A B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN.

Size: px
Start display at page:

Download "A B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN."

Transcription

1 BORROW AS NECESSARY TO CONSTRUCT RIVERWARD SEE NOTE EL.. (MIN.) (MIN.) NEW UNCOMPACTED EL. EARTH C L C C C TYPICAL SECTION AND BORROW NO SCALE. CDF FLAT POOL EL.. JULJRP/REH AS CONSTRUCTED Approved Description Date CDF CELL LEGEND UPPER SEDIMENT LOWER SEDIMENT SEP, EP DACW--R- CDF NEW UNCOMPACTED EARTH (MIN.) (MIN.) EXCAVATE CHANNEL, USE MATERIAL AS ADJACENT BORROW TO CONSTRUCT C L D C C EL.. (MIN.) NO SCALE (MIN.) EL.. MIN. TYPICAL SECTION AND EXCAVATION CDF CELL EXCAVATION LIMIT (MIN.). LAKEWARD EXCAVATION FLAT POOL EL.. RTN SDB MJA POOL ISLANDS TYPICAL SECTIONS II PLATE :: PM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

2 BORROW AS NECESSARY TO CONSTRUCT RIVERWARD SEE NOTE EL.. (MIN.) NEW UNCOMPACTED EARTH EL. (MIN.) C L E C C TYPICAL SECTION AND BORROW NO SCALE. CDF FLAT POOL EL.. AS CONSTRUCTED JUL JRP/REH CDF CELL LEGEND UPPER SEDIMENT LOWER SEDIMENT SEP, EP DACW--R- CDF NEW UNCOMPACTED EARTH (MIN.) (MIN.) EXCAVATE CHANNEL, USE MATERIAL AS ADJACENT BORROW TO CONSTRUCT CL F C C EL.. (MIN.) NO SCALE (MIN.) EL.. MIN. TYPICAL SECTION AND EXCAVATION CDF CELL EXCAVATION LIMIT (MIN.). LAKEWARD EXCAVATION FLAT POOL EL.. RTN SDB MJA POOL ISLANDS TYPICAL SECTIONS III PLATE :: PM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

3 NEW UNCOMPACTED EARTH EL.. C L (MIN.) FLAT POOL EL.. G C C NO SCALE RIVER BOTTOM FLAT POOL EL.. ELEV.. TYP. H C C TYPICAL SECTION NO SCALE. (MIN.). BORROW AS NECESSARY TO CONSTRUCT SEE NOTE CDF CELL CDF CELL EL. (TYP.) (MIN) (MIN) TYPICAL SECTION AND BORROW BETWEEN CDF CELLS LEGEND UPPER SEDIMENT LOWER SEDIMENT EXCAVATION MATERIAL TO BE REMOVED C L NOTE: SECTION H WAS MODIFIED PER VALUE EHGINEERING PROPOSAL, CONTRACT MODIFICATION #A DATED AUGUST,. PLATE TYPICAL SECTIONS IV REVISED AS CONSTRUCTED MOD. - EXCAVATION CHANNEL CHANGE POOL ISLANDS RTN SDB MJA SEP, EP DACW--R- JULJRP/REH :: PM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

4 H:V H:V H:V A H:V H:V PLAN SEDIMENT TRAP NEW GROUNDLINE GROUNDLINE MECHANICAL EXCAVATION (MIN) FLAT POOL EL.. EL.. EL.. TOP OF NEW DEFLECTION ELEV.. SECTION A-A NO SCALE A. B B H:V H:V MECHANICAL EXCAVATION PROFILE B-B H:V H:V TYP. PLACE FLAT POOL EL.. ROCK BERM ELEV.. APPROX. RIVER BOTTOM. PLACE BLANKET TRANSITION BERM INTO BLANKET (TYP.) H:V SEDIMENT TRAP LENGTHENED TO COMPENSATE FOR ROAD BED. (ACTUAL SIZE NOT SHOWN) SLOPE ROCK BERM PLATE FLOW INLET PLAN AND PROFILE REVISED AS CONSTRUCTED POOL ISLANDS RTN SDB MJA SEP, EP DACW--R- JULJRP/REH :: PM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

5 K RM RM E. N. E. N. E. N. AREA C OPTIONAL EXCAVATION AREAS THIS AREA NOT DREDGED MECHANICAL EXCAVATION AREA A OPTION B (NOT DREDGED) NOTES:. OPTION ITEMS MAY BE AWARDED ONLY AFTER ALL CONTRACT EXCAVATION IS COMPLETE.. AWARD WILL DEPEND ON AVAILABLE CAPACITY IN THE CDF. E. N. E. N. E. N.. ALL OPTIONAL EXCAVATION MATERIAL MUST BE PLACED IN THE CDF OR REMOVED OFF SITE AT CONTRACTOR S EXPENSE. POOL ISLANDS OPTION ITEMS PLAN VIEW RTN SDB KNM MJA SEP, EP DACW--R- JULJRP/REH PLATE REVISED AS CONSTRUCTED :: PM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

6 MATERIAL TO BE REMOVED GROUNDLINE FLAT POOL EL.. EL.. (TYP.) C L OPTIONAL EXCAVATION TYPICAL SECTION NO SCALE NOTE: ALL OPTIONAL EXCAVATION SHALL BE TO ELEV.. PLATE OPTION ITEM S TYPICAL SECTION POOL ISLANDS RTN SDB MJA SEP, EP DACW--R- AS CONSTRUCTED JULJRP/REH Date Approved Description :: PM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

7 ARROWHEAD MARINA MUD LAKE PARK BOAT RAMP ACCESS ROAD BM --R EL.. RAILROAD BM R-. EL.. ROAD SITE M AP OF LOCATION BORROW EXCAVATION EDGE OF SHORELINE AND IS APPROXIMATLEY SHOWN AT FLAT POOL BENCHMARK PLATE FLOW SEP, EP AS CONSTRUCTED DACW--R- POOL ISLANDS RTN RSK SDB CJK MJA TEM -- RTN/RAP :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

8 CONSTRUCTION FEATURES THE FOLLOWING PROVIDES A BRIEF DESCRIPTION OF THE MAJOR PROJECT FEATURES. IT IS NOT NECESSARILY A CONSTRUCTION SEQUENCE. FEATURE: DEFLECTION A CONSTRUCT DEFLECTION USING ADJACENT BORROW FROM RIVER BED. FEATURE: DEEP WATER FISH HABITAT (ALIGNMENTS C, E-M) CONSTRUCT A SYSTEM OF DEEP-WATER CHANNELS FOR FISH HABITAT. FEATURE: UPPER FLOW INLET CONSTRUCT A FLOW INLET IN THE DEFLECTION TO ALLOW NOMINAL FLOW THROUGH THE NEWLY EXCAVATED CHANNELS. PLACE TO PROTECT THE INLET FROM EROSION. FLOW INLET DETAILS MAY BE FOUND ON SHEET C. FLOW -- RTN/RAP Approved Description Date ALIGNMENT N ALIGNMENT A FLOW LOWER FLOW INLET FLOW ALIGNMENT L ALIGNMENT K ALIGNMENT M AS CONSTRUCTED ALIGNMENT J UPPER FLOW INLET SHORELINE ALIGNMENT C ALIGNMENT I ALIGNMENT H ALIGNMENT G ALIGNMENT F ALIGNMENT E FLOW INLET SEP, EP DACW--R- SHORELINE FEATURE: LOWER FLOW INLET RTN SDB MJA FEATURE: DEFLECTION B ALIGNMENT B ALIGNMENT D (BORROW SOURCE) FLOW THE EXCAVATED CHANNELS WILL PROVIDE APPROXIMATELY. HECTARES OF FISH HABITAT, AS WELL AS A MATERIAL SOURCE FOR CONSTRUCTION OF (ALIGNMENT A). CONSTRUCT A FLOW INLET IN THE DEFLECTION TO ALLOW NOMINAL FLOW THROUGH THE NEWLY EXCAVATED CHANNELS. PLACE TO PROTECT THE INLET FROM EROSION. FLOW INLET DETAILS MAY BE FOUND ON SHEET C. FLOW INLET FLOW SHORELINE POOL ISLANDS CONSTRUCTION FEATURES PLATE :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

9 A B C D E F G H CONSTRUCTED VEGETATION BED LOWER FLOW INLET AS STA. +A SHOWN Approved Date AS ALIGNMENT G ARMY EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL ALIGNMENT E MJA TEM CJK S DB U.S. EXCAVATE CHANNELS ILLINOIS AND NAVIGATION CHARTS.. FLAT POOL EL., YR EL., YR EL... CONTOURS ARE ESTIMATED FROM VARIOUS SOURCES ( TO PRESENT). A B C D E F G H PLATE AM SI TE PLAN ARE APPROXIMATE.. RIVER BOUNDARIES BASED ON AERIAL PHOTOS. ALL RIVER MILES AND FEATURE LOCATIONS POOL ISLANDS GENERAL NOTES: PI: STA +A GATE LOCATION ALIGNMENT D c:\pw_working\mvr\beddllh\d\o&m_plate.dgn MUDLAKE PARK LANDING :: ALIGNMENT C ISLAND, ROCK ENGINEERS I O W A OF ENGINEER DISTRICT ALIGNMENT F ALIGNMENT B BORROW EXCAVATION ALIGNMENT H CORPS Checked ALIGNMENT I RTN RSK ALIGNMENT M ALIGNMENT K ALIGNMENT J PLACE SIDE CAST BERMS ALIGNMENT L SEP, Drawing REVISED ALIGNMENT N DACW--R- DISTANCE CHANGE STA. +A MOD. # - STATION UPPER FLOW INLET ALIGNMENT A EP DEFLECTION Description By: SEP Code: -- RTN/RAP OW FL S I S P I R M I S I S P E R I V RTN/RJH

10 A B C D E F G H RTN/RAP Approved Date -- Description AS CONSTRUCTED L NE AN CH N IO AT IG V NA ENGINEER DISTRICT EA AR ARMY W LO AL SH P-- P-- DACW--R- EP RSK TEM GJM SHOWN Code: Drawing By: c:\pw_working\mvr\beddllh\d\o&m_plate.dgn LO CATI ONS BORING LOCATION P-- POOL ISLANDS EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL BO RI NG P-- AS U.S. BORROW EXCAVATION P-- Checked RSK P-- ENGINEERS CJK SDB/TP D/GBM P-- OF P-- ILLINOIS P-- ISLAND, ROCK CORPS EA AR SEP, W LO AL SH PLATE A B C D E F G H AM ::

11 ELEVATION (METERS) ELEVATION (METERS) P-- HA HA / / (.). WATER N. E. MARCH P-- P-- P--... WATER HA HA WATER CH GR FAT CLAY (SOFT) (.) CL GR SILTY LEAN CLAY CH GR BR SANDY FAT CLAY WATER SANDY IN PART CL GR LEAN CLAY (SOFT) (FIRMER AND MORE SAND WITH DEPTH) CL GR MEDIUM CLAY (STIFF) / CL GR LEAN CLAY (SOFT) N. E. APRIL CL GR SANDY LEAN CLAY CL-CH GR MEDIUM CLAY (STIFF) CL BR MOTTLED SANDY LEAN TO MEDIUM CLAY (FIRM) CL-CH BR MEDIUM CLAY (FIRM) P-- HA. WATER CH GR FAT CLAY (SOFT) N. E. MARCH (.) / N. E. APRIL CL-CH GR MEDIUM CLAY (FIRM) CH GR FAT CLAY (STIFF) P-- HA. WATER N. E. MARCH CH GR MEDIUM CLAY (SOFT) CL GR LEAN CLAY (MORE FIRM WITH DEPTH) CH GR FAT CLAY (STIFF) N. E. APRIL CL-CH GR MEDIUM CLAY (FIRM) ELEVATION (METERS) ELEVATION (METERS) AS CONSTRUCTED -- RTN/RAP ELEVATION (METERS) P-- HA (.) (.) (.) (.). WATER N. E. SEPTEMBER CL GR SANDY LEAN CLAY SC GR CLAYEY SAND CL-CH GR MEDIUM CLAY (FIRM) CL BR SANDY LEAN CLAY (FIRM) SC BR CLAYEY SAND SP BR GRAVELLY COARSE TO FINE SAND LEGEND P-- HA (.) (.). WATER N. E. SEPTEMBER OH GR ORGANIC FAT CLAY (SOFT) CL-CH GR MEDIUM CLAY (FIRM) CL BR SANDY LEAN CLAY (FIRM) SC BR CLAYEY SAND ELEVATION (METERS) RSK SEP, CJK/TPD/GBM EP RSK TEM DACW--R- GJM BORING NUMBER HOLE ADVANCED BY HAND AUGER WATER LEVEL PERCENT PASSING # SIEVE (.) LIQUID AND PLASTIC LIMIT HA / WL D SIZE (mm). LOCATION OF BORING JULY TOP ELEVATION (IN METERS) NGVD NATURAL MOISTURE CONTENT IN PERCENT DRY WEIGHT MAJOR STRATA CHANGE MINOR STRATA CHANGE HOLE EXTENDED BY DRIVING mm PIPE * PROBE OR SPLIT SPOON REFUSAL APPROXIMATE DATE OF DRILLING ALSO, DATE WATER LEVEL NOTED LOCATIONS GIVEN IN ILLINOIS WEST ZONE STATE PLANE COORDINATES (NAD ) IN METERS NOTE: FOR LOCATIONS OF BORINGS, SEE SHEET C. POOL ISLANDS BORING LOGS PLATE :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

12 -+C +C +C +C +C +C +C +C +C +C +C PLAN KEY PLAN BORROW EXCAVATION EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL +A +A +A +A +A +A +A +A +A +A +A N. E. +B E. +C N. PI STA +A N. +A N. E. -+C PI STA +A PI STA +A PI STA +A PI STA +A PI STA +A +A PI STA +C N. E. PI STA +C N. E. PI STA +C N. E. PI STA +A PI STA +C PI STA +A E. N. E. PI STA +C N. E. PI STA +B N. E. PI STA +C N. E. N. E. N. E. N. E. N. E. N. E. H CC SECOND GATE AT +B PROFILE A MATCH LINE SHEET C A C C PI STA +A N. E. PI STA +A +A N. E. CONSTRUCT UPPER FLOW INLET STA. +A SHEET C FOR DETAILS WOOD POSTS SPACED.M APART EXCAVATE CHANNEL R EXCAVATE FOR CONSTRUCTION FLOW INLET EL.. EL.. GATE LOCATION PI: STA +A SHEET C FOR DETAILS FLOW INLET SEE SHEET C SECTION B-B SEE DETAIL ON SHEET C EXCAVATION EL.. EXCAVATION PROFILE C C C C J C C PLATE POOL ISLANDS EM BANKM ENT A AND EXCAVATION C PLAN AND PROFILE STA. + A TO + A RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- AS CONSTRUCTED -- RTN/RAP MOD. #-CORRECTED COORDINATES --RTN/REH AMD. #-ADDED COORDINATE, CROSS SECTION SYMBOL AND STATION -- JRP/DJJ :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

13 KEY PLAN +A +A +A +A +A +A +A +A +A +A +A +A + +C +C +C +C +C +C +C +C +C +C +C +C +C PI STA +C N. E. PI STA +A PI STA +A PI STA +A PI STA +C N. E. +A N. E. EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL PI STA +C N. E. PI STA +A MIN PI STA +C N. E. PI STA +A J C C E. PI STA +A +A PI STA +A PI STA +A PI STA +A I CC F N. E. C C N. N. E. PI STA +A PLAN ENBANKMENT PROFILE A MATCH LINE SHEET C C MATCH LINE SHEET C CC B CC LOWER FLOW INLET STA. +A SEE SHEET C FOR TYPICAL SECTIONS EXCAVATE CHANNEL PI STA +A N. E. PI STA +A JRP/DJJ +A CONSTRUCT FLOW INLET EL.. EL.. SEE SHEET C FOR DETAIL EXCAVATION EL.. EXCAVATION PROFILE C C C H PLATE POOL ISLANDS EM BANKM ENT A AND EXCAVATION C PLAN AND PROFILE STA. + A TO + A RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- REVISED AS CONSTRUCTED -- RTN/RAP MOD. #-CORRECTED COORDINATES --RTN/REH AMD. #-ADDED CROSS SECTION SYMBOL -- JRP/DJJ :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

14 KEY PLAN EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL +A +A +A +A +A +A +A +A +A +A +C +C +C +C +C +C +C +C +C +C+C CC AGREEMENT WITH FWS AND DNR TO LEAVE AS ONE BIG ISLAND H C PI STA +A PI STA +C +A N. E. PI STA +C N. E. PI STA +A N. E. PI STA +A MIN G C C +A PLAN SIDE CAST BERM WAS ALLOWED BY FWS TO GAIN ACCESS TO PROJECT PROFILE A MATCH LINE SHEET C CONSTRUCT EXCAVATE CHANNEL STA. +A= STA. + POTENTIAL ACCESS DREDGING EXCAVATION PROFILE C FLOW E. CONSTRUCT ROCK SPUR DIKE EL.. SEE SHEET C FOR DETAIL EXCAVATION EL.. C F + N. PI STA + N. E. PLATE POOL ISLANDS EM BANKM ENT A AND EXCAVATION C PLAN AND PROFILE STA. + A TO + A RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- REVISED AS CONSTRUCTED MOD. #-CORRECTED COORDINATES -- RTN/RAP AMD. #-SPECIFICATION AMENDMENT --JRP/DJJ AMD. #-ADDED DIMENSION --JRP/DJJ AMD. #-ADDED NORTHING AND EASTING -- JRP/DJJ :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

15 KEY PLAN +B +B +B +B +B N. E. +B +D +D -+C +D PI STA +B N. E. +B PI STA +B +D EROSION ROCK CONSTRUCT B MG STOCKPILE WOOD POSTS SPACED.m APART PLAN ADDITIONAL GATE AND BARRIER POSTS BORROW EXCAVATION EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL EL.. NOTES: INTERSECTION OF ALIGNMENT C AT -.C WITH ALIGNMENT D AT +D SHALL BE CONTERMINOUS. PROFILE B PLATE POOL ISLANDS EM BANKM ENT B AND EXCAVATION D PLAN AND PROFILE RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- REVISED AS CONTRUCTED -- RTN/RAP MOD. # - ROCK STOCKPILE -- MRP/RAP MOD. # - EROSION ROCK -- MRP/RAP MOD. # - ADDITIONAL GATE AND POSTS -- MRP/RAP MOD. # - STATION DISTANCE CHANGE SEP RTN/RJH Description Date Approved :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

16 KEY PLAN PLAN EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL +E +E +E +E +E +F +F +G +G +H +H PROFILE E PROFILE F PROFILE G PROFILE H CC D +E +E N. E. +E N. E. +E N. E. PI STA +F N. E. +F PI STA +G N. E. +G N. E. PI STA +E CC D +H N. E. PI STA +H N. E. ISLAND STA. +C= STA. +C= STA. +H STA. +G EXCAVATE CHANNEL STA. +C= STA. +C= STA. +F STA. +E R EL.. EL.. EL.. EL.. PLATE POOL ISLANDS PLAN AND PROFILE E, F, G & H RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- AS CONSTRUCTED -- RTN/RAP :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

17 KEY PLAN ISLAND EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL +N +N +N +I +I +J +J +K +K PI STA +I N. E. +I N. E. +J N. E. PI STA +J N E CC D PI STA +K N. E. +K N. E. STA. +C= STA. +J STA. +C= STA. +N STA. +C= STA. +I EXCAVATE CHANNEL PLAN STA. +C= STA. +K EL.. EL.. EL.. EL.. PROFILE N PROFILE I PROFILE J PROFILE K PLATE POOL ISLANDS PLAN AND PROFILE N, I, J & K RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- REVISED AS CONSTRUCTED -- RTN/RAP :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

18 KEY PLAN EDGE OF SHORELINE AND IS APPROXIMATELY SHOWN AT FLAT POOL +M +M +M +M N. E. PI STA +L N. E. +L N. E. PI STA +M N. E. EXCAVATE CHANNEL PLAN +L +L +M +M +M +M +M +M PROFILE L PROFILE M CC E STA. +C= STA. +L SIDE CAST BERMS EL.. EL.. C C D FLOW PLATE POOL ISLANDS PLAN AND PROFILE L & M RTN RSK SDB CJK MJA TEM SEP, EP DACW--R- REVISED AS CONSTRUCTED -- RTN/RAP Date Approved Description :: AM c:\pw_working\mvr\beddllh\d\o&m_plate.dgn

GEOLOGICAL INVESTIGATIONS

GEOLOGICAL INVESTIGATIONS GEOLOGICAL INVESTIGATIONS Aggregate Investigation Greenwood Aggregates Company Limited Part Lots 30 to 32, Concession 4, E.H.S. Town of Mono County of Dufferin Box #122, 38 Alpine Drive, Moonstone, Ontario,

More information

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department February 2, 2015 Fox River and Lower Green Bay Cat Island Chain - 1938 Cat Island Brown County Aerial Photography,

More information

GEOTECHNICAL SUBSURFACE EXPLORATION DATA REPORT

GEOTECHNICAL SUBSURFACE EXPLORATION DATA REPORT GEOTECHNICAL SUBSURFACE EXPLORATION DATA REPORT Traffic Signal Pole Foundations River Road at Huguenot Road City of Richmond and Henrico County, Virginia Schnabel Reference No. 15613005 January 30, 2015

More information

NALYSIS OF STABILIZING SLOPES USING VERTICAL PILES

NALYSIS OF STABILIZING SLOPES USING VERTICAL PILES NALYSIS OF STABILIZING SLOPES USING VERTICAL PILES Mahmoud S. Abdelbaki: Lecturer, Gehan E. Abdelrahman: Lecturer, Youssef G. Youssef :Assis.Lecturer, Civil Eng. Dep., Faculty of Eng., Cairo University,

More information

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

QUANTITY SURVEYS. Introduction

QUANTITY SURVEYS. Introduction QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as

More information

New Jersey Dept. of Environmental Protection Shore Protection Program

New Jersey Dept. of Environmental Protection Shore Protection Program New Jersey Dept. of Environmental Protection Benjamin Keiser, Manager 1510 Hooper Avenue, Suite 140 Toms River, New Jersey 08753 1-732-255-0767 New Jersey s State of New Jersey Chris Christie, Governor

More information

Crow Wing County Mound Design

Crow Wing County Mound Design Property Owner: Date: Mailing Address: City: State: Zip: Home Phone Number: - - Cell: - - Site Address: City: State: Zip: Driving directions if no address issued: Legal Description: Sec: Twp: Range: Township

More information

Performance Monitoring

Performance Monitoring Performance Monitoring Rock Island District Kara N. Mitvalsky, P.E. CEMVR-EC-DN Traditional Reports Analysis of existing data Comparison of data points to objectives identified in the feasibility reports

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

Philadelphia District: Cape May County, New Jersey

Philadelphia District: Cape May County, New Jersey ERDC/RSM-DB6, June 2003 Regional Sediment Management (RSM) Demonstration Program Project Brief Philadelphia District: Cape May County, New Jersey ISSUE The Atlantic coast of New Jersey extends from Sandy

More information

Corps Dredge Plan 2016 Emily Hughes Env Resources, USACE BUILDING STRONG

Corps Dredge Plan 2016 Emily Hughes Env Resources, USACE BUILDING STRONG Corps Dredge Plan 2016 Emily Hughes Env Resources, USACE Goodbye Jeff Richter!! Navigation/Operations USACE Goal/Mission: To maintain safe Navigation in Federal Channels using methods that are most (1)

More information

UPPER MISSISSIPPI RIVER RESTORATION LAKE ODESSA HABITAT REHABILITATION AND ENHANCEMENT PROJECT OPERATION AND MAINTENANCE MANUAL APPENDIX F

UPPER MISSISSIPPI RIVER RESTORATION LAKE ODESSA HABITAT REHABILITATION AND ENHANCEMENT PROJECT OPERATION AND MAINTENANCE MANUAL APPENDIX F UPPER MISSISSIPPI RIVER RESTORATION LAKE ODESSA HABITAT REHABILITATION AND ENHANCEMENT PROJECT OPERATION AND MAINTENANCE MANUAL APPENDIX F PROJECT PHOTOGRAPHS Table of Photographs Photograph 1: Lake Odessa

More information

December 2002 Meeting

December 2002 Meeting Summary of Corps Of Engineers Survey and Monitoring Efforts for ILT Richard A. Fischer, Ph.D. U.S. Army Engineer R&D Center December 2002 Meeting Representatives from 3 Corps Divisions, ( Northwestern,

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014

Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014 Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014 i. Project Overview 1. USACE # # SPK 2013 00851 2. Permittee:

More information

MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS

MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS 1) SMALL SCALE GENERAL SITE PLAN A : The purpose of this map is to indicate the location of the application in relation to surveyed parcels

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives. APPENDIX C: MAIN RIVER BRIDGE PLANS The graphics in this appendix depict the Practical Alternatives. NO. DESCRIPTION BY 4:36:17 PM 10/3/2007 STA.10+843.000 \ PYLON 6.000 5.000 (TYP) PYLON ELEVATION 210.000

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

State of New Jersey Chris Christie, Governor. Dept. of Environmental Protection Bob Martin, Commissioner

State of New Jersey Chris Christie, Governor. Dept. of Environmental Protection Bob Martin, Commissioner Cape May Beach 2016/2017 Renourishment Cape May Inlet to Lower Township & Lower Cape May Meadows Cape May Point Cape May County, New Jersey New Jersey Department of Environmental Protection Engineering

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street

More information

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO. FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88

More information

COOK INLET NAVIGATION CHANNEL

COOK INLET NAVIGATION CHANNEL COOK INLET NAVIGATION CHANNEL 1-5 COOK INLET NAVIGATION CHANNEL, ALASKA (CWIS NO. 10324, 10534) Condition of Improvement 30 September 2011 AUTHORIZATION: (1) Water Resources Development Act of 1996 (Public

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

Dredging, Beach Nourishment and. Bird Conservation Workshop Atlantic Coast Region

Dredging, Beach Nourishment and. Bird Conservation Workshop Atlantic Coast Region Dredging, Beach Nourishment and US Army Corps Bird Conservation Workshop Atlantic Coast Region Beach Nourishment and Bird Habitat Restoration in Southern New Jersey Shore Protection and Ecosystem Restoration

More information

INDEX PAGE RELEASE SECTION NUMBER DATE

INDEX PAGE RELEASE SECTION NUMBER DATE INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

TOPOGRAPHIC MAPS A NEW WAY TO VIEW THE WORLD!

TOPOGRAPHIC MAPS A NEW WAY TO VIEW THE WORLD! TOPOGRAPHIC MAPS A NEW WAY TO VIEW THE WORLD! http://courtneyjennings.weebly.com/unit-4---weathering-erosiontopo-maps-past.html A topographic map, simply put, is a two-dimensional representation of a portion

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

Ramsar Convention. LI To know and understand the purpose of the Ramsar Convention

Ramsar Convention. LI To know and understand the purpose of the Ramsar Convention Ramsar Convention LI To know and understand the purpose of the Ramsar Convention Warm Up Change the following statements so they are appropriate for a report: 1 2 3 4 5 We conducted a beach survey last

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014

Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014 Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that

More information

Charlotte County Utilities DESCRIPTION

Charlotte County Utilities DESCRIPTION As-built Drawings / Surveyor 1. Electronic copy of survey data in tabular form of the utility assets 2. A signed and sealed letter with the following statement: "I hereby certify that the as-built location

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

NWP of 9 Enclosure

NWP of 9 Enclosure A l b a n y Linn County Tax Lots S03W8BD0050 S03W8BA003 S03W8BA00700 Albany, OR 973 G e o R e s o u r c e s, L L C 000 0 000 000 Feet Scale: :,000 FIGURE : LOCATION MAP Scale: " =,000' Source: Albany GIS

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

1. Qualitative Assessment... II-101

1. Qualitative Assessment... II-101 Table of Contents I. Introduction... I-1 A. Session Law 2009-479 / House Bill 709... I-2 B. Public Consultation... I-3 C. Selection of Study Sites... I-5 D. Limitations of Study... I-8 II. Physical Assessment...

More information

Product Specification

Product Specification Product Specification SCA620-EF8H1A SINGLE AXIS ACCELEROMETER WITH ANALOG INTERFACE The SCA620 accelerometer consists of a silicon bulk micro machined sensing element chip and a signal conditioning ASIC.

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

VICINITY MAP LOCATION MAP GRAPHIC SCALES

VICINITY MAP LOCATION MAP GRAPHIC SCALES VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

TABLE OF CONTENTS. Executive Summary 1 Acknowledgements 3 Introduction 3 Storm Recovery and Beach Project Effectiveness 3

TABLE OF CONTENTS. Executive Summary 1 Acknowledgements 3 Introduction 3 Storm Recovery and Beach Project Effectiveness 3 TABLE OF CONTENTS Executive Summary 1 Acknowledgements 3 Introduction 3 Storm Recovery and Beach Project Effectiveness 3 Monmouth County 4 Figures 1a-1d. Monmouth County Station Locations 5 Site Descriptions

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

INTELLIGENT COMPACTION

INTELLIGENT COMPACTION INTELLIGENT COMPACTION Directions to the Future Jimmy Si, Ph.D., P.E. San Antonio, TX, Mar. 20, 2014 Table of Contents 1 What Is Intelligent Compaction 3-5 2 Why Use Intelligent Compaction 6-8 3 National

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

Technologies, Inc. Installation Instructions for Anchors & Components. Rev PAGE 1 / 11

Technologies, Inc. Installation Instructions for Anchors & Components. Rev PAGE 1 / 11 Installation Instructions for Anchors & Components PAGE 1 / 11 GROUND ANCHOR INSTALLATION INSTRUCTIONS NOTE: 1) The tensioning bolt can be inserted in the head from either side. 2) In areas of severe cold

More information

6'' W 8'' W 8'' W 4'' SAN 4'' SAN 2'' W 6'' W 6'' W INSTALL C.U. PAD (SEE MECHANICAL). M FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM TOP OF TOP OF SW

More information

IGLOO MODIFICATIONS CHARLIE AREA BELLEMONT FLAGSTAFF ROADWAY/ RAILROAD NEAR BUILDING 350 CHARLIE AREA IGLOOS N Not to Scale IGLOO MODIFICATIONS CHARLI

IGLOO MODIFICATIONS CHARLIE AREA BELLEMONT FLAGSTAFF ROADWAY/ RAILROAD NEAR BUILDING 350 CHARLIE AREA IGLOOS N Not to Scale IGLOO MODIFICATIONS CHARLI ILOO MODIFICATIOS CHALIE AEA BELLEMOT FLASTAFF OADWAY/ AILOAD EA BUILDI 30 CHALIE AEA ILOOS ot to Scale ILOO MODIFICATIOS CHALIE AEA Vicinity Map Western Technologies Inc. Job o. 224JK132 Plate 1 ILOO

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Digitally Signed 06/02/2015

Digitally Signed 06/02/2015 Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY

More information

SURVEY OF SEAGRASS BEDS AT PLACEMENT AREA 62, WEST BAY CONTRACT FOR GIWW, TEXAS CAUSEWAY U. S. ARMY CORPS OF ENGINEERS CONTRACT NO.

SURVEY OF SEAGRASS BEDS AT PLACEMENT AREA 62, WEST BAY CONTRACT FOR GIWW, TEXAS CAUSEWAY U. S. ARMY CORPS OF ENGINEERS CONTRACT NO. SURVEY OF SEAGRASS BEDS AT PLACEMENT AREA 62, WEST BAY CONTRACT FOR GIWW, TEXAS CAUSEWAY U. S. ARMY CORPS OF ENGINEERS CONTRACT NO. W912HY-10-C-0036 Prepared for: RLB CONTRACTING, INC. P.O. Box 1739 Port

More information

New Jersey Regional Sediment Management

New Jersey Regional Sediment Management New Jersey Regional Sediment Management RSM Demo: Cape May Inlet / Wildwood Sand Bypassing Project Ocean County N Atlantic Ocean Atlantic County Delaware Bay Cape May County 8 0 8 16 Miles Regional Sediment

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Hartwell Lake Application for Dry Dredging

Hartwell Lake Application for Dry Dredging Hartwell Lake Application for Dry Dredging Applicant: Mailing Address: E-Mail Address: Day Time Phone Number/s: Dredging Site Address: Subdivision: Lot #: Shoreline Use Permit #: Next Upstream Permit #,

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223 PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR

More information

Feasibility Study To Define Costs & General Conditions For Construction of Improved Entrance Structure

Feasibility Study To Define Costs & General Conditions For Construction of Improved Entrance Structure Feasibility Study To Define Costs & General Conditions For Construction of Improved Entrance Structure From Lake Michigan Into Mona Lake Muskegon County, Michigan Muskegon Chronicle, August 2007 Prepared

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc

More information

Town of Apex, North Carolina

Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule

More information

Stormwater & Water Quality Training Programs for Colorado

Stormwater & Water Quality Training Programs for Colorado Altitude Training Associates, LLC www.altitudeta.com Stormwater & Water Quality Training Programs for Colorado WINTER/SPRING 2018 Contact: Scott Olson scott@altitudeta.com (307) 630-8110 Altitude Training

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

LD ma very low quiescent current linear regulator IC. applications. Description. Features SOT23-5L. DFN4 1x1

LD ma very low quiescent current linear regulator IC. applications. Description. Features SOT23-5L. DFN4 1x1 200 ma very low quiescent current linear regulator IC Datasheet - production data DFN4 1x1 SOT23-5L Applications Mobile phones Personal digital assistants (PDAs) Digital still cameras (DSC) Cordless phones

More information

Old House Channel Bathymetric and Side Scan Survey

Old House Channel Bathymetric and Side Scan Survey FIELD RESEARCH FACILITY DUCK, NC Old House Channel Bathymetric and Side Scan Survey COASTAL AND HYDRAULICS LABORATORY FIELD DATA COLLECTION AND ANALYSIS BRANCH Michael Forte December 2009 View looking

More information

SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES. Model GEO-LOK. Roctest Limited, All rights reserved.

SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES. Model GEO-LOK. Roctest Limited, All rights reserved. INSTRUCTION MANUAL SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES Model Roctest Limited, 2013. All rights reserved. This product should be installed and operated only by qualified personnel. Its

More information

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location: Rec d Rec d: GWINNETT COUNTY Department of Planning & Development One Justice Square 446 West Crogan Street, Suite 150 Lawrenceville, Georgia 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

Plastibeton Trench System. Installation Packet

Plastibeton Trench System. Installation Packet Plastibeton Trench System Installation Packet Plastibeton Installation Guide This Installation Guide is intended to assist in the preparation and installation of Plastibeton products manufactured by Oldcastle

More information

MILL HILL ARTS VILLAGE

MILL HILL ARTS VILLAGE OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M OCTOBER 7, 2013

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M OCTOBER 7, 2013 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M OCTOBER 7, Introduction The Primrose South in situ oil sands project is located in the Cold Lake Air Weapons Range approximately 65 km north-northeast

More information

ULIAN KISSIOV 476 PRESIDENTIAL LANE MADISON, WISCONSIN PHONE: NORTH

ULIAN KISSIOV 476 PRESIDENTIAL LANE MADISON, WISCONSIN PHONE: NORTH 3601 CROSS HILL DRIVE, MADISON, WI 2906 MARKETPLACE DRIVE, STE. A MADISON, WISCONSIN 53719 CONTACT: JON LANCASTER PHONE: 608-450-6181 email: jonelancaster@gmail.com ULIAN KISSIOV 476 PRESIDENTIAL LANE

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Raging River Quarry Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016 Introduction The Raging River Quarry operates in unincorporated King County, near Fall City, Washington. King

More information

Instruction with Hands-on Practice: Creating a Bathymetric Database & Datum Conversion

Instruction with Hands-on Practice: Creating a Bathymetric Database & Datum Conversion Instruction with Hands-on Practice: Creating a Bathymetric Database & Datum Conversion Tanya Beck Coastal and Hydraulics Laboratory Engineer Research and Development Center May 17, 2010 US Army Corps of

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

Shoe Box Activity Constructing a Topographic Map

Shoe Box Activity Constructing a Topographic Map Shoe Box Activity Constructing a Topographic Map Background Information All maps are models of some feature of the real world. The kind of map oen used by scientists is called a contour or topographic

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

Surveying & Measurement. Detail Survey Topographic Surveying

Surveying & Measurement. Detail Survey Topographic Surveying Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations

More information