1 LONGITUDINAL PROFILE COMPLETION Vertical alignment of the ditch bottom determine using cross-sections plot (refer to fig. 0630) according to the chainage direction: ditch bottom on right side... dotted line ditch bottom on left side... dashed line both ditch bottoms... dot-and-dashed line fig (longitudinal profile types of lines used for marking of vertical alignment of the ditch bottoms) drawing process (result in fig. 0660): determine ditch bottom elevations (if there is no ditch, use elevation of intersection of embankment slope with the original terrain) from the crosssections an example in fig L... left side in the direction of chainage R... right side in the direction of chainage D... ditch bottom (only in the cutting) or the intersection of embankment slope with the original terrain S... intersection of cutting slope with the original terrain

2 fig (determining of ditch bottom elevations in the cutting or in the intersections of soil slopes with the original terrain from the cross-sections) draw the D points in locations of the cross-sections in the longitudinal profile (according to fig. 0640) an example in fig. 0650

3 point... ditch bottom elevation (only in cutting) point... elevation of intersection of the embankment slope with the original terrain combination... the same elevation on both sides (ditch bottom elevation = elevation of intersection of embankment slope with the original terrain) fig (drawing of points showing ditch bottom elevations or elevations of intersections of embankment slopes with the original terrain) provisionally (green = by pencil ) connect separately points corresponding left and right side fig connect 2 consecutive points on the same side of the road by red colour (type of the line corresponds to the left or right side according to fig. 0630) an example in fig. 0650

4 both 2 outside points have the same elevation on both sides (left + right) of the road doublesided ditch according to fig (otherwise not!!!) section between outside points + line is drawn in red only in the half of the section closer to the point (solve for left and right side separately fig. 0650) fig (longitudinal profile plotting ditch bottom)

5 Culverts design in places complying following conditions: road crosses watercourse (maximum deviation from the centre line perpendicular is 30 an example in fig. 0090) one of the ditch bottoms descends from both sides to one point (it must not occur in both ditches in one point at the same time!!!) refer to fig culvert diameter is designed according to its length and longitudinal gradient (refer to the table in fig. 0670) determine length and longitudinal gradient of the ditch bottom using the corresponding cross-section (fig. 0671): between ditch bottoms on both sides alternatively between ditch bottom on one side and embankment slope toe on the other side do not draw the culvert into the cross-section fig (table for determining the culver diameter)

6 fig (example of inclined culvert in a cross-section) if the culvert longitudinal gradient is not within the interval 0,5 ~ 5,0 %, it is necessary to (for the purpose of the exercise) sink the culvert outlet on the suitable side draw it into the longitudinal profile (including the table) according to fig fig (longitudinal profile culvert plotting)

7 Crash barriers design in sections meeting following conditions (simplified conditions used in the exercise): embankment height he 3 m (refer to exercise no. 5) determine from the longitudinal profile (for each side separately) draw it into the longitudinal profile by its location refer to the schema in fig (an example in fig. 0660) fig (longitudinal profile schemas for drawing of different road assets) draw crash barriers into the corresponding cross-sections (the 0,75 m extension of the crown on the crash barrier side must be rearranged according to fig. 0691) crash barrier height is considered to be 0,75 m fig (cross-section with crash barrier in horizontal straight left side of embankment)

8 Lined ditches calculate Gd in all sections between cross-sections (for left and right side separately) = longitudinal profile of ditch bottom: G d(i) St hd(i 1) hd(i) 100 % St 1000 i 1 i Gd(i)... longitudinal gradient of ditch bottom between cross-sections no. i a i+1 Sti... chainage of cross-section no. i ; [St] = km (rounding to 5 decimal places) hd(i)... ditch bottom elevation (or elevation of the intersection of embankment slope with the original terrain) in cross-section no. i (copy from the cross-section); [hd] = m (rounding to 2 decimal places) lined ditch is designed in locations where (it is assessed for left and right side separately): Gd 0,3%; 0,5% Gd 3%; 5% draw it into the longitudinal profile according to its location refer to the schema in fig (examples in fig and fig. 0680)

9 fig (longitudinal profile an example of drawing in the end part)

10 schematically draw the lined ditches into the corresponding cross-sections according to fig fig (cross-section with lined ditch and drain) Superelevation schematically indicate in sections between points TS-SC and CS-ST (include corresponding value of crossfall S or S0 ) according to fig and fig PLAN COMPLETION Road gradient marker in all vertices of elevation polygon drawing labels and all details according to fig gradient marker arms schematically indicate the gradient direction! (value in parenthesis is the vertical curve tangent difference from gradient markers in the longitudinal profile)

11 fig (part of the plan an example of completion) Crash barriers and lined ditches the symbol cannot be used for double-sided (fig. 0690) for crash barriers use symbols according to fig for lined ditches use symbols according to fig plot according to fig fig (plan schemas for plotting of lined ditches)

12 Culverts schemas for plotting of different types of culverts into the plan refer to fig and fig mark including the table the same as in the longitudinal profile an example in fig fig (plan schemas for drawing of culverts)

13 fig (plan schemas for drawing of inclined pipe culvert) Pavement and carriageway crown plot in constant distance on both sides from the road centre line (fig. 0090): the edge of paved carriageway (at the distance a+v+c from the road centre line) the edge of carriageway crown (at the distance a+v+c+e+0,25 m from the centre line, if there are crash barriers, then a+v+c+e+1 m!!! fig. 0090, change of the width happens on a length of about 5 m according to fig. 0750) fig (plan showing changes of the carriageway width)

14 Earthworks construction draw (refer to fig and fig. 0710) based on points D and S according to the distance from the centre line given in the cross-sections (fig. 0640) apply the distances on the centre line perpendicular according to the principle in fig fig (plan schema for earth construction edge plotting) connect consecutive points fig. 0760: D line shows ditch bottom location (or the intersection of embankment slope with the original terrain) S line shows location of intersection of cutting slope with the original terrain (if the points does not exist in one of two consecutive cross-sections line is terminated in the half of the section by merging into the line made by D points)

15 schematic indication of slope gradient direction of earthworks construction using series of long and short lines perpendicular to the centre line according to fig schematic indication of lined or unlined ditch according to fig fig (plan schemas for cutting and embankment) fig (plan schemas for ditches)

16 Superelevation schematic indication in points TS, SC, CS and ST (include the corresponding values of crossfall S or S0 ) an example in fig and fig fig (an example of the whole plan)

BASIC TERMS OF ROAD GEOMETRY

BASIC TERMS OF ROAD GEOMETRY BASIC TERMS OF ROAD GEOMETRY Contour line = a line, which connects terrain points of the same elevation Contour line interval (equidistance) = elevation difference between contour lines Line of maximum

More information

PROGRAM RP83. Drawing of perspective views. User guide. Release: Pragoprojekt a.s

PROGRAM RP83. Drawing of perspective views. User guide. Release: Pragoprojekt a.s ROADPAC 14 PROGRAM User guide Release: 25.02.2014 Pragoprojekt a.s. 1986-2014 PRAGOPROJEKT a.s., 147 54 Praha 4, K Rysance 16 1. Introduction Program DRAWING Of PERSPECTIVE VIEWS is part of ROADPAC system.

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

SURVEYING 1 CE 215 CHAPTER -3-

SURVEYING 1 CE 215 CHAPTER -3- Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- PROFILE AND CROSS SECTION LEVELING 1 2 1 3 4 2 5 6 3 7 8 4 9 10 5 11 12 6 13 14 7 15 16 8 17 18 9 19 20 10 21 22 11 23 24 12 25 26 13 27 28 14

More information

Subdivision Cross Sections and Quantities

Subdivision Cross Sections and Quantities NOTES Module 11 Subdivision Cross Sections and Quantities Quantity calculation and cross section generation are required elements of subdivision design projects. After the design is completed and approved

More information

Design of Roundabouts using Corridor Models (Part 1 of 2)

Design of Roundabouts using Corridor Models (Part 1 of 2) AUTODESK CIVIL3D Design of Roundabouts using Corridor Models (Part 1 of 2) Dynamic vertical modeling By Jack Strongitharm Civil 3D Technical Sales Manager UK and Ireland jack.strongitharm@autodesk.com

More information

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman Engineering Surveying -1 CE212 Contouring Lectures Lecture 2016, November 29 th Muhammad Noman Contour An Imaginary line on the ground surface joining the points of equal elevation is known as contour.

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc SurvCADDR Section - Profile Module PRODUCT DESCRIPTION engineeringsoftwareforanexpandinguniverse The Section - Profile Module creates

More information

Year 11 Graphing Notes

Year 11 Graphing Notes Year 11 Graphing Notes Terminology It is very important that students understand, and always use, the correct terms. Indeed, not understanding or using the correct terms is one of the main reasons students

More information

constant EXAMPLE #4:

constant EXAMPLE #4: Linear Equations in One Variable (1.1) Adding in an equation (Objective #1) An equation is a statement involving an equal sign or an expression that is equal to another expression. Add a constant value

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

REVIEW TOPICS CEEN 2320 FINAL EXAM

REVIEW TOPICS CEEN 2320 FINAL EXAM REVIEW TOPICS CEEN 2320 FINAL EXAM Be familiar with all materials covered in class, your class handouts and the notes you took in class, your homework assignments, test questions, formulas, tables, figures.

More information

Radius Return Select this option to annotate the elevations along the radius return of the intersection.

Radius Return Select this option to annotate the elevations along the radius return of the intersection. ODOT_IntersectionDetail.mvba Application Name: Current version: Required MicroStation Version: Required GEOPAK Version: Video Documentation ODOT_IntersectionDetail.mvba V11.07.15 MicroStation XM or V8i

More information

Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014

Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014 Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that

More information

AutoCAD 2016 for Civil Engineering Applications

AutoCAD 2016 for Civil Engineering Applications Introduction to AutoCAD 2016 for Civil Engineering Applications Learning to use AutoCAD for Civil Engineering Projects Nighat Yasmin Ph.D. SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

Design & Communication Graphics Higher Level Section A (60 marks)

Design & Communication Graphics Higher Level Section A (60 marks) 1 L.85A Pre-Leaving Certificate Examination, 2012 Design & Communication Graphics Higher Level Section A (60 marks) Time: 3 Hours This examination is divided into three sections: SECTION A SECTION B SECTION

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

Slope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading

Slope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading 6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line

More information

Section 101. Street Design

Section 101. Street Design Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

RRR Design & Modeling with the FDOT Civil 3D State Kit

RRR Design & Modeling with the FDOT Civil 3D State Kit RRR Design & Modeling with the FDOT Civil 3D State Kit Mike Racca - CADD Applications Development Specialist Production Support Office CADD 605 Suwannee St - MS 40, Tallahassee, Florida 32399 Session Objectives:

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

GL5: Visualisation and reading drawings

GL5: Visualisation and reading drawings 436-105 Engineering Communications GL5:1 GL5: Visualisation and reading drawings Being able to both: represent a 3D object in multiview drawings interpret a multiview drawing to visualise a 3D object is

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Council Policy Engineering Drawing Submission Requirements

Council Policy Engineering Drawing Submission Requirements POLICY 265 City of Kelowna 1435 Water Street Kelowna, BC V1Y 1J4 250 469-8500 kelowna.ca Council Policy Engineering Drawing Submission Requirements APPROVED June 4, 2001 RESOLUTION: R375/10/04/26 REPLACING:

More information

ORTHOGRAPHIC PROJECTIONS. Ms. Sicola

ORTHOGRAPHIC PROJECTIONS. Ms. Sicola ORTHOGRAPHIC PROJECTIONS Ms. Sicola Objectives List the six principal views of projection Sketch the top, front and right-side views of an object with normal, inclined, and oblique surfaces Objectives

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

Appendix C: Graphing. How do I plot data and uncertainties? Another technique that makes data analysis easier is to record all your data in a table.

Appendix C: Graphing. How do I plot data and uncertainties? Another technique that makes data analysis easier is to record all your data in a table. Appendix C: Graphing One of the most powerful tools used for data presentation and analysis is the graph. Used properly, graphs are an important guide to understanding the results of an experiment. They

More information

Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour.

Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. In other words, contour is a line in which the ground surface is intersected by a level surface

More information

determining the relative height of different

determining the relative height of different Levelling & Contouring Principle of levelling Principle:-The principle of levelling is to obtain horizontal line of sight with respect to which vertical distances of the points above or below this line

More information

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2 Section 4-02 Typical Sections TABLE OF CONTENTS INTRODUCTION...2 General...2 DRAFTING GUIDELINES...3 General...3 Drawing Typical Sections...3 Attaching a Sheet...3 Text Size and Spacing...4 Labeling of

More information

AutoCAD Civil 3D 2013 South African Country Kit

AutoCAD Civil 3D 2013 South African Country Kit AutoCAD Civil 3D 2013 South African Country Kit Contents 1 General... 3 1.1 Introduction from the author and creator... 3 1.2 Overview... 4 2 Drawing Settings... 8 2.1 Edit Drawing Settings... 8 3 Layers...

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Relief Well Spacing

GEO-SLOPE International Ltd, Calgary, Alberta, Canada   Relief Well Spacing 1 Introduction Relief Well Spacing Relief wells are commonly installed on the downstream side of an earth dam to control the seepage and pore-pressures (e.g. levee; Figure 1). A key design requirement

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide

Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide gradual change in its vertical direction, a parabolic

More information

1. The topographic map below shows a depression contour line on Earth's surface.

1. The topographic map below shows a depression contour line on Earth's surface. 1. The topographic map below shows a depression contour line on Earth's surface. Points A, B, C, and D represent surface locations. Contour line elevations are in feet. Which profile best shows the topography

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

General Guide to RoadPlus Editor

General Guide to RoadPlus Editor 20 30 40 50 GPS System 500 General Guide to RoadPlus Editor Version 4.0 English System GPS500 Congratulations on your purchase of a new Leica System GPS500. 2 View of chapters Introduction Design Elements

More information

To apply proposed roadway data (vertical alignments, cross section template data, cut/fill slopes, etc.)

To apply proposed roadway data (vertical alignments, cross section template data, cut/fill slopes, etc.) That CAD Girl J ennifer dib ona Website: www.thatcadgirl.com Email: thatcadgirl@aol.com Phone: (919) 417-8351 Fax: (919) 573-0351 Roadway Design Extracting Existing Ground Cross Sections This document

More information

MAKE A CO NTO U R MAP

MAKE A CO NTO U R MAP Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore Activitydevelop Student Version MAKE A CO NTO U R MAP How does a

More information

CONTRACT PLANS READING

CONTRACT PLANS READING CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil

More information

Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions

Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions Introduction Maps are 2-D representations of 3-D features, the developers of topographic maps needed to devise a method for

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

SECTION 6A ROADWAY PLAN PREPARATION

SECTION 6A ROADWAY PLAN PREPARATION SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4

More information

Graphing Techniques. Figure 1. c 2011 Advanced Instructional Systems, Inc. and the University of North Carolina 1

Graphing Techniques. Figure 1. c 2011 Advanced Instructional Systems, Inc. and the University of North Carolina 1 Graphing Techniques The construction of graphs is a very important technique in experimental physics. Graphs provide a compact and efficient way of displaying the functional relationship between two experimental

More information

Gradient and Rate of Change

Gradient and Rate of Change Name: 1. Base your answer(s) to the following question(s) on the topographic map shown below. Letters A, B, C, and D represent locations on Earth s surface. The symbol marks the highest elevation on Patty

More information

Design & Communication Graphics Ordinary Level Section A (60 Marks)

Design & Communication Graphics Ordinary Level Section A (60 Marks) M.84A ªM.844 Leaving Certificate Examination, 2009 Design & Communication Graphics Ordinary Level Section A (60 Marks) Time: 3 Hours This examination is divided into three sections: SECTION A SECTION B

More information

Design & Communication Graphics Higher Level Section A (60 Marks)

Design & Communication Graphics Higher Level Section A (60 Marks) 1 L.85A Pre-Leaving Certificate Examination, 2011 Design & Communication Graphics Higher Level Section A (60 Marks) Time: 3 Hours This examination is divided into three sections: SECTION A SECTION B SECTION

More information

Topographic Maps. Contour Lines

Topographic Maps. Contour Lines Topographic Maps Our first task today will consist of locating ourselves with the help of a topographic map. GPS units that can tell you the location of any Dunkin' Donuts within a five mile radius. Paper

More information

Multiview Drawing. Definition: Graphical representation of a 3- dimensional object on one plane (sheet of paper) using two or more views.

Multiview Drawing. Definition: Graphical representation of a 3- dimensional object on one plane (sheet of paper) using two or more views. Multiview Drawing Definition: Graphical representation of a 3- dimensional object on one plane (sheet of paper) using two or more views. Multiview Drawing Another name for multiview drawing is orthographic

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

AUTOCAD CIVIL 3D 2008

AUTOCAD CIVIL 3D 2008 AUTOCAD CIVIL 3D 2008 AUSTRALIAN COUNTRY KIT 1 TABLE OF CONTENTS 2 Purpose of this document:... 4 3 Drafting and Plans Production Settings... 5 3.1 Sheet Creation... 5 3.2 Drafting and Labeling... 5 3.3

More information

- 9_12TI7962-QUIZ2 - Print Test

- 9_12TI7962-QUIZ2 - Print Test Page 1 of 5 Report: Test Answer Key District: Madison Test: Description: Unit B CAD Form: 501 1. What CAD dimensioning command allows a line to be drawn from a note to an object? (NCCTE.9_12.TI.7962.D202.01)

More information

ENGINEERING SURVEYING (221 BE) Setting Out And Site Control. Sr Tan Liat Choon Mobile:

ENGINEERING SURVEYING (221 BE) Setting Out And Site Control. Sr Tan Liat Choon   Mobile: ENGINEERING SURVEYING (221 BE) Setting Out And Site Control Sr Tan Liat Choon Email: tanliatchoon@gmail.com Mobile: 016-4975551 WHAT IS SETTING OUT Setting out is all about transferring measurements from

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

ENVI.2030L Topographic Maps and Profiles

ENVI.2030L Topographic Maps and Profiles Name ENVI.2030L Topographic Maps and Profiles I. Introduction A map is a miniature representation of a portion of the earth's surface as it appears from above. The environmental scientist uses maps as

More information

Existing and Design Profiles

Existing and Design Profiles NOTES Module 09 Existing and Design Profiles In this module, you learn how to work with profiles in AutoCAD Civil 3D. You create and modify profiles and profile views, edit profile geometry, and use styles

More information

DFTG-1305 Technical Drafting Prof. Francis Ha

DFTG-1305 Technical Drafting Prof. Francis Ha DFTG-1305 Technical Drafting Prof. Francis Ha Session 4 Orthographic Projection (or Multiview Projection) Reading: Geisecke s textbook: 14 th Ed. Chapter 5 p.162 15 th Ed. Chapter 6 p.232 Update: 18-0205

More information

HEADS Pro: The Simplest & Versatile software for Highway engg.&

HEADS Pro: The Simplest & Versatile software for Highway engg.& HEADS Pro: The Simplest & Versatile software for Highway engg.& design with special features for low cost rual & hill roads, tunnels, road widening, strengthening, profile correction, pavement design,

More information

Shoe Box Activity Constructing a Topographic Map

Shoe Box Activity Constructing a Topographic Map Shoe Box Activity Constructing a Topographic Map Background Information All maps are models of some feature of the real world. The kind of map oen used by scientists is called a contour or topographic

More information

Design & Communication Graphics Higher Level Section A (60 Marks)

Design & Communication Graphics Higher Level Section A (60 Marks) M.85A ªM.858 Leaving Certificate Examination, 2009 Design & Communication Graphics Higher Level Section A (60 Marks) Time: 3 Hours This examination is divided into three sections: SECTION A SECTION B SECTION

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

Magnetic Field of the Earth

Magnetic Field of the Earth Magnetic Field of the Earth Name Section Theory The earth has a magnetic field with which compass needles and bar magnets will align themselves. This field can be approximated by assuming there is a large

More information

Orthographic Projection 1

Orthographic Projection 1 Orthographic Projection 1 What Is Orthographic Projection? Basically it is a way a representing a 3D object on a piece of paper. This means we make the object becomes 2D. The difference between Orthographic

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

CONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani

CONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- CONTOURS 1 2 1 3 4 2 PURPOSE OF CONTOURING Contour survey is carried out at the starting of any engineering project such as a road, a railway,

More information

Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer

Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer Joe Waxmonsky, Bentley Civil 2 WWW.BENTLEY.COM Why Overlay? Why Overlay? Accommodate wedging / leveling Milling Widening Crown

More information

Chapter 2: Dimensioning Basic Topics Advanced Topics Exercises

Chapter 2: Dimensioning Basic Topics Advanced Topics Exercises Chapter 2: Dimensioning Basic Topics Advanced Topics Exercises Dimensioning: Basic Topics Summary 2-1) Detailed Drawings 2-2) Learning to Dimension 2-3) Dimension Appearance and Techniques. 2-4) Dimensioning

More information

How to Graph Trigonometric Functions

How to Graph Trigonometric Functions How to Graph Trigonometric Functions This handout includes instructions for graphing processes of basic, amplitude shifts, horizontal shifts, and vertical shifts of trigonometric functions. The Unit Circle

More information

Relative Coordinates

Relative Coordinates AutoCAD Essentials Most drawings are created using relative coordinates. This means that the next point is set from the last point drawn. The last point drawn is stored as temporary 0,0". AutoCAD uses

More information

Contents TRAM TRACK DESIGN GUIDELINES

Contents TRAM TRACK DESIGN GUIDELINES Contents 1. Introduction 1 1.1 Purpose 1 1.2 Scope 1 1.3 Responsibilities 1 1.4 Records 1 1.5 Referenced Documents 1 1.6 Definitions 3 2. Approval of Design Documentation 4 3. Survey Works 5 3.1 General

More information

Objective: Investigate patterns in vertical and horizontal lines, and. interpret points on the plane as distances from the axes.

Objective: Investigate patterns in vertical and horizontal lines, and. interpret points on the plane as distances from the axes. NYS COMMON CORE MATHEMATICS CURRICULUM Lesson 6 5 6 Lesson 6 Objective: Investigate patterns in vertical and horizontal lines, and Suggested Lesson Structure Fluency Practice Application Problem Concept

More information

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved.

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved. 4.4 Slope and Graphs of Linear Equations Copyright Cengage Learning. All rights reserved. 1 What You Will Learn Determine the slope of a line through two points Write linear equations in slope-intercept

More information

Section 7 Notes and Annotations

Section 7 Notes and Annotations Section 7 Notes and Annotations Drive Structure Fence Begin/End Project, Crossing Utilities, Eisting Ground, Finished Grade, Flow Lines Guardrail, Mailbo, Present/Proposed/Temporary Right of Way Special

More information

Year 10 Practical Assessment Skills Lesson 1 Results tables and Graph Skills

Year 10 Practical Assessment Skills Lesson 1 Results tables and Graph Skills Year 10 Practical Assessment Skills Lesson 1 Results tables and Graph Skills Aim: to be able to present results and draw appropriate types of graphs Must: identify mistakes in data recording Should: be

More information

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION SCHEDULE 10 ENGINEERING DRAWING SUBMISSION Subdivision, Development and Servicing Bylaw No. 1535 10. ENGINEERING DRAWING SUBMISSIONS TABLE OF CONTENTS 1.0 General 3 1.1. Introduction 3 1.2. General Requirements

More information

Trade of Metal Fabrication. Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2

Trade of Metal Fabrication. Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2 Trade of Metal Fabrication Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 6 Fabrication

More information

Graphic representation in technological projects

Graphic representation in technological projects 1st ESO: Technology, Programming and Robotics Graphic representation in technological projects Author: Guillermo Gómez Revision: Pablo Rivas Martín Contents 1 Prior knowledge... 2 2 Keywords... 2 3 Mindmap

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

Subdivision Application Checklist

Subdivision Application Checklist City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

In this section, we find equations for straight lines lying in a coordinate plane.

In this section, we find equations for straight lines lying in a coordinate plane. 2.4 Lines Lines In this section, we find equations for straight lines lying in a coordinate plane. The equations will depend on how the line is inclined. So, we begin by discussing the concept of slope.

More information

technical drawing

technical drawing technical drawing school of art, design and architecture nust spring 2011 http://www.youtube.com/watch?v=q6mk9hpxwvo http://www.youtube.com/watch?v=bnu2gb7w4qs Objective abstraction - axonometric view

More information

PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED:

PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED: CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STREET IMPROVEMENT PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STREET IMPROVEMENT PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO.

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Chapter 5 Pictorial sketching

Chapter 5 Pictorial sketching Chapter 5 Pictorial sketching Contents Freehand sketching techniques Pictorial projections - Axonometric - Oblique Isometric projection vs isometric sketch Isometric sketch from an orthographic views Isometric

More information

Maps and map interpretation An introduction for geoscientists

Maps and map interpretation An introduction for geoscientists Maps and map interpretation An introduction for geoscientists Produced by the University of Derby in conjunction with UKOGL Aims This teaching package provides an introduction to maps and how to identify

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Section 2.3 Task List

Section 2.3 Task List Summer 2017 Math 108 Section 2.3 67 Section 2.3 Task List Work through each of the following tasks, carefully filling in the following pages in your notebook. Section 2.3 Function Notation and Applications

More information

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted MINIMUM STANDARD Z/16 SURVEY SPECIFICATIONS 1. GENERAL This specification sets out the Consultant s requirements for topographical survey (ground and aerial) for the Detailed Business Case (DBC) and Pre-Implementation

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.   Earthwork This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Earthwork CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In

More information

Construction Plan Reading Basics & Applications

Construction Plan Reading Basics & Applications Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project

More information