Landmark. Series and. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedure for installing Landmark shingles.
|
|
- Scarlett Rogers
- 6 years ago
- Views:
Transcription
1 CerainTeed Shingle Applicaor Manual Landmark Serie and 12 Landmark TL 110 YOUR OBJECTIVE: To learn he correc procedure for inalling Landmark hingle. landmark erie and landmark TL Landmark hingle have he inaller-friendly NailTrak feaure, which provide 1 1 2" wide nailing area and pecially formulaed Quadra-Bond laminaing adheive (See Figure 12-3). Landmark Special i impac reian and i pecially manufacured wih a reinforced fibergla crim o mee UL 2218 Cla 4 impac reiance raing. NOTE: Landmark Special mu be inalled over a clean deck (no roof-over) o obain he UL 2218 raing. I i rongly recommended ha impac reian cap hingle made from XT 30 IR hingle be inalled on all hip and ridge. Some inurance carrier may no conider he roof yem a complian o UL 2218 Cla 4 wihou impac reian cap hingle. Landmark Solari hingle are ENERGY STAR qualified roof produc ha mee boh olar reflecance and hermal emiiviy requiremen. Uing CerainTeed advanced roofing granule, Landmark Solari reflec olar energy and radiae hea far beer han radiional roofing hingle i can reduce he roof emperaure by a much a 20 percen in he ummer. NOTE: Ue maching Landmark Solari hip and ridge hingle which are alo olar reflecive. Landmark TL i unique becaue i paened Tri-Laminae deign combine hree layer of maerial o provide a dramaically hick hingle wih a wood hake yle. Wih he excepion of Landmark TL, cloed-cu valley are preferred by CerainTeed when applying hee hingle; however, open valley are alo accepable. Open valley are recommended when applying Landmark TL; however cloed-cu valley are alo accepable. Woven valley are no recommended for Landmark TL becaue he ri-laminaed hingle can buckle and become damaged when haped ino he valley. Nail are required a faener for Landmark TL, aple are no allowed. STANDARD OR STEEP SLOPES: CerainTeed recommend DiamondDeck Synheic Underlaymen, Roofer Selec High Performance Underlaymen, or hingle underlaymen meeing ASTM D226, D4869 or D6757. Take care o enure ufficien deck venilaion when DiamondDeck or oher ynheic underlaymen i inalled. Follow manufacurer applicaion inrucion. Low lopes: One layer of CerainTeed WinerGuard Waerproofing Shingle Underlaymen (or equivalen, meeing ASTM D1970) or wo layer of 36" wide fel hingle underlaymen (Roofer Selec or underlaymen produc meeing ASTM D226, D4869 or D6757) lapped 19" mu be applied over he enire roof; enure ufficien deck venilaion. When DiamondDeck or oher ynheic underlaymen i inalled, weaher-lap a lea 20" and enure ufficien deck venilaion. IMPORTANT: When inalling LandMark TL on low lope, one layer of WinerGuard or an equivalen waerproofing hingle underlaymen mu be applied over he enire roof. Applying wo layer of fel hingle underlaymen i no an accepable alernaive o WinerGuard. One layer of hingle underlaymen meeing ASTM D4869 applied over he required WinerGuard i alo recommended. 90 STEEP Slope Applicaion (over 21/12) 60 (21/12) STANDARD Slope Applicaion (4/12 up o 21/12) LOW Slope Applicaion (below 4/12) 18.5 (4/12) 9.5 (2/12) 0 (0/12) Figure 12-1: Slope definiion. The roof deck* mu be a lea: 3 8" (9.5 mm) hick plywood, or 7 16" (11 mm) hick non-veneer, or nominal 1" (25 mm) hick wood deck. Cold Weaher Climae (All Slope): Applicaion of WinerGuard or i equivalen i rongly recommended whenever here i a poibiliy of ice build-up. Follow manufacurer applicaion inrucion. Flahing: Corroion-reian flahing mu be ued o help preven leak where a roof mee a wall, anoher roof, a chimney or oher objec ha penerae a roof. Sealing: Shingle ealing may be delayed if hingle are applied in cool weaher and may be furher delayed by airborne du accumulaion. If any hingle have no ealed afer a reaonable ime period, hand ealing may be neceary. Cauion: To preven cracking, hingle mu be ufficienly warm o allow proper forming for hip, ridge and valley. Warrany: Thee hingle are warraned again manufacuring defec and are covered by SureSar proecion. See he warrany ielf for pecific deail and limiaion. * For echnical queion, informaion on accepable alernaive applicaion mehod and maerial, or a copy of he produc warrany, conac he ource lied below: Warrany Alernae Inrucion Technical Queion Your upplier or roofing applicaor CerainTeed Home Iniue CerainTeed-RPG Technical Service
2 faening Low and Sandard Slope LANDMARK Shingle Roof Deck Proper Nailing Crooked Under- Driven Figure 12-2: Proper and improper nailing. Over- Driven 1 1 /2 Nailable Area /4 (375 mm) 12 1 (25 mm) Releae Tape 1 (25 mm) IMPORTANT: For deck 3 4" (19 mm) hick or hicker, nail mu go a lea 3 4" (19 mm) ino he deck. On hinner deck, nail mu go a lea 1 8" (3.2 mm) hrough he deck. Nail mu be 11- or 12-gauge roofing nail, corroion-reian, wih a lea 3 8" (9.5 mm) head, and a lea 1" (25 mm) long. LandMark TL require nail a lea 1 1 4" long. Landmark TL 13 1 /2 (343 mm) 13 (330 mm) 13 1 /2 (343 mm) 1 (25 mm) 1 (25 mm) Nail Area for Low & Sandard Slope Seep Slope Figure 12-4: Ue four nail for every full hingle. Nail Area for Seep Slope Avoid Placing Nail Along Thi Line Releae Tape Ue ix nail and four po of aphal roofing cemen for every full laminaed hingle. See below. Aphal roofing cemen hould mee ASTM D 4586 Type II. Apply 1" po of aphal roofing cemen under each corner and a abou o 13" in from each edge. LANDMARK FRONT /4 (375 mm) 12 BACK Nailing Line Sealan Srip Nail Area For Seep 1 (25 mm) 1 (25 mm) Releae Tape Roofing Cemen 1 (25 mm) 1 (25 mm) UNDERSIDE OF TOP LAMINATE LAYER Quadra-Bond Landmark TL 13 1 /2 (343 mm) 13 (330 mm) 13 1 /2 (343 mm) Four laminaing adheive rip for a ronger bond. 1 (25 mm) 1 (25 mm) Figure 12-3: NailTrak feaure a wider nail area and exra-rong Quadra-Bond conrucion. 1 (25 mm) Roofing Cemen 1 (25 mm) Figure 12-5: Ue ix nail and four po of aphal roofing cemen on eep lope. CAUTION: Exceive ue of roofing cemen can caue hingle o blier. CERTAINTEED SHINGLE APPLICATOR S MANUAL Chaper
3 wo CLEAN-DECK APPLICATION METHOD for landmark and Landmark TL hingle five-coure diagonal Mehod (6" and 11") five-coure diagonal Mehod (5 5 8" and ") NOTE: The 6" and 11" mehod i hown below. The 5 5 8" and " mehod follow he ame applicaion inrucion a he 6" and 11" mehod excep he dimenion of he hingle cu-off in he econd and hird coure are 5 5 8" and " repecively. CAUTION: Ue of oher inallaion mehod may reul in an objecionable paern. Preparing he Deck: u Apply underlaymen a required. CerainTeed ugge ha a layer of hingle underlaymen be applied. For UL fire raing, underlaymen i generally required. Apply fla and unwrinkled. u Snap chalkline o aure hingle will be correcly aligned. Expoe all hingle 5 5 8" (143 mm). Sarer Coure: 1. Ue CerainTeed Swifar Sarer, or hree-ab elf-ealing hingle wih he lower ab porion removed. Be ure ha he arer hingle are a lea 7 5 8" in heigh.(figure 12-6). Sarer Shingle 7 5 /8 1 Coure: Apply a full hingle a he lower lef corner of he roof. Make he lower edge and lef edge lie fluh wih he edge of he arer coure (Figure 12-7). 2nd hrough 5h coure: CAUTION! Failure o follow inrucion ep 1-5 below will bring join oo cloe ogeher and may caue unaracive paern! 1. Cu 6" off he lef end of he fir hingle and ave hi piece for laer ue. Apply he " (34 for Landmark TL) long piece over and above he fir-coure hingle. Leave he boom 5 5 8" ab porion of he fir-coure hingle expoed. 2. Cu 11" off he fir hingle of he hird coure and ave hi for laer. Inall he " (29 for Landmark TL) long piece over and above he econd-coure hingle. 3. Apply he previouly removed 11" long piece over and above he hird-coure hingle. 4. Apply he previouly removed 6" long piece from he econd coure over and above he fourh-coure hingle. 5. Inall a full hingle again he righ edge of each hingle in coure one hrough five. Coninuing up he Roof: 1. Beginning again wih a full hingle, repea he five-coure paern up he lef rake.(figure 12-8, B). 2. Fill-in coure acro he roof in a epped diagonal fahion uing full hingle. (Fgure 12-8, A). Do no run coure raigh acro. IMPORTANT: Do no align join of hingle cloer han 3 1 2" from one anoher. Ridge R e m o v e h e e p o r i o n Roof Deck Figure 12-6: Make arer hingle ha are 7 5 8" in heigh. 2. For he fir arer, cu 6" from one ide of he arer hingle. 3. Apply he remaining piece o he lower lef corner of he roof. Make ure here i 1 2" overhanging he rake and eave if drip edge i being ued. If you are no uing drip edge, make he overhang 3 4". 4. Ue full lengh arer hingle for he re of he coure. Meal Drip Edge Save 11 " piece o ue in 4h Coure Underlaymen 11" Save 6 "piece o ue in 5h Coure 5h Coure 2" Side Lap 6" 4h Coure 3rd Coure 27 3 /4" 32 3 /4" Full Shingle 4" End Lap 2nd Coure 1 Coure Sarer Coure Figure 12-7 : Applying he fir 5 coure of Landmark. Noe: The LandMark TL dimenion differ. 112 Chaper 12 CERTAINTEED SHINGLE APPLICATOR S MANUAL
4 Figure 12-8: Five-Coure Diagonal Mehod inallaion chemaic. For capping hip and ridge, apply CerainTeed Acceory hingle of a like color. Ridge Ven Trim fluh o roof deck opening Underlaymen Air Flow Through Soffi Provide adequae venilaion under he roof deck o preven harmful condenaion in winer and hea build-up in ummer. CL Underlaymen lap WinerGuard 2 (50 mm) Line valley by cenering 36 (915 mm) wide CerainTeed WinerGuard Waerproofing Shingle Underlaymen or equivalen direcly o deck. Lay hingle on maller roof area, acro valley and ono he adjoining roof area a lea 12. Do no nail wihin 6 (150 mm) of valley cenerline Embed each hingle in a 2 (50 mm) wide rip of aphal roofing cemen. Remove Cu 2 (50 mm) diagonally off upper corner of rimmed hingle. CL Cu hingle 2 (50 mm) back from valley cenerline Figure 12-9: Highligh of cloed-cu valley deail. CERTAINTEED SHINGLE APPLICATOR S MANUAL Chaper
5 chimney flahing 2" (50 mm) Minimum Meal Sep Flahing 7 5/8" (193 mm) HIPS AND RIDGES Shadow Ridge acceory hingle Shadow Ridge hingle have an accened hadow line ha i deigned o complemen hee hingle. Simply fold along he pre-cu line and deach individual cap piece. Save valuable inallaion ime compared o cuing 3-ab hingle. 3" (75 mm) Minimum Couner Flahing Figure 12-10: Sep flahing minimum dimenion. Fold down couner flahing over ep flahing Apron Flahing 2 Lap (50 mm) minimum Faen Flahing To Roof Figure 12-12: Shadow Ridge acceory hingle deach eaily from hree-piece uni o make 72 individual cap piece. There are 24 hree-piece uni in each Shadow Ridge bundle, providing 72 individual cap ha will cover 30 linear fee ( linear fee, Meric) of a hip or ridge. Each Englih dimenion cap piece i by (Meric cap are " by 9 7 8") and feaure clipped corner on he boom edge of he expoed porion. Applicaion i a follow: 1. Apply hingle up o he hip or ridge on boh ide, hen rim fluh. NOTE: The la coure of hingle hould have an expoure of 5" (5 5 8" for meric) or le when he hingle cap or ridge ven i faened in place. Oherwie, a poenial waer leak could occur a expoed hingle end join. The figure ued in hi ecion illurae he applicaion of acceory hingle over a ridge ven; applicaion direcly o he roof deck i very imilar. (305mm) Apply Over Sarer Shingle 7" (180mm) Sarer Shingle Figure 12-11: Flahing around a chimney. wo roof-over mehod for landmark and Landmark TL hingle The ame mehod ued for clean-deck applicaion of hee hingle are ued for roof-over. Applicaion of hee hingle over Englih dimenion hingle i no recommended due o he high co of workmanhip and greaer rik of worker error. Figure 12-13: Apply a full cap hingle over he arer piece, fluh wih he boom and ide edge of he arer. 2. Inall cap beginning a he boom of a hip or a eiher end ofa ridge. Apply a arer piece ha ha he boom 5 (5 5 8" for meric) removed (Figure 12-18). Faen he arer wih wo nail locaed abou 3" from he rake edge, and 1" in from each ide edge. Make ure faener ued o apply cap penerae a lea 3 4" ino or hrough he decking. NOTE: To ai in proper alignmen when ridge ven i no ued, nap a chalk line parallel o he hip or ridge along he line where he ide edge of he cap hingle hould be. 114 Chaper 12 CERTAINTEED SHINGLE APPLICATOR S MANUAL
6 3. Apply a full cap hingle over he arer (Figure 12-18), and place faener a 5 5 8" (6 1 4" for meric) up from he expoed boom edge and 1 in from each ide. Nail mu no be expoed on he finihed roof. All nail head mu be driven raigh and mu no cu ino he hingle urface. (305mm) Laying Noch 5" (125mm) Expoure 5" (125mm) Expoure Figure 12-14: Inall cap hingle a heir correc expoure and cover all faener. NOTE: Each cap ha a laying/alignmen noch a he op edge o cener he piece on he ridge line, and wo noche on each ide o indicae he correc expoure and hadow-line placemen (Figure 12-19). The ide noche of he cap being applied hould be aligned wih he op edge of he previouly applied cap. (305mm) 6" (150mm) (305mm) Noch for Cenering 6" (150mm) Noche for Alignmen o he Top Edge of he Previou Cap for 5" (125mm) Expoure 7" (180mm) Figure 12-16: Ue laying noche o cener hingle on hip and ridge, and o locae he correc expoure. Mounain Ridge High-Profile HIP AND RIDGE Acceory Ue Mounain Ridge acceory hingle o cover hip, ridge or rake edge. One box will cover 20 linear fee. To preven damage o hingle during applicaion, hey mu be ufficienly warm o allow proper forming. Faening IMPORTANT: Ue wo nail o faen each hingle. Nail mu be minimum 1 3 4" (45 mm) long. For he 4" (100 mm) arer hingle, place faener 1" (25 mm) in from each ide edge and abou 2" (50 mm) from he rake (or eave) edge, making ure he faener goe 3 4" ino he deck or all he way hrough. For each full Mounain Ridge hingle, place faener 8 5 8" (219 mm) up from i expoed bu edge and 1" (25 mm) in from each ide edge. Sealan 415/16" (125mm) 9 7 /8" (250mm) 4 15 /16" (125mm) Sealan Expoure 8 Nail 8 5/8 Noch for Cenering 4 Sarer Piece 131/4" (337mm) Noche for Alignmen o he Top Edge of he Previou Cap for 5 5 /8" (141mm) Expoure 7 5 /8" (196mm) Figure 12-17: Hip and ridge applicaion. Figure : Each Shadow Ridge hingle ha a cenering noch and wo ide-alignmen noche o help enure proper placemen CERTAINTEED SHINGLE APPLICATOR S MANUAL Chaper
7 Hip, Ridge and Rake Shingle Applicaion Apply he primary field roofing up o he hip or ridge from boh ide of he roof and rim fluh or lap over one ide, no more han half he widh of a Mounain Ridge hingle. Aure ha he inalled Mounain Ridge hingle properly cover hip and ridge field hingle on boh ide and he field hingle applied along rake edge. For a rake edge inallaion, cu he field hingle fluh o he rake edge. Apply Mounain Ridge hingle enuring hey fi ecurely again he rake board. To ai in proper alignmen, nap a chalk line parallel o he hip, ridge or rake along he line where he ide edge of he Mounain Ridge hingle hould fall. Prepare a 4" Sarer hingle by cuing off he lower 8" color granule bu porion of one Mounain Ridge hingle. Apply he 4" arer piece (wih ealan neare he ouer edge) over he boom corner of he hip or rake, or on eiher end of he ridge, overhanging he corner or end by approximaely 1 2" and bending he arer hingle along i cenerline o form ino place (ee figure below.) Inall a nail on each ide abou 2" up from he arer hingle expoed bu edge and 1" in from each ide edge of he hingle. The 8" piece ha wa cu off may be ued o finih he oppoie end of hip, ridge or rake. Nex, apply a full Mounain Ridge hingle over he inalled arer hingle, bending i along i cenerline and forming ino place over he hip, ridge or rake, fluh wih he boom and ide edge of he arer hingle. Inall a nail on each ide of he hingle 8 5 8" up from he boom edge and 1" in from each ide edge. Coninue applicaion of he Mounain Ridge hingle along he hip, ridge or rake a hown. Expoe Mounain Ridge hingle 8", covering all faener. cedar cre medium-profile HIP AND RIDGE Acceory hingle Ue Cedar Cre acceory hingle o cover hip and ridge. Carefully eparae he hree-piece uni prior o applicaion, by fir folding along he pre-cu line and hen deaching he piece (ee Figure 12-18). No cuing i neceary. There are 30 individual hingle (10 hree-piece uni) in each bundle. One bundle will cover 20 linear fee. Each x hingle ha a hadowline ha i a deign feaure which i viible when applied properly. To preven hingle damage during applicaion, hey mu be ufficienly warm o allow proper forming. Figure 12-18: Separae o make 3 cap hingle. Faening IMPORTANT: Ue TWO nail o faen each hingle. Faener mu be minimum 1-3/4" (45 mm) long. For he arer hingle, place faener 1" in from each ide edge and abou 2" up from he arer hingle expoed bu edge, making ure faener goe 3/4" ino he deck or all he way hrough he deck. (ee Figure 12-19). For each full Cedar Cre hingle, place faener 8-5/8" up from i expoed bu edge and 1" in from each ide edge (ee Figure 12-20). 4" (102 mm) Sarer hingle Figure 12-19: Apply a full cap hingle over he arer hingle. 8" (203 mm) Expoure 2" (50 mm) 8 5/8" (219 mm) 1" (25 mm) 1" (25 mm) Apply over arer hingle Figure 12-20: Inall cap hingle a an 8" expoure and faen wih one nail on each ide a hown. Three-piece uni Shadowline Chaper 12 CERTAINTEED SHINGLE APPLICATOR S MANUAL
8 IMPORTANT: High Wind Inrucion. In order o achieve he ASTM D3161 Cla F Wind Reiance Claificaion each hip and ridge hingle mu be boh 1) faened wih nail a hown and 2) hand-ealed wih wo 1/4" wide bead of eiher BASF Sonolaic NP1 Adheive or Henkel PL Polyurehane Roof & Flahing Cemen applied from he middle of he hingle raied overlay on he op piece and exending approximaely 4" along he ide of he headlap along a line 3/4"-1" in from each ide edge of he hingle headlap a hown. Immediaely align and apply he nex overlying hingle, genly preing ab ide ino adheive. Only one ide of he double hickne ab i laminaed ogeher; o ecure he oher ide, afer folding he hingle over he 1/4" 3/4" Hand-ealing adheive Dab of aphal cemen beween hingle layer ridge and nailing ino poiion, a 1" diameer po of eiher NP1 or PL adheive mu be applied beween he hingle layer a hown. Immediaely align and apply he nex overlying hingle, genly preing ab ide ino adheive. 1" Figure 12-21: Hand eal cap a hown. 4" 1" cedar cre applicaion Apply primary roofing up o hip or ridge on boh ide of roof and rim fluh. Enure ha he Cedar Cre hingle will adequaely cover he op coure of he hingle on boh ide of he hip or ridge. Prepare a 4" arer hingle by cuing off he lower 8" color granule porion of one Cedar Cre hingle. Apply he 4" arer piece wih raied overlay edge over he boom corner of he hip or o eiher end of he ridge, overhanging he corner or end by approximaely 1/2" and bending he arer hingle along i cenerline o form ino place (ee Figure 12-19). Inall a nail on each ide abou 2" up from he arer hingle expoed bu edge and 1" in from each ide edge of he hingle. Then apply a full x piece over he arer, bending he hingle along i cenerline and forming i ino place over he hip or ridge, fluh wih he boom and ide edge of he arer hingle. Faen wih wo nail minimum 1-3/4" long wih one nail on each ide of hingle 8 5/8" up from he bu edge and 1 in from each ide edge (ee Figure 12-20). Coninue applicaion of Cedar Cre hingle up he hip or along he ridge, forming each hingle over he hip or ridge, and faen a hown in Faening. Expoe Cedar Cre hingle 8", covering all faener. To ai in proper alignmen, nap a chalk line parallel o he hip or ridge applying along he line where he ide edge of he Cedar Cre hingle hould be. Here a Tip In he winer pu hip and ridge cap hingle in your ruck wih he heaer blaing for 20 minue o he cap don crack when formed. (Thank o Mark Dulz, Richmond, MI.) CERTAINTEED SHINGLE APPLICATOR S MANUAL Chaper
Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual
CertainTeed Shingle Applicator s Manual Laminated Shingles 12 Landmark Series and Landmark TL YOUR OBJECTIVE: To learn the correct procedure for installing Laminated shingles. LANDMARK SERIES AND LANDMARK
More informationLAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT
15 CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT LAMINATED SHINGLES 90 YOUR OBJECTIVE: To learn the correct procedure for installing Laminated shingles. ENGLISH DIMENSIONS LANDMARK SERIES WOODSCAPE
More informationHatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles
CertainTeed Applicator s Manual Hatteras s 14 YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles HATTERAS SHINGLES Hatteras shingles are a premium oversize (18" x 36") roofing
More informationC e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)
C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l Grand Manor 16 and Carriage House YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products. These shingles
More informationGrand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.
CertainTeed Shingle Applicator s Manual Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products. 90 STEEP Slope Application
More informationThree -Tab Shingles. CertainTeed Shingle Applicator s Manual
CertainTeed Shingle Applicator s Manual Three -Tab Shingles 10 YOUR OBJECTIVE: To learn the correct procedures for installing three-tab type strip shingles. ENGLISH DIMENSIONS CLASSIC HORIZON, XT 30, XT
More informationTHREE-TAB SHINGLES. YOUR OBJECTIVE: To learn the correct procedures for installing three-tab type strip shingles.
M A S T E R S H I N G L E A P P L I C A T O R S M A N U A L THREE-TAB SHINGLES 12 YOUR OBJECTIVE: To learn the correct procedures for installing three-tab type strip shingles. ENGLISH DIMENSIONS CLASSIC
More informationA P P L I C A T I O N I N S T R U C T I O N S
1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More information5 Spatial Relations on Lines
5 Spaial Relaions on Lines There are number of useful problems ha can be solved wih he basic consrucion echniques developed hus far. We now look a cerain problems, which involve spaial relaionships beween
More informationCambridge English Application Instructions
Cambridge English Application Instructions ROOF SLOPE: Never apply asphalt shingles to roof slopes less than 2:12. For slopes 2:12 to 4:12 (LOW SLOPE), see special underlayment requirements outlined below.
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationRANCH RAIL FENCE AND GATE INSTALLATION INSTRUCTIONS
Good Fences Make Good Neighbors RANCH RAIL FENCE AND GATE INSTALLATION INSTRUCTIONS HUSKER VINYL Ranch Rail Fence & Gae Insallaion Insrucions 1 BEFORE YOU START, IT S IMPORTANT TO CHECK: Tha fence or he
More informationSG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application
1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE
More information3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25
3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 1 Directions For Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to building code and local amendments.
More informationBARDOLINE INSTALLATION INSTRUCTIONS
BARDOLINE INSTALLATION INSTRUCTIONS www.onduline.com CONTENTS General conditions Material requirements Terms Estimating shingle requirements Roof preparation Shingle application 9 GENERAL CONDITIONS ONDULINE
More informationFlow Meter / Monitor FLEX-HD2K
Meer / Monior FLEX-HD2K vicoiy abilized..20 ma or 0..10 V oupu ignal 1 x programmable wich or frequency oupu Programmable wiching value, full cale, or zero poin via magne clip Programming proecion by removal
More informationA201 3 PROPOSED SOUTH ELEVATION SCALE: PROPOSED EAST ELEVATION SCALE: EXISTING EAST ELEVATION EXISTING SOUTH ELEVATION WEST WORKSHOP
WEST WORKSHOP Residential Designer Kurt West P: 202-957-0933 E: kurt@westworkshop.com NOTE: INSTALL NEW ROOFING -REPLACE ALUM DRIP EDGES -REPLACE ICE/WATER SHIELD AT EAVES AND VALLEYS -INSTALL SYNTHETIC
More informationConductive Elastomer Waveguide Gaskets
Conducive Elasomer Waveguide Gaskes WAVEGUIDE GASKES Parker Chomerics offers a selecion of EMI gaske maerials ha provide effecive EMI shielding and pressure sealing for choke, cover and conac flanges.
More informationThe proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.
The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage. LANDMARK SERIES DESIGNER ROOFING SHINGLES Landmark, shown in Silver
More informationStormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK
StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM
More informationLab 3 Acceleration. What You Need To Know: Physics 211 Lab
b Lab 3 Acceleraion Wha You Need To Know: The Physics In he previous lab you learned ha he velociy of an objec can be deermined by finding he slope of he objec s posiion vs. ime graph. x v ave. = v ave.
More informationSIGNATURE CUT SHINGLES. Getting Started
General Instructions This technical bulletin is focused on getting Paramount shingle installation started correctly. Specifically, this bulletin details the application of PABCO Universal Starter, Paramount
More informationCapstone Application Instructions
Capstone Application Instructions Information Sheet Updated: 2007 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer L IFETIME D ESIGNER S HINGLES APPLICATION INSTRUCTIONS
More informationfancy yarns for fun stripes, while using hardsave wearing Jawoll Superwash Sock, with extra nylon, for knitting replaceable toes and heels.
Toe-up Socks h g u o h r e f A Heel wih fancy yarns for fun sripes, while using hardsave wearing Jawoll Superwash Sock, wih exra nylon, for kniing replaceable oes and heels. Toe up Socks wih Aferhough
More informationTimberline and Sovereign Expanded Fastener Placement Area
Timberline and Sovereign Expanded Fastener Placement Area Information Sheet Updated: 2004 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer Less Fastening Hassles! Announcing
More informationF-WAVE REVIA SYNTHETIC ROOFING SHINGLES
F-WAVE REVIA SYNTHETIC ROOFING SHINGLES Installation Manual for Steep-Slope Residential Installations For support with all other Steep-Slope Installations, please call F-Wave Technical Support at 888-GO-FWAVE.
More informationThe University of Melbourne Department of Mathematics and Statistics School Mathematics Competition, 2013 JUNIOR DIVISION Time allowed: Two hours
The Universiy of Melbourne Deparmen of Mahemaics and Saisics School Mahemaics Compeiion, 203 JUNIOR DIVISION Time allowed: Two hours These quesions are designed o es your abiliy o analyse a problem and
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationPREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationHERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationNEMO etc. Certificate of Authorization # Christian Street, Unit #13 Oxford, CT (203)
Certificate of Authorization #32455 353 Christian Street, Unit #13 Oxford, CT 06478 (203) 262-9245 ENGINEER EVALUATE TEST CONSULT CERTIFY CertainTeed Corporation 20 Moores Road Malvern, PA 19355 (610)
More informationSwitch Basics and Applications. Selection Service Speed
Swich Basics and Applicaions Selecion Service Speed Inroducion Basic Swich Types and Applicaions Swich Funcion - Mechanical Poles and Throws, Mechanical Characerisics Swich Funcion - Elecrical Volage and
More informationApplication instructions
SECTION 5 LAMINATE SHINGLES 5.0 Weather-Tite TM : Sealant Bands / Release Tapes 5.1 East : Everest 42 and Mystique 42 5.2 West : Mystique 42 and Vangard 42 IR 5.3 East / West: Manoir 5.0 Weather-Tite TM
More informationOPERATION MANUAL. Indoor unit for air to water heat pump system and options EKHBRD011ADV1 EKHBRD014ADV1 EKHBRD016ADV1
OPERAION MANUAL Indoor uni for air o waer hea pump sysem and opions EKHBRD011ADV1 EKHBRD014ADV1 EKHBRD016ADV1 EKHBRD011ADY1 EKHBRD014ADY1 EKHBRD016ADY1 EKHBRD011ADV1+Y1 EKHBRD014ADV1+Y1 EKHBRD016ADV1+Y1
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationA NEW DUAL-POLARIZED HORN ANTENNA EXCITED BY A GAP-FED SQUARE PATCH
Progress In Elecromagneics Research Leers, Vol. 21, 129 137, 2011 A NEW DUAL-POLARIZED HORN ANTENNA EXCITED BY A GAP-FED SQUARE PATCH S. Ononchimeg, G. Ogonbaaar, J.-H. Bang, and B.-C. Ahn Applied Elecromagneics
More informationChapter 2 Introduction: From Phase-Locked Loop to Costas Loop
Chaper 2 Inroducion: From Phase-Locked Loop o Cosas Loop The Cosas loop can be considered an exended version of he phase-locked loop (PLL). The PLL has been invened in 932 by French engineer Henri de Belleszice
More informationW DESIGN ASSOCIATES. Consulting Engineers & Architects McCook, Nebraska Hastings, Nebraska 68901
W DEIGN AOCIAE Consulting Engineers & Architects McCook, Nebraska 69001 Hastings, Nebraska 68901 NEW BARN ADDENDUM NO. 1 MINDEN PUBLIC CHOOL NOVEMBER 1, 2018 MINDEN, NEBRAKA WDA PROJEC #717-18 I. INRUCION
More informationSTORMMASTER SHAKE GENERAL INSTRUCTIONS
STORMMASTER SHAKE GENERAL INSTRUCTIONS IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM
More information3-Tab Shingle Installation Instructions
3-Tab Shingle Installation Instructions WWW.MALARKEYROOFING.COM Directions for Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to adopted building code and
More informationHip & Ridge Shingles Installation Instructions
Hip & Ridge Shingles Installation Instructions WWW.MALARKEYROOFING.COM Directions for Applying Malarkey Hip & Ridge Shingles MALARKEY HIP AND RIDGE SHINGLE SPECIFICATIONS Malarkey Roofing Products manufacture
More informationOPERATION MANUAL. Indoor unit for air to water heat pump system and options EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1
OPERAION MANUAL Indoor uni for air o waer hea pump sysem and opions EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1 EKHBRD011AAY1 EKHBRD014AAY1 EKHBRD016AAY1 EKHBRD011AAV1 EKHBRD014AAV1 EKHBRD016AAV1 EKHBRD011AAY1
More informationInstalling remote sites using TCP/IP
v dc Keypad from nework Whie/ 3 Whie/ 4 v dc Keypad from nework Whie/ 3 Whie/ 4 v dc Keypad from nework Whie/ 3 Whie/ 4 +v pu +v pu +v pu v dc Keypad from nework Whie/ 3 Whie/ 4 v dc Keypad from nework
More informationEEO 401 Digital Signal Processing Prof. Mark Fowler
EEO 40 Digial Proceing Pro. Mark Fowler Noe Se #3 Baic Sampling heory Reading Aignmen: Sec. 6. o Proaki & Manolaki /9 Sampling i Key o Much o oday echnology Analog Elecronic ADC DSP Compuer DAC C- C- Syem
More informationGlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing
GlassMaster General Instructions - Ardmore, OK & Hampton, GA (For Metric Size Franklin, OH Instructions Click Here) IMPORTANT: THE STATEMENTS EXPRESSED ON THIS WRAPPER ARE THE RECOMMENDATIONS FOR THE APPLICATION
More informationLaminate Shingle Installation Instructions
Laminate Shingle Installation Instructions WWW.MALARKEYROOFING.COM Directions for Applying Malarkey Laminate Shingles GENERAL INSTRUCTIONS Install Malarkey laminate shingles according to adopted building
More informationA-LEVEL Electronics. ELEC4 Programmable Control Systems Mark scheme June Version: 1.0 Final
A-LEVEL Elecronics ELEC4 Programmable Conrol Sysems scheme 243 June 26 Version:. Final schemes are prepared by he Lead Assessmen Wrier and considered, ogeher wih he relevan quesions, by a panel of subjec
More informationStormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)
StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí) IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR
More informationHERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL
Application Instructions for THESE ARE THE APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. SHALL NOT BE RESPONSIBLE FOR LEAKS OR OTHER ROOFING PROBLEMS RESULTING
More informationApplication instructions
Application instructions ASPHALT SHINGLES SECTION 3 GENERAL INSTRUCTIONS 3.1 General Directions A Nail Requirements B Asphalt Plastic Cement C Protective Tape D Application on slopes 15/12 E High Wind
More informationEngines (diesel, HFO ) and gas turbines
Engines (diesel, HFO ) and gas urbines Energy Efficiency Produce power from your exhaus fumes www.aqylon.com Environmenally friendly s organic working fluids have a very low Global Warming Poenial (320).
More informationSolid-state Multi-functional Timer
Solid-sae Muli-funcional Timer Eigh operaing modes (H3DE-M) and four operaing modes (H3DE-S) cover a wide range of applicaions. Programmable conac enables he building of a self-holding relay circui (-
More informationROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION
ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood
More information4.5 Biasing in BJT Amplifier Circuits
4/5/011 secion 4_5 Biasing in MOS Amplifier Circuis 1/ 4.5 Biasing in BJT Amplifier Circuis eading Assignmen: 8086 Now le s examine how we C bias MOSFETs amplifiers! f we don bias properly, disorion can
More informationIndustrial, High Repetition Rate Picosecond Laser
RAPID Indusrial, High Repeiion Rae Picosecond Laser High Power: RAPID is a very cos efficien, compac, diode pumped Nd:YVO4 picosecond laser wih 2 W average power a 1064 nm. Is 10 ps-pulses have high pulse
More information1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS
General This Installation Instruction document for Owens Corning Berkshire roofing shingles is to be read in conjunction with the Installation information printed on each packet of shingles along with
More informationAnswer Key for Week 3 Homework = 100 = 140 = 138
Econ 110D Fall 2009 K.D. Hoover Answer Key for Week 3 Homework Problem 4.1 a) Laspeyres price index in 2006 = 100 (1 20) + (0.75 20) Laspeyres price index in 2007 = 100 (0.75 20) + (0.5 20) 20 + 15 = 100
More informationMonitoring Technique. VARIMETER Current relay BA 9053, MK 9053N
Monioring Technique VARIMETER Curren relay, MK 9053N 0221540 Your Advanages Prevenive mainenance For beer produciviy Quicker faul locaing Precise and reliable MK 9053N Opions wih Pluggable Terminal Blocks
More information49.8. Control Relays and Timers. Contents. Product Selection Guide. Timing Relays
Conrol Relays and Timers.8 Produc Selecion Guide Noes Applies o TRN model only. Applies o TRF model only. The E5-248 is baery powered and has hree programmable rigger funcions. This produc may perform
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: CERTAINTEED CORPORATION EVALUATION SUBJECT:
0 ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org Most Widely Accepted and Trusted ESR-3537 Reissued 06/2018 Revised 08/2018 This report is subject to renewal 06/2019.
More informationCertainTeed. Designer and Luxury Shingles. Shown in Landmark Moire Black
CertainTeed 2014 Designer and Luxury Shingles Shown in Landmark Moire Black You know it, when you see it. It s not just a roof. It s a Landmark. Quality. Durability. Style. Color. When you select a roof
More information4 20mA Interface-IC AM462 for industrial µ-processor applications
Because of he grea number of indusrial buses now available he majoriy of indusrial measuremen echnology applicaions sill calls for he sandard analog curren nework. The reason for his lies in he fac ha
More informationSolid-state Timer H3CT
Solid-sae Timer H3CT DIN 48 x 48-mm Sandard Size Analog Timer Wide ime range (for 4 series of models); 0.1 s o 30 hrs. Wih H3CT-8H models, he oupu ype can be swiched beween ime limi DPDT and ime limi SPDT
More informationROOFING APPLICATION STANDARD (RAS) No. 130
ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used
More information<Diode Modules> RM200CY-24S HIGH POWER SWITCHING USE INSULATED TYPE
dual swich (Cahode Common) Forward curren...... 2 0 0 A Repeiive peak reverse volage V RRM... 1 2 0 0 V Maximum juncion emperaure T jmax... 1 5 0 C Fla base Type Copper base plae RoHS Direcive
More informationTurada Hardwood Shingles and Shakes Installation instructions
1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced
More information2.6 Special Angles on Parallel Lines Objectives: I CAN define angle pairs made by parallel lines. I CAN solve problems involving parallel lines.
2.6 Special Angles on Parallel Lines Objecives: I CAN define angle pairs made by parallel lines. I CAN solve problems involving parallel lines. 1 coplanar: poins on he same plane ransversal: a line ha
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: CERTAINTEED CORPORATION
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1389 Reissued 01/2018 This report is subject to renewal 01/2019. DIVISION: 07 00
More informationECMA st Edition / June Near Field Communication Wired Interface (NFC-WI)
ECMA-373 1 s Ediion / June 2006 Near Field Communicaion Wired Inerface (NFC-WI) Sandard ECMA-373 1 s Ediion / June 2006 Near Field Communicaion Wired Inerface (NFC-WI) Ecma Inernaional Rue du Rhône 114
More informationSECTION ASPHALT SHINGLES
(Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying glass-fiber-reinforced asphalt shingle products for sloped roofing applications. The specifier
More informationMonitoring Technique. VARIMETER Current Relay BA 9053, MK 9053N
Monioring Technique VARIMETER Curren Relay, MK 9053N 0221540 Your Advanages Prevenive mainenance For beer produciviy Quicker faul locaing Precise and reliable Circui Diagrams A1 i A2 k A1 11 12 14 22 A1
More informationThe student will create simulations of vertical components of circular and harmonic motion on GX.
Learning Objecives Circular and Harmonic Moion (Verical Transformaions: Sine curve) Algebra ; Pre-Calculus Time required: 10 150 min. The sudens will apply combined verical ranslaions and dilaions in he
More informationSmartVent Eave Edge Installation Instructions
SmartVent Eave Edge Installation Instructions STEP 1: Cut a slit 1 wide (or a series of 1 ¾ holes at 3 on center) into the roof decking 6 to 7 up from the drip edge. SmartVent is rated 9NFA. Ensure drip
More informationAnnouncement. Allowed
9//05 nnouncemen Firs es: Sep. 8, Chap. -4 llowed wriing insrumen poce calculaor ruler One 8.5" " paper conaining consans, formulas, and any oher informaion ha you migh find useful (NOT any inds of soluions).
More informationMODEL: M6SXF1. POWER INPUT DC Power R: 24 V DC
Tension-Clamp Ulra-Slim Signal Condiioners M6S Series FUNCTION MODULE (PC programmable) Funcions & Feaures Mainenance-free ension clamp connecion Single inpu filer and funcion module 12 ypes of funcions
More informationInnovation Through Science and Art TM
Innovation Through Science and Art TM Color shown is Weathered Wood Color shown is Hunter Green TAKING LANDMARK TO THE NEXT LEVEL Ask about Landmark TL CertainTeed is proud to announce the premier shingle
More informationeco-shake INSTALLATION INSTRUCTION
1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,
More informationHow To Install Asphalt Shingles. Part 1 of 3: Preparing the Roof. Tutorial
Tutorial How To Install Asphalt Shingles Installing new shingles yourself can save considerable time and money, and you can follow the same steps they do to achieve the same professional look. Re-doing
More informationA New Method for Anti-Noise FM Interference
Wirele Senor Nework, 9, 1, 93-99 doi:1.436/wn.9.1436 Publihed Online November 9 (hp://www.cirp.org/journal/wn). A New Mehod for Ani-Noie FM Inerference Abrac Changyong JIANG, Meiguo GAO, Defeng CHEN Deparmen
More information16.5 ADDITIONAL EXAMPLES
16.5 ADDITIONAL EXAMPLES For reiew purposes, more examples of boh piecewise linear and incremenal analysis are gien in he following subsecions. No new maerial is presened, so readers who do no need addiional
More informationb) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the
PART 1 GENERAL 1) DESCRIPTION a) CertainTeed Symphony TM composite slate is an innovative roofing product that simulates the appearance, texture, and contours of traditional natural slate. It is a carefully
More informationPERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, RECEIVING TYPE 8233
INCH-POUND MIL-PRF-1/1593E 15 Augus 2012 SUPERSEDING MIL-PRF-1/1593D 17 Augus 2004 DESCRIPTION: Penode, sharp cuoff. Ouline: See figure 1. PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, RECEIVING TYPE
More informationDaVinci SlateTM INSTALLATION
DaVinci SlateTM INSTALLATION GUIDE DaVinci Slate is a synthetic slate carefully engineered to provide the authentic look and durability of natural slate... at a fraction of the cost and weight. Special
More informationECE-517: Reinforcement Learning in Artificial Intelligence
ECE-517: Reinforcemen Learning in Arificial Inelligence Lecure 12: Generalizaion and Funcion Approximaion Ocober 13, 2015 Dr. Iamar Arel College of Engineering Deparmen of Elecrical Engineering and Compuer
More informationOWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS
General This Installation Instruction document for Owens Corning asphalt roofing shingles is to be read in conjunction with the Installation information printed on each packet of shingles along with the
More informationLaser retro-reflective photoelectric sensor with polarization filter. Dimensioned drawing
Specificaions and descripion PRKL 3B Laser rero-reflecive phooelecric sensor wih polarizaion filer Dimensioned drawing en 09-2012/06 50105363 2 khz 0 3m 10-30 V DC We reserve he righ o make changes DS_PRKL3B622_en_50105363.fm
More informationEXPERIMENT #4 AM MODULATOR AND POWER AMPLIFIER
EXPERIMENT #4 AM MODULATOR AND POWER AMPLIFIER INTRODUCTION: Being able o ransmi a radio frequency carrier across space is of no use unless we can place informaion or inelligence upon i. This las ransmier
More informationDimensions. Model Number. Electrical connection emitter. Features. Electrical connection receiver. Product information. Indicators/operating means
OBE-R-SE Dimensions.8.8 ø..75 7.5 6. 5 6.7 4.9 4. 5.9 ø.6 Model Number OBE-R-SE Elecrical connecion emier Thru-beam sensor wih m fixed cable Feaures 45 cable oule for maximum mouning freedom under exremely
More informationGeneral data 8/91. Overview
SIRIUS 3RS0, 3RS, 3RS0, 3RS Temperaure Monioring Relays General daa Overview Temperaure seing LED "Device on volage" LED "Relay swiched" Hyseresis swich NSB0_04a LED for display "Up and Down" keys Roary
More informationUniversal microprocessor-based ON/OFF and P programmable controller MS8122A MS8122B
COMPETENCE IN MEASUREMENT Universal microprocessor-based ON/OFF and P programmable conroller MS8122A MS8122B TECHNICAL DESCRIPTION AND INSTRUCTION FOR USE PLOVDIV 2003 1 I. TECHNICAL DATA Analog inpus
More informatione How did the earliest Californians use mammoths? e wruit foods did the early Californians eat after the large animals di~d out?
Name ---------------------- Dae...:...-_ (. The Firs Californians IIJi;U;j W." Read ad answer he quesions below abou he firs Californians. o Wha was California's cllinae like when he earlies people lived
More informationSignal Characteristics
Signal Characerisics Analog Signals Analog signals are always coninuous (here are no ime gaps). The signal is of infinie resoluion. Discree Time Signals SignalCharacerisics.docx 8/28/08 10:41 AM Page 1
More informationInstallation Instructions
Installation Instructions ROLL VENT STANDARD / METRIC Page Installation Considerations 3 Roll Vent Standard General Installation 4 Roll Vent Metric General Installation 5 Steep Pitch Guidelines 6 Asphalt
More informationElectrical connection
Reference scanner Dimensioned drawing en 02-2014/06 50117040-01 200 500mm Disance on background/reference 10-30 V DC We reserve he righ o make changes DS_HRTR46Bref_en_50117040_01.fm Robus objec deecion
More informationSLATE & SHINGLE INSTALLATION
EAVE EDGE Apply a small strip of roofing paper to the bottom of eave. Eave flashing is attached to substrate with roofing nails every 9". Install underlayment over entire roof. (See Fig. 1) PAGE 1 Bend
More informationBARRELL VAULT BATTENLESS
i BARRELL VAULT BATTENLESS INSTALLATION GUIDE INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Barrel Vault battenless
More informationA1 K. 12V rms. 230V rms. 2 Full Wave Rectifier. Fig. 2.1: FWR with Transformer. Fig. 2.2: Transformer. Aim: To Design and setup a full wave rectifier.
2 Full Wave Recifier Aim: To Design and seup a full wave recifier. Componens Required: Diode(1N4001)(4),Resisor 10k,Capacior 56uF,Breadboard,Power Supplies and CRO and ransformer 230V-12V RMS. + A1 K B1
More information