that shows the differences between a PFD and P&ID :

Comparison that shows the differences between a PFD and P&ID : Comparison that shows the differences between a PFD and P&ID : PFD P&ID Used during construction? No Yes* Shows all process and service piping? No Yes Indicates presence of all controls? No Yes Shows all

More information

General Four-Way Operation, Maintenance & Service Manual

General Four-Way Operation, Maintenance & Service Manual General Four-Way Operation, Maintenance & Service Manual SCOPE Included in the following pages you will find assembly drawings, exploded views, parts lists, assembly tips, operational descriptions and

More information

PLACE LOGO HERE. Final Project Report 10/02/2014. Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems.

PLACE LOGO HERE. Final Project Report 10/02/2014. Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems. PLACE LOGO HERE Final Project Report 10/02/2014 Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems Company 1 Prepared For: Company 1 Prepared By: CAN-AK Date: 10/03/14 CONTENTS 1.0

More information

Char-Lynn Hydraulic Motor. Repair Information. R Series General Purpose Geroler Motor November, 1996

Char-Lynn Hydraulic Motor. Repair Information. R Series General Purpose Geroler Motor November, 1996 Char-Lynn Hydraulic Motor November, 1996 Repair Information General Purpose Geroler Motor 001 002 2 Geroler Motors Parts Drawing Bearing Race Needle Thrust Bearing Key Output Shaft Cap Screw -001 12 pt

More information

CV Control Valves Installation and Operation Manual

CV Control Valves Installation and Operation Manual CV00 - Control Valves Installation and Operation Manual Overview Warning: This bulletin should be used by experienced personnel as a guide to the installation of the Armstrong CV00 Control Valve. Selection

More information

Clayton Off Road COR COR COR

Clayton Off Road COR COR COR Clayton Off Road COR-4806011 COR-4806021 COR-4806031 JEEP GRAND CHEROKEE WJ LONG ARM UPGRADE KITS (1999-2004 WJ) NOTES: This product requires general welding, fabrication and automotive mechanic skills.

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL MAINTENANCE MECHANIC V4 MEMT32_04 Released June 2013 Focus Statement A journey-level Industrial Maintenance Mechanic

More information

GENERAL ISOMETRIC LAYOUT

GENERAL ISOMETRIC LAYOUT EXISTING OR PROPOSED WIPER WALL SUPPORT STRUCTURE GATE LID CARBATHAN HG 0 WEB GRAY LOWER PAN GRATING ALUMINUM WIPER WALL CARBATHANE HG, 90 GRAY STRUCTURAL SPECIFICATIONS:. FLOODGATE MATERIAL TO BE ALUMINUM

More information

RHINO II Bottom Drain Installation Instructions

RHINO II Bottom Drain Installation Instructions Crane Enterprises, Inc. DBA: Aquadyne Filtration Systems Hartwell, GA 30643 Ph: (706) 436-9041 Fax: (706) 377-4554 www.aquadyne-filters.com RHINO II Bottom Drain Installation Instructions Manufactured

More information

Symphony II Adaptable Table System

Symphony II Adaptable Table System Symphony II Adaptable Table System 1.00 General 1.01 Conditions 1.02 Scope of work 1. This section covers all materials, equipment, tools and labor for the supply and installation of the laboratory Symphony

More information

Installation and Specification Manual December 2012

Installation and Specification Manual December 2012 Installation and Specification Manual December 2012 APOLLOXPRESS TM fittings are a heat-free method for joining copper tube and provide a clean, easy to use joining method designed to save time and money

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Gas Solutions. Perfection Permasert 2.0 Gas Coupling Installation Guide

Gas Solutions. Perfection Permasert 2.0 Gas Coupling Installation Guide Gas Solutions Perfection Permasert 2.0 Gas Coupling Installation Guide Permasert 2.0 Mechanical Gas Couplings A B C D E F A B C D Permasert 2.0 Coupling: Molded from PE4710 resin. Meets or exceeds US DOT

More information

TOOLS FOR THE SPECIALIST UNDERWATER TOOLS

TOOLS FOR THE SPECIALIST UNDERWATER TOOLS TOOLS FOR THE SPECIALIST UNDERWATER TOOLS PNEUMATIC TOOLS Performance data at an operating pressure of 6 bar (cont. flow). ANGLE GRINDER This handy angle grinder is particularly usable in tight spaces

More information

WHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA.

WHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA. WHO WE ARE and Non-destructive Examination Company operating within Western Canada. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA. We service Western Canada from

More information

BRAZING PROCEDURE SPECIFICATION NO

BRAZING PROCEDURE SPECIFICATION NO NATIONAL CERTIFIED PIPE WELDING BUREAU BRAZING PROCEDURE SPECIFICATION NO. 107-1 FOR TORCH BRAZING OF ALLOYS 102, 120, 122, 142, 192 OF TUBE, VALVES, FITTING AND FLANGES USING BcuP-3 THROUGH-7 FILLER METALS

More information

Asme B31 1 Power Piping Design Standard Certification

Asme B31 1 Power Piping Design Standard Certification ASME B31 1 POWER PIPING DESIGN STANDARD CERTIFICATION PDF - Are you looking for asme b31 1 power piping design standard certification Books? Now, you will be happy that at this time asme b31 1 power piping

More information

Series 760 Heavy Duty Fixed Displacement Motor. Parts and Repair Manual

Series 760 Heavy Duty Fixed Displacement Motor. Parts and Repair Manual Series 760 Heavy Duty Fixed Displacement Motor Parts and Repair Manual Series 760 Fixed Displacement Motor Contents Introduction 3 ID Tag Information 3 Parts List 4 Parts Drawing 5 Disassembly Instructions

More information

HSB Global Standards ASME Code Changes and Discussions

HSB Global Standards ASME Code Changes and Discussions HSB Global Standards ASME Code Changes and Discussions Presented by: David M. Allore Field Services Manager September 12, 2012 AGENDA Guidelines for AI Review of Design Calculations Frequent Mistakes on

More information

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL. METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.

More information

Satish Lele M:

Satish Lele M: Satish Lele satish.lele@gmail.com M:91-98202 77283 This is a program for Skill Development and Bridging the Gap between Manual and Computer work. I offer Training of Basic Fundamentals and How to Use my

More information

Design Guide for Hot Dip Galvanizing best practice for venting and draining

Design Guide for Hot Dip Galvanizing best practice for venting and draining Design Guide for Hot Dip Galvanizing best practice for venting and draining Contents Introduction 3 Handrails/ 25 Balustrades Importance 4 of Venting and Draining Purpose Safety Quality Aesthetics General

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway. TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Multi-Set II Drop-In Anchors

Multi-Set II Drop-In Anchors CONCRETE ANCHORING SPECIALISTS Internally Threaded Heavy- Duty Anchoring Systems DESCRIPTION/SUGGESTED SPECIFICATIONS Drop-In, Shell-Type Anchors SPECIFIED FOR ANCHORAGE INTO CONCRETE Drop-In, shell-type

More information

Digitally Signed 06/02/2015

Digitally Signed 06/02/2015 Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY

More information

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type PAGE 2 of 6 2.14 Main Cable Type HO7RN-F4G10-15 Metres each 2.15 (a) O/P Voltage-350V(Max.) (b) O/P Current 150A(Max.) 2.16 Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type 2.17

More information

INSTALLATION GUIDE StreamLine Linear Drain

INSTALLATION GUIDE StreamLine Linear Drain INSTALLATION GUIDE StreamLine Linear Drain TM With Full Mortar Bed Adapter Kit Supply Drainage Support www.siouxchief.com TM StreamLine Linear Drain With Full Mortar Bed Adapter Kit When using Full Mortar

More information