1 XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13)
2 Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters Tasks & up-grade scenarios Heat load capacities of XFEL refrigerator Use of former HERA refrigerators Lay out of XFEL cryogenic system Cold turbo compressor issues Pressure variations/stability CW operation of TESLA cavities (reference to BESSY)
3 XFEL Photon Parameters 3
4 XFEL Accelerator requirements: GeV electron beam energy About superconducting RF cavities at 23 MV/m -> TESLA technology pulsed 10 Hz operation 4 Main linac: 1.65 km cryomodules two independent injectors (1.3 GHz cm GHz cm each) Booster 12 cryomodules two bunch-compressor sections -> transferline bypasses needed 0.1 nm Photons X-ray FEL
5 XFEL-Accelerator Tunnel XTL 5
6 Main features of XFEL-cryomodule design based on the TESLA/TTF type III design -> use of TESLA -technology 6 10 Hz pulsed operation each cryomodule consist of: GHz 9-cell Nb cavities (2K) 1 magnet package (2K) 2 thermal shields (5-8K;40-80K) 8 main RF couplers 8 cold tuners XFEL requirement: 23.6 MV/m Cryomodule cross-section
7 Accelerator Module (Cryomodule) 7 The XFEL accelerator module is based on the 3 rd cryomodule generation tested at the TESLA Test Facility and designed by INFN. Already 12 cryomodules have been built and commissioned for the TTF Linac. Length Total weight 12.2 m 7.8 t 38 carbon steel vessel 300 mm He gas return pipe acting as support structure 8 accelerating cavities cavity to cavity spacing exactly one RF wavelength inter-module cavity to cavity spacing a multiple of one RF wavelength one beam position monitor / magnet unit manually operated valves to terminate the beam tube at both ends longitudinal cavity position independent from the contraction / elongation of the HeGRP during cool-down / warm-up procedure 16
8 Accelerator Module (Cryomodule) 8 70 K shield 2 K return magnet current feedthrough 2.2 K forw ard 5 K forward 80 K return 8 K return RF main coupler 40 K forward 4 K shield 2 K 2-phase cav ity 17
9 Safety Measures 9 Safety flaps (up to DN300) installed on the vacuum vessel of each cryomodule LHC event : we reviewed helium release in XFEL tunnel
10 SC Magnet Package at 2K XFEL Magnet Package and Cold BPM 10 At the downstream end of the cavity string of each module a magnet package and an attached BPM is placed. a super-ferric quadrupole a vertical and a horizontal dipole BPM is either re-entrant (SACLAY design) or pick-up (DESY design) type. current leads Quadrupole to BPM alignment is 0.3 mm and 3 mrad. The magnet design is done in collaboration with CIEMAT. The current leads are based on the CERN design used at LHC. magnet package beam position monitor 2 K two-phase line 19
11 Choice of cryogenic parameters 11 2K Helium II bath: well below lambda transition close to heat conductivity maximum of saturated liquid Qo>10**10 for TESLA cavities (lower temperature has only limited advantage for pulsed RF operation) Low vapor pressure enables relative pressure stability in the order of less than +/- 1 % (problems with CCs!?) 5-8K circuit: 5K traditional from TESLA TDR (TESLA quad cooling,still main coupler thermal intercepts), fits to HERA cryo plant 40-80K circuit: Standard layout, fits to HERA plant
12 TESLA Cavities show BCS temperature dependence in Cryomodule 12 Module 6 CMTB Meas. Qo/Eacc average gradient 10Hz 500/800us Status:13-Mar-07 Esch/Kos/Lil/Lan MKS 1,00E+11 2K 19-Dec-06 2K 21-Feb-07 2K 28-Feb-07 with feedb/piezo 1.8K 1-Mar K 1-M ar-07 2K 9-M ar-07 1,8K 9-mar-07 1,59K 9-mar-07 Q o 1,00E Eacc [MV/m]
13 XFEL-Linac-Cryogenic tasks (TDR) Very (NEW new start start ) version sc Nb 1.3-GHz 9-cell cavities have to be cooled in a Helium II bath at 2K, Qo= 10**10, 23.6 MV/m, 10 Hz GHz cavities (in 2 cryomodules) ,3 GHz cryomodules in RF operation cryomodules in cold stand-by - 2 Cryo-Bypass-Transfer-Lines (BCBTL) - at warm Bunch-Compressor sections - 2 independent injectors ( 1.3 GHz GHz cm each)
14 XFEL project realization in stages 14 Start version: 80 cryomodules 14 GeV Could be up-graded already during construction to 100 cryomodules 17.5 Gev Final up-grade (according to TDR): 120 cryomodules 20 Gev + cw injector
15 Heat loads & mass flows of final 20 GeV stage KW 4.5K eq Subjects of process optimization
16 Heat loads & mass flows of 17.5 GeV stage KW eq 4.5K
17 Operating conditions of XFEL Linac-Cryogenic 17 Continous operation of the refrigerator 24 h per day / 7 days per week Operation periods of 2 3 years without scheduled break of cold helium supply Avialability > 99% (without utilities and process control)
18 Use of HERA cryogenic plant 18 Preliminary studies from TU Dresden and a detailed industrial study by LINDE KRYOTECHNIK AG -> 2 HERA refrigerators (8 KW eq 4.5K each) could be modified to XFELrefrigerator ( + 2K system) Advantages: Only ½ of investment costs compared to new refrigerator No extra civil engineering effort Utilities exist Dis-advantages: Lower efficiency compared to new plant Re-use of worn equipment Parallel operation of 2 cold boxes challenging (symmetrical operation) There is still hope that only one CB will be sufficient to operate the 14 GeV linac ( or even the 17.5 GeV linac, if we ll not need all the capacity of the overhead)
19 Concept of XFEL-cryogenic 19 SC SC SC SC VC AMTF SC SC 2K BOX CC Valve BOX CB CB Distribution Box F CM VALVE BOX BCBTL BCBTL SCB 3.9 GHz CM F CMS CMS CMS CMS INJECTORS SCB BOOSTER MAIN LINAC
20 Main Transfer Line Piping Bridge to XSE 20
21 Cryogenic installations in XSE 21 Distribution Box
22 Concept of XFEL-Linac Cryogenic 22 Up-graded HERA plant Simplified flow scheme DB-box simplified 40K -> 80K shield circuit (in series) moved to XSE 5K -> 8K shield circuit (in series) 2K circuit (supply in parallel,return in series) warm gas collection pipe 40/80 K return, shield cooling 40/80 K forward 8 K return, shield cooling 5 K forward JTHEX 2.2 K forward 2 K return 40/80 K forward 5 K forward JTHEX 2 K return 40/80 K return, shield cooling lead cooling 8 K return, shield cooling 2.2 K forward Injector 2 (not shown) Injector 1 module string 9-10 module string 2 module string 1 cryogenic unit (9-10 strings), 1.7 km
23 Linac cryogenic string 23 Cryogenic units of 12 cryomodules = strings String Connection Boxes contain all cryogenic instrumentation Breaking news: All individual cavity helium vessels will get a thermometer!
24 Disadvantage: 2-phase flow affected by gravitational forces 24 Laser-straight XFEL-linac Liquid Helium II JT JT JT JT supply JT JT BC BC 8 Modules Length [m] Beam direction String 11 String 10 String 9 One String = 12 cryomodules each of 12 m length Deviation from gravity equipotential [mm] String String 1 72,7 61,5 52,3 34,7 26,0 17,7 0,04 26,3 36,3 Gravity equipotential surface
25 Linac cryogenic components 25 regular string connection box End-BOX Bunch Compressor Bypass Transferline (only 1-phase helium) Cool-down/warm-up JT Feed-Box
26 Spec of Cold Turbo Compressors (CCs) 26 DESY MKS has NO experience with the operation of CCs We need advice from CERN,J-Lab, SNS Up to now, we learned from our CERN/LHC colleagues: - mixed-cycle approach mandatory - to increase CCs dynamic range - to restart from sub-atmospheric conditions of the linac - 5 stages approach too risky - make up of T,P, mass flow is a touchy operation
27 CCs mixed-cycle approach 27 DESY mixed-cycle approach: we could use the JT-screw (minimum 650 mbar) and/or make use of our helium pump units of the Accelerator Module Test Facility (AMTF) 2 X 20 g/s at 20 mbar (sufficient for static loads) 100 g/s at 200 mbar for mixed cycle + Extra heat exchanger in distribution box
28 2K reference specification ( simplified) 28 mixed cycle VC SC SC HEX HEX Existing Refrigerator Cold Compressors Details are subject of call for tender!? HEX JT JT subcooler HEX Critical for HERA CBs HEX JT T bath = f ( P bath ) 4.5 K load 40/80 K load
29 Sources of pressure variations: heavy single cavity quench in FLASH 29 Mass flow [g/s] P at helium pumps P at linac endcap Pressure [mbar] Temp [K] He mass flow T cavity He vessel 5 min!!!
30 XFEL pressure stability Spec 30 RF change of TESLA cavities vs pressure change : about 50 Hz / mbar Note from DESY RF experts: fluctuations not larger than +/- 35 Hz to avoid RF phase shifts -> pressure stability better than +/- 0.7 mbar required We specify 1% relative pressure stability -> 31 mbar +/- 0.3 mbar (LHC 5 % relative pressure changes caused by the accelerator components) Our question in call for tender: How does the CCs regulation react on a sudden mass flow change of 10%?
31 Pressure variations expected in XFEL linac 31 Arkadiy s questions: 1. Range of presures during normal operations? -> 31 mbar +/- 0.3 mbar ( 1%) 2. Timescale? -> Hours! From FLASH experience we expect very stable conditions 3. Occasional/rare pressure variations? -> Switching on/off RF, Quenches (see FLASH example) For the switching of RF we ll need some ramping by means of electrical heaters Trips of CCs?
32 CW-operation of TESLA cavities -> BESSY(1) W.Anders, J.Knobloch et al. at DESY: see SRF2009 paper D.Kostin, WD Möller et al. 32
33 CW-operation of TESLA cavities -> BESSY(2) 33
34 CW-operation of TESLA cavities -> BESSY(3) 34
35 CW-operation of TESLA cavities -> BESSY(4) 35
36 Summary 36 XFEL accelerator structure TESLA technology Basic cryogenic parameters Tasks & up-grade scenarios Heat load capacities of XFEL refrigerator Use of former HERA refrigerators Lay out of XFEL cryogenic system Cold turbo compressor issues Pressure variations/stability CW operation of TESLA cavities (reference to BESSY)
THE CRYOGENIC SYSTEM OF TESLA
THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider
More informationCryogenics for Large Accelerators
Cryogenics for Large Accelerators Dr. Sergiy Putselyk Deutsches Elektronen-Synchrotron (DESY) MKS Division Notkestrasse 85 22607 Hamburg (Germany) Phone: +49 40 89983492 Fax: +49 40 89982858 E-Mail: Sergiy.Putselyk@desy.de
More informationSLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera
SLHiPP-2, Catania, Italy A cryogenic system for the MYRRHA linac Nicolas Chevalier, Tomas Junquera 04.05.2012 Outline 1 ) Cryogenic system requirements : heat loads 2 ) Temperature optimization, possible
More informationCommissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008
Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)
More informationRF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS
RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.
More informationINSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM
INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals
More informationPerformance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium
Performance of Superconducting Cavities for the European XFEL Detlef Reschke DESY for the EU-XFEL Accelerator Consortium Outline 2 European XFEL Linear Accelerator Cavity Production Vertical Acceptance
More informationOverview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University
Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Overview of ERL projects: SRF issues and challenges Slide 1 Outline Introduction: SRF for ERLs What makes it special
More informationPackaging of Cryogenic Components
Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?
More informationLARGE SCALE TESTING OF SRF CAVITIES AND MODULES
LARGE SCALE TESTING OF SRF CAVITIES AND MODULES Jacek Swierblewski IFJ PAN Krakow IKC for the XFEL Introduction IFJ PAN 2 Institute of Nuclear Physics (IFJ) located in Kraków, Poland was founded in 1955
More informationTo produce more powerful and high-efficiency particle accelerator, efforts have
Measuring Unloaded Quality Factor of Superconducting RF Cryomodule Jian Cong Zeng Department of Physics and Astronomy, State University of New York at Geneseo, Geneseo, NY 14454 Elvin Harms, Jr. Accelerator
More informationSuperstructures; First Cold Test and Future Applications
Superstructures; First Cold Test and Future Applications DESY: C. Albrecht, V. Ayvazyan, R. Bandelmann, T. Büttner, P. Castro, S. Choroba, J. Eschke, B. Faatz, A. Gössel, K. Honkavaara, B. Horst, J. Iversen,
More informationStatus of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY
Status of the European XFEL Accelerator Construction Project Reinhard Brinkmann, DESY European XFEL Introduction Some specifications Photon energy 0.3-24 kev Pulse duration ~ 10-100 fs Pulse energy few
More informationTests of the Spoke Cavity RF Source and Cryomodules in Uppsala
FREIA Report 2012/03 October 2012 DEPARTMENT OF PHYSICS AND ASTRONOMY UPPSALA UNIVERSITY Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala ESS TDR Contribution R. Ruber, T. Ekelöf, R.A. Yogi.
More informationINFN School on Electron Accelerators. Cryomodule Design & Cryogenics
INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7a Cryomodule Design & Cryogenics Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC technology choice
More informationCEBAF Overview June 4, 2010
CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications
More information3.9 GHz System (AH1) XFEL WP46
3.9 GHz System (AH1) XFEL WP46 14th European XFEL Machine Advisory Committee Meeting 02 May 2016 Paolo Pierini, INFN & DESY Elmar Vogel, DESY + INFN/DESY contributors PPT version 1 26/04/2016 Outline Status
More informationStatus of superconducting module development suitable for cw operation: ELBE cryostats
Status of superconducting module development suitable for cw operation: ELBE cryostats, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A. Winter Forschungszentrum
More informationH. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group
7+(7(6/$;)(/352-(&7 H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group $EVWUDFW The overall layout of the X-Ray FEL to be built in international collaboration at DESY will
More informationHIGH POWER COUPLER FOR THE TESLA TEST FACILITY
Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear
More informationSRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE
SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE M. Liepe, S. Belomestnykh, E. Chojnacki, Z. Conway, V. Medjidzade, H. Padamsee, P. Quigley, J. Sears, V. Shemelin, V. Veshcherevich,
More informationVibration studies of a superconducting accelerating
Vibration studies of a superconducting accelerating module at room temperature and at 4.5 K Ramila Amirikas, Alessandro Bertolini, Wilhelm Bialowons Vibration studies on a Type III cryomodule at room temperature
More informationEngineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team
Engineering Challenges and Solutions for MeRHIC Andrew Burrill for the MeRHIC Team Key Components Photoinjector Design Photocathodes & Drive Laser Linac Cavities 703.75 MHz 5 cell cavities 3 rd Harmonic
More informationINSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE
INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE S. M. Pattalwar, R. Bate, G. Cox, P.A. McIntosh and A. Oates, STFC, Daresbury Laboratory, Warrington, UK Abstract ALICE is a prototype
More informationUsing Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY
Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at FLASH @ DESY N. Baboi, DESY, Hamburg for the HOM team : S. Molloy 1, N. Baboi 2, N. Eddy 3, J. Frisch 1, L. Hendrickson
More informationPhilippe Lebrun & Laurent Tavian, CERN
7-11 July 2014 ICEC25 /ICMC 2014 Conference University of Twente, The Netherlands Philippe Lebrun & Laurent Tavian, CERN Ph. Lebrun & L. Tavian, ICEC25 Page 1 Contents Introduction: the European Strategy
More informationCHALLENGES IN ILC SCRF TECHNOLOGY *
CHALLENGES IN ILC SCRF TECHNOLOGY * Detlef Reschke #, DESY, D-22603 Hamburg, Germany Abstract With a baseline operating gradient of 31,5 MV/m at a Q-value of 10 10 the superconducting nine-cell cavities
More informationSupporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience
Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Lars Hagge, Benno List SLAC, 31.03.2014 Agenda > Introduction: Collaborative Engineering > Collaborative Design &
More informationPhysics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7
Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,
More informationTECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *
TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing
More informationThe TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration
The TESLA Linear Collider Winfried Decking (DESY) for the TESLA Collaboration Outline Project Overview Highlights 2000/2001 Publication of the TDR Cavity R&D TTF Operation A0 and PITZ TESLA Beam Dynamics
More informationDEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT
DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT G. Olry, J-L. Biarrotte, S. Blivet, S. Bousson, C. Commeaux, C. Joly, T. Junquera, J. Lesrel, E. Roy,
More informationoverview of cryomodules for proton accelerators
overview of cryomodules for proton accelerators Paolo Pierini INFN Sezione di Milano Laboratorio Acceleratori e Superconduttività Applicata Paolo.Pierini@mi.infn.it 19 March 2009 Bilbao outline discuss
More informationDemonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team
Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY
More informationALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory
ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting
More informationOperation Status of KEK Accelerator Cryogenic Systems
Operation Status of KEK Accelerator Cryogenic Systems NAKAI Hirotaka, HARA Kazufumi, HONMA Teruya, KOJIMA Yuuji, NAKANISHI Kota and SHIMIZU Hirotaka (KEK, Japan) Outline Overview of KEK cryogenic systems
More informationESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University
ESS RF Development at Uppsala University Roger Ruber for the FREIA team Uppsala University ESS-UU Collaboration 2009 ESS and UU start discussion on 704 MHz RF development proposal for ESS dedicated test
More informationSuperconducting RF System. Heung-Sik Kang
Design of PLS-II Superconducting RF System Heung-Sik Kang On behalf of PLS-II RF group Pohang Accelerator Laboratory Content 1. Introduction 2. Physics design 3. Cryomodules 4. Cryogenic system 5. High
More informationTESLA Quad Package With BPM
TESLA Quad Package With BPM H. Brueck, DESY Zeuthen, January 22, 2004 Technology Working Group 1 Topics The TESLA Quadrupole Package Status of Components Magnet Feedthroughs HTc Leads BPM Test in ACC6
More information7 Infrastructure and auxiliary systems
7 Infrastructure and auxiliary systems 7.1 Site layout and civil construction 7.1.1 Overall site layout The overall layout of the X-Ray Free-Electron Lasers (XFEL) is shown in Figure 7.1.1. It will be
More informationThe ILC Accelerator Complex
The ILC Accelerator Complex Nick Walker DESY/GDE UK LC meeting 3 rd September 2013 Oxford University, UK. 1 ILC in a Nutshell 200-500 GeV E cm e + e - collider L ~2 10 34 cm -2 s -1 upgrade: ~1 TeV central
More informationOVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*
Presented at the 13th International Workshop on RF Superconductivity, Beijing, China, 2007 SRF 071120-04 OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* S. Belomestnykh #, CLASSE, Cornell
More informationCavity development for TESLA
Cavity development for TESLA Lutz.Lilje@desy.de DESY -FDET- Cavity basics History: Limitations and solutions»material inclusions»weld defects»field emission»increased surface resistance at high field Performance
More informationThird Harmonic Superconducting passive cavities in ELETTRA and SLS
RF superconductivity application to synchrotron radiation light sources Third Harmonic Superconducting passive cavities in ELETTRA and SLS 2 cryomodules (one per machine) with 2 Nb/Cu cavities at 1.5 GHz
More informationMotivation: ERL based e linac for LHeC
Erk Jensen, for the LHeC team and the RF group ERL 2013, BINP, Novosibirsk, 09 Sep 2013 09 Sep 2013 1 Motivation: ERL based e linac for LHeC ( O. Brünings presentation) NB.: This is a 09 Sep 2013 2 Some
More informationLCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014
LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC Marc Ross 13 January 2014 What are the technical and practical limits for DF? 1st limit: Heat load at 2K for each cryomodule
More informationACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II
ACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II G. Wu 1, A. Grassellino, E. Harms, N. Solyak, A. Romanenko, C. Ginsburg, R. Stanek Fermi National Accelerator Laboratory, Batavia,
More informationTHE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY
Presented at the 1999 Particle Accelerator Conference, New York City, NY, USA, March 29 April 2 CLNS 99/1614 / SRF 990407-03 THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING
More informationtwo pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,
Chapter 6 Quadrupole Package The quadrupole package is shown in Fig. 6.1. It consists of a superferric quadrupole doublet powered in series enclosed in a stainless steel vessel and cooled by 4 K LHe; two
More informationCurrent Industrial SRF Capabilities and Future Plans
and Future Plans Capabilities in view of Design Engineering Manufacturing Preparation Testing Assembly Taking into operation Future Plans Participate in and contribute to development issues, provide prototypes
More informationDEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY -
DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY - F. Peauger, C. Arcambal, F. Ardellier, S. Berry, P. Bosland, A. Bouygues, E. Cenni, JP. Charrier, G. Devanz, F. Eozénou,
More informationFLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously
FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First
More informationSRF in Storage Rings. Michael Pekeler ACCEL Instruments GmbH Bergisch Gladbach Germany
SRF in Storage Rings Michael Pekeler ACCEL Instruments GmbH 51429 Bergisch Gladbach Germany SRF in Storage Rings Michael Pekeler ACCEL Instruments GmbH 51429 Bergisch Gladbach Germany TESLA type cavity:
More informationREVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh
REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES S. Belomestnykh HPC workshop JLAB, 30 October 2002 Introduction Many aspects of the high-power coupler design, fabrication, preparation, conditioning, integration
More informationCryogenic Operations at SLAC
Cryogenic Operations at SLAC J. G. Weisend II, A. Candia, W.W. Craddock, E. Thompson CryoOps 2006 5/30/2006 J. G. Weisend II 1 What Do We Do? Cryogenics at SLAC involve: Large scale He refrigerator operation
More informationCEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute
CEBAF waveguide absorbers R. Rimmer for JLab SRF Institute Outline Original CEBAF HOM absorbers Modified CEBAF loads for FEL New materials for replacement loads High power loads for next generation FELs
More information3 General layout of the XFEL Facility
3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and
More informationGrounding for EMC at the European XFEL
Grounding for EMC at the European XFEL Herbert Kapitza, Hans-Jörg Eckoldt, Markus Faesing Deutsches Elektronensynchrotron (DESY) D-22603 Hamburg, Germany Email: herbert.kapitza@desy.de Abstract The European
More informationTuning systems for superconducting cavities at Saclay
Tuning systems for superconducting cavities at Saclay 1 MACSE: 1990: tuner in LHe bath at 1.8K TTF: 1995 tuner at 1.8K in the insulating vacuum SOLEIL: 1999 tuner at 4 K in the insulating vacuum Super-3HC:
More informationTESLA RF POWER COUPLERS DEVELOPMENT AT DESY.
TESLA RF POWER COUPLERS DEVELOPMENT AT DESY. Dwersteg B., Kostin D., Lalayan M., Martens C., Möller W.-D., DESY, D-22603 Hamburg, Germany. Abstract Different RF power couplers for the TESLA Test Facility
More informationA few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o
Particle Accelerators, 1990, Vol. 29, pp. 47-52 Reprints available directly from the publisher Photocopying permitted by license only 1990 Gordon and Breach, Science Publishers, Inc. Printed in the United
More informationASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY
ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY P. A. McIntosh #, R. Bate, C. D. Beard, M. A. Cordwell, D. M. Dykes, S. M. Pattalwar and J. Strachan, STFC Daresbury Laboratory,
More informationHigh Power Couplers for TTF - FEL
High Power Couplers for TTF - FEL 1. Requirements for High Power Couplers on superconducting Cavities 2. Characteristics of pulsed couplers 3. Standing wave pattern in the coaxial coupler line 4. Advantages
More informationSNS CRYOMODULE PERFORMANCE*
SNS CRYOMODULE PERFORMANCE* J. Preble*, I. E. Campisi, E. Daly, G. K. Davis, J. R. Delayen, M. Drury, C. Grenoble, J. Hogan, L. King, P. Kneisel, J. Mammosser, T. Powers, M. Stirbet, H. Wang, T. Whitlatch,
More informationKEK ERL CRYOMODULE DEVELOPMENT
KEK ERL CRYOMODULE DEVELOPMENT H. Sakai*, T. Furuya, E. Kako, S. Noguchi, M. Sato, S. Sakanaka, T. Shishido, T. Takahashi, K. Umemori, K. Watanabe and Y. Yamamoto KEK, 1-1, Oho, Tsukuba, Ibaraki, 305-0801,
More informationCurrent Status of cerl Injector Cryomodule
Current Status of cerl Injector Cryomodule E. Kako, Y. Kondo, S. Noguchi, T. Shishido, K. Watanabe, Y. Yamamoto (KEK, Japan) 1 Outline Overview of Injector Cryomodule 2-cell Cavities HOM RF Feedthroughs
More informationC100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint
1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >
More informationThe European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013
The European Spallation Source Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013 Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average
More information5.5 SNS Superconducting Linac
JP0150514 ICANS - XV 15 th Meeting of the International Collaboration on Advanced Neutron Sources November 6-9, 2000 Tsukuba, Japan Ronald M. Sundelin Jefferson Lab* 5.5 SNS Superconducting Linac 12000
More informationAurélien Ponton. First Considerations for the Design of the ESS Cryo-Modules
Accelerator Division ESS AD Technical Note ESS/AD/0001 Aurélien Ponton First Considerations for the Design of the ESS Cryo-Modules 16 March 2010 First considerations for the design of the ESS cryo-modules
More informationBehavior of the TTF2 RF Gun with long pulses and high repetition rates
Behavior of the TTF2 RF Gun with long pulses and high repetition rates J. Baehr 1, I. Bohnet 1, J.-P. Carneiro 2, K. Floettmann 2, J. H. Han 1, M. v. Hartrott 3, M. Krasilnikov 1, O. Krebs 2, D. Lipka
More informationHIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY
HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY G. Devanz, D. Braud, M. Desmons, Y. Gasser, E. Jacques, O. Piquet, J. Plouin, J.- P. Poupeau, D. Roudier, P. Sahuquet, CEA-Saclay,
More informationR.Bachimanchi, IPAC, May 2015, Richmond, VA
1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >
More informationAmit Roy Director, IUAC
SUPERCONDUCTING RF DEVELOPMENT AT INTER-UNIVERSITY ACCELERATOR CENTRE (IUAC) (JOINT PROPOSAL FROM IUAC & Delhi University (DU)) Amit Roy Director, IUAC to be presented by Kirti Ranjan (DU / Fermilab) Overview
More informationSystem Integration of the TPS. J.R. Chen NSRRC, Hsinchu
System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem
More informationLLRF Operation and Performance of the European XFEL. An overview
LLRF Operation and Performance of the European XFEL. An overview Mathieu Omet LLRF, Barcelona, 16.10.2017 Contents > Introduction > LLRF commissioning > Energy Reach > LLRF performance > Summary / Outlook
More informationTESLA Progress on R1 & R2 issues
TESLA Progress on R1 & R2 issues Carlo Pagani Milano & DESY carlo.pagani@desy.de The TESLA Challenge for LC Physical limit at 50 MV/m > 25 MV/m could be obtained Common R&D effort for TESLA Higher conversion
More informationERLP Status. Mike Dykes
ERLP Status Mike Dykes Content ASTeC RF & Diagnostics Group Work of the Group 4GLS ERLP Photo-injector Accelerating Modules Summary High Power RF Engineering Andy Moss SRS Support; DIAMOND; ERLP; MICE;
More informationFLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY
FLASH Training: RF Gun FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously Siegfried Schreiber, DESY FLASH Training DESY 17-Mar-2017 FLASH1 RF Gun History RF Guns operated
More informationAdvance on High Power Couplers for SC Accelerators
Advance on High Power Couplers for SC Accelerators Eiji Kako (KEK, Japan) IAS conference at Hong Kong for High Energy Physics, 2017, January 23th Eiji KAKO (KEK, Japan) IAS at Hong Kong, 2017 Jan. 23 1
More informationCouplers for Project X. S. Kazakov, T. Khabiboulline
Couplers for Project X S. Kazakov, T. Khabiboulline TTC meeting on CW-SRF, 2013 Requirements to Project X couplers Cavity SSR1 (325MHz): Cavity SSR2 (325MHz): Max. energy gain - 2.1 MV, Max. power, 1 ma
More informationMaurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator
Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator Every accelerator needs a linac as injector to pass the region where the velocity of the particles increases with energy. At high energies (relativity)
More informationTESLA TeV Collider Project Overview
Hamburg-Zeuthen Linear Collider Meeting TESLA TeV Collider Project Overview Carlo Pagani Milano & DESY carlo.pagani@desy.de The TESLA Challenge Physical limit is 50 MV/m > 25 MV/m could be obtained Common
More informationHIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK
HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK E. Kako #, H. Hayano, S. Noguchi, T. Shishido, K. Watanabe and Y. Yamamoto KEK, Tsukuba, Ibaraki, 305-0801, Japan Abstract An input coupler,
More informationDESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX
DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX Speaker: P.N. Ostroumov Contributors: A. Plastun, B. Mustapha and Z. Conway HB2016, July 7, 2016, Malmö, Sweden
More informationSuperconducting 1.3 GHz Cavities for European XFEL
Superconducting 1.3 GHz Cavities for European XFEL W. Singer, J. Iversen, A. Matheisen, X. Singer (DESY, Germany) P. Michelato (INFN, Italy) Presented by Waldemar Singer Main issues: preparation phase
More informationProposal of test setup
Proposal of test setup Status of the study The Compact Linear collider (CLIC) study is a site independent feasibility study aiming at the development of a realistic technology at an affordable cost for
More informationX-Band Linear Collider Report*
SLAC DOE Program Review X-Band Linear Collider Path to the Future X-Band Linear Collider Report* D. L. Burke NLC Program Director * Abstracted from recent presentations to the International Technical Recommendation
More informationInitial Beam Phasing of the SRF Cavities in LCLS-II
Introduction Initial Beam Phasing of the SRF Cavities in LCLS-II P. Emma Nov. 28, 2016 One of the more challenging aspects of commissioning the LCLS-II accelerator is in the initial phasing of the SRF
More informationLow-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY
Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main
More informationA New 2 K Superconducting Half-Wave Cavity Cryomodule for PIP-II
A New 2 K Superconducting Half-Wave Cavity Cryomodule for PIP-II Zachary Conway On Behalf of the ANL Physics Division Linac Development Group June 29, 2015 Acknowledgements People Working at ANL: PHY:
More informationProject X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF
Project X Cavity RF and mechanical design T. Khabiboulline, FNAL/TD/SRF TTC meeting on CW-SRF, 2013 Project X Cavity RF and mechanical design T 1 High ß Low ß 0.5 HWR SSR1 SSR2 0 1 10 100 1 10 3 1 10 4
More informationREVIEW ON SUPERCONDUCTING RF GUNS
REVIEW ON SUPERCONDUCTING RF GUNS D. Janssen #, A. Arnold, H. Büttig, U. Lehnert, P. Michel, P. Murcek, C. Schneider, R. Schurig, F. Staufenbiel, J. Teichert, R. Xiang, Forschungszentrum Rossendorf, Germany.
More informationSUPERCONDUCTING CAVITIES AND CRYOMODULES FOR PROTON AND DEUTERON LINACS
Proceedings of LINAC2014, Geneva, Switzerland THIOA04 SUPERCONDUCTING CAVITIES AND CRYOMODULES FOR PROTON AND DEUTERON LINACS G. Devanz, CEA-Irfu CEA-Saclay, Gif-sur-Yvette 91191, France Abstract We review
More informationMain linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions
Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions 1 Three Upgrade Options 1 : Half-Empty Build tunnel long enough (41km) for one TeV, but install only 500 GeV
More informationNiowave s Growth and the Role of STTR in its Development
Niowave s Growth and the Role of STTR in its Development Terry L. Grimm Niowave, Inc. Lansing MI Presented at National Academies STTR Workshop, Wash DC, May 2015 Outline Superconducting electron linacs
More informationMechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay. Abstract
SRF Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay Abstract This report presents the piezo tuner developed at Saclay in the framework of CARE/SRF.
More informationStatus and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti
Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti 7/6/2009 1 Outline : Description of the Box cavity Concept. Box Cavity Summary Plans. HFSS Models of orthogonal and
More informationStatus of the ESS Accelerator Workpackage
Status of the ESS Accelerator Workpackage Peter McIntosh STFC Daresbury Laboratory UK ESS Interactions and Opportunities Rutherford Appleton Laboratory 3 Dec 2014 The ESS Linac The European Spallation
More informationAdvances in CW Ion Linacs
IPAC 2015 P.N. Ostroumov May 8, 2015 Content Two types of CW ion linacs Example of a normal conducting CW RFQ Cryomodule design and performance High performance quarter wave and half wave SC resonators
More information