1 Facility Ratings Methodology FAC Compliance Document Establishment Date: December 19, 2016 Effective Date: July 14 th, 2017 Approved by: Job Title Manager, Network & IRP Transmission Planning Name Sachin Verma Version: The Facility Ratings Methodology (FRM) was established on December 19, 2016, and is subject to change based on new information and input collected during NV Energy Facility Ratings data collection. 1 P a g e

2 Contents Scope... 4 Overview... 4 Hierarchy of Reference Sources for Manufacturer/Nameplate Ratings... 4 Determination of Most Limiting Facility... 4 Jointly-Owned Facility Ratings... 5 Procedures for Ring and Breaker-and-a-Half Bus Configurations... 5 Procedures for Non-standard Bus Configurations... 5 Methodology... 6 Transmission Line Conductor - [TRANSMISSION PLANNING]... 6 Underground Cable Ratings... 8 Transformers [TRANSMISSION PLANNING] Shunt Compensation Devices [SUBSTATION DESIGN] Series Compensation Devices [SUBSTATION DESIGN] Circuit Breakers/Circuit Switchers [SUBSTATION DESIGN] Bus [SUBSTATION DESIGN] Jumpers [SUBSTATION DESIGN] Disconnect Switches [SUBSTATION DESIGN] Line Switches [TRANSMISSION ENGINEERING] Current Transformers (CTs) [SUBSTATION DESIGN & SYSTEM PROTECTION] Control Cables and Wiring [SUBSTATION DESIGN] Protective Relay Devices [SYSTEM PROTECTION] Wave Traps [SUBSTATION DESIGN] Facility Rating Communication Reliability Coordinator Communication Neighboring Entities Communication of Thermal Rating Incursions Change Control Process Facility Ratings Methodology Facility Ratings Data/Spreadsheet Facility Ratings Updates SharePoint Workflow Example Workflow Version History Appendix A - Analysis of Weather Assumptions Appendix B - Standard Conductor Ratings Appendix C NV Energy MOT Conductor Ratings P a g e

3 Appendix D Aluminum Conductor Bus Ratings (Classes AA and A) Appendix E - Standard Bus Ratings Appendix F Control Cable Ratings Appendix G NVE Jointly-owned Facility Rating Data Request P a g e

4 Scope Overview This document provides NV Energy s methodology for developing and communicating Facility Ratings of its solely and jointly-owned Facilities. This document defines the basis for the calculation of normal and emergency ratings of NV Energy Bulk Electric System (BES) Facilities, to comply with the requirements of NERC Reliability Standard FAC NV Energy s Transmission Planning department has primary responsibility for developing and maintaining the Facility Ratings and methodology, beyond the Generator Step-up (GSU) Transformer high-side bushings 2. Facility Ratings collection is a collaborative effort between multiple NV Energy departments: Substation Construction and Maintenance, Substation Design, System Protection, Transmission Civil Engineering and Construction, and Transmission Planning. The NV Energy Generation department maintains primary responsibility for developing Facility Ratings for Generation Facilities and equipment up to the high-side bushings of the GSU 3. NV Energy s transmission system is designed such that the high-side bushings of the GSU are the point of interconnection between the Generator Owner and the Transmission Owner. Given that there are no Facilities between the generation Facilities and the point of interconnection with the Transmission Owner, NV Energy, by definition does not own or operate Facilities addressed under Requirement 2. Procedural documents and Element data association with Generation Facilities are owned and maintained by the NV Energy Generation department. Hierarchy of Reference Sources for Manufacturer/Nameplate Ratings Several reference sources will be used to establish equipment ratings based on manufacturer or nameplate ratings. The following list establishes a hierarchy of reference sources used when establishing equipment nameplate or manufacturer ratings. 1) Manufacturer data or correspondence 2) Nameplate drawing or image 3) Engineering single line diagram 4) Other engineering drawings (plan view, section views, bill of materials, etc.) 5) Purchase Orders The highest ranked resource known at the time the rating is established will be used in establishing the equipment rating. Determination of Most Limiting Facility The NERC defined term, Facility, is a set of electrical equipment that operates as a single Bulk Electric System Element. In addition, the NERC defined term, Element, is any electrical device with terminals that may be connected to other electrical devices such as a generator, transformer, circuit breaker, bus section, or transmission line. An Element may be comprised of one or more components. Elements in series, which make up a Facility (line section, substation transformer circuit, shunt reactive device), will be reviewed to determine which Element(s) have the most limiting rating. NV Energy s Facility Rating shall respect the most limiting applicable Equipment Rating of the individual equipment that comprises that Facility 4. 2 FAC R6 3 FAC R1 4 FAC R3.3 4 P a g e

5 If information is received suggesting that a more limiting Element exists on a Facility, NV Energy will take steps to verify the information, which may include field inspections. Once review and field verification, (if applicable) is complete, NV Energy will take steps to mitigate any differences identified for either the Facility normal rating or Facility emergency rating. Jointly-Owned Facility Ratings In cases where a BES Facility is shared with an external entity (such as a line terminal being owned by one party and the line conductor by another party), NV Energy takes into account rating data provided by the owner(s) of the segment(s) of the Facility and applies the most limiting rating as the rating of the Facility. The communication process for requesting these ratings can be found in the Establishment and Communication of Facility Ratings section of this Methodology. In cases where a Facility is jointly owned (such as two owners each owning an undivided 50% ownership interest in a Facility), the operator of the Facility determines the Facility rating and shares this rating information with the other joint owners. Procedures for Ring and Breaker-and-a-Half Bus Configurations In the event that a line section or bulk power transformer terminates on a substation configured as a ring bus or a breaker-and-half, the facility rating for long-range planning models will be determined assuming a closed ring bus or closed breaker-and-a-half. The most limiting facility rating of the entire ring bus or the most limiting facility rating of the breaker positions adjacent to the line section or bulk power transformer in a breaker-and-a-half scheme are considered in determining the rating of the line section or bulk power transformer. In order to account for the flow split when entering a closed ring or closed breaker-and-a-half, a multiplier is used to adjust the ratings of the ring bus or breaker-and-a-half facilities. The multiplier assumes a split of 50%-50%, meaning that 50% of the line section flow or bulk transformer flow is assumed to be transferred onto one leg of the ring bus or breaker-anda-half. This results in the ring bus or breaker-and-a-half limit (including breakers, switches, and jumpers) being adjusted by 200% to account for the flow split of a closed ring or a closed breaker-and-a-half. Procedures for Non-standard Bus Configurations In the event that a bulk power transformer terminates on a substation not configured in a ring bus or a breakerand-half, the facility rating for long-range planning models will still be determined assuming a configuration with all breakers closed. In order to account for the flow split when entering, the non-standard configuration, a summation of the connected breaker ratings (Breaker A + Breaker B.+ Breaker N = Facility Rating) multiplied by a safety factor of.75, is used to adjust the ratings of transformer facilities. 5 P a g e

6 Methodology 5 Transmission Line Conductor - [TRANSMISSION PLANNING] Background NV Energy s original Legacy ratings for Northern Transmission Lines were based on values in the Westinghouse Transmission & Distribution Reference books. For the Northern system, lines will keep their Legacy ratings until Maximum Operating Temperatures (MOTs) are known (pending completion of LiDAR analysis). Once MOTs are known, the ratings will be re-calculated based on the IEEE 738 assumptions in this report. Most of the lines in Southern Nevada have LiDAR verified MOT information available. In absence of LiDAR MOT or verified DOT information, it is assumed that the line meets clearance requirements, and can operate up to the maximum conductor temperature. The ratings for these lines are determined based on RateKit IEEE738 calculations using standard weather assumptions for that region, and the conductor s MOT. In the Northern System, NV Energy previously had the underground cable manufacturer perform the design based on information provided to them. The manufacturer then provided NV Energy a rating for the complete line design as it was to be constructed in the field. Lead lines connected from the high-side bushing of the GSU, are designed not to be limiting Elements for the operation of the GSU or the Transmission Line Facility. Procedure NV Energy uses the following procedure to determine ratings on overhead conductors. LiDAR MOT? Yes No Is this line on an exception list in NVE s FAC Policy? Yes Confirmed DOT? No Run Ratekit with the Standard North or South rating parameters. Yes Run RateKit with the Exception Weather Parameters in the Policy. No North or South? NOTE: If the LiDAR Clearance MOD or DOT is above the Conductor MOT, the lower is used. Is there a Westinghouse Rating available for the conductor? No Run Ratekit with Conductor MOT Yes North Westinghouse Ratings South Run Ratekit with Conductor MOT Figure 1: Conductor Rating Procedure 5 FAC R3 6 P a g e

7 Switches are included in the line facility rating if they meet the below flow-chart criteria. Is the switch connected to any bus-work? No Include in Line Listing Yes Addressed in FAC Ratings Spreadsheet Figure 2: Procedure to Determine Switch Inclusion in Line Ratings Normal & Emergency Current Ratings The ratings calculated by RateKit using the weather assumptions (Appendix A) result in the Continuous Current Rating of the conductor. NV Energy uses an emergency rating for conductor equal to the normal rating. Within the NV Energy system, there are instances where dynamic ratings are used for transmission lines. Protection of these locations are done through thermal-loading protective relaying schemes. Dynamic ratings of transmission lines are not a common practice in NV Energy. The following lines are identified with dynamic ratings: Line #118: Eagle Oreana 120kV Line Line #173: Mira Loma Airport 120kV Line Standard Weather Assumptions Below are the standard weather assumptions for use in RateKit IEEE738 conductor rating calculations. Under certain conditions, NV Energy may monitor ambient temperature and dynamically rate lines for operational purposes. IEEE 738 Steady State Thermal Rating Calculation Parameters North South Laughlin Air Temperature ( C) 40 (104F) 44.4 (112F) 48.9 (120F) Wind Speed (Ft/Sec) Wind Angle relative to conductor Elevation (Ft) Latitude (Deg N) Date (Month/Day) 4-Jul 4-Jul 4-Jul Solar Time (Hr) Coefficient of Emissivity Coefficient of Solar Absorptivity Conductor Orientation (North=0) Atmosphere Conductor Type Diameter (In) Conductor Resistance 25 C Conductor Resistance 75 C MOT ( C) Clear Actual Actual (or DOT) Figure 3: RateKit Parameters 7 P a g e

8 Westinghouse & RateKit Engineering Reference Appendix C is a list of all conductor types that NV Energy owns on 55kV or above facilities. For each conductor, the Westinghouse Legacy Rating is included (if available). Additionally, the conductor code-name used for RateKit is included, and RateKit ampacity ratings are calculated using the standard weather assumptions plus the conductor s MOT. Laughlin Weather Assumptions (Exception) The Laughlin Area subjects NV Energy s lines to different conditions than those present in Vegas. For Laughlin, the same assumptions are used as in Vegas, except for the following alterations: Ambient Temperature: 48.9 C Altitude: 800 feet Latitude: 35 This exception applies to the following list of lines: Laughlin - Mohave 500kV #1 Laughlin - Mohave 500kV #2 Laughlin - Southpoint 69kV Laughlin - River Road 69kV Laughlin - Big Bend 69kV River Road - Kidwell 69kV Southpoint Big Bend 69kV Kidwell Searchlight 69kV Underground Cable Ratings For NV Energy, the normal rating will be ampacity that produces a conductor temperature of 90⁰C. A four hour emergency rating may be applied if needed to meet contingencies; the emergency rating shall be equal to the ampacity that will produce a conductor temperature of 105⁰C. NV Energy designs and constructs the underground cable system duct-bank around physical space constraints such as highways, parallel transmission lines sewer and water lines, or other subsurface utilities. The rating may be calculated using a program called Cymcap or may be based on outside consultant s engineering study, or cable manufacturer provided data. Initial design takes into account the ampacity requirement, and what short circuit ratings are necessary from the underground cable system. If necessary, parallel cables may be placed in the same duct bank. CYMCAP is then used to rate the ampacity of the cable using: o Cable system design and/or As Built conditions. o Cable information from manufacturer. o Concrete thermal data. o PVC pipe thermal data. o NV Energy utilizes thermal conductivity of the soil for ampacity calculations. If unavailable, typical data may be utilized. o The software considers crossover points for underground mutual heating. o 90⁰C/105 ⁰C Normal/Emergency is the maximum operating temperature assumed for underground cable. 8 P a g e

9 If necessary, outside consultants may be engaged to conduct an ampacity study for a specific cable installation. This study may use CYMCAP software, or other software that may be proprietary to the consultant. Assumptions Conductor Rating Methodology Summary Table FAC-008 R3.1 Methodology Used 1) Industry Standard 2) Equipment Manufacturers FAC-008 R3.2.1 Standard Used ANSI/IEEE Standard 738 Method of Calculation FAC-008 R3.2.2 Manufacturers Ratings Westinghouse Ratings (See Appendix B) FAC-008 R3.2.4 Ambient Conditions See Standard Weather Assumptions above FAC-008 R3.2.4 Operating Limitations N/A 9 P a g e

10 Transformers [TRANSMISSION PLANNING] Procedure NV Energy will use the manufacturer s transformer nameplate rating to determine normal and emergency current ratings. Normal Ratings For each winding on a transformer, NV Energy uses the maximum nameplate MVA rating as the Normal rating for that particular winding, unless a detailed engineering study has shown that the transformer needs to be de-rated below this value. Emergency Ratings In general, NV Energy utilizes the following priority list for selecting transformer ratings: 1. Manufacturer provided 2-hour thermal MVA ratings hour thermal ratings based on a detailed engineering study, as detailed in the following section: Emergency Load Rating Methodology. 3. In the absence of other information, NV Energy will use a default 2-hour rating equal to 120% of the maximum nameplate value. In situations where known operational response time is shorter than 2-hours (for example 30-minutes) such ratings may be used with comments indicating the timeframe in the Facility Ratings spreadsheet. The default emergency 2-hour rating of 120% is based on ANSI C , Tables 3(m)(n)(p). The emergency rating assumes 70% initial load or lower (see Figure below). Legacy Transformer Emergency Ratings 10 P a g e

11 Application of Transformer Facility Ratings (For System Modeling Purposes) A Target Operational Nominal kv Base (for example 525kV) is provided in the Facility Ratings Spreadsheet. Two categories of ratings are considered for each winding when applying Transformer Facility Ratings to models: Transformer Rating o Transformers in NV Energy s system will be rated in terms of MVA (as opposed to Amps). Connected Equipment Rating o All connected amp-limited equipment will be identified with a rating in Amps. o The minimum Amp rating is the total rating of the Connected Equipment. o The Amp rating, on the Operational kv Base, provides an MVA rating for the Connected Equipment. The minimum MVA rating of these two is the total Facility Rating for a Transformer Winding. Emergency Load Rating Methodology For detailed engineering studies on transformer ratings, the loading capability will be calculated utilizing the EPRI PTLOAD (Version 6.1) computer program which models/simulates the electrical and thermal properties of the transformer. The calculations are based on a 113 degree maximum 24 hour ambient temperature provided by weather service hourly data and typical 24 hour load cycle profiles provided by Transmission and Distribution Planning and System Operations with all existing cooling fans or pumps in continuous operation. For each calculation, the maximum allowable values of winding temperature (hot spot), top oil temperature, and Acceptable Loss of (transformer) Life of insulation were specified. Specific test parameters associated with each transformer were used, including heat run (temperature rise data), load and no load losses, core and coil weight, gallons of oil, etc. Emergency rating limitations are based upon a 2 hour period: Hot Spot and Top Oil temperature limitations of 140C and 110C respectively in addition to other limiting parameters described below. Acceptable Loss of Life of 0.04% is considered along with a typical 24 hour load cycle preload. Assumptions Transformer Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Manufacturer s nameplate and Engineering Analysis FAC-008 R3.2.1 Standard Used IEEE C IEEE C FAC-008 R3.2.2 Manufacturers Ratings Nameplate rating FAC-008 R3.2.4 Ambient Conditions 65 Degree C Rise FAC-008 R3.2.4 Operating Limitations N/A 11 P a g e

12 Shunt Compensation Devices [SUBSTATION DESIGN] Background NV Energy has Shunt Reactors and Shunt Capacitors within its system. Procedure The normal rating shall be the continuous rating provided by the equipment manufacturer or obtained from manufacturer specifications such as the top nameplate rating of the capacitor, reactor, or that of the most limiting device (e.g., a disconnect switch) in the series circuit for series compensation or in the shunt circuit for shunt compensation. Normal & Emergency Current Ratings Normal and Emergency current ratings are equivalent. Assumptions Shunt Devices Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Manufacturer s Nameplate Rating FAC-008 R3.2.1 Standard Used N/A FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s Nameplate Rating FAC-008 R3.2.4 Ambient Conditions N/A FAC-008 R3.2.4 Operating Limitations N/A 12 P a g e

13 Series Compensation Devices [SUBSTATION DESIGN] Background NV Energy only has Series Capacitors within its system. NV Energy does not have Series Reactors within its system. Procedure The normal rating shall be the continuous rating provided by the equipment manufacturer or obtained from manufacturer specifications such as the top nameplate rating of the capacitor, reactor, or that of the most limiting device (e.g., a disconnect switch) in the series circuit for series compensation or in the shunt circuit for shunt compensation. Normal & Emergency Current Ratings Normal and Emergency current ratings are equivalent. Assumptions Series Capacitor Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Manufacturer s Nameplate Rating FAC-008 R3.2.1 Standard Used N/A FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s Nameplate Rating FAC-008 R3.2.4 Ambient Conditions N/A FAC-008 R3.2.4 Operating Limitations N/A 13 P a g e

14 Circuit Breakers/Circuit Switchers [SUBSTATION DESIGN] Background In some locations in Northern Nevada and Southern Nevada, Power Circuit Breakers have breaker bypass switches installed. These switches are designed for providing a current path during maintenance of the circuit breaker. Operationally, NV Energy will only use breaker bypass switches in as-needed emergencies. Bypass switches are rated at the same current as the connected circuit breaker, unless otherwise noted in the Facilities Rating spreadsheet. Procedure Nameplate Ratings are used for circuit breakers and circuit switchers, unless the manufacturer provides specific calculations. These are based on the current ANSI, NEMA, and IEEE Standards. Circuit breakers in the SPPC system are rated at 40 C ambient temperature as per the latest version of IEEE C Circuit breakers in the NEVP system are designed to have a continuous current rating at 50 C ambient temperature. Normal & Emergency Current Ratings Normal and Emergency ratings are equivalent to nameplate unless the manufacturer provides specific normal and emergency ratings. Assumptions Circuit Breaker Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Manufacturer s nameplate rating FAC-008 R3.2.1 Standard Used IEEE C37.04 FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s nameplate rating FAC-008 R3.2.4 Ambient Conditions 40 C for SPPC; 50 C for NEVP FAC-008 R3.2.4 Operating Limitations N/A 14 P a g e

15 Bus [SUBSTATION DESIGN] Background Presently for Transmission Line conductors, for SPPC, lines will keep their Legacy ratings until Maximum Operating Temperatures (MOTs) are known (pending completion of LiDAR analysis). Once MOTs are known, the ratings will be re-calculated based on the IEEE 738 assumptions in this report. Most of the lines in NEVP have LiDAR verified MOT information available. In order to maintain consistency with similar conductor types used for lines, substation bus conductor ratings will be the same as transmission line conductors. Procedure Bus Conductor Bus conductor located in SPPC substations will use the Westinghouse ratings located in Appendix B as an initial rating. Bus Conductor located in NEVP substation will use ratings based on Conductor MOT s, calculated from IEEE 738 calculations and weather assumptions for the South. These values are shown in Appendix C. Bus Conductor used in NEVP substations that do not have a Conductor MOT listed in Appendix C, will use ratings from Standard Handbook for Electrical Engineers (13 th Ed.), D. Fink &H.W. Beaty Eds., McGraw-Hill, Aluminum Conductor Physical Characteristics, Classes AA and A, Table 4-22, (Appendix D) Aluminum Bus Bus Ratings for both NEVP and SPPC shall be based on Table from Aluminum Electrical Conductor Handbook (3 rd Ed.), L. Kirkpatrick. The current ratings selected should use the values for Schedule 40 pipe for Aluminum 6063-T6 Temper located in Appendix E 6. GIS Bus Bus Ratings for both NEVP and SPPC shall be based on Manufacturer s Specifications. Normal & Emergency Current Ratings NV Energy uses an emergency rating for all bus types equal to the normal rating P a g e

16 Assumptions Bus Conductor Weather assumptions used for IEEE738 Transmission Line Conductor calculations are the same assumptions used for Bus Conductors. For bus conductors used in NEVP substations that do not have a Conductor MOT listed in Appendix C, The following conditions will be assumed: 40 C Rise over 40 C Ambient with 2.0 ft/sec crosswind, 0.5 emissivity factor, without sun. Jumper Rating Methodology Summary Table FAC-008 R3.1 Methodology Used 1) Equipment Manufacturers 2) Industry Standard FAC-008 R3.2.1 Standard Used ANSI/IEEE Standard 738 Method of Calculation FAC-008 R3.2.2 Manufacturers Ratings Westinghouse Ratings (See Appendix B) FAC-008 R3.2.4 Ambient Conditions See Transmission Line Conductors Ambient Conditions FAC-008 R3.2.4 Operating Limitations Not Applicable Aluminum Bus Per NV Energy s Substation Material Standard SB-6, Aluminum Bus shall be designed to meet standard ASTM B241/B241M using a material of Seamless Aluminum 6063-T6 temper, produced from hollow extrusion ingrot and extruded by use of the die and mandrel method. Weather assumptions match the assumptions used by AFL Global: 30 degree C rise over 40 degree C ambient, horizontally mounted conductors, with spacing sufficient to eliminate proximity effects, 2 ft./sec crosswind, nominal oxidized surface (e=0.50). Bus Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Manufacturers Rating FAC-008 R3.2.1 Standard Used Not Applicable FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s Specifications provided by AFL Global FAC-008 R3.2.4 Ambient Conditions 30 degree C rise over 40 degree C ambient, horizontally mounted conductors, with spacing sufficient to eliminate proximity effects, 2 ft./sec crosswind, nominal oxidized surface (e=0.50). FAC-008 R3.2.4 Operating Limitations Not Applicable 16 P a g e

17 Jumpers [SUBSTATION DESIGN] Background Currently at SPPC, Transmission Line conductors, will keep their Legacy ratings until Maximum Operating Temperatures (MOTs) are known (pending completion of LiDAR analysis). Once MOTs are identified, the conductor ratings will be re-calculated based on the IEEE 738 assumptions in this report. The majority of the lines owned by NEVP have LiDAR-verified MOT information available. In order to maintain consistency with similar conductor used for lines, substation jumper ratings will be identified as the same as transmission line conductors. Procedure As an initial rating, jumpers located in SPPC substations will use the Westinghouse ratings located in Appendix B. Jumpers located in NEVP substations, will use ratings based off of Conductor MOT s, calculated from IEEE 738 calculations and weather assumptions for the South. These values are shown in Appendix C. Jumpers used in NEVP substations that do not have a Conductor MOT listed in Appendix C, will use ratings from Standard Handbook for Electrical Engineers (13th Ed.), D. Fink &H.W. Beaty Eds., McGraw-Hill, Aluminum Conductor Physical Characteristics, Classes AA and A, Table 4-22,, Pg Normal & Emergency Current Ratings NV Energy uses an emergency rating for jumpers equal to the normal rating. Assumptions Weather assumptions used for IEEE738 Transmission Line Conductors calculations are the same assumptions used for jumpers. Jumper Rating Methodology Summary Table FAC-008 R3.1 Methodology Used 1) Equipment Manufacturers 2) Industry Standard FAC-008 R3.2.1 Standard Used ANSI/IEEE Standard 738 Method of Calculation FAC-008 R3.2.2 Manufacturers Ratings Westinghouse Ratings (See Appendix B) FAC-008 R3.2.4 Ambient Conditions See Transmission Line Conductors Ambient Conditions FAC-008 R3.2.4 Operating Limitations Not Applicable 17 P a g e

18 Disconnect Switches [SUBSTATION DESIGN] Procedure For switches manufactured under the ANSI standards, the normal rating shall be the rating provided by the manufacturer or obtained from the manufacturer specifications such as the nameplate rating of the switch. The ANSI temperature rise is based on the allowable temperature rise in ANSI C37.37 for the specific switch contact material utilized in the switch (e.g., copper/copper alloy or aluminum). In some instances, if no manufacturer s drawing(s) or nameplate information was available, an assumed rating of 600 amps for the disconnect switch was used for these instances. This assumption is based on the known information for existing disconnect switch ratings offered by NVE vendors, and manufacturers. Normal & Emergency Current Ratings Normal and Emergency current ratings are equivalent. Assumptions Substation Disconnect Switch Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Equipment manufacturer FAC-008 R3.2.1 Standard Used ANSI IEEE C37.37 FAC-008 R3.2.2 Manufacturers Ratings Nameplate rating FAC-008 R3.2.4 Ambient Conditions 40 C FAC-008 R3.2.4 Operating Limitations N/A 18 P a g e

19 Line Switches [TRANSMISSION ENGINEERING] Background NV Energy has transmission line switches in operation from several manufactures with widely varying manufacturer dates, configuration types, voltage classes and current ratings. In general, NV Energy has required the switch manufacturers to provide switches that been rated by applicable ANSI and IEEE standards. Therefore, NV Energy uses the current rating provided on the final drawings or nameplate. Procedure For switches manufactured under the ANSI standards, the normal rating shall be the rating provided by the manufacturer or obtained from the manufacturer specifications such as the nameplate rating of the switch. For the Northern System, if no nameplate is available then the switches should be assumed to be rated for 600 amps, which is the lowest rating that is available in a line switch. Normal & Emergency Current Ratings Normal and Emergency ratings are equivalent. Assumptions Transmission Line Switch Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Ratings provided by equipment manufacturers through drawings or nameplates. NV Energy requires to manufacturers to determine rating based on several ANSI/IEEE standards. FAC-008 R3.2.1 Standard Used ANSI C29.8, ANSI C29.9, IEEE C37.30, ANSI C37.32, IEEE C37.37 FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s Information FAC-008 R3.2.3 Ambient Conditions -40 C to 50 C based on current specification. FAC-008 R3.2.4 Operating Limitations N/A. 19 P a g e

20 Current Transformers (CTs) [SUBSTATION DESIGN & SYSTEM PROTECTION] Background The standard nominal rating of all CTs in the NVE system is 5 A secondary. The primary CT rating is part of the major equipment specifications of which the CTs are a part. For example, a 2000 A rated circuit breaker would typically include 2000:5 multi-ratio bushing CTs, unless specified otherwise. Multi-ratio CTs use standard tap ratios, as listed in IEEE C , Table 11 (or its successor). Continuous overload thermal rating factors will be applied to tapped windings per manufacturer s data and recommendations. The thermal rating factor (TRF) allows multiplication of secondary current rating by the specified value (1.0, 1.33, 1.5, 2.0, 3.0, or 4.0). Procedure For calculation of CT ratings, if the thermal rating factor is available, NVE will use this value. If a CT rating factor is unknown, NVE will assume a TRF = 1.0. For CTs, with tapped windings not set on the highest available tap, a continuous overload rating will be calculated based on the methodology created by PJM Interconnection, and documented within PJM article VI.C Circuit Breakers and PJM article VI.F Current Transformers. Itap Ir Itapr RF n = Adjusted rated continuous current of specific current transformer tap under consideration = Rated continuous current (current transformer nameplate rating) = Rated continuous current of specific current transformer tap under consideration = Continuous thermal current rating factor = 2; NV Energy will always use the more conservative value of 2 (Circuit Breaker n equals 1.8) for rating CTs Auxiliary CT s For those instance where auxiliary CT s are used, the auxiliary CT will always be rated at TRF = 1.0 Normal & Emergency Current Ratings Normal and Emergency ratings are equivalent. Assumptions Current Transformer Rating Methodology Summary Table FAC-008 R3.1 Methodology Used PJM Method, see above Engineering Analysis FAC-008 R3.2.1 Standard Used N/A FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s Specifications FAC-008 R3.2.4 Ambient Conditions See Standard Weather Assumptions under T-Line Conductor FAC-008 R3.2.4 Operating Limitations N/A 20 P a g e

21 Control Cables and Wiring [SUBSTATION DESIGN] Background NV Energy substation design recommended practices specify installation of 12 AWG through 8 AWG for control leads and current transformer secondary leads. Procedure The smallest CT cable from the CT through the CT circuit will be used as the limiting rating for the CT cable. In instances where the CT cable is unknown, 12AWG will be assumed. Ratings of the cable type can be determined by the NEC Table (B)(16) Allowable Ampacities of Insulated Conductors (Appendix F). In instances where there is an auxiliary CT in a CT circuit, if the auxiliary CT ratio decreased the current then the cable rating will be determined by multiplying the cable rating by the primary CT ratio. If the auxiliary CT ratio increases the current, then the rating of the cable should be adjusted by multiplying the cable rating by the auxiliary CT ratio and the primary CT ratio. Normal & Emergency Current Ratings Normal and Emergency current ratings are equivalent. Assumptions CT Cable Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Industry Standard FAC-008 R3.2.1 Standard Used NEC Table (b)(16) Allowable Ampacities of Insulated Conductors FAC-008 R3.2.2 Manufacturers Ratings N/A FAC-008 R3.2.4 Ambient Conditions N/A FAC-008 R3.2.4 Operating Limitations N/A 21 P a g e

22 Protective Relay Devices [SYSTEM PROTECTION] Background NV Energy System Protection maintains a philosophy for new protective relay installations, or revisions to existing protective relaying packages, to use Schweitzer Engineering Laboratories (SEL) microprocessor relays. The model of the SEL relay selected is based on the specific application requirements. Previous protective relaying philosophy, required installation of various relay equipment types and manufacturers, based on precedence, education, and technology available. Regardless of philosophy, Substation relays and protection control equipment match or exceed the 5A secondary current transformer Ratings used by NV Energy. Procedure NV Energy uses the manufacturer s standard equipment ratings for relays that require AC current to operate. Additionally, NV Energy System Protection personnel will determine the specific relay AC current ratings by referencing the manufacturer s instruction manuals, or by using a conservative assumption of 10 A. For instances where currents from multiple CT s are summed together and then go to a relay (such as for a high impedance differential relay), the current seen by the relay during load conditions would nominally be zero. As such, the ratings for these relays should not be considered. In instances where there is an auxiliary CT in a CT circuit, if the auxiliary CT ratio decreased the current then the relay rating will be determined by multiplying the relay rating by the primary CT ratio. If the auxiliary CT ratio increases the current, then the rating of the relay should be adjusted by multiplying the relay rating by the auxiliary CT ratio and the primary CT ratio. For facilities subject to NERC Standard PRC-023, Criteria 1 may be used to ensure adequate margin between the facility rating and the relay trip setting. For facilities subject to NERC Standard PRC-023 which are using a different Criteria or facilities not subject to NERC Standard PRC-023, best efforts are made to set the trip points above the facility ratings. In instances where this is not possible, the relay trip setting will be the new limiting factor. Normal & Emergency Current Ratings Normal and emergency ratings are the same. Example Data Entry To simplify the data entry process, the following process has been implemented: Engineers first enter: o Lowest Tapped CT Ratio o Lowest Relay Rating o Blank entry for Relay CT Ratio By default, the spreadsheet will make the conservative assumption that the Relay CT Ratio is the Lowest Tapped CT. If this causes a system limitation on the facility, the following investigation must be performed: o For each CT connected, multiply the CT Ratio (as found at actual tap) by the Relay Rating. o Select the lowest multiplied value, and enter the Relay CT Ratio and Relay Rating based on this final, lowest rated value. Below is an example for properly entering the Relay Rating. 22 P a g e

23 Assumptions Protective Relay Rating Methodology Summary Table Equipment Thermal Rating Relay Settings FAC-008 R3.1 Methodology Used Manufacturer Ratings NA FAC-008 R3.2.1 Standard Used NV Energy purchase specifications NA FAC-008 R3.2.2 Manufacturers Ratings Manufacturer Specifications NA FAC-008 R3.2.4 Ambient Conditions NA NA FAC-008 R3.2.4 Operating Limitations NA PRC-023, when applicable 23 P a g e

24 Wave Traps [SUBSTATION DESIGN] Background Transmission line wave traps are designed to meet ANSI and IEEE Standards, as well as other international standards. Terminals are supplied to meet the applicable IEEE standards. Wave trap Ratings assume a 40 C rise over a 24-hour mean ambient temperature as per the latest version of IEEE/ANSI Standards. Procedure For wave traps manufactured under the ANSI standards, the normal rating shall be the rating provided by the manufacturer or obtained from the manufacturer specifications such as the nameplate rating of the wave trap. In some instances, if no manufacturer s drawing(s) or nameplate information was available, an assumed rating of 800 amps for the wave trap was used for these instances. This assumption is based on the known information for existing wave traps and the similarities to the known wave traps with ratings and the wave traps without ratings. Normal & Emergency Current Ratings Normal and Emergency current ratings are equivalent. Assumptions Wave Trap Rating Methodology Summary Table FAC-008 R3.1 Methodology Used Manufacturer s Rating FAC-008 R3.2.1 Standard Used Not Applicable FAC-008 R3.2.2 Manufacturers Ratings Manufacturer s Ratings FAC-008 R3.2.4 Ambient Conditions 40 C rise over a 24-hour FAC-008 R3.2.4 Operating Limitations Not Applicable 24 P a g e

25 Facility Rating Communication NV Energy Transmission Owner (and each Generator Owner subject to Requirement R2) shall provide requested information as specified below (for its solely and jointly owned Facilities that are existing Facilities, new Facilities, modifications to existing Facilities and re-ratings of existing Facilities) to our Reliability Coordinator, and neighboring Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s) and Transmission Operator(s). Reliability Coordinator Communication NV Energy s communication of Facility Ratings to the Reliability Coordinator (PeakRC) consists of coordination of System Operating Limits (SOLs) per FAC-014, and then communication to PeakRC, our internal Transmission, Distribution, and Network Operations groups. The following process is to occur after revisions to Facility Ratings: Collected Facility Ratings will be used to establish NV Energy SOLs based upon NVE s SOL methodology NVE will ensure that NVE established SOLs are consistent with PeakRC s SOL methodology 7 Update NVE SOLs documentation accordingly Communicate any newly established SOL s to PeakRC 8 Communication to NVE Operations personnel of any newly established SOL s Updated NVE EMS to account for newly established SOL s Neighboring Entities NV Energy has multiple Facilities that are jointly-owned with a neighboring entity. These Facilities may also have different ownership percentages associated with Elements that make up the Facility. Regardless of ownership percentage, NV Energy will provide Facility Rating data upon request of the neighboring entity 9. NV Energy will also have the obligation to submit Facility Rating requests to an Entity that shares ownership of a Facility. The NVE Transmission Planning department will be the conduit for NV Energy to request Facility Ratings from jointly-owned Facilities. Transmission Planning will maintain a NV Energy Interconnection spreadsheet that will contain the locations of the jointly-owned Facilities, as well as the communication information of the personnel at the Entity that will receive the data request. Transmission Planning will submit (through electronic mail) a request (see Appendix G), to the identified point of contact (POC) of the Entity, for ratings of the Entityowned Element(s) that make up the shared Facility. Communication of Thermal Rating Incursions NV Energy will provide the information described in R8.1 within 30 calendar days (or a later date if specified by the requester), for any requested Facility with a Thermal Rating that limits the use of Facilities under the requester s authority by causing any of the following: 1) An Interconnection Reliability Operating Limit 2) A limitation of Total Transfer Capability 3) An impediment to generator deliverability 4) An impediment to service to a major load center 7 FAC-011-2, FAC FAC R5.2 9 FAC R P a g e

26 In addition to providing the Thermal Rating that limits the use of Facilities under the requestor s authority by causing any of the limitations described in 1-4 above, NV Energy will provide the identity of the next most limiting equipment (R8.2.1) and the thermal rating (R8.2.2) of the Facility. Change Control Process Facility Ratings Methodology Documentation Location The Facility Ratings Methodology will be located on the Transmission Planning department s SharePoint site, within the Facility Ratings library. Users will be granted access permissions based on need (read/write requirements), by the owner of the SharePoint site, Manager of Network & IRP Transmission Planning and/or delegated Transmission Planning Engineer. Review Process This document will be reviewed by the NV Energy Transmission Planning department every 12 calendar months. Revisions to the document can occur during the review process, or through communication of methodology changes for Element rating data collection by Element owners. All revisions to this document will require approval by the Manager, Network & IRP Transmission Planning. Document Revision Notification Upon completion of revisions to the Facility Ratings Methodology, notification of the revisions will be required to be delivered to management personnel of the following Facility Ratings stakeholders: Compliance & Standards Substation Design Substations & Technical Operations Transmission & Distribution Operations Transmission Planning Transmission Civil Engineering & Construction Facility Ratings Data/Spreadsheet Documentation Location The Facility Ratings spreadsheet will be located on the Transmission Planning department s SharePoint site, within the Facility Ratings library. Users will be granted access permissions based on need (read/write requirements), by the owner of the SharePoint site, Manager of Network & IRP Transmission Planning and/or delegated Transmission Planning Engineer. Review Process This spreadsheet will be reviewed annually as part of the Technical Assessment, conducted by the Senior Compliance Engineer in Compliance & Standards. Findings from the review will be delivered to the Manager, Network & IRP Transmission Planning, and a corrective action plan and timeline will be requested for any findings that require revisions to the spreadsheet. Additionally, it is the responsibility of the Element owners to review this spreadsheet at their own discretion. Ongoing review by the Element owners will ensure the spreadsheet will contain correct Facility Rating data. 26 P a g e

27 Revision Notification Process Revisions to the Facility Ratings spreadsheet will be required in the following scenarios: Installation of a new Facility Modifications to an existing Facility Modifications in the Element owners methodology for establishing Rating Modifications to an existing jointly-owned Facility To ensure that all Element ratings are accounted for during the aforementioned scenarios, it will require the diligent effort of all Element owners to maintain consistent communication with Transmission Planning on the occurrence of these scenarios. Installation of a New Facility The process for data collection for new predicted installations of Elements will begin and close with Transmission Planning. Transmission Planning will be the single point of data entry for Facility Ratings for new installations. Transmission Planning personnel will update the Facility Ratings spreadsheet, upon receipt of a completed Facility Ratings installation form (referred to as the Form ). Upon completion of revisions, identified NV Energy Facility Ratings stakeholders will be notified of the changes. The Form will live throughout the lifetime of a project, and all document-required data will be completed by project stakeholders (if necessary) at the close of the project. Data entry and management roles and responsibilities are as follows: 1. Initial data entry would be completed by Transmission Planning, on what the existing Facility Ratings are for projected connections, and what the Facility must be rated for 2. The Project Manager s responsibility is to verify that stakeholders have provided Element data to Transmission Planning by the close of a capital project. 3. Data should be communicated to Transmission Planning through a completed Form(s), or other mutually agreed upon format, by close of pre-energization meeting(s) by the Project Manager or Facility Rating stakeholder. 4. Project Managers also have the responsibility of notifying EIM and/or Transmission Technology Engineers of projected Facility ratings. Information is required for updates to NVE EMS network model, and quarterly CAISO model updates. 5. It is the responsibility of the Facility Rating stakeholders to verify that data provided is correct within the Form(s), or other mutually agreed upon format, to the Project Manager and/or Transmission Planning. 6. Substation Design will then fill in the Form with their ratings, as determined by procured material for the project. This will include the majority of elements within the Form. 7. System Protection will provide tapped CT Ratio, Relay Thermal Rating, and Loadability to the Form 8. Transmission Engineering will provide transmission line parameters to the Form. Line parameter data will be used for MOT calculations completed by Transmission Planning, prior to data entry in the Facility Ratings spreadsheet. 9. Substation Construction & Maintenance will provide the final verification of the data on the Form. Substation Construction will verify that installed equipment matches the equipment identified within the Form. Any incorrect information will be identified, and revised on the document by Substation Construction & Maintenance personnel. 10. If Transmission Planning identifies any issues with the data in the Form, they will provide corrective action requests to identified stakeholder personnel Modifications to an Existing Facility The assumption is that instances of modifications to existing Facilities would occur due to an unpredictable occurrence (i.e. identified while doing maintenance, an outage, or other emergencies). For all modifications to 27 P a g e

28 Facilities conducted through planned and managed scheduled projects, please refer to the processes in the Installation of a New Facility. The key to capturing necessary data through an unpredictable occurrence is to document the occurrence and necessary processes required for the installation. The identified responsible parties for data collection are Substation Construction & Maintenance, System Protection, and Transmission Lines, as their equipment and field personnel would be more than likely affected by unpredictable events and immediate Element installation. Field personnel from these departments would be required to document the ratings (and other identifying data) of the equipment that is being installed. This ratings information should be entered directly into the Form, or through another mutually agreeable format. For unplanned equipment installation, Substation Construction & Maintenance and System Protection personnel will replace the equipment with similar equipment; however, in the event that similar equipment is unavailable, it is the responsibility of field personnel to document the installation of unlike equipment for delivery to Transmission Planning for entry into the Facility Ratings spreadsheet. For unplanned maintenance of transmission lines, personal will repair the equipment with the same size conductor however, in the event that a similar conductor is unavailable and another conductor must be used in the replacement/repair, it is the responsibility of field personnel to provide the new conductor information to Transmission Engineering. Transmission Engineering will use this information to update the NV Energy PLS-CADD model (if available), and then Transmission Engineering will deliver the Element ratings to Transmission Planning. To track and process Facility Rating updates, Facility Rating stakeholders will submit their rating changes, and justification, through the Transmission Planning SharePoint site. Stakeholders will upload documentation of necessary Facility Rating changes to the Facility Ratings Update library. Manager of IRP Transmission Planning will delegate (through SharePoint work task) Transmission Planning Engineering personnel to review the rating change and justification prior to updating the Facility Ratings spreadsheet and model. Upon completion of review, the Engineer has completed his SharePoint work task, and upon closing the item out, a subsequent work task will be delivered to the Manager of Network Engineering & EIM Market Operations for review. Manager of Network Engineering & EIM Market Operations will delegate (through the same SharePoint work task) Network Engineering personnel to review the rating change and justification prior to requesting updates to the NVE EMS model. Modifications to Element Ratings Methodology All modifications to an Element Ratings Methodology must follow the procedures listed above in the Review Process section of the Facility Ratings Methodology. Any modifications to Element Ratings Methodologies that effect the rating values of the Element itself (based upon changes in calculations, analysis, etc.), will require the associated Element owner to provide updated ratings to the Facility Ratings spreadsheet. The notification system within SharePoint will provide other Element owners awareness of the revisions to the spreadsheet, as well as the revisions to the Facility Ratings Methodology. In addition, all revisions to the spreadsheet, and Methodology, must be completed with a detailed description of the revisions with in the versioning history of the spreadsheet and Word document. Modifications of a Jointly-Owned Facility by the Non-NVE Owner These modifications will be initiated based upon communication from the external party that shares ownership with NV Energy of a Facility. NV Energy will provide third-party communication of NV Energy Facility Ratings modifications through the Transmission Planning department; however, it cannot be assumed that all Facility modifications will be communicated from third-parties through Transmission Planning. It will be the responsibility of all Element owners to provide communication to the Manager of Network & IRP Transmission Planning of thirdparty Facility modifications that would require adjustments to currently maintained Facility Ratings. 28 P a g e

29 Upon notification of third-party Facility modifications, Transmission Planning will be the point of contact for NV Energy for retrieving all necessary Element ratings data to update the NV Energy Facility Ratings spreadsheet. Additional Element Owner Responsibilities It is the responsibility of all Element owners to provide appropriate training and education on the change control processes listed in the Methodology. 29 P a g e

30 Facility Ratings Updates SharePoint Workflow A Facility Ratings Updates SharePoint library is being maintained to: 1. Store detailed documentation for every Facility Rating Update 2. Provide document versioning (e.g. for spreadsheets that get regular updates and impact ratings) 3. Give managers flexibility in tracking assignments 4. Improve transparency for compliance purposes When a document is uploaded to the Facility Ratings Updates library, a SharePoint Workflow will automatically initiate an Approval process on the uploaded document. 1. A task is created and an is sent to a manager in Transmission Planning to review the item. (A manager may complete the task, or re-assign the task) Transmission Planning must do the following, then mark the item as Approved : a. Implement the rating in the Master.SAV PSLF case, and create a Change Log to include in the Master Case Corrections folder. b. Modify the Facility Ratings spreadsheet to reflect the update. 2. Once TP marks the item as Approved, the task is assigned to Operations, and an is sent to a manager in Operations. Operations must do the following, then mark the item as Approved : a. Review & implement changes to operational SOLs (if necessary) b. Review & implement the rating in their alarm settings (if necessary) 30 P a g e

31 Example Workflow Figure 4: Facility Rating Update Submittal Process (Users submitting ratings changes are done at this point) Figure 5: Automatic Received by Manager 31 P a g e

32 Figure 6: Task Review & Approval Process Figure 7: Compliance Monitoring of Updates (Clicking the In Progress button will show full detail of task timeline) 32 P a g e

33 Version History Version No. Issue Date Name Description or reason for revision /19/2016 Salsbury Initial version /21/2016 Salsbury Multiple revisions /29/2016 Salsbury 0.3 1/27/2017 Salsbury Revision to Change Control Process to incorporate Sub Construction & Maint., Major Projects Revised to include dynamic line ratings; Updated Change Control Process; Rating appropriation for ring and breaker-and-a-half scheme 0.4 6/20/2017 Ben Multiple revisions 0.5 7/14/2017 Ben Underground Cable methodology revisions 33 P a g e

34 Appendix A - Analysis of Weather Assumptions The IEEE 738 standard discusses how to rate Transmission Lines, and it includes thermal models to determine an Amp rating based on Maximum Operating Temperature (MOT) and weather assumptions. The RateKit software package is used to perform these calculations based on the below parameters. Air Temperature Ratings should use 40C (104F) ambient air temperature conditions for Northern Nevada based on the temperature data below. This is a conservative value, since the temperature is below 40C for 99.99% of the recorded values. For Southern Nevada, ratings would use 44.4C (112F). The historical temperature in Las Vegas was below this value for 99.94% of the recorded values. Wind Speed In reference to CIGRE TB299, IEEE 738 says the following: Figure 8: Ambient Air Temperature In the absence of data from field rating studies, the use of certain worst-case weather conditions including a 2 ft./s (0.61 m/s) perpendicular wind speed and an air temperature near the seasonal maximum should be used IEEE Std , Page P a g e

35 Due to the sparse nature of NV Energy s transmission system and the variety of weather conditions to which our lines may be subject, ratings should use a 2 ft./s perpendicular Effective Wind Speed 11 assumption per IEEE 738. Emissivity & Absorptivity Emissivity (ε) and absorptivity (α) are addressed in IEEE 738 and CIGRE TB299. For sag-limited lines, the JTF recommends that base ratings be calculated for an effective wind speed of 0.6 m/s, an ambient temperature close to the maximum annual value along the line route and a solar radiation of 1000 W/m2. When combined with an assumed conductor absorptivity of no less than 0.8 (Conductor emissivity should be chosen to be 0.1 less than absorptivity), this combination can be considered safe for thermal rating calculations without field measurements. 12 Based on the above references, ratings should use: α = 0.8 ε = 0.7 Elevation NV Energy uses the average elevation of Nevada for Northern Nevada rating calculations, which is 5500 ft. per a book entitled The Average Elevation of the United States by Henry Gannett, Department of the Interior US Geological Survey. For Southern Nevada, the elevation of Las Vegas is used (2,000 ft.). Latitude Carson City (Nevada s Capital) is located at approximately 39 Latitude in Northern Nevada. This is used as the reference Latitude for the rest of Northern Nevada s transmission system. For Southern Nevada, the latitude of Las Vegas is used (36 ). Date & Solar Time NV Energy uses July as its Date & Solar Time assumption. MOT 13 A line s Maximum Operating Temperature is determined on a case-by-case basis, and is either limited either by line clearance or by the temperature at which the conductor begins to anneal (whichever is lowest). Clearance Where LiDAR data is available, the MOT is calculated based on NEC 14 & NESC 15 clearance limitations. 11 Per CIGRE TB299, August 2006, Page 10: Most transmission lines consist of multiple line sections, each line section being terminated by strain structures. Wind speed and direction (and thus conductor temperature) may vary along each line section but the sags depend on the average conductor temperature in the line section. The effective wind speed is that perpendicular wind speed which yields the same average conductor temperature along the line section as the actual variable wind. 12 CIGRE TB , Page Maximum Operating Temperature (MOT): Means the maximum temperature at which an aerial conductor may continuously operate with the conductor clearance meeting or exceeding the minimum National Electrical Safety Code (NESC) clearance requirements applicable at the time of construction, and the maximum temperature at which an aerial conductor may continuously operate that will not cause permanent damage to the conductor, whichever is more limiting. 14 National Electrical Code 15 National Electrical Safety Code 35 P a g e

36 Conductor Annealing On lines with abundant clearance, the next most limiting factor is the temperature at which there would be loss of life due to annealing of the conductor as follows: AA 95C ACSR 100C ACCC 180C ACSS 200C 36 P a g e

37 Appendix B - Standard Conductor Ratings The table below includes Westinghouse conductor ratings, Manufacturer Ratings, ACSR Conductor Data from Westinghouse Electrical Transmission & Distribution Reference Book 37 P a g e

38 Copperweld Conductor Data from Westinghouse Electrical Transmission & Distribution Reference Book 38 P a g e

39 Copper Conductor Data from Westinghouse Electrical Transmission & Distribution Reference Book 39 P a g e

40 Aluminum Conductor Data from Westinghouse Electrical Transmission & Distribution Reference Book 40 P a g e

41 Appendix C NV Energy MOT Conductor Ratings Unique ID Size Type Conductor Conductor MOT ( C) MOT ( F) NV Energy Conductor Ratings RateKit IEEE738 Wire Name Legacy Wire Ratings (Westinghouse) North IEEE738 Calc South IEEE738 Calc Rating (Amps) Laughlin IEEE738 Calc Manufacturer Ratings 2011 NEC Table (B)(16) 4 / 0 CU I-Beam 4 / 0 CU IB Copper Twisted I-Beam Use: CU4/0AWG A Copperweld 2A Copperweld A Copperweld Use: CU2AWG ACAR 721 ACAR CURTIS 776 Use: ORCHID (For ORCHID) ACSS 1272 ACSS BITTERN/ACSS ACSS, Old 1272 ACSS PHEASANT/ACSS ACSS 954 ACSS CARDINAL/ACSS ACCC 1949 ACCC LAPWING/ACCC/TW ACCC 1026 ACCC DRAKE/ACCC/TW ACCC 431 ACCC LINNET/ACCC/TW / 0 CU 4 / 0 CU CU4/0AWG / 0 CU 2 / 0 CU CU2/0AWG / 0 CU 1 / 0 CU CU1/0AWG #4 CU #4 CU CU4AWG #2 CU #2 CU CU2AWG #1 CU #1 CU CU1AWG CU 250 CU CU CU 350 CU CU ACSR 2156 ACSR BLUEBIRD ACSR 1590 ACSR LAPWING ACSR 1272 ACSR BITTERN ACSR, North 954 ACSR RAIL ACSR, South 954 ACSR CARDINAL ACSR 795 ACSR TERN ACSR, Old 795 ACSR DRAKE ACSR 636 ACSR GROSBEAK ACSR ACSR DOVE ACSR 477 ACSR HAWK ACSR ACSR IBIS ACSR, Old ACSR LARK ACSR ACSR LINNET / 0 ACSR 4 / 0 ACSR PENGUIN / 0 ACSR 3 / 0 ACSR PIGEON / 0 ACSR 2 / 0 ACSR QUAIL / 0 ACSR 1 / 0 ACSR RAVEN #2 ACSR #2 ACSR SPARROW / 0 AAC 4 / 0 AAC OXLIP / 0 AAC 2 / 0 AAC ASTER / 0 AAC 1 / 0 AAC POPPY #2 AAC #2 AAC IRIS AAC 2500 AAC LUPINE AAC 2250 AAC SAGEBRUSH Use: BLUEBIRD AAC 2000 AAC COWSLIP AAC 1590 AAC COREOPSIS AAC 1272 AAC NARCISSUS AAC, North 954 AAC GOLDENROD AAC, South 954 AAC MAGNOLIA AAC 795 AAC ARBUTUS AAC 636 AAC ORCHID AAC AAC DAHLIA AAC 477 AAC COSMOS AAC AAC CANNA AAC AAC TULIP Conductor Rating Reference (Westinghouse Ratings and RateKit IEEE738 Ratings with Standard Weather Assumptions + Conductor MOT) 41 P a g e

42 Appendix D Aluminum Conductor Bus Ratings (Classes AA and A) 42 P a g e

43 43 P a g e

44 Appendix E - Standard Bus Ratings The table below shows manufacturer ratings provided by AFL Global. Current ratings used should be for 6063-T6, Schedule 40 Pipe. 44 P a g e

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008-3 Version 3.4 1 Contents 1. Scope... 3 2. Establishment and Communication of Facility Ratings:... 3 2.1.

More information

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008 and FAC-009 Issued by: Dan Custer Reviewed by: Tom Mielnik Version 2.7 1 1.0 Scope: This document provides

More information

MidAmerican Energy Company 69 kv Facility Ratings Methodology

MidAmerican Energy Company 69 kv Facility Ratings Methodology MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

Kansas City Power & Light Company. Transmission Facility Rating Methodology

Kansas City Power & Light Company. Transmission Facility Rating Methodology Company Prepared by: KCP&L Transmission Planning December 6, 2017 Table of Contents 1. Purpose...4 2. Generator Rating Methodology...4 3....4 3.1. Equipment Rating Methodology...4 3.2. Items considered

More information

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings

More information

Transmission Facilities Rating Methodology for Florida

Transmission Facilities Rating Methodology for Florida Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke

More information

Transmission Facilities Rating Methodology

Transmission Facilities Rating Methodology Document title Transmission Facilities Rating Methodology Document number EGR-TRMC-00009 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning- Progress Energy

More information

TRANSMISSION FACILITIES...7

TRANSMISSION FACILITIES...7 Table of Contents 1. INTRODUCTION...4 1.1. Objective... 4 1.2. NERC FAC-008 Compliance... 4 1.3. Seminole s Normal Rating... 5 1.4. Seminole s Four-Hour Rating... 5 1.5. Seminole s Emergency Rating...

More information

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Nicholas Klemm Western Area Power Administration Rocky Mountain Region March 2012 Organizational Overview Western

More information

Tampa Electric Company Facility Rating Methodology Approved 11/20/2018

Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Effective Date: 12/01/2018 Responsible Department: System Planning Review Cycle: 3 Years Last Date Reviewed: 11/16/2018 Next Planned

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

Criteria. Table of Contents

Criteria. Table of Contents Criteria Title: SUBSTATION EQUIPMENT AMPACITY RATINGS Department: Document No: Issue Date: Previous Date: Asset Management CR-0063 v08 06-16-2014 12-26-2013 Table of Contents 1.0 Scope... 2 2.0 Introduction...

More information

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Voltage and Reactive Procedures CMP-VAR-01

Voltage and Reactive Procedures CMP-VAR-01 Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk

More information

VAR Voltage and Reactive Control. A. Introduction

VAR Voltage and Reactive Control. A. Introduction VAR-001-5 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-5 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document Version 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying the definition.

More information

VAR Voltage and Reactive Control

VAR Voltage and Reactive Control VAR-001-4 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are

More information

A. Introduction. VAR Voltage and Reactive Control

A. Introduction. VAR Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4.2 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24 RC0120A - RC IRO-010 Data Specification NOTE: Changes from Peak's Attachment A are highlighted in red in columns C through G Section Category Number Responsible Pa Data Item Data Transfer Method 1.1 Transmission

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-2 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE)

NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE) COORDONNATEUR DE LA FIABILITÉ Direction Contrôle des mouvements d énergie Demande R-3944-2015 NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE) Original : 2016-10-14 HQCMÉ-10, Document 2 (En liasse) Standard

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Definition of Bulk Electric System Phase 2

Definition of Bulk Electric System Phase 2 Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order

More information

COS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1

COS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1 Outage Coordination Process Version 1.0 NERC Reliability Standard IRO-017-1 COS MANUAL March 24, 2017 www.peakrc.com. Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...

More information

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table

More information

August 25, Please contact the undersigned if you have any questions concerning this filing.

August 25, Please contact the undersigned if you have any questions concerning this filing. !! August 25, 2017 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-4 3. Purpose: To ensure generators provide reactive support and voltage control, within generating

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2014-03-31 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Meeting Date: 27.03.2017 Time: 1430 Hrs Venue: NRPC Conference

More information

August 25, 2017 VIA ELECTRONIC FILING

August 25, 2017 VIA ELECTRONIC FILING !! August 25, 2017 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation

More information

Transmission Availability Data System (TADS) DATA REPORTING INSTRUCTION MANUAL

Transmission Availability Data System (TADS) DATA REPORTING INSTRUCTION MANUAL Transmission Availability Data System (TADS) DATA REPORTING INSTRUCTION MANUAL Version History Version History Version Date October 17, 2007 November 20, 2007 New Major Changes P. 4. Table 1.5, third row

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

Industry Webinar Draft Standard

Industry Webinar Draft Standard Industry Webinar Draft Standard Project 2010-13.2 Phase 2 of Relay Loadability: Generation PRC-025-1 Generator Relay Loadability December 13, 2012 Agenda Welcome, Introductions and Administrative NERC

More information

GridLiance Reliability Criteria

GridLiance Reliability Criteria GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances

More information

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase

More information

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst

More information

Bruce L. Graves /01/$ IEEE. IEEE Industry Applications Magazine PhotoDisc, Inc.

Bruce L. Graves /01/$ IEEE. IEEE Industry Applications Magazine PhotoDisc, Inc. Bruce L. Graves A Defining a Power System A power system is an assembly of generators, transformers, power lines, fuses, circuit breakers, protective devices, cables, and associated apparatus used to generate

More information

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g 2011 SERTP Welcome SERTP 2011 First RPSG Meeting & Interactive Training Session 9:00 AM 3:00 PM 1 2011 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Implementation Plan Project Modifications to PRC Reliability Standard PRC-025-2

Implementation Plan Project Modifications to PRC Reliability Standard PRC-025-2 Project 2016-04 Modifications to PRC-025-1 Reliability Standard PRC-025-2 Applicable Standard PRC Generator Relay Loadability Requested Retirement PRC 025 1 Generator Relay Loadability Prerequisite Standard

More information

PRC Disturbance Monitoring and Reporting Requirements

PRC Disturbance Monitoring and Reporting Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020 TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES Document 9020 Puget Sound Energy, Inc. PSE-TC-160.50 December 19, 2016 TABLE OF CONTENTS

More information

Modelling Parameters. Affect on DER Impact Study Results

Modelling Parameters. Affect on DER Impact Study Results Modelling Parameters Affect on DER Impact Study Results Agenda Distributed Energy Resources (DER) Impact Studies DER Challenge Study Steps Lessons Learned Modeling Reverse Power Transformer Configuration

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) 1 PART 1: GENERAL This section describes materials and installation requirements for low voltage

More information

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection A. Introduction 1. Title: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection 2. Number: PRC-019-2 3. Purpose: To verify coordination of generating unit Facility

More information

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED SECTION 16280 LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED PART 1 - GENERAL 1.1 SUMMARY This specification defines the requirements for active harmonic filter systems in order to meet IEEE-519-2014

More information

Back to the Basics Current Transformer (CT) Testing

Back to the Basics Current Transformer (CT) Testing Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

I WP Asset # I ~:2 3. I Review Annual. ~c~~ Date: 'l/j(j/! ZL>IJ,...

I WP Asset # I ~:2 3. I Review Annual. ~c~~ Date: 'l/j(j/! ZL>IJ,... - District Standard - FAC Facility Design, Connections 950.001 and Maintenance CHELAN COUNTY ~ PUBLIC UTILITY DISTRICT Owned By The People~ Serve Facility Connection Requirements Page 1 of 101 EFFECTIVE

More information

Technical recommendation for the purchase of Real Time Thermal Rating for transformers

Technical recommendation for the purchase of Real Time Thermal Rating for transformers Version: 1.0 Date of Issue: December 2014 1 Technical recommendation for the purchase of Real Time Thermal Rating for transformers 1 Purpose The purpose of this document is to set out and describe the

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

Number: Prepared by: TABLE OF CONTENTS

Number: Prepared by: TABLE OF CONTENTS Prepared by: C. J. McWhirter Issued by: D. J. Papadoulis Date: 30 August 2013 Page 1 of 19 TABLE OF CONTENTS Page 1 INTRODUCTION... 2 2 TRANSMISSION LINES... 2 3 TRANSFORMERS... 6 4 SHUNT REACTORS... 8

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600

More information

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics:

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics: A. Introduction 1. Title: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions 2. Number: MOD-027-1 3. Purpose: To verify that the turbine/governor

More information

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL

More information

Comparison of recloser and breaker standards

Comparison of recloser and breaker standards s Technical Data TD280024EN Supersedes February 1994 (R280-90-5) COOPER POWER SERIES Comparison of recloser and breaker standards Technical Data TD280024EN Comparison of recloser and breaker standards

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability Corporation ) ) Docket No. PETITION OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION FOR

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

Facility Interconnection Requirements for Colorado Springs Utilities Version 03 TABLE OF CONTENTS

Facility Interconnection Requirements for Colorado Springs Utilities Version 03 TABLE OF CONTENTS TABLE OF CONTENTS 1.0 INTRODUCTION (NERC FAC-001 Requirement R1, R2)... 4 2.0 INTERCONNECTION REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITIES (NERC FAC-001 Requirements R3 & R4)... 4

More information

Standard VAR Voltage and Reactive Control

Standard VAR Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-3 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained within

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer

More information