1 Additions and Renovations to Upper Bucks County Technical School SECTION ADDENDUM NUMBER 2 23 April 2014 RE: From: To: Addition and Renovations to Upper Bucks County Technical School Godshall Kane O Rourke Architects LLC 12 East Butler Avenue, Suite 205 Ambler, PA Registered Bidders This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated 8 April, 2014 as noted below. This addendum must be acknowledged in the Form of Proposal in the space provided for this purpose. Failure to so acknowledge this addendum may subject the Bidder to disqualification. This addendum consists of 35 pages including the following attachments: 21 Pages of sketches SKC-01, SKC-02, SKC-03, SKC-04, SKA-9, SKA-10, SKA-11, SKS-01, SKS-02, SKS-03, SKS-04, SKS-05, SKS-06, SKS-07, SKP-1, SKP-2, SKP-3, SKP-4, SKE-1, SKE-2, SKE-3. 1 Page of DRAWING C0.9, UTILITY PLAN Changes to Previous Addenda 2.1 None Changes to the Bidding Requirements, Contract Forms, and Conditions of the Contract , LIST OF DRAWINGS, add the following references; 1. C9.0 Utility Plan 2.3 Document Multiple Contract Summary; Make the following revisions: There were two copies of the Multiple Contract Summary inadvertently included in Volume 1 of the Project Manual. - The first version which ends with a blank page is incorrect. DELETE THIS COPY. - The second version which ends at the bottom of page 44 is correct. If you are scrolling through the entire Volume 1, the first MCS starts on page 367 and ends on 410, Delete these pages. The second (correct) one starts on page 411 and ends on Document ALTERNATES Please note the following clarification to Alternate Number 11. The rooms included in this Alternate are all the 221 series rooms, including rooms 221 thru ADDENDUM NUMBER Issued April 23,

2 Additions and Renovations to Upper Bucks County Technical School Changes to Specifications Fiberglass Sandwich Panels; Add the following; Item 2.1.B, Subject to compliance with specified requirements and modifications to details at no cost to the Owner, provide products by one of the following: a. Major Industries, Inc Sound-Absorbing Ceiling Baffles; Within Machine Tech Provide 15 rows of 8 baffles in each row, and 8 rows of 2 baffles in each row to be located in the field Display cases; Please note the following modifications Item 2.4.Fabrication, add the following; 2.4. A.1. Units shall be constructed to the following dimensions a. Display case in Corridor C-07 shall be 5-4 h x 14-8 l x 2 6 deep b. Display case in Corridor C-08 shall be 4-0 h x 8-8 l x 1-4 deep Fire-protection Specialties; Provide the following quantities of fire extinguishers to be located in the field Type FE-1, quantity shall be Type FE-2, quantity shall be 4, 2 in Bakery Lab 202 and 2 in Culinary Lab , Loading Dock Equipment; Item 2.3.C delete in its entirety and replace with the following; Item 2.3.C. Type: Provide fully Mechanical dock leveler designed for permanent installation in the existing recessed concrete pit. 1. Platform Size: Shall match existing pit size. 2. Existing Pit is Approximately 7-4 long x 6-2 wide x 2-0 deep , Food Service; the following is offered for Clarification: Item 13 specifications refer to 11. There are 9 on the drawing. THE QUANTITY OF 11 PER THE SPECIFICATION IS CORRECT. THESE ARE EXISTING UNITS AND DO NOT AFFECT THE BID. THEY ARE EXISTING MOBILE BUN PANS AND WILL BE LOCATED IN THE FIELD Item 17 specifications refer to 2. There is 1 on the drawing. THE SINGLE LOCATION FOR ITEM 17 ON THE DRAWING IS A COMBINED 2 UNITS AS SPECIFIED SIDE BY SIDE IN THAT LOCATION Item 22 specifications refer to 28. There are 11 on the drawing DISREGARD THE QUANTITY OF 28. THESE ARE FOUR TIER SHELVING UNITS. THERE ARE A TOTAL OF 44 SHELVES, 44 POSTS AND 44 CASTERS. 44 DIVIDED BY 4 EQUALS 11 SHELVING UNITS PER THE DWG Item 146 specifications refer to 9. There is 1 on the drawing. THERE IS ONE UNIT, IT WAS SPECIFIED PER LINEAL FOOT PER THE MANUFACTURER Item 153 specifications refer to 8. There are 2 on the drawing. THESE ARE 4 TIER SHELVING UNITS, 8 EQUALS TWO UNITS , Sanitary Waste and Vent Piping, Section 3.10, D, 1, Add schedule 40 pvc for underground sanitary and vent piping except for kitchen and boiler room underground. Kitchen and boiler room underground piping shall be service class, cast iron soil pipe and fittings; with gasketed joints ADDENDUM NUMBER Issued April 23,

3 Additions and Renovations to Upper Bucks County Technical School , Facility Storm Drainage Piping, Section 3.10, B, 1, Add Schedule 40 pvc for underground rainwater piping. Changes to the Drawings 2.12 C3.0, Existing Features and Demolition Plan; The existing features have been updated to show existing roof drain lines and an existing tree and landscape area; see SKC C5.0, Grading and Drainage Plan; Make the following revisions: New pipe connection from existing roof drain added to STM200 pipe run and grading revised to lessen steepness of hill; please refer to SKC The ramp, sidewalk, and surrounding grading have been revised; see SKC C6.0, Erosion and Sediment Control Plan; Add tree protection fence around existing tree near corner of building; see SKC-03 for location C9.0, Utility Plan; Add this sheet in its entirety as attached. Sanitary profile added and new Utility Plan created A0.3, Schedule and Notes; Reference the wall type B, delete the note that reads: Provide lead lined GWB in Room only A0.5, Finish Schedule and Room Finish Schedule; provide the following modifications ACP 2x4, Black, In lieu of the material listed in the schedule, provide the following; Armstrong Fine Fissured #1729BL, 24 x48 Black, square edge tile, or equivalent product by USG, with Black 15/16 Grid A2.1 thru A2.7, Floor Plans; Reference the Lockers Lockers in Baking Theory and Culinary Lockers shall have masonry bases as detailed in 46/A8.3. All other lockers shall have metal bases as detailed in 47/A A2.1, Floor Plan Cosmetology Baking Culinary; Make the following revisions; Doors 204c and 204d At the Cafeteria, Modify the existing door frames to reverse the swing so these doors swing out to the Corridor A2.4, Floor Plan Business industry Machine Lab Health /Dental; Make the following revision; Door 220.1; reverse the swing of the door so it opens out to the corridor. See attached sketch SKA A2.8a, Roof Plan Main Building; Make the following Modifications Please add the roof plan of the Maintenance Building to this drawing as attached in Sketch SKA-10, for reference for patching existing roof at new Mechanical Equipment Delete roof top unit RTU-8 from the roof plan Reference Mechanical Drawing H2.8 for location and orientation of Roof top Unit RTU A6.6, Reflected Ceiling Plan Annex Lower Level; Refer to sketch SKA-9 for the addition of soffits in Theory Rooms and Theory room S1.0, Foundation Plan; Make the following revisions: New footing for new steel column at Auto Mechanics Mezzanine. See attached SKS- 01 and SKS New footing for turned down slab edge outside Small Engine Lab. See attached SKS- 05 and SKS ADDENDUM NUMBER Issued April 23,

4 Additions and Renovations to Upper Bucks County Technical School 2.24 S2.0, Roof Framing Plan; Make the following revisions: New steel column and structural steel modifications Auto Mechanics Mezzanine. See attached SKS-01 and SKS S3.1, Foundation Sections and Details; Make the following revisions: New Section F10 added. See SKS Revisions to Section F28. See SKS S3.2, Framing Notes and Typical Details; Make the following revisions: New Structural Details. See attached SKS-03 and SKS Drawing P0.1, Cover Sheet, Add the following Note 19 to the Plumbing Scope of Work notes: PC shall refer to the Phasing plans related to demolition and new plumbing work to assure proper order of construction Drawing P1.2, Floor Plan Demolition Diesel Tech Automotive Fitness, Change Demolition Keynote No 21, 24 and 29 to that the relocation of the equipment is to be by the PC in lieu of the GC Drawing P1.4, Floor Plan Demolition Business-Ind. Machine Lab Health/Dental, Change Demolition Keynote No 21 and 24 to that the relocation of the equipment is to be by the PC in lieu of the GC Drawing P2.1, Floor Plan Drainage Cosmetology Bakery Lab Culinary Lab, Refer to attached Sketch SKP-1 for Exterior Grease Interceptor Detail Drawing P2.2, Floor Plan Drainage Diesel Tech Automotive Fitness, Refer to attached Sketch SKP-2 for Oil Sand Interceptor Detail Drawing P2.2, Floor Plan Drainage Diesel Tech Automotive Fitness, Add FD-1 tag at ESE-1 in Room Drawing P2.2, Floor Plan Drainage Diesel Tech Automotive Fitness, Add a FD-2 off southeast corner of small boiler in Boiler Room M-01. Tie 3 waste below floor into main which serves FD-2 s already shown. Verify exact size and location of connection point in field Drawing P2.7, Floor Plan Drainage Horticulture & Maintenance Bldgs, Provide new Fiat Products Utility Sink, Model No. SF-1F with A1 deck type faucet along west exterior wall approximately 23-0 north of southwest corner of Maintenance Garage Building. Run new 2 waste pipe racked tight to wall and connect to waste piping which serve sink in room in northwest corner of building. Refer to architectural drawings for exact location of sink. Provide a Studer Vent at new sink for venting purposes Drawing P3.1, Floor Plan-Supply-Cosmetology Bakery Lab Culinary Lab, Refer to attached Sketch SKP-5 for changes to gas piping Drawing P3.1, Floor Plan-Supply-Cosmetology Bakery Lab Culinary Lab, Add water hammer arrestors in supply piping for 3-bowl sinks and dishwashers Drawing P3.1, Floor Plan-Supply-Cosmetology Bakery Lab Culinary Lab, Clarification: Kitchen Note No 7 should read, All exposed supply piping in kitchen areas shall include a pvc jacket on the pipe insulation Drawing P3.2, Floor Plan-Supply-Diesel Tech Automotive Fitness, Provide a gas pressure regulator for the gas serving the paint spray booth, 2 psi- 10 wc. With a volume of 1,500 mbh. Vent regulator vent to exterior with turned down el Drawing P3.2, Floor Plan-Supply-Diesel Tech Automotive Fitness, Delete New Work Keynotes No 31 and ADDENDUM NUMBER Issued April 23,

5 Additions and Renovations to Upper Bucks County Technical School 2.40 Drawing P3.2, Floor Plan-Supply-Diesel Tech Automotive Fitness, Add the following General Note: All propane gas pressure regulators shall be vented to the atmosphere and be terminated with a turned down el to avoid freezing (typical) Drawing P3.3, Floor Plan-Supply-Welding Lab Nurse Office Connection Link, Supply water mains which enter Room T15 shall be 1-1/4 cw, ½ hw and ½ hwr. Supply water mains which enter Room 217 shall be 1 cw, 1 hw and ½ hwr. Supply water mains which enter Room shall be 1-1/2 cw, 1-1/4 hw and ¾ hwr. Supply water mains which enter Room T-16 shall be 1-1/4 cw, ½ hw and ½ hwr Drawing P3.3, Floor Plan-Supply-Welding Lab Nurse Office Connection Link, For typical compressed air connection detail, refer to attached Sketch SKP Drawing P3.3, Floor Plan-Supply-Welding Lab Nurse Office Connection Link, In Room 217.1, compressed air shall drop between Equipment 14 and 15 in lieu of that shown on east side of Equipment No Drawing P3.7, Floor Plan Supply Horticulture & Maintenance Bldgs, Provide ½ cw from existing cw piping which is located along wall at new sink location. Hot water is to be connected to ½ hw piping which is serving existing sink as referenced in this addendum under Rack piping tight to wall Drawing P8.1, Schedules, Revise Hose Reel Specification in Plumbing Fixture and Equipment Schedule to the following: ACO Ultra Duty Hose Reel, Model No. 7UL4050 with 50 foot hose with SR (Safety Reel Option) Drawing P8.1, Schedules, Refer to attached Sketch SKP-3 for Hot Water Return Connection Detail Drawing P8.1, Schedules, Add the following under the substitutions section of the Plumbing Fixture and Equipment Schedule, Wall Hydrant : Zurn, Josam Washfountains: Acorn Hose Reels: Reelcraft Emergency Eyewashes and Showers: Haws Air Compressor: Ingersoll Rand Sump Pump: Myers Shampoo Sink: Minerva Beauty Grease Interceptor (GI-1): Schier Grease Interceptor (GI-2): Zurn Oil Sand Interceptor: Schier Mixing Valves: Apollo Acid Waste Piping: Not Required 2.48 Drawing P8.1, Schedules, On Plumbing Fixture and Equipment Schedule, Air Compressor (CMP-1) Air Center, Model Number shall include T for integral refrigerated dryer. System shall also include a 24 hr. lead/lag alternator Drawing P8.1, Schedules, For compressor piping detail, refer to attached Sketch SKP Drawing H2.8, Roof Plan New Work, shift roof penetrations approximately 0-2 for RV- 2B, RV-3B, RV-4A, and RV-4A to maintain clearances between existing steel Drawing H2.8, Roof Plan New Work, shift HRU-A approximately 2-0 SE on the roof to maintain clearances for SA and RA drops between existing steel ADDENDUM NUMBER Issued April 23,

6 Additions and Renovations to Upper Bucks County Technical School 2.52 Drawing H2.8, Roof Plan New Work, shift RTU-1A approximately 0-2 NW on the roof to maintain clearances for SA and RA drops between existing steel Drawing H2.8, Roof Plan New Work, shift RV-3A NE to column line 2 to maintain clearances for SA and RA drops between existing steel Drawing H2.8, Roof Plan New Work, shift RTU-3 approximately 4-3 NE. Maintain same distance from column line O Drawing H2.9, Roof Plan New Work-Annex, shift RTU-6 approximately 0-2 to maintain clearance for SA and RA drops between existing steel Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, DISP 201.3, shift HRU-A SA & RA openings 2-0 SE to maintain clearances between existing steel Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Storage A-09, modify SA takeoff. Center 28x20 elbow on 40 x 36 SA riser up to RTU-2. Provide 1-0 long collar to connect elbow to riser Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Freezer 202.9, shift RTU-1A SA & RA openings 0-2 NW to maintain clearances between existing steel Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Disp , add 4 dryer vent up thru roof Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Conference Room A- 15, Add tag #8 to 200 cfm SA grille Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Bakery Lab 202, Replace 18x16 riser up to MAU-3 leader text with 18x16 riser up to MAU Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Cosmetology Lab 201, relocate SA & EA ductwork to maintain clearances for CH-1. Shorten 22 x16 SA main and relocate 14 SA takeoff for VAV-A6. Shift 8 RA branch ductwork to Toilet T-04 NW to avoid CH Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Conference Room A- 15, add plenum RA grille # Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Lobby C-02, add plenum RA grille # Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Secure Lobby C-01, add plenum RA grille # Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Theory Room 203.9, add plenum RA grille #6 and 18x12 TA ductwork in north corner of theory room 2.67 Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Culinary Lab 203.2, add two plenum RA grilles # Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Culinary Lab 203.3, add two plenum RA grilles # Drawing H2.1, Floor Plan Cosmetology, Bakery Lab, Culinary Lab, Cosmetology Lab 201, delete two plenum RA grilles # Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Protective Services 213, shift 36 x48 riser up to RV-3A NE to column line 2 to maintain clearances between existing steel ADDENDUM NUMBER Issued April 23,

7 Additions and Renovations to Upper Bucks County Technical School 2.71 Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Graphic Arts 212, shift 20x12 TA duct SE along partition wall to above entry doorway for Graphic Arts Maintain clearances from 36 x48 riser to RV-4A Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Storage C-05.1, shift SA & RA risers to RTU NE. Maintain same distance from column line O Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Auto Body 209.1, replace leader text Refer to H5._ enlarged plans with Refer to H5.5 enlarged plans Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Small Engine Lab 207, add leader & text to SA & RA main break lines Refer to drawing H2.2A for Continuation (typ) Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Auto Mechanic 210.1, add leader & text to SA & RA main break lines Refer to drawing H2.2A for Continuation (typ) Drawing H2.2, Floor Plan Diesel Tech, Automotive, Fitness, Diesel Mech 208, add leader & text to SA & RA main break lines Refer to drawing H2.2A for Continuation (typ) Drawing H2.2A, Floor Plan New Work Mezzanine, AHU-1, label OA duct with the following leader 56 x18 OA duct up thru roof to OAI Drawing H2.2A, Section View D-H2.1, Relocate 30 x12 SA takeoff in joist bay 5 (starting at column line H) to joist bay 6. Refer to floor Plan New Work Mezzanine on drawing H2.2A for location of all 30 x12 SA takeoffs Drawing H2.2A, Floor Plan New Work Mezzanine, AHU-3, add 8 round takeoff from 30 x30 SA main to SA grille #13 in Tool Room Drawing H2.3, Floor Plan Welding Lab, Nurse Office, Connection Link Welding Lab 216.1, add note refer to drawing H5.4 for work in this area Drawing H2.4, Floor Plan Business, Ind. Machine Lab, Health/Dental, Patient Room 218.3, Replace 6 round EA duct with 6 round hard duct Drawing H2.4, Floor Plan Business, Ind. Machine Lab, Health/Dental, Toilet T-17, replace 8 round EA duct with 8 round hard duct Drawing H2.4, Floor Plan Business, Ind. Machine Lab, Health/Dental, Lab 219.1, replace 8 round EA duct with 8 round hard duct Drawing H2.4, Floor Plan Business, Ind. Machine Lab, Health/Dental, Locker 219.7, add note Refer to drawing H5.9 for work above this area Drawing H2.4, Floor Plan Business, Ind. Machine Lab, Health/Dental, Lab 219.1, add 4 dryer vent up thru roof Drawing H2.5, Floor Plan Annex Admin., Electrical Lab, Upper Level Annex, Girls Locker C-10.1, add plenum RA grille #5. Add 10 x6 open ended duct above ceiling and connect to 16x8 RA main in corridor C-10. Add fire damper to supply air and return air ductwork penetrations at corridor C-10 partition wall Drawing H2.6, Floor Plan Annex Lower Level, add drawing notes as indicated below to through the wall duct penetrations ADDENDUM NUMBER Issued April 23,

8 Additions and Renovations to Upper Bucks County Technical School Room Name Location Duct ID Drawing Note Toilet Room T SA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating Toilet Room T x 4 EA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating Toilet Room T x 4 EA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating CH x 4 EA Cut existing Utility Crawl Space Partition Wall to accommodate 12 x 4 EA ductwork. Patch wall to match existing construction & fire rating Tools x 8 RA Cut existing Utility Crawl Space Partition Wall to accommodate 22 x 8 RA ductwork. Patch wall to match existing construction & fire rating Supplies J SA Cut existing Utility Crawl Space Partition Wall to accommodate 10 SA ductwork. Patch wall to match existing construction & fire rating Supplies J x 4 EA Cut existing Utility Crawl Space Partition Wall to accommodate 10x4 EA ductwork. Patch wall to match existing construction & fire rating Supplies J x 8 RA Cut existing Utility Crawl Space Partition Wall to accommodate 32x8 RA ductwork. Patch wall to match existing construction & fire rating. Cut existing Corridor C-12 Partition Wall to accommodate 32x8 RA ductwork. Patch wall to match existing construction & fire rating Boys T x 4 EA Enlarge existing opening in Utility Crawl Space Partition Wall for 12x4 EA duct. Patch opening to match existing wall construction & fire rating 2175 ADDENDUM NUMBER Issued April 23,

9 Additions and Renovations to Upper Bucks County Technical School Room Name Location Duct ID Drawing Note Girls T-26 12x4 EA Enlarge existing opening in Utility Crawl Space Partition Wall for 12x4 EA duct to Elev Mach M05. Patch opening to match existing wall construction & fire rating. Cut existing Elev Mach M05 partition wall to accommodate 12x4 EA ductwork. Patch wall to match existing construction & fire rating Girls T-26 12x4 EA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating Faculty T-27 12x4 EA Enlarge existing opening in Utility Crawl Space Partition Wall for 12x4 EA duct. Patch opening to match existing wall construction & fire rating Cust J SA Cut existing Utility Crawl Space Partition Wall to accommodate 10 SA ductwork. Patch wall to match existing construction & fire rating Cust J SA Cut existing Utility Crawl Space Partition Wall to accommodate 10 SA ductwork. Patch wall to match existing construction & fire rating Cust J-02 10X4 EA Enlarge existing opening in Utility Crawl Space Partition Wall for 10x4 EA duct. Patch opening to match existing wall construction & fire rating IT Clo E-06 12x4 EA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating T-28 12x4 EA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating Theory Room x8 RA Cut existing Utility Crawl Space Partition Wall to accommodate 22x8 RA ductwork. Patch wall to match existing construction & fire rating 2175 ADDENDUM NUMBER Issued April 23,

10 Additions and Renovations to Upper Bucks County Technical School Room Name Location Duct ID Drawing Note Theory Room SA Re-use existing opening in Utility Crawl Space Partition Wall. Patch opening to match existing wall construction & fire rating Mech Room M-04 24x18 SA Enlarge existing opening in Utility Crawl Space Partition Wall for 24x18 SA duct. Patch opening to match existing wall construction & fire rating Mech Room M-04 36x22 RA Cut existing Utility Crawl Space Partition Wall to accommodate 36x22 RA ductwork. Patch wall to match existing construction & fire rating 2.88 Drawing H2.6, Floor Plan Annex Lower Level, relocate the following leader notes to drawing H5.2 Floor Plan Annex Mechanical Room M-04 ; Existing 84 x36 OA louver, Exist. Evap to Remain, Exist RS & RL to Remain, and Exist CLR X1 to Remain Drawing H2.6, Floor Plan Annex Lower Level, Cust J-02, relocate 10 round SA takeoff to avoid door framing Drawing H2.6, Floor Plan Annex Lower Level, Corridor C-12 shift 10 round SA upstream of VAV 9-E and all SA ductwork downstream of VAV9-E to avoid corridor SE wall framing Drawing H2.6, Floor Plan Annex Lower Level, Tool Room 102.3, add 75 cfm diffuser Tag #7. Connect diffuser to 40 round SA main from AHU-7 with 6 round ductwork Drawing H2.6, Floor Plan Annex Lower Level, Tool Room 103.5, add 75 cfm diffuser Tag #7. Connect diffuser to 30x12 SA main from AHU-8 with 6 round ductwork Drawing H2.6, Floor Plan Annex Lower Level, Tool Room 103.4, add 75 cfm diffuser Tag #7. Connect diffuser to 40 round SA main from AHU-8 with 6 round ductwork Drawing H2.6, Floor Plan Annex Lower Level, Tool Room 103.3, add 75 cfm diffuser Tag #7. Connect diffuser to 40 round SA main from AHU-8 with 6 round ductwork Drawing H2.7, Floor Plan Horticulture, Male Toilet T-29, replace 10 round EA duct with 10 round hard duct Drawing H2.7, Floor Plan Horticulture, Female Toilet T-30, replace 10 round EA duct with 10 round hard duct Drawing H2.7, Floor Plan Horticulture, Work Room 301.3, replace leader text 15.5x15.5 EA duct up thru room to EF- with 15.5x15.5 EA duct up thru room to EF Drawing H2.7, Floor Plan Maintenance Garage, Add the following tags to GF-1 SA Grilles; Tag # 16 to 145 CFM diffuser, Tag #17 to 415 CFM diffuser, Tag #16 to 270 CFM diffuser, Tag # 16 to 195 CFM diffuser, Tag # 16 to 230 CFM diffuser Drawing H2.8, Roof Plan New Work-Annex, Condenser units for freezer & walk-in cooler (kitchen equipment tags 155 & 21), add note HC to provide roof curb & piping curb for 2175 ADDENDUM NUMBER Issued April 23,

11 Additions and Renovations to Upper Bucks County Technical School remote Freezer and Cooler condensing units. Provide 3 equipment curbs, nominal 10-0 long by 14 high; Coordinate final sizes and location with food service contractor Drawing H2.8, Roof Plan New Work-Annex, Boiler Room M-01, add three (3) 16 round boiler flues & one (1) 12 round boiler flue. Refer to drawing H5.1 for exact locations. Add note Terminate boiler flue stack 4 above finished roof. Refer to drawing H5.1 for details Drawing H2.9, Roof Plan New Work, Disp Dryer Vent, add 4 dryer vent down thru roof to dryer in Disp Add drawing note Provide 4 dryer vent. Terminate 24 above roof. HC to provide final connection to dryer Drawing H2.9, Roof Plan New Work, Lab Dryer Vent, add 4 dryer vent down thru roof to dryer in Lab Add drawing note Provide 4 dryer vent. Terminate 24 above roof. HC to provide final connection to dryer Drawing H3.2, Floor Plan Diesel Tech, Automotive, Fitness, Corridor C-05, replace 4- inch piping tag with 5-inch piping tag for HWS & HWR mains Drawing H3.2, Floor Plan Diesel Tech, Automotive, Fitness, Custodial J-01, replace 4- inch piping tag with 5-inch piping tag for HWS & HWR mains Drawing H3.2, Floor Plan Diesel Tech, Automotive, Fitness, Theory Room 207.1, Delete VAV 4-F and associated branch piping. Unit is located on Mezzanine Level drawing H3.2A Drawing H3.2, Floor Plan Diesel Tech, Automotive, Fitness, Boiler Room M-01, show replacement 2 FOS piping in same location as demolished 1-1/4 FOS piping from boiler room to existing fuel oil tank. Add the following drawing notes Provide new 2 FOS piping. Refer to drawing H1.2 for additional information. and Connect new 2 FOS piping to existing fuel tank Drawing H3.4, Floor Plan Business, Ind. Machine Lab, Health/Dental, Corridor C-09 & Reception 218a, relocate Base Bid CH-7A and CH-7B as well as all associated piping & notes to Base Bid Dental Lab Vestibule viewport on drawing H Drawing H3.5, Floor Plan Annex Admin., Electrical lab, Upper Level Annex, Girls Locker C-10.1, Add ¾ HWS & HWR piping from corridor main to VAV 10-L Drawing H5.1, Section A-H5.1, Boiler Room M-01. Add following note to boiler flue stacks above roof; Boiler flue stack to terminate 4 feet above finished roof Drawing H5.2, Floor Plan Annex Mechanical Room M-04, Chiller 2, Add flow arrows for RL & RS lines. RL lines flow towards mechanical room. RS lines flow towards the chiller Drawing H5.2, Floor Plan Annex Mechanical Room M-04, Pumps, replace pump tag P-9 with tag P-7 and pump tag P-7 with P-9. Pump 7 should service EVP-X1 and Pump 9 should service EVP Drawing H5.3, Chiller Plant Flow Diagram, Pump Valves, replace check valves down stream of pumps 7, 8, and 9 with triple duty valves per detail requirements on H Drawing H5.4, Floor Plan Welding Lab 216.1, Welding Lab 216.1, shift 54x14 RA riser & 40x24 SA riser to align between current joist bay Drawing H5.8, Annex Building Maintenance B-01, Building Maintenance B-01, replace EF -32 grille #4, 650 cfm, associated ductwork, and drawing note with 16x8 open ended duct up thru roof to EF-32. Add note Provide 14x14 open ended duct with bird screen up thru roof to EF Drawing H8.1, VAV Schedule, VAV 9-E, replace 1100 CFM SA with 1000 CFM SA ADDENDUM NUMBER Issued April 23,

12 Additions and Renovations to Upper Bucks County Technical School Drawing E1.1, Lobby C-04: Maintain existing motorized door operator and controls Drawing E1.2, Boiler Room M-01: Demolish existing well pump starter Drawing E1.4, Small Engine 224: Demolish power from existing lift. Demolish power from existing compressor Drawing E1.7 A. Maintenance Building, Garages: Wall between garages being demolished: Demolish all electrical devices and equipment in or attached to wall. B. Maintenance Building, Theory Room: Wall being demolished: Demolish all electrical devices and equipment in or attached to the wall. C. Maintenance Building: Demolish power from existing lift Drawing E2.1, Reception A-01: Provide additional luminaire type L2, circuit to LCPMF Drawing E2.2, Supply C-06.2: Provide additional luminaire type L3, circuit with other luminaire in the room Drawing E2.4 A. Patient room 218.3: Room enlarged: add type L luminaire, circuit to LCPAC-25. B. Darkroom 218.4: Room deleted: delete luminaires associated with room Drawing E2.6 A. Modify lighting as indicated in SKE-2. B. Modify lighting as indicated in SKE Drawing E2.7 A. Maintenance Building, garages at demolished wall: Relocate switches to front wall. B. Maintenance Building, new door: Provide exit sign, circuit to building exit sign circuit. C. Maintenance Building, Theory Room: Provide six type I luminaires, DT occupancy sensor, and two sets of three-way switching; switch front row separately Drawing E3.1, Lobby C-04/Vestibule C-04A: Extend existing motorized door operator circuit to new motorized door operator. Provide boxes, install and wire four new pushbuttons furnished by GC for control of existing and new door operators Drawing E3.2, Boiler Room M-01: Provide new well pump starter MS-WP Drawing E3.4 A. Patient room 218.3: Room enlarged: add receptacles from Darkroom B. Darkroom 218.4: Room deleted: move receptacles to enlarged Patient room C. Small Engine 224: Provide two cord reels, circuit to AP2-43. Locations to be determined Drawing E3.6 A. Building Maintenance B-02: PC will provide pump alternator. Provide power circuit ALLA-59. B. Building Maintenance B-02: Delete well pump starter MS-WP. Provide well pump starter MS-WP1. C. Building Maintenance B-02: Do not control UV sterilizer receptacles. Circuit directly to ALLA-33,35, Drawing E3.7 A. Maintenance Building, garages at demolished wall: Relocate panels to adjacent wall. Relocate one receptacle circuit to adjacent wall. Relocate one receptacle circuit to front wall. B. Maintenance Building, temporary diesel shop: Provide connection to lift, 30/2 safety switch, 2#10 & #10 ground in 0.75 conduit to 30/2 circuit P ADDENDUM NUMBER Issued April 23,

13 Additions and Renovations to Upper Bucks County Technical School Drawing E4.4, Small Engine 224: Provide two data locations, each with two jacks, locations to be determined. Provide wall telephone location, location to be determined Drawing E4.7, Garages: Provide two data locations, each with two jacks, locations to be determined. Provide two wall telephone locations, each with one jack, locations to be determined Drawing E7.4, Detail 2, Water System Control Detail: Replace detail with SKE-1. Provide #12 control wiring between MS-WP1, pump alternator and contractor as shown, in minimum 0.75 conduit. Provide 8#12 control wiring (4 spare) between MS-WP1 (Annex) and MS-WP2 (Main Building) in dedicated 0.75 conduit Drawing E8.1 A. Disconnect Schedule: Change MS-EM to the following: Voltage 208, Size 30A, Fuse TBD, Enclosure NEMA 1, Phase Wires 3#10, Ground #10, Conduit 0.75 with auxiliary contact. B. Motor Starter Schedule: Delete MS-WP. Provide MS-WP1 as follows: Type FVNR Combination, Size NEMA 3, Voltage 208, fuse TBD, Enclosure NEMA 1, Phase Wires 3#3, Ground Wire #8, Automatic Control SKE-1, with CPT, HOA switch, PTT LED run indicator lamp, phase loss relay, electronic overload, aux contact. Provide MS-WP2 with same specifications as MS-WP Drawing E8.4 A. PNL-P3: Provide 30/2 breaker for diesel lift. Provide additional 20/2, 30-/2, and 50/2 spare breakers. B. PNL-P4: Provide additional 20/2, 30/2, and 50/2 spare breakers Drawing E8.4, PNL-LPBL: Replace 4-20/1 spare breakers with 1-30/2 and 1-50/2. END OF SECTION ADDENDUM NUMBER Issued April 23,

14 SCALE: 1" = 50' Drawing Number: SKC-01 Drawing Title: C5.0 - GRADING AND PROFILES Date: Scale: AS NOTED UPPER BUCKS COUNTY TECHNICAL SCHOOL Ridge Road Perkasie, Pennsylvania 18944

15 SKC-02 Drawing Number: Drawing Title: C3.0 - EXISTING FEATURES AND DEMOLITION PLAN Date: Scale: 1" = 50' UPPER BUCKS COUNTY TECHNICAL SCHOOL Ridge Road Perkasie, Pennsylvania 18944

16 Drawing Number: SKC-03 Drawing Title: C6.0 EROSION & SEDIMENT CONTROL PLAN Date: Scale: 1" = 50' UPPER BUCKS COUNTY TECHNICAL SCHOOL Ridge Road Perkasie, Pennsylvania 18944

17 F10 S3.1 Drawing Number: SKC-04 Drawing Title: C5.0 - GRADING AND PROFILES Date: Scale: 1" = 40' UPPER BUCKS COUNTY TECHNICAL SCHOOL Ridge Road Perkasie, Pennsylvania 18944

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35 REVISIONS GKO JOB NO. DRAWING TITLE UTILITY PLAN DRAWING NO. C9.0 DATE SCALE 1" = 50' DWN. BY GGH/MFC/MRS UPPER BUCKS COUNTY TECHNICAL SCHOOL RIDGE ROAD, PERKASIE, PA 18944

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

BUILDING DEPARTMENT CURRENT

BUILDING DEPARTMENT CURRENT CITY OF LAPEER FEE SCHEDULE EFFECTIVE 7-1-2018 BUILDING DESCRIPTION BUILDING DEPARTMENT CURRENT FEE Administrative Plan Review Fees Plan Review $81.00 per hour; 1 hr minimum Commercial Plan Review Deposit

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

A. This Section includes plumbing fixtures and related components.

A. This Section includes plumbing fixtures and related components. SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.

This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,

More information

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations. Addendum No. 3 Re / Objet: Phase Two Espanola High School Redevelopment Project 147 Spruce Street Espanola, ON YBA Project No.: 1323 `The following information, amendments and revisions shall constitute

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION

DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION DEPARTMENT OF VETERANS AFFAIRS DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS LOCATION : VAMC, PROJECT TITLE : PROJECT NO. : [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION DEVELOPMENT DOCUMENTS EQUIPMENT

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

Non-Residential and Multi-Family Plan Check Submittal Requirements

Non-Residential and Multi-Family Plan Check Submittal Requirements Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder. ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

2012 IMC Performing Commercial Mechanical Inspections

2012 IMC Performing Commercial Mechanical Inspections 2012 IMC Performing Commercial Mechanical Inspections Based Primarily on the 2012 International Mechanical Code (IMC ) and the 2012 International Fuel Gas Code (IFGC ) as applicable. ` Welcome I am You

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

SECTION EQUIPMENT WIRING

SECTION EQUIPMENT WIRING PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 26 27 17 EQUIPMENT WIRING A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General Provisions,

More information

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste

More information

Philip Rogers Elementary School

Philip Rogers Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017

ADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017 Procurement Services Lucas Administrative Center, 617 1 Nunn Drive Highland Heights, KY 41099 859.572.6605 FAX 859.572.6995 ADDENDUM NO: 1 IFB/RFP No: NKU-22-18 Commodity: Kentucky Hall Renovation Date:

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES SECTION 224000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes 1. Faucets for lavatories and sinks. 2. Flushometers. 3. Toilet seats. 4. Protective shielding guards. 5. Fixture

More information

North Lawndale College Prep Charter - Collins

North Lawndale College Prep Charter - Collins Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE 231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

MONROE COUNTY BOARD OF EDUCATION ABC PROJECT NO ADDENDUM NUMBER 4. Thursday, May 8, 2014

MONROE COUNTY BOARD OF EDUCATION ABC PROJECT NO ADDENDUM NUMBER 4. Thursday, May 8, 2014 RENOVATIONS TO VARIOUS MONROE COUNTY SCHOOLS MONROEVILLE, AL MONROE COUNTY BOARD OF EDUCATION ABC PROJECT NO. 2014101 ADDENDUM NUMBER 4 Thursday, May 8, 2014 PROJECT: RENOVATIONS TO VARIOUS MONROE COUNTY

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

To Contractor: Cris Goldy GH Phipps Construction Companies 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, CO , Ext 1255

To Contractor: Cris Goldy GH Phipps Construction Companies 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, CO , Ext 1255 Seventeenth Street Denver Colorado 00 0 Fax 0 0 amd@amdarchitects.com Anderson ndersonmason asondale ale Architects WORK CHANGE PROPOSAL REQUEST # 00 Date: June 0 Project #: 0.00 Project: DU RSECS + Knoebel

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.

More information

NIAGARA REGIONAL HOUSING MZE FILE NO

NIAGARA REGIONAL HOUSING MZE FILE NO M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information