1500 UNDERGROUND J-BOXES & VAULTS
|
|
- Lydia Lawson
- 5 years ago
- Views:
Transcription
1 00 UNDEGOUND J-BOXES & VAULTS //0 C UE4-UE Secondary J-Box " x 0" x " Deep ~ UJ Primary Junction Box Single Phase ~ UJ Primary Junction Box Three Phase ~ UJ Primary Ø Padmount Junction Box pad ~ UJM Primary Junction Box Single & Three Phase Material List ~ ULE Loop Enclosure ~ UVG,UVG Underground Vault Grounding System ~ UVN Installation of Telephone Ground at Padmount Transformers and Junction Boxes N New Standard edrawn Standard C Changed Standard ~ No Change
2 LOAD SOUCE LOAD GOUND LEVEL IN SIDEWALK TOP VIEW 4" GOUND LEVEL IN FLOWE BED O GASS STACK SUBMESIBLE PED'S VETICALLY "-4" SIDE VIEW ESIDENTAL- UP TO 0 KCM COMMECIAL - UP TO 00 KCM NOTES:. DO NOT INSTALL S/N IN STEETS, ALLEYS, O HIGHWAYS.. CUT ALL CABLES LONG ENOUGH TO ALLOW MAKEUP TO BE DONE ABOVE THE BOX TOP WITH CABLES IN AN APPOXIMATELY VETICAL POSITION.. BEND CABLES DOWN AFTE MAKEUP SO THAT LID CAN BE INSTALLED. 4.. USE SILICONE GEASE ON ALL ALLEN WENCH PLUGS AND CABLE BOOTS (BOTH ENDS). IF ADDITIONAL DEPTH IS NEEDED, PLACE ONE BOX UPSIDE DOWN, BOLT THE BOXES TOGETHE AND SALVAGE ONE LID. (S/N ONLY). ev : emoved all Fiberglass box (S/N ), added Notes for occasional and heavier traffic areas, and updated material issue SECONDAY JUNCTION BOX " x 0" x " DEEP DATE ENG OPS //00 HWH MA //0 JEH T 0// CM DK of UE4,UE,UE,UE4,UE,UE UE4 JEH //00 00
3 OCCASIONAL TAFFIC AEAS (S/N ): ATED 0,000 POUNDS THIS BOX IS NOT FO USE IN STEETS, ALLEY O HIGHWAYS DO NOT USE IN DIVEWAYS IF LOCATION IS PAT OF THE NOMAL TAVELED WAY HEAVIE TAFFIC AEAS (S/N 0): ATED 0,000 POUNDS THIS BOX IS 4" x " x " MAY BE USED IN ALLEYS O DIVEWAYS-ONLY ATED 0k DO NOT USE IN STEETS O HIGHWAYS ev : emoved all Fiberglass box (S/N ), added Notes for occasional and heavier traffic areas, and updated material issue Secondary J-Box " x 0" x " (H Is 4" x " x ") Connector, Submersible, Sec., 4 Position, #0 to 00 MCM Al/Cu Secondary J-Box " x 0" x " (H Is 4" x " x ") Connector, Submersible, Sec., Position, #0 to 00 MCM Al/Cu Secondary J-Box " x 0" x " (H Is 4" x " x ") Connector, Submersible, Sec., Position, # to 00 MCM Al/Cu Secondary J-Box " x 0" x " (H Is 4" x " x ") Connector, Submersible, Sec., 4 Position, #0 to 00 MCM Al/Cu Secondary J-Box " x 0" x " (H Is 4" x " x ") Connector, Submersible, Sec., Position, #0 to 00 MCM Al/Cu Secondary J-Box " x 0" x " (H Is 4" x " x ") Connector, Submersible, Sec., Position, # to 00 MCM Al/Cu SECONDAY JUNCTION BOX " x 0" x " DEEP UE4H UEH UEH 4 UE4H 4 0 UEH UEH UE4 UE UE 4 UE4 4 0 UE 0 4 UE 4 4 DATE ENG OPS //00 HWH MA //0 JEH T 0// CM DK of UE4,UE,UE,UE4,UE,UE UE4 JEH //00 00
4 J OUT (LOAD) IN (SOUCE) " FUTUE " 4" " Notes:. TYPICAL ELBOW AANGEMENT IS SHOWN.. DO NOT PUT DIT INSIDE JUNCTION BOX. SPACE IS EQUIED FO CABLE SLACK AND OPEATING CLEAANCE.. LEAVE CABLE SLACK FO FUTUE OPEATIONS. LEGEND: FAULT INDICATO NOMALLY OPEN (ON STANDOFF BACKET) ev 4: Changed to Voltage-reset fault indicators and added equipment lock. UJM4 UJM4 Ground od /" x ' UJM4 Clamp, Ground od /", Small UJM4 UJM44 UJM4 UJM4 MATEIAL LIST UJM4 UJM4 UJM4 Junction Box, Ø 4 4 Equipment Lock, UG DATE ENG OPS PIMAY JUNCTION BOX SINGLE PHASE QTY S/N 4 //00 HWH MA //04 LB AH //04 LB AH 4 4//0 CM AH of UJ UJ JEH //00 00
5 " BACK " " FOM EDGE " CONDUIT " LEFT SIDE " CONDUIT FUTUE FEEDS OUT GOUND OD AT CENTE OF J-BOX IGHT SIDE FONT PLAN VIEW -PHASE J-BOX ev 4: Changed to Voltage-reset fault indicators and added equipment lock. PIMAY JUNCTION BOX SINGLE PHASE DATE ENG OPS //00 HWH MA //04 LB AH //04 LB AH 4 4//0 CM AH of UJ UJ JEH //00 00
6 J 4 0 A B C 0" " FUTUE CL NOTES: ". TYPICAL ELBOW AANGEMENT IS SHOWN.. DO NOT PUT DIT INSIDE JUNCTION BOX. SPACE IS EQUIED FO CABLE SLACK AND OPEATING CLEAANCE.. LEAVE CABLE SLACK FO FUTUE OPEATIONS. 4" LEGEND: FAULT INDICATO NOMALLY OPEN (ON STAND OFF BACKET) ev : Changed to Voltage-reset fault indicators and added equiment lock. UJM4 UJM4 UJM4 UJM4 UJM44 UJM4 UJM4 UJM4 UJM4 UJM4 Ground od /" x ' Clamp, Ground od, Small Junction Box, Ø MATEIAL LIST 4 Equipment Lock, UG PIMAY JUNCTION BOX THEE PHASE QTY DATE ENG S/N 4 04 OPS 0 //00 HWH MA //04 LB AH //04 LB AH 4//0 CM AH of UJ UJ AH //00 00
7 " AØ BACK BØ " CØ 4" 4" O " CONDUITS " LEFT SIDE CL 4" O " FUTUE CONDUITS L C GOUND OD AT CENTE OF J-BOX IGHT SIDE FONT PLAN VIEW -PHASE J-BOX 4" J-4 FONT FINAL GADE 4" MAX. GOUND OD " FINAL GADE " " SWEEP 4" MAXIMUM 4" PVC CONDUIT PIMAY J-BOX CONDUIT AANGEMENT ev : Changed to Voltage-reset fault indicators and added equiment lock. PIMAY JUNCTION BOX THEE PHASE DATE ENG OPS 0 //00 HWH MA //04 LB AH //04 LB AH 4//0 CM AH of UJ UJ AH //00 00
8 PLAN " " " MAK A " A " MAK B-0 KINDOF CHANNEL " '-4" OPENING " WELD CHANNEL TO EBA MAK " " MAK " " " " " " " 4 " 4 " 4'-" 4" " "A-A" NOTE: EINFOCING SCHEDULE MAK SIZE LENGTH EMAKS 4 /" '-0" STAIGHT 4 /" 4'-" STAIGHT ALL CONCETE SHALL BE --4 AND HAVE A SLUMP OF 4" TO " EINFOCING SHALL CONFOM TO A.S.T.M. DESIGNATION A AND A0. TOWEL SMOOTH SUFACES AND BUSH FINISH. OUND ALL EDGES, PIMAY Ø PADMOUNT JUNCTION BOX PAD DATE ENG 0 //0 OPS of UJ UJ 0 EDAWN IN CAD ELM //0 00
9 ev : Changed to Voltage-reset fault indicators. Elbow, Loadbreak, /0, 00A, mil Cap, Protective Insulated, 00A U.G. 0 UJM ft 0 Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Bushing, Standoff Insul. 00A Cap, Protective Insulated, 00A U.G. UJM ft 0 Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Bushing, Standoff Insul. 00A Cap, Protective Insulated, 00A U.G. UJM4 0 ft Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Bushing, Standoff Insul. 00A Cap, Protective Insulated, 00A U.G. UJM ft Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Cap, Protective Insulated, 00A U.G. UJM ft 4 4 PIMAY JUNCTION BOX SINGLE AND THEE PHASE MATEIAL LIST of UJM UJM DATE ENG OPS 0 //00 HWH MA //04 LB AH //04 LB AH 4//0 CM AH JEH //00 00
10 0 ev : Changed to Voltage-reset fault indicators. Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Bushing, Standoff Insul. 00A Cap, Protective Insulated, 00A U.G. UJM ft 0 Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Bushing, Standoff Insul. 00A Cap, Protective Insulated, 00A U.G. UJM ft 0 Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Cap, Protective Insulated, 00A U.G. UJM ft 0 Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG Bushing, Standoff Insul. 00A Cap, Protective Insulated, 00A U.G. UJM4 4 0 ft Elbow, Loadbreak, /0, 00A, mil Voltage-eset Fault Indicator, 400A Trip, Ø UG UJM ft PIMAY JUNCTION BOX SINGLE AND THEE PHASE MATEIAL LIST of UJM UJM DATE ENG OPS 0 //00 HWH MA //04 LB AH //04 LB AH 4//0 CM AH JEH //00 00
11 GOUND LEVEL " GOUND LEVEL 00 UG J-Box/Vault DO NOT GLUE ELBOWS TO CONDUIT MATEIAL LIST CABLE LOOP ENCLOSUE MAKE, UG, FULL ANGE, DISC QTY. S/N 0 00 UG J-Box/Vault NOTES:. BUY APPOXIMATELY ONE FOOT OF THE ENCLOSUE.. CONDUITS SHALL BE BUIED 4" TO 4" DEEP UNLESS OTHEWISE APPOVED BY CPU.. THE DISC MAKE IS TO BE INSTALLED FLAT WITH THE INSTUCTIONS FACING UP. 4. THE DISC SHOULD BE PLACED IN ADIUS OF ELBOW.. CPU HAS THE LOCATO FO FINDING THESE MAKES.. THE MAKES AE EUSABLE.. LOOP ENCLOSUES AND MAKE DISCS POVIDED BY CPU. EV - MEGED WITH STD. UBM AND UPDATED FO ALL-CONDUIT SYSTEM. LOOP ENCLOSUE DATE ENG OPS 0 //04 LB AH //04 LB AH of ULE ULE 0 KP 00
12 VAULT BOTTOM WALL KNOCKOUT INSTALL GOUND ODS AND OUTSIDE /0 COPPE BEFOE VAULT IS INSTALLED. FEED /0 TAPS FOM OUTSIDE GOUND THOUGH VAULT WALL KNOCKOUTS. 4 FO NEW VAULTS UVG- VAULT BOTTOM CUT GOUND ODS IN HALF. DIVE ONE HALF. COUPLE ON SECOND HALF AND DIVE SO THAT ONLY THE CLAMP IS EXPOSED ABOVE THE FLOO. 4 UNDEGOUND VAULT GOUNDING SYSTEM FO EXISTING VAULTS UVG- DATE ENG OPS 0 //00 HWH MA of UVG-, UVG- UVG- 0 JEH //00 00
13 NOTE: INSTALL GOUNDING LUG TO TANK * - GOUNDING LUG * BY TELEPHONE TELEPHONE CLOSUE NOTE: IN JOINT TENCH INSTALLATIONS A #4 CU. GOUND, FO TELEPHONE USE, FOM THE CONCENTIC NEUT. MUST BE POVIDED AT INTEVALS NOT TO EXCEED 000 FT. 0' OF #4 CU. # CU. MIN. BY TELEPHONE COMPANY EV - CHANGES MAKED WITH STA; ADDED GOUNDING LUG & CENTE GOUNDING OD EV - MINO DAWING CHANGES INSTALLATION OF TELEPHONE GOUND AT PADMOUNT TANSFOMES O PHASE JUNCTIONS of UVN UVN DATE ENG OPS //00 HWH MA //0 JEH T MINO DAWING CHANGES JEH //00 00
1400 UG PADMOUNT TRANSFORMERS
00 UG PDMOUNT TNSFOMES //0 ~ F Bay-O-Net Fuse Schedule for Padmount Transformers ~ HB,HB Hillside Barrier ~ UID Padmounted Equipment Identification Tags & Safety Signs ~ UT Single Phase Padmount Transformer
More informationELEVATION VIEW: TOP TETHER INSTALLATION SPAN WIRE CLAMP R Y G DETAIL "A": SPAN WIRE INSTALLATION WITH TOP TETHER SPAN WIRE
TETHE ATTACH TETHE ASSEMBL SO THAT TETHE UNS STAIHT ACOSS. WOOD POLE ANCHO U 17' MIN. ALL VEHICLE SINALS AND SINS HUN ON A SPAN SHALL BE TETHEED. SPAN POLE CONTACT HEIHTS NEED NOT BE AT THE SAME ELEVATION.
More information12 1/2 89 1/8 29 7/ /4 RIGHT SIDE VIEW DRAWN BY: T. KENNEDY MECH. ENG: W.W. 8/18/2015 8/10/2015 CHECKED BY: S.A.C. ELEC. ENG: J.E.S.
NOTES:. ALL CLEAANCES AE FACTOY ECOMMENDATIONS. CONSULT LOCAL JUISDICTION FO EXACT CODE COMPLIANCE..... FULTON ECOMMENDS MINIMUM CLEAANCE OF " IN FONT OF ELECTICAL PANELS. FULTON ECOMMENDS " CLEAANCE BETWEEN
More informationSECTION 29 - NETWORKS, VAULTS AND TRANSCLOSURES TABLE OF CONTENTS
9. VAULTS, GENEAL TANSFOME VAULTS AND ENCLOSUES 9. VAULTS INSIDE O ON TOP OF BUILDINGS 9. INSTALLATION OF COODINATE NUMBES 9.8 9. VAULT LIGHTING, PUMPS AND COVES SIDEWALK AEA VAULT LIGHTS AND SUMP PUMP
More informationCHEVY TH350/700R AUTO TRANSMISSION TO JEEP 4.0L, ENGINE BLOCKS NEW STYLE
Paso Robles, CA 93447 PAGE 1 OF 5 KIT CONSISTS OF: No. Qty Pat No. Desciption 1. 2 716123 GM ENGINE DOWEL PIN 2. 1 716138-F TORQUE CONVERTER ADAPTER 3. 2 716138-DB DOWEL BOLTS 4. 1 716138-PLT ADAPTER PLATE
More informationMETER - INSTALLATION Pad Mount Transformer
ER 1-210-C PAGE 1 OF 5 USE: Pad mount transformer secondary compartment LATEST REVISION: PREVIOUS REVISION 10-01-12 ORIGINATED 0-94 PREVIOUS NUMBER ER 700, 10-01-86 Added specification for placement and
More informationUpdated sheet quantities Clarified security camera information and existing network rack approximate location Added and additional light pole
ADDENDUM NO. DATE: November 7, 18 POJECT: OWNE: BID DATE: Marquette High School Parking Lot Improvements Marquette Area Public Schools Wednesday, December 5, 18 at 1: a.m. The following shall be incorporated
More informationUNIT SHOULD BE INSTALLED BY 2 OR MORE PERSONS. 1 PC 1 PC 1 PC
ICB-406L-BCH/BLK/EGG/GY-1 ICB-410L-BCH/BLK/EGG/GY-1 -BCH/BLK/EGG/GY-1 Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts that may come loose
More informationQuality Control Checklist - Design Drawings
Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not
More informationE /11/2018 AA
B-3 CU 1 CU 2 CU 3 EVISIONS BY GFI,WP GFI AHU 1 AHU 2 AHU 3 GFI,WP MECH. WOMEN'S 6 MEN'S 7 OFFICE 3 8 TEACE 14 OFFICE 4 9 TC 10 PNL 'A' PNL 'B' A-31 GFI A-33 F A-30 A-28 OFFICE 5 11 GFI A-35 OFFICE 2 5
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationCustomer Requirements Commercial Secondary Service
Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may
More informationFreeSpace ZA 2120-HZA Zone Amplifier
Poduct Desciption The Bose zone amplifie is designed to povide basic amplification and sound system expansion when using font-end Bose poducts such as FeeSpace integated zone amplifies and ContolSpace
More informationEXISTING RIGHT-IN/RIGHT-OUT ACCESS CONNECTION TO REMAIN LOCATION TO BE DETERMINED DURING PERMITTING PROCESS) PARKING ENVELOPE
223 GAHAM STEET, NC 2822 74333325 WWWLADESIGNCOM FULL MOVEMENT ACCESS EXF ( 8 PL ANTI NG S 6 SID 4 S ETBA CK F LK OM B ACK PUBL IC OAD /W) IGHT-IN/IGHT-OUT ACCESS CONNECTION TO TIP EWA OD MID-BLOCK COSSING
More informationMDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop
500 460 MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop Check if Applicable TRAFFIC SIGNAL SPECIAL DETAILS INDEX/CHECKLIST *One completed checklist required
More informationINSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION
TITLE: RECOMMENDED: P. Lemay NO: APPROVED: C. Malone, P.Eng. REV. DATE: 2015-11-02 Working Procedure GCG0001 REV: 3 INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling
More informationMX100/MW100 Data Acquisition Unit Installation and Connection Guide
* M X 0 0 E 0 * Use s Manual MX00/MW00 Data cquisition Unit Installation and Connection Guide Foewod Thank you fo puchasing the MX00/MW00 Data cquisition Unit. This guide descibes concisely the installation
More informationHard machining of steel grades up to 65 HRC. High-efficiency carbide cutters with ultra-high performance in hard machining applications
Had machining of steel gades up to 65 HRC High-efficiency cabide cuttes with ulta-high pefomance in had machining applications Title END MILLS FOR STEEL UP TO 65 HRC SOLID CARBIDE END MILLS Highly efficient
More informationAutomatic openers collection. Open work gate kit - Sliding gate kit - Garage door kit Accessories
Automatic openes 04 collection Open wok gate kit - Sliding gate kit - Gaage doo kit Accessoies Maxi cm Maxi cm Wom dive automatic opene VERA 5 maximum gate leaf weight 00 Kg maximum gate leaf width m supply
More informationB O S L E Y W A S H DETENTION BASIN
B O S L E Y W A S H DETENTION BASIN MESA COUNTY WATE DIVISION 5 WATE DISTICT 72 DAM I.D. NUMBE 720425 LIST OF DAWINGS IS CONTAINED ON SHEET 2. MANDATOY PE-BID CONFEENCE I HEEBY DECLAE THAT THESE PLANS
More informationINTERMEDIATE METAL CONDUIT
PRODUCT GUIDE 08 CONDUIT PIPES CONDUIT FITTINGS FITTINGS FOR FLEXIBLE CONDUITS METALLIC ELECTRICAL BOXES AND COVERS CONDUIT BODIES WEATHERPROOF BOXES AND COVERS CHANNELS & SUPPORTS METAL ENCLOSURES CHANNELS
More informationMACOMB COUNTY TRAFFIC SIGNAL DETAILS. Michigan Department of Transportation. Traffic and Safety MC-026A THROUGH MC-120A ENGLISH VERSION
Traffic and Safety MACOMB COUNT TAFFIC SINAL DETAILS MC-026A THOUH MC-120A Disclaimer: The information provided is a product of the Michigan Department of Transportation (MDOT) and is intended for your
More informationWeek 5. Lecture Quiz 1. Forces of Friction, cont. Forces of Friction. Forces of Friction, final. Static Friction
Lectue Quiz 1 Week 5 Fiction (Chapte 5, section 8) & Cicula Motion (Chapte 6, sections 1-) You hae a machine which can acceleate pucks on fictionless ice. Stating fom est, the puck taels a distance x in
More informationCustomer Requirements RF Antenna Installations
Application Terms Attachment requirements and clearances on the Pole for Radio Frequency (RF) antenna equipment installations. This standard is intended to allow electrical workers to perform their normal
More informationRigid PVC Conduit Fittings Injection Molded in Sizes 1/2-6
Rigid PVC Conduit Fittings Injection Molded in Sizes / - E Royal Building Products offers a complete line of rigid PVC conduit fittings. Royal s non-metallic conduit and fittings are certified by the CSA
More informationRigid PVC Conduit Fittings Injection Molded in Sizes 1/2-6
Rigid PVC Conduit Fittings Injection Molded in Sizes / - Royal Building Products offers a complete line of rigid PVC conduit fittings. Royal s non-metallic conduit and fittings are certified by the CSA and
More informationIAS 2.4. Year 12 Mathematics. Contents. Trigonometric Relationships. ulake Ltd. Robert Lakeland & Carl Nugent
Yea 12 Mathematics IS 2.4 Tigonometic Relationships Robet Lakeland & al Nugent ontents chievement Standad.................................................. 2 icula Measue.......................................................
More informationA cone is a solid formed by one circular base and a vertex.
Volume of Cones Lesson 4.7 A cone is a solid fomed by one cicula base and a vetex. EXPLORE! Rita is making snow cones fo he fiends. She has fou cylindical glasses that she is using to take the cushed ice
More informationTECHNICAL DATA. JIS (Japanese Industrial Standard) Screw Thread. Specifications
JIS (Japanese Industial Standad) Scew Thead Specifications TECNICAL DATA Note: Although these specifications ae based on JIS they also apply to and DIN s. Some comments added by Mayland Metics Coutesy
More informationPT PROP LEVEE (BY OTHERS) TX54 TX54 TX70
(+) 1.97% (+) 2.52% (+) 1.88% (+) 1.43% (+).75% (+).62% THIS PINT IS FUNISHED FO INFOMATION ONLY. THE PLAN INFOMATION O OTHE DATA SHOWN HEEON IS SUBJECT TO CHANGE AND MUST NOT BE CONSTUED AS FINAL. FO
More informationGas Tube Arresters. Certifications, Device Selection Purpose, Operation, Installation Part Number Construction, Part Marking. General Information
Gas Tube Aestes The Potection Poducts Goup of Wold Poducts Inc., specializing in potection poducts fo AC and DC cicuits, is poud to featue a full line of Gas Tube Aestes. Ceamic Gas Tube Aestes povide
More informationUNIT SHOULD BE INSTALLED BY 2 OR MORE PERSONS.
ASSEMBLY INSTUCTIONS ITEM NO: I07-412-WB/PEP Queen ails Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts that may come loose inside the carton
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationTriMark. Gill Group. Orlando Division - 31 FLINT, MI FOODSERVICE EQUIPMENT PLAN & SCHEDULE TYPICAL GUEST FLOOR ICE MACHINE DETAIL
ACTUAL LOCATION OF EFIGEATION ACK TBD BY ACHITECT 10" HC WATE STUB OUTS, PIPING AND CONNECTIONS TO WATE FILTE AND FOM WATE FILTE TO ICE MACHINE BY BY PC F F FLOO SINK BY PC WATE FILTE BY KEC, MOUNTED BY
More informationSAMPLE PLAN. design service SAMPLE KITCHEN REMODEL HOUSTON, TX SAMPLE ST. design service 2044 columbia PAGE 1.
SAMPLE EMODEL POJECT: DAWN BY: FIELD VEIFY ALL dimensions and enclosed drawing. LOUIS FENANDEZ EVISED: 1 4'-11 1/2" LAUNDY 1 x 8'-4" 21'-4" plumbing electrical and water 21'-0" x 16'-0" ironing board D/W
More informationMinimizing Ringing and Crosstalk
Minimizing Ringing and Cosstalk By Glen Dash, Ampyx LLC, GlenDash at alum.mit.edu Copyight 1998, 26 Ampyx LLC When viewed on a schematic, a wie is just a wie. Howeve, when isetimes shink to a few nanoseconds
More informationInstallation Manual. Jandy Housing for Wet Niche Fixtures WARNING. For Vinyl and Fiberglass Pool Installations Model No.
H0284300 Rev C Installation Data Installation Manual Jandy Housing for Wet Niche Fixtures For Vinyl and Fiberglass Pool Installations Model No. PLNICVFLRG WARNING FOR YOUR SAFETY - This product must be
More informationPRIMARY METERING ENCLOSURE
I. CONSTRUCTION NOTES I.1. I.2. I.3. I.4. I.5. I.6. I.7. I.8. Metering transformer enclosure furnished and installed by JEA. Line cables furnished and installed by JEA. Meter enclosure furnished by JEA,
More informationTYPE J (20 FT - 40 FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" NOTE: sheet 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.
Column truss connection Chord splice (see details (See details sheets 3 & 4 of 10) s Top truss chord Free end panel 10-0" Support end panels length varies (See chart below) \ Truss Back truss chord Top
More informationTotal Stalls required % Variance for Mixed Use Sites 604 Additional Variance 544 Total Stalls Provided 544
Symbol Legend ame Elevation 0 A0 W A0 SIM SIM Doo Tag Section Callout Wall Tag Level Indicato Detail Callout Room name 0 Room Tag & umbe / A0 View Refeence Building Code/By-Law Info Building Use & Classification
More informationSECTION 5 TRANSFORMERS
SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established
More informationDISTRIBUTION VAULT 8' x 14' x 9'-4" DEEP TRAFFIC FLAT WALL WITH 5' x 8' OPENING
CU16003K REV 8' x 14' x 9'4" DEEP TRAFFIC FLAT WALL 0113 SHEET 1 OF 6 CU 16003K CU16003K REV 8' x 14' x 9'4" DEEP TRAFFIC FLAT WALL 0113 SHEET OF 6 CU 16003K ITEM (PER ENDWALL): A. 6" DIAMETER PVC CONDUIT
More information(50 FT FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" 8-0" 6-0" Truss Depth. 3" sheets 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.
Column truss connection (See details sheets 3 & 4 of 10) \ Span (Odd number of panels) \ Span (Even number of panels) Back truss chord Top truss chord \ Truss Chord splice Truss depth (See details \ Left
More informationThe Variable Threshold Neutral Isolator (VTNI)
The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary
More informationWisconsin Contractors Institute Continuing Education
IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you
More informationSurface Areas of Cylinders ACTIVITY: Finding Surface Area. ACTIVITY: Finding Area. How can you find the surface area of. a cylinder?
9.3 Suface Aeas of Cylindes a cylinde? How can you find the suface aea of A cylinde is a solid that has two paallel, identical cicula s. lateal suface h 1 ACTIVITY: Finding Aea Wok with a patne. Use a
More information1/4 Turn Fastener - Black Painted Zinc 1/4 Turn Fastener - Stainless Steel 1/4 Turn Cam,.649 Offset - Zinc
ACCESSORIES Y001721 Y001722 Y001723 Y001724 Y001725 Y001726 Y001160 Y001363 Y001442 Y001184 Y002192 Y002193 PART NUMBER Y001721 Y001722 Y001723 Y001724 Y001725 Y001726 Y001160 Y001363 Y001442 Y001184 Y002192
More informationMERALCO Standards: Electrical Design. Engr. Eduard Mercado Electrical Design Team
MERALCO Standards: Electrical Design Engr. Eduard Mercado Electrical Design Team Electrical Design Standards SERVICE VOLTAGES SECONDARY METERED - 240 V, 400 V, 460 V PRIMARY METERING -34.5 kv, 13.8 kv
More informationS11 PHY114 Problem Set 8
S11 PHY114 Poblem Set 8 S. G. Rajeev Apil 4, 2011 Due Monday 4 Ap 2011 1. Find the wavelength of the adio waves emitted by the Univesity of Rocheste adio station (88.5 Mhz)? The numbe of bits pe second
More informationPowerAmp Design. PowerAmp Design PAD188 COMPACT HIGH VOLATGE OP AMP
Preliminary Information PowerAmp Design ev C KEY FEATUES LOW COST SMALL SIZE 31.5mm SQUAE HIGH VOLTAGE 525 VOLTS OUTPUT CUENT 100mA 5 WATT DISSIPATION CAPABILITY 3V/µS SLEW ATE 1mA QUIESCENT CUENT APPLICATIONS
More informationFigure Geometry for Computing the Antenna Parameters.
Spheical Coodinate Systems Definitions Figue 1.2.1 Geomety fo Computing the Antenna Paametes. Antenna Radiation Patten: The distibution of adiated enegy fom an antenna ove a suface of constant adius centeed
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationOptimize Outage Management and Improve Underground System Reliability
SEL-8301 Underground Distribution Sensor Optimize Outage Management and Improve Underground System Reliability Line current measurement accuracy of 1.5 percent allows for more effective switching decisions
More informationHeat-Shrinkable Tubing
HS Series 3:1 Shrink Ratio Made of thermally stabilized cross-linked polyolefin, enabling a recovered wall thickness greater than that of the cable jacket replaced Withstands severe mechanical requirements
More informationSECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting
SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation
More informationUNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1
GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers
More informationCustomer Connection Guide Updates Effective May 2017
This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services
More informationPage Electric Utility Service Specifications
T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum
More informationProposal of Circuit Breaker Type Disconnector for Surge Protective Device
Poposal of Cicuit Beake Type Disconnecto fo Suge Potective Device MASAO SHIBAYAMA, HITOSHI KIJIMA Polytechnic Univesity 2-32-1 Ogawanishi, Kodaia, Tokyo, 187-0035 JAPAN hkijima@uitec.ac.jp Abstact: - A
More informationNOVEMBER 2007: SPECIAL EXCEPTION (CASE #CBA-1667) FOR MEDICAL OFFICE BUILDING IN R-90 ZONE.
Attachment 2 PAT OF PACEL "C", PLAT #24091 Civil Engineers SITE PLAN AMENDMENT #82008024B License No. 16905, Expiration Date: 04/21/2020 7505 ALINGTON OAD OCKVILLE, 20850 THE HEALTH DEPATMENT ECODS DO
More informationMV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer
PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with
More informationStatement of Works Data Template Version: 4.0 Date:
Statement of Woks Data Template Vesion: 4.0 Date: 16.08.17 This Statement of Woks (SoW) Data Template is to be completed by Distibution Netwok Opeatos (DNOs) in ode to povide National Gid the equied data
More informationThermocouples. Table of Contents. Industrial (A-2) Smart Model 1100 (A-26) Smart with Leads Model 1200 (A-27) Wire (A-32)...
Thermocouples Table of Contents page Industrial (A-2)... 2 Smart Model 1100 (A-26)... 3 Smart with Leads Model 1200 (A-27)... 4 Wire (A-32)... 5 sorinc.com 913-888-2630 Industrial Thermocouples M.I. Cable
More information4.3 Section CONDUIT INSTALLATION ACCESSORIES. Thinking of the environment. Fixing accessories Coupling accessories
CONDUIT INSTALLATION ACCESSORIES Thinking of the environment We use only fully recyclable halogen-free thermoplastics, without harmful additives. No cadmium or asbestos in the colourants either. For total
More informationTRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval
Redwood City Electric, Inc. TRANSMITTAL LETTER To: Transworld Construction, Inc. 1178 Folsom Street San Francisco, CA 94103 Date: 05/31/12 Job #: 9340 Regarding: SFO DATA CENTER Attn: Rob Acero We are
More informationElectric Service Guide. Residential Subdivision
Electric Service Guide Residential Subdivision January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website
More informationcontent Introduction Some good reasons to use SMARTr products Reducers, Plugs Conduit Reducer Stopping Plug
CONTENT 1 2 Introduction Some good reasons to use SMARTr products G.I. CONDUITS SMARTr BS4568 : PT1 : 1970 Class 4, IEC 61386-21 : 2004 IEC60614-2 - 1 : 1993, BS EN 50086-2 -1 : 1996 SMARTr BS4568 : PT1
More informationNEER Zinc Cable and Conduit Connectors For Flexible Metal Conduit
For Flexible Metal Conduit SC: Straight Squeeze Type Connector These squeeze type connectors are used to terminate flexible metal conduit to a 1/2 knockout in a dry location box or enclosure. 1/2" and
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationMulti-Channel Power Amplifi ers
Multi-Channel Powe Amplifi es CX-A450 & CX-A850 482.6mm / 19" 88mm / 3 1 /2" (2U) Clou CX-A450 font view Clou CX-A450 ea view 482.6mm / 19" 88mm / 3 1 /2" (2U) Clou CX-A850 font view Geneal Desciption
More informationNemalux INSTALLATION INSTRUCTIONS APPLICATION 1-4
I N D U S T R I A L rev. A- INSTALLATION INSTRUCTIONS *PENDING* E77827 E77827 APPLICATION MR3 & MR6 Luminaires are suitable for use in the following areas as defined by the National Electrical Code (NEC)
More informationTransmission Line Support Systems
Antenna Support Bracket for transmission line The Antenna Support Bracket angle mounts directly to a 4-1/2" (114 mm) OD antenna pipe mount or tower leg. This is ideal for supporting transmission line runs
More informationJL110 / JL110SE. Instruction book
JL110 / JL110SE Instuction book IMPORTANT SAFETY INSTRUCTIONS This appliance is not intended fo use by pesons (including childen) with educed physical, sensoy o mental capabilities, o lack of expeience
More informationSection. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS
Section 8 City of Ellensburg ILLUMINATION STANDARDS Table of Contents STREET ILLUMINATION...3-5 GENERAL NOTES...3 INSTALLATION AND CONNECTIONS...3 MARKING...3 STAKING...3-4 TRENCH REQUIREMENTS...4 ILLUMINATION
More informationDistribution/Substation Transformer
Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation
More informationCONTINUING EDUC ATION
3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com
More informationONE-WAY RADAR EQUATION / RF PROPAGATION
ONE-WAY RADAR EQUATION / RF PROPAGATION The one-way (tansmitte to eceive) ada equation is deived in this section. This equation is most commonly used in RWR o ESM type of applications. The following is
More informationPowerpole Connectors - PP75: up to 120 Amps
Powerpole Connectors - PP75: up to 120 Amps PP75 with Mounting Wings PP75 series Powerpole housings can be used for wire-to-wire, wire-to-board, and wire-to-busbar applications. Wire sizes from #16 AWG
More informationCHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT
CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the
More informationTHE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS
THE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 (503) 266-2231 (503)
More informationMEDIUM VOLTAGE
WWW.GENERGYCABLE.COM 800-308-1330 TM MEDIUM VOLTAGE MEDIUM VOLTAGE ASSEMBLIES Type SH Medium Voltage Power Cable Assemblies are designed for heavy-duty MV applications that require temporary or permanent
More informationBox Fill. We have learned how to fill or NOT overfill a conduit. We must also determine how to fill boxes and conduit bodies.
Box Fill We have learned how to fill or NOT overfill a conduit. We must also determine how to fill boxes and conduit bodies. Box Fill This falls into four categories: 1. Small box fill (NEC 314.16) 2.
More informationSECTION TRANSFORMERS
SECTION 16460 - TRANSFORMERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Section
More informationReplacement Part Number List
DATE: 2016-06-15 I07-400-WB ZI07-400-WB-PATS Queen Sleigh HB Parts Drawing and Bill of Materials eplacement Part Number List P# DESCIPTION WHEE TO USE Qty Unit I07-400/404/412/415-WB/PEP,IFS-422/425-BLC/CA,IML-412/415-
More informationLGH High Voltage Connectors
Introduction Product Facts No exposed high voltage parts Space saving maximum performance from small size and weight Fast connect and disconnect Wide temperature range -67 F to +257 F [-55 C to +5 C],
More informationShrink temperature of 120 C. High-impact, abrasion, corrosion and chemical resistance. Rated for 600V, 90 C continuous use
HS Series 3:1 Shrink Ratio Made of thermally stabilized cross-linked polyolefin, enabling a recovered wall thickness greater than that of the cable jacket replaced Withstands severe mechanical requirements
More informationWELDING POSITIONER PARTS BREAKDOWN DRAWING GP-200
WELDING POSITIONER PARTS BREAKDOWN 10 DRAWING GP-200 1 GP-200-001 FRAME 1 2 GK-160-012 5/16"-18UNC x 5/8" CARRIAGE BOLT 6 3 GK-136-055 5/16"Ø LOCK WASHER 6 4 GK-109-052 5/16"-18UNC HEX NUT 10 5 GP-200-002
More informationDevelopment of Corona Ozonizer Using High Voltage Controlling of Produce Ozone Gas for Cleaning in Cage
Moden Envionmental Science and Engineeing (ISSN 333-58) July 07, Volume 3, No. 7, pp. 505-509 Doi: 0.534/mese(333-58)/07.03.07/0 Academic Sta Publishing Company, 07 www.academicsta.us Development of Coona
More informationCONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI
GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationThru Wall Floor Seals For New Installation
The O-Z/Gedney Thruwall and Floor Seals provide a positive means of sealing pipe, conduit or tube where they pass through a concrete foundation of a structure below grade or below ground water level or
More informationMetal Oxide Varistor Elbow (M.O.V.E.) Surge Arrester
Surge Arresters Catalog Data CA235025EN Supersedes November 2015 COOPER POWER SERIES Metal Oxide Varistor Elbow (M.O.V.E.) Surge Arrester General Eaton combines metal (zinc) oxide varistor technology in
More informationPART OF THE SOUTH HALF OF SECTION 19, TOWNSHIP 1 NORTH, RANGE 64 WEST OF THE 6TH PRINCIPAL MERIDIAN, WELD COUNTY, STATE OF COLORADO
PAT OF THE SOUTH HALF OF SECTION 9, TOWNSHIP, ANGE 6 WEST OF THE 6TH PINCIPAL MEIDIAN, WELD COUNTY, STATE OF COLOADO 0 000' 000' SCALE: " = 000' SUVEYO'S STATEMENT: I, MAK A. HALL, A POFESSIONAL LAND SUVEYO
More informationMC-CVR-1. Király Trading KFT H-1151 Budapest Mogyoród útja
MC-CVR-1 Király Trading KFT H-11 Budapest Mogyoród útja -14 E-mail:_agi@kiralytrading.hu carver clamp Series Applications C-Style Carver Clamps A djustment screw is shielded and out of the work area Ideal
More informationInstallation Instructions
Installation Instructions 30 Built-In Wall Oven with Microwave JTP86, JT965 If you have questions, call 1.800.GE.CARES or visit our website at: ge.com Before You Begin Read these instructions carefully
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationINSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL
March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete
More informationORDIC FIBERGLASS, INC.
s, 3 Phase Sectionalizing 15kV 200Amp s Nordic cabinets are produced of fire-retardant resin and a combination of chopped glass spray-up and hand lay-up using woven roving glass reinforcement, which adds
More informationPowerAmp Design. PowerAmp Design PAD195 COMPACT HIGH VOLATGE OP AMP
Preliminary Information PowerAmp Design ev E KEY FEATUES LOW COST SMALL SIZE 40mm SQUAE HIGH VOLTAGE 1040 VOLTS OUTPUT CUENT 100mA 10 WATT DISSIPATION CAPABILITY 3V/µS SLEW ATE 1mA QUIESCENT CUENT APPLICATIONS
More information