1 XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13)

2 Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters Tasks & up-grade scenarios Heat load capacities of XFEL refrigerator Use of former HERA refrigerators Lay out of XFEL cryogenic system Cold turbo compressor issues Pressure variations/stability CW operation of TESLA cavities (reference to BESSY)

3 XFEL Photon Parameters 3

4 XFEL Accelerator requirements: GeV electron beam energy About superconducting RF cavities at 23 MV/m -> TESLA technology pulsed 10 Hz operation 4 Main linac: 1.65 km cryomodules two independent injectors (1.3 GHz cm GHz cm each) Booster 12 cryomodules two bunch-compressor sections -> transferline bypasses needed 0.1 nm Photons X-ray FEL

5 XFEL-Accelerator Tunnel XTL 5

6 Main features of XFEL-cryomodule design based on the TESLA/TTF type III design -> use of TESLA -technology 6 10 Hz pulsed operation each cryomodule consist of: GHz 9-cell Nb cavities (2K) 1 magnet package (2K) 2 thermal shields (5-8K;40-80K) 8 main RF couplers 8 cold tuners XFEL requirement: 23.6 MV/m Cryomodule cross-section

7 Accelerator Module (Cryomodule) 7 The XFEL accelerator module is based on the 3 rd cryomodule generation tested at the TESLA Test Facility and designed by INFN. Already 12 cryomodules have been built and commissioned for the TTF Linac. Length Total weight 12.2 m 7.8 t 38 carbon steel vessel 300 mm He gas return pipe acting as support structure 8 accelerating cavities cavity to cavity spacing exactly one RF wavelength inter-module cavity to cavity spacing a multiple of one RF wavelength one beam position monitor / magnet unit manually operated valves to terminate the beam tube at both ends longitudinal cavity position independent from the contraction / elongation of the HeGRP during cool-down / warm-up procedure 16

8 Accelerator Module (Cryomodule) 8 70 K shield 2 K return magnet current feedthrough 2.2 K forw ard 5 K forward 80 K return 8 K return RF main coupler 40 K forward 4 K shield 2 K 2-phase cav ity 17

9 Safety Measures 9 Safety flaps (up to DN300) installed on the vacuum vessel of each cryomodule LHC event : we reviewed helium release in XFEL tunnel

10 SC Magnet Package at 2K XFEL Magnet Package and Cold BPM 10 At the downstream end of the cavity string of each module a magnet package and an attached BPM is placed. a super-ferric quadrupole a vertical and a horizontal dipole BPM is either re-entrant (SACLAY design) or pick-up (DESY design) type. current leads Quadrupole to BPM alignment is 0.3 mm and 3 mrad. The magnet design is done in collaboration with CIEMAT. The current leads are based on the CERN design used at LHC. magnet package beam position monitor 2 K two-phase line 19

11 Choice of cryogenic parameters 11 2K Helium II bath: well below lambda transition close to heat conductivity maximum of saturated liquid Qo>10**10 for TESLA cavities (lower temperature has only limited advantage for pulsed RF operation) Low vapor pressure enables relative pressure stability in the order of less than +/- 1 % (problems with CCs!?) 5-8K circuit: 5K traditional from TESLA TDR (TESLA quad cooling,still main coupler thermal intercepts), fits to HERA cryo plant 40-80K circuit: Standard layout, fits to HERA plant

12 TESLA Cavities show BCS temperature dependence in Cryomodule 12 Module 6 CMTB Meas. Qo/Eacc average gradient 10Hz 500/800us Status:13-Mar-07 Esch/Kos/Lil/Lan MKS 1,00E+11 2K 19-Dec-06 2K 21-Feb-07 2K 28-Feb-07 with feedb/piezo 1.8K 1-Mar K 1-M ar-07 2K 9-M ar-07 1,8K 9-mar-07 1,59K 9-mar-07 Q o 1,00E Eacc [MV/m]

13 XFEL-Linac-Cryogenic tasks (TDR) Very (NEW new start start ) version sc Nb 1.3-GHz 9-cell cavities have to be cooled in a Helium II bath at 2K, Qo= 10**10, 23.6 MV/m, 10 Hz GHz cavities (in 2 cryomodules) ,3 GHz cryomodules in RF operation cryomodules in cold stand-by - 2 Cryo-Bypass-Transfer-Lines (BCBTL) - at warm Bunch-Compressor sections - 2 independent injectors ( 1.3 GHz GHz cm each)

14 XFEL project realization in stages 14 Start version: 80 cryomodules 14 GeV Could be up-graded already during construction to 100 cryomodules 17.5 Gev Final up-grade (according to TDR): 120 cryomodules 20 Gev + cw injector

15 Heat loads & mass flows of final 20 GeV stage KW 4.5K eq Subjects of process optimization

16 Heat loads & mass flows of 17.5 GeV stage KW eq 4.5K

17 Operating conditions of XFEL Linac-Cryogenic 17 Continous operation of the refrigerator 24 h per day / 7 days per week Operation periods of 2 3 years without scheduled break of cold helium supply Avialability > 99% (without utilities and process control)

18 Use of HERA cryogenic plant 18 Preliminary studies from TU Dresden and a detailed industrial study by LINDE KRYOTECHNIK AG -> 2 HERA refrigerators (8 KW eq 4.5K each) could be modified to XFELrefrigerator ( + 2K system) Advantages: Only ½ of investment costs compared to new refrigerator No extra civil engineering effort Utilities exist Dis-advantages: Lower efficiency compared to new plant Re-use of worn equipment Parallel operation of 2 cold boxes challenging (symmetrical operation) There is still hope that only one CB will be sufficient to operate the 14 GeV linac ( or even the 17.5 GeV linac, if we ll not need all the capacity of the overhead)

19 Concept of XFEL-cryogenic 19 SC SC SC SC VC AMTF SC SC 2K BOX CC Valve BOX CB CB Distribution Box F CM VALVE BOX BCBTL BCBTL SCB 3.9 GHz CM F CMS CMS CMS CMS INJECTORS SCB BOOSTER MAIN LINAC

20 Main Transfer Line Piping Bridge to XSE 20

21 Cryogenic installations in XSE 21 Distribution Box

22 Concept of XFEL-Linac Cryogenic 22 Up-graded HERA plant Simplified flow scheme DB-box simplified 40K -> 80K shield circuit (in series) moved to XSE 5K -> 8K shield circuit (in series) 2K circuit (supply in parallel,return in series) warm gas collection pipe 40/80 K return, shield cooling 40/80 K forward 8 K return, shield cooling 5 K forward JTHEX 2.2 K forward 2 K return 40/80 K forward 5 K forward JTHEX 2 K return 40/80 K return, shield cooling lead cooling 8 K return, shield cooling 2.2 K forward Injector 2 (not shown) Injector 1 module string 9-10 module string 2 module string 1 cryogenic unit (9-10 strings), 1.7 km

23 Linac cryogenic string 23 Cryogenic units of 12 cryomodules = strings String Connection Boxes contain all cryogenic instrumentation Breaking news: All individual cavity helium vessels will get a thermometer!

24 Disadvantage: 2-phase flow affected by gravitational forces 24 Laser-straight XFEL-linac Liquid Helium II JT JT JT JT supply JT JT BC BC 8 Modules Length [m] Beam direction String 11 String 10 String 9 One String = 12 cryomodules each of 12 m length Deviation from gravity equipotential [mm] String String 1 72,7 61,5 52,3 34,7 26,0 17,7 0,04 26,3 36,3 Gravity equipotential surface

25 Linac cryogenic components 25 regular string connection box End-BOX Bunch Compressor Bypass Transferline (only 1-phase helium) Cool-down/warm-up JT Feed-Box

26 Spec of Cold Turbo Compressors (CCs) 26 DESY MKS has NO experience with the operation of CCs We need advice from CERN,J-Lab, SNS Up to now, we learned from our CERN/LHC colleagues: - mixed-cycle approach mandatory - to increase CCs dynamic range - to restart from sub-atmospheric conditions of the linac - 5 stages approach too risky - make up of T,P, mass flow is a touchy operation

27 CCs mixed-cycle approach 27 DESY mixed-cycle approach: we could use the JT-screw (minimum 650 mbar) and/or make use of our helium pump units of the Accelerator Module Test Facility (AMTF) 2 X 20 g/s at 20 mbar (sufficient for static loads) 100 g/s at 200 mbar for mixed cycle + Extra heat exchanger in distribution box

28 2K reference specification ( simplified) 28 mixed cycle VC SC SC HEX HEX Existing Refrigerator Cold Compressors Details are subject of call for tender!? HEX JT JT subcooler HEX Critical for HERA CBs HEX JT T bath = f ( P bath ) 4.5 K load 40/80 K load

29 Sources of pressure variations: heavy single cavity quench in FLASH 29 Mass flow [g/s] P at helium pumps P at linac endcap Pressure [mbar] Temp [K] He mass flow T cavity He vessel 5 min!!!

30 XFEL pressure stability Spec 30 RF change of TESLA cavities vs pressure change : about 50 Hz / mbar Note from DESY RF experts: fluctuations not larger than +/- 35 Hz to avoid RF phase shifts -> pressure stability better than +/- 0.7 mbar required We specify 1% relative pressure stability -> 31 mbar +/- 0.3 mbar (LHC 5 % relative pressure changes caused by the accelerator components) Our question in call for tender: How does the CCs regulation react on a sudden mass flow change of 10%?

31 Pressure variations expected in XFEL linac 31 Arkadiy s questions: 1. Range of presures during normal operations? -> 31 mbar +/- 0.3 mbar ( 1%) 2. Timescale? -> Hours! From FLASH experience we expect very stable conditions 3. Occasional/rare pressure variations? -> Switching on/off RF, Quenches (see FLASH example) For the switching of RF we ll need some ramping by means of electrical heaters Trips of CCs?

32 CW-operation of TESLA cavities -> BESSY(1) W.Anders, J.Knobloch et al. at DESY: see SRF2009 paper D.Kostin, WD Möller et al. 32

33 CW-operation of TESLA cavities -> BESSY(2) 33

34 CW-operation of TESLA cavities -> BESSY(3) 34

35 CW-operation of TESLA cavities -> BESSY(4) 35

36 Summary 36 XFEL accelerator structure TESLA technology Basic cryogenic parameters Tasks & up-grade scenarios Heat load capacities of XFEL refrigerator Use of former HERA refrigerators Lay out of XFEL cryogenic system Cold turbo compressor issues Pressure variations/stability CW operation of TESLA cavities (reference to BESSY)

THE CRYOGENIC SYSTEM OF TESLA

THE CRYOGENIC SYSTEM OF TESLA THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider

More information

Cryogenics for Large Accelerators

Cryogenics for Large Accelerators Cryogenics for Large Accelerators Dr. Sergiy Putselyk Deutsches Elektronen-Synchrotron (DESY) MKS Division Notkestrasse 85 22607 Hamburg (Germany) Phone: +49 40 89983492 Fax: +49 40 89982858 E-Mail: Sergiy.Putselyk@desy.de

More information

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera SLHiPP-2, Catania, Italy A cryogenic system for the MYRRHA linac Nicolas Chevalier, Tomas Junquera 04.05.2012 Outline 1 ) Cryogenic system requirements : heat loads 2 ) Temperature optimization, possible

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals

More information

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium Performance of Superconducting Cavities for the European XFEL Detlef Reschke DESY for the EU-XFEL Accelerator Consortium Outline 2 European XFEL Linear Accelerator Cavity Production Vertical Acceptance

More information

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Overview of ERL projects: SRF issues and challenges Slide 1 Outline Introduction: SRF for ERLs What makes it special

More information

Packaging of Cryogenic Components

Packaging of Cryogenic Components Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?

More information

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES LARGE SCALE TESTING OF SRF CAVITIES AND MODULES Jacek Swierblewski IFJ PAN Krakow IKC for the XFEL Introduction IFJ PAN 2 Institute of Nuclear Physics (IFJ) located in Kraków, Poland was founded in 1955

More information

To produce more powerful and high-efficiency particle accelerator, efforts have

To produce more powerful and high-efficiency particle accelerator, efforts have Measuring Unloaded Quality Factor of Superconducting RF Cryomodule Jian Cong Zeng Department of Physics and Astronomy, State University of New York at Geneseo, Geneseo, NY 14454 Elvin Harms, Jr. Accelerator

More information

Superstructures; First Cold Test and Future Applications

Superstructures; First Cold Test and Future Applications Superstructures; First Cold Test and Future Applications DESY: C. Albrecht, V. Ayvazyan, R. Bandelmann, T. Büttner, P. Castro, S. Choroba, J. Eschke, B. Faatz, A. Gössel, K. Honkavaara, B. Horst, J. Iversen,

More information

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY Status of the European XFEL Accelerator Construction Project Reinhard Brinkmann, DESY European XFEL Introduction Some specifications Photon energy 0.3-24 kev Pulse duration ~ 10-100 fs Pulse energy few

More information

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala FREIA Report 2012/03 October 2012 DEPARTMENT OF PHYSICS AND ASTRONOMY UPPSALA UNIVERSITY Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala ESS TDR Contribution R. Ruber, T. Ekelöf, R.A. Yogi.

More information

INFN School on Electron Accelerators. Cryomodule Design & Cryogenics

INFN School on Electron Accelerators. Cryomodule Design & Cryogenics INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7a Cryomodule Design & Cryogenics Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC technology choice

More information

CEBAF Overview June 4, 2010

CEBAF Overview June 4, 2010 CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications

More information

3.9 GHz System (AH1) XFEL WP46

3.9 GHz System (AH1) XFEL WP46 3.9 GHz System (AH1) XFEL WP46 14th European XFEL Machine Advisory Committee Meeting 02 May 2016 Paolo Pierini, INFN & DESY Elmar Vogel, DESY + INFN/DESY contributors PPT version 1 26/04/2016 Outline Status

More information

Status of superconducting module development suitable for cw operation: ELBE cryostats

Status of superconducting module development suitable for cw operation: ELBE cryostats Status of superconducting module development suitable for cw operation: ELBE cryostats, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A. Winter Forschungszentrum

More information

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group 7+(7(6/$;)(/352-(&7 H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group $EVWUDFW The overall layout of the X-Ray FEL to be built in international collaboration at DESY will

More information

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear

More information

SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE

SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE M. Liepe, S. Belomestnykh, E. Chojnacki, Z. Conway, V. Medjidzade, H. Padamsee, P. Quigley, J. Sears, V. Shemelin, V. Veshcherevich,

More information

Vibration studies of a superconducting accelerating

Vibration studies of a superconducting accelerating Vibration studies of a superconducting accelerating module at room temperature and at 4.5 K Ramila Amirikas, Alessandro Bertolini, Wilhelm Bialowons Vibration studies on a Type III cryomodule at room temperature

More information

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team Engineering Challenges and Solutions for MeRHIC Andrew Burrill for the MeRHIC Team Key Components Photoinjector Design Photocathodes & Drive Laser Linac Cavities 703.75 MHz 5 cell cavities 3 rd Harmonic

More information

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE S. M. Pattalwar, R. Bate, G. Cox, P.A. McIntosh and A. Oates, STFC, Daresbury Laboratory, Warrington, UK Abstract ALICE is a prototype

More information

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at FLASH @ DESY N. Baboi, DESY, Hamburg for the HOM team : S. Molloy 1, N. Baboi 2, N. Eddy 3, J. Frisch 1, L. Hendrickson

More information

Philippe Lebrun & Laurent Tavian, CERN

Philippe Lebrun & Laurent Tavian, CERN 7-11 July 2014 ICEC25 /ICMC 2014 Conference University of Twente, The Netherlands Philippe Lebrun & Laurent Tavian, CERN Ph. Lebrun & L. Tavian, ICEC25 Page 1 Contents Introduction: the European Strategy

More information

CHALLENGES IN ILC SCRF TECHNOLOGY *

CHALLENGES IN ILC SCRF TECHNOLOGY * CHALLENGES IN ILC SCRF TECHNOLOGY * Detlef Reschke #, DESY, D-22603 Hamburg, Germany Abstract With a baseline operating gradient of 31,5 MV/m at a Q-value of 10 10 the superconducting nine-cell cavities

More information

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Lars Hagge, Benno List SLAC, 31.03.2014 Agenda > Introduction: Collaborative Engineering > Collaborative Design &

More information

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,

More information

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing

More information

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration The TESLA Linear Collider Winfried Decking (DESY) for the TESLA Collaboration Outline Project Overview Highlights 2000/2001 Publication of the TDR Cavity R&D TTF Operation A0 and PITZ TESLA Beam Dynamics

More information

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT G. Olry, J-L. Biarrotte, S. Blivet, S. Bousson, C. Commeaux, C. Joly, T. Junquera, J. Lesrel, E. Roy,

More information

overview of cryomodules for proton accelerators

overview of cryomodules for proton accelerators overview of cryomodules for proton accelerators Paolo Pierini INFN Sezione di Milano Laboratorio Acceleratori e Superconduttività Applicata Paolo.Pierini@mi.infn.it 19 March 2009 Bilbao outline discuss

More information

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

Operation Status of KEK Accelerator Cryogenic Systems

Operation Status of KEK Accelerator Cryogenic Systems Operation Status of KEK Accelerator Cryogenic Systems NAKAI Hirotaka, HARA Kazufumi, HONMA Teruya, KOJIMA Yuuji, NAKANISHI Kota and SHIMIZU Hirotaka (KEK, Japan) Outline Overview of KEK cryogenic systems

More information

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University ESS RF Development at Uppsala University Roger Ruber for the FREIA team Uppsala University ESS-UU Collaboration 2009 ESS and UU start discussion on 704 MHz RF development proposal for ESS dedicated test

More information

Superconducting RF System. Heung-Sik Kang

Superconducting RF System. Heung-Sik Kang Design of PLS-II Superconducting RF System Heung-Sik Kang On behalf of PLS-II RF group Pohang Accelerator Laboratory Content 1. Introduction 2. Physics design 3. Cryomodules 4. Cryogenic system 5. High

More information

TESLA Quad Package With BPM

TESLA Quad Package With BPM TESLA Quad Package With BPM H. Brueck, DESY Zeuthen, January 22, 2004 Technology Working Group 1 Topics The TESLA Quadrupole Package Status of Components Magnet Feedthroughs HTc Leads BPM Test in ACC6

More information

7 Infrastructure and auxiliary systems

7 Infrastructure and auxiliary systems 7 Infrastructure and auxiliary systems 7.1 Site layout and civil construction 7.1.1 Overall site layout The overall layout of the X-Ray Free-Electron Lasers (XFEL) is shown in Figure 7.1.1. It will be

More information

The ILC Accelerator Complex

The ILC Accelerator Complex The ILC Accelerator Complex Nick Walker DESY/GDE UK LC meeting 3 rd September 2013 Oxford University, UK. 1 ILC in a Nutshell 200-500 GeV E cm e + e - collider L ~2 10 34 cm -2 s -1 upgrade: ~1 TeV central

More information

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* Presented at the 13th International Workshop on RF Superconductivity, Beijing, China, 2007 SRF 071120-04 OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* S. Belomestnykh #, CLASSE, Cornell

More information

Cavity development for TESLA

Cavity development for TESLA Cavity development for TESLA Lutz.Lilje@desy.de DESY -FDET- Cavity basics History: Limitations and solutions»material inclusions»weld defects»field emission»increased surface resistance at high field Performance

More information

Third Harmonic Superconducting passive cavities in ELETTRA and SLS

Third Harmonic Superconducting passive cavities in ELETTRA and SLS RF superconductivity application to synchrotron radiation light sources Third Harmonic Superconducting passive cavities in ELETTRA and SLS 2 cryomodules (one per machine) with 2 Nb/Cu cavities at 1.5 GHz

More information

Motivation: ERL based e linac for LHeC

Motivation: ERL based e linac for LHeC Erk Jensen, for the LHeC team and the RF group ERL 2013, BINP, Novosibirsk, 09 Sep 2013 09 Sep 2013 1 Motivation: ERL based e linac for LHeC ( O. Brünings presentation) NB.: This is a 09 Sep 2013 2 Some

More information

LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014

LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014 LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC Marc Ross 13 January 2014 What are the technical and practical limits for DF? 1st limit: Heat load at 2K for each cryomodule

More information

ACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II

ACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II ACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II G. Wu 1, A. Grassellino, E. Harms, N. Solyak, A. Romanenko, C. Ginsburg, R. Stanek Fermi National Accelerator Laboratory, Batavia,

More information

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY Presented at the 1999 Particle Accelerator Conference, New York City, NY, USA, March 29 April 2 CLNS 99/1614 / SRF 990407-03 THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING

More information

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity, Chapter 6 Quadrupole Package The quadrupole package is shown in Fig. 6.1. It consists of a superferric quadrupole doublet powered in series enclosed in a stainless steel vessel and cooled by 4 K LHe; two

More information

Current Industrial SRF Capabilities and Future Plans

Current Industrial SRF Capabilities and Future Plans and Future Plans Capabilities in view of Design Engineering Manufacturing Preparation Testing Assembly Taking into operation Future Plans Participate in and contribute to development issues, provide prototypes

More information

DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY -

DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY - DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY - F. Peauger, C. Arcambal, F. Ardellier, S. Berry, P. Bosland, A. Bouygues, E. Cenni, JP. Charrier, G. Devanz, F. Eozénou,

More information

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First

More information

SRF in Storage Rings. Michael Pekeler ACCEL Instruments GmbH Bergisch Gladbach Germany

SRF in Storage Rings. Michael Pekeler ACCEL Instruments GmbH Bergisch Gladbach Germany SRF in Storage Rings Michael Pekeler ACCEL Instruments GmbH 51429 Bergisch Gladbach Germany SRF in Storage Rings Michael Pekeler ACCEL Instruments GmbH 51429 Bergisch Gladbach Germany TESLA type cavity:

More information

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES S. Belomestnykh HPC workshop JLAB, 30 October 2002 Introduction Many aspects of the high-power coupler design, fabrication, preparation, conditioning, integration

More information

Cryogenic Operations at SLAC

Cryogenic Operations at SLAC Cryogenic Operations at SLAC J. G. Weisend II, A. Candia, W.W. Craddock, E. Thompson CryoOps 2006 5/30/2006 J. G. Weisend II 1 What Do We Do? Cryogenics at SLAC involve: Large scale He refrigerator operation

More information

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute CEBAF waveguide absorbers R. Rimmer for JLab SRF Institute Outline Original CEBAF HOM absorbers Modified CEBAF loads for FEL New materials for replacement loads High power loads for next generation FELs

More information

3 General layout of the XFEL Facility

3 General layout of the XFEL Facility 3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and

More information

Grounding for EMC at the European XFEL

Grounding for EMC at the European XFEL Grounding for EMC at the European XFEL Herbert Kapitza, Hans-Jörg Eckoldt, Markus Faesing Deutsches Elektronensynchrotron (DESY) D-22603 Hamburg, Germany Email: herbert.kapitza@desy.de Abstract The European

More information

Tuning systems for superconducting cavities at Saclay

Tuning systems for superconducting cavities at Saclay Tuning systems for superconducting cavities at Saclay 1 MACSE: 1990: tuner in LHe bath at 1.8K TTF: 1995 tuner at 1.8K in the insulating vacuum SOLEIL: 1999 tuner at 4 K in the insulating vacuum Super-3HC:

More information

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY.

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY. TESLA RF POWER COUPLERS DEVELOPMENT AT DESY. Dwersteg B., Kostin D., Lalayan M., Martens C., Möller W.-D., DESY, D-22603 Hamburg, Germany. Abstract Different RF power couplers for the TESLA Test Facility

More information

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o Particle Accelerators, 1990, Vol. 29, pp. 47-52 Reprints available directly from the publisher Photocopying permitted by license only 1990 Gordon and Breach, Science Publishers, Inc. Printed in the United

More information

ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY

ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY P. A. McIntosh #, R. Bate, C. D. Beard, M. A. Cordwell, D. M. Dykes, S. M. Pattalwar and J. Strachan, STFC Daresbury Laboratory,

More information

High Power Couplers for TTF - FEL

High Power Couplers for TTF - FEL High Power Couplers for TTF - FEL 1. Requirements for High Power Couplers on superconducting Cavities 2. Characteristics of pulsed couplers 3. Standing wave pattern in the coaxial coupler line 4. Advantages

More information

SNS CRYOMODULE PERFORMANCE*

SNS CRYOMODULE PERFORMANCE* SNS CRYOMODULE PERFORMANCE* J. Preble*, I. E. Campisi, E. Daly, G. K. Davis, J. R. Delayen, M. Drury, C. Grenoble, J. Hogan, L. King, P. Kneisel, J. Mammosser, T. Powers, M. Stirbet, H. Wang, T. Whitlatch,

More information

KEK ERL CRYOMODULE DEVELOPMENT

KEK ERL CRYOMODULE DEVELOPMENT KEK ERL CRYOMODULE DEVELOPMENT H. Sakai*, T. Furuya, E. Kako, S. Noguchi, M. Sato, S. Sakanaka, T. Shishido, T. Takahashi, K. Umemori, K. Watanabe and Y. Yamamoto KEK, 1-1, Oho, Tsukuba, Ibaraki, 305-0801,

More information

Current Status of cerl Injector Cryomodule

Current Status of cerl Injector Cryomodule Current Status of cerl Injector Cryomodule E. Kako, Y. Kondo, S. Noguchi, T. Shishido, K. Watanabe, Y. Yamamoto (KEK, Japan) 1 Outline Overview of Injector Cryomodule 2-cell Cavities HOM RF Feedthroughs

More information

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013 The European Spallation Source Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013 Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average

More information

5.5 SNS Superconducting Linac

5.5 SNS Superconducting Linac JP0150514 ICANS - XV 15 th Meeting of the International Collaboration on Advanced Neutron Sources November 6-9, 2000 Tsukuba, Japan Ronald M. Sundelin Jefferson Lab* 5.5 SNS Superconducting Linac 12000

More information

Aurélien Ponton. First Considerations for the Design of the ESS Cryo-Modules

Aurélien Ponton. First Considerations for the Design of the ESS Cryo-Modules Accelerator Division ESS AD Technical Note ESS/AD/0001 Aurélien Ponton First Considerations for the Design of the ESS Cryo-Modules 16 March 2010 First considerations for the design of the ESS cryo-modules

More information

Behavior of the TTF2 RF Gun with long pulses and high repetition rates

Behavior of the TTF2 RF Gun with long pulses and high repetition rates Behavior of the TTF2 RF Gun with long pulses and high repetition rates J. Baehr 1, I. Bohnet 1, J.-P. Carneiro 2, K. Floettmann 2, J. H. Han 1, M. v. Hartrott 3, M. Krasilnikov 1, O. Krebs 2, D. Lipka

More information

HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY

HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY G. Devanz, D. Braud, M. Desmons, Y. Gasser, E. Jacques, O. Piquet, J. Plouin, J.- P. Poupeau, D. Roudier, P. Sahuquet, CEA-Saclay,

More information

R.Bachimanchi, IPAC, May 2015, Richmond, VA

R.Bachimanchi, IPAC, May 2015, Richmond, VA 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

Amit Roy Director, IUAC

Amit Roy Director, IUAC SUPERCONDUCTING RF DEVELOPMENT AT INTER-UNIVERSITY ACCELERATOR CENTRE (IUAC) (JOINT PROPOSAL FROM IUAC & Delhi University (DU)) Amit Roy Director, IUAC to be presented by Kirti Ranjan (DU / Fermilab) Overview

More information

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem

More information

LLRF Operation and Performance of the European XFEL. An overview

LLRF Operation and Performance of the European XFEL. An overview LLRF Operation and Performance of the European XFEL. An overview Mathieu Omet LLRF, Barcelona, 16.10.2017 Contents > Introduction > LLRF commissioning > Energy Reach > LLRF performance > Summary / Outlook

More information

TESLA Progress on R1 & R2 issues

TESLA Progress on R1 & R2 issues TESLA Progress on R1 & R2 issues Carlo Pagani Milano & DESY carlo.pagani@desy.de The TESLA Challenge for LC Physical limit at 50 MV/m > 25 MV/m could be obtained Common R&D effort for TESLA Higher conversion

More information

ERLP Status. Mike Dykes

ERLP Status. Mike Dykes ERLP Status Mike Dykes Content ASTeC RF & Diagnostics Group Work of the Group 4GLS ERLP Photo-injector Accelerating Modules Summary High Power RF Engineering Andy Moss SRS Support; DIAMOND; ERLP; MICE;

More information

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY FLASH Training: RF Gun FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously Siegfried Schreiber, DESY FLASH Training DESY 17-Mar-2017 FLASH1 RF Gun History RF Guns operated

More information

Advance on High Power Couplers for SC Accelerators

Advance on High Power Couplers for SC Accelerators Advance on High Power Couplers for SC Accelerators Eiji Kako (KEK, Japan) IAS conference at Hong Kong for High Energy Physics, 2017, January 23th Eiji KAKO (KEK, Japan) IAS at Hong Kong, 2017 Jan. 23 1

More information

Couplers for Project X. S. Kazakov, T. Khabiboulline

Couplers for Project X. S. Kazakov, T. Khabiboulline Couplers for Project X S. Kazakov, T. Khabiboulline TTC meeting on CW-SRF, 2013 Requirements to Project X couplers Cavity SSR1 (325MHz): Cavity SSR2 (325MHz): Max. energy gain - 2.1 MV, Max. power, 1 ma

More information

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator Every accelerator needs a linac as injector to pass the region where the velocity of the particles increases with energy. At high energies (relativity)

More information

TESLA TeV Collider Project Overview

TESLA TeV Collider Project Overview Hamburg-Zeuthen Linear Collider Meeting TESLA TeV Collider Project Overview Carlo Pagani Milano & DESY carlo.pagani@desy.de The TESLA Challenge Physical limit is 50 MV/m > 25 MV/m could be obtained Common

More information

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK E. Kako #, H. Hayano, S. Noguchi, T. Shishido, K. Watanabe and Y. Yamamoto KEK, Tsukuba, Ibaraki, 305-0801, Japan Abstract An input coupler,

More information

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX Speaker: P.N. Ostroumov Contributors: A. Plastun, B. Mustapha and Z. Conway HB2016, July 7, 2016, Malmö, Sweden

More information

Superconducting 1.3 GHz Cavities for European XFEL

Superconducting 1.3 GHz Cavities for European XFEL Superconducting 1.3 GHz Cavities for European XFEL W. Singer, J. Iversen, A. Matheisen, X. Singer (DESY, Germany) P. Michelato (INFN, Italy) Presented by Waldemar Singer Main issues: preparation phase

More information

Proposal of test setup

Proposal of test setup Proposal of test setup Status of the study The Compact Linear collider (CLIC) study is a site independent feasibility study aiming at the development of a realistic technology at an affordable cost for

More information

X-Band Linear Collider Report*

X-Band Linear Collider Report* SLAC DOE Program Review X-Band Linear Collider Path to the Future X-Band Linear Collider Report* D. L. Burke NLC Program Director * Abstracted from recent presentations to the International Technical Recommendation

More information

Initial Beam Phasing of the SRF Cavities in LCLS-II

Initial Beam Phasing of the SRF Cavities in LCLS-II Introduction Initial Beam Phasing of the SRF Cavities in LCLS-II P. Emma Nov. 28, 2016 One of the more challenging aspects of commissioning the LCLS-II accelerator is in the initial phasing of the SRF

More information

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main

More information

A New 2 K Superconducting Half-Wave Cavity Cryomodule for PIP-II

A New 2 K Superconducting Half-Wave Cavity Cryomodule for PIP-II A New 2 K Superconducting Half-Wave Cavity Cryomodule for PIP-II Zachary Conway On Behalf of the ANL Physics Division Linac Development Group June 29, 2015 Acknowledgements People Working at ANL: PHY:

More information

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF Project X Cavity RF and mechanical design T. Khabiboulline, FNAL/TD/SRF TTC meeting on CW-SRF, 2013 Project X Cavity RF and mechanical design T 1 High ß Low ß 0.5 HWR SSR1 SSR2 0 1 10 100 1 10 3 1 10 4

More information

REVIEW ON SUPERCONDUCTING RF GUNS

REVIEW ON SUPERCONDUCTING RF GUNS REVIEW ON SUPERCONDUCTING RF GUNS D. Janssen #, A. Arnold, H. Büttig, U. Lehnert, P. Michel, P. Murcek, C. Schneider, R. Schurig, F. Staufenbiel, J. Teichert, R. Xiang, Forschungszentrum Rossendorf, Germany.

More information

SUPERCONDUCTING CAVITIES AND CRYOMODULES FOR PROTON AND DEUTERON LINACS

SUPERCONDUCTING CAVITIES AND CRYOMODULES FOR PROTON AND DEUTERON LINACS Proceedings of LINAC2014, Geneva, Switzerland THIOA04 SUPERCONDUCTING CAVITIES AND CRYOMODULES FOR PROTON AND DEUTERON LINACS G. Devanz, CEA-Irfu CEA-Saclay, Gif-sur-Yvette 91191, France Abstract We review

More information

Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions

Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions 1 Three Upgrade Options 1 : Half-Empty Build tunnel long enough (41km) for one TeV, but install only 500 GeV

More information

Niowave s Growth and the Role of STTR in its Development

Niowave s Growth and the Role of STTR in its Development Niowave s Growth and the Role of STTR in its Development Terry L. Grimm Niowave, Inc. Lansing MI Presented at National Academies STTR Workshop, Wash DC, May 2015 Outline Superconducting electron linacs

More information

Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay. Abstract

Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay. Abstract SRF Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay Abstract This report presents the piezo tuner developed at Saclay in the framework of CARE/SRF.

More information

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti 7/6/2009 1 Outline : Description of the Box cavity Concept. Box Cavity Summary Plans. HFSS Models of orthogonal and

More information

Status of the ESS Accelerator Workpackage

Status of the ESS Accelerator Workpackage Status of the ESS Accelerator Workpackage Peter McIntosh STFC Daresbury Laboratory UK ESS Interactions and Opportunities Rutherford Appleton Laboratory 3 Dec 2014 The ESS Linac The European Spallation

More information

Advances in CW Ion Linacs

Advances in CW Ion Linacs IPAC 2015 P.N. Ostroumov May 8, 2015 Content Two types of CW ion linacs Example of a normal conducting CW RFQ Cryomodule design and performance High performance quarter wave and half wave SC resonators

More information