System Ratings, Limits and Real-Time Monitoring. Presented to: Operating Committee April 21, 2016
|
|
- Rose Jenkins
- 5 years ago
- Views:
Transcription
1 System Ratings, Limits and Real-Time Monitoring Presented to: Operating Committee April 21, 2016
2 Thermal Facility Ratings In New England Summer ratings (April 1 to October 31) Winter ratings (November 1 to March 31) Thermal capacity ratings for transmission facilities ISO-NE procedure OP-16 ISO-NE database NX-9 Normal and Emergency ratings are applied Normal continuous 24 hour rating *Long Time Emergency (LTE) 12 hour summer and 4 hour winter load cycle ratings Short Time Emergency (STE) 15 minute rating Drastic Action Limit (DAL) 5 minute rating *The use of these ratings requires the pre-contingent circuit loading to be at or below the Normal rating and that the circuit loading be returned to or below the Normal rating after the daily load cycle 2 2
3 Voltage Limits Voltage limits required with NERC standard changes Full implementation in summer of 2015 No seasonal limit changes for voltage Transmission owners supply limits based on their equipment ratings Voltage limits for transmission facilities ISO-NE procedures OP-19 and M/LCC-15 M/LCC-15, attachment H lists LCC operating area limits M/LCC-15, attachment E lists all exceptions Normal and Emergency limits are applied, high and low Normal Voltage Limit (NORMVL) continuous limit Long Time Emergency Voltage Limit (LTEVL ) minimum of 30 minute limit Short Time Emergency Voltage Limit (STEVL) 15 minute limit Drastic Action Limit Voltage Limit (DALVL) 5 minute limit 3 3
4 4 4 Voltage Limits (M/LCC-15H)
5 Transmission Voltage Limits Used in Operations Operation at voltages and time durations outside of the shaded area may result in an SOL exceedance 5 5
6 6 6 SCADA Transmission Voltage Alarms
7 7 7 SCADA Subtransmission Voltage Alarms
8 Transmission Voltage Limits Used in Planning Company Other New England Utilities National Grid VELCO kv Level Pre Contingency Post Contingency Pre Switching Post Switching High Voltage Low Voltage High Voltage Low Voltage High Voltage Low Voltage Subtransmission 34.5 kv, 46 kv and 69 kv limits 0.95 pu to 1.05 pu pre-contingency 0.90 pu to 1.1 pu post-contingency What is the post-contingency pre switching low voltage limit? What is the lowest voltage allowed at the customer service meter? 8 8
9 Real Time Monitoring Real-Time Contingency Analysis (RTCA) is a predictive tool required for Transmission Operators Uses a power-flow model ingesting real time data In the VELCO control room RTCA runs every 5 minutes RTCA application outages 521 transmission and subtransmission contingencies (element outages) within VT and with our neighboring utilities Ranks thermal and voltage limit violations by severity for the Operators to monitor The Operator must know the risk to the system at all times with this application, have mitigation plans and if necessary take pre-contingency actions to prevent a transmission limit violation 9 9
10 Real Time Monitoring Both VELCO and ISO-NE monitor the VELCO transmission system and run RTCA Both VELCO and ISO-NE have what NERC requires, a wide-area view within our geographic areas VELCO has better detail of the VT system in the EMS model ISO-NE looks to VELCO for ensuring local area reliability ISO-NE Transmission Operating Guides (TOGs) are used for monitoring interface limits Studies performed by ISO-NE and VELCO determine the thermal, voltage and stability operating interface limits for the VT and NE areas 10 10
11 Real Time Monitoring The PSSE load-flow model used by ISO-NE for studies completely models the VT subtransmission system and distribution loads ISO-NE ensures that for all transmission system contingencies, the area customer loads and transfers can be supported, i.e. both thermal loading and voltage The looped VT subtransmission system is critical to supporting load and is impacted by the overlying transmission system VELCO has the responsibility to monitor the subtransmission that ISO-NE does not fully model or monitor in their SCADA/EMS 11 11
12 System Models and Ratings The VT subtransmission system is completely represented in the regional power flow PSSE models Annual update process includes review of the subtransmission system Topology changes provided at least one month prior to change Needed for EMS modeling, Operations awareness, Engineering and Planning studies Modeling data is needed for the following Lines Transformers Shunt capacitor banks Generators Others, such as overload protection schemes 12 12
13 Modeling Data Data responsibilities GMP, VEC, BED, Swanton, WEC, Stowe, VPPSA Existing process Send all updates to DUSYSTEM GMP-North consistently using process 13 13
14 Thermal Circuit Ratings (GMP-North) Covers 34.5kV system Includes other utilities, e.g. Morrisville and Hardwick 14 14
15 Thermal Circuit Ratings (GMP-South) We follow table based on conductor rating Could there be a more limiting element? 15 15
16 Thermal Circuit Ratings (VELCO) Publish 1 st and 2 nd limiting elements Device legend to define limiting elements 16 16
17 Recent Operating Events Several operating events in recent months regarding system thermal ratings used in real-time operation February 3 rd, loss of VELCO K22 line with the K21 open for maintenance Morrisville #3 to GMPR-Johnson B kV circuit was operated up to 111% above its winter limit of 37.5MVA for 22 minutes Ambiguity with the VELCO and GMP control centers on the winter rating Morrisville #3 to VELCO-Stowe kV circuit operated up to 85% of rating The line conductor sagged making contact with the underbuilt lower voltage distribution 17 17
18 Recent Operating Events March 22 nd, VELCO F206 Granite to Comerford line out of service for maintenance The GMP Websterville to McIndoes 3311 line approached overload at 17.9 MVA winter rating 3311 limiting element, Websterville substation switch The 3311 was opened by SCADA control Opening of the 3311 line as a pre-planned option added more load on the NGRID Comerford to GMP Marshfield 3316 line Ambiguity between the VELCO and GMP control centers on the 3316 winter ratings, caused three area generators (Dodge Falls, Ryegate, and McIndoes) to be reduced 3316 limiting element, WEC Danville Tap switch Replacement of the Websterville switch has been postponed with the intention to upgrade with rebuild of the substation 18 18
19 19 19 Geographical Area
20 20 20 GMP Area One-line
21 Survey of VT Control Centers BED have max alarm limits in SCADA and unclear on seasonal changes GMP-N have a list used in the control room, hope to have SCADA upgrade include limits in SCADA and update for Winter and Summer GMP-S have alarm limits in SCADA, however they are very conservative and when in alarm the Operators refer to the list in the control room to verify. No seasonal limit changes being made Swanton no SCADA indications, the reclosers control (limit) line loading. Rely on experience for operating. VEC mainly rely on Engineering, no list in the control room 21 21
22 Possible Solutions Develop a common VT thermal circuit database for subtransmission and specific distribution (e.g. BED 13.8kV) VELCO would be responsible for administration We need consistency in rating methodology In the interim, send all updates to DUSYSTEM DATA@VELCO.COM Make priority for looped subtransmission that can more easily be overloaded Publish common ratings in each control center for real time operation Will require a revision and update process For control centers with SCADA monitoring, apply seasonal limits with alarm set-points Provide training to the VT operators on rating methodologies, contingencies, limit exceedance resolution 22 22
23 23 23 Questions?
MidAmerican Energy Company 69 kv Facility Ratings Methodology
MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy
More informationVoltage and Reactive Procedures CMP-VAR-01
Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes
More informationFACILITY RATINGS METHOD TABLE OF CONTENTS
FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5
More informationCentral Hudson Gas & Electric Corporation. Transmission Planning Guidelines
Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008 and FAC-009 Issued by: Dan Custer Reviewed by: Tom Mielnik Version 2.7 1 1.0 Scope: This document provides
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationSystem Operating Limit Definition and Exceedance Clarification
System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion
More informationPhase Angle Monitoring:
Phase Angle Monitoring: Industry Experience Following the 2011 Pacific Southwest Outage Recommendation 27 Ryan D. Quint, PhD, PE NERC SMS Coordinator NASPI Work Group Meeting October 2016 Background Purpose:
More informationDocument C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting
Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.
More informationATTACHMENT Y STUDY REPORT
Dynegy Marketing and Trade, LLC Wood River Units 4 & 5: 473 MW Retirement: June 1, 2016 ATTACHMENT Y STUDY REPORT March 23, 2016 PUBLIC / REDACTED PUBLIC VERSION EXECUTIVE SUMMARY An Attachment Y notification
More informationDUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning
DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation
More informationSYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011
SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 Baselining using large quantities of historical phasor data to identify and understand patterns in interconnection-wide grid behavior, to
More information1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g
2011 SERTP Welcome SERTP 2011 First RPSG Meeting & Interactive Training Session 9:00 AM 3:00 PM 1 2011 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission
More informationGridLiance Reliability Criteria
GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances
More informationTransmission Facilities Rating Methodology for Florida
Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke
More informationGeomagnetic Disturbances. IEEE PES Chicago Chapter Technical Presentation March 12, Alan Engelmann Transmission Planning ComEd.
Geomagnetic Disturbances IEEE PES Chicago Chapter Technical Presentation March 12, 2014 Alan Engelmann Transmission Planning ComEd GMD Background Solar Disturbances Impacts Monitoring Events 2 Solar Disturbances
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008-3 Version 3.4 1 Contents 1. Scope... 3 2. Establishment and Communication of Facility Ratings:... 3 2.1.
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationLONG-RANGE TRANSMISSION PLAN
LONG-RANGE TRANSMISSION PLAN 2011-2020 Transmission and Substation Engineering Department August 15, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY Page i I. OVERVIEW 1 A. Factors Affecting the Long Range Transmission
More informationTTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line
TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line Vince Leung March 27, 2017 Reviewed by Johnny Nguyen Table of Contents Background 2 Objective 3 Base Case Assumptions
More informationROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT
ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings
More informationTransmission Facilities Rating Methodology
Document title Transmission Facilities Rating Methodology Document number EGR-TRMC-00009 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning- Progress Energy
More informationLine Impedance Estimation Using SCADA Data
Line Impedance Estimation Using SCADA Data Presenter: Ramiro Da Corte - Power System Engineer Prepared by: James Shen - Principal Engineer, AESO Nov. 5, 214 Background AESO is responsible for grid reliability
More informationAMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Ameren Missouri, Ameren Illinois, and Ameren Transmission Company of Illinois)
AMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Missouri, Illinois, and Transmission Company of Illinois) TRANSMISSION PLANNING CRITERIA AND GUIDELINES March 28, 2003 Revised April
More informationSuccess Story: Practical Use of Synchrophasor Technology in ISO-NE Operations
2018-10- 23 PHILADELPHIA, PA Success Story: Practical Use of Synchrophasor Technology in ISO-NE Operations NASPI Work Group Meeting Xiaochuan Luo TECHNICAL MANAGER BUSINESS ARCHITECTURE AND TECHNOLOGY
More informationCentral East Voltage and Stability Analysis for Marcy FACTS Project Phase I
Prepared by NYISO Operations Engineering 1. INTRODUCTION Central East Voltage and Stability Analysis for The Marcy Flexible AC Transmission System (FACTS) project is a joint technology partnership between
More informationTRANSMISSION FACILITIES...7
Table of Contents 1. INTRODUCTION...4 1.1. Objective... 4 1.2. NERC FAC-008 Compliance... 4 1.3. Seminole s Normal Rating... 5 1.4. Seminole s Four-Hour Rating... 5 1.5. Seminole s Emergency Rating...
More informationKansas City Power & Light Company. Transmission Facility Rating Methodology
Company Prepared by: KCP&L Transmission Planning December 6, 2017 Table of Contents 1. Purpose...4 2. Generator Rating Methodology...4 3....4 3.1. Equipment Rating Methodology...4 3.2. Items considered
More informationP3 Policy 3: Operational Security
P3 Policy 3: Operational Security Chapters A. N-1 Security Principle (operational planning and real time operation) 1. Types of contingencies 2. Regional approach Observability area determination 3. Operating
More informationAC Transmission Cases: Updated Powerflow Analysis
AC Transmission Cases: Updated Powerflow Analysis Zach Smith Director - Transmission Planning New York Independent System Operator New York State Public Service Commission AC Transmission Technical Conference
More informationPhasor Measurements for Blackout Prevention
Phasor Measurements for Blackout Prevention Anjan Bose Washington State University Pullman, WA, USA i-pcgrid 2013 San Francisco, CA March 26-28, 2013 Monitoring the Power Grid (SCADA) Visualization Tables
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping
More informationSub Regional RTEP Committee Mid-Atlantic - PSEG Solution Meeting
Sub Regional RTEP Committee Mid-Atlantic - PSEG Solution Meeting October 29, 2018 Need Number: PSEG-2018-0001 Need Presented: 9/21/2018 Meeting Date: 10/29/2018 Process Stage: Solution Meeting Supplemental
More informationNORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE)
COORDONNATEUR DE LA FIABILITÉ Direction Contrôle des mouvements d énergie Demande R-3944-2015 NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE) Original : 2016-10-14 HQCMÉ-10, Document 2 (En liasse) Standard
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area
More informationATTACHMENT - AESO FUNCTIONAL SPECIFICATION
ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments
More informationCOS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1
Outage Coordination Process Version 1.0 NERC Reliability Standard IRO-017-1 COS MANUAL March 24, 2017 www.peakrc.com. Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...
More informationMaine Public Service Reliability Solutions Update
Maine Public Service Reliability Solutions Update Presentation at the Planning Advisory Group 9/17/13 MPS Reliability Solutions Study Review of Previous PAG Updates RLC completed assessment of existing
More informationPower System Studies
Power System Studies Laois Ballyragget Cable Feasibility Study PE667-F4-R3-1-3 ESBI Engineering Solutions Stephen Court, 18/21 St Stephen s Green, Dublin 2, Ireland Telephone+353-1-73 8 Fax+353-1-661 66
More informationG. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Assessment of the Impact of GMD on the TVA 500 kv Grid & Power Transformers Part II:
More informationLinear State Estimation
Linear State Estimation Marianna Vaiman, V&R Energy marvaiman@vrenergy.com WECC JSIS Meeting Salt Lake City, UT October 15 17, 2013 Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved.
More informationCAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24
RC0120A - RC IRO-010 Data Specification NOTE: Changes from Peak's Attachment A are highlighted in red in columns C through G Section Category Number Responsible Pa Data Item Data Transfer Method 1.1 Transmission
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationAN ADVANCED REACTIVE POWER MANAGEMENT SYSTEM FOR THE SEOUL METROPOLITAN POWER SYSTEM
AN ADVANCED REACTIVE POWER MANAGEMENT SYSTEM FOR THE SEOUL METROPOLITAN POWER SYSTEM Scott G. Ghiocel 1, Sangwook Han 2, Byung-Hoon Chang 3, Yong-gu Ha 3, Byong-Jun Lee 2, Joe H. Chow 1, and Robert Entriken
More informationGIS Data Assessment for DMS and Smart Grid Implementation
GIS Data Assessment for DMS and Smart Grid Implementation John Dirkman, P.E. Telvent Esri EGUG 11 October 2011 11/3/2011 1 Agenda 1. Determining your Distribution Management System and Smart Grid Drivers
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities
More informationIMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES
IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES (Summary) N S Markushevich and A P Berman, C J Jensen, J C Clemmer Utility Consulting International, JEA, OG&E Electric Services,
More informationNERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell
Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June
More informationAppendix A. NERC Transmission Vegetation Management Plan. F:\P2000\ \A89\VMP\Final_VMP_ docx
Appendix A NERC Transmission Vegetation Management Plan F:\P2000\2000727\A89\VMP\Final_VMP_20130517.docx Standard FAC-003-1 Transmission Vegetation Management Program A. Introduction 1. Title: Transmission
More informationLow Frequency Demand Disconnection Summary
Low Frequency Demand Disconnection Summary This article assesses the suitability of current low frequency protection on the network as more distributed generation is connected to WPD s network. DSOF June
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer
More informationTampa Electric Company Facility Rating Methodology Approved 11/20/2018
Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Effective Date: 12/01/2018 Responsible Department: System Planning Review Cycle: 3 Years Last Date Reviewed: 11/16/2018 Next Planned
More informationHow OSHA s New Transient Overvoltage Requirements Affect Work Practices. B.A. YEUNG, H. BRANCO Leidos Engineering, LLC USA
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium How OSHA s New Transient Overvoltage Requirements Affect Work Practices B.A. YEUNG,
More informationPlanning Criteria. Revision 1.4 MAINTAINED BY: Transmission Working Group System Protection and Control Working Group Supply Adequacy Working Group
Planning Criteria Revision 1.4 MAINTAINED BY: Transmission Working Group System Protection and Control Working Group Supply Adequacy Working Group PUBLISHED: 10/9/2017 LATEST REVISION: Effective 7/25/2017
More informationITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/
ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...
More informationROSE - Real Time Analysis Tool for Enhanced Situational Awareness
ROSE - Real Time Analysis Tool for Enhanced Situational Awareness Marianna Vaiman V&R Energy Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved. WECC JSIS Salt Lake City, UT October
More informationCONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y
CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y. 10003 EP 7000 5 JULY 2009 VOLTAGE SCHEDULE, CONTROL, AND OPERATION OF THE TRANSMISSION SYSTEM PURPOSE This specification describes
More informationCHAPTER 6 MITIGATION OF VOLTAGE SAG, SWELL AND SINGLE PHASE OUTAGE USING MULTI WINDING TRANSFORMER
90 CHAPTER 6 MITIGATION OF VOLTAGE SAG, SWELL AND SINGLE PHASE OUTAGE USING MULTI WINDING TRANSFORMER 6.1 INTRODUCTION From the literature survey it is observed that the DVRs based on direct converters
More informationTransmission System Phase Backup Protection
Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated
More informationGMD Voltage Collapse Study
GMD Voltage Collapse Study Terry Volkmann 2016 Fall Reliability Conference November 2, 2016 1 GMD Voltage Collapse Studies in Wisconsin and Maine Overview: Modeling shows GMD Voltage Collapse Issues: Power
More informationInverter-Based Resource Disturbance Analysis
Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western
More information(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in
A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationImpact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods
Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing
More informationFault Locating at Pacific Gas and Electric Company
Fault Locating at Pacific Gas and Electric Company i-pcgrid 2015 Scott Hayes Relay Targets were the earliest fault location devices. Light Beam Oscillographs and later Digital Fault Recorders Microprocessor
More informationMANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. July 2016 Version 4
MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS July 2016 Version 4 This page intentionally blank LEGISLATIVE AUTHORITY Section 15.0.3(1) of The Manitoba Hydro Act (C.C.S.M. c. H190) authorizes
More informationI WP Asset # I ~:2 3. I Review Annual. ~c~~ Date: 'l/j(j/! ZL>IJ,...
- District Standard - FAC Facility Design, Connections 950.001 and Maintenance CHELAN COUNTY ~ PUBLIC UTILITY DISTRICT Owned By The People~ Serve Facility Connection Requirements Page 1 of 101 EFFECTIVE
More informationAppendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS
Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements
More informationJason Harchick, P.E. Sr. Manager, System Planning and Protection Ryan Young Manager, Substation Engineering
DLC s Brady IIB Project Jason Harchick, P.E. Sr. Manager, System Planning and Protection Ryan Young Manager, Substation Engineering Project Need In 2007, PJM and Duquesne Light Company (DLC) transmission
More informationWide Area Voltage Dispatch. - Case studies of ISO New England using NETSS AC XOPF program
Wide Area Voltage Dispatch - Case studies of ISO New England using NETSS AC XOPF program Xiaochuan Luo ISO New England Inc Marija Ilic, Jeff Lang NETSS Inc. EPRI AVC Workshop PJM, Norristown, PA May 19,
More informationSmart Wires. Distributed Series Reactance for Grid Power Flow Control. IEEE PES Chapter Meeting - Jackson, MS August 8, 2012
Smart Wires Distributed Series Reactance for Grid Power Flow Control IEEE PES Chapter Meeting - Jackson, MS August 8, 2012 Jerry Melcher Director Program Management Smart Wires Inc. 2 Agenda Technology
More informationOPERATING PROCEDURE. Table of Contents
Table of Contents PURPOSE... 1 1.0 CAISO DISPATCHER RESPONSIBILITIES... 2 Monitor Loads and Generators... 2 Monitor Balancing Areas... 2 Operate CAISO Controlled Grid Voltage Equipment... 3 Voltage Schedules...
More informationCompany Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design
Company Directive POLICY DOCUMENT: SD4/7 Relating to 11kV and 6.6kV System Design Policy Summary This document describes the standard requirements for the design of the 11kV and 6.6kV systems. Reference
More informationMOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE
MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description
More informationModule 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY
Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground
More informationFundamental Concepts of Dynamic Reactive Compensation. Outline
1 Fundamental Concepts of Dynamic Reactive Compensation and HVDC Transmission Brian K. Johnson University of Idaho b.k.johnson@ieee.org 2 Outline Objectives for this panel session Introduce Basic Concepts
More informationA Comprehensive Approach for Sub-Synchronous Resonance Screening Analysis Using Frequency scanning Technique
A Comprehensive Approach Sub-Synchronous Resonance Screening Analysis Using Frequency scanning Technique Mahmoud Elfayoumy 1, Member, IEEE, and Carlos Grande Moran 2, Senior Member, IEEE Abstract: The
More informationIndustry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017
Industry Webinar Reactive Power Planning NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Webinar Topics Reliability Guideline on Reactive Power Planning Webinar Topics Fundamentals of
More informationDistribution Network Capacitor Resonance A Case Study
Distribution Network Capacitor Resonance A Case Study Authors: Chris Halliday Frank Iannelli Dr Robert Barr Director of Technical Services Power Quality Technician Director and Training Electrical Consulting
More informationFacility Ratings Methodology
Facility Ratings Methodology FAC-008-3 Compliance Document Establishment Date: December 19, 2016 Effective Date: July 14 th, 2017 Approved by: Job Title Manager, Network & IRP Transmission Planning Name
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationCriteria. Table of Contents
Criteria Title: SUBSTATION EQUIPMENT AMPACITY RATINGS Department: Document No: Issue Date: Previous Date: Asset Management CR-0063 v08 06-16-2014 12-26-2013 Table of Contents 1.0 Scope... 2 2.0 Introduction...
More informationEH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström
EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids
More informationWestern New York Transmission Constraints
Western New York Transmission Constraints Wes Yeomans Vice President Operations Market Issues Working Group Rensselaer, NY August 4, 2016 2000-2016 New York Independent System Operator, Inc. All Rights
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More informationApplication for A Sub-harmonic Protection Relay. ERLPhase Power Technologies
Application for A Sub-harmonic Protection Relay ERLPhase Power Technologies 1 Outline Introduction System Event at Xcel Energy Event Analysis Microprocessor based relay hardware architecture Sub harmonic
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationReliability Analysis Update
Reliability Analysis Update Transmission Expansion Advisory Committee March 9, 2017 2016/17 RTEP Long Term Proposal Window 2 2016/17 RTEP Long Term Proposal Window Timeline Window Opened: 11/1/2016 Window
More informationReliability Analysis Update
Reliability Analysis Update Transmission Expansion Advisory Committee August 11, 2016 2016 RTEP Window #3 Anticipated Scope and Timeline Anticipated 2016 RTEP Window #3 Anticipated 2016 RTEP Window #3
More informationDetecting and Managing Geomagnetically Induced Currents With Relays
Detecting and Managing Geomagnetically Induced Currents With Relays Copyright SEL 2013 Transformer Relay Connections Voltage Current Control RTDs Transformer Protective Relay Measures differential current
More informationPJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016
PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6
More informationSub Regional RTEP Committee South
Sub Regional RTEP Committee South June 9, 2017 Subregional RTEP (SRRTEP) Meeting Format Update Response to stakeholder feedback Today s Presentation approach First Review (baseline and supplemental by
More informationThe Engineering Problem. Calculating GIC Flow through the EHV System
The Engineering Problem Calculating GIC Flow through the EHV System 1 Creating the GIC System Model Since the EHV system is a three-phase balanced network, it is only necessary to model a single-phase
More informationIntegration of Wind Generation into Weak Grids
Integration of Wind Generation into Weak Grids Jason MacDowell GE Energy Consulting NERC ERSTF Atlanta, GA December 10-11, 2014 Outline Conventional and Power Electronic (PE) Sources Stability limitations
More informationPre-Construction Sound Study. Velco Jay Substation DRAFT. January 2011 D A T A AN AL Y S IS S OL U T I ON S
Pre-Construction Sound Study Substation DRAFT January 2011 D A T A AN AL Y S IS S OL U T I ON S TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 SOUND LEVEL MONITORING...1 3.0 SOUND MODELING...4 3.1 Modeling
More information