PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service

Size: px
Start display at page:

Download "PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service"

Transcription

1 COMPLETE REVISION October 2013 Process Industry Practices Machinery PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service

2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation / purchase orders or requests for proposals / contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PUBLISHING HISTORY February 2010 Issued October 2013 Complete Revision Not printed with State funds

3 Process Industry Practices Machinery PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service Table of Contents 1. Introduction Purpose Scope... 2 Data Sheets REDP003-R Documentation Requirements Sheet REDP003-T Inspection and Testing Requirements Sheet Process Industry Practices Page 1 of 2

4 PIP REDP003 COMPLETE REVISION Documentation Requirements for High Power Centrifugal Pumps for Water Service October Introduction 1.1 Purpose This Practice provides data forms for specifying requirements for horizontal, vertical, and vertical submerged motor centrifugal pumps of 150 kw (200 HP) or greater for water service. 1.2 Scope 2. References This Practice contains two data forms for providing documentation, inspection, and testing requirements for horizontal, vertical, and vertical submerged motor centrifugal pumps of 150 kw (200 HP) or greater for water service. This Practice is to be used in conjunction with any of the following Practices: PIP RESP003H - Specification for High Power Horizontal Centrifugal Pumps for Water Service PIP RESP003S - Specification for High Power Vertical Submerged Motor Centrifugal Pumps for Water Service PIP RESP003V - Specification for High Power Vertical Centrifugal Pumps for Water Service Applicable parts of the following industry codes and standards shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate. 2.1 Industry Codes and Standards American Society of Mechanical Engineers (ASME) ASME Boiler and Pressure Vessel Code (ASME Code) Section V Nondestructive Examination American Society for Testing and Materials (ASTM) ASTM E125 Reference Photographs for Magnetic Particle Indications on Ferrous Castings ASTM E709 Practice for Magnetic Particle Examination Hydraulic Institute Hydraulic Institute Standard Process Industry Practices Page 2 of 2

5 DOCUMENTATION REDP003-R PAGE 1 OF 5 FACILITY NAME/LOCATION: ITEM NAME: PURCHASER/LOCATION: ITEM TAG NO.: JOB NO.: SERVICE: PURCHASER ORDER NO.: UNIT: SUPPLIER/LOCATION: P&ID NO.: SUPPLIER ORDER/SERIAL NOS.: / 1. Submittal of documentation is a condition of progress invoice payment. Refer to contract or purchase order. 2. Purchaser review of documentation shall not relieve supplier of responsibility to provide equipment of proper design, and mechanically suited to meet the operating performance and service conditions specified. Instructions 1. Complete and return this form with quotation. 2. Submit With Quote documentation with quotation. 3. Submit documentation in accordance with this documentation requirements sheet(s) as regards timing, quantity, and form of documentation. 4. Documentation shall be identified in transmittal (cover) letters and in title blocks or title pages with the following information: a. Purchaser s corporate name b. End user name c. Job/project number d. Equipment item number and service name e. Inquiry or purchaser order number f. Supplier order number 5. Each drawing, bill of materials, and data sheet shall have a title block in its lower right-hand corner that shows the date of certification, identification information specified in Instruction 4, the revision number and date, and the title. 6. All drawings and documents shall be black on white with clear image suitable for reproduction. Drawings and documents shall show information for this project only. Purchaser, at its sole discretion, may accept preprinted standard data if applicable information is clearly indicated and non-applicable information is cross-hatched out. 7. As Built documents and data books shall be submitted at time of equipment completion. 8. If hard copy data books are specified, data shall be provided on three-hole paper and bound in hard covers. Unless clarity is adversely affected, drawings shall be reduced to scale on 11-inch by 17-inch paper. If the clarity of reduced drawings is adversely affected, large drawings shall be folded and placed in heavy-duty, three-sided plastic covers and inserted into the binders. 9. Identify supplier representative responsible for documentation: NAME: TITLE: PHONE: DEFINITIONS Approval: Submitted for purchaser review and comment. Certified: Certified correct by purchaser/supplier and incorporates comments by purchaser from approval copy. As Built: Incorporates modifications made during fabrication. REMARKS NO. DATE REVISION BY APPROVED

6 DOCUMENTATION DOCUMENT TYPE LEGEND TIME LEGEND X = ORIGINAL A = WEEKS AFTER CONTRACT AWARD P = PRINT B = WEEKS BEFORE WORK STARTS R = REPRODUCIBLE C = WEEKS AFTER WORK COMPLETE S = SHOTDOWN D = WEEKLY E = ELECTRONIC MEDIA (DISK, TAPE, ETC.) E = SHIPMENT REDP003-R PAGE 2 OF 5 DOCUMENTATION WITH QUOTE QTY TYPE APPROVAL COPIES QTY TYPE TIME CERTIFIED COPIES QTY TYPE TIME AS BUILT COPIES QTY TYPE DATA BOOK COPIES QTY TYPE 1. Proposal Drawings per Section A.2 2. Proposal Technical Data per Section A.3 3. Proposal Curves per Section A.4 4. Proposal Options per Section A.5 5. Contract Data List per Section B.1.a 6. Contract Drawings, Technical Data, and Curves per Section B.2 7. Parts Lists and Recommended Spares per Section B.3 8. Installation Manual per Section B.4 9. Operation, Maintenance, and Technical Data Manuals per Section B Instrument Wiring Diagram 11. For Vertical Centrifugal Pumps, Data Lateral and Torsional Vibration Analysis

7 DOCUMENTATION REDP003-R PAGE 3 OF 5 REQUIREMENTS FOR DOCUMENTATION A. Proposal 1. General a. The original proposal and the specified number of copies shall be sent to the address specified in the inquiry documents. b. At a minimum, the proposal shall include the data specified in Sections A.2 through A.4 of this requirements sheet and a specific statement that the system and all its components are in strict accordance with the following Practice or a list that details and explains each deviation: PIP RESP003H PIP RESP003S PIP RESP003V c. Enough details shall be provided to enable the purchaser to evaluate any proposed alternate designs. 2. Drawings a. At a minimum, the following drawings shall be provided: 1) General arrangement or outline drawing showing direction of rotation, size, and approximate location of major purchaser connections, overall dimensions, maintenance clearance dimensions, overall weights, erection weights, and maximum maintenance weights (shown for each piece) 2) Cross-sectional drawings showing the details with part numbers of proposed equipment 3) Mechanical seal drawing 4) Auxiliary piping drawings b. If typical drawings, schematics, and bills of materials are used, they shall be marked to show the correct weight and dimension data and to reflect the actual equipment and scope proposed. 3. Technical Data The following technical data shall be provided: a. Data sheets with complete supplier s information entered thereon and literature to fully describe details of the equipment b. A specific statement that the supplier s schedule for transmitting the specified data is in accordance with the schedule shown in this requirements sheet or a list that details and explains each deviation c. Schedule, in weeks, for shipment of the equipment after receipt of the order d. List of major wearing components e. List of spare parts recommended for startup and normal maintenance f. For vertical submerged motor centrifugal pumps, weld repair procedure and qualification reports for cast iron casings 4. Curves a. Complete performance curves, including differential head, typical efficiency, water NPSH3, and power expressed as functions of capacity shall be provided. b. Curves shall be extended from zero capacity to 120% minimum of BEP capacity and the rated operating point shall be shown. c. Head curve for maximum and minimum impeller diameters shall be provided. d. Eye area of the first-stage impeller and the impeller identification number shall be shown on the curves. e. Minimum flow shall be shown on the curves. f. For vertical centrifugal pumps, a cold alignment curve shall be provided. 5. Options A list of procedures for any special or optional tests that have been specified by the purchaser or proposed by the supplier shall be provided.

8 DOCUMENTATION REDP003-R PAGE 4 OF 5 B. Contract Data 1. General a. A complete list of supplier s data shall be provided with the first issue of the major drawings. List shall contain titles, drawing numbers, and a schedule for transmission of all the data. b. On receipt of approval copies of documents, purchaser shall review the data. Review shall not constitute permission to deviate from any requirements in the order, unless the purchaser agrees in writing. c. Purchaser comments on the drawings that revise the specifications or scope of supply shall require a purchase order change. Purchaser shall be notified of the need for such changes promptly so that the purchaser can issue revised specifications and/or data sheets. d. After approval copies have been reviewed and revisions have been agreed, certified copies shall be provided in the quantity specified. e. Drawings and manuals shall provide sufficient information for the purchaser to properly install, operate, and maintain the equipment. f. Manufacturer s standard Inspection Test Plan (ITP) 2. Drawings, Technical Data, Curves, and Data Sheets a. Drawings, data, and curves shall be transmitted in accordance with the schedule agreed with purchaser. b. Certified test curves and data shall be submitted within 15 days after testing and shall include head, power recalculated to the proper specific gravity, and efficiency plotted against capacity. For vertical submerged motor centrifugal pumps, viscosity corrections shall be shown if applicable. c. NPSH3 curve shall be provided. Curve shall be drawn from actual test data for an impeller cast from the same pattern. d. Curve sheet shall show maximum and minimum diameters of the impeller design provided, eye area of the first stage impeller, suction specific speed, identification number of the impeller(s), and pump serial number. e. As built data sheets 3. Parts Lists and Recommended Spares a. Complete parts lists for all equipment and accessories shall be provided. b. Lists shall include unique part numbers, materials of construction, and delivery times. c. Each part shall be identified and shown on cross-sectional or assembly-type drawings so that the purchaser can determine the interchangeability of these parts with other equipment. d. Parts that have been modified from standard dimensions and/or finished to satisfy specific performance requirements shall be uniquely identified by part number for interchangeability and future duplication purposes. Alternate systems shall be approved by purchaser. e. Standard purchased items shall be identified by the original manufacturer s name and part number. f. Recommended spares for startup and normal maintenance shall be shown on the parts list. g. The parts lists shall be submitted to the purchaser promptly after receipt of the reviewed drawings and in time to permit delivery of the parts before startup of the pump.

9 DOCUMENTATION REDP003-R PAGE 5 OF 5 4. Installation, Operation, Maintenance, and Technical Data Manuals a. General 1) Manual(s) shall be compiled and shipped in accordance with schedule agreed with purchaser. 2) An index sheet containing section titles, and a complete list of referenced and enclosed drawings by title and drawing number shall be provided. 3) Written instructions and a cross-referenced list of drawings shall be provided to enable the purchaser to correctly install, operate, and maintain all the equipment ordered. 4) Manuals shall be prepared for the specified installation. If preprinted manuals are provided, they shall be supplemented with specific order data to enable the purchaser to correctly install, operate, and maintain all the equipment ordered. 5) Shipping List, Preservation, and Protection Instructions b. Installation Manual 1) Installation manual shall include the following: a) All installation procedures and installation design data b) Special alignment and grouting procedures c) Utility specifications including utility quantities d) Sketches that show the location of the center of gravity and rigging provisions to permit the removal of the top half of the casings, rotors, and any subassemblies that weigh more than 135 kg (300 lb) 2) Special information required for proper installation design that is not on the drawings shall be provided separately from the operating and maintenance instructions. Special installation information shall be transmitted at a time agreed upon with purchaser in the purchase order but not later than the final issue of drawings. c. Operating, Maintenance, and Technical Data Manual A manual containing operating, maintenance, and technical data shall be shipped with the equipment and shall include the following: 1) Instructions for pump operation at specified environmental conditions (e.g., temperature) 2) Required and recommended maintenance procedures

10 INSPECTION AND TESTING REDP003-T PAGE 1 OF 7 FACILITY NAME/LOCATION: ITEM NAME: PURCHASER/LOCATION: ITEM TAG NO.: JOB NO.: SERVICE: PURCHASER ORDER NO.: UNIT: SUPPLIER/LOCATION: P&ID NO.: SUPPLIER ORDER/SERIAL NOS.: / Horizontal Vertical Vertical Submerged Motor Other: 1. Purchaser denotes purchaser or designated representative. 2. Purchaser shall specify the extent of purchaser s participation in the inspection and testing. 3. Purchaser reserves the right to witness all aspects of manufacturing, to review and reject manufacturing equipment, testing equipment, test procedures, and test results; and to reject product not meeting requirements. 4. Purchaser shall be given written notice working days before inspection or test. If a test is rescheduled, the purchaser shall be notified a minimum of working days before the new test date. 5. Purchaser may perform additional testing, inspection, or both. 6. The submission of inspection and testing results is a condition of acceptance and payment. S = Supplier provided inspection or test W = Purchaser witnessed inspection or test D = Document results of inspection or test INSPECTION OR TEST DP = Send documentation to purchaser O = Purchaser observes inspection or test 1. Ultrasonic Inspection per Section B.2 Impeller Casing 2. Magnetic Particle Inspection per Section B.3 Impeller Casing 3. Liquid Penetrant Inspection per Section B.4 Impeller Casing 4. Radiographic Examination Impeller Casing 5. Hydrostatic Test per Section C.2 Hydrotest Pressure: Bowl Assembly: psig Column Assembly: psig Head Assembly (Disch.): psig Head Assembly (Suct.): psig Suction Barrel: psig Mechanical Seal: psig Hydrotest Fluid: Water Kerosene 6. Pump Running Test (Minimum 4 hours) 7. Performance Test per Section C.3 S W D DP O Remarks NO. DATE REVISION BY APPROVED

11 INSPECTION AND TESTING REDP003-T PAGE 2 OF 7 INSPECTION OR TEST S = Supplier provided inspection or test W = Purchaser witnessed inspection or test D = Document results of inspection or test DP = Send documentation to purchaser O = Purchaser observes inspection or test S W D DP O Remarks 8. NPSH Test per Section C.4 Test to be carried out with: Actual Driver Supplier s Driver Test to be carried out at: Rated Speed Derated Speed: rpm 9. Submergence Test per Section C Complete-Unit Test per Section C FFT Spectrum per Section C.3.d Motor Tests per Section C.3.f Dismantling Inspection 14. Dynamic Balance Impeller Rotor Coupling 15. Sound Level Test 16. Pipe Load Test A. General 1. Purchaser witnessed inspections and tests require that a hold be applied to the production schedule and that the inspections and tests be performed with the purchaser in attendance. Purchaser and supplier shall coordinate manufacturing hold points and inspector s visits. 2. Before witnessing mechanical running or performance tests, the purchaser shall be informed that a successful preliminary in-house test has been completed. 3. Equipment required for the specified inspection and tests shall be provided. 4. Purchaser s representative shall have access to review the supplier s quality assurance program. 5. For vertical centrifugal pumps, pumps shall be tested as complete assemblies if possible. If testing of assembled unit is impractical, alternative testing procedures shall be submitted with the proposal. Suction cans, if provided, are not required to be used for performance testing.

12 INSPECTION AND TESTING REDP003-T PAGE 3 OF 7 B. Material Inspection 1. General a. If specified, ultrasonic, magnetic particle, or liquid penetrant inspection shall be performed in accordance with Sections B.2 through B.4 of this requirements sheet. b. If not specified by purchaser, wrought material may be inspected by ultrasonic, magnetic particle, or liquid penetrant in accordance with Sections B.2 through B.4 of this requirements sheet. c. For horizontal and vertical centrifugal pumps, if not specified by purchaser, cast iron, cast steel, and welds may be inspected by magnetic particle or liquid penetrant in accordance with Sections B.3 and B.4. d. For vertical submerged motor centrifugal pumps: 1) If inspection method is not specified by purchaser, cast iron may be inspected by magnetic particle and liquid penetrant in accordance with Sections B.3 through B.4. 2) Steel impellers shall be subjected to a liquid penetrant examination or a wet fluorescent magnetic particle examination if the peripheral velocity of the impeller at operating speed is 45 m/s (150 ft/s) or higher. 3) Visible surfaces of the impeller shall be examined and shall be in accordance with ASME Code Section VIII, Division 1, Appendices 6 and Ultrasonic Inspection a. Ultrasonic inspection shall be in accordance with ASME Code Section V, Articles 5 and 23. b. Acceptance standard for welded fabrications shall be in accordance with ASME Code Section VIII, Division 1, Appendix 12. c. Acceptance standard for castings shall be in accordance with ASME Code Section VIII, Division 1, Appendix Magnetic Particle Inspection a. Both wet and dry methods of magnetic particle inspection shall be in accordance with ASTM E709. b. Acceptance standard for welded fabrications shall be in accordance with ASME Code Section VIII, Division 1, Appendix 6 and Section V, Article 25. c. Acceptability of defects in castings shall be based on a comparison with the photographs in ASTM E125. For each type of defect, the degree of severity shall not be greater than the limit specified in Table T1 of this requirements sheet. TABLE T1 MAXIMUM SEVERITY OF DEFECTS IN CASTINGS Type Defect Maximum Severity Level I Linear discontinuities 1 II Shrinkage 2 III Inclusions 2 IV Chills and chaplets 1 V Porosity 1 VI Welds 1

13 INSPECTION AND TESTING REDP003-T PAGE 4 OF 7 4. Liquid Penetrant Inspection a. Liquid penetrant inspection shall be in accordance with ASME Code Section V, Article 6. b. Acceptance standard for welded fabrications shall be in accordance with ASME Code Section VIII, Division 1, Appendix 8 and Section V, Article 24. c. Acceptance standard for castings shall be in accordance with ASME Code Section VIII, Division 1, Appendix 7. C. Testing 1. General a. If specified, hydrostatic, performance, NPSH3, submergence, and complete-unit tests shall be provided in accordance with the requirements of Sections C.2 through C.6 of this requirements sheet. b. If specified, performance and NPSH3 tests shall be conducted in accordance with the Hydraulic Institute Standard, except that efficiency data shall be for information only, and test tolerances shall be in accordance with Table T2 of this requirements sheet. c. For horizontal and vertical centrifugal pumps, mechanical seals: 1) Shall not be used during the hydrostatic test. 2) Shall be used during all running or performance tests. TABLE T2 PERFORMANCE TOLERANCES Condition Rated Point (%) Shutoff (%) Rated differential head 0 to 150 m (0 to 500 ft) (Note) Rated power +4 (Note 3) Rated NPSH +0 Note: 1. Efficiency is not a rating value. 2. Negative tolerance is permitted only if the test curve still shows a rising characteristic. 3. Under any combination of the above. Cumulative tolerances are not permitted. 2. Hydrostatic Test a. All pressure-casing components including seal glands, bowls, surface plate assembly, seal chambers, and welded auxiliary process fluid piping shall be hydrostatically tested with liquid at a minimum pressure of 1-1/2 times the MAWP for a minimum of 30 minutes. b. Test liquid shall be at a higher temperature than the nil-ductility transition temperature of the material being tested. c. Hydrostatic test liquid shall have a maximum of 50 ppm of chlorides. Comment: Chlorides in the test liquid will be deposited on components during evaporative drying. Chlorides may cause cracking in austenitic materials. d. All residual liquid shall be removed from tested parts at the conclusion of the test. e. Tests shall be maintained for a sufficient period not less than 30 minutes to permit complete examination of parts under pressure. f. Test shall be considered satisfactory when neither leaks nor seepage through the casing or casing joint is observed.

14 INSPECTION AND TESTING REDP003-T PAGE 5 OF 7 3. Performance Test a. Unless otherwise specified, a performance test shall be conducted if any of the following conditions are met: 1) Pumps are to be operated in parallel. 2) Purchaser specifies a performance test on this requirements sheet. 3) For horizontal and vertical centrifugal pumps, an NPSH3 test is required. 4) For vertical centrifugal pumps, a submergence test is required. b. The following requirements shall be met before the performance test: 1) Contract seals and bearings shall be used. 2) All joints and connections shall be checked for tightness, and any leaks shall be corrected. 3) All warning, protective, and control devices used during the test shall be checked for proper operation, and adjustments shall be made as required. 4) For horizontal and vertical centrifugal pumps, acceptable level of seal leakage during testing shall be zero visible leakage, unless otherwise agreed in writing among the purchaser, supplier, and seal manufacturer. 5) For horizontal centrifugal pumps, bearings specified to be normally lubricated from a pure oil mist system shall be prelubricated before performance test using suitable hydrocarbon oil. c. Unless otherwise specified, performance test shall be conducted as follows: 1) Test data, including head, capacity, and power shall be taken at a minimum of five points. These points are typically shutoff (no vibration data required), minimum continuous stable flow, midway between minimum and rated flow, rated flow, and maximum allowable flow (as a minimum, 120% of BEP). 2) All running tests and mechanical checks shall be completed before the purchaser s inspection. 3) Unless otherwise agreed in writing with purchaser, test speed shall be within 3% of the rated speed shown on the purchaser s Data Sheet. Test results shall be converted to anticipated results at the rated speed. 4) For vertical submerged motor centrifugal pumps specified for fire water service, pumps shall be tested to 150% of rated capacity. 5) For vertical centrifugal pumps, measurement of the differential pressure across the stuffing box shall be recorded. d. The following requirements shall be met during the performance test: 1) When operated at rated speed and capacity, pumps shall perform within the tolerances shown in Table T2 of this requirements sheet. 2) Overall bearing housing vibration levels in root mean square (RMS) velocities shall be recorded at each test point. If specified, an FFT spectrum (required for vertical submerged motor centrifugal pumps) shall be recorded at each test point. Vibration values shall not be greater than the values shown in Table T3 of this requirements sheet for the specified pump type.

15 INSPECTION AND TESTING REDP003-T PAGE 6 OF 7 Location of Measurement TABLE T3 VIBRATION LIMITS Horizontal Vertical Centrifugal Pumps Centrifugal Pumps Bearing Housing Pump Thrust Bearing Housing or Driver Mounting Stand Vertical Submerged Motor Centrifugal Pumps Pump Thrust Bearing Housing Pump bearing type All All All Vibration at any flow within the pump s preferred operating region: Overall V u<4.25 mm/s RMS (0.17 inch/s RMS) V u<5.0 mm/s RMS S (0.20 inch/s RM) V u<5.0 mm/s RMS (0.20 inch/s RMS) Discrete Frequencies V f<2.0 mm/s RMS (0.12 inch/s RMS) V f<3.4 mm/s RMS (0.13 inch/s RMS) V f<3.4 mm/s RMS (0.13 inch/s RMS) Increase in allowable 30% 30% 30% vibration at flows beyond the preferred operating region but within the acceptable operating region Notes: 1. Values calculated from the basic limits shall be rounded off to two (2) significant figures. 2. V u = unfiltered velocity 3. V f = filtered velocity, determined by Fast Fourier Transfer (FFT) 3) For horizontal and vertical centrifugal pumps, pumps shall operate with bearing temperature limits in accordance with Table T4 of this requirements sheet. TABLE T4 OIL-LUBRICATED BEARING HOUSINGS FOR HORIZONTAL AND VERTICAL CENTRIFUGAL PUMPS ALLOWABLE OIL AND BEARING TEMPERATURES For pressurized systems operating at an ambient temperature of 50 C (122 F) or less: Note: Pressurized oil systems are rarely applied to vertical pumps. Oil temperature at outlet <71 C (160 F) Bearing metal temp (if bearing temp sensors are provided) <93 C (200 F) Bearing oil temp rise 10 C (50 F) For ring-oiled or splash systems for Horizontal Centrifugal Pumps: Oil sump temperature <82 C (180 F) Sump oil temp rise 21 C (70 F) 4) For vertical submerged motor centrifugal pumps, pumps shall not display signs of unfavorable operation (e.g., noise caused by cavitation).

16 INSPECTION AND TESTING REDP003-T PAGE 7 OF 7 e. The following requirements shall be met after the performance test: 1) For vertical submerged motor centrifugal pumps, after the performance test, the pump shall be set at its rated point and run for a continuous period of 1-hour minimum. Test measurements shall be recorded at 15-minute intervals during this period. 2) If a pump is dismantled for the sole purpose of machining impellers to meet the tolerances for differential head, a retest shall not be required unless the reduction in diameter is greater than 5% of the original diameter. 3) The following shall be recorded on the certified shop-test curve that shows the operating characteristics after the diameter of the impeller has been reduced: a) For horizontal and vertical centrifugal pumps, final diameter of the impeller b) For vertical submerged motor centrifugal pumps, diameter of the impeller at the time of shop test, and final diameter of impeller and wear ring clearances 4) If it is necessary to dismantle a pump for some other correction (e.g., improvement of power, NPSH3, or mechanical operation), the initial test shall not be acceptable, and the final performance test shall be run after the correction is made. f. For vertical submerged motor centrifugal pumps, the following motor tests and data shall be provided: 1) The following motor tests shall be performed to demonstrate that the motors are free from mechanical and electrical defects: a) High-potential test on the stator b) High-potential test on cables and splices c) Insulation resistance test d) Winding resistance measurement e) No-load current measurement (each phase) f) Nominal no-load speed measurement g) Locked rotor current determination 2) Curves showing motor efficiency and power factor at 100%, 75%, and 50% of full load shall be provided. The test code method used in preparing the performance data shall be provided. 3) For oil-filled motors, a polarization index test shall be performed. The polarization index shall not be less than NPSH Test for Horizontal and Vertical Centrifugal Pumps a. An NPSH test shall be performed if the NPSH3 is within 1.5 m (5 ft) of the NPSHA. b. If specified, an NPSH test shall be performed. Purchaser and supplier shall agree upon test details. c. If an NPSH test is specified, a performance test shall also be conducted. d. NPSH3 data shall be taken at each test point specified in Section C.3.c.1 of this requirements sheet, except at shutoff. 5. Optional Submergence Test for Vertical Centrifugal Pumps a. If specified, a submergence test shall be performed. Purchaser and supplier shall agree upon test details. b. Vortex shedding at the minimum submergence depth shall not be permitted. 6. Complete-Unit Test for Vertical Submerged Motor Centrifugal Pumps a. If specified, a complete-unit test shall be performed. Purchaser and supplier shall agree upon test details. b. Components (e.g., pumps, drivers, and auxiliaries) that make up a complete unit shall be tested together.

TECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts

TECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts TECHNICAL CORRECTION October 2006 Process Industry Practices Structural PIP STF05121 Fabrication and Installation of Anchor Bolts PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize

More information

PIP STF05121 Anchor Fabrication and Installation Into Concrete

PIP STF05121 Anchor Fabrication and Installation Into Concrete June 2017 Structural PIP STF05121 Anchor Fabrication and Installation Into Concrete PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

COMPLETE REVISION October Process Industry Practices Piping. PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details

COMPLETE REVISION October Process Industry Practices Piping. PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details COMPLETE REVISION October 2007 Process Industry Practices Piping PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

Series 80 In-Line Mounted Centrifugal Pumps

Series 80 In-Line Mounted Centrifugal Pumps Bulletin B-G Bell & Gossett Series In-Line Mounted Centrifugal Pumps Applications Hydronic Heating & Cooling Systems Industrial Process General Service Pressure Boosting Advantages Close Coupled Space

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process ASME B73.1-2012 [Revision and Consolidation of ASME B73.1-2001 (R2007) and ASME B73.5M-1995 (R2007)] Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process AN AMERICAN NATIONAL

More information

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

PIP VEDV1003 Documentation Requirements for Vessels ASME Code Section VIII, Divisions 1 and 2

PIP VEDV1003 Documentation Requirements for Vessels ASME Code Section VIII, Divisions 1 and 2 COMPLETE REVISION March 2012 Process Industry Practices Vessels PIP VEDV1003 Documentation Requirements for Vessels ASME Code Section VIII, Divisions 1 and 2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

D.C. Hydraulic Power Systems

D.C. Hydraulic Power Systems D.C. Hydraulic Power Systems Bucher Hydraulics M-3000 Series Compact designs, integrated and manifold valve circuits Reference: 500-P-000001-EN-05 Issue: 02.2018 1/144 Contents Page 1 General information...

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

REQUEST FOR INFORMATION (RFI) RFI NO: /WJG

REQUEST FOR INFORMATION (RFI) RFI NO: /WJG (RFI) RFI NO: 15-219/WJG WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY 600 FIFTH STREET, NW WASHINGTON DC 20001 ( WMATA OR AUTHORITY ) 1 ⅝ INCH RADIATING COAXIAL CABLE DATE: AUGUST 7, 2015 Contents Introduction...

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

Technical Specifications SECTION C

Technical Specifications SECTION C Page 1 of 12 INSTITUTE FOR PLASMA RESEARCH Technical Specifications SECTION C Design, Fabrication, assembly, testing and supply of Filter polychromators & associated components and demonstration of performance

More information

Booster Pumping Station 115 Booster Pump Procurement

Booster Pumping Station 115 Booster Pump Procurement Madison Water Utility Tom Heikkinen General Manager 119 E. Olin Avenue Alan L. Larson PE, BCEE Principal Engineer Madison, Wisconsin 53713 Telephone: 608 266-4653 FAX: 608 266-4426 email: allarson@cityofmadison.com

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

ALLOY STEEL SOCKET SET SCREWS 1

ALLOY STEEL SOCKET SET SCREWS 1 1 IFI NOTE: - is reprinted with permission from the Annual Book of ASTM Standards, copyright American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959, U.S.A,

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

Mechanical Design. Brian Brinson Mechanical Design Manager.

Mechanical Design. Brian Brinson Mechanical Design Manager. Mechanical Design Brian Brinson Mechanical Design Manager brian.brinson@spx.com September 26, 2018 Agenda 1. Design Process 2. Pre-Approval Drawings Bid Drawings Preliminary Drawings 3. Approval Package

More information

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL. METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

for authorized workshops

for authorized workshops for authorized workshops GSE2200 1. USING THIS MANUAL The instructions provided in this manual are intended for and delivered solely to authorized workshops recognized by the manufacturer, and are intended

More information

High-efficiency Circulator Pump. Rio-Eco N / Rio-Eco Z N. Type Series Booklet

High-efficiency Circulator Pump. Rio-Eco N / Rio-Eco Z N. Type Series Booklet High-efficiency Circulator Pump Rio-Eco N / Rio-Eco Z N Type Series Booklet Legal information/copyright Type Series Booklet Rio-Eco N / Rio-Eco Z N All rights reserved. The contents provided herein must

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

400 SERIES GRINDER PUMPS 41502, 42202,43302, AND MODELS

400 SERIES GRINDER PUMPS 41502, 42202,43302, AND MODELS Section: MOYNO 500 PUMPS Page: 1 of 6 Date: March 1, 1998 SERVICE MANUAL MOYNO 500 PUMPS 400 SERIES GRINDER PUMPS 41502, 42202,43302, AND 44402 MODELS DESIGN FEATURES Housing: Cast iron Pump Rotor: Chrome

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

FAIRBANKS NIJHUIS 1590 SERIES SINGLE STAGE VERTICAL INLINE PUMP.

FAIRBANKS NIJHUIS 1590 SERIES SINGLE STAGE VERTICAL INLINE PUMP. FAIRBANKS NIJHUIS 0 SERIES SINGLE STAGE VERTICAL INLINE PUMP www.fairbanksnijhuis.com FAIRBANKS NIJHUIS 0 Series Single Stage Vertical Inline Pump Capacities to 00 GPM (,00 m/hr) Heads to 0 Feet ( m) Temperatures

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing

More information

Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications

Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications Petroleum, Petrochemical and Natural Gas Industries Steam Turbines Special-purpose Applications ANSI/API STANDARD 612 SIXTH EDITION, NOVEMBER 2005 ISO 10437, (Identical) Petroleum, petrochemical and natural

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: February 2, 2010 Expiration Date: February 2, 2015 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011 J O I N T I N D U S T R Y S T A N D A R D Requirements for Soldering Pastes J Standard 005A December 2011 Requirements for Soldering Pastes 1.0 SCOPE 1.1 Scope This standard prescribes general requirements

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods NAVSEA STANDARD ITEM ITEM NO: 009-48 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Pressure Seal Bonnet Valve; repair (shop) 2. REFERENCES: 2.1 S9086-CJ-STM-010/CH-075, Fasteners 2.2. T9074-AS-GIB-010/271,

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

Reliance SG800 Series Steel Water Gage Valves

Reliance SG800 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-33 34 13 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-33 34 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

NVIC March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO Tensile Fasteners

NVIC March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO Tensile Fasteners UNITED STATES COAST GUARD COMMANDANT (MMT-4) U.S. COAST GUARD WASHINGTON, DC 20591 NVIC 3-68 21 March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO. 3-68 Subj: Tensile Fasteners 1. Purpose. The purpose

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant), TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone: +91 431 257 7653 Fax

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

Split case double suction centrifugal pump. Technical data Serie: DPAS C

Split case double suction centrifugal pump. Technical data Serie: DPAS C Split case double suction centrifugal pump Technical data Serie: DPAS C Table of Contents 1 Introduction 1.1 Fields of Application... 1. Pumped Liquids... 1.3 Design... 1. Bearings... 1.5 Shaft Seal...

More information

INTERPLANT STANDARD - STEEL INDUSTRY

INTERPLANT STANDARD - STEEL INDUSTRY INTERPLANT STANDARD - STEEL INDUSTRY IPSS GUIDELINES FOR ARRANGEMENT DRAWINGS AND DOCUMENTS TO BE SUBMITTED TO AN EOT CRANE CUSTOMER FOR APPROVAL No corresponding Indian Standard exits IPSS:2-02-011-02

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

AS Australian Standard STEEL WIRE FOR TENDONS IN PRESTRESSED CONCRETE. This is a free 5 page sample. Access the full version online.

AS Australian Standard STEEL WIRE FOR TENDONS IN PRESTRESSED CONCRETE. This is a free 5 page sample. Access the full version online. AS 1310 1987 Australian Standard STEEL WIRE FOR TENDONS IN PRESTRESSED CONCRETE This Australian Standard was prepared by Committee BD/23, Structural Steel. It was approved on behalf of the Council of the

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

Reliance SG777 Series Steel Water Gage Valves

Reliance SG777 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.SG777 10/16/2016 Reliance SG777 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Installation Instructions

Installation Instructions Installation Instructions Durametallic PSS III Split Seal Experience In Motion While the PSS III has been designed for rugged industrial application and ease of installation, it does require assembly in

More information

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines. STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings. 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)

More information

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information