1 Distribution Network Capacitor Resonance A Case Study Authors: Chris Halliday Frank Iannelli Dr Robert Barr Director of Technical Services Power Quality Technician Director and Training Electrical Consulting and Training Pty Ltd Country Energy Electric Power Consulting Pty Ltd This paper was presented at the Energy NSW Balancing the New Energy Equation Conference & Trade Exhibition in Sydney, Wednesday 12 to Friday 14 September Abstract Harmonics are generally caused by customer non-linear loads interacting with network impedances. Capacitor banks used for voltage support can resonant and cause excessive levels of harmonics that may cause problems for customer equipment. This case study looks at the problems associated with a capacitor bank in Country Energy s Narrandera Zone Substation, the levels of network harmonics at various locations, the effects on customer equipment and the solution implemented to overcome the problem. 1. Introduction Country Energy s regional electricity network covers 95% of NSW. This network supplies approximately 870,000 customers and is supported by approximately 4,000 employees. The distribution network consists of over 195,000 kilometres of subtransmission, high voltage and low voltage distribution lines. There are approximately 1.4 million power poles for the overhead component of this network. The distribution network is supplied and radiated out from approximately 340 zone substations via approximately 1360 distribution feeders. One of these zone substations is located at Narrandera (see Map 1) and it is this zone substation that is the focus of this paper. Map 1: Showing NSW and Narrandera Narrandera Harmonics are generated by customer non-linear loads interacting with network impedances. Harmonics in Australia are typically at low levels and generally cause no problems. At some locations, harmonics can reach high levels due usually to a combination of local load and network circumstances. This case study is one of those rare situations. Distribution Network Capacitor Resonance A Case Study 1
2 Capacitors are used in banks by distribution companies, such as Country Energy, to correct poor power factor, to provide voltage support and minimise losses. These capacitors can resonate at or around the 5 th or 7 th harmonic if measures aren t taken to prevent such resonance. Harmonic resonances can result in damage to capacitor banks and customer equipment as well as increased network losses and maloperation of customer equipment. Problems occurred at Narrandera in 2006 due to a relatively low level of customer generated harmonic currents generated at the end of a rural line that was interacting with the capacitor bank at Narrandera Zone Substation (see Map 1 to show the location of Narrandera in relation to NSW). This paper looks at the effects on customers, the process taken to identify the problem and cause, the solution implemented and effectiveness of this solution. 2. Effects to Customers Only one customer supplied from the zone substation had reported problems. The customers installation is connected to the end of a lightly loaded radial rural feeder that is a combination of HV 7/.064 copper conductor, 7/4.5 aluminium, 6/1/2.5 ACSR and 35 mm Aluminium underground cable: a total of 50.6 kms of powerline from transformer Tx 1 at Narrandera Zone Substation (see Sketch 1 for the single line diagram from the zone substation to the site). Sketch 1: Single Line Diagram. Zone Sub to Site Narrandera Zone Sub 66/11kV 3.2 km 7/4.5 AAC 22.8 km 7/064 HDBC 11 km 7/4.5 AAC 9 km 6/1/2.5 ACSR Note: Numerous spurs and distribution transformers are connected all the way along the feeder but are not shown for simplicity. Other feeders from the zone substation are also neglected 4.6 km 35 mm² al XLPE 150 kva Distribution Transformer The transformer supplying the site was a 3 phase 150 kva padmount transformer, set on the 11275/433 tap position and with a percentage impedance of 4.1%. The load was typically amps but at times getting up to 50 amps not a significant amount of load by any means. The customer premise was a communication receiver station that comprised of racks of sensitive electronic communication equipment, switch mode power supplies and amplifiers. The site had a backup generator that was starting intermittently from an unknown cause since the site was commissioned in This resulted in an enormous amount of unnecessary generator starts over this time which was costing the customer a significant amount of money in terms of fuel cost, wear and tear on the generator and other equipment e.g. a changeover contactor had to be replaced. There was also the inconvenience and labour cost associated with topping up the generator fuel and ensuring it was ready for use at all times. The customer s consultant initially thought that voltage sags were causing the problem but monitoring proved that voltage sags did not cause any change in the status of the generator. In one seven day period alone the generator started unnecessarily 25 times and ran for approximately 47 hours. The generator changeover sensing relay was set as follows: Voltage Unbalance - 15% with a 10 sec delay; Under Voltage - 85% with a 10 sec delay. Distribution Network Capacitor Resonance A Case Study 2
3 3. Identifying the Problem and Cause Initial investigations were focused at the customer who was having the problems. A Gridsense Powermonic PM30 was installed at the distribution transformer. This locations was selected as it was the point of supply and as voltage sags from the medium voltage network was suspected as the cause of the problems. The monitoring established that the supply voltage was within standards and the substation was not overloaded (see Graph 1). Graph 1 Voltage and Current at the Distribution Transformer Supply the Receiver Site The graphs showed that the generator was starting when Total Harmonic Distortion (THD) levels exceeded approximately 9.8% (see Graph 2). This level is in excess of the required 8% compatibility level as set down by AS/NZS The graphs also showed that the 5 th and 7 th harmonics were the most significant harmonics by far. The generator changeover relay appeared to be confused by such high levels of THD and sensed the need to swap to the generator. THD reduces by approximately 4% when the generator cuts in as shown by Graph 2 and so the customer s load was contributing significantly to the problem. The generator changeover relay would sense when the harmonic distortion dropped to below 9% voltage THD and the generator would be stopped and mains supply would return. The generator would cycle in and out unless the THD remained below about 9.8%. Graph 2 Voltage THD percentage at the customer s premise Generator cutting in and out Distribution Network Capacitor Resonance A Case Study 3
4 It was not easy to tong the medium voltage network to determine where the major harmonic current sources were originating from so an analysis of customer loads connected to the network was carried out to determine those customers likely to have been generating significant harmonics. The only identified major harmonic producing load was a large plant in Narrandera township and this customer was supplied by the other Zone Substation transformer, Tx 2. Spot readings of THD levels were taken at this site and found to be very low and it was concluded that this site was not contributing greatly to the problem. It has since been concluded that the largest contributing harmonic load from Tx1 was in fact the customer with problems (this can often be the case). 4. The Identified Problem Narrandera zone has 2 x 10MVA 66/11 kv transformers operating in a split bus arrangement in the peak load periods during summer and winter. This zone substation had a capacitor bank (see Photo 1) that was used to improve power factor on Tx 1 which supplies part of Narrandera township and some of the surrounding rural network. Graphs taken at the zone substation showed the Voltage THD at times to about 5.7% and with low levels of current THD and individual harmonics. The voltage THD levels at the zone substation are much less than those recorded at the receiver site. It was decided that the old capacitor bank may be causing a Photo 1 Old Capacitor Bank resonant affect and it was to be disconnected from the network for a short period. This was to occur between 9 am 4 th September to 4 pm on the 5 th September Monitoring at the receiver site was to be undertaken to monitor the change in the harmonic distortion (see Graph 3). Unfortunately the current to the capacitor bank was not logged at any stage to prove that resonance was or wasn t occurring. Also logs at the zone substation were not taken when the capacitor bank was switched out to see the effect at that location. Graph 3 THD at the Receiver site while Capacitor Bank Switched out Voltage distortion reduced while capacitor bank was switched out. The generator did not cut in or out during this period. Distribution Network Capacitor Resonance A Case Study 4
5 Total harmonic voltage distortion at the receiver site when the capacitor bank was disconnected had reduced by approx 4 % and the operations of the generator had stopped due to the voltage THD at the site staying below 9 %. THD levels at the zone substation reduced from peaks of 6% down to approximately 3-4% at all times. A link was therefore established between the cause of the generator operations at the receiver site and the old capacitor bank. The capacitor bank was then disconnected from supply for an extended period to assist the customer. No further reports of the generator cutting in and out were received through this period. It is noted from the graphs taken at the receiver site that when the load on the feeder is high at midnight to 3 am due to hot water load (resistive load) and during the day period from 8 am to 6 pm that the total harmonic distortion was somewhat lower than at lightly loaded times. Dugan, et al [1] states that as little as 10% resistive loading can have a significant beneficial impact on peak impedance and this is illustrated by the results of the graphs for this site. 5. Modelling the Network A model was set up in Excel to investigate what was occurring. A simplified sketch of this model is provided at Sketch 2. The numerous parallel paths of connected spurs and distribution transformers had not been included in the sketch for simplicity. Sketch 2 Simplified drawing of model developed in Excel This model showed consistency with the practical measured results. The model confirmed that there was a resonance in the low order harmonics around the 5 th harmonic (see Graph 4). The graph produced from the model also supports that a reduction in harmonics was to be expected when the capacitor bank was taken out of service. Graph 4 Modelled Harmonic Impedances at Zone Substation 11 kv Busbar 70 PU Harmonic Impedance with P.F. Correction Capacitors without P.F. Correction Capacitors Harmonic Distribution Network Capacitor Resonance A Case Study 5
6 6. Solution Implemented The capacitor bank at Narrandera Zone Substation was planned to be replaced in the near future due to its PCB dielectric. The capacitor bank was left out of service for a period until it was replaced some months later. The new capacitor bank was installed with blocking inductors to prevent resonance (see Sketch 3). Sketch 3 New Capacitor Bank Single Line Diagram (Courtesy of ABB) Harmonic filtering was also recommended for the receiver site to assist in reducing harmonic levels generated. 7. Solution Effectiveness Levels of THD were measured again once the new capacitor bank was installed. This showed voltage THD levels at the zone substation were maintained at similar levels as without the old capacitor bank at approximately 3% and at the receiver site at approximately 7.6%. This is a significant improvement and the customer is not having further problems. Voltage THD levels are still nearing the compatibility limits allowed by the standards. Future upgrading of the network will help to overcome this issue and/or emission limits may need to be applied to customer. 8. Conclusions 1. Electricity distributors need to be aware of the potential adverse harmonic impacts of shunt capacitor bank resonances. 2. Modelling over the harmonic spectrum is an important part of avoiding harmonic related problems. 3. Excessive harmonic voltages caused by capacitor resonances or other reasons can cause sensitive customer equipment to malfunction. Investigation techniques can always be improved and problems like this provide a learning opportunity for all. 9. Acknowledgements Brendon McPhillips, Kris McCanna, Peter Day and others from Country Energy for information and assistance provided in compiling this paper. 10. References [1] Dugan, etal Electrical Power Systems Quality, Second Edition. McGraw Hill. Distribution Network Capacitor Resonance A Case Study 6
MAINS SIGNAL PROPAGATION THROUGH DISTRIBUTION SYSTEMS. J. Stones*, S. Perera*, V. Gosbell* and N. Browne**
ABSTRACT MAINS SIGNAL PROPAGATION THROUGH DISTRIBUTION SYSTEMS J. Stones*, S. Perera*, V. Gosbell* and N. Browne** *School of Electrical, Computer and Telecommunications Engineering University of Wollongong
More informationTechniques for the Control of Steady State Voltage in MV and LV Networks
Techniques for the Control of Steady State Voltage in MV and LV Networks by Dr Robert Barr, Electric Power Consulting Pty Ltd Prof. Vic Gosbell, University of Wollongong Mr Chis Halliday, Electrical Consulting
More informationA new SAIFI based voltage sag index
University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 28 A new SAIFI based voltage sag index Robert A. Barr University of Wollongong,
More informationTHE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES
THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES C.E.T. Foote*, G.W. Ault*, J.R. McDonald*, A.J. Beddoes *University of Strathclyde, UK EA Technology Limited, UK c.foote@eee.strath.ac.uk
More informationPOWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:
POWER CORPORATION Power Quality Specifications and Guidelines for Customers Phone: 403-514-3700 Fax: 403-514-3719 1 GENERAL OVERVIEW........................................ 1.1 WHAT DOES THIS SPECIFICATION
More informationPredicting the Voltage Sag Performance of Electricity Distribution Networks
Predicting the Voltage Sag Performance of Electricity Distribution Networks by Dr Robert Barr, Prof. Vic Gosbell, Mr Chris Halliday, Figure - Typical Rectangular Voltage Sag PU Supply Voltage..2 0.8 0.6
More informationVOLTAGE CONTROL FOR DISTRIBUTION NETWORKS and the 230V/400V Standard. Alex Baitch FIEAust, CPEng Manager Network Capability, Integral Energy
VOLTAGE CONTROL FOR DISTRIBUTION NETWORKS and the 230V/400V Standard by Alex Baitch FIEAust, CPEng Manager Network Capability, Integral Energy This paper was presented to the Annual Conference of the Electric
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationPOWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS ENGINEERING STANDARDS CITY OF LETHBRIDGE ELECTRIC
CITY OF LETHBRIDGE ELECTRIC ENGINEERING STANDARDS POWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS The City of Lethbridge acknowledges the use of other utility industry and industry committee
More informationPower Quality Report. A Manufacturing Plant
Power Quality Report Prepared for A Manufacturing Plant 6 May 2016 by Dr Angelo De Francesco Power Quality Consultant CHK Power Quality Pty Ltd Page 1 Contents 1 EXECUTIVE SUMMARY... 4 2 INTRODUCTION...
More informationEE 741. Primary & Secondary Distribution Systems
EE 741 Primary & Secondary Distribution Systems Radial-Type Primary Feeder Most common, simplest and lowest cost Example of Overhead Primary Feeder Layout Example of Underground Primary Feeder Layout Radial-Type
More informationHarmonic Planning Levels for Australian Distribution Systems
Abstract Harmonic Planning Levels for Australian Distribution Systems V.J. Gosbell 1, V.W. Smith 1, D. Robinson 1 and W. Miller 2 1 Integral Energy Power Quality Centre, University of Wollongong 2 Standards
More informationModelling of Voltage Regulation Issues in SWER Systems Using PSCAD/EMTDC
Modelling of Voltage Regulation Issues in SWER Systems Using PSCAD/EMTDC Jason Mayer Connell Wagner Pty Ltd Spring Hill, Queensland, Australia Email: mayerj@conwag.com ABSTRACT An economic (low-cost) distribution
More informationUse only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at
Reviewed: Sergey Kryuchkov Distribution Engineering Scott Merriman Distribution Standards Valentina Dabic Distribution Planning Warren Quan Distribution Operations, FVO Raj Solanki Distribution Engineering
More informationMV network design & devices selection EXERCISE BOOK
MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester
More informationTHE COMPREHENSIVE APPROACH TO FACILITY POWER QUALITY
by Cesar Chavez, Engineering Manager, Arteche / Inelap, and John Houdek, President, Allied Industrial Marketing, Inc. Abstract: Industrial facility harmonic distortion problems can surface in many different
More informationHarmonic distortion analysis on the MV and LV distribution networks: problems, influencing factors and possible solutions
Harmonic distortion analysis on the MV and LV distribution networks: problems, influencing factors and possible solutions Fernando Bastião and Humberto Jorge Department of Electrical Engineering and Computers
More informationSlide 1. New Delhi India Oct CIGRE AORC Meeting New Delhi October 2017
Slide 1 CIGRÉ AORC Panel B1 Insulated Cables Victorian REFCL Program Update (Rapid Earth Fault Current Limiter) Russell Wheatland : Principal Engineer - Asset Management CIGRE AORC Meeting New Delhi October
More informationOptions to Improve the MEN System into the 21 st Century
Options to Improve the MEN System into the 21 st Century Chris Halliday Electrical Consulting and Training Pty Ltd, Gladstone NSW, Australia. Email: chris@elect.com.au Web: www.elect.com.au Abstract Network
More informationHarmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits
WREF 01 Paper # 048 Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits Ketut Dartawan Ricardo Austria, Le Hui and Mark Suehiro* Pterra Consulting Maui Electric Company*
More informationEE 340 Transmission Lines. Spring 2012
EE 340 Transmission Lines Spring 2012 Physical Characteristics Overhead lines An overhead transmission line usually consists of three conductors or bundles of conductors containing the three phases of
More informationEffects of Harmonic Distortion I
Effects of Harmonic Distortion I Harmonic currents produced by nonlinear loads are injected back into the supply systems. These currents can interact adversely with a wide range of power system equipment,
More informationPOWER SYSTEMS QUALITY Topic 5: Principles for Controlling Harmonics
POWER SYSTEMS QUALITY Topic 5: Principles for Controlling Harmonics EE589-Power System Quality & Harmonics Electrical Engineering Department School of Engineering University of Jordan 1 Control of Harmonics
More informationCASE STUDY. Implementation of Active Harmonic Filters at Ford Motor Company SA Silverton Plant
CASE STUDY Implementation of Ford Motor Company SA Silverton Plant 1 SCENARIO Ford Motor Company is a global automotive and mobility company based in Dearborn, Michigan. Ford Motor Company of Southern
More informationUNDERSTANDING POWER QUALITY
Technical Note No. 1 June 1998 UNDERSTANDING POWER QUALITY This Technical Note describes the range of problems, what causes them, what they affect and what could be done to manage them. Integral Energy,
More informationCHAPTER 5 POWER QUALITY IMPROVEMENT BY USING POWER ACTIVE FILTERS
86 CHAPTER 5 POWER QUALITY IMPROVEMENT BY USING POWER ACTIVE FILTERS 5.1 POWER QUALITY IMPROVEMENT This chapter deals with the harmonic elimination in Power System by adopting various methods. Due to the
More informationPower System Studies
Power System Studies Laois Ballyragget Cable Feasibility Study PE667-F4-R3-1-3 ESBI Engineering Solutions Stephen Court, 18/21 St Stephen s Green, Dublin 2, Ireland Telephone+353-1-73 8 Fax+353-1-661 66
More informationTransmission Facilities Rating Methodology for Florida
Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke
More informationHarmonics and Flicker Levels at a Sub- Transmission Substation: A Measurement Experience
University of Wollongong Research Online Faculty of Informatics - Papers (Archive) Faculty of Engineering and Information Sciences 2003 Harmonics and Flicker Levels at a Sub- Transmission Substation: A
More informationMidAmerican Energy Company 69 kv Facility Ratings Methodology
MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy
More informationROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT
ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings
More informationChapter 6. WIRING SYSTEMS Safe Electrical Design
Chapter 6 WIRING SYSTEMS Safe Electrical Design Topic 6-3 CABLE SELECTION BASED ON CURRENT CARRYING CAPACITY REQUIREMENTS INSTALLATION CONDITIONS Current carrying capacity (CCC) is the maximum continuous
More informationFatima Michael college of Engineering and Technology
Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric
More informationEH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström
EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids
More informationPOWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.
POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products
More informationBE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %
BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and
More informationSubstation Testing and Commissioning: Power Transformer Through Fault Test
1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of
More informationHV AC TESTING OF SUPER-LONG CABLES
HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008-3 Version 3.4 1 Contents 1. Scope... 3 2. Establishment and Communication of Facility Ratings:... 3 2.1.
More informationPower Factor. Power Factor Correction.
Power Factor. Power factor is the ratio between the KW and the KVA drawn by an electrical load where the KW is the actual load power and the KVA is the apparent load power. It is a measure of how effectively
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008 and FAC-009 Issued by: Dan Custer Reviewed by: Tom Mielnik Version 2.7 1 1.0 Scope: This document provides
More informationSolving Customer Power Quality Problems Due to Voltage Magnification
PE-384-PWRD-0-11-1997 Solving Customer Power Quality Problems Due to Voltage Magnification R. A. Adams, Senior Member S. W. Middlekauff, Member Duke Power Company Charlotte, NC 28201 USA E. H. Camm, Member
More informationComparison of methodologies for assessment of harmonic current emission limits for large installations connected to LV networks
University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 212 Comparison of methodologies for assessment
More informationPower Factor improved by Variable Speed AC Drives By Mauri Peltola, ABB Oy, Drives
For your business and technology editors Power Factor improved by Variable Speed AC Drives By Mauri Peltola, ABB Oy, Drives The use of AC induction motors is essential for industry and utilities. AC induction
More informationHigh Voltage Pylon earth Measurements. Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy
High Voltage Pylon earth Measurements Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy Abstract The earth connection of high voltage electrical power line pylons is obviously
More informationPrepared By Pierre Archambault, PEng Power Survey International Inc Trans Canada Hwy. St-Laurent, QC H4S 1S4 CANADA
ATCO Electric Hangingstone Substation HARMONIC STUDY Prepared By Pierre Archambault, PEng Power Survey International Inc. 8025 Trans Canada Hwy. St-Laurent, QC H4S 1S4 CANADA Rev.: 6 March 2007 TABLE OF
More informationHarmonic Survey of an MV Distribution System. V. Gosbell, D. Mannix, D. Robinson & S. Perera University of Wollongong
Harmonic Survey of an MV Distribution System V. Gosbell, D. Mannix, D. Robinson & S. Perera University of Wollongong Abstract The harmonic survey of a medium voltage distribution system involves three
More informationPOWER SYSTEM PRINCIPLES APPLIED IN PROTECTION PRACTICE. Professor Akhtar Kalam Victoria University
POWER SYSTEM PRINCIPLES APPLIED IN PROTECTION PRACTICE Professor Akhtar Kalam Victoria University The Problem Calculate & sketch the ZPS, NPS & PPS impedance networks. Calculate feeder faults. Calculate
More informationCork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)
Cork Institute of Technology Bachelor of Science (Honours) in Electrical Power Systems - Award Instructions Answer FIVE questions. (EELPS_8_Y4) Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Examiners:
More informationImpact of Distributed Generation on Network Voltage Levels
EEE8052 Distributed Generation Taster Material Impact of Distributed Generation on Network Voltage Levels Steady-state rise in network voltage levels Existing practice is to control distribution voltage
More informationHarmonic impact of photovoltaic inverter systems on low and medium voltage distribution systems
University of Wollongong Research Online University of Wollongong Thesis Collection 1954-2016 University of Wollongong Thesis Collections 2006 Harmonic impact of photovoltaic inverter systems on low and
More informationCentral Hudson Gas & Electric Corporation. Transmission Planning Guidelines
Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents
More informationMaximum Allowable PV Penetration by Feeder Reconfiguration Considering Harmonic Distortion Limits
Maximum Allowable PV Penetration by Feeder Reconfiguration Considering Harmonic Distortion Limits Vemula Mahesh Veera Venkata Prasad #1, R. Madhusudhana Rao *, Mrutyunjay Mohanty #3 #1 M.Tech student,
More informationSome aspects regarding harmonic s distortions propagation in large medium voltage distribution system
Some aspects regarding harmonic s distortions propagation in large medium voltage distribution system L. E. PETREAN 1, D. C. PETER 1, M. HORGOŞ 1, A. BUCHMANN 1, L. PETREAN 2 1 Electrical Engineering Department,
More informationUProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy
UProtection Requirements Ufor a Large scale Wind Park Shyam Musunuri Siemens Energy Abstract: In the past wind power plants typically had a small power rating when compared to the strength of the connected
More informationNJWA - Harmonics and Drives Proper System Design
Session Goals Larry Stanley, Sr. Regional Business Development Engineer, Water Segment Matthew LaRue, ABB Drives Product Manager Philadelphia District, Baldor of Philadelphia NJWA - Harmonics and Drives
More informationCONTENTS. 1. Introduction Generating Stations 9 40
CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific
More informationImpact of limiting reactors for voltage sag mitigation in distribution utilities
Elektrotehniški vestnik 71(5): 31-37, 24 Electrotechnical Review; Ljubljana, lovenija Impact of limiting reactors for voltage sag mitigation in distribution utilities tefano Quaia, imone Castellan Department
More informationHARMONIC MITIGATIONCASE STUDY
HARMONIC MITIGATIONCASE STUDY CNCE AND NCE INSTALLATION AT BROADCASTING STUDIO Concerned about video noise detected on some of its studio equipment, E! Entertainment Television (ETV), commissioned a study
More informationBusbars and lines are important elements
CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection
More informationModeling and Validation of an Unbalanced LV Network Using Smart Meter and SCADA Inputs
Modeling and Validation of an Unbalanced LV Network Using Smart Meter and SCADA Inputs Derek C. Jayasuriya, Max Rankin, Terry Jones SP AusNet Melbourne, Australia Julian de Hoog, Doreen Thomas, Iven Mareels
More informationTransmission Facilities Rating Methodology
Document title Transmission Facilities Rating Methodology Document number EGR-TRMC-00009 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning- Progress Energy
More informationDistance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.
Distance Protection for Distribution Feeders Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Why use distance protection for distribution feeders? Distance protection is mainly used for protecting
More informationEE 340 Transmission Lines
EE 340 Transmission Lines Physical Characteristics Overhead lines An overhead transmission line usually consists of three conductors or bundles of conductors containing the three phases of the power system.
More informationImpact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods
Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing
More informationCase Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations
Case Study 1 Power System Planning and Design: Power Plant, Transmission Lines, and Substations Lindsay Thompson, 5203120 Presented to Riadh Habash ELG 4125 11/10/2013 1.0 ABSTRACT A power plant delivers
More informationZENER ELECTRIC PTY LTD
ACN 00 595 428 APPLICATION NOTE: IM 0002 Revision -, June 996 Effective: 24/06/96 Topic: Mains Harmonic Disturbance and Variable Speed AC-Drives Introduction Most common industrial variable speed drives
More informationImpact of Harmonic Resonance and V-THD in Sohar Industrial Port C Substation
Impact of Harmonic Resonance and V-THD in Sohar Industrial Port C Substation R. S. Al Abri, M. H. Albadi, M. H. Al Abri, U. K. Al Rasbi, M. H. Al Hasni, S. M. Al Shidi Abstract This paper presents an analysis
More information2 METHODOLOGY. The method of reactive power compensation, proposed in this research is suitable
2 METHODOLOGY 2.1 BASE LOAD REACTIVE POWER REQUIREMENT The method of reactive power compensation, proposed in this research is suitable to meet the base reactive power requirement of the network. The base
More information2C73 Setting Guide. High Impedance Differential Relay. Advanced Protection Devices. relay monitoring systems pty ltd
2C73 Setting Guide High Impedance Differential Relay relay monitoring systems pty ltd Advanced Protection Devices 1. INTRODUCTION This document provides guidelines for the performance calculations required
More informationThyristorised Automatic Power Factor
Thyristorised Automatic Power Factor Correction with 7% D Tune Harmonics Suppression (Reactor/Filtering) System Power quality? In the present Low voltage (LV) industrial distribution system the power factor
More informationElectrical Protection System Design and Operation
ELEC9713 Industrial and Commercial Power Systems Electrical Protection System Design and Operation 1. Function of Electrical Protection Systems The three primary aims of overcurrent electrical protection
More informationLIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION
LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION Andreas SUMPER sumper@citcea.upc.es Antoni SUDRIÀ sudria@citcea.upc.es Samuel GALCERAN galceran@citcea.upc.es Joan RULL rull@citcea.upc.es
More informationPQ for Industrial Benchmarking with various methods to improve. Tushar Mogre.
General PQ: Power Quality has multiple issues involved. Thus, need to have some benchmarking standards. Very little is spoken about the LT supply installation within an industry. There is need to understand
More informationConventional Paper-II-2013
1. All parts carry equal marks Conventional Paper-II-013 (a) (d) A 0V DC shunt motor takes 0A at full load running at 500 rpm. The armature resistance is 0.4Ω and shunt field resistance of 176Ω. The machine
More informationExercises on overhead power lines (and underground cables)
Exercises on overhead power lines (and underground cables) 1 From the laws of Electromagnetism it can be shown that l c = 1 v 2 where v is the speed of propagation of electromagnetic waves in the environment
More informationBUFFALO ENERGY SCIENCE AND TECHNOLOGY GROUP
The BEST Group THE BUFFALO ENERGY SCIENCE AND TECHNOLOGY GROUP -Winter Lecture Series HARMONICS Presented by: Syed Khundmir T Department of Electrical Engineering University at Buffalo khundmir@buffalo.edu
More informationOPTIMIZING MAINS IMPEDANCE: REAL WORLD EXAMPLES by Judith M. Russell Consulting Electrical Engineer PowerLines
by Judith M. Russell Consulting Electrical Engineer PowerLines Introduction Power Quality has historically been quantified in terms of voltage. Metering equipment measures RMS voltage level, voltage sags
More informationReport Demonstration Field Test
Report Demonstration Field Test The device under test: Genesys Resonant Active Tunable (GRAT) antenna Designer-owner: GENESYS LTD Model code name: GRAT-C-27V3 Device Purpose: RF Transmitting-Receiving
More informationCompany Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels
More informationPump ED 101. Two Steps To Increased Pump Life (Part Two) Voltage Unbalance
Pump ED 101 Two Steps To Increased Pump Life (Part Two) Voltage Unbalance Joe Evans, Ph.D http://www.pumped101.com Last month we investigated the importance of identifying the actual operating point of
More informationAn easy-to-use Precision Power Analyser. The touch of a button gives direct readout of true power and a host of other useful measurements.
An easy-to-use Precision Power Analyser. The touch of a button gives direct readout of true power and a host of other useful measurements. Easy to use-fully autoranging for voltage, current and frequency
More informationImprovement of Power System Distribution Quality Due to Using Dc-Converter Loads and Electric Arc Furnaces. H.A. Khalik, M. A. Aziz, and E. Farouk.
, 2011;4(12) Improvement of Power System Distribution Quality Due to Using Dc-Converter Loads and Electric Arc Furnaces H.A. Khalik, M. A. Aziz, and E. Farouk. Electrical power and Machines Engineering
More informationSAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING
SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING Y. Rajotte J. Fortin G. Lessard Hydro-Québec, Canada Hydro-Québec, Canada Hydro-Québec, Canada e-mails: rajotte.yves@ireq.ca fortin.jacques@ireq.ca
More informationPOWER FACTOR CORRECTION AND ITS PITFALLS
Technical Note No. May 1999 POWER FACTOR CORRECTION AND ITS PITFALLS This Technical Note considers power factor correction as applied by large customers and the possible consequences when power factor
More informationChapter L Power factor correction and harmonic filtering
Chapter L Power factor correction and 1 2 3 4 5 6 7 8 9 10 Contents Reactive energy and power factor 1.1 The nature of reactive energy L2 1.2 Equipment and appliances requiring reactive energy L2 1.3 The
More informationFluke 1740 Series. Three-Phase Power Quality Loggers Memobox. Assess power quality and conduct long-term studies with ease
Fluke 1740 Series Three-Phase Power Quality Loggers Memobox Technical Data Assess power quality and conduct long-term studies with ease Compact and rugged, the Fluke 1740 Series three-phase power quality
More informationPOWER QUALITY MONITORING - PLANT INVESTIGATIONS
Technical Note No. 5 January 2002 POWER QUALITY MONITORING - PLANT INVESTIGATIONS This Technical Note discusses power quality monitoring, what features are required in a power quality monitor and how it
More informationSession Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages
Session Four: ractical Insulation Co-ordination Session Four: ractical Insulation Co-ordination for Lightning Induced Overvoltages Jason Mayer Technical Director, Energy Services, Aurecon Introduction
More informationUpdate on the Australian National Network PQ Survey
Update on the Australian National Network PQ Survey Vic Gosbell 1, Sean Elphick 1, Robert Barr 2 1 Integral Energy Power Quality and Reliability Centre, University of Wollongong 2 Electric Power Consulting
More informationPower quality report. A Manufacturing Plant
Power quality report Prepared for A Manufacturing Plant 6 May 2016 by Dr Angelo De Francesco Power Quality Consultant Page 1 Contents 1 EXECUTIVE SUMMARY... 4 2 INTRODUCTION... 5 2.1 SITE MONITORED...
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationAggregated Rooftop PV Sizing in Distribution Feeder Considering Harmonic Distortion Limit
Aggregated Rooftop PV Sizing in Distribution Feeder Considering Harmonic Distortion Limit Mrutyunjay Mohanty Power Research & Development Consultant Pvt. Ltd., Bangalore, India Student member, IEEE mrutyunjay187@gmail.com
More informationE S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY --
D.,.,.,. E S C R I P T I V E B U L L E T I N Bulletin DB-106 Square D Company October, 1990 ---1 I SQU ARED COMPANY -- Electrical Power Distribution System - The Heart of the Business From small commercial
More informationGRID INTERCONNECTION OF EMBEDDED GENERATION. Part 2: Small-scale embedded generation
ISBN 978-0-626-29938-5 NRS 097-2-3:2014 Edition 1 GRID INTERCONNECTION OF EMBEDDED GENERATION Part 2: Small-scale embedded generation Section 3: Simplified utility connection criteria for low-voltage connected
More informationSHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP
SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,
More informationHV Substation Earthing Design for Mines
International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.
More informationEffective Harmonic Mitigation with Active Filters
Advancing Power Quality White Paper Effective Harmonic Mitigation with Active Filters Written by: Ian Wallace Variable Speed Drive with no Harmonic Mitigation Industry standard variable speed drives, with
More informationAGN 026 Harmonic Voltage Distortion
Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 026 Harmonic Voltage Distortion Comment; The critical level of acceptable harmonic voltage distortion % is set
More informationKansas City Power & Light Company. Transmission Facility Rating Methodology
Company Prepared by: KCP&L Transmission Planning December 6, 2017 Table of Contents 1. Purpose...4 2. Generator Rating Methodology...4 3....4 3.1. Equipment Rating Methodology...4 3.2. Items considered
More information