1 Reference for Autotransformer National Grid, UK Tilbury SGT Delivery MVA, three-phase AUT 403/132/14 kv 100% first pass yield Autotransformer 45 units to several SGT of NG in the past 12 years and further 2 in order Page 27

2 Reference for Generator Step Up Transformer Westar Energy Inc., USA Rapid Recovery EHV Delivery 2016 Special 133,30 MVA, single-phase SPT 345/230, 345/138, 345/115, 230/138, 230/115, TW 14.4kV Mineral oil unit All electrical connections are plug in components Modular design TW Delta realized by external cables TW utilized for self contained power supply via auxiliary transformer LV 138/115kV alternative connections to grid by cable Page 28

3 Reference for Generator Step Up Transformer EDF, France Generator Step-Up Transformer Cattenom, Creil and Paluel Power Plant Delivery MVA, single-phase GSU 405/20 kv Short circuit test on model transformer Replacement of old transformer under very limited space and timely conditions 11 units in the past 7 years and further 3 in order Page 29

4 Reference for Generator Step Up Transformer Generator Step-Up Transformer ESKOM, South Africa Medupi, Kendal Power Station and others 20 units delivered and 1 in order 910 MVA, three-phase GSU 420 kv Highest 3ph rating 50 Hz built up to now Page 30

5 Reference for Phase Shifting Transformer Phase Shifting Transformer Consolidated Edison of New York, USA Ramapo Substation Delivered 2014 and 1 further unit under manufacturing 575 MVA, three-phase PST 345 kv Low Noise GIC- with standability tested up to 150 A DC 1 further unit in order with bulletproof recovery Page 31

6 Reference for Shunt Reactor Dong Energy Windpower A/S, UK Hornsea Offshore Windfarm Delivery MVAr, three-phase SHR 220 kv Offshore Online gas monitoring Shunt Reactor Page 32

7 Reference for Autotransformer Beatrice Offshore Ltd., UK Blackhilock Substation Delivery 2017 Autotransformer 320 MVA, three-phase AUT 400 kv Equipped with DC compensation Page 33

8 Reference for Autotransformer Exelon ComEd, USA Ridgeland Delivery 2015 Autotransformer 336 MVA, three-phase AUT 330/138/33 kv 4000th Power Transformer unit 11 units since 2013 to several Exelon ComEd Substations and further 1 under manufacturing Page 34

9 Reference for Shunt Reactor Statnett SF, Norway Shunt Reactor Bardufoss & Ofoten Delivery (2 units) 150 MVAr, three-phase SHR 420 kv Regulating range MVAr Very low PD values measured during FAT 6 units are delivered since 2013 to various Statnett SS Page 35

10 Reference for Generator Step Up Transformer Generator Step-Up Transformer Detroit Edison, USA NPP Enrico Fermi Delivery MVA, three-phase GSU 345/17.3/21.1/24.8 kv Multiple Spare Unit, fits 9 different generating stations Bullet Resistant Design, protected against high-powered ballistics (Protection Level VPAM Class 9) Tank mounted panels protecting tank, turrets, cooling equipment and conservator Sliding panels allowing easy maintenance Page 36

11 Reference for Phase Shifting Transformer Phase Shifting Transformer San Diego Gas and Electric, USA Imperial Valley Substation 2 units delivery in MVA, three-phase PST 230/230 kv Phase Angle -80/+31 in -16/+48 steps 2 tanks ~ 815 t totally assembled Page 37

12 Reference for Phase Shifting Transformer PSE, Poland Mikulowa Substation Delivery 4 units since MVA, three-phase PST 410 kv Dual Tank Phase Shifting Transformer Page 38

13 Reference for Shunt Reactor American Electric Power, USA Dumont Substation Delivery since MVAr SHR 765/ 3 kv ONAN Low Loss Design Full Type Tests Shunt Reactor 68 units in the past 12 years to several AEP Substations and 3 under manufacturing Page 39

Transformers TRANS FORM ERS

Transformers TRANS FORM ERS Transformers TRANS FORM ERS Meiden Transformers are standard design, standard quality. Our Factories on world-wide supply chain Since its founding in 1897 Meidensha Corporation has not only built up a

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

Power transformers. Shunt reactors Proven history for future success

Power transformers. Shunt reactors Proven history for future success Power transformers Shunt reactors Proven history for future success Shunt reactors an investment for today and for the future 2 Shunt reactors Improving power quality and reducing transmission costs Shunt

More information

Grounding Resistance

Grounding Resistance Grounding Resistance Substation grounding resistance is the resistance in ohms between the substation neutral and earth ground (zeropotential reference) An actual fall of potential test is the best way

More information

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project General Technical Specifications of Converters for Tokyo-Chubu Interconnection Project Note: It is possible that the contents of these specifications may be changed according to our detailed studies. Present

More information

SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING

SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING 9.11/2 Transformer Testing n Type tests n Routine tests n Special tests n Applicable for tests on power and distribution transformers in factory and on-site

More information

Dietrich Bonmann, ABB Monselice Transformer Days, May 5, 2010 Optimized AC transmission solutions with phase-shifting transformers and shunt reactors

Dietrich Bonmann, ABB Monselice Transformer Days, May 5, 2010 Optimized AC transmission solutions with phase-shifting transformers and shunt reactors Dietrich Bonmann, ABB Monselice Transformer Days, May 5, 2010 Optimized AC transmission solutions with phase-shifting transformers and shunt reactors May 11, 2010 Slide 1 Why phase-shifting transformers

More information

GREEN TRAFO PRODUCTS SHR - THREE-PHASE SHUNT REACTOR

GREEN TRAFO PRODUCTS SHR - THREE-PHASE SHUNT REACTOR SHR - THREE-PHASE SHUNT REACTOR Three-phase shunt for compensation of reactive power and stopping of the electric arc of one-phase short circuit. Maximal allowed time of the one-phase short circuit depends

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y. 10003 EP 7000 5 JULY 2009 VOLTAGE SCHEDULE, CONTROL, AND OPERATION OF THE TRANSMISSION SYSTEM PURPOSE This specification describes

More information

Shunt Reactors for Medium and High-Voltage Networks

Shunt Reactors for Medium and High-Voltage Networks Shunt Reactors for Medium and High-Voltage Networks Versatile Shunt Reactors 5 6 Shunt reactors are used for various areas of application: Compensation of capacitive reactance of transmission cables, in

More information

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers in cooperation with Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers BZ-MS/1 pazifik power Complete Transformer Monitoring System (TMS) ZVCM-1001 Bushing Monitoring

More information

Phase Shifting Transformers. Presented by

Phase Shifting Transformers. Presented by Phase Shifting Transformers Presented by Phase Shifting Transformers (PST s) (a.k.a. Phase Angle Regulators) VS φ S P V V S = X L L X L sin( φ φ ) L S VL φ L PST s are power flow control devices between

More information

Experience with Connecting Offshore Wind Farms to the Grid

Experience with Connecting Offshore Wind Farms to the Grid Oct.26-28, 2011, Thailand PL-22 CIGRE-AORC 2011 www.cigre-aorc.com Experience with Connecting Offshore Wind Farms to the Grid J. FINN 1, A. SHAFIU 1,P. GLAUBITZ 2, J. LOTTES 2, P. RUDENKO 2, M: STEGER

More information

Short-Circuit Apparent Power of System Survey Comments

Short-Circuit Apparent Power of System Survey Comments WG Item 87 Short-Circuit Apparent Power of System Survey Comments Again, the values given in Table 18 are totally unrealistic of system conditions. I do not know any systems for which the short-circuit

More information

Classification of Transformers Family

Classification of Transformers Family TECHNOLOGY BASICS ABSTRACT Transformers are used in the electrical networks everywhere: in power plants, substations, industrial plants, buildings, data centres, railway vehicles, ships, wind turbines,

More information

Jason Harchick, P.E. Sr. Manager, System Planning and Protection Ryan Young Manager, Substation Engineering

Jason Harchick, P.E. Sr. Manager, System Planning and Protection Ryan Young Manager, Substation Engineering DLC s Brady IIB Project Jason Harchick, P.E. Sr. Manager, System Planning and Protection Ryan Young Manager, Substation Engineering Project Need In 2007, PJM and Duquesne Light Company (DLC) transmission

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

The Engineering Problem. Calculating GIC Flow through the EHV System

The Engineering Problem. Calculating GIC Flow through the EHV System The Engineering Problem Calculating GIC Flow through the EHV System 1 Creating the GIC System Model Since the EHV system is a three-phase balanced network, it is only necessary to model a single-phase

More information

Variable Shunt Reactors. Johann Griebichler I EM TR LPT GTC

Variable Shunt Reactors. Johann Griebichler I EM TR LPT GTC Variable Shunt Reactors Johann Griebichler I EM TR LPT GTC Unrestricted Siemens AG Österreich 2017 siemens.at/future-of-energy Capacitive load and reactive power in grid lines demands for compensation

More information

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS n Quality made in Germany n Standardized and customized solutions n Turn key projects, all from one hand 0.1-1/1 Product Portfolio Test and Measuring Systems

More information

Case Study Effects of Geomagnetically Induced Current (GIC) Neutral Blocking Device

Case Study Effects of Geomagnetically Induced Current (GIC) Neutral Blocking Device 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Case Study Effects of Geomagnetically Induced Current (GIC) Neutral Blocking Device

More information

Quanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES

Quanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES National Conference of State Legislatures The Forum for America s Ideas April 2011 National Association of Regulatory Utility Commissioners Q U A N T A SERVI CES Quanta Technology Advancing the Grid Flexible

More information

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Waruna Chandrasena, Bruno Bisewski, and Jeff Carrara Abstract-- This paper describes several system

More information

Grid Impact of Neutral Blocking for GIC Protection:

Grid Impact of Neutral Blocking for GIC Protection: Report submitted to EMPRIMUS - Critical Infrastructure Protection Grid Impact of Neutral Blocking for GIC Protection: Impact of neutral grounding capacitors on network resonance Prepared By: Athula Rajapakse

More information

Efacec work every day to anticipate solutions for a sustainable world in the new energy era.

Efacec work every day to anticipate solutions for a sustainable world in the new energy era. Transformers Efacec is the largest industrial portuguese company of the electric and electromechanical sector developing high technology products, solutions and systems used every day by millions of people

More information

2. Group Discussion Meeting in Paris Session 2014

2. Group Discussion Meeting in Paris Session 2014 CIGRE 2014 A2-00 SPECIAL REPORT FOR GROUP A2 (Transformer) Pawel WARCZYNSKI Energopomiar Elektryka - Poland - PS1 Gerhard GREVE - ABB AG Germany - PS2 Raj AHUJA SPX Corporation United States of America

More information

Magnetization System of Magnetically Controlled Shunt Reactors

Magnetization System of Magnetically Controlled Shunt Reactors Magnetization System of Magnetically Controlled Shunt Reactors Leonid Kontorovych, Technical Director of ZTR PJSC, PH.D. in Engineering Sciences; Igor Shyrokov, head of the department of reactors control

More information

A Process for Evaluating the Degree of Susceptibility of a fleet of Power Transformers to Effects of GIC

A Process for Evaluating the Degree of Susceptibility of a fleet of Power Transformers to Effects of GIC 1 A Process for Evaluating the Degree of Susceptibility of a fleet of Power Transformers to Effects of GIC Ramsis Girgis, Kiran Vedante, and Gary Burden ABB Power Transformers Abstract: There has been

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

Phase Shifter Application Workshop. Siemens Energy, Inc.

Phase Shifter Application Workshop. Siemens Energy, Inc. Phase Shifter Application Workshop Siemens Energy, Inc. PJM Power Pool, March, 2015 siemens.com/energy Phase Shifter Application Workshop Phase Shifting Transformers Principles, Design Aspects and Operation

More information

Geo-Magnetic Disturbance Analysis of HV and EHV Grids

Geo-Magnetic Disturbance Analysis of HV and EHV Grids Engineering Conferences International ECI Digital Archives Modeling, Simulation, And Optimization for the 21st Century Electric Power Grid Proceedings Fall 10-22-2012 Geo-Magnetic Disturbance Analysis

More information

Impact of Shunt Reactor Bank Switching on Transformer Neutral Geomagnetic Induced Current (GIC) Monitoring

Impact of Shunt Reactor Bank Switching on Transformer Neutral Geomagnetic Induced Current (GIC) Monitoring Impact of Shunt Reactor Bank Switching on Transformer Neutral Geomagnetic Induced Current (GIC) Monitoring Larry Anderson Cigre GOTF Houston, TX October 2, 24 2 2 Background AEP started installing GIC

More information

Tab 2 Voltage Stresses Switching Transients

Tab 2 Voltage Stresses Switching Transients Tab 2 Voltage Stresses Switching Transients Distribution System Engineering Course Unit 10 2017 Industry, Inc. All rights reserved. Transient Overvoltages Decay with time, usually within one or two cycles

More information

Appendix D Fault Levels

Appendix D Fault Levels Appendix D Fault Levels Page 1 Electricity Ten Year Statement November 2013 D.1 Short Circuit Currents Short Circuit Currents Three phase to earth and single phase to earth short circuit current analyses

More information

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved. Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing

More information

DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER

DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER JESSE M LOPEZ CPS ENERGY USA EMILIO MORALES CRUZ QUALITROL USA SUMMARY Power transformers are essential

More information

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of

More information

Siemens Subsea. Aravinda Perera, Edson Federighi 2nd May 2017

Siemens Subsea. Aravinda Perera, Edson Federighi 2nd May 2017 Siemens Subsea Aravinda Perera, Edson Federighi 2nd May 2017 www.siemens.com/subsea Subsea future is electrical Page 2 Agenda Introduction to Siemens Subsea Technology Subsea Power Grid Siemens Qualification

More information

The Polytransformer. The Multivoltage Substation Power Transformer

The Polytransformer. The Multivoltage Substation Power Transformer The Polytransformer The Multivoltage Substation Power Transformer The need for a single transformer for different transmission systems. Change of electric power industry to a fully competitive and deregulated

More information

Power Transformers Basics

Power Transformers Basics Power Transformers Basics Transformer Basic Objective Introduce Basic Transformer Theory as it Relates to Diagnostics Provide a Better Understanding of the Diagnostic Test Environment Identify Important

More information

Load Tap Changers for Power Transformers

Load Tap Changers for Power Transformers Load Tap Changers for Power Transformers Dr. Dieter Dohnal / Maschinenfabrik Reinhausen GmbH Dipl. Ing. Bernhard Kurth / Reinhausen Manufacturing Inc. Load Tap Changers for Power Transformers Content Basic

More information

Joe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation

Joe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation Joe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation Slide 1 Excerpt from the BoA BoA: Book of Acronyms MSC/MSR: Mechanically

More information

HVDC High Voltage Direct Current

HVDC High Voltage Direct Current HVDC High Voltage Direct Current Typical HVDC Station BACK TO BACK CONVERTER STATION MONO POLAR WITH GROUND RETURN PA Back to Back Converters indicates that the Rectifiers & Inverters are located in the

More information

KIT-ENERGY CENTRE. KIT The research University in the Helmholtz Association

KIT-ENERGY CENTRE.   KIT The research University in the Helmholtz Association Superconducting Transformers Prof. Dr.-Ing. Mathias Noe, Karlsruhe Institute of Technology Institute for Technical Physics EUCAS Short Course Power Applications, September 17th 2017., Geneva KIT-ENERGY

More information

Subsea Electric Power Grid

Subsea Electric Power Grid Subsea Electric Power Grid Transatlantic Science Week November 14, 2012 Anngjerd Pleym Siemens - Oil & Gas Division Integrated System Solutions Technology & Innovation Subsea power distribution is the

More information

MEDIUM & HIGH VOLTAGE

MEDIUM & HIGH VOLTAGE MEDIUM & HIGH VOLTAGE TESTING EQUIPMENT VOLTAGE WITHSTAND SGM Series Resonant Systems The SGM series are used for generating high AC voltages at a fixed frequency (mainly 50 or 60 Hz) by means of an excited

More information

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Target Mchunu and Themba Khoza Eskom Transmission

More information

HV AC TESTING OF SUPER-LONG CABLES

HV AC TESTING OF SUPER-LONG CABLES HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The

More information

REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.

REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. (DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/2015-16/Mgr(T)O&M-E-2/22

More information

Transformer protection IED RET 670

Transformer protection IED RET 670 Gunnar Stranne Transformer protection IED RET 670 Santiago Septiembre 5, 2006 1 Transformer protection IED RET670 2 Introduction features and applications Differential protection functions Restricted Earth

More information

TRANSFORMER TECHNOLOGY GPT

TRANSFORMER TECHNOLOGY GPT Core-Form TRANSFORMER TECHNOLOGY GlobalPT Corporation performs research and engineering developments and co-ordination of works of technical partners in the field of technological progress and commercial

More information

International Journal of Scientific & Engineering Research, Volume 4, Issue 7, July ISSN

International Journal of Scientific & Engineering Research, Volume 4, Issue 7, July ISSN International Journal of Scientific & Engineering Research, Volume 4, Issue 7, July-2013 866 Study of position of SFCL for maximum fault current limiter for power systems protection Sachin Trankatwar 1,

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

G. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY

G. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Assessment of the Impact of GMD on the TVA 500 kv Grid & Power Transformers Part II:

More information

Onsite Mobile AC High Voltage Test System

Onsite Mobile AC High Voltage Test System TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument

More information

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N S C I E N C E P A S S I O N T E C H N O L O G Y HVDC Transmission Michael Muhr Graz University of Technology Austria www.tugraz.at 1 Definition HV High Voltage AC Voltage > 60kV 220kV DC Voltage > 60kV

More information

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications: SGMF(T) series Onsite Mobile AC High Voltage Test System On-site AC high voltage test systems are used for voltage withstanding test, partial discharge measurement, tan delta measurement on those instrument

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

Design of Magnetically Controlled Shunt Reactors

Design of Magnetically Controlled Shunt Reactors Design of Magnetically Controlled Shunt Reactors Leonid Kontorovych, Technical Directo of Zaporozhtransformator PJSC, PH.D. in Engineering Sciences Magnetically Controlled Shunt Reactors (MCSR) is a new

More information

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device ABB AG - EPDS The worldʼs fastest limiting and switching device Agenda The world s fastest limiting and switching device Customers Function: Insert-holder with insert Comparison: I S -limiter Circuit-breaker

More information

ON-SITE TESTING OF SPECIAL TRANSFORMERS

ON-SITE TESTING OF SPECIAL TRANSFORMERS ON-SITE TESTING OF SPECIAL TRANSFORMERS Simanand GANDHI JEYARAJ, Megger Ltd, UK, Simanand.gandhi@megger.com, Robert MILNE, UK Power Networks, UK, robert.milne83@googlemail.com Grant MITCHELL, Transmag

More information

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

Generation Interconnection Study Data Sheet Synchronous Machines

Generation Interconnection Study Data Sheet Synchronous Machines FOR INTERNAL USE ONLY GTC Project Number: Queue Date: Generation Interconnection Study Data Sheet Synchronous Machines Customers must provide the following information in its entirety. GTC will not proceed

More information

MMC Design Aspects and Applications. John Strauss Siemens AG.

MMC Design Aspects and Applications. John Strauss Siemens AG. MMC Design Aspects and Applications John Strauss Siemens AG. John.Strauss@Siemens.com 1 VSC-HVDC with MMC Basic Scheme Reference HVDC PLUS Converter Arm Converter Module Power Module Electronics (PME)

More information

High voltage shunt capacitor banks HIGH VOLTAGE COMPENSATION AND HARMONIC FILTERING PRODUCTS

High voltage shunt capacitor banks HIGH VOLTAGE COMPENSATION AND HARMONIC FILTERING PRODUCTS High voltage shunt capacitor banks Alstom Grid high voltage shunt capacitor bank offering is divided in: By bank construction HV open rack capacitor banks HV enclosed capacitor banks By bank design HV

More information

EL-INSTA ENERGO ltd. Zizkova Hrusovany u Brna Czech republic tel

EL-INSTA ENERGO ltd. Zizkova Hrusovany u Brna Czech republic tel EL-INSTA ENERGO ltd. Zizkova 427 66462 Hrusovany u Brna Czech republic tel. +420 547236270 www.el-insta.cz el-insta@el-insta.cz acting Czech, Slovakia Employs 15 workers Focus Energy (transmission and

More information

Wind Power Plant Voltage Control Optimization with Embedded Application of Wind Turbines and Statcom

Wind Power Plant Voltage Control Optimization with Embedded Application of Wind Turbines and Statcom Downloaded from orbit.dtu.dk on: Aug 3, 018 Wind Power Plant Voltage Control Optimization with Embedded Application of Wind Turbines and Statcom Wu, Qiuwei; Solanas, Jose Ignacio Busca; Zhao, Haoran; Kocewiak,

More information

The Upgradabilty of Conventional Three Phase Delta/Star Networks

The Upgradabilty of Conventional Three Phase Delta/Star Networks The Upgradabilty of Conventional Three Phase Delta/Star Networks WHY NEW STANDARDS? CAPITAL COSTS Initial Final OPERATIONAL COSTS UPGRADABILITY SAFETY MAINTAINANCE CONVENTIONAL CONFIGURATION Electrification

More information

SUMMARY. KEYWORDS Advanced Control, Type 4 WTG, Offshore, HVDC, Grid Access, Diode Rectifier Unit. 21, rue d Artois, F PARIS B4-121 CIGRE 2016

SUMMARY. KEYWORDS Advanced Control, Type 4 WTG, Offshore, HVDC, Grid Access, Diode Rectifier Unit. 21, rue d Artois, F PARIS B4-121 CIGRE 2016 21, rue d Artois, F-75008 PARIS B4-121 CIGRE 2016 http : //www.cigre.org Diode-Rectifier HVDC link to onshore power systems: Dynamic performance of wind turbine generators and Reliability of liquid immersed

More information

Arrowhead Station Special Equipment Operation. Dudley Maki Minnesota Power

Arrowhead Station Special Equipment Operation. Dudley Maki Minnesota Power Arrowhead Station Special Equipment Operation Dudley Maki Minnesota Power Arrowhead - Equipment Operation Non-Standard Equipment at Arrowhead 345 kv Phase Shifting Transformer (8TR) Voltage Regulating

More information

Model, Monitor & Mitigate Geomagnetically Induced Currents

Model, Monitor & Mitigate Geomagnetically Induced Currents Model, Monitor & Mitigate Geomagnetically Induced Currents Jeff Fleeman, American Electric Power CIGRE Grid of the Future Boston, MA October 22, 2013 CWG/9416P Page 1 Solar Storm Impacts Coronal mass ejections

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

4. CAPACITIVE VOLTAGE TRANSFORMERS AND COUPLING CAPACITORS Oil-paper insulation

4. CAPACITIVE VOLTAGE TRANSFORMERS AND COUPLING CAPACITORS Oil-paper insulation 4. CPCITIVE VOLTGE TRNSFORMERS ND COUPLING CPCITORS 420 kv Capacitive voltage transformers. Fingrid, Visulahti (Finland). 34 Instrument transformers High voltage INTRODUCTION Capacitive voltage transformers

More information

MODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY

MODERN POWER TRANSFORMER PRACTICE BIBLIOGRAPHY 354 BIBLIOGRAPHY MODERN POWER TRANSFORMER PRACTICE Bolton, D. J., Electrical Engineering Economics, Chapman and Hall, London, 2nd edn (1936) Brownsey, C. M., 'The Problem of Noise with Particular Reference

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Increased Reliability of EHV Systems through Station Switchable Spare Transformer and Shunt Reactor Design and Operation

Increased Reliability of EHV Systems through Station Switchable Spare Transformer and Shunt Reactor Design and Operation 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Increased Reliability of EHV Systems through Station Switchable Spare Transformer and

More information

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections

More information

The Research of DC bias Magnetic phenomenon in Large Capacity Single Phase Power Transformer Du Jianping

The Research of DC bias Magnetic phenomenon in Large Capacity Single Phase Power Transformer Du Jianping The Research of DC bias Magnetic phenomenon in Large Capacity Single Phase Power Transformer Du Jianping Shandong Power Equipment Company Ltd, Shandong Jinan CONTENTS 1 Introduc+on 2 Genera+on and Effect

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Liquid-Filled Transformers

Liquid-Filled Transformers Liquid-Filled Transformers Custom Transformers at Standard Prices NIAGARA TRANSFORMER CORP. Induction Furnace Transformer Cycloconverter Rectifier Duty Transformer Arc Furnace Transformer Full Range of

More information

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION - S K Mishra & S K Das NHPC Ltd O&M Division 1 PRESENTATION COVERS Introduction DESCRIPTION OF EVENTS INITIAL RESPONSE DETAILED INSPECTION

More information

SECTION VI TECHNICAL SCHEDULES

SECTION VI TECHNICAL SCHEDULES SECTION VI TECHNICAL SCHEDULES Kenya Power and Lighting Company VI 4.3 - i Contract A36B TECHNICAL SCHEDULES 1 PREAMBLE...1 TECHNICAL SCHEDULES SUBSTATIONS...2 SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR

More information

Operational Experiences of an HV Transformer Neutral Blocking Device

Operational Experiences of an HV Transformer Neutral Blocking Device MIPSYCON NOVEMBER 7, 2017 Operational Experiences of an HV Transformer Neutral Blocking Device Fred R. Faxvog, Emprimus Michael B. Marz, American Transmission Co. SolidGround GIC Neutral Blocker Fully

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

Industrial Applications

Industrial Applications Industrial Applications Transformers for Industrial Applications Tamini has always produced industrial transformers of high quality and reliability, designed to satisfy the most diverse and complex technical

More information

Leif Steffensen. Curriculum Vitae. General information. Owner and Senior Consultant Year of birth: 1964

Leif Steffensen. Curriculum Vitae. General information. Owner and Senior Consultant Year of birth: 1964 Leif Steffensen Curriculum Vitae Position: Owner and Senior Consultant Year of birth: 1964 Residence: Malmo, General information More than 25 years experience in different types of duties from onshore

More information

GIC Analysis using PSS E. K.V. PATIL Siemens Power Technologies International Schenectady, New York, USA

GIC Analysis using PSS E. K.V. PATIL Siemens Power Technologies International Schenectady, New York, USA CIGRÉ-697 2015 CIGRÉ Canada Conference 21, rue d Artois, F-75008 PARIS http : //www.cigre.org Winnipeg, Manitoba, August 31-September 2, 2015 GIC Analysis using PSS E K.V. PATIL Siemens Power Technologies

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

Arc Suppression Coils

Arc Suppression Coils Arc Suppression Coils (22kV Arc Suppression Coils ) Introduction Resonance grounding by Petersen coils (Arc Suppression Coils) has been used in Scandinavia and other European countries for some eighty

More information

Reliability Analysis Update

Reliability Analysis Update Reliability Analysis Update Transmission Expansion Advisory Committee March 9, 2017 2016/17 RTEP Long Term Proposal Window 2 2016/17 RTEP Long Term Proposal Window Timeline Window Opened: 11/1/2016 Window

More information

SYSTEMS AND COMPONENTS FOR CABLE TESTING

SYSTEMS AND COMPONENTS FOR CABLE TESTING SYSTEMS AND COMPONENTS FOR CABLE TESTING 9.20/1 Cable Testing n Routine tests n Type and sample tests n PQ tests n On-site tests TEST SYSTEMS FOR CABLE TESTING HIGHVOLT OFFERS ALL NECCESSARY TEST SYSTEMS

More information

PES & IAS NY Chapter And NY LMAG June 23 rd, 2015

PES & IAS NY Chapter And NY LMAG June 23 rd, 2015 PES & IAS NY Chapter And NY LMAG June 23 rd, 2015 High Temperature Insulation Systems and their use in Mobile Transformers Myron B. Bell, PE mbell@deltastar.com Delta Star, Inc. June 23 rd 2015 Introduction

More information

Transformers. GE Digital Energy. Three Phase up to 1500MVA. with Primary Plus TM

Transformers. GE Digital Energy. Three Phase up to 1500MVA. with Primary Plus TM g Transformers Three Phase up to 1500MVA with Primary Plus TM Pre-engineered solution set that digitizes XD GE primary equipment and provides factory installed and configured protection, monitoring, diagnostics

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Modeling of Three-phase or Bank of Three Single Phase Three Winding Transformers Zero-phase-sequence Leakage Impedance in PSS E Short Circuit Module

Modeling of Three-phase or Bank of Three Single Phase Three Winding Transformers Zero-phase-sequence Leakage Impedance in PSS E Short Circuit Module Siemens Industry, Inc. Power Technology Issue 125 Modeling of Three-phase or Bank of Three Single Phase Three Winding Transformers Zero-phase-sequence Leakage Impedance in PSS E Short Circuit Module Carlos

More information