Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya

Size: px
Start display at page:

Download "Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya"

Transcription

1 Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya ABSTRACT Offshore and subsea wells present multiple challenges for conventional Electrical Submersible Pumping System ESP. As conventional ESPs have much shorter run lives compared to the filed life and the intervention cost for Subsea and offshore application are very expensive, demanding ESP system with longer run life is a necessity to economically produce from those types of wells. This paper discusses how Quality Assurance QA and Quality Control QC systems to enhance ESP system run life. Moreover, this paper illustrates Quality Management System as a business strategy designed to add value to customers and satisfying all their requirements. In any integrated ESP subsea or offshore system, overall reliability is a function of reliability of each equipment; therefore, assuring reliability and quality for each component in the equipment is crucial to extend overall run life for the system and reduce well intervention cost. All manufacturing process supported with the QA&QC requirements such as Documentation, Monitoring, Measurement, Audit, Equipment Traceability, Dimensional Conformance, Witness Test, Vibration Test, and Factory Acceptance are to improve ESP system reliability and significantly increase system run life. This paper describes the benefit of the QA & QC systems to boost ESP system run life and enhance reliability in subsea and offshore application, where the intervention cost is significantly expensive. Reduce well intervention helps the customer to lower operational expenditure OPEX and down time related to ESP failures due to quality issues. Also, decrease optional of any health, safety, and environment HSE incident related to rig work over operation. The proposed solution helped the operator to improve overall ESP system run life and reliability. It also helped the customer to reduce OPEX, well down time, and potential HSE risk related to well intervention and work overs. INTRODUCTION Saipem is a major player off Mediterranean Sea with interests in every major oil & gas exploration and production operations. With high cost of intervention especially for offshore operation, the need of longer production system runlife is essential to economically produce and operate the offshore wells. In today s environment, where reduced budgets, enhance safety, and aggressive schedules are becoming customary, a higher emphasis on procedural and equipment quality and reliability is imperative to ensure that the end product will meet the performance standards that are required and expected. Subsequently Baker Hughes Oil & Gas services Artificial Lift system division developed an innovative approach to implementing QA & QC for all Saipem offshore ESP operation in general and for the

2 emergency booster pump specifically. Figure 1 shows typical booster pump configuration which Saipem currently using. Fig 1 Saipem ESP Booster& Subsea System The Saipem subsea system project was managed by Baker Hughes quality department team based in Claremore, Oklahoma. The quality department helped to implement and execute the quality plan to manufacture, assemble, test, and deliver the ESP system. By treating the each component of the ESP as a system, planning and execution of quality assurance actions can reduce the level of risk associated with motor, pump, seal, cable, and downhole gauge failures. The implementation of Baker Hughes QA & QC enhanced the overall performance of ESP system and extends the system runlife. Saipem project requirement The following table shows Saipem reference codes and standards requirements: Table 1 Saipem Reference Codes & Standards Code & Standards Reference Part 4: Subsea Wellhead and tree ISO Design and operation of subsea production systems equipment Part 6: Subsea Production control ISO Design and operation of subsea production systems systems ISO Design and operation of subsea production systems Part 8: Remotely operated vehicle DNV 158 Rules for Planning and Execution of Marine Operations Part 2 Chapter 5: Lifting API RP 2A WSD Recommended Practice for planning, designing and construction of fixed offshore platforms Working stress design ISO Pipeline Transportation System Subsea Pipeline Valves DNV OS D201 Electrical installations DNV STANDARD FOR CERTIFICATION Lifting appliances API RP 11S3 Recommended Practice for Electrical Submersible Pump Installations API RP 11S4 Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations API 610 Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries

3 Quality requirement for subcontractors In general, Contractor has Quality requirements for the subcontractors which are all described in specific project procedure; this procedure defines the minimum Quality Requirements to be fulfilled by SUBCONTRACTOR in order to ensure implementation of the Project Quality Management System defined for the subsea system project, the procedure describes : Subcontractor responsibilities Activity description: Quality assurance activities Quality control activities Control of fabrication process Identification and traceability Storage and handling of material equipment Control of monitoring and measuring devices Inspection notification Inspection statues Reports Report of inspections (certificates) Applicable QCR/ITP for project QCP Project Quality Management System (QMS) Structure The QMS which was implemented for Saipem subsea system project consists of four main levels as shown in the figure 2. Fig 2 QMS Levels Level 1 includes quality policy statement, framework, objectives, and quality manual and could be summarized as follow:

4 The Quality Policy Statement and Framework establishes the overall intentions, direction and executive management s affirmation of Baker Hughes quality commitment to comply with requirements and continually improve the effectiveness of the quality management system. Quality Objectives are established annually to further the overall goal of satisfying the project requirement. The objectives, progress towards meeting the objectives and the role all employees play in meeting objectives are communicated to employees throughout the organization. The Quality Manual establishes the scope and requirements of the Quality Management System, establishes justifications for exclusions to the International Standard/Specification and provides an explanation of the interaction of the processes in the system. The Quality Policy Statement, Framework and Manual are inherently linked and reviewed concurrently to ensure they form a consistent and coherent system. Level 2 include documents which specified methods to carry out an activity or process. The documentation define the responsibilities, authorities and what activities for implementing the quality system in accordance with the requirements of the developed quality manual for the project. Each Level 2 document should reference applicable Level 3 document, Level 4 forms, and resulting records. Level 3 documents detail the acvies on how to accomplish specific tasks necessary to ensure the effective planning, operation and control of an activity or process. Some Level 3 documents may reference forms that, once completed, may become quality records. Some forms may be considered Level 3 documents, if the requirements of the form are inherently obvious Level 4 includes forms, records and reference documents which could be summarized as follow: Forms. Provide for an organized recording of information/data gathered when performing specific tasks related to the quality management system. Work instructions will reference those forms that apply. Records. Provide evidence that processes and specifications have been performed according to specified requirements. Reference Documents. Copies of these documents required to design and manufacture products and operate the quality system are maintained, including externally controlled documents. Project Quality Assurance (QA) Quality assurance is being achieved in the Saipem offshore and subsea project through the implementation of documented QMS. This system provides the organizational structure, procedures, processes and resources to be utilized by Baker Hughes to manage Saipem Project. Systematic implementation, monitoring and follow up of the QMS provides assurance of the QA & QC requirements such as Documentation, Monitoring, Measurement, Audit, Equipment Traceability, Dimensional Conformance, Witness Test, Vibration Test, and Factory Acceptance.

5 Project Quality Plans The strategy provides Saipem with the framework to help them develop the quality plans, quality control, and project quality plan (PQP) for the project in uniform and consistent manner. These plans set out the project quality objectives, identify (QA & QC) activities and processes necessary to achieve quality objective to enhance the runlife of the system and to focus the attention on the prevention of nonconformities. The project Quality Plan defines the Project Quality management system that will be applied by Baker Hughes for the execution of the Project The Saipem subsea system project. In particular it specify all the Quality requirements to be applied during all the stages of the project, the project procedures issued to support the project work process and the QA & QC activities, to be conducted to achieve the Quality objectives of the project. The PQP shall enable the project management to assess the Quality objectives and to focus the attention on the prevention of nonconformities Project Quality Implementation Baker Hughes quality management team is responsible for ensuring that quality plans and associated processes and procedures are effectively implemented and verified. The quality management team is also responsible for assuring the quality related policies and strategies are clearly understood by employees. Understanding the quality process is crucial to the implementation plan to meet the target runlife of the ESP system. The following is the summary of the quality process and implementation plan for Saipem subsea system project. Equipment Inspection and Testing Plan for Saipem subsea system Project Multiple analysis were evaluated to ensure that all necessary equipment inspection and testing is performance before equipment delivery. List of checks, inspections, and testing are displayed in the table below. Table 2 Testing & Inspection Plan ITEM BASIC DESCRIPTION OF CHECKS AND TESTS Baker Hughes 1. AFTER CONTRACT AWARD (before manufacturing) ACTION CODE Saipem 1.1 SUPPLIER's and Sub Vendors Inspection and Test Plan (ITP) 1.2 Pre-inspection meeting 1.3 Sub Vendors List 1.4 Copy of main sub orders and checking description 1.5 Inspection schedule (revised on monthly basis )

6 Manufacturing and Inspection Procedures (before start of manufacturing) Manufacturing procedures (traceability, cutting, beveling, rolling, heat treatment, painting, repairing etc ) Welding procedures with qualification approval, repair and welders qualification 2.3 NDT procedures and NDT operator qualification 2.4 Testing procedure (pneumatic, hydro-test, visual & dimensional, etc) 2.5 Painting & pickling/passivation procedure 2.6 Dossier to be prepared by SUPPLIER for local regulation (CS) 3. DURING FABRICATION (for any relevant part or auxiliary) 3.1 Checking of instrument calibration (transmitters, orifice plate, actuated valve) 3.2 Raw material certificates checking INCLUDING welding consumables and baseplates, auxiliaries equipment, 3.3 Welding Witness Heat treatment ( checking of thermocouples, diagram review) NDT tests : - Pump housing, Pumps pipe caisson Casing/casing welding/shaft/impeller/gas, recycling oil & chemical lines piping - welding Welding/ impellers/journal bearing Witness/ 3.6 Hardness test 3.7 Review of SUPPLIER Data Book when fabrication progress is at 50% 3.8 Electrical and instrumentation cable testing (continuity, isolation) 3.9 Electrical equipment insulation resistance and continuity test 3.10 Valves tests (Valves stroking and functional testing of installed instruments and control valves) 4. HYDROSTATIC TEST 4.1 Internal and external visit before hydro-test (ID and thickness) N/A

7 4.2 Test parameters check (including water analysis) N/A 4.3 Hydrostatic tests for pumps package including at least (but not limited to) : - Fabricated pump housing, - Pressure casing for subsea control system, - Piping (Gas line, Pump Recycling system line, - Chemical line and oil line), - Body of valves for control and safety valves 4.4 Mfr s nameplate stamping and certificate record 4.5 Pneumatic tightness test Witness 4.6 Helium test (when applicable) Witness Pneumatic test for control valves (seal-plug seal / Actuator shell & diaphragms seal) Pneumatic test for safety valves (disk-nozzle seal, bellows seal) Witness Witness 4.9 Cleaning & drying Witness 5. Balancing Test 5.1 Balancing test of rotor components Witness 5.2 Overspeed test of rotor components Witness Dye penetrant check and dimensional check after overspeed Individual balancing of rotor components & dynamic balancing test of rotor Witness Witness 5.5 Overspeed test of rotor Witness 5.6 Clearances check Witness Functional and Performance Test Inspection before test (Accessibility, insulation check, fire protection check, material physical integrity, cleanliness, supporting, equipment levelling..., quantity, tests and measurement, etc.) Performance test for Pump as per API610 for each operating condition Variable Speed Drive System (VSD) Test: - Transformer Routine test & Type Test (the last only for one unit in case of several VSD) Converter Routine test & Type Test (the last only for one unit) - Combined Test: including HV motor, converter and feeding Transformer 6.6 Complete unit test full load / full speed including job Variable Speed Drive System (VSD) Test

8 6.7 Torsional vibration measurement shall be specified if SUPPLIER recommends it. 6.8 ise and vibration measurement N 6.9 Inspection after test and dismantling, check of cleanliness 6.10 Visual and dimensional check 6.11 mechanical running test of spare pump if any N/A 6.12 mechanical running test of spare pump rotor and electric motor N/A 7. AUXILIARIES TEST 7.1 Functional check of local control panels Witness 7.2 Functional check of local control panels Witness 7.3 Control system UCP FAT during the complete witnessed unit test (full load string test) Witness 7.4 Vibration monitoring module tests and certificates Witness 7.5 Calibration certificates review of instrumentation Witness 7.6 Explosion proof certificates review for electrical, instrumentation parts, Mechanical protection 7.7 Instrument tubing to be leak tested. Witness N/A 8. FINAL INSPECTION BEFORE SHIPMENT 8.1 Visual inspection & cleanliness 8.2 Flange protection, pipe checking 8.3 Marking, tagging & nameplate checking 8.4 Dimensions & quantity checking 8.5 Painting checking (visual, thickness, color, sample, certificates ) Witness 8.6 Certificates review 8.7 Weight, dimensions, center of gravity, lifting points

9 8.8 Earthing connection check, electrical continuity check 8.9 Visual inspection of Spare parts for commissioning & start-up, 6 months & 2 years operation, and Capital spare parts: visual and quantity, identification check 8.10 Visual inspection of special tools, storage special tools 8.11 Visual inspection of spare pump rotor, spare electric motor, spare pump seal system or spare pump if any 8.12 Inspection release note issue 8.13 SUPPLIER data book review (100%) 9. PACKING INSPECTION And / Or EXPEDITING Review of packing list and shipping documents Witness Packing checking (as per applicable documents) Witness Preservation for shipment checking Witness Transportation and Handling procedure and transport drawings review 10. FINAL DOCUMENTATION REVIEW Final dossier for local regulation SUPPLIER data book (copies and CD-Rom) Equipment Identification and Traceability for Saipem Project For this project Baker Hughes establishes and maintains procedures for identifying product by suitable means from receipt of raw material and purchased items and during all stages of production, delivery and installation. Components are identified per the requirements specified on engineering drawings. Identification may be by stamping, etching, bagging, I.D. plate or tagging, depending on the material and geometry of the part being identified. Written specifications document the information to be identified on components. Written procedures maintain the documented traceability of components and assemblies. Traceability to the batch number is maintained for polymers and elastomers. The documents used in providing traceability include: Material test reports (chemistry, mechanical properties, etc.), n destructive reports, Shipping reports Certification reports as required.

10 Electronic or hardcopy documentation necessary to provide traceability is maintained as a part of the quality records system, which provides for retention, maintenance, disposition, retrieval, and protection against loss or damage. In addition, Multiple analysis were evaluated to ensure that all necessary equipment inspection and testing is performance before equipment delivery. List of equipment identification and traceable sub components is showing in the following tables. Motor Traceable Components: Table 3 Motor Traceable Components Component Head Base Shaft Stator Housing Lower Tandem Motor Adapter Lower Tandem Reservoir Housing Magnet Wire Stator Adapter Flange Fasteners Elastomers Carbide Sleeves, Bushings & Inserts Seal Traceable Components: Table 4 Seal Traceable Components Component Head Base Shaft Housing Coupling Guides Mechanical Seal Expansion Element Flange Fasteners Elastomers Carbide Sleeves & Bushings

11 Pump Traceable Components: Table 5 Pump Traceable Components Component Head Base Shaft Housing Coupling Intake Discharge Impellers Diffusers (includes bottom diffusers) Top Bearing Bearings Flange Fasteners Elastomers Carbide Sleeves & Bushings Intake Traceable Components: Table 6 Intake Traceable Components Component Body Shaft Coupling Flange Fasteners Carbide Sleeves & Bushings Motor Lead Extension Traceable Components: Table 7 Motor Lead Extension Traceable Components Component Polyimide Film Armor Insulation Lead Barrier Tube Pothead Housing Elastomer

12 Variable Speed Drive Traceable Components: Project Audit Program Table 8 Variable Speed Drive Traceable Components Component Printed Circuit Boards Enclosure To endure continuing process compliance and identify improvement opportunities, qualified competent auditors review the processes defined in the relevant documentation procedures. A schedule of audit of the Saipem project is approved by management and amended during the project to ensure that the systems of control are continually reviewed for effectiveness. This ensures that reliable products and services that will meet and exceed project requirements, including compliance with industry standards, relevant statutory legislation and regulations. Project Quality Management Value Added Effective quality management is a key component of the ESP runlife enhancement for the Saipem subsea system project. Implementing such a system helped Saipem to achieve the runlife target for the ESP system and maximize their Key Performance Indicators (KPI). Also, the quality management process helped Saipem to reduce OPEX, well down time, and potential HSE risk related to well intervention and work overs. The following table summarizes the runlife improvement for ESP system which is installed in the Saipem project with implanting improved quality management and ESP system with standard quality system. Table 7 Runlife Improvement implementing new QMS Implementation of Saipem Project Quality Management system Implementation of Standard Quality Management Average ESP runlife 5 Years 2.5 years As shown in Table 2, the runlife and system reliably is doubled with the implementation of the enhanced QMS. Implementing the QMS helped Baker Hughes to identify any equipment ESP equipment, components, and sub component malfunction which contribute to avoid failures and improve system reliability. Applying the QMS helped Saipem to achieve the target runlife for ESP system and economically produce using the ESP technology. Enhancing the runlife of the ESP system save millions of dollars for Saipem where the average cost for well intervention is 0.5 million dollar per day. The estimate average cost saving per intervention is around 2.5 million. The following table shows a comparison of average workover cost in 10 years applying different quality management.

13 Table 8 Workover Cost Comparison between Standard & Saipem Project Quality Management Average Workover Cost in 10 Years Workover Cost for ESP implementing Standard Quality Management Workover Cost for ESP implementing Saipem Project Quality Management 10 Million USD 5 Millions USD Conclusion Quality Assurance and Quality Control is an important and valuable segments of any offshore and subsea operation. For effectiveness, it needs to be consistent in plan and personnel, from conceptual design, through manufacturing, equipment traceability, testing and installation. Projects especially the ones with high OPEX cost should maintain quality assurance and quality control effort in conjunction with the engineering effort to ensure that QMS is actually realized. Even though the cost of applying enhanced QMS is high compare standard QMS, the cost of equipment failure is significantly higher. The results shows that implementing the right QMS plan can tremendously reduce the OPEX and economically produce form those types of wells. References 1. Dinkins, W., Lana, D, ELmahbes, R.: ENI Saipem Temp Subsea Booster, Baker Hughes Project Neely, B., Gipson, F., Clegg, J., Wilson, P., Capps, B.: Selection of Artificial Lift Method, 2000 SPE Annual Technical Conference and Exhibition. 3. Dr. Robert C. Byrd, PE, Donald J. Miller, Steven M. Wiese: Cost Estimation for Offshore Oil & Gas Facility and Decommissioning, 2014 AACE International.

Subsea Lift. Inwell and caisson lifting systems

Subsea Lift. Inwell and caisson lifting systems Subsea Lift Inwell and caisson lifting systems Two Decades of Subsea Experience With more than 70 percent of the Earth s surface covered by water, it was inevitable for oil and gas fields to eventually

More information

Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications

Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications ANSI/API STANDARD 612 SIXTH EDITION, NOVEMBER 2005 ISO 10437, (Identical) Petroleum, petrochemical and natural

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...

More information

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing

More information

Turning the wheels of your success

Turning the wheels of your success INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the

More information

OBSERVATORY SERVICING AND MAINTENANCE

OBSERVATORY SERVICING AND MAINTENANCE OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I

More information

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT

More information

QUALITY ASSURANCE SPECIFICATION

QUALITY ASSURANCE SPECIFICATION Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

RELIANCE INDUSTRIES LIMITED

RELIANCE INDUSTRIES LIMITED RELIANCE INDUSTRIES LIMITED Petroleum Business (E&P) Notice Inviting Expression of Interest (RIL/E&P/EOI/2012/07) (Under International Competitive Bidding) A] For All Oil & Gas Fields Reliance Industries

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

Inspection and Test Plan for Water Tube Boiler

Inspection and Test Plan for Water Tube Boiler www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING

More information

WHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA.

WHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA. WHO WE ARE and Non-destructive Examination Company operating within Western Canada. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA. We service Western Canada from

More information

Specification for Subsea Umbilicals

Specification for Subsea Umbilicals Specification for Subsea Umbilicals Upstream Segment ANSI/API SPECIFICATION 17E FOURTH EDITION, OCTOBER 2010 EFFECTIVE DATE: APRIL 1, 2011 ISO 13628-5:2009 (Identical), Petroleum and natural gas industries

More information

INSPECTION AND TEST PLAN

INSPECTION AND TEST PLAN BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Emergency Pipeline Repair Solutions and Future Contingency Planning

Emergency Pipeline Repair Solutions and Future Contingency Planning Emergency Pipeline Repair Solutions and Future Contingency Planning SubseaEurope 2010 Espace Grande Arche, Paris 28/10/10 Paul Hughes, Product Manager - Connectors Hydratight Products & Services Part of

More information

Weldment Visual Inspection Requirements

Weldment Visual Inspection Requirements Table of Contents 1.0 Purpose / Scope / Timing... 2 1.1 Purpose / Scope... 2 1.2 Compliance Date... 2 2.0 Procedure / Quality Recd Requirements... 2 2.1 General Requirements... 2 2.2 Acceptance Criteria...

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing

More information

Oil&Gas Subsea Production

Oil&Gas Subsea Production Oil&Gas Subsea Production Oil&Gas Subsea Production The first subsea technologies were developed in the 1970s for production at depths of a few hundred meters. Technology has advanced since then to enable

More information

ESP Advisors with a clear focus on improving run life

ESP Advisors with a clear focus on improving run life ESP Advisors with a clear focus on improving run life Name: CHEONG GIN LIN Abilities: QCP Engineer for DHE, Cable and Surface Equipment SUMMARY Ten (10) years of experience as a Third Party Inspector and

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Through standardized processes, common core components, and

More information

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise Deepsea technologies INTEGRATED INTERVENTION SYSTEMS Lowering Costs and Risks with Customized Tools and Application Expertise Specialized Intervention Services for Specific Field Needs AFGlobal and Deepsea

More information

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999.

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999. AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999. 1.0 WELCOME AND APOLOGIES The members were welcomed to the meeting. There were nine attendees

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

Select, wear adjust, use and maintain personal protective equipment

Select, wear adjust, use and maintain personal protective equipment ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

Introduction INTRODUCTION DISCOVER THE NEXT GENERATION IN EDGE WELDED METAL BELLOWS

Introduction INTRODUCTION DISCOVER THE NEXT GENERATION IN EDGE WELDED METAL BELLOWS 2 INTRODUCTION Introduction DISCOVER THE NEXT GENERATION IN EDGE WELDED METAL BELLOWS BellowsTech, an MW Industries company, is a premier US manufacturer of high quality, dependable edge welded bellows

More information

Vendor Document Requirement Titles Titles Count: 471

Vendor Document Requirement Titles Titles Count: 471 Vendor Document Requirement s s Count: 471 Sorted: VDR category / VDR Nr VDR Nr Project documents s Count: 28 005 Project plan / handbook 006 Detailled list of drawings and documents with document numbers

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates Managing Offshore Field Development & Marine Asset 22-26 October 2017 Dubai, United Arab Emirates This course is Designed, Developed, and will be Delivered under ISO Quality Standards Managing Offshore

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

NDT KONFERANSEN ZENOVIEA VOROSCIUC

NDT KONFERANSEN ZENOVIEA VOROSCIUC NDT KONFERANSEN 2011 ZENOVIEA VOROSCIUC Short about FMC Expectations Requirements New Challenges. New Solutions. 2 FMC Technologies Subsea Eastern ~ 150% growth from 2004-2010 MUSD Revenue Employees ER

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

DNVGL-SE-0478 Edition July 2017

DNVGL-SE-0478 Edition July 2017 SERVICE SPECIFICATION DNVGL-SE-0478 Edition July 2017 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

Reliance Industries Limited

Reliance Industries Limited Reliance Industries Limited Notice Inviting Expression of Interest (RIL/E&P/EOI/2010/05) (Under International Competitive Bidding) For BLOCK NO : KG-DWN-98/3 (KG D6) Reliance Industries Limited (RIL),

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient Standard Horizontal Subsea Trees Integrated offshore offering for reliable, high-quality, and capitalefficient performance Standard Horizontal Subsea Trees Through standardized processes, common core components,

More information

Certifications and Licenses

Certifications and Licenses Company OMPA is a qualified Oilfield Machine Shop with over 40 years experience in Manufacturing of Custom Designed Equipment, Threading Service and Precision Machining Service. It operates on a total

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

Code for Construction of Industrial Metallic Piping Engineering

Code for Construction of Industrial Metallic Piping Engineering UllC NATIONAL STANDARD OF THE PEOPLE'S REPUBLIC OF CHINA p r:fl ~A ~~'Jl IE r@ ~t"flit GB 50235-2010 Code for Construction of Industrial Metallic Piping Engineering GB 50235-2010 -- How to BUY & immediately

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et

More information

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates Offshore Engineering Design, Fabrication, Installation, Hook-up and Commissioning 17-NOV-16 This course is Designed, Developed, and will be Delivered under ISO Quality Standards 24-28 September 2017 Dubai,

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

FORTIES ESP FAILURE ANALYSIS EXPERIENCE 2014 EUALF

FORTIES ESP FAILURE ANALYSIS EXPERIENCE 2014 EUALF FORTIES ESP FAILURE ANALYSIS EXPERIENCE 2014 EUALF INTRODUCTION Dismantle Inspection and Failure Analysis (DIFA) has driven a number of key ESP improvements for Apache by properly establishing failure

More information

Introduction INTRODUCTION

Introduction INTRODUCTION 2 INTRODUCTION Introduction Discover the Next Generation in Edge Welded Metal Bellows BellowsTech is a premier US manufacturer of high quality, dependable edge welded bellows and assemblies. Engineers

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement. Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process ASME B73.1-2012 [Revision and Consolidation of ASME B73.1-2001 (R2007) and ASME B73.5M-1995 (R2007)] Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process AN AMERICAN NATIONAL

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

Building on Engineering Centres of Excellence for Offshore Oil and Gas

Building on Engineering Centres of Excellence for Offshore Oil and Gas Expert Skills Showcase 22 nd June 2016 National Subsea Research Initiative Building on Engineering Centres of Excellence for Offshore Oil and Gas Willie Reid Executive Director Strathclyde Oil and Gas

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

SERVICE SPECIFICATION. Certification of subsea equipment and components DNVGL-SE-0045: DNV GL AS

SERVICE SPECIFICATION. Certification of subsea equipment and components DNVGL-SE-0045: DNV GL AS SERVICE SPECIFICATION DNVGL-SE-0045:2014-08 Certification of subsea equipment and components The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version.

More information

Integrity Management of Offshore Assets

Integrity Management of Offshore Assets OIL & GAS Integrity Management of Offshore Assets Opening session Leif Collberg 05 May 2017 1 DNV GL 2015 05 May 2017 SAFER, SMARTER, GREENER How regulations can solve the challenge of being performance

More information

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Special Notes API publications necessarily address problems

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

IAF MD 10:2013 IAF Mandatory Document for Assessment of CB Management of Competence in Accordance with ISO/IEC 17021:2011

IAF MD 10:2013 IAF Mandatory Document for Assessment of CB Management of Competence in Accordance with ISO/IEC 17021:2011 IAF Mandatory Document for Assessment of CB Management of Competence in Accordance with ISO/IEC 17021:2011 4. Table of Contents 1. INTRODUCTION 2. DEFINITIONS 3. GENERAL 4. TECHNICAL AREAS 5. DETERMINATION

More information

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10407-2 First edition 2008-10-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Inspection and classification of used drill stem elements Industries du

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Emergency Pipeline Repair Systems; A Global Overview of Best Practice Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James

More information

Industrial Mechanic (Millwright) Level 4

Industrial Mechanic (Millwright) Level 4 Level 4 Rev. September 2005 Unit: A3 Pre-Interprovincial Review 50 hours Theory: Practical: 50 hours 0 hours This unit offers apprentices a systematic review of skills and knowledge required to pass the

More information

Ring Pair Corrosion Monitor : RPCM

Ring Pair Corrosion Monitor : RPCM Ring Pair Corrosion Monitor : RPCM RPCM is an in-line, piggable, monitor for pipelines, flow lines and process pipework giving true corrosion rate measurement in all service conditions due to full inner

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

Personalized Service, Industry Expertise. Franklin Howard

Personalized Service, Industry Expertise. Franklin Howard Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty

More information

Investor Presentation

Investor Presentation Connecting What s Needed with What s Next Investor Presentation September 2017 Forward-Looking Statements Statements we make in this presentation that express a belief, expectation, or intention are forward

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A XXVIII BRAZE/BRAZING PROCESS I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B MIL- B-007883 Rev OTHER (IF Other, Specify :) NAVSEA 0900-LP-001-7000 II:

More information

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center Report Number B0622 Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center 1 Index Title Page....1 Index....2 Index of Page Changes.. 3 1.0 Scope....4 1.1 Relations to other

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service

PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service COMPLETE REVISION October 2013 Process Industry Practices Machinery PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

More information

The use of Mechanical Connectors throughout Life of Field

The use of Mechanical Connectors throughout Life of Field The use of Mechanical Connectors throughout Life of Field Andrew Woodward Subsea Sales Engineer andrew.woodward@hydratight.com 1 What I will cover Safety Moment Introduction to Hydratight What are Mechanical

More information

Compact subsea gas compression solution for maximized recovery

Compact subsea gas compression solution for maximized recovery Compact subsea gas compression solution for maximized recovery Aberdeen, 6 th February 2014 Marco Gabelloni Senior engineer 2014 Aker Solutions Why subsea gas compression Gas fields require boosting of

More information

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World 1 Overview About Subsea UK Facts and figures UK industry evolution Centre of Excellence Technology and Innovation

More information

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Siemens Subsea. Aravinda Perera, Edson Federighi 2nd May 2017

Siemens Subsea. Aravinda Perera, Edson Federighi 2nd May 2017 Siemens Subsea Aravinda Perera, Edson Federighi 2nd May 2017 www.siemens.com/subsea Subsea future is electrical Page 2 Agenda Introduction to Siemens Subsea Technology Subsea Power Grid Siemens Qualification

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

MIL- B Rev NAVSEA 0900-LP

MIL- B Rev NAVSEA 0900-LP I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B OTHER (IF Other, Specify :) MIL- B-007883 Rev NAVSEA 0900-LP-001-7000 II: ATTRIBUTES: YES NO 2a. Does a

More information

2019 CALL FOR ABSTRACTS

2019 CALL FOR ABSTRACTS 2019 CALL FOR ABSTRACTS Oil, Gas, and Chemical Industry Sectors Covered: Upstream (Drilling, Sub Sea, Production Systems, Integrity Management) Midstream (Pipelines, Terminals) Downstream (Refining, Chemical

More information

Control and Monitoring of Subsea Power Grid

Control and Monitoring of Subsea Power Grid Control and Monitoring of Subsea Power Grid 26.05.2011 Siemens Oil & Gas solutions - Offshore 2010. All rights reserved. Siemens Subsea Solution Segments 5 Main Solution Segments That are Evolving Subsea

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13628-8 First edition 2002-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 8: Remotely Operated Vehicle (ROV) interfaces on

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information