Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014

Size: px
Start display at page:

Download "Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014"

Transcription

1 Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that at each set up of the leveling instrument, two sets of independent backsights and foresights are taken Double-Rodded Leveling Advantage: provide a continuous check on the process of determining ground elevations while the work is in progress Useful when there is an urgent need to undertake differential leveling in a short period of time where no established benchmarks are available for checking results. Complete the following differential level notes for a double- rodded line from BM 1 to BM 2. Show the customary arithmetic check. STA BS HI FS ELEV BM m TP 1 H L TP 2 TP 3 H L H L BM

2 Arithmetic Check 1 st Method Mean Elev BM 2 = DE 1 = (ΣBS-ΣFS)/2 2 nd Method Mean Elev BM 2 = BM 1 + [(ΣBS-ΣFS)/2] Three-Wire Leveling DE 2 = BM 1 Mean Elev BM 2 Three-Wire Leveling Three-Wire Leveling More precise method Method of determining the differences in elevation wherein three horizontal hairs are read and recorded rather than from a single horizontal hair Any level equipped with three horizontal cross hairs can be used for three-wire leveling s = a-b m = (a+b+c)/3 HD = Ks + C Elev = HI - m a = upper stadia hair reading b = lower stadia hair reading c = horizontal cross hair reading s = stadia intercept - difference between the upper and lower stadia hair reading m = mean of the three-hair readings HD = horizontal distance from the level to the rod K = stadia interval factor (100) C = instrument constant (0) 2

3 STA BM BACKSIGHT FORESIGHT HAIR MEAN HI HAIR MEAN S RDGS RDG RDGS RDG S ELEV Arithmetic Check 1 st Method DE 1 = (ΣBS m -ΣFS m )/2 2 nd Method Elev BM 2 = BM 1 + ΣBS - ΣFS TP TP DE 2 = Elev BM 1 Elev BM 2 TP BM The process of determining differences in elevation along a fixed line at designated short measured intervals Design and construction of roads, railroads, canals, culverts, bridges, sewer lines (horizontal structures) Usually taken along the centerline with the level set up a convenient distance away from it so that sights of more uniform lengths can be obtained 3

4 Any number of foresights can be taken Intermediate t foresights are taken where necessary to portray accurately the existing ground surface along the route surveyed Profile A curved line which graphically portrays the intersection of a vertical plane with the surface of the earth Represent the ground elevations of selected critical points along a surveyed line and the horizontal distances between these points Stationing A numerical designation given in terms of horizontal distance any point along a profile line is away from the starting point Intermediate foresights (ground rod readings) Taken along the centerline of the proposed project to provide an accurate representation of the ground surface Full stations Points which are established along the profile level route at uniformly measured distances Plus stations Points established along a profile level route which is not designated as a full station Points taken at breaks in the ground surface slope and at critical points (location of culverts, bridges) A schematic arrangement of a profile level route from BM 3 to BM 4 are shown below. The values indicated represent backsight, foresight, and intermediate foresight readings taken on stations along the route. Prepare and complete profile level notes for the portrayed information. Show the customary arithmetic check and plot the profile BM 3 Elev m TP 1 HI HI BM 4 4

5 STA BS HI FS IFS ELEV BM m TP BM ELEVATION (m) E STATIONINGS Arithmetic Check Elev BM 4 = BM 3 + ΣBS - ΣFS Reciprocal Leveling 5

6 Reciprocal Leveling Employed to determine the difference in elevation between two points when it is difficult or impossible to keep backsights and foresights short and equal Such conditions are running a line of levels across wide rivers, lakes, and rugged terrain (deep canyons) Two sets of rod readings are observed (Method of Reversion) One set taken with the instrument set up close to one point and another instrument on the other Reciprocal Leveling Errors due to refraction by the atmosphere, curvature of the earth and faulty adjustment of the instrument are significantly reduced if not eliminated Reciprocal Leveling Instrumental errors and the effect of curvature and refraction DE 1 DE 2,»» DE1 a b DE2 a' b' DE1 DE TDE 2 2 ( a b) ( a' b') 2 *Note: If TDE is negative, A is higher than B; If TDE is positive, B is higher than A. In leveling across a deep and wide river, reciprocal level readings were taken between two points, X and Y as follows: a. With instrument set up near X, the rod readings on X are 1.27 and meters; on the distant point Y, the rod readings are 2.50, 2.52, 2.55, and 2.49 meters. b. With instrument set up near Y, the rod readings on Y are 3.48 and 3.47 meters; on the distant point X, the rod readings are 2.13, 2.14, and meters. Determine the true difference in elevation between the two points and the elevation of Y if the known elevation of X is meters. 6

7 Elev=289.90m Ti Trigonometric ti Leveling Instrument Set up near X STA BS FS X Y SUM MEAN Instrument Set up near Y STA BS FS X Y SUM MEAN Trigonometric Leveling Trigonometric Leveling Indirect Leveling Determine the difference in elevation from observed vertical angle and either horizontal or inclined distances Used extensively when undertaking topographic surveys over rugged or rolling terrain since it provides a rapid means of determining vertical distances and elevation of points V V dtan ssin DE DE ab ab ElevB ElevA dtan HI RR ssin HI RR DE ab 7

8 Trigonometric Leveling For horizontal distance is greater than 300 meters, effects of the earth s curvature and refraction must be considered in the calculation of the vertical distances. d 2 DE ab dtan HI RR ( ) 1000 d 2 DE ab ssin HI RR ( ) 1000 A vertical angle of is read to a target 1.23m above point B. the measured inclined distance, s, is m and the elevation of A is m above datum. If the HI at A is 1.35m, determine the difference in elevation between A and B and the elevation of B, considering the effects of curvature and atmospheric refraction. Cross-Section Leveling 8

9 CROSS-SECTION LEVELING Short profiles taken perpendicular to the centerline of projects such as a highway, railroad, irrigation canal, or sewer line They may also be taken for borrow pits and excavations required for buildings, structures, and quarries. Roadway Cross-Sections Borrow-Pit Cross Sections ROADWAY CROSS-SECTION This type of cross-section is required for most route projects such as roads and railroads. Elevations of ground points along the section are taken at regular intervals on either side. Where significant changes occur in ground features, ground elevations are also taken. BORROW-PIT CROSS-SECTION Employed in the construction of structures and buildings, and in the excavation of borrow pits. Borrow pit is an open area which is usually adjacent to a construction project where suitable fill material is excavated. The base line from which the GL are referred should be established outside the immediate project area so that reference stakes and other markers will not be obliterated or disturbed during the process of excavation. Similarly, any reference bench mark should also be located outside the work area. 9

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Leveling results are used: To design highways, railroads, canals, sewers,

More information

LEVELING. Definitions

LEVELING. Definitions Definitions An elevation of a point : The vertical distance between the point and the reference level surface ( datum ),the most commonly used datum is the mean sea level (MSL ). Leveling : The process

More information

SURVEYING 1 CE 215 CHAPTER -3-

SURVEYING 1 CE 215 CHAPTER -3- Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- PROFILE AND CROSS SECTION LEVELING 1 2 1 3 4 2 5 6 3 7 8 4 9 10 5 11 12 6 13 14 7 15 16 8 17 18 9 19 20 10 21 22 11 23 24 12 25 26 13 27 28 14

More information

determining the relative height of different

determining the relative height of different Levelling & Contouring Principle of levelling Principle:-The principle of levelling is to obtain horizontal line of sight with respect to which vertical distances of the points above or below this line

More information

QUANTITY SURVEYS. Introduction

QUANTITY SURVEYS. Introduction QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as

More information

Surveying & Measurement. Detail Survey Topographic Surveying

Surveying & Measurement. Detail Survey Topographic Surveying Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations

More information

IF YOU WERE GIVEN the task of installing a drainage

IF YOU WERE GIVEN the task of installing a drainage Applying Profile Leveling Techniques IF YOU WERE GIVEN the task of installing a drainage system, how would you determine the slope needed to keep the water flowing? Profile leveling is an option. As part

More information

UNIT 4 LEVELLING 4.1 INTRODUCTION. Structure. 4.1 Introduction. 4.2 Definitions of Basic Terms 4.3 Basic Principle 4.4 Instruments and Equipment

UNIT 4 LEVELLING 4.1 INTRODUCTION. Structure. 4.1 Introduction. 4.2 Definitions of Basic Terms 4.3 Basic Principle 4.4 Instruments and Equipment UNIT 4 LEVELLING Levelling Structure 4.1 Introduction Objectives 4.2 Definitions of asic Terms 4.3 asic Principle 4.4 Instruments and Equipment 4.4.1 Different Types of Level 4.4.2 Levelling Staff 4.4.3

More information

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure)

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure) FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK LEVELING (Standard Of Procedure) Subject Code Date Group Number Student Name & ID Number Group Member Name & ID Number 1 2 Lecturer

More information

Figure Sample field notes from cross-section leveling at first three stations shown in figure NAVEDTRA 14069A 15-26

Figure Sample field notes from cross-section leveling at first three stations shown in figure NAVEDTRA 14069A 15-26 method so that a point 100 feet away is within 1 foot of the true perpendicular. Measure elevations consisting of abrupt changes or breaks in the ground with a rod and level. Use a metallic tape to measure

More information

Department of Civil and Environmental Engineering

Department of Civil and Environmental Engineering Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University

More information

Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour.

Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. In other words, contour is a line in which the ground surface is intersected by a level surface

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information

More information

Question bank. Unit 1: Introduction

Question bank. Unit 1: Introduction Question bank Unit 1: Introduction 1. Define surveying. 2. State the objects of surveying 3. State and explain the principle of surveying 4. State and explain the classification of surveying 5. Differentiate

More information

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100 Total No. of Questions 12] [Total No. of Printed Pages 8 Seat No. [4162]-108 S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100 N.B. : (i)

More information

The several methods for making linear measurements are quite simple and straightforward. They are described below:

The several methods for making linear measurements are quite simple and straightforward. They are described below: INTRODUCTION TO LINEAR MEASUREMENTS Many pay items are measured on the basis of linear measurements - items such as guardrail, pipe culvert, curb and gutter, fencing, etc. These measurements usually are

More information

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman Engineering Surveying -1 CE212 Contouring Lectures Lecture 2016, November 29 th Muhammad Noman Contour An Imaginary line on the ground surface joining the points of equal elevation is known as contour.

More information

ENVI.2030L Topographic Maps and Profiles

ENVI.2030L Topographic Maps and Profiles Name ENVI.2030L Topographic Maps and Profiles I. Introduction A map is a miniature representation of a portion of the earth's surface as it appears from above. The environmental scientist uses maps as

More information

Suveying Lectures for CE 498

Suveying Lectures for CE 498 Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations

More information

Scheme I Sample Question Paper

Scheme I Sample Question Paper Sample Question Paper Max. Marks : 70 Time : 3 Hrs. Q.1) Attempt any FIVE of the following. a. Define the term surveying b. List different instruments used for linear measurement. c. Define the term bearing

More information

AutoCAD 2016 for Civil Engineering Applications

AutoCAD 2016 for Civil Engineering Applications Introduction to AutoCAD 2016 for Civil Engineering Applications Learning to use AutoCAD for Civil Engineering Projects Nighat Yasmin Ph.D. SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com

More information

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus Surveying Unit-II Important Questions Define Surveying and Leveling Differentiate between Surveying and Leveling. Explain fundamental Principles of Surveying. Explain Plain and Diagonal Scale. What is

More information

COPYRIGHTED MATERIAL. Contours and Form DEFINITION

COPYRIGHTED MATERIAL. Contours and Form DEFINITION 1 DEFINITION A clear understanding of what a contour represents is fundamental to the grading process. Technically defined, a contour is an imaginary line that connects all points of equal elevation above

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

LONGITUDINAL PROFILE COMPLETION

LONGITUDINAL PROFILE COMPLETION LONGITUDINAL PROFILE COMPLETION Vertical alignment of the ditch bottom determine using cross-sections plot (refer to fig. 0630) according to the chainage direction: ditch bottom on right side... dotted

More information

Construction Surveying and Layout

Construction Surveying and Layout Construction Surveying and Layout A Field Engineering Methods Manual Third Edition WESLEY G. CRAWFORD.CREATIVE CONSTRUCTION Creative Construction Publishing, Inc. 2720 South River Road West Lafayette,

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.   Earthwork This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Earthwork CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In

More information

Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide

Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide gradual change in its vertical direction, a parabolic

More information

CHAPTER 5 Vertical Control. CE 316 January 2012

CHAPTER 5 Vertical Control. CE 316 January 2012 CHAPTER 5 Vertical Control CE 316 January 01 137 5.1 Introduction Vertical Datums Leveling Techniques and Corrections Bench Mark Design and Construction Bench Mark Data Trigonometric Barometric Leveling

More information

Slope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading

Slope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading 6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line

More information

To determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works.

To determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works. UET-11-CE-SCET WAH SURVEYING-I Dumpy (Wye) Level LEVELLING: It is a surveying method used to determine the level of points/objects with reference to the selected datum. It is also used to set out engineering

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

Land Navigation / Map Reading

Land Navigation / Map Reading Land Navigation / Map Reading What is the Field Manual for map reading and land navigation? FM 3-25.26 What are the basic colors of a map, and what does each color represent? Black - Indicates cultural

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

CONTRACT PLANS READING

CONTRACT PLANS READING CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil

More information

SURVEYING I CENG 383

SURVEYING I CENG 383 SURVEYING I CENG 383 9/21/2011 2 Introduction Definition An art of collecting data for mapping the relative positions of points above, below or on the surface of the earth. Surveying also includes the

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G. Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters 19-22 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 19 - Layout Techniques... 3 Chapter

More information

47 CFR Ch. I ( Edition)

47 CFR Ch. I ( Edition) 73.684 should decrease more rapidly with distance beyond the horizon than for Channels 2 6, and modification of the curves for Channels 14 69 may be expected as a result of measurements to be made at a

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

International Journal of Scientific & Engineering Research, Volume 7, Issue 9, September ISSN

International Journal of Scientific & Engineering Research, Volume 7, Issue 9, September ISSN International Journal of Scientific & Engineering Research, Volume 7, Issue 9, September-2016 769 Leveling By Differential Global Position System (Case Study) Assistant Lecturer Bashar Halleem Muhsen Al-Yasery

More information

Automated Machine Guidance

Automated Machine Guidance Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,

More information

Design of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo

Design of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo Design of control network and survey for CSNS Accelerator center of IHEP Wang tong, Li bo 2012.09.11 Contents 1 Project Overview 2 Design of the Primary Control Network 3 Survey Scheme for the Surface

More information

June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL

June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) CHAPTER 1 GENERAL SURVEYING AND MAPPING MANUAL TABLE OF CONTENTS 1-1 INTRODUCTION...1 1-1.01 PURPOSE...1 1-1.02 SCOPE...1 1-2 SURVEYING

More information

Shoe Box Activity Constructing a Topographic Map

Shoe Box Activity Constructing a Topographic Map Shoe Box Activity Constructing a Topographic Map Background Information All maps are models of some feature of the real world. The kind of map oen used by scientists is called a contour or topographic

More information

Existing and Design Profiles

Existing and Design Profiles NOTES Module 09 Existing and Design Profiles In this module, you learn how to work with profiles in AutoCAD Civil 3D. You create and modify profiles and profile views, edit profile geometry, and use styles

More information

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved.

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved. 4.4 Slope and Graphs of Linear Equations Copyright Cengage Learning. All rights reserved. 1 What You Will Learn Determine the slope of a line through two points Write linear equations in slope-intercept

More information

BACKGROUND INFORMATION

BACKGROUND INFORMATION Build an Island INTRODUCTION For this assignment, you will be creating a topographic map and three-dimensional model of a fictional island that you have designed. You will start by exploring some basic

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

SURVEYING LAB MANUAL

SURVEYING LAB MANUAL DEPLOMA IN CIVIL ENGINEERING C-111 SURVEYING LAB MANUAL D.VINAYA ASST.PROFESSOR CIVIL ENGINEERING DEPARTMENT SANKETIKA POLYTECHNIC COLLEGE AFFILIATED TO STATE BOARD OF TECHNICAL EDUCATION & TRAINING, HYDERABAD

More information

Level Surveying Method and Accuracy Analysis on Passenger Dedicated Line CP Network

Level Surveying Method and Accuracy Analysis on Passenger Dedicated Line CP Network Level Surveying Method and Accuracy Analysis on Passenger Dedicated Line CP-Network Ding Ke-liang, Tie Li-san Zhou-shi-hong, Wang bing-hai Key words: passenger dedicated line, trigonometric leveling,cpiii

More information

CONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani

CONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- CONTOURS 1 2 1 3 4 2 PURPOSE OF CONTOURING Contour survey is carried out at the starting of any engineering project such as a road, a railway,

More information

Module-4 Lecture-2 Perpendicularity measurement. (Refer Slide Time: 00:13)

Module-4 Lecture-2 Perpendicularity measurement. (Refer Slide Time: 00:13) Metrology Prof. Dr. Kanakuppi Sadashivappa Department of Industrial and Production Engineering Bapuji Institute of Engineering and Technology-Davangere Module-4 Lecture-2 Perpendicularity measurement (Refer

More information

Lab #4 Topographic Maps and Aerial Photographs

Lab #4 Topographic Maps and Aerial Photographs Lab #4 Topographic Maps and Aerial Photographs Purpose To familiarize you with using topographic maps. Visualizing the shape of landforms from topographic maps is an essential skill in geology. Proficiency

More information

BASIC Surveying Manual. Transportation Information Center

BASIC Surveying Manual. Transportation Information Center BASIC Surveying Manual Transportation Information Center Contents Page Measuring horizontal distances 4 Pacing 4 Tapes 5 Historical surveyor s chain 5 Taping methods 6 Horizontal distances 7 Stationing

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

E. Slope-Intercept Form and Direct Variation (pp )

E. Slope-Intercept Form and Direct Variation (pp ) and Direct Variation (pp. 32 35) For any two points, there is one and only one line that contains both points. This fact can help you graph a linear equation. Many times, it will be convenient to use the

More information

SURVEY GUIDANCE AND FORMS

SURVEY GUIDANCE AND FORMS Appendix H Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN SURVEY GUIDANCE AND FORMS Version 2.0 April 2014 1 Table of Contents Section 1 Survey and Mapping... 1 1.1 Introduction...

More information

ENGI 3703 Surveying and Geomatics

ENGI 3703 Surveying and Geomatics Distance Measurement Errors (Chapter 6) We have reviewed at vertical distance measurement and identified errors associated with those. Now we turn to horizontal distance measurement. There are a number

More information

PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION

PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION Before aerial photography and photogrammetry became a reliable mapping tool, planimetric and topographic

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

COURSE SYLLABUS SURVEYING I

COURSE SYLLABUS SURVEYING I Solution Manual for Surveying Fundamentals and Practices 6th Edition by Nathanson Lanzafama Emeritus Link full download: http://testbankcollection.com/download/solution-manual-forsurveying-fundamentals-and-practices-6th-edition-by-nathanson-lanzafamaemeritus/

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but

More information

Design & Communication Graphics

Design & Communication Graphics L.84/85 Design & Communication Graphics Marking Scheme Ordinary Pg. 3 Higher Pg. 12 2013 L.84/85_MS 1/20 2013 L.84/85_MS 2/20 SECTION A - Core - Answer Any Three of the questions on this A3 sheet A-1.

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

REVIEW TOPICS CEEN 2320 FINAL EXAM

REVIEW TOPICS CEEN 2320 FINAL EXAM REVIEW TOPICS CEEN 2320 FINAL EXAM Be familiar with all materials covered in class, your class handouts and the notes you took in class, your homework assignments, test questions, formulas, tables, figures.

More information

COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey

COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey Introduction Set Up 1. Review Chapter 8 Total Station & EDM. 2. This activity will test your ability to set

More information

In this section, we find equations for straight lines lying in a coordinate plane.

In this section, we find equations for straight lines lying in a coordinate plane. 2.4 Lines Lines In this section, we find equations for straight lines lying in a coordinate plane. The equations will depend on how the line is inclined. So, we begin by discussing the concept of slope.

More information

Basic Surveying. Kabul, Afghanistan February 2011

Basic Surveying. Kabul, Afghanistan February 2011 Basic Surveying Kabul, Afghanistan February 2011 1 This watershed rehabilitation and restoration training was prepared by the U.S. Department of Agriculture (USDA) team of Jon Fripp (Civil Engineer USDA/NRCS),

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project

More information

Chapter 9 Linear equations/graphing. 1) Be able to graph points on coordinate plane 2) Determine the quadrant for a point on coordinate plane

Chapter 9 Linear equations/graphing. 1) Be able to graph points on coordinate plane 2) Determine the quadrant for a point on coordinate plane Chapter 9 Linear equations/graphing 1) Be able to graph points on coordinate plane 2) Determine the quadrant for a point on coordinate plane Rectangular Coordinate System Quadrant II (-,+) y-axis Quadrant

More information

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc SurvCADDR Section - Profile Module PRODUCT DESCRIPTION engineeringsoftwareforanexpandinguniverse The Section - Profile Module creates

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

Design & Communication Graphics Higher Level Section A (60 Marks)

Design & Communication Graphics Higher Level Section A (60 Marks) M.85A ªM.858 Leaving Certificate Examination, 2009 Design & Communication Graphics Higher Level Section A (60 Marks) Time: 3 Hours This examination is divided into three sections: SECTION A SECTION B SECTION

More information

Lesson 8: Surveying the Forest

Lesson 8: Surveying the Forest Lesson 8: Surveying the Forest TEACHER: SCHOOL: GRADE LEVEL: 9-12 TASKS/COMPETENCIES ANR8046.172 Set up and operate a transit level and rod. ANR8046.173 Read a rod and a level to calculate slope. ANR8046.174

More information

SECTION SITE SURVEYS

SECTION SITE SURVEYS SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder 9 LAND SURVEYING 9.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with land surveying, including Project and supplemental horizontal and vertical control

More information

Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions

Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions Introduction Maps are 2-D representations of 3-D features, the developers of topographic maps needed to devise a method for

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers

1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers 1 Exam Prep Prov Module: 28306-05 Distance Measurement and Leveling Questions and Answers 1. Site layout involves extensive use of plans. A. Foundation B. Elevation C. Floor D. Plot 2. Contour lines are

More information

6.1 INTRODUCTION Chapter 6 ORTHOGRAPHIC PROJECTIONS OF SIMPLE MACHINE BLOCKS We have already made you aware of many simple geometrical shapes (laminae), projected on such planes (vertical plane, horizontal

More information

4. Draw the development of the lateral surface of the part P of the cylinder whose front view is shown in figure 4. All dimensions are in cm.

4. Draw the development of the lateral surface of the part P of the cylinder whose front view is shown in figure 4. All dimensions are in cm. Code No: Z0122 / R07 Set No. 1 I B.Tech - Regular Examinations, June 2009 ENGINEERING GRAPHICS ( Common to Civil Engineering, Mechanical Engineering, Chemical Engineering, Bio-Medical Engineering, Mechatronics,

More information

Instructors Manual. for. Construction Surveying and Layout. Third Edition. Part One - Surveying Field Practices. Chapters 1-10.

Instructors Manual. for. Construction Surveying and Layout. Third Edition. Part One - Surveying Field Practices. Chapters 1-10. Instructors Manual for Construction Surveying and Layout Third Edition Part One - Surveying Field Practices Chapters 1-10 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 1 - Construction Surveying...

More information

UNIT I PLANE CURVES AND FREE HAND SKETCHING CONIC SECTIONS

UNIT I PLANE CURVES AND FREE HAND SKETCHING CONIC SECTIONS UNIT I PLANE CURVES AND FREE HAND SKETCHING CONIC SECTIONS Definition: The sections obtained by the intersection of a right circular cone by a cutting plane in different positions are called conic sections

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

Design & Communication Graphics Ordinary Level Section A (60 Marks)

Design & Communication Graphics Ordinary Level Section A (60 Marks) M.84A ªM.844 Leaving Certificate Examination, 2009 Design & Communication Graphics Ordinary Level Section A (60 Marks) Time: 3 Hours This examination is divided into three sections: SECTION A SECTION B

More information

ORTHOGRAPHIC PROJECTIONS. Ms. Sicola

ORTHOGRAPHIC PROJECTIONS. Ms. Sicola ORTHOGRAPHIC PROJECTIONS Ms. Sicola Objectives List the six principal views of projection Sketch the top, front and right-side views of an object with normal, inclined, and oblique surfaces Objectives

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

Design & Communication Graphics Higher Level Section A (60 marks)

Design & Communication Graphics Higher Level Section A (60 marks) Coimisiún na Scrúduithe Stáit State Examinations Commission 2011. M81A Leaving Certificate Examination, 2011 Design & Communication Graphics Higher Level Section A (60 marks) Friday, 17 June Afternoon,

More information

Rec. ITU-R P RECOMMENDATION ITU-R P PROPAGATION BY DIFFRACTION. (Question ITU-R 202/3)

Rec. ITU-R P RECOMMENDATION ITU-R P PROPAGATION BY DIFFRACTION. (Question ITU-R 202/3) Rec. ITU-R P.- 1 RECOMMENDATION ITU-R P.- PROPAGATION BY DIFFRACTION (Question ITU-R 0/) Rec. ITU-R P.- (1-1-1-1-1-1-1) The ITU Radiocommunication Assembly, considering a) that there is a need to provide

More information

CHAPTER 7 Total Station Surveying. CE 316 March 2012

CHAPTER 7 Total Station Surveying. CE 316 March 2012 CHAPTER 7 Total Station Surveying CE 316 March 2012 249 7.1 Introduction Total station surveying - defined as the use of electronic survey equipment used to perform horizontal and vertical measurements

More information

GL5: Visualisation and reading drawings

GL5: Visualisation and reading drawings 436-105 Engineering Communications GL5:1 GL5: Visualisation and reading drawings Being able to both: represent a 3D object in multiview drawings interpret a multiview drawing to visualise a 3D object is

More information

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1

More information