1 WG Item 87 Short-Circuit Apparent Power of System Survey Comments Again, the values given in Table 18 are totally unrealistic of system conditions. I do not know any systems for which the short-circuit current exceed 63 ka (except for only few cases). Moreover, you will not find on the market, any HV circuit-breakers having a rated short-circuitcurrent exceeding 80 ka except for some very special MV generator circuit-breakers (not exceeding 36 kv). For me, specifying system fault current exceeding 63 ka is misleading since this is more or less impossible to get it for most of the substations. Specifying too high system fault current may lead to overdesign the transformer regarding its ability to withstand the forces causes by the short-circuit-current, mainly for high MVA and low impedance transformers. See attached document (Table below) giving practical examples of resulting overdesign. If these values were there in order to get a kind of safety margin, it will be more adequate to specify a realistic value of the system short-circuit current (I propose an unified value of 63 ka for all system voltages) but to calculate the total fault impedance (system + transformer) at an overvoltage of 105% or 110%. For me, this is more logic than to specify values such as 160 ka fault current at 145 kv... Hoping this is clarifying my comment. Transformer rating Short-circuit current on primary using system fault current of the actual Table 18 of C Short-circuit current on primary using a system fault current of 63 ka Fault current overrating Mechanical forces overrating 100 MVA, 145 kv, 3φ, 10% 300 MVA, 145 kv, 3φ, 10% 100 MVA, 145 kv, 3φ, 20% 300 MVA, 145 kv, 3φ, 20% 300 MVA, 242 kv, 3φ, 15% 600 MVA, 242 kv, 3φ, 15% 300 MVA, 242 kv, 3φ, 25% 600 MVA, 242 kv, 3φ, 25% 550 MVA, 800 kv, 1φ, 12% 550 MVA, 800 kv, 1φ, 20% (ka rms sym.) (ka rms sym.) (%) (%) 3,89 3,75 3,7 7,6 11,12 10,05 10,7 22,4 1,97 1,93 2,1 4,2 5,76 5,46 5,5 11,4 4,60 4,44 3,7 7,3 8,87 8,29 7,0 14,5 2,80 2,74 2,2 4,6 5,48 5,25 4,4 9,0 8,82 8,57 2,9 5,9 5,54 5,44 1,8 3,7

2 1) Obviously, there are a great many who support added design margins via the infinite bus and/or 110% prefault voltage approach. For a fair segment of the transformer market, this relates to satisfying the requirement with a combination of special configurations and materials. It's only then a matter of cost optimization and which is ultimately included in the quoted price of the transformer. There are those other segments, as Pierre as identified, who will be faced with a difficult challenge. There is another set of users, probably not well represented at the committee, who seek the most realistic solution at the minimum of expenses. For this segment, realistic system impedance values may be important in getting approvals for projects that will still provide reliable transformer designs based upon their specific applications. I am only commenting on feedback received from the field sales persons asking how these can engineers specify their needs at the most economical levels. From a manufacturers viewpoint, once the requirements are specified, there will be an engineering solution developed. For that certain segment, today the published system impedance values may not satisfy their need. 2) I assume the system fault capacity values in Table 18 are symmetrical and not asymmetrical since there is reference to the X0/X1 ratio. Symmetrical values on our 765kV system are below 40kA. I will check further on the lower voltages. Maximum system Voltage (kv) Below 48.3 Table 18 Proposed Revisions (AEP) System fault capacity (Existing Values) (ka rms) (MVA) AEP Projected System Fault Capacity (ka rms) (MVA) ) Duke Energy Carolinas has parts of its system with fault currents in excess of 63 ka. We have made some adjustments to mitigate this using neutral reactors, etc. but some levels remain >63 ka. We have had to use some 80 ka breakers at 230 kv. We have some new generation coming

3 on to replace some older plants and sometimes the location of these new plants change the system fault current availability. This same statement would apply to possible future new nuclear plants planned in the next decade. I believe that research continues into breakers above 80 ka which tells me the problem is not going away. We call for infinite bus and 110% pre-fault voltage for calculated thru-fault designs. The majority of transformers fail on our system due to thru-fault or dielectric failures due to change in dimensions/clearances due to thru-fault so we have made the business decision to seek this level of margin. I agree with Robert Thompson s comment that some conservative value should appear in the absence of a specified system impedance to protect less experienced users. 4) David s comments also apply to the BGE system. I also agree that the conservatism should be maintained in the standard for less experienced users. 5) Steve: I have to agree with Dave especially about one thing : It is a good operating procedure to have all transformers designed for short circuit with 110% pre-fault of the rated tap voltage applied. This simply results in about 110% of the current and 121% of the normal forces. This has been in the CSA CAN3 specification since 1979 The system fault MVA in the USA and Canada is typically a lot higher than in Europe and other parts of the world. I do believe that we still should use the anticipated maximum system fault MVA for the installed locations. If individual users wish to specify infinite bus, that is their option. I have seen many large autotransformers with low impedances which were nearly impossible to design with infinite bus. This also holds true for many Windfarm Y-Y-delta transformers which may be paralleled with similar transformers. In those cases a single line to ground fault on the LV could result in excessively high forces unless realistic LV system impedances were used or designed with artificially high TV impedances. This discussion is getting a little out of the original scope but many of the points brought up need to be tabled for future consideration in the standard. I think the present Xo/X1 ratio of 1 in C version is indicative of modern grounding practices and will all ensure little more margins in all transformers as the systems continue to grow. 6) After reading many of these replies, I don't have anything different to add. I too believe that the standard should set a minimum default requirement. I don't see any problem with retaining the present values.

4 7) We, SCE is already facing over 70kA in several substation and preparing for 80kA. I don't agree with the statement of not exceeding 63kA. In my view, transformers should be designed for infinite bus. We should review IEC In general, the IEC standard is in line with Table 18. Also, we should review IEEEC57.109, since the table 18 was used for transformer through fault current duration. 8) Our specifications typically call for an assumption of infinite bus for calculated thru-fault design for all types of transformer we purchase- GSUs, Distribution and Auto-banks. At the same time, we specific high impedances for both auto banks and distribution transformers. The transformers we purchase can be used generally anywhere on our system with the exception of GSUs. We are in favor of retaining Table 18 for providing some guidance to less experienced users and designers as well. 9) Although I am now retired from Entergy I can confidently state that Entergy always preferred using an infinite bus for units installed on their transmission system. Generator main transformers and other transformers associated with auxiliary power could, if practical, be designed with generator impedances in mind. 10) Our preference here at APS is also to have a unit that can operate in any system/location as units do get moved around. It's obvious that the easiest thing to do is to use infinite bus and we simply treat the "overdesign" as extra design margins. For certain large units we did have to resort to system impedance. Therefore the idea of eliminating system impedance in general and including system impedance in special occasions sounds good to me. 11) My comment was only that at Xcel Energy, we assume an infinite bus for through fault calculations on our TRs. 12) With regard to the question of system short-circuit current, we previously queried the table 18 with respect to the 765 kv entry back in 2007, as you can see from the (s) copied below. Looking at Pierre's comments, I must agree with him that the maximum short-circuit current in the table is too high and I think his proposal is reasonable. One of my colleagues has queried something in the latest C :2006. It refers to the fault capacity table (table 18). As you can see below, there appears to be an anomoly that has existed from at least the 2000 version. Forget his first question, but does his second query come under your PCS C WG, or does it belong with the Dielectric Test SC? I also find his comment at the end of his of interest. Do you have access to the IEC standard?

5 If there is an error with the entry in Table 18 for the 765 KV entry, then can we get it corrected in time for the next revision (i.e. before the December deadline)? The fault capacity table in both the 2000 version (table 16) and 2006 version (table 18) give values for the system fault capacity which, in all but the last case, are the product of the nominal system voltage (not actually given in the table but elsewhere in the documents) and fault current given in the table. My questions are: 1) Why is it necessary to give both the current and MVA? (This is actually rhetorical since, if both hadn't been given, I'd have assumed the fault capacity at the highest system voltage and not the nominal value.) 2) Why don't the values for the 765/800kV levels follow this same "logic"? Or have I done something silly? I also question the difference between C and what IEC calls "Current North American Practice". 13) I agree that the fault capacities in the table seem excessive and 63 ka does seem like an appropriate limit as only a few HV systems ever get higher than that. I think the Montreal and Toronto areas are over 63 ka on their 245 kv systems. We usually refer to the CSA standard for transformer purchases and the fault levels defined there are similar to the existing ANSI levels but not exactly the same. We work to an ultimate level for stations recorded in an informal table established many years ago where the maximum levels are as follows:

6 145 kv 33 ka 245 kv 63 ka 362 kv 32 ka 550 kv 40 ka I don't think the change of Xo/X1 from 2 to 1 is a good idea. A very strong system with a weak zero sequence source will force more current through a a grounded winding than would otherwise occur for an equivalent system with a strong zero sequence because the transformer becomes the main zero sequence current source when the system is weak in the zero sequence. The current can go above what the transformer alone would carry. This may be the reason for the apparently excessive source strength in the standards. My understanding is that transformer failures on through faults have been found more common than expected across the industry suggesting that all the transformer designers don't have a good handle on the design required to withstand through fault forces. It might be better to retain some extra design margin. The excessive fault levels defined don't make very much difference to the through fault that is restrained by the transformer impedance. 14) I know of several locations on our 115 kv and 230 kv systems where the available fault current is approaching 60 kaic. There are 80 ka breakers available for 230 kv. That doesn't mean that max fault currents are 80 ka. However it probably does mean they are above 63 ka. For 500 kv and above, 80 ka would be a fairly good sized source and probably not realistic. This probably doesn't help. Someone from the switchgear committee that's involved with planning and breaker duty might give some insight. As a utility user, Southern Company's applications are typically distribution, transmission (network autos), and generating. The impedances for these applications are relatively high. A utility user's general specification will typically call for infinite source impedance as ours does. In this case, it is a non-issue. And in most cases, it is a non-issue. For the specical application that requires system impedance, I would expect the user (or consultant) to provide the system impedance for their particular application. The table is there to protect the user and manufacturer when the user forgets or doesn't know to provide the source impedance for a special application that requires this information. 15) Please get info from large power users and manufacturers. Delta Star uses infinite bus for all transformers including autos. The table might make sense for very large autos with very low impedance but I do not know realistic system values. 16) On the surface, it seems that Pierre's request is correct and that changes should be made. But we are all part of the transformers committee, and the specification of power system short-circuit MVA is not a transformer issue, but a power system question. So I think you should consider asking the appropriate committee in the IEEE to give us some inputs on this question. Maybe the reason that you did not get much feedback from the working group on this question is that the members are primarily transformer experts and not power system analysis experts. 17) In real "transformer" world situations, the "overdesign" is NOT as significant for most power transformers with "standard" or higher impedances. For the rare cases that Pierre referenced, such as large autotransformers with low impedances, the user is generally aware of the cost

7 increase associated with fault duty of the transformer and works with manufacturers to add the "realistic" system impedance to limit the calculated fault currents. My preference is to eliminate the system impedances so that the transformers are designed to be strong enough to withstand faults in any system. We can add provisions to address the rare cases where a user and manufacturer can include the system impedance to reduce the calculated fault currents. 18) I concur with Mark and Jin s comments. As representing users, my specifications typically call for an assumption of infinite bus for calculated thru-fault design. If a system impedance is to be included, the user should provide the number. If a standard system impedance is to be assumed, it should be conservative in the absence of a number based on actual system characteristics.

8 The following three (3) responses resulted from an appeal to the PES SCC (Standards Coordinating Committee) earlier this year : 1) I am writing you concerning the first document. It says: "Most of the values given are not realistic and are leading to unnecessary over designs. Except for very rare cases, the short-circuit current never exceeds 63 ka r.m.s. and this should be the ultimate standardized value. Specifying values which are higher than that lead to uneconomical designs." This might be true for transformers but definitely it is more complicated in case of AVRs design. It seem that it is difficult to design AVR devices that meet all grid code requirements when the short-circuit power is too small (less than ~6 MVA). I do not know if that matches with the North American practice but this is the case in a few European systems. 2) I am an electrical engineer for the Bureau of Reclamation and I do all sorts system studies for many of our plants, including arc flash studies, fault current studies, equipment rating studies, etc. I was passed along an regarding IEEE C and the suggestion to put a ceiling on the short-circuit current a new transformer is required to withstand, which asked that responses be sent to you. The proposed ceiling is for transformer short-circuit withstand capability is 63 ka rms. In studies I have done for our facilities, I have indeed run into scenarios where the transformer could see greater than 63 ka rms during a fault condition on the low voltage bus. Also, I am concerned that because the system can change over the years resulting in fault current increases. So while an existing installation may have fault currents just below 63 ka, future changes could result in fault currents above 63 ka. Changing the standard to have a ceiling of 63 ka maximum short-circuit withstand capability for new transformers would cause more work on our end as we would have to look into this parameter for every transformer and likely specify a higher fault current for many of our new installations. So, while this may save the manufacturer some money since they don t have to build the transformer as robust, it costs us more time and money to have to put specific values into our spec instead of just referencing the standard. I am curious how much money the manufacturer would save by using this 63 ka ceiling. The examples provided showed an average of 9% mechanical overrating and 7% fault current overrating. Is this saving the manufacturer only 7-9% of their cost? I am also wondering which of these examples could actually see greater than 63 ka fault current, and therefore do actually need to be built for greater than 63 ka. Lastly, the existing standard gives the option of using actual system values rather than those listed Table 18. The systems represented in the table essentially provide a worst-case scenario, which is an infinite bus. If the manufacturer used actual system values, which he could likely get from the customer, he could probably reduce the fault current the transformer needs to withstand, which would save him money without changing the standard.

9 Therefore, I do not see the need to place a ceiling on the fault current withstand capabilities in the standard. This would cause difficulties on the customer end as we would need to do a more in-depth study of each transformer for short-circuit withstand, rather than just relying on the standard. I hope this is helpful. Please let me know if you have any questions. I attended the IEEE Transformer Committee meeting in Houston in March (it was the first one I have attended) and will try to attend in Toronto in the Fall or San Diego in the Spring. Thank you for this opportunity to contribute. 3) We had a request for assistance to provide fault level for various voltage levels. Below are the 2010 numbers for the voltages on the Southern Electric System. From the SCS 2010 Base case the maximum fault currents at the follow voltage levels are: Voltage (kv) SLG (amps) 3-Ph (amps) ,508 40, ,330 61, ,932 19, ,580 57, ,808 8,479 If you have any questions, please let me know.

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

Appendix D Fault Levels

Appendix D Fault Levels Appendix D Fault Levels Page 1 Electricity Ten Year Statement November 2013 D.1 Short Circuit Currents Short Circuit Currents Three phase to earth and single phase to earth short circuit current analyses

More information

EDS FAULT LEVELS

EDS FAULT LEVELS Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

PCS Working Group on General Requirements C

PCS Working Group on General Requirements C WG Item 82 C57.12.00-2000 Section 7.1.4.4 Stabilizing windings Change Requested by : V. Sankar 5/07/2005 & 10/23/2006 Requested Change : Request to form a task force to discuss the following on buried

More information

Distribution System Development & Preliminary Studies

Distribution System Development & Preliminary Studies Distribution System Development & Preliminary Studies IEEE CED January 27, 2016 (second night) 2016 KBR, Inc. All Rights Reserved. Agenda Distribution System Development Modeling Data Studies Overview

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved. Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents Page: 1 Electrical Transient Analyzer Program Short Circuit Analysis ANSI Standard 3-Phase Fault Currents Number of Buses: Swing Generator Load Total 1 0 4 5 Number of Branches: XFMR2 XFMR3 Reactor Line/Cable

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

Operational Experiences of an HV Transformer Neutral Blocking Device

Operational Experiences of an HV Transformer Neutral Blocking Device MIPSYCON NOVEMBER 7, 2017 Operational Experiences of an HV Transformer Neutral Blocking Device Fred R. Faxvog, Emprimus Michael B. Marz, American Transmission Co. SolidGround GIC Neutral Blocker Fully

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Waruna Chandrasena, Bruno Bisewski, and Jeff Carrara Abstract-- This paper describes several system

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

The Advantages and Application of Three Winding Transformers

The Advantages and Application of Three Winding Transformers The Advantages and Application of Three Winding Transformers MSc, CEng, FIEE, FIMechE, FIPENZ Principal, Sinclair Knight Merz Abstract Although seldom used in Australia and New Zealand, three winding transformers

More information

THREE-PHASE SHORT-CIRCUIT TESTING OF HIGH-VOLTAGE CIRCUIT-BREAKERS USING SYNTHETIC CIRCUITS

THREE-PHASE SHORT-CIRCUIT TESTING OF HIGH-VOLTAGE CIRCUIT-BREAKERS USING SYNTHETIC CIRCUITS Denis DUFOURNET Head of CERDA High Power and High Voltage Laboratories in Villeurbanne, France. Georges MONTILLET Dead Tank Circuit Breakers Product Manager Development, Charleroi, PA USA. Charleston,

More information

Power Plant and Transmission System Protection Coordination Fundamentals

Power Plant and Transmission System Protection Coordination Fundamentals Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and

More information

Evaluating the Response of Surge Arresters

Evaluating the Response of Surge Arresters 1 Jens Schoene Chandra Pallem Tom McDermott Reigh Walling Evaluating the Response of Surge Arresters to Temporary Overvoltages Panel Session of the IEEE Wind and Solar Collector Design Working Group 2014

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

Transformer Thermal Impact Assessment White Paper (Draft) Project (Geomagnetic Disturbance Mitigation)

Transformer Thermal Impact Assessment White Paper (Draft) Project (Geomagnetic Disturbance Mitigation) Transformer Thermal Impact Assessment White Paper (Draft) Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance during Geomagnetic Disturbances Background

More information

Problems connected with Commissioning of Power Transformers

Problems connected with Commissioning of Power Transformers Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.

More information

Validation of a Power Transformer Model for Ferroresonance with System Tests on a 400 kv Circuit

Validation of a Power Transformer Model for Ferroresonance with System Tests on a 400 kv Circuit Validation of a Power Transformer Model for Ferroresonance with System Tests on a 4 kv Circuit Charalambos Charalambous 1, Z.D. Wang 1, Jie Li 1, Mark Osborne 2 and Paul Jarman 2 Abstract-- National Grid

More information

Tab 2 Voltage Stresses Switching Transients

Tab 2 Voltage Stresses Switching Transients Tab 2 Voltage Stresses Switching Transients Distribution System Engineering Course Unit 10 2017 Industry, Inc. All rights reserved. Transient Overvoltages Decay with time, usually within one or two cycles

More information

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com ARC FLASH PPE GUIDELINES FOR

More information

Modeling insulation in high-voltage substations

Modeling insulation in high-voltage substations 38 ABB REVIEW DESIGNED FOR SAFETY DESIGNED FOR SAFETY Modeling insulation in high-voltage substations The goal of insulation coordination is to determine the dielectric strength of transformers and other

More information

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

Transformer Thermal Impact Assessment White Paper Project (Geomagnetic Disturbance Mitigation)

Transformer Thermal Impact Assessment White Paper Project (Geomagnetic Disturbance Mitigation) Transformer Thermal Impact Assessment White Paper Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance for Geomagnetic Disturbance Events Background On

More information

Poly Canyon Cogeneration System

Poly Canyon Cogeneration System Poly Canyon Cogeneration System By Jaideep Gill Senior Project Electrical Engineering Department California Polytechnic State University San Luis Obispo 2011 ii Table of Contents Section Acknowledgements

More information

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 % BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and

More information

Comparison of recloser and breaker standards

Comparison of recloser and breaker standards s Technical Data TD280024EN Supersedes February 1994 (R280-90-5) COOPER POWER SERIES Comparison of recloser and breaker standards Technical Data TD280024EN Comparison of recloser and breaker standards

More information

DEVELOPING TESTING PROCEDURES FOR HIGH VOLTAGE INNOVATION TECHNOLOGIES

DEVELOPING TESTING PROCEDURES FOR HIGH VOLTAGE INNOVATION TECHNOLOGIES DEVELOPING TESTING PROCEDURES FOR HIGH VOLTAGE INNOVATION TECHNOLOGIES Daniel HARDMAN Jonathan BERRY Neil MURDOCH WSP Parsons Brinckerhoff UK Western Power Distribution UK WSP Parsons Brinckerhoff UK daniel.hardman@pbworld.com

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

This document covers common questions concerning the design of an effectively grounded system.

This document covers common questions concerning the design of an effectively grounded system. This document covers common questions concerning the design of an effectively grounded system. To prevent against temporary overvoltage conditions when a line-to-ground fault occurs on the power grid.

More information

Improving High Voltage Power System Performance. Using Arc Suppression Coils

Improving High Voltage Power System Performance. Using Arc Suppression Coils Improving High Voltage Power System Performance Using Arc Suppression Coils by Robert Thomas Burgess B Com MIEAust CPEng RPEQ A Dissertation Submitted in Fulfilment of the Requirements for the degree of

More information

System grounding of wind farm medium voltage cable grids

System grounding of wind farm medium voltage cable grids Downloaded from orbit.dtu.dk on: Apr 23, 2018 System grounding of wind farm medium voltage cable grids Hansen, Peter; Østergaard, Jacob; Christiansen, Jan S. Published in: NWPC 2007 Publication date: 2007

More information

ETAP PowerStation 4.0

ETAP PowerStation 4.0 ETAP PowerStation 4.0 User Guide Copyright 2001 Operation Technology, Inc. All Rights Reserved This manual has copyrights by Operation Technology, Inc. All rights reserved. Under the copyright laws, this

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

TRV OVERVIEW FOR REACTANCE LIMITED FAULTS

TRV OVERVIEW FOR REACTANCE LIMITED FAULTS The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com TRV OVERVIEW FOR REACTANCE

More information

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,

More information

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device ABB AG - EPDS The worldʼs fastest limiting and switching device Agenda The world s fastest limiting and switching device Customers Function: Insert-holder with insert Comparison: I S -limiter Circuit-breaker

More information

Catastrophic Relay Misoperations and Successful Relay Operation

Catastrophic Relay Misoperations and Successful Relay Operation Catastrophic Relay Misoperations and Successful Relay Operation Steve Turner (Beckwith Electric Co., Inc.) Introduction This paper provides detailed technical analysis of several catastrophic relay misoperations

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY Dr. Karthik Reddy VENNA Hong URBANEK Nils ANGER Siemens AG Germany Siemens AG Germany Siemens AG Germany karthikreddy.venna@siemens.com

More information

WIND FARM Flexible AC Transmission Systems

WIND FARM Flexible AC Transmission Systems WIND FARM Flexible AC Transmission Systems WIND ENERGY AND GRID INTEGRATION Madrid 24-25 January 2006 Jacques COURAULT Assumption: Wind farm is with Fixed Speed Induction Generator (FSIG) SUMMARY 1/ Wind

More information

Hamdy Faramawy Senior Application Specialist ABB Sweden

Hamdy Faramawy Senior Application Specialist ABB Sweden Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy

More information

StarSine Power Quality Products

StarSine Power Quality Products StarSine Power Quality Products Medium Voltage Static Voltage Regulator ( MV SVR ) MV SVR PROTECTS THE WHOLE FACILITY LOADS FROM VOLTAGE SAGS CAUSED BY UTILITY GRID FAULTS Voltage sags, whether due to

More information

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) 1MRS752324-MUM Issued: 3/2000 Version: D/23.06.2005 Data subject to change without notice PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) Contents 1. Introduction... 2 1.1

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Shunt Reactor Switching

Shunt Reactor Switching Shunt Reactor Switching Dielectric stresses produced by circuit-breakers to shunt reactors. Presentation made during the IEEE Transformers Committee meeting, Amsterdam, Netherlands, April 2001 Presented

More information

Arc Flash Analysis Training

Arc Flash Analysis Training Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is

More information

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

Safety through proper system Grounding and Ground Fault Protection

Safety through proper system Grounding and Ground Fault Protection Safety through proper system Grounding and Ground Fault Protection November 4 th, 2015 Presenter: Mr. John Nelson, PE, FIEEE, NEI Electric Power Engineering, Inc. Event to start shortly Scheduled time:

More information

Fault Ride Through Technical Assessment Report Template

Fault Ride Through Technical Assessment Report Template Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance

More information

Selective Coordination for Emergency and Legally-Required Standby Power Distribution Systems

Selective Coordination for Emergency and Legally-Required Standby Power Distribution Systems Selective Coordination for Emergency and Legally-Required Standby Power Distribution Systems Presented for the IEEE Central TN Section / Music City Power Quality Group August 1, 2006 By Ed Larsen and Bill

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

Prepared by Mick Maytum

Prepared by Mick Maytum IEC Technical Committee 109: Standards on insulation co-ordination for low-voltage equipment Warning Prepared by Mick Maytum mjmaytum@gmail.com The document content is of a general nature only and is not

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

Roadmap For Power Quality Standards Development

Roadmap For Power Quality Standards Development Roadmap For Power Quality Standards Development IEEE Power Quality Standards Coordinating Committee Authors: David B. Vannoy, P.E., Chair Mark F. McGranghan, Vice Chair S. Mark Halpin, Vice Chair D. Daniel

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

How OSHA s New Transient Overvoltage Requirements Affect Work Practices. B.A. YEUNG, H. BRANCO Leidos Engineering, LLC USA

How OSHA s New Transient Overvoltage Requirements Affect Work Practices. B.A. YEUNG, H. BRANCO Leidos Engineering, LLC USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium How OSHA s New Transient Overvoltage Requirements Affect Work Practices B.A. YEUNG,

More information

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL 007 2 includes requirements for entities to

More information

Past CIGRE and Emerging IEEE Guide Documents on FCLs

Past CIGRE and Emerging IEEE Guide Documents on FCLs Past CIGRE and Emerging IEEE Guide Documents on FCLs Michael Mischa Steurer Leader Power Systems Research Group at FSU-CAPS Email: steurer@caps.fsu.edu, phone: 850-644-1629 Presented by W. Hassenzahl Advanced

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Impedance protection on power transformer.

Impedance protection on power transformer. Impedance protection on power transformer www.siemens.com/siprotec5 SIPROTEC 5 Application Impedance Protection on Power Transformer APN-045, Edition 1 Content 1...3 1.1 Introduction...3 1.2 Application

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Adi Mulawarman, P.E Xcel Energy Minneapolis, MN. Pratap G. Mysore, P.E Pratap Consulting Services, LLC Plymouth, MN

Adi Mulawarman, P.E Xcel Energy Minneapolis, MN. Pratap G. Mysore, P.E Pratap Consulting Services, LLC Plymouth, MN Effectiveness of Surge Capacitors on Transformer Tertiary connected shunt reactors in preventing failures- Field measurements and comparison with Transient study results Pratap G. Mysore, P.E Pratap Consulting

More information

Three-Phase Transformer Test Systems

Three-Phase Transformer Test Systems Three-Phase Transformer Test Systems PHENIX TECHNOLOGIES R Testing Applications Models Available Perform tests on utility distribution and power transformers in accordance with IEC 60076 and ANSI / IEEE

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping

More information

Max voltage in 400 kv Networks

Max voltage in 400 kv Networks Max voltage in 400 kv Networks ENTSO-E GC ESC, 08, Brussels 1 Summary NEED TO WITHSTAND WIDE VOLTAGE RANGE 3 EXISTING CONNECTION RULES 4 KEMA REPORT ON RFG 5 STUDIES ABOUT TOV 6 REFERENCE TO EU NC REGULATIONS

More information

Revision of TRV Requirements for the Application of Generator Circuit-Breakers

Revision of TRV Requirements for the Application of Generator Circuit-Breakers Revision of TRV Requirements for the Application of Generator Circuit-Breakers M. Palazzo, M. Popov, A. Marmolejo and M. Delfanti Abstract-- The requirements imposed on generator circuitbreakers greatly

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description

More information

Short Circuit Calculation in Networks with a High Share of Inverter Based Distributed Generation

Short Circuit Calculation in Networks with a High Share of Inverter Based Distributed Generation Short Circuit Calculation in Networks with a High Share of Inverter Based Distributed Generation Harag Margossian, Juergen Sachau Interdisciplinary Center for Security, Reliability and Trust University

More information

2012 Grid of the Future Symposium. Impacts of the Decentralized Photovoltaic Energy Resources on the Grid

2012 Grid of the Future Symposium. Impacts of the Decentralized Photovoltaic Energy Resources on the Grid 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Impacts of the Decentralized Photovoltaic Energy Resources on the Grid B. ENAYATI, C.

More information

Understanding Input Harmonics and Techniques to Mitigate Them

Understanding Input Harmonics and Techniques to Mitigate Them Understanding Input Harmonics and Techniques to Mitigate Them Mahesh M. Swamy Yaskawa Electric America YASKAWA Page. 1 Organization Introduction Why FDs Generate Harmonics? Harmonic Limit Calculations

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Technical Reference Document Power Plant and Transmission System Protection Coordination NERC System Protection and Control Subcommittee Revision 1 July 2010 Table of Contents 1. Introduction... 1 1.1.

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC Short-Circuit Analysis IEC Standard 1996-2009 Operation Technology, Inc. Workshop Notes: Short-Circuit IEC Purpose of Short-Circuit Studies A Short-Circuit Study can be used to determine any or all of

More information

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL-007-2 includes requirements for entities to

More information