1 FLASH Training: RF Gun FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously Siegfried Schreiber, DESY FLASH Training DESY 17-Mar-2017 FLASH1

2 RF Gun History

3 RF Guns operated at FLASH since 2004 Gun Gun2: 5 Hz, 3.5 MW, 350 µs, 5 kw, 680 GJ Window: G29 Gun2 breakdown Gun 4.2 Gun 4.1 Gun 3.1 1/2010 6/2010 9/2011 5/2012 6/2012 3/2013 Gun4.2: 10 Hz, 3.9 MW, 400 µs, 15 kw, 1200 GJ Window: Gxx Window break down; G67 Window break down; G29 Gun4.2 breakdown Gun4.1: 10 Hz, 4 MW, 550 µs, 21 kw, 930 GJ Window: G29 Gun3.1: 10 Hz, 5 MW, 550 µs, 27 kw, 2400 GJ(*) Window: Thales 5 4/2014 Window leak; G64 6/2016 Window leak; G57 Integrated RF-power (*) until 17-Mar-2017 RF gun controlled by a MTCA.4 based LLRF system since Jan 2015

4 Status RF-gun June 2016 > RF-gun 3.1 in operation since 8/2013 window exchanged in Apr 2014 (vacuum leak) no breakdown events since June 2014 > RF-pulse length slowly increased stable operation with ~500 µs flat top reached end of 2014 > April 2016: continued to lengthen the flat top to 600 µs > Phase stability improved by a factor of 3 Pulse width modulation feedback implemented > Fast interlock implemented if increase in reflected RF power is detected, RF is switched off within 3 µs; next pulse full power (not at start-up)

5 RF-Gun: again RF-Window vacuum leak > 27-Jun-2016: Hard breakdown event shortly after restart from the summer shutdown Actually the first one since June 2014 We had a few breakdowns at the air(!) part close to the window We have 1.5 bar air at the window > Then: continues problems to keep power and pulse length in the gun > increase of vacuum pressure > 4-July: leak detected at RF window > Window G64 has been exchanged with G57 this took 69.5 h incl. pumping > Conditioning up to 100 µs w/o beam h > 13-July: beam back after 9 days G64: 1.5 TJ of integrated RF RF Gun 3.1: 2.1 TJ up to now

6 RF-Gun breakdown event > RF-Gun vacuum pressure at the breakdown event Pressure (mbar) Serious breakdown event during ramp-up small e- event Vacuum base level increased by an order of magnitude 12 h 14 h 16 h 18 h 27-Jun-2016 Time

7 RF Gun recovered with very short pulses 175 µs <1 µs e- event (from 600 us) RF pulse length 20 µs Pressure (mbar) Serious breakdown event during ramp-up 12 h 14 h 16 h 18 h 27-Jun-2016 Time

8 RF Gun full RF power difficult to achieve 54 MV/m RF Power Pressure (mbar) h 14 h 16 h 18 h 27-Jun-2016 Time

9 RF-Gun 3.1 with window G64 > In 2014, we installed a special waveguide with 8 pick-ups to measure the RF wave and to compare with simulations Simulations agree with measured data > From this, we concluded, that the window should be mounted ¾ λ further away to reduce RF field load on the window during operation Gun 3.1 with Window G64 Light and electron sensor ¾ λ Knee with sensors Coupler Window G64 8 pick-up s Directional couplers

10 RF-Gun section with window G57 > We installed the new window with an intermediate piece of ¾ λ in length Intermediate piece with pump RF-window G57 Gun coupler RF

11 RF Gun Set-up

12 RF Gun Overview Laser Beamline Box TSP/IGP 2GUN IGP 1GUN IGP - 0GUN Cathode System Transfer Box with spare cathodes

13 GUN section Darkcurrent Kicker Laser Mirror BPM Dipol Steerer Steerer

14 RF Gun: Coupler Interlocks Sensors Photomultiplier (LUVA) Electron Pick-up (e- WG) Vacuum (2GUN) Temperature Window (PT1000 WG)

15 RF Gun interlock Sensors Vacuum Waveguide filled with air (1.5 bar)

16 RF Gun: Coupler Interlocks Sensors IR Detector (IR Temp. Win) Circulator Spark Detector (LUWG) Directional Coupler

17 RF Gun Gun Body Solenoid Cathode Chamber Bucking

18 RF Gun > Laser driven photo emission from a Cs 2 Te cathode Iris 3 h Temperature Sensor

19 RF Gun Start-up

20 RF Gun panel > Main Injector Gun Conditioning Startup Help Solenoid Coupler interlocks PM Coupler interlock spectra e- Spark GUN vacuum

21 RF Gun LLRF panel > Main Injector Gun LLRF FSM Fast Protection Pulse Width Modulation Feed Forward Feedback etc

22 RF Gun Water System Cold water Gun Temperature Hot water

23 RF Gun tuning panel > Main Injector Temperature Tuning RF off Refl. Power: Keep minimum below ~1.4 Start-up with 58.3 dg dt to correct temperature: keep positive around 0.1 K Temperature needs to rise when RF pulse length is increased

24 RF Gun tuning panel > T=58.3 dgc > Start with 20 us > ramp up forward power rather quickly to SP=53 MV/m > Observe vacuum and interlock signals Refl. Power: Keep well below 1.4 Start-up with 58.3 dg and 20 us pulse length

25 RF Gun temperature vs RF pulse length End with dg for 640 us Start with 58.3 dg

26 After Ramp-up: close feedback 1. Output vector correction (use with care, if you know how: manually) 2. Feedback Feed-Forw. Correction Learning FF 3. Activate fast protection

27 Activate Pulse width modulation feedback > Before the feedback is activated: > Wait for a good proposed SP You may need to adjust the SP temperature And/or try to set it manually > Best SP detuning Temp.: dt = Positive around 0.04 K

28 What you never should do

29 After a trip: be careful before reset > Vacuum trip at gun coupler > FSM was off Thus: gun is not in a safe state to reset 1. Feed-forward off 2. Ampl. SP to pulse length to 20 us > Check vacuum > Then reset interlocks > Switch FSM on

30 Never leave the gun alone during ramp-up

31 Never leave the gun alone during ramp-up Pfwd SP 53 MV/m Pfwd >5 MW RF pulse 200 us Prfl 1.8 full reflection T=60.5 dgc

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

Behavior of the TTF2 RF Gun with long pulses and high repetition rates

Behavior of the TTF2 RF Gun with long pulses and high repetition rates Behavior of the TTF2 RF Gun with long pulses and high repetition rates J. Baehr 1, I. Bohnet 1, J.-P. Carneiro 2, K. Floettmann 2, J. H. Han 1, M. v. Hartrott 3, M. Krasilnikov 1, O. Krebs 2, D. Lipka

More information

R.Bachimanchi, IPAC, May 2015, Richmond, VA

R.Bachimanchi, IPAC, May 2015, Richmond, VA 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

Dark Current Kicker Studies at FLASH

Dark Current Kicker Studies at FLASH Dark Current Kicker Studies at FLASH F. Obier, J. Wortmann, S. Schreiber, W. Decking, K. Flöttmann FLASH Seminar, DESY, 02 Feb 2010 History of the dark current kicker 2005 Vertical kicker was installed

More information

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

Performance of the TTF Photoinjector Laser System

Performance of the TTF Photoinjector Laser System Performance of the TTF Photoinjector Laser System S. Schreiber, DESY Laser Issues for Electron Photoinjectors, October 23-25, 22, Stanford, California, USA & I. Will, A. Liero, W. Sandner, MBI Berlin Overview

More information

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals

More information

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY.

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY. TESLA RF POWER COUPLERS DEVELOPMENT AT DESY. Dwersteg B., Kostin D., Lalayan M., Martens C., Möller W.-D., DESY, D-22603 Hamburg, Germany. Abstract Different RF power couplers for the TESLA Test Facility

More information

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main

More information

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear

More information

Drive Beam Photo-injector Option for the CTF3 Nominal Phase

Drive Beam Photo-injector Option for the CTF3 Nominal Phase CTF3 Review Drive Beam Photo-injector Option for the CTF3 Nominal Phase Motivation CTF3 Drive Beam Requirements CTF3 RF gun design The Laser (I. Ross / RAL) The Photocathode Cost estimate Possible schedule

More information

FLASH: Status and upgrade

FLASH: Status and upgrade : Status and upgrade The User Facility Layout Performance and operational o a issues Upgrade Bart Faatz for the team DESY FEL 2009 Liverpool, UK August 23-28, 2009 at DESY > FEL user facility since summer

More information

FLASH rf gun. beam generated within the (1.3 GHz) RF gun by a laser. filling time: typical 55 μs. flat top time: up to 800 μs

FLASH rf gun. beam generated within the (1.3 GHz) RF gun by a laser. filling time: typical 55 μs. flat top time: up to 800 μs The gun RF control at FLASH (and PITZ) Elmar Vogel in collaboration with Waldemar Koprek and Piotr Pucyk th FLASH Seminar at December 19 2006 FLASH rf gun beam generated within the (1.3 GHz) RF gun by

More information

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY

More information

LLRF Operation and Performance of the European XFEL. An overview

LLRF Operation and Performance of the European XFEL. An overview LLRF Operation and Performance of the European XFEL. An overview Mathieu Omet LLRF, Barcelona, 16.10.2017 Contents > Introduction > LLRF commissioning > Energy Reach > LLRF performance > Summary / Outlook

More information

LC Technology Hans Weise / DESY

LC Technology Hans Weise / DESY LC Technology Hans Weise / DESY All you need is... Luminosity! L σ 2 N e x σ y σ y σ x L n b f rep Re-writing reflects the LC choices... L P E b c. m. N e σ σ x y... beam power... bunch population... Ac-to-beam

More information

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13) Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters

More information

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS A. Aryshev On behalf of QB group and THz collaboration 14 Outline THz project overview LUCX activity LUCX Projects Overview THz program LUCX Laser system LUCX

More information

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, FLASH 2 FEL seminar Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, 2016-03-22 Charge: 0.5 nc Overview 1. FLASH 2 Overview 1.Layout parameters 2. Operation FLASH2. 1.Lasing at wavelengths between

More information

3.9 GHz System (AH1) XFEL WP46

3.9 GHz System (AH1) XFEL WP46 3.9 GHz System (AH1) XFEL WP46 14th European XFEL Machine Advisory Committee Meeting 02 May 2016 Paolo Pierini, INFN & DESY Elmar Vogel, DESY + INFN/DESY contributors PPT version 1 26/04/2016 Outline Status

More information

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration The TESLA Linear Collider Winfried Decking (DESY) for the TESLA Collaboration Outline Project Overview Highlights 2000/2001 Publication of the TDR Cavity R&D TTF Operation A0 and PITZ TESLA Beam Dynamics

More information

FLASH II: an Overview

FLASH II: an Overview FLASH II: an Overview 1. Layout. 2. Status 1. Civil Construction 2. E-beamline 3. Photon Beamline 3. Timeplan 4. Finances 5. Personnel Situation 6. Simultaneous Operation of FLASH1 and 2 FLASH II is a

More information

Borut Baricevic. Libera LLRF. 17 September 2009

Borut Baricevic. Libera LLRF. 17 September 2009 Borut Baricevic Libera LLRF borut.baricevic@i-tech.si 17 September 2009 Outline Libera LLRF introduction Libera LLRF system topology Signal processing structure GUI and signal acquisition RF system diagnostics

More information

Jørgen S. Nielsen Institute for Storage Ring Facilities, Aarhus, University of Aarhus Denmark

Jørgen S. Nielsen Institute for Storage Ring Facilities, Aarhus, University of Aarhus Denmark Jørgen S. Nielsen Institute for Storage Ring Facilities, Aarhus, University of Aarhus Denmark What is ISA? ISA operates and develops the storage ring ASTRID and related facilities ISA staff assist internal

More information

Status of berlinpro and BESSY II Installation of SSA. Helmholtz-Zentrum Berlin for materials and energy (HZB)

Status of berlinpro and BESSY II Installation of SSA. Helmholtz-Zentrum Berlin for materials and energy (HZB) Status of berlinpro and BESSY II Installation of SSA Wolfgang Anders, Helmholtz-Zentrum Berlin for materials and energy (HZB) 19th ESLS-RF Meeting 30.9.-1.10.2015 MaxLab outline BERLinPro Status building

More information

Cavity Field Control - Feedback Performance and Stability Analysis. LLRF Lecture Part3.2 S. Simrock, Z. Geng DESY, Hamburg, Germany

Cavity Field Control - Feedback Performance and Stability Analysis. LLRF Lecture Part3.2 S. Simrock, Z. Geng DESY, Hamburg, Germany Cavity Field Control - Feedback Performance and Stability Analysis LLRF Lecture Part3.2 S. Simrock, Z. Geng DESY, Hamburg, Germany Motivation Understand how the perturbations and noises influence the feedback

More information

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii Acceleration of High-Intensity Protons in the J-PARC Synchrotrons KEK/J-PARC M. Yoshii Introduction 1. J-PARC consists of 400 MeV Linac, 3 GeV Rapid Cycling Synchrotron (RCS) and 50 GeV Main synchrotron

More information

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011 Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs Josef Frisch Pohang, March 14, 2011 Room Temperature / Superconducting Very different pulse structures RT: single bunch or short bursts

More information

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,

More information

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen International Technology Recommendation Panel X-Band Linear Collider Path to the Future RF System Overview Chris Adolphsen Stanford Linear Accelerator Center April 26-27, 2004 Delivering the Beam Energy

More information

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti 7/6/2009 1 Outline : Description of the Box cavity Concept. Box Cavity Summary Plans. HFSS Models of orthogonal and

More information

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES S. Belomestnykh HPC workshop JLAB, 30 October 2002 Introduction Many aspects of the high-power coupler design, fabrication, preparation, conditioning, integration

More information

Superstructures; First Cold Test and Future Applications

Superstructures; First Cold Test and Future Applications Superstructures; First Cold Test and Future Applications DESY: C. Albrecht, V. Ayvazyan, R. Bandelmann, T. Büttner, P. Castro, S. Choroba, J. Eschke, B. Faatz, A. Gössel, K. Honkavaara, B. Horst, J. Iversen,

More information

EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF

EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF Y. Yamamoto #, H. Hayano, E. Kako, T. Matsumoto, S. Michizono, T. Miura, S. Noguchi, M. Satoh, T. Shishidio, K. Watanabe, KEK, Tsukuba,

More information

Calibrating the Cavity Voltage. Presentation of an idea

Calibrating the Cavity Voltage. Presentation of an idea Calibrating the Cavity Voltage. Presentation of an idea Stefan Wilke, DESY MHF-e 21st ESLS rf meeting Kraków, 15th/16th nov 2017 Accelerators at DESY. linear and circular Page 2 Accelerators at DESY. linear

More information

Bioimaging of cells and tissues using accelerator-based sources

Bioimaging of cells and tissues using accelerator-based sources Analytical and Bioanalytical Chemistry Electronic Supplementary Material Bioimaging of cells and tissues using accelerator-based sources Cyril Petibois, Mariangela Cestelli Guidi Main features of Free

More information

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Overview of ERL projects: SRF issues and challenges Slide 1 Outline Introduction: SRF for ERLs What makes it special

More information

To produce more powerful and high-efficiency particle accelerator, efforts have

To produce more powerful and high-efficiency particle accelerator, efforts have Measuring Unloaded Quality Factor of Superconducting RF Cryomodule Jian Cong Zeng Department of Physics and Astronomy, State University of New York at Geneseo, Geneseo, NY 14454 Elvin Harms, Jr. Accelerator

More information

THE ORION PHOTOINJECTOR: STATUS and RESULTS

THE ORION PHOTOINJECTOR: STATUS and RESULTS THE ORION PHOTOINJECTOR: STATUS and RESULTS Dennis T. Palmer SLAC / ARDB ICFA Sardinia 4 July 2002 1. Introduction 2. Beam Dynamics Simulations 3. Photoinjector 1. RF Gun 2. Solenoidal Magnet 3. Diagnostics

More information

SPS Crab Cavity Validation Run ( )

SPS Crab Cavity Validation Run ( ) SPS Crab Cavity Validation Run (2017-2018) Alick Macpherson BE-RF-SRF Acknowledgments Marton Ady, Vincent Baglin, Philippe Baudrenghien, Krzyzstof Brodzinski, Rama Calaga, Ofelia Capatina, Frederic Galleazzi,

More information

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES LARGE SCALE TESTING OF SRF CAVITIES AND MODULES Jacek Swierblewski IFJ PAN Krakow IKC for the XFEL Introduction IFJ PAN 2 Institute of Nuclear Physics (IFJ) located in Kraków, Poland was founded in 1955

More information

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY Status of the European XFEL Accelerator Construction Project Reinhard Brinkmann, DESY European XFEL Introduction Some specifications Photon energy 0.3-24 kev Pulse duration ~ 10-100 fs Pulse energy few

More information

RF Design of Normal Conducting Deflecting Cavity

RF Design of Normal Conducting Deflecting Cavity RF Design of Normal Conducting Deflecting Cavity Valery Dolgashev (SLAC), Geoff Waldschmidt, Ali Nassiri (Argonne National Laboratory, Advanced Photon Source) 48th ICFA Advanced Beam Dynamics Workshop

More information

Performance Evaluation of the Upgraded BAMs at FLASH

Performance Evaluation of the Upgraded BAMs at FLASH Performance Evaluation of the Upgraded BAMs at FLASH with a compact overview of the BAM, the interfacing systems & a short outlook for 2019. Marie K. Czwalinna On behalf of the Special Diagnostics team

More information

Frank Schmidt-Föhre, DESY

Frank Schmidt-Föhre, DESY Commissioning of the New Online- Radiation-Monitoring-System at the New European XFEL Injector with First Tests of the High-Sensitivity-Mode for Intra-Tunnel Rack Surveillance Frank Schmidt-Föhre, DESY

More information

THz Imaging by a Wide-band Compact FEL

THz Imaging by a Wide-band Compact FEL FEL-2004, Trieste, Italy THz Imaging by a Wide-band Compact FEL 2 Sep. 2004 Young Uk Jeong, Grigori M. Kazakevitch b, Hyuk Jin Cha, Seong Hee Park, and Byung Cheol Lee Korea Atomic Energy Research Institute

More information

Status of the APEX Project at LBNL

Status of the APEX Project at LBNL at LBNL Fernando Sannibale K. Baptiste, B. Bailey, D. Colomb, C. Cork, J. Corlett, S. De Santis, J. Feng, D. Filippetto, G.Huang, R. Kraft, S. Kwiatkowski, D. Li, M. Messerly, R. Muller, W. E. Norum, H.

More information

Advance on High Power Couplers for SC Accelerators

Advance on High Power Couplers for SC Accelerators Advance on High Power Couplers for SC Accelerators Eiji Kako (KEK, Japan) IAS conference at Hong Kong for High Energy Physics, 2017, January 23th Eiji KAKO (KEK, Japan) IAS at Hong Kong, 2017 Jan. 23 1

More information

KU-FEL Facility. Status Report. Konstantin Torgasin PhD Student Graduate School of Energy Science Kyoto University

KU-FEL Facility. Status Report. Konstantin Torgasin PhD Student Graduate School of Energy Science Kyoto University KU-FEL Facility Status Report Konstantin Torgasin PhD Student Graduate School of Energy Science Kyoto University KU-FEL(Kyoto University FEL) A mid-infrared free electron laser (MIR-FEL) facility KU-FEL

More information

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute CEBAF waveguide absorbers R. Rimmer for JLab SRF Institute Outline Original CEBAF HOM absorbers Modified CEBAF loads for FEL New materials for replacement loads High power loads for next generation FELs

More information

The low level radio frequency control system for DC-SRF. photo-injector at Peking University *

The low level radio frequency control system for DC-SRF. photo-injector at Peking University * The low level radio frequency control system for DC-SRF photo-injector at Peking University * WANG Fang( 王芳 ) 1) FENG Li-Wen( 冯立文 ) LIN Lin( 林林 ) HAO Jian-Kui( 郝建奎 ) Quan Sheng-Wen( 全胜文 ) ZHANG Bao-Cheng(

More information

High-field test at KEK

High-field test at KEK High-field test at KEK CLIC Workshop Oct. 16-18, CERN T. Higo, KEK Contributors Accelerator S. Fukuda S. Matsumoto M. Akemoto M. Yoshida K. Yokoyama N. Kudoh T. Higo Total FTE = 4~5 KEK MEC staff K. Ueno

More information

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing

More information

Software Requirements Specification for LLRF Applications at FLASH Version 1.0 Prepared by Zheqiao Geng MSK, DESY Nov. 06, 2009

Software Requirements Specification for LLRF Applications at FLASH Version 1.0 Prepared by Zheqiao Geng MSK, DESY Nov. 06, 2009 Software Specification for LLRF Applications at FLASH Version 1.0 Prepared by Zheqiao Geng MSK, DESY Nov. 06, 2009 Copyright 2009 by Zheqiao Geng. Any change of this document should be agreed by the development

More information

3 General layout of the XFEL Facility

3 General layout of the XFEL Facility 3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and

More information

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at FLASH @ DESY N. Baboi, DESY, Hamburg for the HOM team : S. Molloy 1, N. Baboi 2, N. Eddy 3, J. Frisch 1, L. Hendrickson

More information

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium Performance of Superconducting Cavities for the European XFEL Detlef Reschke DESY for the EU-XFEL Accelerator Consortium Outline 2 European XFEL Linear Accelerator Cavity Production Vertical Acceptance

More information

THE CRYOGENIC SYSTEM OF TESLA

THE CRYOGENIC SYSTEM OF TESLA THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider

More information

RF-based Synchronization of the Seed and Pump-Probe Lasers to the Optical Synchronization System at FLASH

RF-based Synchronization of the Seed and Pump-Probe Lasers to the Optical Synchronization System at FLASH RF-based Synchronization of the Seed and Pump-Probe Lasers to the Optical Synchronization System at FLASH Introduction to the otical synchronization system and concept of RF generation for locking of Ti:Sapphire

More information

Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source.

Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source. Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source. I.K. Sedlyarov V.S. Arbuzov, E.I Gorniker, A.A. Kondakov, S.A. Krutikhin, G.Ya. Kurkin, I.V.Kuptsov, V.N. Osipov, V.M. Petrov,

More information

Status of superconducting module development suitable for cw operation: ELBE cryostats

Status of superconducting module development suitable for cw operation: ELBE cryostats Status of superconducting module development suitable for cw operation: ELBE cryostats, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A. Winter Forschungszentrum

More information

SwissFEL Design and Status

SwissFEL Design and Status SwissFEL Design and Status Hans H. Braun Mini Workshop on Compact X ray Free electron Lasers Eastern Forum of Science and Technology Shanghai July 19, 2010 SwissFEL, the next large facility at PSI SwissFEL

More information

FLASH performance after the upgrade. Josef Feldhaus

FLASH performance after the upgrade. Josef Feldhaus FLASH performance after the upgrade Josef Feldhaus European XFEL / HASYLAB Users Meeting DESY, January 27, 2011 Upgrade 2009 / 2010 > Upgrade shutdown: September 2009 February 2010 exchanged RF stations

More information

EUROFEL-Report-2006-DS EUROPEAN FEL Design Study

EUROFEL-Report-2006-DS EUROPEAN FEL Design Study EUROFEL-Report-2006-DS3-034 EUROPEAN FEL Design Study Deliverable N : D 3.8 Deliverable Title: RF Amplitude and Phase Detector Task: Author: DS-3 F.Ludwig, M.Hoffmann, M.Felber, Contract N : 011935 P.Strzalkowski,

More information

The HPRF system for a new 6 GeV synchrotron light source in Beijing

The HPRF system for a new 6 GeV synchrotron light source in Beijing 中国科学院高能物理研究所 INSTITUTE OF HIGH ENERGY PHYSICS CHINESE ACADEMY OF SCIENCES The HPRF system for a new 6 GeV synchrotron light source in Beijing (RF group, IHEP) The HEPS HPRF team Power coupler & power source

More information

Description of options, upgrades and accessories for the laser beam stabilization system Compact

Description of options, upgrades and accessories for the laser beam stabilization system Compact Description of options, upgrades and accessories for the laser beam stabilization system Compact The basic configuration of the Compact laser beam stabilization system is fully equipped for stabilization

More information

Commissioning of the FLASH2 Electron Beam Diagnostics in respect to its Use at the European XFEL

Commissioning of the FLASH2 Electron Beam Diagnostics in respect to its Use at the European XFEL FLASH2 Extension of the FLASH Facility Commissioning of the FLASH2 Electron Beam Diagnostics in respect to its Use at the European XFEL N. Baboi, DESY for the Diagnostics Team Contents > FLASH2 New undulator

More information

RF-Based Detector for Measuring Fiber Length Changes with Sub-5 Femtosecond Long-Term Stability.

RF-Based Detector for Measuring Fiber Length Changes with Sub-5 Femtosecond Long-Term Stability. RF-Based Detector for Measuring Fiber Length Changes with Sub-5 Femtosecond Long-Term Stability. J. Zemella 1, V. Arsov 1, M. K. Bock 1, M. Felber 1, P. Gessler 1, K. Gürel 3, K. Hacker 1, F. Löhl 1, F.

More information

Waveguide Arc Restrike Test Results Abstract Background

Waveguide Arc Restrike Test Results Abstract Background Waveguide Arc Restrike Test Results Tom Powers, Doug Curry, Kirk Davis, Larry King, and Mike Tiefenback Thomas Jefferson National Accelerator Facility (Test dates July 6, 2004 through September 2, 2004)

More information

O. Napoly LC02, SLAC, Feb. 5, Higher Order Modes Measurements

O. Napoly LC02, SLAC, Feb. 5, Higher Order Modes Measurements O. Napoly LC02, SLAC, Feb. 5, 2002 Higher Order Modes Measurements with Beam at the TTF Linac TTF Measurements A collective effort including most of Saclay, Orsay and DESY TTF physicists : S. Fartoukh,

More information

Beam Instability Investigations at DELTA

Beam Instability Investigations at DELTA 10 th ESLS-RF Meeting, September 27-28, Dortmund Beam Instability Investigations at Thomas Weis for the group Dortmund University Synchrotron Radiation Center Content: Status of the Facility Instability

More information

Tuning systems for superconducting cavities at Saclay

Tuning systems for superconducting cavities at Saclay Tuning systems for superconducting cavities at Saclay 1 MACSE: 1990: tuner in LHe bath at 1.8K TTF: 1995 tuner at 1.8K in the insulating vacuum SOLEIL: 1999 tuner at 4 K in the insulating vacuum Super-3HC:

More information

Evaluation of Laser Stabilization and Imaging Systems for LCLS-II

Evaluation of Laser Stabilization and Imaging Systems for LCLS-II Evaluation of Laser Stabilization and Imaging Systems for LCLS-II Matthew Barry Auburn University mcb0038@auburn.edu By combining the top performing commercial laser beam stabilization system with the

More information

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009 DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY LCTW 09 Orsay, 3.-5. Nov. 2009 DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no

More information

J. Jacob: Status of the ESRF RF upgrade

J. Jacob: Status of the ESRF RF upgrade 17th ESLS RF Meeting 2013 HZB BESSY 18th 19th September Status of the ESRF RF upgrade J. Jacob J.-M. Mercier V. Serrière M. Langlois G. Gautier [CINEL] 1 RF upgrade phase 1 until 2015 - reminder Replacement

More information

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors V.A. Dolgashev, P. Emma, M. Dal Forno, A. Novokhatski, S. Weathersby SLAC National Accelerator Laboratory FEIS 2: Femtosecond Electron

More information

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07 Plan for Collimator Commissioning R. Assmann, CERN/AB 7/12/2007 for the Collimation Project LHC MAC RWA, LHC MAC 12/07 1) Installation Planning and Performance Reach Collimation is an performance-driven

More information

The ILC Accelerator Complex

The ILC Accelerator Complex The ILC Accelerator Complex Nick Walker DESY/GDE UK LC meeting 3 rd September 2013 Oxford University, UK. 1 ILC in a Nutshell 200-500 GeV E cm e + e - collider L ~2 10 34 cm -2 s -1 upgrade: ~1 TeV central

More information

FLASH II. FLASH II: a second undulator line and future test bed for FEL development.

FLASH II. FLASH II: a second undulator line and future test bed for FEL development. FLASH II FLASH II: a second undulator line and future test bed for FEL development Bart.Faatz@desy.de Outline Proposal Background Parameters Layout Chalenges Timeline Cost estimate Personnel requirements

More information

Multimoded RF Systems for Future Linear Colliders. Sami G. Tantawi

Multimoded RF Systems for Future Linear Colliders. Sami G. Tantawi Multimoded RF Systems for Future Linear Colliders Sami G. Tantawi Acknowledgment This work is a result of a continuous effort by many researches and engineers over many years. In particular, The efforts

More information

Status of the 1.5 GeV Synchrotron Light Source DELTA and Related Accelerator Physics Activities

Status of the 1.5 GeV Synchrotron Light Source DELTA and Related Accelerator Physics Activities Status of the 1.5 GeV Synchrotron Light Source and Related Accelerator Physics Activities 2006 RuPAC, September 10-14, Novosibirsk Thomas Weis for the machine and accelerator physics group Dortmund University

More information

Operational progress of 170GHz 1MW ECH system in KSTAR

Operational progress of 170GHz 1MW ECH system in KSTAR 8 th IAEA TM on Steady State Operation of Magnetic Fusion Devices, May. 29, 2015, NARA, JAPAN Operational progress of 170GHz 1MW ECH system in KSTAR J. H. Jeong a, Y. S. Bae a, M. Joung a, M. H. Woo a,

More information

Slide Title. Bulleted Text

Slide Title. Bulleted Text Slide Title 1 Slide Outline Title Brief view of the C-AD Complex Review of the RHIC LLRF Upgrade Platform Generic Implementation of a Feedback Loop RHIC Bunch by Bunch Longitudinal Damper Cavity Controller

More information

Status, perspectives, and lessons from FLASH and European XFEL

Status, perspectives, and lessons from FLASH and European XFEL 2014 International Workshop on EUV and Soft X-ray Sources November 3-6, 2014 Dublin, Ireland Status, perspectives, and lessons from FLASH and European XFEL R. Brinkmann, E.A. Schneidmiller, J, Sekutowicz,

More information

FLASH Operation at DESY From a Test Accelerator to a User Facility

FLASH Operation at DESY From a Test Accelerator to a User Facility FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012 Vocabulary DESY: Deutsches Elektronen-Synchrotron, Hamburg, Germany

More information

Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality

Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality Jonathan Dumas 1,2, Joe Grames 2, Eric Voutier 1 December 16, 28 JLAB-TN-8-86 1 Laboratoire de Physique

More information

Cavity Field Control - RF Field Controller. LLRF Lecture Part3.3 S. Simrock, Z. Geng DESY, Hamburg, Germany

Cavity Field Control - RF Field Controller. LLRF Lecture Part3.3 S. Simrock, Z. Geng DESY, Hamburg, Germany Cavity Field Control - RF Field Controller LLRF Lecture Part3.3 S. Simrock, Z. Geng DESY, Hamburg, Germany Content Introduction to the controller Control scheme selection In-phase and Quadrature (I/Q)

More information

Hardware Commissioning

Hardware Commissioning Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status

More information

Progress in High Gradient Accelerator Research at MIT

Progress in High Gradient Accelerator Research at MIT Progress in High Gradient Accelerator Research at MIT Presented by Richard Temkin MIT Physics and Plasma Science and Fusion Center May 23, 2007 MIT Accelerator Research Collaborators MIT Plasma Science

More information

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera SLHiPP-2, Catania, Italy A cryogenic system for the MYRRHA linac Nicolas Chevalier, Tomas Junquera 04.05.2012 Outline 1 ) Cryogenic system requirements : heat loads 2 ) Temperature optimization, possible

More information

Normal-conducting high-gradient rf systems

Normal-conducting high-gradient rf systems Normal-conducting high-gradient rf systems Introduction Motivation for high gradient Order of 100 GeV/km Operational and state-of-the-art SwissFEL C-band linac: Just under 30 MV/m CLIC prototypes: Over

More information

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* Presented at the 13th International Workshop on RF Superconductivity, Beijing, China, 2007 SRF 071120-04 OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* S. Belomestnykh #, CLASSE, Cornell

More information

Feedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan

Feedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan Feedback Requirements for SASE FELS Henrik Loos, SLAC, Kyoto, Japan 1 1 Henrik Loos Outline Stability requirements for SASE FELs Diagnostics for beam parameters Transverse: Beam position monitors Longitudinal:

More information

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction Chapter 4 The RF systems and beam feedback 4.1 Introduction The injected beam will be captured, accelerated and stored using a 400 MHz superconducting cavity system, and the longitudinal injection errors

More information

CHARACTERIZATION OF BUTTON AND STRIPLINE BEAM POSITION MONITORS AT FLASH. Summer Student Programme 2007 DESY- Hamburg.

CHARACTERIZATION OF BUTTON AND STRIPLINE BEAM POSITION MONITORS AT FLASH. Summer Student Programme 2007 DESY- Hamburg. CHARACTERIZATION OF BUTTON AND STRIPLINE BEAM POSITION MONITORS AT FLASH Summer Student Programme 2007 DESY- Hamburg Yeşim Cenger Ankara University, Turkey E-mail: ycenger@eng.ankara.edu.tr supervisor

More information

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* THB04 Proceedings of FEL2014, Basel, Switzerland ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* Josef Frisch, Paul Emma, Alan Fisher, Patrick Krejcik, Henrik Loos, Timothy Maxwell, Tor Raubenheimer,

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

Current Status of cerl Injector Cryomodule

Current Status of cerl Injector Cryomodule Current Status of cerl Injector Cryomodule E. Kako, Y. Kondo, S. Noguchi, T. Shishido, K. Watanabe, Y. Yamamoto (KEK, Japan) 1 Outline Overview of Injector Cryomodule 2-cell Cavities HOM RF Feedthroughs

More information