Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

Size: px
Start display at page:

Download "Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)"

Transcription

1 Reprioritized Projects in the Highway and Bridge Construction Schedule Introduction The information in this section is in accordance with the highlighted portion in the following section of the reporting statute. "(2) A detailed explanation of the methods or criteria employed to select construction projects, including a listing of any new or reprioritized projects not mentioned in a previous report, and an explanation as to how the new or reprioritized projects meet the selection methods or criteria;..." Section (2), RSMo Supp (L TAFP HB 668) (emphasis added). This section identifies projects in the Highway and Bridge Construction Schedule reprioritized in the schedule and in state fiscal year. Projects delayed, accelerated or removed are considered reprioritized. Reprioritization occurs when working with planning organizations, adjusting to unforeseen circumstances or amending schedules to accommodate changes in environmental review or right of way acquisition. With multi-year projects, reprioritization is a normal aspect of the construction process and reflects an effort to efficiently manage the schedule. An explanation for the date change is included with each project. Many of the projects are urban improvements in the St. Louis and Kansas City metropolitan planning areas that, along with, plan the highway and bridge construction in these two areas. The total number of projects reprioritized (delayed, accelerated and/or removed) is 243, representing 27 percent of the projects in the schedule. This level is up from last year mainly due to the Safe and Sound Bridge Improvement Project and the Better Roads Brighter Future Program. The Safe and Sound Bridge Improvement Project incorporated 96 projects identified in the STIP. The 96 projects are no longer listed individually. Instead, they are included as components of the Safe and Sound Bridge Improvement Program. The Safe and Sound Bridge Improvement Project is an initiative to improve more than 800 bridges around the state by December 31, A team of contractors and designers will be selected to perform all the work. Each of the bridges will be replaced or repaired and the successful bidder will be required to keep them in good condition for at least 25 years, beginning at the completion of construction. The Better Roads Brighter Future Program resulted in the acceleration of 33 projects in the STIP. The Better Roads Brighter Future program picks up where the Smooth Roads Initiative left off, making more roads smoother and safer. It will bring 85 percent of Missouri s major highways to good condition by the end of 2011, and keep

2 them in good condition. The Better Roads Brighter Future program started in January.

3 KEY County location of project Job number used to track project costs State fiscal year in which project is now to be awarded STIP SFY or County Route Job No. SFY Award Date Description of Location/Improvement Route location of project State fiscal year in which project was to be awarded in the previous STIP Details of project description, improvement and location of project Reason projects were reprioritized from the Highway and Construction Program

4 Andrew 169 1P Replace bridge over the Niagara River 0.1 mile north of Rte. V near Rochester. Andrew 71 1P Resurface pavement and shoulders with 3 3/4" asphalt from south of Rte. B in Andrew County to north of Rte. A in Nodaway County. Andrew DD 1S Replace bridge deck over Dillon Creek, 0.2 mile south of Rte. I-29 near Country Club Village. Andrew H 1S Replace bridge deck over Peddler Creek 3.2 miles north of Rte. A near Fillmore. Atchison 136 1P0742C Replace bridge over Cow Branch 2.5 miles east of Rte. 59 south junction near Tarkio. 10/9/ Page 1

5 Atchison 275 1S Replace bridge deck over Kings Branch, 0.4 mile south of the Iowa State line. Atchison 59 1P Geometric improvements at the intersection with Rte. 136 near Tarkio. The project was delayed due to scope changes and redesigns. Atchison M 1S Replace bridge deck over Long Branch 5 miles north of Rte. 136 near Tarkio. Buchanan 59 1P Resurface driving lanes and shoulders with 1 3/4" asphalt, from Rte. 752 in St. Joseph to Platte County Line. Buchanan DD 1S Replace bridge over Malden Creek 1.2 miles east of Rte. E near Gower. 10/9/ Page 2

6 Buchanan M 1S Replace bridge deck over Sugar Creek, 0.6 mile south of Rte. 116 near Rushville. Buchanan O 1S Replace bridge deck over I-29, 1.8 miles south of I-229 interchange, near St. Joseph. Caldwell 116 1S Replace bridge deck over North Mud Creek 2.5 miles west of Rte. A near Braymer. Caldwell 36 1P Replace bridge deck on westbound lanes over Union Pacific Railroad 2 miles east of Rte. B near Hamilton. Caldwell N 1S Replace bridge deck over Mud Creek 0.9 mile east of Rte. A near Braymer. 10/9/ Page 3

7 Caldwell U 1S Replace bridge deck over Otter Creek 1.1 miles east of Rte. B near Hamilton. Clinton A 1S Geometric improvements at the intersection with Rte. T near Turney. The project was delayed due to scope changes and redesigns. Clinton K 1S Replace bridge deck over Castile Creek 3 miles south of Rte. NN near Plattsburg. Clinton V 1S Replace bridge deck over I miles west of Rte. 69 near Lathrop. Daviess J 1S Replace bridge deck over Marrowbone Creek 0.6 mile south of Rte. D near Kidder. 10/9/ Page 4

8 Daviess T 1S Replace bridge deck over Sampson Creek 3 miles west of Rte. 69 near Pattonsburg. Daviess Z 1S Replace bridge deck over the Grand River Channel 0.1 mile west of Rte. AA near Pattonsburg. Dekalb 33 1S Replace bridge deck over West Fork of Lost Creek 3.8 miles south of Rte. 6 near Maysville. Dekalb 33 1S Replace bridge deck over Branch of Lost Creek 1.1 miles south of Rte. 6 near Maysville. Dekalb 36 1P Replace bridge deck over Castile Creek 0.4 mile east of Stewartsville. 10/9/ Page 5

9 Dekalb 36 1P Resurface eastbound lanes and shoulders with 5" asphalt from 1.5 miles east of Rte. 31 (north) to Rte. 33 (north), near Stewartsville. Dekalb 36 1P Replace bridge deck over Grindstone Creek 2.3 miles east of Rte. 33, westbound lane only. Dekalb C 1S Replace bridge deck over Grindstone Creek 2 miles north of Rte. 36. Dekalb E 1S Replace bridge deck over North Fork of Lost Creek, 1.5 miles east of Rte. A near Fairport. Dekalb F 1S Replace bridge deck over Crooked Creek 3.6 miles south of Rte. 169 near Union Star. 10/9/ Page 6

10 Dekalb V 1S Replace bridge deck over Third Fork of Platte River 0.1 mile west of Rte. F. Gentry UU 1S Replace bridge deck over Turkey Creek 1.5 miles south of Rte. M near Stanberry. Harrison 136 1P Replace bridge over Sugar Creek 1.4 miles east of Rte. 146 near Bethany. Harrison 69 1P Geometric revisions and realignment of Rte. 136 to intersect with Rte. 13. The project was delayed due to scope changes and redesigns. Harrison 69 1P Geometric revisions at the intersection of Rte. 69 and Rte The project was delayed due to scope changes and redesigns. 10/9/ Page 7

11 Harrison AA 1S Replace bridge deck over Big Creek 1.2 miles east of Rte. 69 near Bethany. Harrison HH 1S Replace bridge deck over Lotts Creek, 1.5 miles north of Rte. 46 near Allendale. Harrison KK 1S Replace bridge deck over Shain Creek 1 mile east of Rte. 69 near the Iowa state line. Harrison M 1S Replace bridge deck over West Fork of Big Creek 1.7 miles west of Rte. 69 near Eagleville. Holt 111 1S Replace bridge deck over Cannon Creek 1.1 miles south of Rte /9/ Page 8

12 Nodaway VV 1S Replace bridge deck over Long Branch 0.7 mile south of Rte. N near Conception Junction. Carroll 24 2P Right of way acquisition and replace bridge over Wild Cat Creek 1.5 miles east of Rte The project was accelerated due to coordination with outside agencies. Linn 36 2P Resurface pavement and rehabilitate bridges to provide smoother pavement from 2 miles west of Rte. 11 east to Macon County line. Project involves bridges G0657, G0659 and G0815. Livingston 36 2P Resurface pavement to provide smoother pavement from Caldwell County line to Rte. 65 in Chillicothe. Macon 36 2P Diamond grind and overlay pavement to provide smoother pavement and rehabilitate bridges A2041 and L0569 from Middle Fork Chariton River to end of dual lanes east of Macon. 10/9/ Page 9

13 Macon 36 2P Resurface existing pavement from Kellogg Street in Macon to Shelby County line. Putnam 136 2P Replace bridge over Chariton River, and replace overflow bridges from approx. 0.1 mile west of Rte. N to approx. 0.6 mile east of Putnam-Schuyler County line. The project was accelerated due to additional funding made available from practical design savings. Randolph 63 2P Resurface pavement and provide edgeline rumble strips from Rte. 24 to Boone County line. Saline 240 2P0754 N/A Paint bridge, mill asphalt, overlay, replace 3 joints, 5%.5 sole repair and structural steel repair. Project involves bridge G0069 over Missouri River at Glasgow on Rte The project was removed and incorporated into 2P0793. Various Various 2P N/A Annual resurfacing of major routes in District 2. The project will be accomplished by maintenance forces. 10/9/ Page 10

14 Audrain K 3S Grading, paving and replace bridge over Sandy Creek 1.5 miles east of Rte. W east junction. Clark AA 3S Bridge project over Linn Creek 2.9 miles south of Rte. NN. The project was delayed due to bids being rejected by the MHTC. Clark D 3S Rehabilitate bridge over Wyaconda River 0.5 mile east of Rte. M. Clark NN 3S Rehabilitate bridge over Fox River 4.1 miles east of Rte. AA. Knox 156 3S Grading, paving and rehabilitate bridge over Salt River 2 miles east of Macon County line. 10/9/ Page 11

15 Knox E 3S Grading, paving and replace bridge over Troublesome Creek 3.4 miles south of Rte. 6. Lewis 61 3P N/A Pavement rehabilitation on southbound lanes from 0.8 mile south of Clark County line to 0.4 mile south of Bus. Rte. 61 (3 disconnected sections). The project was removed due to performing projects in combination. Project was Incorporated into 3P0711. Lincoln D 3S Grading, paving and replace bridge over Turkey Creek 2.4 miles south of Rte. TT. Lincoln E 3S Grading, paving and replace bridge over Little Lead Creek 2.5 miles east of Rte. O north junction. Marion 24 3P Rehabilitate pavement on northbound lanes from 0.5 mile north of Rte. 6 to 0.3 mile south of Bus. 61 south of Palmyra. 10/9/ Page 12

16 Marion 24 3P N/A Pavement rehabilitation on northbound lanes from 0.5 mile north of Rte. 6 to 2.9 miles north of Rte The project was removed due to performing projects in combination. Project was incorporated into 3P0731. Marion 36 3P Pavement improvements on eastbound concrete pavement from east of Shinn Lane to new concrete pavement. Project involves bridge A0088. Marion 61 3P Rehabilitate pavement on southbound lanes from 0.9 mile west of Rte. KK south 5.7 miles. Marion 61 3P Rehabilitate pavement on the southbound lanes from 0.5 mile north of Rte. 168 to 0.9 mile west of Rte. KK. Project involves bridge A0556. Monroe 151 3S Grading, paving and replace bridge over Reese Fork Salt River 0.1 mile south of Rte. M north junction. 10/9/ Page 13

17 Monroe D 3S Grading, paving and rehabilitate bridge over Long Branch Creek 3.0 miles east of Rte. Z. Pike M 3S Grading, paving and replace bridge over South Branch Indian Creek 0.3 mile south of Rte. V. Pike V 3S Grading, paving and replace bridge over Indian Creek 3.3 miles west of Rte. M. Ralls P 3S Rehabilitate bridge over Spencer Creek 3.2 miles south of Rte. JJ. Scotland D 3S Grading, paving and rehabilitate bridge over North Fork Middle Fabius 2.7 miles east of Schuyler County. 10/9/ Page 14

18 Shelby DD 3S Grading, paving and replace bridge over Otter Creek 2.4 miles east of Rte Cass 58 4P Replace bridge over Middle Big Creek 2.25 miles east of Rte This project was accelerated due conditions deteriorating faster than expected. Cass 71 4P Replace bridges and upgrade interchange at 163rd Street and Rte. Y. The project was delayed due to coordination with outside agencies. Cass O 4S Replace bridge deck over Grand River. Cass W 4S Replace bridge deck over South Fork of Grand River 5.1 miles south of Rte. O between Freeman and Archie. 10/9/ Page 15

19 Cass Y 4S Replace bridge deck over Massey Creek. Clay 1 4S Pavement and shoulder treatments from I-35 to Rte. 210 in the City of Kansas City. Clay 10 4P Replace bridge deck over Rte. 69. Clay 169 4P Pavement treatments southbound from I-29 to Barry Road in the City of Kansas City. The project was accelerated due to conditions deteriorating faster than expected. Clay 169 4P Various pavement and shoulder treatments from 1 mile north of I-435 to 108th Street in the City of Kansas City. The project was accelerated due to conditions deteriorating faster than expected. 10/9/ Page 16

20 Clay 169 4S Experimental test section for various thin preventive maintenance pavement treatments northbound from I-29 to south of Barry Road in the City of Kansas City. The project was delayed due to bids being rejected by the MHTC. Clay 35 4I Interchange improvements at I-35/Rte. 69/Rte. 33. The project was delayed due to coordination with outside agencies. Clay 435 4I Resurfacing of pavement and shoulders from Platte County line to 108th Street. Clay 435 4I Resurfacing of pavement and shoulders from 108th Street to Rte. 69. Clay 69 4S Pavement and shoulders treatments from I-35 north junction to I-35 south junction through the City of Claycomo. 10/9/ Page 17

21 Clay 92 4P Replace bridge over First Creek. Clay 92 4P Redeck bridge over Williams Creek. Clay A 4S Replace bridge over the Fishing River. Clay CC 4S Replace bridge deck over Clear Creek 1.5 miles west of Rte. 33 near Holt. Clay N 4S Replace bridges over Fishing River and Fishing River Overflow 2 miles north of Rte. 210 to 3 miles north of Rte /9/ Page 18

22 Henry 2 4S Replace Bridge over Tebo Creek with a triple box culvert 0.6 mile south of Johnson County. To be combined with 4S1412. Henry 2 4S Replace bridge over Middle Tebo Creek 0.1 mile east of Rte. 23. Henry 7 4P Redeck bridge over Big Creek Overflow and over Fields Creek 1.4 miles north of and 2 miles south of Rte. O. Henry K 4S Replace bridge deck over S. Grand River. Henry N 4S Replace bridge deck over Big Creek. 10/9/ Page 19

23 Henry O 4S Replace bridge deck over Honey Creek. Jackson 150 4U Widen to four lanes from Rte. 71 to Rte The project was delayed due to scope changes and redesigns. Jackson 24 4P Replace bridge over Missouri Pacific Railroad between Overton Avenue and Huttig Avenue in Independence. The project was delayed due to a right of way condemnation process. Jackson 24 4P Replace bridge 0.9 mile east of I-435 (Rock Creek west of Brookside Avenue). Jackson 24 4S N/A Paint bridge over Cambridge Avenue and Burlington Northern Santa Fe Railroad. The project was removed and incorporated into 4S /9/ Page 20

24 Jackson 35 4I1757 N/A Paint bridge over 23rd Street Traffic way. The project was removed and incorporated into 4I2012. Jackson 350 4S Rehabilitate and replace bridges on Blue Ridge Blvd. Jackson 435 4I1121B 2008 Add lanes to ramps and Front Street from River Front Road south to Hawthorne Road in the City of Kansas City. The project was delayed due to coordination with outside agencies. Jackson 470 4I1641B 2008 Construction of half diamond interchange at Pryor Road and installation of a collector distributor lane on EB I-470. The project was delayed due to a right of way condemnation process. Jackson 470 4I1641C 2008 N/A Construction of a half diamond interchange at Pryor Road and installation of a collector distributor lane on EB I-470. The project was removed and incorporated into 4I1641D. 10/9/ Page 21

25 Jackson 7 4S Improve intersection at Colbern Road. The project was delayed due to coordination with outside agencies. Jackson 70 4I N/A Paint bridges over Manchester Traffic way. The project was removed and incorporated into 4I2013. Jackson 71 4P Interchange revisions, including widening to add lanes, replace bridges, and new bridges at Rte. 150 in the cities of Grandview and Kansas City. The project was delayed due to coordination with outside agencies. Jackson D 4S Pavement and shoulder treatments from Rte. 150 to Rte. 58 near the City of Belton. The project was accelerated due to conditions deteriorating faster than expected. Johnson 131 4S Replace bridge over Blackwater River 1.3 miles south of Lafayette County line. The project was accelerated due to conditions deteriorating faster than expected. 10/9/ Page 22

26 Johnson 2 4S Replace bridge deck over Big Creek. Johnson DD 4S Replace bridge deck over Clear Creek. Johnson PP 4S Replace bridge deck over Clear Creek. Lafayette 13 4P Two-lane relocation on four-lane right of way from Rte. 24 to County Road 113 (existing Rte. 13). The project was delayed due to scope changes and redesigns. Lafayette 23 4S Replace bridge over Davis Creek. 10/9/ Page 23

27 Lafayette 24 4P Rehabilitate bridges over Big Sni-a-Bar and Little Sni-a-Bar Creeks. Platte 29 4I Bridge improvements at Line Creek. The project was delayed due to bids being rejected by the MHTC. Platte 435 4I Resurface pavement and shoulders from I-29 south junction to Clay County line. Platte 435 4I Ultra-thin bonded wearing surface on pavement and resurface shoulders from I-29 to the bridge over the Missouri River. Platte 45 4P Construct a roundabout to relocate Rte. K and Union Chapel Road 600' west of the intersection of existing Rtes. 45 and K near the City of Parkville. The project was delayed due to coordination with outside agencies. 10/9/ Page 24

28 Platte 635 4I N/A Paint bridge over Union Pacific railroad and Missouri River. KDOT to reimburse 50% of costs per cost share agreement. The project was removed and incorporated into 4I2014. Platte B 4S Replace bridge deck over Platte River 3 miles north of Rte. 92 east of Platte City. Platte E 4S Replace bridge 1.6 miles east of Rte. I-29. Platte H 4S Replace bridge deck over I-29. Platte V 4S Replace bridge deck over Jordan Branch. 10/9/ Page 25

29 Ray 10 4L0600H 2008 Pavement treatments from Rte. 10 to Rte. 13 The project was delayed due to coordination with outside agencies. Ray C 4S Replace bridge at Rocky Fork Creek and Swafford Branch 1.9 and 1.5 miles north of Rte. U. Various Various 4P Pavement treatment to improve safety at various urban locations. The project was delayed due to the extension of an existing construction contract. Various Various 4P Pavement treatment to improve safety at various rural locations. The project was delayed due to the extension of an existing construction contract. Benton 65 5P Paint structural steel of bridge over Osage River south of Warsaw. The project was delayed due to scope changes and redesigns. 10/9/ Page 26

30 Benton 7 5P Paint structural steel for bridge over Truman Lake. The project was delayed due to scope changes and redesigns. Benton 7 5P Paint structural steel for bridge over Truman Lake. Project involves bridge A3465. The project was delayed due to scope changes and redesigns. Camden 5 5P Structural repairs, railing repair and painting of bridge over Lake of the Ozarks (Hurricane Deck). The project was delayed due to scope changes and redesigns. Camden 54 5P Mill and 1 3/4" thin lift resurfacing west of Rtes. 5 and 7 to west of Rte. KK. Camden A 5S Bridge replacement over Barnett Creek 1.0 mile south of Rte. E. 10/9/ Page 27

31 Cole B 5S Structural repairs, deck repairs and painting for bridge over Osage River. The project was delayed due to preventative maintenance being performed on the bridge by forces. Maries BB 5S Grading, paving and replace bridge over Little Maries River, 2 miles west of Rte Miller MM 5S Bridge replacement over J Buster Creek 2.7 miles south of Rte. 54. Miller U 5L0700F N/A Thin lift resurfacing from Rte. 42 to end. The project will be accomplished by maintenance forces. Morgan BB 5S Replace bridge over Richland Creek 1.1 miles north of Rte. D. 10/9/ Page 28

32 Osage 50 5P Resurfacing and shoulder stabilization from 0.5 mile east of Rte. 89 south Jct. east to 0.1 mile west of Rte. 19 Jct. in Gasconade County. Pettis 65 5P Replace bridge deck over Cedar Creek 1.4 miles north of Rte. HH. Pettis U 5S Grading, paving and replace bridge over Spring Fork Creek, 1.6 miles south of Rte. V. Pettis W 5S Grading, paving and replace bridge over Flat Creek, 4.4 miles south of Rte. 50. Various Various 5P N/A Thin lift overlay projects across the district in central Missouri area. The project will be accomplished by maintenance forces. 10/9/ Page 29

33 Franklin 100 6S Replace bridge 0.5 mile east of Rte. 185 at Little Boeuf Creek. The project was delayed due to a value engineering study (cost savings). Franklin 100 6S Resurface, pavement repair, and shoulder improvements from I-44 to Rte. OO. The project was delayed due to additional requirements after establishment of the award date. Franklin 44 6I Add restrooms at the Shaw Nature Reserve in Gray Summit. The project was delayed due to coordination with outside agencies. Franklin F 6S Mill and resurface pavement from 1st Street to Rte. O. The project was accelerated due to conditions deteriorating faster than expected. Jefferson 141 6S Rehabilitate bridge deck over Rte /9/ Page 30

34 Jefferson 67 6L0700F N/A Pavement treatments from I-55 to south of Rte The project will be accomplished by maintenance forces. St. Charles 364 6U1028E 2008 Grading, drainage, paving, one-way outer roads, bridges, retaining walls, signing, signals and lighting 0.5 mile west of Harvester Drive to 0.4 mile east of Harvester Drive. The project was delayed due to a value engineering study (cost savings). St. Charles 70 6I Widen I-70 westbound off-ramp, traffic signal and widen Fifth Street. The project was delayed due to right of way process taking longer than expected. St. Charles 70 6I Addition of a dual right turn lane to the westbound off-ramp at Wentzville Parkway. The project was delayed due to bids being rejected by the MHTC. St. Charles 94 6S Pavement treatment from Rte. D to Rte. 40 and outer road south of Rte. 94. The project was accelerated due to conditions deteriorating faster than expected. 10/9/ Page 31

35 St. Charles C 6L0700C 2008 Pavement repair and pavement treatment from Mid Rivers Mall Drive to end of state maintenance. The project was delayed due to coordination with outside agencies. St. Louis 109 6S Mill and resurface pavement from Rte. CC to Rte The project was accelerated due to conditions deteriorating faster than expected. St. Louis 170 6I Structural steel painting on bridges from Nyflot to Scudder Road. The project was delayed due to performing projects in combination. (6I1954) St. Louis 170 6I Interchange improvements and sidewalks at Scudder Road. The project was delayed due to coordination with outside agencies. St. Louis 267 6S Mill and resurface including signals, guardrail, repair pavement and curb upgrade from 150' north of Bayless Avenue to 450' north of Rte. 61/67 (Lindberg Boulevard). The project was accelerated due to conditions deteriorating faster than expected. 10/9/ Page 32

36 St. Louis 270 6I Upgrade guardrail at various locations on I-270 from Dorsett to Riverview Drive and on I-70 from the Blanchette Bridge to Goodfellow Boulevard. The project was delayed due to bids being rejected by the MHTC. St. Louis 270 6I2070 N/A Replace interchange at Dorsett Road. The project was removed due to the work being incorporated into another project. (6I1830B) St. Louis 340 6S Soundwalls from Clarkson Farm Drive to south of Kehrs Mill Road, Clarkson Crossing, Forest Hills and Westhampton. The project was delayed due to additional information needed after establishment of the letting date. St. Louis 364 6S Sound abatement at Red Robin Court. The project was delayed due to coordination with outside agencies. St. Louis 364 6U1045B Grading, paving and bridges from Bennington Road to I-270. The project was delayed to minimize traffic impacts expected from the I-64 reconstruction. 10/9/ Page 33

37 St. Louis 64 6I0978C 2008 Lower MetroLink rail line approximately 20', to obtain needed profile for new I-64 at St. Louis Terminal Railroad, proposed MetroLink crossing. The project was accelerated due to coordination with outside agencies. St. Louis 64 6I0978F N/A Demolition of structures to prepare for future roadway construction from I-170 to Big Bend. The project was removed due to the work being incorporated into another project. (6I0978) St. Louis 67 6P Add turn lanes and improve access control at Patterson Road and Lindsay Lane intersections. The project was accelerated to be let in combination with 6P1829 (cost savings). St. Louis 67 6P Pavement treatment from I-270 to Rte. AC. St. Louis CC 6S Mill and resurface pavement from Rte. 109 to Chesterfield Airport Road. The project was accelerated due to conditions deteriorating faster than expected. 10/9/ Page 34

38 St. Louis D 6S Rehabilitate bridge over branch of the River Des Peres west of Rte. 180 Spur at Pennsylvania Avenue. St. Louis City 55 6I Install ITS devices on I-55 from I-70 to Rte. M and I-64 from I-170 to Sara Street. The project was delayed due to the design of plans being behind schedule. St. Louis City 55 6I Street and pedestrian lighting, sidewalks, curb replacement, drainage, and landscaping at 7th Street. The project was delayed due to coordination with outside agencies. St. Louis City 64 6I Replace lighting on double deck structure and Poplar Street Bridge from east of 21st Street to Poplar Street Bridge. The project was accelerated to address safety concerns. St. Louis City 64 6I0985J Seismic retrofit and replace drainage system from west of 11th Street to west of 7th Street. The project was delayed due to a right of way condemnation process. 10/9/ Page 35

39 St. Louis 64 6I0985M Seismic retrofit work at General Services Administration (GSA) including painting of the structure between 11th Street City and 14th Street. The project was delayed due to performing projects in combination. (6I0985J, 6I0985O) St. Louis City 64 6I Replace bridge over Jefferson Avenue. The project was delayed to accelerate a higher regional priority. St. Louis City Riverfront 6O Land acquisition for Confluence Greenway/Riverfront Trail Development along the riverfront from north of Lacledes Landing to the Old Chain of Rocks Bridge. The project was delayed due to coordination with outside agencies. Various Various 6P N/A Bridge, pavement and traffic systems preservation and operational improvements on various routes in the St. Louis area. The project was removed due to incorporating work into another project. (6P2042B) Barry 39 7S Structural repairs, joint repairs, deck repairs and painting bridge over Table Rock Lake 0.4 mile south of Rte. YY. The project was delayed to accelerate a higher statewide major bridge priority. 10/9/ Page 36

40 Jasper 249 7U Paving to add lanes for a dual divided highway from Rte. 171 to Rte. 66. The project was accelerated to allow a four-lane segment to open approximately one year earlier than previously scheduled. Jasper 571 7S Pavement improvement from 0.3 mile north of Rte. 71 (south) to Rte. 71 (south) in Carthage. Jasper 66 7S Pavement improvement from 0.4 mile west of Bus. 71 to 0.1 mile west of Bus. 71 in Joplin. Jasper 71 7P Pavement and bridge improvement from 20th Street in Joplin to Rte Jasper FF 7S Pavement improvement to disconnected sections from east of Bus. 71 to 0.1 mile east of Rte /9/ Page 37

41 Jasper M 7S Grading, paving and replace bridge over North Fork of Spring River 3 miles west of Rte. 71. Lawrence 44 7I Grading, bridge, and paving to replace interchange at Rte. 39 in Mount Vernon. The project was accelerated due to practical design savings. McDonald 71 7P Grading, bridges and paving to provide a freeway from Pineville (Rte. H) to the Arkansas State line. The project was accelerated due to schedule changes involving the Arkansas portion of the bi-state project (Bella Vista Bypass). McDonald 71 7P0601L 2008 N/A Grading and bridges to provide a freeway from Pineville (Rte. H) to the Arkansas State line. The project was removed due to the work being incorporated into another project. (7P0601) Newton 71 7P N/A Diamond grind various bridge decks in Newton and McDonald counties. The project was removed due to the work being incorporated into another project. (7P0733) 10/9/ Page 38

42 St. Clair 82 7P Grading, paving and replace bridge over Coon Creek 0.4 mile west of Rte. K. Various Various 7P N/A Pavement improvements on major roadways in the Southwest Missouri area. The project was removed due to splitting general project into specific locations. (7P0824B, 7P0824C, 7P0824D, 7P0824E) Vernon 71 7P N/A Mill and resurface on northbound lanes from 2.3 miles north of Rte. E to 0.8 mile south of Rte. E. The project was removed due to the work being incorporated into another project. (7P0838) Vernon 71 7P Resurface disconnected sections from 0.3 mile south of Highland Avenue in Nevada to 2.7 miles south of Rte Vernon N 7S Grading, paving and replace bridge over fork of Little Drywood Creek 2.3 miles west of Rte /9/ Page 39

43 Dallas 65 8P0696 N/A Resurface 1-24' pavement from 0.8 mile south of Rte. 32 (Buffalo) to Rte. EE. The project was removed due to work being incorporated into another job. (8P0833 & 8P0833B) Dallas 65 8P Add left-turn lanes at Rte. C intersection north of Buffalo. The project was delayed due to a right of way condemnation process. Greene 125 8S Replace bridge over James River 0.5 mile north of Rte. AD. Greene 44 8I N/A SFY 2008 on-call guard cable repair in the Ozarks Transportation Organization area. The project was removed due to the work being incorporated into another project. (8I0869) Greene 44 8I N/A SFY 2009 on-call guard cable repair in the Ozarks Transportation Organization area. The project was removed due to the work being incorporated into another project. (8I0870) 10/9/ Page 40

44 Greene 44 8S Add left turn lanes, improved right turns and signals at Chestnut Expressway and National Avenue in Springfield. The project was delayed due to coordination with outside agencies. Greene 60 8P0692C 2008 Roadway improvements at the James River Freeway/Glenstone Avenue interchange in Springfield. The project was delayed due to scope changes and redesigns. Greene Various 8P Design and construct a traffic management center for the Springfield area. To be let by the City of Springfield. Fed. No. ITS-0329(801) 100% fed. The project was delayed due to coordination with outside agencies. Laclede 44 8U Improve Business Loop 44 west interchange in Lebanon. The project was accelerated due to coordination with outside agencies. Laclede 5 8P0845 N/A Pave shoulders to prevent edge rutting from south of Camden County line to north of Rte. VV. The project was removed due to incorporating work into another project. (8P0902) 10/9/ Page 41

45 Polk 123 8S Remove and replace deck and approach slabs plus miscellaneous work on bridge A2081 over Little Sac River 0.8 mile south of Aldrich and Rte. T. Polk AA 8S Remove and replace deck and approach slabs plus miscellaneous work on bridge over Hominy Creek, 2.5 miles north of Rte. 32. Various Various 8I SFY 2008 on-call guardrail and guard cable repair in the Ozarks Transportation Organization area. The project was accelerated due to coordination with outside agencies. Various Various 8I SFY 2009 on-call guardrail and guard cable repair in the Ozarks Transportation Organization area. The project was accelerated due to coordination with outside agencies. Various Various 8P N/A SFY 2008 on-call guard cable repair throughout non-metropolitan District 8. The project was removed due to performing projects in combination. (8P0873) 10/9/ Page 42

46 Various Various 8P N/A SFY 2009 on-call guard cable repair throughout non-metropolitan District 8. The project was removed due to performing projects in combination. (8P0874) Various Various 8P SFY 2008 on-call guardrail and guardcable repair throughout non-metropolitan District 8. The project was accelerated due to coordination with outside agencies. Various Various 8P SFY 2009 on-call guardrail and guard cable repair throughout non-metropolitan District 8. The project was accelerated due to coordination with outside agencies. Various Various 8P0877 N/A SFY Pavement improvements on major routes throughout the Ozarks Transportation Organization area. The project was removed and replaced by 8P0877B. Various Various 8P N/A SFY 2008 pavement improvements on major routes throughout the Ozarks Transportation Organization area. The project was removed and replaced by 8P0878B & 8P0878C. 10/9/ Page 43

47 Various Various 8P N/A SFY 2009 pavement improvements on major routes throughout the Ozarks Transportation Organization area. The project was removed and replaced by 8P0879B & 8P0879C. Various Various 8P N/A SFY 2008 pavement improvements on major routes throughout non-metropolitan District 8. The project was removed and replaced by 8P0885B, 8P0885C & 8P0885D. Various Various 8P N/A SFY 2009 pavement improvements on major routes throughout non-metropolitan District 8. The project was removed and replaced by 8P0886C, 8P0886D & 8P0886E. Various Various 8P0892 N/A SFY pavement improvements on major routes throughout non-metropolitan District 8. The project was removed and replaced by 8P0892B. Various Various 8Q Implementation of ITS infrastructure in the Branson Area. The project was delayed due to the design of necessary software being behind schedule. 10/9/ Page 44

48 Crawford 8 9P Asphalt overlay and paved shoulders from Steelville to Rte AA in Washington County and from Rte 21 to the St. Francois County line (2 disconnected sections). Howell 60 9P N/A Grading, paving and bridges for additional lanes. The project was removed due to the work being incorporated into another project. (9P0381B, 9P0381C & 9P0381D) Howell 63 9P Widen and construct passing/climbing lanes from south of Rte. ZZ to north of Rte. 19 North. Phelps 63 9P Add climbing/passing lanes and resurface from Rte. CC in Rolla to 3.6 miles south of Little Piney River. Phelps 63 9P N/A Construct paved shoulders to improve safety on Rte. 63 from north of Rolla to Maries County line. This project work was incorporated into 9P /9/ Page 45

49 Shannon 60 9P0359B 2008 Grading, paving and bridges to add lanes for divided highway from 0.35 miles east of Rte. DD in Shannon County to 3.5 miles east of Rte. J in Carter County. The project was delayed due to scope changes and redesigns. Texas 63 9P Replace bridge deck on Arthur Creek Bridge on Rte. 63 approximately 4.3 miles south of Rte. BB. Texas 63 9P Replace and widen bridge deck for Bender Creek Bridge approximately 3.8 miles south of Rte. BB. Project involves bridge A0671. Various V 9S Resurface and construct shoulders from Rte. 21 in Iron County to Rte. 67 in St. Francois County at Farmington. The project was accelerated due to additional funding made available from practical design savings. Butler 67 0P Resurface with 3 3/4" asphalt from 0.5 mile south of Rte. 160 to the Arkansas State Line. 10/9/ Page 46

50 Cape 25 0P Intersection improvements at the intersection of Rtes. 25 and 77 at Blomeyer. Girardeau The project was delayed due to coordination with outside agencies. Cape Girardeau 34 0P Grading and paving and replace bridge over Byrd Creek at 2.5 miles west of Rtes. 72/34 intersection. Cape Girardeau 34 0P Grading, paving and replace two bridges 0.7 mile east of Rtes. OO/ UU intersection at Burfordville. Cape Girardeau 72 0P Widen and resurface with paved shoulders from Bollinger County line to 0.1 mile west of Rte. 34. Cape Girardeau AB 0S Grading and paving from Rtes. 25 & 77 intersection east to Rte. AB (Nash Road). The project was delayed due to coordination with outside agencies. 10/9/ Page 47

51 New Madrid U 0S Paving and construct additional entrance and drainage structure over a ditch in the city of Lilbourn at a site on the north side of Rte. U. The project was delayed due to coordination with outside agencies. Scott H 0S Replace bridge over Blue Ditch 1.3 miles south of Rte. 77. The project was delayed to accelerate a higher regional priority. St. Francois 67 0P0591H 2008 N/A Right of way acquisition, grading and drainage on Outer Road 1, Old Orchard Road relocation and interchange ramps. 0.9 mile south of Rte. 47 and Rte. K interchange at Bonne Terre. The project was removed due to the work being incorporated into another project. (0P0591L) The right of way acquisition was in a prior year and will remain with project 0P0591H. St. Francois 67 0P0591K 2009 N/A Paving Outer Road #1 (Old Orchard Road relocation) interchange ramps and bridges for Old Orchard Road underpass 0.9 mile south of Rte. 67 and K interchange at Bonne Terre. The project was removed due to the work being incorporated into another project. (0P0591L) Ste. Genevieve D 0S Grading, drainage, 24' pavement and replace bridge over Salem Creek 0.7 mile south of Rte. JJ in western St. Genevieve County. 10/9/ Page 48

52 Stoddard 60 0P Pavement rehabilitation from Rte. F to Rte. AD. Wayne 67 0P Resurface existing lanes from Madison County line to 4.1 miles south of Butler County line. Wayne P 0S Grading, drainage and replace bridge over Gribler Creek 2.7 miles west of Rte. Z. Total Count of Projects Reprioritized: 243 Access: T:\planning\OTPM\reports\Accountability\Reprioritized.mdb Query: qry Reprioritized in ; Report: rpt Reprioritized SFY Tables: tbl Reprioritized in Final; tbl HIP4_TMS_STIP_ALLJOBS_CURR_STIP and T:\planning\stap\data\REASONS DBF.dbf 10/9/ Page 49

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2) Reprioritized Projects in the 2006-2010 Highway and Bridge Construction Schedule Introduction The information in this section is in accordance with the highlighted portion in the following section of the

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

C Missouri Extension Homemakers Association, Inc., Mural Documentation Project, linear feet

C Missouri Extension Homemakers Association, Inc., Mural Documentation Project, linear feet C Missouri Extension Homemakers Association, Inc., Mural Documentation Project, 1975-951 1976.75 linear feet This collection is available at The State Historical Society of Missouri. If you would like

More information

Letting Schedule For Letting of

Letting Schedule For Letting of March 16, 2018 * includes grading, drainage, base surface, bridge and misc. construction costs (excludes 2% percent construction contingency). Cost* (1000) Central Callaway Old US Highway 54 and County

More information

Appendix G: Freight Project List SFY

Appendix G: Freight Project List SFY As described in Chapter 8 of the, The Decision-Making Process, a prioritization process is used to evaluate freight needs based on mode. Figure 8-2 depicts the freight project prioritization process. The

More information

Program vs. Award FY15 per District Through May 15, 2015 Bid Opening

Program vs. Award FY15 per District Through May 15, 2015 Bid Opening 6/30/2015 Program vs. Award FY15 per District Through May 15, 2015 Bid Opening TOTAL TOTAL PROGRAM AWARD FISCAL YR % Difference 42,827,000.00 43,252,003.11 425,003.11 1.0% 38,365,000.00 38,958,555.09 593,555.09

More information

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY 2009 Produced by The Green Hills Regional Planning Commission 1 County: Caldwell Source: RTP Needs Assessment 06 Rt: US

More information

Highway and Bridge Construction Schedule RSMo (3)

Highway and Bridge Construction Schedule RSMo (3) Highway and Bridge Construction Schedule RSMo 21.795.3(3) Introduction The information in this section is in accordance with the highlighted portion in the following section of the reporting statute. "(3)

More information

MO-WAC Missouri--Work All Counties

MO-WAC Missouri--Work All Counties Missouri-Work All Counties MO-WAC 1 MO-WAC Missouri--Work All Counties This Award is sponsored by the Central Missouri Radio Association (CMRA) to encourage HF radio activity among Amateur Radio operators

More information

MISSOURI SALARY SCHEDULE & BENEFITS REPORT MISSOURI STATE TEACHERS ASSOCIATION

MISSOURI SALARY SCHEDULE & BENEFITS REPORT MISSOURI STATE TEACHERS ASSOCIATION MISSOURI STATE TEACHERS ASSOCIATION MISSOURI SALARY SCHEDULE & BENEFITS REPORT 2017-18 TABLE OF CONTENTS Introduction...3 Dear Missouri educator...4 Key Findings...5 Table 1. Years of Outside Experience

More information

ROAD AND BRIDGE PROGRAM

ROAD AND BRIDGE PROGRAM Missouri RAD AND BRIDGE RGRAM 2019-2023 TABLE F CNTENTS Message from the Director Financial and Regional lanning rocess Summary Reference Information i ii iii Northwest District Construction rogram 1 Northeast

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

Individual and Family Health Insurance Rates

Individual and Family Health Insurance Rates Individual and Family Health Insurance Rates New Business Rates Effective January 1, 2018 * *rates subject to change A Division of Health Care Service Corporation, a Mutual Legal Reserve Company, an Independent

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

2018 District 1 Highway Construction Program

2018 District 1 Highway Construction Program District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last

More information

Updated: April 7, 2016

Updated: April 7, 2016 Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace

More information

Missouri Infrastructure Investment FOCUS ON BRIDGES

Missouri Infrastructure Investment FOCUS ON BRIDGES Missouri Infrastructure Investment FCU N BRIDGE 1I3110 Missouri Infrastructure Investment 13161 13218 13163 63 10616 13139 23089 13134 4 6 13122 29 10447 136 13107 13253 13138 61 129 149 13160 136 71 13258

More information

Coordination Guideline. Application of Selective Access

Coordination Guideline. Application of Selective Access Coordination Guideline Application of Selective Access 20-Apr-2015 Reduce regional draft document to Illinois specific version Copyright 2015 Illinois Repeater Association Inc. Preface...1 Policy...1 Methodology...2

More information

FORM G-37. Name of Regulated Entity: L.J. Hart & Company. Report Period: First Quarter of 2018

FORM G-37. Name of Regulated Entity: L.J. Hart & Company. Report Period: First Quarter of 2018 FORM G-37 Name of Regulated Entity: L.J. Hart & Company Report Period: First Quarter of 2018 I. CONTRIBUTIONS made to officials of a municipal entity (list by state) State None Complete name, title (including

More information

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 The Asphalt Indexes for the Month of August 2016 are: ACI -

More information

Arkansas State Highway and Transportation Department

Arkansas State Highway and Transportation Department Arkansas State Highway and Transportation Department Fayetteville Rotary Club Mermaids Restaurant Thursday, January 30, 2014 About AHTD The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

This document explains differences between the March 2008 LSA circuit breaker model and the January 2009 model.

This document explains differences between the March 2008 LSA circuit breaker model and the January 2009 model. LEGISLATIVE SERVICES AGENCY Office of Fiscal and Management Analysis 200 W. Washington Street, Suite 302 Indianapolis, Indiana 46204-2789 (317) 233-0696 (317) 232-2554 (FAX) Circuit Breaker Model Update

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

School Age Community (SAC) Grant Recipients

School Age Community (SAC) Grant Recipients Adair County R-II School District Region:1 Novinger Elementary School County: Adair Contact: Evelyn Stokes Phone: (660) 488-5440 Albany R-III School District Adventure Club County: Gentry Contact: Julie

More information

MDwise Excel Network and MDwise Connect Provider Relations Territory Map

MDwise Excel Network and MDwise Connect Provider Relations Territory Map Excel Network and Connect Territory Map 1 Paulette Means pmeans@mdwise.org 317-822-7490 2 Garrett Walker gwalker@mdwise.org 317-983-6088 3 Charmaine Campbell ccampbell@mdwise.org 317-822-7301 4 Jamaal

More information

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017 MoDOT ACEC St. Louis Partnering Meeting September 14, 2017 Agenda Introductions & Department Update Bill Schnell Design/Planning Updates Tom Evers STL City Jeff Bohler STL North County Lisa Kuntz I-270

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

South Central Indiana Communications Support Group, Inc. The State of Amateur Radio In the State of Indiana

South Central Indiana Communications Support Group, Inc. The State of Amateur Radio In the State of Indiana South Central Indiana Communications Support Group, Inc. The State of Amateur Radio In the State of Indiana September 2011 Since the creation of South Central Indiana Communications Support Group, Inc.

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Straight Line Diagram. Lawrence 37. January 2010

Straight Line Diagram. Lawrence 37. January 2010 Straight Line Diagram Lawrence 37 January 2010 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is

More information

Historical Soybean Yields by County The average soybean yields for counties

Historical Soybean Yields by County The average soybean yields for counties File A1-13 March 18 www.extension.iastate.edu/agdm Historical Soybean Yields by County The average soybean yields for counties and areas in Iowa are included in this file. Averages from 8 through 17 are

More information

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction

More information

Missouri. The Quilted Cow Business 13 Ste 203 Branson West MO

Missouri. The Quilted Cow Business 13 Ste 203 Branson West MO Your Quilt Shop 2051 Southway Drive Arnold MO 63010 636-464-2929 The Quilted Garden Fabric Shop 620 McNatt Ave. Aurora MO 65605 417-678-1600 Fox Pen Quilting 154 NE Elm Billings MO 65610 417-695-3031 The

More information

JUDICIAL MH ADVOCATE BY COUNTY

JUDICIAL MH ADVOCATE BY COUNTY ADAIR ADAMS Donna Ray Lisa Swanson 2163 190 th St. 118 Jackson Greenfield, IA 50849 Orient, IA 50858 Phone: (641) 743-8289 Phone: (641) 337-5605 Fax: NA Cell: NA Fax: NA Cell: (641) 247-9934 Email: dkrayadvocate@gmail.com

More information

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast 2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast Our Mission is to upgrade and maintain a safe and efficient road system We are making a difference! Miles of roads in GT

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

Planarization & Routing Guide

Planarization & Routing Guide Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

MICRO MILLING. Applications and Advantages for Pavement Preservation

MICRO MILLING. Applications and Advantages for Pavement Preservation MICRO MILLING Applications and Advantages for Pavement Preservation Presentation Overview 1. Difference between standard milling, fine milling and micro milling 2. Factors that dictate surface texture

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

Subject: State-Wide Hoosier Healthwise Mandatory Managed Care Organization Transition

Subject: State-Wide Hoosier Healthwise Mandatory Managed Care Organization Transition P R O V I D E R B U L L E T I N B T 2 0 0 5 0 6 M A R C H 9, 2 0 0 5 To: All Providers Subject: State-Wide Hoosier Healthwise Mandatory Managed Care Organization Transition Overview The Office of Medicaid

More information

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER P:\Transportation\RTP2030\Maps_Images\Map2-1.mxd Map 2-1: Capacity Projects, Thurston County, WA UV 8 12 LITTLEROCK RD SW HWY 8 173RD AVE SW OLD HWY 99 CONFEDERATED TRIBES OF THE CHEHALIS RESERVATION JAMES

More information

Appendix G. Visual Simulations and Illustrations

Appendix G. Visual Simulations and Illustrations Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99

More information

This first partnership performed work throughout Missouri, Illinois and Kentucky, building roads and performing other concrete construction projects.

This first partnership performed work throughout Missouri, Illinois and Kentucky, building roads and performing other concrete construction projects. A partnership in 1920 among Edward F. Regenhardt and the Harrison brothers, Bob, Charles, and Arthur, led to the establishment of a series of construction and materials companies that would eventually

More information

Locate Request Information

Locate Request Information Locate Request Information NOTE: DO NOT USE any apostrophes ( )or quotation marks ( ) in Web Ticket Entry. Doing so may hamper the transmission of tickets to the utilities and locators. Limit per Ticket

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report County of Sonoma Agenda Item Summary Report Agenda Item Number: 43a (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors

More information

Directions to GMC Middle School Game Sites (updated 8/20/13)

Directions to GMC Middle School Game Sites (updated 8/20/13) Bridgetown Bridgetown Middle School, 3900 Race Rd, Cincinnati I-275 West to 74 East to Rybolt Rd, turn left. At Harrison Avenue, turn right and follow to Race Rd. and turn right. School is on the left.

More information

Missouri 2016 Row by Row Experience ~ Home Sweet Homd ~

Missouri 2016 Row by Row Experience ~ Home Sweet Homd ~ Your Quilt Shop 2051 Southway Drive Arnold, MO 63010 636-464-2929 The Quilted Garden Fabric Shop 620 McNatt Avenue Aurora, MO 65605 417-678-1600 The Hideaway Quilt Shop 3217 W. First St. Birch Tree, MO

More information

Greene County Resources

Greene County Resources Greene County Resources Health and Community Resources University of Missouri Extension- Greene County 2160 W. Chesterfield Blvd. Suite F200 Phone: 417-886-2059 Email: greeneco@missouri.edu http://extension.missouri.edu/greene

More information

BRIDGEPORT COMMUNITY HEALTH CENTER 471 Barnum Avenue Bridgeport, CT /

BRIDGEPORT COMMUNITY HEALTH CENTER 471 Barnum Avenue Bridgeport, CT / The following is a list of Community Health Centers in Connecticut. They provide comprehensive, family-oriented, culturally competent medical, dental and social services to the uninsured and underinsured.

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

Office of Transportation Delivery Vickie Bourne, Executive Director KBT January 23, 2015 Medicaid Expansion and Impact on Public Transit

Office of Transportation Delivery Vickie Bourne, Executive Director KBT January 23, 2015 Medicaid Expansion and Impact on Public Transit Office of Transportation Delivery Vickie Bourne, Executive Director KBT January 23, 2015 Medicaid Expansion and Impact on Public Transit Goal for Human Service Transportation Delivery Save Cost/ Cost Containment

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010 I-405 Sepulveda Pass Improvements Project Quarterly Community Meeting December 9, 2010 1 Project Boundaries Southern boundary from National Bl. south to the Santa Monica-Rosa Parks Freeway (I-10) Northern

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Directions to Away Schools

Directions to Away Schools Directions to Away Schools BEAR CREEK PARK- Take I-25 to US 24 west (exit 141). Continue traveling west on US 24. Turn left on 21 st Street. Drive south for approximately 1.5 miles. Turn left on Rio Grande

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS

PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS 2014-2015 PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS ANACORTES SCHOOLS Anacortes High School 1916 J. Ave. Anacortes, WA 98221 Take Hwy 20 to Anacortes. Take a right on Commercial. Take a left on

More information

Charlton/Oxford Route 20 Reconstruction Project

Charlton/Oxford Route 20 Reconstruction Project Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting

More information

UTILITY SERVICE/REPAIR PERMIT

UTILITY SERVICE/REPAIR PERMIT Form M-21 Revised: September TRANSPORTATION COMMISSION OF WYOMING and its UTILITY SERVICE/REPAIR PERMIT 1. Parties. The parties to this License are, hereinafter referred to as Permittee, whose address

More information

Union Station Tunnel Overall DBE Goal Calculation

Union Station Tunnel Overall DBE Goal Calculation Bi-State Development Agency of the Missouri-Illinois Metropolitan District Union Station Tunnel Overall DBE Goal Calculation Federal Transit Administration Prepared by: Francoise Lyles-Wiggins Bi-State

More information

Jointed Precast Concrete Pavement

Jointed Precast Concrete Pavement NATIONAL PRECAST CONCRETE ASSOCIATION Manual for Jointed Precast Concrete Pavement 3rd Edition Authors Peter Smith, P.E. Mark B. Snyder, Ph.D., P.E. Graphic Designer Deborah Templeton NPCA Precast Concrete

More information

ROADWAY CROSS SECTIONS

ROADWAY CROSS SECTIONS LAKE ONTARIO U:\190335\Transportation\Design - Highway\Drawing\Plan Set\XSC\XSC_COVER.dgn 11:43:37 AM D. CLARK T. BRADLEY D. CLARK T. BRADLEY JOB MANAGER S. MILLER B. WALKER DESIGN DRAFTING S. MILLER CHECK

More information

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE COORDINATING AGENCY

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE COORDINATING AGENCY RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE OORDINATING AGENY WHEREAS, the Northeast Ohio Areawide oordinating Agency (NOAA), the Metropolitan ning Organization (MPO) for the five

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

TO UPSON LEE HIGH SCHOOL:

TO UPSON LEE HIGH SCHOOL: TO UPSON LEE HIGH SCHOOL: The softball field is in a complex at the high school. Take Hwy 41through Barnesville to get on Hwy 36. Take 36 through The Rock into Thomaston. Make one turn off of Hwy 36 onto

More information

A & A Hauling, Inc. PO Box 838, Collinsville, IL phone: (618) fax: (618)

A & A Hauling, Inc. PO Box 838, Collinsville, IL phone: (618) fax: (618) A & A Hauling, Inc. PO Box 838, Collinsville, IL 62234 phone: (618)797-6100 (618)797-6105 Local 670/742 Agreement Central Laborers Rehabilitation Plan - 670/742 A & H Mechanical Contracting, Inc. 2741

More information

Straight Line Diagram. Forest 27. January 2019

Straight Line Diagram. Forest 27. January 2019 Straight Line Diagram Forest 27 January 2019 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

COUNTY-LEVEL DATA ON TENNESSEE S 2018 OBAMACARE ENROLLMENT

COUNTY-LEVEL DATA ON TENNESSEE S 2018 OBAMACARE ENROLLMENT APRIL 19, COUNTY-LEVEL DATA ON TENNESSEE S OBAMACARE ENROLLMENT Last week, we dug into statewide data on open enrollment in private health insurance through the healthcare.gov Marketplace created by the

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

Winter Athletic Directions

Winter Athletic Directions Winter Athletic Directions 2014-2015 ALTER 940 E. David Road Kettering, OH 45429 I-75 north to I-675 north. Take the St Rt 48 /Kettering exit (it is the 2 nd St Rt 48 exit). Bear right off the ramp. Take

More information

ERIE LORAIN HURON ASHLAND WAYNE RICHLAND MORROW KNOX. Columbus East /Newark DELAWARE. Columbus West LICKING FRANKLIN FAIRFIELD PERRY PICKAWAY HOCKING

ERIE LORAIN HURON ASHLAND WAYNE RICHLAND MORROW KNOX. Columbus East /Newark DELAWARE. Columbus West LICKING FRANKLIN FAIRFIELD PERRY PICKAWAY HOCKING Instructions: Choose a territory to find your nearest Energy Advisor in the AEP Ohio Business Incentives Program. Reducing your business's energy use and boosting your bottom line starts here. LUCAS LAKE

More information

Straight Line Diagram. Forest 27 January 2018

Straight Line Diagram. Forest 27 January 2018 Straight Line Diagram (Including Drain Pipes) Forest 27 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained

More information

Summer Agricultural Institute

Summer Agricultural Institute 2019 Summer Agricultural Institute Sprouting Success in the Classroom Gain seeds of knowledge through: Graduate Credit/Professional Development Units Free Innovative Teaching Materials Exciting Hands-On

More information

ERIE LORAIN HURON ASHLAND WAYNE RICHLAND MORROW KNOX. Columbus East /Newark DELAWARE. Columbus West LICKING FRANKLIN FAIRFIELD PERRY PICKAWAY HOCKING

ERIE LORAIN HURON ASHLAND WAYNE RICHLAND MORROW KNOX. Columbus East /Newark DELAWARE. Columbus West LICKING FRANKLIN FAIRFIELD PERRY PICKAWAY HOCKING Instructions: Choose a territory to find your nearest Energy Advisor in the AEP Ohio Business Incentives Program. Reducing your business's energy use and boosting your bottom line starts here. LUCAS LAKE

More information

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY. BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ

More information

Tennessee Housing Development Agency Andrew Jackson Building 502 Deaderick Street, Third Floor Nashville, Tennessee /

Tennessee Housing Development Agency Andrew Jackson Building 502 Deaderick Street, Third Floor Nashville, Tennessee / Ralph M. Perrey Tennessee Housing Development Agency Andrew Jackson Building 502 Deaderick Street, Third Floor Nashville, Tennessee 37243 615/815-2200 Writer s Phone Number: Executive Director 615-815-2210

More information

Southern Illinois Phone Resource Guide

Southern Illinois Phone Resource Guide Southern Illinois Phone Resource Guide Ministerial iance Benton Township Goode Township Frank. Co. Food Pantry Salva on Army First Bap st Church Jackson Co. Food Pantry Lakeland Church First Bap st Elkville

More information

Interchange Feasibility Study

Interchange Feasibility Study Interchange Feasibility Study I-88/Illinois Route 47 Full Interchange Kane County, IL Prepared for Village of Sugar Grove, Illinois August 5, 2010 Prepared by GRAEF 8501 West Higgins Road, Suite 280 Chicago,

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

Straight Line Diagram. Perry 50. January 2019

Straight Line Diagram. Perry 50. January 2019 Straight Line Diagram Perry 50 January 2019 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Straight Line Diagram. Pike 51. January 2018

Straight Line Diagram. Pike 51. January 2018 Straight Line Diagram Pike 51 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Straight Line Diagram. Pike 51. January 2018

Straight Line Diagram. Pike 51. January 2018 Straight Line Diagram Pike 51 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Straight Line Diagram. Monroe 45. January 2018

Straight Line Diagram. Monroe 45. January 2018 Straight Line Diagram Monroe 45 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Straight Line Diagram. Jefferson 33. January 2018

Straight Line Diagram. Jefferson 33. January 2018 Straight Line Diagram Jefferson 33 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is

More information

%&g( %&g( ) Bridge Projects DRAFT

%&g( %&g( ) Bridge Projects DRAFT BELCHER RD 66TH ST N DRAFT 09-18-14 GULF BLVD Dunedin Causeway 16 Gulf of Mexico WEST BAY DR WALSINGHAM RD Beckett Bridge 102ND AVE N 26 27 S MYRTLE AVE 113TH ST N EDGEWATER DR BAYSHORE BLVD S MISSOURI

More information

Straight Line Diagram. Lawrence 37. January 2018

Straight Line Diagram. Lawrence 37. January 2018 Straight Line Diagram Lawrence 37 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

1 st Judicial District Resources

1 st Judicial District Resources 1 st Judicial District Resources Angels of Grace/Anna s Place (Forrest City) 406 Pecan Street Helena, AR 72342 Phone: 870-338-8447 Hotline: 877-572-9530 Toll free Restoration of Hope P. O. Box 812 Stuttgart,

More information

Straight Line Diagram. Columbia 19. January 2018

Straight Line Diagram. Columbia 19. January 2018 Straight Line Diagram Columbia 19 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is

More information

Straight Line Diagram. Blair 7. January 2018

Straight Line Diagram. Blair 7. January 2018 Straight Line Diagram Blair 7 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information