1 Amr Cme. Build. Hpe. Single Huse (01-18) 1

2 Amr Cme. Build. Hpe. Single Huse (01-18) 2 TABLE OF CONTENTS BEFORE YOU BEGIN: Inventry and Srt... 3 PHASE ONE: Slab PHASE TWO - A: Framing... 7 PHASE TWO - B: Wall Prep & Rfing PHASE THREE: Stucc... 24

3 Amr Cme. Build. Hpe. Single Huse (01-18) 3 Inventry and Srt Welcme t yur Amr Ministries building prject! This is yur guide t the cnstructin prcess. It is cntinually updated, s even if this is nt yur first prject, please read these instructins t familiarize yurself with recent changes. If this is yur first prject, we recmmend that yu keep this entire manual handy, alng with the tri-fld Site Freman s Guide, which cntains gd tips fr getting yur entire build crew invlved. They are bth designed t help yu prgress step-by-step thrugh the cnstructin prcess. STEP 1. AT THE SITE The hmewner has already determined where the hme is t be built. They have taken int cnsideratin their neighbrs, existing structures, and their family s needs. Please make every effrt t hnr their requests. It s always helpful t sketch ut the flr plan, including the psitining f drs and windws in accrdance with the family s wishes. They have already wrked t level the wrk site. Clear the area fr the slab. Dn t assume anything; ask where t place all items cleared frm the wrk area. Check fr a water surce in case the family is relying n deliveries r brrwed barrels. STEP 2. MATERIAL INVENTORY In the days prir t yur arrival, all the materials fr the prject were delivered t the wrk site. Using the material checklist prvided belw, lcate and inventry everything necessary t cmplete the prject. 10 kgs. - 1 bag 1 ¼ in. Rfing nails (Tachuelas) 1 Brush (Brcha) 1 galln Rfing tar (Brea en fri) 6 meters Sand and gravel (Arena y grava) 2 Windws (Ventanas) 1 Dr (Puerta) 3 Hinges (Visagras) 1 Dr knb (Chapa) 6 Family prvides water barrels (La familia prprcina tambs de agua) STEP 3. SEPARATE AND SORT THE LUMBER The mst cmmn mistake ccurs when cutting lumber and plywd. It is very imprtant t avid cutting the 12 ft. 2x4s needed fr the rf. Find 18 straight and strng 12 ft. bards fr the rf (n large knts r splits). Mark and set them aside s that they wn t be cut r used fr anything else. * Nte: Check 8 fters and 12 fters fr unifrm length! * See site Freman s Guide fr mre time saving tips. NAIL DIAGRAMS 1 ¼ in. Rfing Nail ft. tw-by-furs (Barrtes) ft. tw-by-furs (Barrtes) ft. ne-by-furs (Latilla) 9 Plywd (Petatill) 4 rlls Felt paper (Felpa) 4 rlls Rll rfing (Arenad) 2 rlls Chicken wire (Alambre de pll) 8 kgs. Bailing wire (Alambre recsid) kg. Bags cement (Cement) r kg. Bags 18 Mud sill anchrs (Anclas) 8 Hurricane straps (Sprtes del tech) 3 bags High Tech fibers (Fibra) 14 kgs. - 1 bag 16-penny nails (Clavs grandes) 5 kgs. - 1 bag 8-penny nails (Clavs medianas) 8-penny (2 ½ in.) 16-penny (3 ½ in.) *Standard Measurement Abbreviatins 8 Feet = 8 ft. = 8 8 Inches = 8 in. = 8 tw-by-fur = 2x4 ne-by-fur = 1x4

4 Amr Cme. Build. Hpe. Single Huse (01-18) 4 YOU WILL NEED: 7 12 ft. tw-by-furs 2 8 ft. tw-by-furs 18 Stakes kg. Bags f cement r kg. Bags 18 Mud sill anchrs 1 Large pile f sand and gravel 4 Barrels f water (r mre) 3 Bags f High Tech fiber penny nails STEP 1. LEVEL THE GROUND (DIAGRAM 1 = D1) It is wise t level an area at least 6 in. larger than the 11 ft. x 22 ft. fundatin. Allw 2 ft. f wrk space arund the utside f the fundatin s that yu have rm fr wrking. If yu dn t have enugh rm, cnsult yur Amr Team Member. STEP 2. BUILD THE FOUNDATION FORM (D1) Use six 12 ft. 2x4s t cnstruct the frm. If at all pssible, d nt cut these! They will be used later in the building prcess. Fllwing Diagram 1, put the frm tgether, using tw 16-penny nails in each crner jint. The interir dimensin shuld equal 11 ft. x 22 ft., s that the finished slab will equal 11 ft. x 22 ft. Use an 8 ft. 2x4 t cnnect the 12 fters tgether fr the tw 22 ft. sides. If yu must cut a 12 fter t fit jb circumstances, use the piece later as the tp r bttm plate fr a rake wall. STEP 3. SQUARE, STRAIGHTEN, AND LEVEL THE FORM (D1) Measure diagnally frm crner t crner, as shwn in Diagram 1. The frm is square when the tw crss-measurements are equal. After the tw crss measurements are equal, stake arund the utside f each crner f the frm t hld it in place. D nt put any nails in the stakes at this pint. After yur frm bards are square, the bards need t be straightened. Use a string line frm end t end as a guide. Secure a stake n the utside f the frm where the bard is even and straight with the string line. Yu will need at least three secured stakes fr each 11 ft. sectin. D nt put any nails in the stakes at this pint. T level the frm, it helps t establish ne crner at permanent height. Set a level in that crner sectin and nail the stakes t the frm when it is level. Frm there wrk yur way arund the frm with the level in each 11 ft. sectin, crner and splice. Nail the stakes t the frm when that area is level. Ntes: SLAB

5 Amr Cme. Build. Hpe. Single Huse (01-18) 5 STEP 4. DIG A FOOTING TRENCH AROUND THE INSIDE OF THE FORM (D2) The fting anchrs the fundatin t the grund and keeps it frm shifting. The trench shuld be n larger than 8 in. wide x 10 in. deep measured frm the TOP f the frm. Use a rund shvel fr this step. Square tip shvels make the trenches t big. STEP 5. LEVEL THE SOIL (D2) Place a 12 ft. 2x4 n edge acrss the tp f the frm, and measure the distance frm the bttm f the 2x4 t the leveled grund. This will shw hw thick the cement will be. Add r remve dirt until the distance is between 3 and 4 inches. Nte: Sft grund will cmpact when yu walk n it. Make sure the grund is cmpact when measuring the slab depth s the slab will nt be t thick. Yu can use a 2x4 (actually 3½ in. wide) n edge t measure the gap underneath. Yu can nail an 8ft. 2x4 n edge t the bttm f the 12 ft. bard t create a depth gauge fr leveling the pad area. An inverted steel rake whse pints are apprximately 3 ½ in. high can als be dragged under the 12 fter as a depth gauge fr leveling the dirt. D1 STEP 6. MIX THE CONCRETE When the frm is level and square, it s time t mix. Mix in a wheelbarrw, r in a mixing bin. The rati is: five shvels f sand and gravel t every ne shvel f cement; make sure t be cnsistent with the size f scps. Larger amunts can be mixed as lng as the rati is 5:1. If rcks and sand are separate r if the pile is unevenly mixed, try t use three sand and tw rck t every ne cement. Add the High Tech fibers at 1/5 bag f fiber t ne sack f cement. Use all three bags t cmplete the slab. This means yu shuld have used ne bag f fiber by the time yu cmplete 1/3 f the slab. If nt, increase the amunt f fiber yu re adding t the mix. Cmpletely mix the dry materials befre adding water, achieving an even clr and texture. Add water gradually and mix until a cnsistency f atmeal is attained. Pur the cncrete int the frm, wrking frm ne end t the ther, leveling as yu g. Dn t bump the frm ut f square r level! Cncrete can get pretty hectic. It helps t lay a 12 ft. bard acrss the frm (starting perhaps 2 ft. away frm ne end) and instruct wrkers t dump cncrete nly n the ppsite side. STEP 7A. TAMP AND SCREED THE CONCRETE (D2) This is the prcess which creates a flat, level surface f cncrete. Once yu have pured a cuple feet f cncrete, take a straight 12 ft. 2x4 (this is yur screed bard) and place it n edge at the 8 8

6 Amr Cme. Build. Hpe. Single Huse (01-18) 6 beginning f yur slab. Tamp the cncrete by lifting ne end f the screed bard and striking the cncrete (alternate sides). This frces rcks dwn frm the surface and brings water up. Tamp rhythmically (and firmly), wrking frm the beginning t the leading edge f the pured cncrete. Make sure that bth ends f the screed bard tuch the frm; if they dn t, yu must remve cncrete t make it level. After tamping, screed the surface as fllws: tw peple shuld take the same bard, start again at the beginning, and saw the bard back and frth between them, mving slwly tward the leading edge f cncrete (See Diagram 2). Keep the bard in cntact with the frm. This will push a lt f cncrete ff the tp, and may require anther persn t help pull cncrete away. It may take several passes t make the surface smth, and yu may need t screed it again later if it is disturbed, r puddles f water frm n the surface. STEP 7B. PLACE THE MUD SILL ANCHORS (D1 & D3) Anchrs are used t secure the walls f the huse t the fundatin (Diagram 1). As yu pur cncrete dwn the frm, yu can place anchrs in the area already tamped and screeded. The mud sill anchrs are placed 10 in. frm each crner and equally spaced alng the edge f the slab, three anchrs in each 11 ft. sectin (See Diagrams 1 & 2). DO NOT PLACE AN ANCHOR IN YOUR DOORWAY! STEP 7C. TROWEL THE CONCRETE Cncrete at this pint can be very different depending n quality and carseness f materials, timing and quality f screeding, and time f day and temperature. If the surface after screeding is still rcky, tamp it again and mre firmly! Next, yu will need t trwel it with flats (trwels made f wd r magnesium) t get an even surface. Once the surface is fairly smth, it is best t leave it alne fr 20 t 30 minutes. The best finish is btained when the cncrete has been allwed t dry until it is n lnger shiny. When yu are ready, use finish trwels (large, smth metal trwels) t make the surface cmpletely smth. Using scrap wd t stand n, begin frm the center f the slab and wrk yur way ut, smthing ver yur wn bard marks as yu mve. Apply a little water where necessary (spray bttles are handy). Tip up the leading edge f the trwel and use lts f dwnward pressure. This is the secret t gd finish trweling. Use the trwel as yu wuld a butter knife: mre angle fr scraping, less angle fr smearing. D PROPER ANCHOR PLACEMENT!

7 Amr Cme. Build. Hpe. Single Huse (01-18) 7 FRAMING YOU WILL NEED: Ntes: ft. tw-by-furs 83 8 ft. tw-by-furs ½ bx 16-penny nails The huse is built using seven separate wall sectins. Fur walls are 11 ft. lng with straight tps. Three walls are 10 ft. 5 in. lng and have slping tps; these are called rake walls. After the materials are srted, yu may build the walls in any rder. Try t develp a system that wrks best fr yur team. Fllw the basic design s that yu d nt run shrt f materials. STEP 1. BUILDING A STANDARD WALL Sketch ut a flr plan with the family fr the lcatin f drs, windws, and pitch f the rf. Of the fur standard walls, tw will be built with 8 ft. studs and tw with 7 ft. studs. Nte: Always use 16-penny nails t cnnect 2x4s! STEP 2A. STANDARD 8-FOOT WALL WITHOUT DOORS OR WINDOWS (D4 & D5) Tw 11 ft. 2x4s will be used as plates and nine 8 ft. 2x4s are needed fr studs. Place the tw 11 ft. bards face-t-face n edge, flush n bth ends. Measure alng the bards and make a mark n bth bards every 2 ft. On the right side f each mark place an X. Place an X n each end f bth bards, as well. The 8 ft. studs are placed between the 11 ft. plates, n the X and next t the 2 ft. mark. Nail the studs t the plates using 16- penny nails (the largest), tw nails in every jint (See Diagrams 4 & 5). Repeat the prcess t build anther 8 ft. wall and tw 7 ft. walls. Sme studs have nly three crners. Make sure the gd side f the studs face ut fr the nrmal studs. Fr the Califrnia crners, the gd side shuld face the inside f the huse Only use 2x4s with cmplete r square edges fr the rugh penings f the dr r windws. STEP 2B. ADD A DOOR OPENING TO A WALL (D6 & D7)!!!DOOR SIZE WILL VARY!!! Measure the utside dimensins f yur dr. Make yur drway is 2 in. wider than the dr and ¾ in. taller than the dr, remember yu will cut the bttm plate ut f the drway after the walls are up, s measure accrdingly.. (See Diagrams 6 & 7). If the family wants a dr centered in a wall sectin, center it within the sectin, using whatever methd seems best, but make sure that the rugh pening fr the dr is the prper width and the prper height.

8 STEP 2C. ADD A WINDOW OPENING TO A WALL (D8 & D9) First, verify the style f yur prject s windws Nt all but mst Windws used by Amr Ministries are 24 tall by 48 wide. T frame the windw pening Cut tw pieces f 2X4 t 24 lng. Sme f The windws we use have a channel n either side that yu will slide the tw pieces yu just cut int.!check windw style! Nt all f the windws we receive frm ur vendrs have a channel Nw measure frm the utside f the wd acrss the windw t the utside f the ther side t get yur width, and measure frm the bttm f the windw t the tp and this measurement will be yur height. Add a ½ nt these measurements and this will be yur rugh windw pening. (Example: If the windw size is 24 wide by 36 tall, yu will frame the pening 24 ½ X 36 ½ ) Measure frm the bttm f the bttm plate, mark the tw studs at 4ft. this will be the inside f the bttm plate fr yur windw pening. Nail a bard measuring a half inch larger than yur actual windw size belw this line and then measure frm there t get the psitin f yur tp bard. (See Diagrams 8&9) STEP 3. ADD THE CALIFORNIA CORNERS (D11 & D4 D10) On bth ends f each 11 ft. straight wall sectin, add a Califrnia crner. This is dne by placing a 2x4 at right angles t the utside stud. Nail int the 11 ft. plate at bth ends and t the utside stud in at least three places (See Diagram 11 r Diagrams 4 thrugh Diagram 10 shaded areas indicate Califrnia crners). When the walls are raised, the Califrnia crners must be flush t the inside f the huse. at the 2 ft., 4 ft., 6 ft. levels, and alternate nailing the fire blcks n the tp r bttm f the line giving a staggered difference f 1¾ in. n each blck (See Diagram 4-10). D nt allw fire blcks that are t lng t bulge end wall studs r dr and windw penings. Als, there are tw exceptins where fur fire blcks are needed (See Diagrams 12 & 16). STEP 6. BUILD THE ROOF SECTIONS (D18) Take the ft. 2x4s that were laid aside earlier and cut 14 bards t 11 ft. 9 in. Make sure the remaining fur 2x4s are exactly 12 ft. If yu have less than 18 f the 12 ft. bards r if all were cut t 11 ft. 9 in. in errr, cnsult yur Amr Team Member. Take tw f the 12 ft. 2x4s and place them face-t-face n edge, flush n bth ends. Measuring frm ne end, make a mark every 2 ft. n bth 12 ft. bards. Nail an 11 ft. 9 in. 2x4 centered n each mark. This is different than the walls, and is abslutely crucial if the plywd is t fit the rf well. Finally, nail three 21¾ in. 2x4s between the first and secnd rafters, spaced 3 ft. apart n ne end nly f each rf square. These are called utriggers and are fr the supprt f the utside rafter. N fire blcks are needed n the rf, nly bird blcks (Phase Tw-B, Step 5) and utriggers. Build tw identical sectins at these specificatins (See Diagram 18). Bird blcks may be pre-measured, pre-cut and numbered t each pening t speed up later assembly. D nt install bird blcks until the rf sectins have been placed n the walls, squared, and nailed dwn. NOTES: STEP 4. BUILD THREE RAKE WALLS (D12-D17) Cnsult with the family regarding the placement f any drs (especially the interir rake wall drway) r windws in the rake walls and then refer t Steps 2b and 2c. Start with a 10 ft. 5 in. 2x4, a 10 ft. 5 5/8 in. 2x4, an 8 fter, and a 7 fter. The 10 ft. 5 5/8 in. bard will be the tp plate f the wall and the 10 ft. 5 in. will be the bttm plate. Nail these tgether (Diagram 12 17).Square the tw bttm crners and nail a blck diagnally acrss each t keep it square. Make marks every 2 ft. n the 10 ft. 5 in. side, as yu did fr the 11 ft. walls. Select ne very straight 8 ft. 2x4 and place ne end n each mark in turn. Square this bard with the bttm plate, than mark it at the tp plate t indicate where the stud shuld be nailed. Then measure the distance between tp and bttm and cut a different bard t fit. Keep the straight bard fr measuring each stud. Repeat t build tw mre walls. Rake walls d nt need Califrnia crners. STEP 5. ADD FIRE BLOCKS TO THE WALLS (D4 D17) Fire blcks are necessary t make the huse mre rigid, and t prvide a place t nail the uter cvering f the huse t the walls. Put three fire blcks between every tw studs in every wall, except fr the interir (center) rake wall. The fire blcks shuld be spaced 2 ft. apart and staggered slightly fr easier nailing. Mark Amr Cme. Build. Hpe. Single Huse (01-18) 8

9 Amr Cme. Build. Hpe. Single Huse (01-18) 9 9

10 Amr Cme. Build. Hpe. Single Huse (01-18) Applies t D5 + D6 12

11 Amr Cme. Build. Hpe. Single Huse (01-18) 11

12 Amr Cme. Build. Hpe. Single Huse (01-18) 12

13 Amr Cme. Build. Hpe. Single Huse (01-18) 13

14 Amr Cme. Build. Hpe. Single Huse (01-18) 14

15 Amr Cme. Build. Hpe. Single Huse (01-18) 15

16 Amr Cme. Build. Hpe. Single Huse (01-18) 16 STEP 7. ENDING AT PHASE TWO-A If stpping here, stack the finished walls n the slab and secure all remaining materials with the family. PHASE TWO-B >

17 Amr Cme. Build. Hpe. Single Huse (01-18) 17 YOU WILL NEED: ft. ne-by-furs 9 4 ft. x 8 ft. sheets f plywd 4 rlls Black felt paper 4 rlls Sand and tar rfing paper ½ bx 1½ in. rfing nails ¼ bx 8-penny nails 2 rlls Bailing wire 2 rlls Chicken wire 1 gal Cld tar & brush penny nails 16 8 in. tw-by-furs 8 Hurricane Straps Wall Prep & Rfing Ntes STEP 1. STANDING UP THE WALLS T ensure that the walls will be straight, yu can make straight lines n the slab with a chalk line. G t each crner f the fundatin. Mark 3½ in. in frm the utside edge f the slab in bth directins. Use the marks t snap chalk lines arund the slab. Take ne f the 11 ft. walls and stand it n the slab alng the 22 ft. chalk line. Cnsult yur flr plan again t make sure it is in the crrect psitin. The Califrnia crners shuld be n the inside f the huse. Line up the end f the wall with the utside edge f the fundatin. D nt nail any anchrs until all walls are in place. The next wall t stand is an end rake wall. This will als be lined up with the chalk line, and between the inside edges f the 11 ft. walls (See Diagram 4, TOP VIEW). This is why the rake walls are built with a 10 ft. 5 in. bttm plate, s that it will fit between the 11 ft. walls. Stand the rake wall and nail it t the first wall, using tw 16-penny nails (side-by-side) every 2 ft. Make sure t nail int studs whenever pssible, as well as Califrnia crners. Stand and nail the rest f the walls. Be certain that the interir center wall is in place prir t getting all f the utside walls std. Nail the center rake wall s that it is centered n the jint where tw 11 ft. walls meet (See Diagram 11, TOP VIEW). Once all f the walls are std and nailed tgether, Square the bttm f the huse by using the same methd f crss taping as yu did when squaring the frms fr the slab. STEP 2. NAIL IN THE MUD SILL ANCHORS Once all walls are up, finish centering the structure n the slab. When the final psitin is assured, fld the mud sill anchrs ver the plates and nail them in with 8-penny nails. CAUTION! Anchrs can have sharp edges. Except fr the threshld, drive a few 16-penny nails thrugh the bttm plate in t the slab t secure the rake wall t the flr. D the same n either side f the dr pening. STEP 3. PLUMB AND BRACE ALL WALLS T plumb a wall, place a level vertically n the utside f the wall at a crner and check t see if it is straight. With the bttm f the wall secured, mve the tp f the wall back and frth until it is plumb. Brace the wall by nailing an 8 ft. 2x4 frm the crner stud t the bttm plate diagnally acrss the inside f the wall. D this n all seven walls. It is essential fr safety. Duble check windw and dr penings fr accuracy.

18 Amr Cme. Build. Hpe. Single Huse (01-18) 18 STEP 4. DOOR INSTALLATION Determine which way the hmewner wuld like the dr t swing and pre-hang the dr n a 2x4 hinge plate with the pins n tp. Cut ut the bttm plate. Center the dr in the rugh pening and nail the stud directly t the adjacent stud in the rugh pening using nly a cuple f 16-penny nails. Check the full swing f the dr and be sure there is ¼ in. f clearance all the way arund. If the dr swings prperly finish the installatin by installing the lck set. D nt install 1x4 trim until step 17! STEP 5. PLACE THE ROOF SECTIONS ON TOP OF THE WALLS (D19) The utriggers rest ver the utside rake walls. Once the tw sectins are resting n tp, nail them nly t each ther s that they are even. Center this jint abve the middle rake wall. Leave an equal verhang n the 22 ft. sides f the huse. Use a string line r a gd eye t make sure yur rf line is straight, and dn t trust the tp f the wall t be straight! Nail the high side f each rafter int the tp plate f the wall in bth directins (tenail), using tw 16-penny nails per rafter. Finish squaring the rf by crss-measuring befre nailing dwn the lw side f the rf. When the rf is square, nail the utriggers and the lw side f each rafter t the huse in the same manner. If yu d nt have 30 ft. tape measures, measure frm the tp utside crners t the furthest rafter n the ppsite edge. The rf shuld nt be mre than ½ in. ut f square. Lcate all 8 hurricane srtaps in yur materials. The straps are installed inside the huse with 8-penny nails. A single huse has tw rf panels. The hurricane straps shuld be placed in all fur crners f each rf panel (See Diagram 19). STEP 6. PLACE BIRD-BLOCKS ON THE ROOF (D20) Nail blcks between each f the rf rafters and each f the utriggers directly ver the tp f the wall flush with the utside f the wall (See Diagram 20). This is t prevent wind and birds frm getting int the huse after the plywd is n the rf. This step must be well under way befre starting Step 7. The blcks are much harder t add after the plywd is n. Since nly a few peple will be wrking n bird blcks, this is a great time fr the rest f the crew t make tar squares (Step 14) and t start the bailing wire prcess (Step 11). STEP 7. POSITION THE PLYWOOD ON THE ROOF (D21) Stagger the plywd n the rf (Diagram 21). The ends f each sheet shuld meet tgether in the middle f a rafter. Cut a sheet f plywd in half fr the ends f the middle rw (Place cut edge ut). Pre-nail the crners f the plywd leaving the nail sticking up ¼ in. D nt cmpletely sink any nails until the three rws f plywd are installed. This allws warped rafters t be adjusted as each rw falls int place. Nail fur 8-penny nails in each rafter per sheet. Never have mre than 1000 lbs. r five peple n the rf, and avid standing in a grup. It helps t use a chalk line when laying plywd. This ensures that the plywd will fit the rf squarely. Make chalk lines hrizntally acrss the rafters at fur and eight feet (the lng hrizntal lines in Diagram 21). If plywd sheets dn t meet n a rafter, it is ften because f warped rafters. Yu shuld crrect the rafter, straightening it while yur partner nails. In cases where this is nt enugh, yu shuld measure and cut a secnd rafter t be nailed adjacent t the rafter in questin. This shuld als be dne t rafters which are split r have knts. Ntes:

19 Amr Cme. Build. Hpe. Single Huse (01-18) 19

20 Amr Cme. Build. Hpe. Single Huse (01-18) 20 STEP 8. LAY THE FELT PAPER ON THE ROOF (D22) After the plywd is securely nailed dwn, lay the black felt paper n the rf. Begin n the lw side f the rf. Allw n mre than 3 in. f paper t verhang each edge f the rf. Anything lnger than 3 in. will need t be trimmed later. Once the rw is straight and as flat as pssible, nail the verhang dwn every ne ft alng the utside edges f the rf frame and every 2 ft. int a rafter alng the tp edge f the paper, using the 1 ½ in. rfing nails. D nt nail the verhang thrugh the plywd but rather thrugh the side f the 2x4 rf frame (Diagram 22). The next rw verlaps the first by 3 in. On sme rws, the paper rll will run ut befre the rw is cmpleted. Simply cntinue with a new rll and verlap the ld sectin by 1 ft. If yu think yu are behind yu can d this step at any ther pint f the building prcess even while yu are stuccing. STEP 9. LAY THE ROLLED SAND-AND-TAR ROOFING PAPER ON THE ROOF (D23) Fllw the same pattern used fr the felt, but nail the lwer edge f the first rw f paper every 1 ft. n the utside edges f the rf frame and the tp edge every 2 ft. Make sure there are n waves r bubbles in the rfing paper, r else water will build up n the rf and cause leaks. Rfing paper has a lt f sand glued t the frnt. It s easiest t cut frm the back f the paper. Carefully drive the nails with a smth face hammer s they dn t rip the paper. Unlike the felt paper, the sand and tar paper requires sme cld tar. After laying dwn each rw, tar the tp 2 in. f the paper s that the next rw will cver it. Use a stick t pull the tar ut f the can. A brush is prvided t smth ut the tar. Nail alng the tar line verlap every 2-3 in. Make sure t use an unbrken rll f paper n each rw. STEP 10. TRIM THE ROOF EDGE Overlap the 1x4 s it meets flush at the crners f the rf. Take the 1x4 bards and nail them with 8-penny nails, tw nails every tw feet, arund the face f the rf edge, cvering the verlap f paper. Flush the 1x4 with the bttm f the utside rafter. This will prevent the paper frm being weathered ff the edges f the rf. Use smth face hammers! Cut ff any paper which prtrudes beneath the 1x4. After the rf is trimmed and everyne is ff the rf, tar the nail heads n the rfing paper with the extra tar.

21 Amr Cme. Build. Hpe. Single Huse (01-18) 21

22 Amr Cme. Build. Hpe. Single Huse (01-18) 22 STEP 11. PREPARE BAILING WIRE Bailing wire is needed as backing fr the felt paper n the walls. Using rfing nails drive the nails in halfway t allw the wire t be wrapped arund them. The nails shuld be placed vertically in a line, 5 in. apart, n the end studs f every exterir wall sectin (six sectins ttal) and vertically n the sides f windw and dr penings. D nt wire acrss dr r windw penings. Wire shuld be strung tightly, and as free f kinks and bends as pssible. This step definitely calls fr beying the spirit f the technique, nt the letter. What yu re trying t achieve is a wall cvered with wire with n vertical gaps greater than 5 in. This step can be dne befre the walls are std, hwever, d nt tighten (Step 12) the bailing wire until the wall sectin is plumbed and braced. STEP 12. TIGHTEN THE BAILING WIRE (D24) Tighten the wire by pulling up, clse t the stud, n each wire and nail the wire int place. Mve t the first stud which has nt been nailed. Tighten the wire by pulling up n each wire that crsses the stud and nail the wire int place. G t the next stud and push dwn n each wire and nail. Alternate this pattern until yu reach the end f the wall. D nt verstretch the wire, and d nt pull with hammers (See Diagram 24). STEP 13. MAKING THE TAR SQUARES Yur grup des nt need t make r use tar squares unless yu believe wind might blw the tar paper ff, r if yu plan t leave the paper up vernight withut installing chicken wire. Plain rfing nails r a staple gun can be used instead f tar squares. Tar squares are made frm narrw strips f black felt paper and rfing nails and will be used later t secure the felt paper t the utside f the walls. Cut a strip f felt paper abut 1 in. wide. Fld it ver itself twice s that yu have a 1 in. square f felt paper three layers thick and push the tip f a rfing nail thrugh the center f it. This is knwn as a tar square and yu will need abut ne full bucket. STEP 14. PUT FELT PAPER ON THE WALLS (D24) An easy methd f applying felt paper is t pre-cut ft. 6 in. pieces. Start n the bttm and wrk yur way up. Be sure t cver the tp and bttm plates. Align ne f the precut pieces with the lwer edge f the bttm plate and run it full length. Make sure there are n bubbles r rips and nail with tar squares, ne per ft n each stud. Overlap the bttm rw by n mre than 3 in. with the next rw up. Nail each rw the same way. If the paper has guidelines r ther ink n ne side, be sure t place that side facing the utside f the huse, as the inside f the walls may nt be finished. Three rws f paper shuld cver a wall. On the rake walls, hang the tp piece f felt paper at an angle, flush

23 Amr Cme. Build. Hpe. Single Huse (01-18) 23 with upper edge f the tp plate. If yu d each wall separately, be sure ne-side wraps arund the crner t avid pen seams. It helps t nail the tp edge f a rw f paper first, and let gravity help yu with the rest as yu nail acrss the middle and bttm f the paper. Cut paper flush frm windw and dr penings. Yu can repair hles in the paper quite easily. Just slip a scrap piece f tar paper behind the hle, between the paper and the bailing wire. Sme teams prefer duct tape and bring their wn. Lse bailing wire can leave deep pckets in the felt paper fr stucc. Rlled scraps f felt paper can be wrked int slack areas between bailing wire and paper t push ut bubbles fr flatter stucc surface. STEP 15. STRETCHING THE CHICKEN WIRE (D25) Tw rws f chicken wire will cver every wall sectin. The wire shuld be as tight as pssible, with n bubbles, r gaps larger than a nrmal (hexagnal) chicken wire hle. This is the mst efficient methd we have fund fr stretching chicken wire: Prepare the tp and bttm f all the walls with a rw f rfing nails in the tp and bttm plates, 6 in. apart; leave the nail heads sticking ut ¼ in. Beginning in the drway leaving 1 ft. f extra material, wrap the huse with ne cntinuus piece ending at the same drway with the same amunt f extra material. Tightly (be sure it s straight t) hk the bttm (duble-strand) wire t the nails and finish the nails in the bttm plate all the way arund the huse. The wire will be sagging ff the huse. D nt wrry. G t the fur crners f the huse and stretch the wire up the wall as far as pssible and nail it. Once the crners have been stretched, mve nt the dr pening. Stretch the wire in the same way and finish nailing the dr frame every 4 in. Nw, wrking yur way frm stud t stud, starting in the middle f each wall sectin, estimate the distance yu can stretch the wire. Place a nail in the stud, ¼ in. expsed, then stretch the wire and hk the tp (duble-strand) wire nt the nail. Finish the nail ff befre mving t the next stud. Yu will find bubbles under a stretched stud can be remved when stretching at the next stud. After the entire wall is stretched, add nails, ne every ft vertically n each stud, and tw nails n each fire blck. With a new rll f wire, in the same way hang the secnd rw f chicken wire frm the tp plate, beginning in the middle f the dr. Leave enugh extra material t verlap the seam at the dr. Fllw the same prcedure as befre in stretching the wire dwn the wall. Befre cutting the wire ut f the drways and windws, thrughly nail chicken wire every 4 in. arund penings t maintain the tensin in the wire. If yu still have bubbles in the chicken wire after yur best stretching effrts ask an Amr Team Member fr guidance. STEP 16. WINDOW INSTALLATION Be sure t check and see that the windw is placed right side up with the latch lcking dwn and n the inside. Then slide the windw int place frm the utside f the huse. Finally, nail the windw int place with the shrt, green 8-penny nails; drive the nails thrugh the flange and int the studs that frame the rugh pening. Be sure t remve the sliding prtin f the windw while yu d this. Yu may find that it s hard t drive the nail all the way in due t the way the windw is built. Take a 16-penny nail and turn it upside dwn t be used as a nail punch.!! D Nt Trim The Windws!! We d nt prvide enugh material t trim the ut the windws. STEP 17. TRIM THE DOOR (D26) The 1x4 acts as a drstp. Using 8-penny nails, surrund the inside f the dr jam with 1x4 trim. This will als act as a place fr the stucc t end at the dr. Cut and fit the 1x4 such that it slides sideways int the dr jamb, the 1 in. side butting up against the dr (See Diagram 26). Use a smth face hammer when nailing the trim. Ntes:

24 Amr Cme. Build. Hpe. Single Huse (01-18) 24 (

25 Amr Cme. Build. Hpe. Single Huse (01-18) 25 STUCCO Yu Will Need: Ntes: kg. Bags f cement (first cat) r 6 50 kg. Bags kg. Bags f cement (secnd cat) r 5 50 kg. Bags 2 Barrels f water (minimum) Remaining sifted sand STEP 1. SIFT THE SAND Using a screen, sift the rcks ut f the remaining sand. Even if yu built the huse yurself, this is a gd time t perfrm a final check f the walls. Remve any chicken-wire bubbles (See Tw-B, Step 13), check fr thrugh nailing f each stud and fire blck, and repair any tar paper (See Tw-B, Step 12) r bailing wire prblems befre yu start stuccing. STEP 2. MIX SAND AND CEMENT 14 (16 if yu have 50 kg. bags f cement) rund shvels f sifted sand with ½ bag f cement. Mix sand and cement dry befre adding water. Add water t the mixture until it reaches the cnsistency f mashed ptates. Rcks are bad! STEP 3. APPLY THE FIRST COAT OF STUCCO Beginning at the bttm f a wall, use a trwel r stucc hawk t put stucc n the wall, always wrking in an upward directin. Make sure that the finish is grved r rugh s the secnd cat f stucc has smething t hld n t. Cver the walls cmpletely, bttm t tp, but allw the chicken wire t shw verall n the first cat. Start n the shady side f the huse at ne crner and wrk arund the huse. By the time yu get arund the huse, the first cat shuld be dry enugh t begin the secnd. STEP 4. APPLY THE SECOND COAT OF STUCCO Apply a secnd cat when the first is cmpletely dry and has begun t change clr. If the first cat f stucc dried vernight, wet the first cat dwn befre yu begin the secnd cat. This will prevent the secnd cat frm drying befre yu can spread it prperly. The mix fr the secnd cat is just a little bit mre cement-rich (a cnsistency like frsting): abut 12 (14 if yu have 50 kg. bags f cement) rund shvels f sand t ½ bag f cement. The secnd cat will be smth, with n wire shwing. Finish with wd r metal trwels. Autmtive spnges, rubber glves, and high-vlume spray bttles are handy finishing tls.

26 Amr Cme. Build. Hpe. Single Huse (01-18) 26 Tl Inventry - When finished with yur rental tls each grup shuld 1. Empty ut yur tl bin COMPLETELY (please n trash, lse nails, etc.) 2. Clean ALL tls! Ladders, Mixing Bins, Wheelbarrws, Cement Tls) 3. Inventry ALL yur tls n this sheet and tell us what is missing. 4. Place the inventry sheet inside the tl bin, n tp f the small tls. 5. Grups renting nly large tls shuld tape the list t a Wheelbarrw Herramientas Grande Herramientas Deben FaltaPequena Deben Falta LARGE TOOLS YOU ITEMS SMALL TOOLS YOU ITEMS SHOU SHOULD YOU LD YOU HAVE ARE HAVE ARE MISSING MISSING Carretillas 2 Serruchs 6 Cajas para mezclar 3 Martills 15 Cubetas 5 Barreta 1 Palas Rednd 6 Navajas 4 Palas cuadrada 2 Crte de Alambre 4 Azadnes 6 Flexmetrs 6 Rastills 2 Escuadras, Grande 1 Pic 2 Escuadras, Chica 4 Escaleras 2 Hil de chalk 1 Cernidr 1 Pata de Chiva 1 Nivel de 4 1 Llanas 10 Wheel barrws 2 Saws 6 Mixing Tubs, Large 3 Hammers 15 Five-Galln Buckets 5 Pry Bars 1 Shvels, Rund 6 Utility Knives 4 Shvels, Square 2 Wire Snips 4 Hes 6 Tape Measurers 6 Rakes 2 Squares, Large 1 Picks 2 Squares, Speed/Tri 4 Ladders 2 Chalk Lines 1 Sand Sifter 1 Nail Pullers 1 4 Level 1 Trwels 10 Grup Name Lapis 5 Grup Name Pencils 5 Sargents rapid 2 Family Ceppill de Name alambre 1 Prject ID# Marr 1 Frmnes 1 Desarmadr 1 Clamps 2 Family Name Wire Brush 1 Prject ID# Hand Sledge 1 Wd Chisel 1 Phillips Screw Driver 1 Charlas cn mang 10 Hawks 10 Nivel de Level 1

Big Kahuna Assembly Instructions

Big Kahuna Assembly Instructions Big Kahuna Assembly Instructins Thank yu fr purchasing a d-it-yurself pergla kit frm Average Je s Pergla Dept. We appreciate yur business, and we are here t help yu in any way pssible. Read this entire

More information

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved Hw t Install a Slate Tile Flr By See Jane Drill TM Cpyright 2014, All Rights Reserved Resurces Needed t Cmplete the Jb Tls & Supplies Pwer drill with mixing want (a bucket trwel can als be used fr mixing)

More information

Installing a Squeak-Free Nascor Floor System

Installing a Squeak-Free Nascor Floor System Nascr s precise manufacturing tlerances deliver a prduct that resists shrinking, warping and twisting the mst cmmn causes f squeaks in flr systems built with dimensinal lumber. Ensuring a squeak-free flr,

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

Take Along Sewing Tote

Take Along Sewing Tote Take Alng Sewing Tte This great tte will hld lts f supplies fr yur take alng prjects. Specifically designed fr English Paper Piecing, any small prject will fit int this tte. Just thrw it in yur purse and

More information

Cyrus Redblock. Kit Inventory

Cyrus Redblock. Kit Inventory Kit Inventry Cyrus Redblck Left and Right Inner Side Panels Frnt and Back Inner Panels Shelf Panel Base Outer Panel Drawer Left and Right Sides Frnt and Back Drawer pieces Drawer Stp and Tw (2) Drawer

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

Dice Box. Kit Inventory. Other Items Needed o Glue I use a craft type tacky glue such as Aleenes Tacky Glue which can be found at craft stores like

Dice Box. Kit Inventory. Other Items Needed o Glue I use a craft type tacky glue such as Aleenes Tacky Glue which can be found at craft stores like Kit Inventry Dice Bx Frnt, Left, Back, Right and Bttm Inner Bx Panels Spacer (left), Sliding Piece (left), and Left Outer Panel Spacer 1 (back), Spacer 2 (back), Sliding Piece (back), and Back Outer Panel

More information

Colourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald Quick Summer Medallion.

Colourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald   Quick Summer Medallion. Quick Summer Medallin 45 x 45 Clurful Stitches 16 (finished) panel r rphan blck fr center ½ yard, center framing triangles ¼ yard, skinny frame brder 1 ⅔ yard, inside setting triangles 1¼ yard, utside

More information

Note: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener.

Note: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener. Made in USA By Dawn Cavanaugh APQS Natinal Educ atin and Service Directr Celebrate summer with this bright, patritic quilt! Use yur favrite methd t secure the stars t lng strips f blue fabric t speed up

More information

Zintra Acoustic Textures Cutting and Installation Instructions for ½ panels

Zintra Acoustic Textures Cutting and Installation Instructions for ½ panels Zintra Acustic Textures Cutting and Installatin Instructins fr ½ panels CUTTING AND FABRICATING PANELS ON SITE Any f the panels can be cut r adjusted n site. This allws fr site adjustments r adaptatins

More information

Owner's Manual & Assembly Instructions. Model No.

Owner's Manual & Assembly Instructions. Model No. Owner's Manual & Assembly Instructins IV0 Mdel N. RGB66ONEU RGB66FGEU 780409 Strage Area: 34 Sq. Ft. Cu. Ft. 3, m 6,0 m 3 BUILDING DIMENSIONS * Size runded ff t the nearest ft CAUTION: SOME PARTS HAVE

More information

BigMouth

BigMouth http://www.scaryguys.cm/bigmuth.htm BigMuth Yu're walking dwn a dark path, and cme upn an area cvered with cam net. On ne wall it lks like a table with a skull perched n the edge. Just cam net hanging

More information

Meet the Science Expert

Meet the Science Expert Smithsnian Latin Center Meet the Science Expert DESCUBRA! CREATE-IT POCKET SCIENCE HANDOUTS DESIGN AND BUILD WIND INSTRUMENTS 1. Overview: Wrking with different sized straws and ther materials (see the

More information

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions Owner's Manual & Assembly Instructins IU01 Mdel N. RGB65ONEU RGB65FGEU 727950119 Strage Area: 27 Sq. Ft. 167 Cu. Ft. 2,5 m 2 4,7 m 3 BUILDING DIMENSIONS * Size runded ff t the nearest ft CAUTION: SOME

More information

Dragon Chest. Kit Inventory. Other Items Needed o

Dragon Chest. Kit Inventory. Other Items Needed o Kit Inventry Dragn Chest Frnt, Back and Base Panels Frnt Bttm Rail, Back Bttm Rail Tw (2) Tp Rails Left Upper Inner End, Left Lwer Inner End Right Upper Inner End, Right Lwer Inner End Left Tngue Piece,

More information

SINGER FUTURA TM Holiday Banner

SINGER FUTURA TM Holiday Banner SINGER FUTURA TM Hliday Banner Have fun decking the halls with this festive banner! It s s simple t make the HyperFnt sftware and yur SINGER FUTURA machine. Create the base applique right in yur embridery

More information

Cascading Skirt Pattern

Cascading Skirt Pattern Cascading Skirt Pattern Fr this pattern yu will need: 1/3 yard f well draping fabric. Swimwear, dance fabrics, and very stretch knits are the perfect fabrics fr this pattern s style. (Yu can use ld T-shirts

More information

To receive a service letter, please scan the Volunteer Log and it to:

To receive a service letter, please scan the Volunteer Log and  it to: Thank yu fr yur interest in helping the animals at San Dieg Humane Sciety s Prject Wildlife! We wuld nt be able t prvide the level f care and cmmitment t ur animals withut the help f peple like yu. This

More information

ASSEMBLE ALUMINUM TOOLBOX

ASSEMBLE ALUMINUM TOOLBOX ASSEMBLE ALUMINUM TOOLBOX INTRODUCTION In this lessn, yu will assemble an aluminum sheet metal tlbx using rivets. Yu will start with a kit that includes pre cut and pre frmed aluminum tlbx panels. This

More information

Pencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft

Pencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft This activity is abut learning hw t use ur pencils t create wnderful images like these. Take a lk at a few that All Saints students have dne in the past. (Take a lk at the riginals at the frnt f the rm

More information

For as long as there have been people trying to find their way, there have been stars to guide them. Stars dance in the heavens weather we see them

For as long as there have been people trying to find their way, there have been stars to guide them. Stars dance in the heavens weather we see them Fr as lng as there have been peple trying t find their way, there have been stars t guide them. Stars dance in the heavens weather we see them there r nt. They warm the darkness f the night and fill us

More information

Build a Gopher Tortoise Burrow. Instructions

Build a Gopher Tortoise Burrow. Instructions Build a Gpher Trtise Burrw Instructins Burrw Supply List 'A PVC pipe (need 5, 10 lng pipes @ 1.75 each = $8.75, Lwe s will cut pipe fr free) Fur 3 pieces Seventeen 2 pieces Fur 4 pieces Five 4 PEX pipe

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

INFINITY ALUMINUM INSTALLATION GUIDE

INFINITY ALUMINUM INSTALLATION GUIDE 1 INFINITY ALUMINUM INSTALLATION GUIDE Revised 01/17 2 PLEASE NOTE All installatins have a varying degree f uniqueness t them. The fllwing instructins are meant t be general guidelines. If yu are installing

More information

6 th and 7 th Grade Advisory Plans (Week 16)

6 th and 7 th Grade Advisory Plans (Week 16) 6 th and 7 th Grade Advisry Plans (Week 16) This week in Advisry: On Mnday students will check in and share ut. On Tuesday- Thursday, students will participate in a fun grup building activity t minimize

More information

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467 Ten-Tec Mdel RX-366 Subreceiver 565/566 Subreceiver Installatin and Operatin Manual-74467 Tls required: Sldering irn r heat gun (fr shrinking heat shrink tubing) Number 1 Phillips screw driver Number 2

More information

Mpressive Threadz Studio

Mpressive Threadz Studio Mpressive Threadz Studi Sewing Schl Prject # 1 Drafting Yur Six- gre Skirt and Fitting It The six gre skirt is easy t draft, easy t sew, and easy t fit. It has a gentle flare t it and it flatters all bdy

More information

Using the Laser Cutter

Using the Laser Cutter Using the Laser Cutter Prerequisites Befre yu will be allwed t use the laser cutter, yu must cmplete these three steps: 1. Yu must have cmpleted the Laser Cutter training at Cyberia 2. Yu must schedule

More information

Samples from

Samples from BCI jist hanger. - Backer blck. Nail with 10 ~ 10d nails. Filler blck. Nail with 10 10d nails. Backer blck required where hanger lad exceeds 1000 Ibs. Backer fr hriznal / siding r stucc. --- BCI jist hanger.

More information

WiFi Lab C. Equipment Needs:

WiFi Lab C. Equipment Needs: WiFi Lab C Event Objective: Teams will cnstruct an antenna prir t the turnament that is designed t transmit a signal at 2.4 GHz and cmplete a written test n the principles f electrmagnetic wave prpagatin.

More information

STRONGHOLD IRON INSTALLATION GUIDE

STRONGHOLD IRON INSTALLATION GUIDE 1 STRONGHOLD IRON INSTALLATION GUIDE Revised 01/16 2 PLEASE NOTE All installatins have a varying degree f uniqueness t them. The fllwing instructins are meant t be general guidelines. If yu are installing

More information

Appendix M Trellis Type Shade Structure Design Guide

Appendix M Trellis Type Shade Structure Design Guide Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis

More information

c2b: slip two stitches onto cable needle and hold behind work. Knit the following two stitches, then knit the two stitches from the cable needle.

c2b: slip two stitches onto cable needle and hold behind work. Knit the following two stitches, then knit the two stitches from the cable needle. Matthew s beanie Materials needed: 1 skein Yarn Bee Sft Secret. The clrs featured are Shale and Hney. Simply Sft yarn by Carn als fits the gauge. Size 4.5mm 16 inch circular needles (fr ribbing) Size 5.5mm

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL Yu will learn the fllwing in this lab: The UNIVERSITY f NORTH CAROLINA at CHAPEL HILL Cmp 541 Digital Lgic and Cmputer Design Prf. Mntek Singh Fall 2016 Lab Prject (PART A): Attaching a Display t the Prcessr

More information

Improv Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America

Improv Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America Imprv Piecing and Matchstick Quilting By Kelly Nagel, Sulky f America What is Imprv Piecing? Piecing withut a set pattern, hwever, yu can plan yur entire quilt befre yu start, if yu chse. This kind f piecing

More information

ANTIOCH UNIVERSITY VIRTIUAL WRITING CENTER

ANTIOCH UNIVERSITY VIRTIUAL WRITING CENTER IDENTIFYING AUDIENCE AND PURPOSE As yu mve further int yur research, it can be helpful t step back and name the purpse and audience yu think yur writing will serve. The prcess belw will help yu sift thrugh

More information

Planning Guide. Create a "wish list" for your new project, and then number the items in order of importance.

Planning Guide. Create a wish list for your new project, and then number the items in order of importance. Rbbinsville, NJ 08691 Email: inf@cenurykitchens.net Planning Guide At Century Kitchens & Bathrms, we can help yu all alng the way, frm start t finish, in the planning, design and cmpletin f yur new kitchen

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

SLATE LITE. handling fabrication and installation guide

SLATE LITE. handling fabrication and installation guide e inf@ handling fabricatin and installatin guide PLEASE CAREFULLY INSPECT THE PRODUCT PRIOR TO INSTALLING, CUTTING, DRILLING OR FABRICATING AND INFORM BARESQUE (Baresque Australia - +612 9966 8470) IMMEDIATELY

More information

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities. ... a. Ul -'" '" c / RIG SOLAR FILM Fr ver 25 years, Thusand Oak Optical has manufactured the mst ppular white lightfilters in the wrld. Nw with the intrductin f the R-G slar film, ur traditin f excellence

More information

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines BASIC SAFETY AND FABRICATION GUIDE Safety Guidelines These manuals are designed t give basic guidelines t help ensure that Century Quartz Stne Surfaces prducts are t be handled, stred, fabricated, and

More information

Elements and Principles of Design Guided Notes

Elements and Principles of Design Guided Notes Name Perid Date Elements and Principles f Design Guided Ntes DO NOT LOSE THIS PACKET!!! We will be using this packet fr multiple days. Yu will nt get anther packet it yu lse this! Elements & Principles

More information

A2: Aperture, DOF, & Focus

A2: Aperture, DOF, & Focus Art 205 A2: Aperture, DOF, & Fcus Original RAW Shts Due: Crit Date: Requires 2 Ink Jet Prints (50 pints) Objectives: 1. T understand hw apertures like f-16 & f-22 have a large DOF r range f fcus. 2. T

More information

21 st Century Shooting

21 st Century Shooting 21 st Century Shting NECK TURNING LATHE USER MANUAL WARNING: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN CAUSE CATASTROPHIC CASE FAILURE RESULTING IN DAMAGE TO YOUR FIREARM AND SEVERE INJURY OR DEATH. Precisin

More information

Pool & Hot Tub Guide

Pool & Hot Tub Guide Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.

More information

60min Tinkerb t games

60min Tinkerb t games 60min + - Tinkerb t games Creepstne Manr has been clsed fr nearly ne hundred years, standing dark and silent abve the twn f Creepstne and that s just the way resident ghst Spkie likes it! But nw the manr

More information

SolarEdge Built-in Revenue Grade Meter Troubleshooting

SolarEdge Built-in Revenue Grade Meter Troubleshooting SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices

More information

MSU Extension Publication Archive. Scroll down to view the publication.

MSU Extension Publication Archive. Scroll down to view the publication. MSU Extensin Publicatin Archive Archive cpy f publicatin, d nt use fr current recmmendatins. Up-t-date infrmatin abut many tpics can be btained frm yur lcal Extensin ffice. Clthing fr Independent Living

More information

Banner pocket v3 Page 1/7. Banner pocket v3

Banner pocket v3 Page 1/7. Banner pocket v3 Banner pcket v3 Page 1/7 Banner pcket v3 Descriptin Banner pcket will help yu get the printed sheets arranged in the way yu need fr attaching the frnt and back side pckets tgether. It will crp ne sides

More information

Desktop Teller Exception User Guide

Desktop Teller Exception User Guide Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw

More information

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server. Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either

More information

Consciousness Shifting

Consciousness Shifting Frmula fr Miracles Presents Cnsciusness Shifting Shift Yur Cnsciusness, Open Yur Mind, and See Int The Matrix With Open Eyes! By Brent Phillips and Daniel Metraux www.frmulafrmiracles.net Shift Yur Cnsciusness

More information

Double Axis Square Turned Bowl

Double Axis Square Turned Bowl Duble Axis Square Turned Bwl Thames Valley Wdturners' Guild Presented by Paul Newtn INTRODUCTION Yur Presenter: Paul Newtn has been wdturning fr apprximately six years. He is a member f the American Assciatin

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Original Recipe. Original Recipe can be found at

Original Recipe. Original Recipe can be found at Original Recipe Have yu ever gtten an idea in yur head and then had a hard time shaking it? It is like a sng that inserts itself int yur day and will nt be abandned. N matter what yu d that silly sng is

More information

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter .,Plc..d,~t l~ucji PA300 DIGITAL BASS PROCESSOR Cngratulatins n yur purchase f a Planet Audi signal prcessr. It has been designed, engineered and manufactured t bring yu the highest level f perfrmance

More information

What your Board Should look like!

What your Board Should look like! What yur Bard Shuld lk like! Fr almst every science fair prject, yu need t prepare a display bard t cmmunicate yur wrk t thers. In mst cases yu will use a standard, three-panel display bard that unflds

More information

DEAD MAN S DOUBLOONS. Rules v1.2

DEAD MAN S DOUBLOONS. Rules v1.2 DEAD MAN S DOUBLOONS Rules v1.2 OVERVIEW Welcme t Dead Man s Dublns, an actin packed bard game fr 2 t 6 players, playable in 30 t 45 minutes. Each player takes n the rle f a legendary pirate ship captain,

More information

Potting Bench BUILD TIME

Potting Bench BUILD TIME Ptting Bench 1 GET MORE PROJECT PLANS AT www.yellawd.cm BUILD TIME Cutting parts: 2 4 hurs Assembly: 6 8 hurs Finishing: 4 5 hurs Ttal: 12 17 hurs Gardening wrk will be mre enjyable and efficient with

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

POWERSLED CIRCUIT INTRODUCTION GAME COMPONENTS

POWERSLED CIRCUIT INTRODUCTION GAME COMPONENTS POWERSLED CIRCUIT WRITTEN & DESIGNED BY Kevin Smith GRAPHIC DESIGN & EDITING Daniel Kast Eric Rennie PLAYTESTING Tm Akerman Rbert Flaharty Keith Hudsn Chris McArthur Glenn Mchn Demian Rse Tm Warhurst Cpyright

More information

Photoshop Elements: Color and Tonal Correction Basics

Photoshop Elements: Color and Tonal Correction Basics Phtshp Elements: Clr and Tnal Crrectin Basics Cntrast Lighten Phtshp Elements: Clr and Tnal Crrectin Basics 1 Sharpen Expsure Phtshp Elements: Clr and Tnal Crrectin Basics 2 Highlights and Shadws All key

More information

SISTEMA ELEVATÓRIO ETV 460A

SISTEMA ELEVATÓRIO ETV 460A Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )

More information

Security Exercise 12

Security Exercise 12 Security Exercise 12 Asynchrnus Serial Digital Baseband Transmissin Discussin: In this chapter, yu learned that bits are transmitted ver a cpper wire as a series f vltage pulses (a prcess referred t as

More information

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Excel Step by Step Instructions Creating Lists and Charts. Microsoft Infrmatin Yu Can Enter in a Wrksheet: Labels: Any type f text r infrmatin nt used in any calculatins. Labels are used fr wrksheet headings and make wrksheets easy t read and understand. Labels can als

More information

Photoshop Elements 7 Intermediate: Layout & Design

Photoshop Elements 7 Intermediate: Layout & Design Phtshp Elements 7 Intermediate: Layut & Design Designing a prject... 2 Preparing pictures fr use in a prject... 2 Creating a new blank dcument... 2 Adding a picture(s) t a prject... 2 Turning n the Ruler/Grid...

More information

Fitting instructions for all. SitaRoof- and renovation outlets, extension elements and accessories

Fitting instructions for all. SitaRoof- and renovation outlets, extension elements and accessories s fr all SitaRf- and renvatin utlets, extensin elements and accessries Cntents General Infrmatin... 01. SitaStandard SitaTrendy - SitaDSS Prfi rf utlet... with extensin unit... 5 02. SitaTrendy screw-n-flange

More information

Building and Installing Bumblebee Houses

Building and Installing Bumblebee Houses 17507 Frt Rad Edmntn AB T5Y 6H3 Phne: 780-643-6732 Email: inf@awes-ab.ca Building and Installing Bumblebee Huses Each spring in Alberta, millins f queen bumblebees wake up frm hibernatin, shake themselves

More information

Spring 06 Assignment 3: Robot Motion, Game Theory

Spring 06 Assignment 3: Robot Motion, Game Theory 15-381 Spring 06 Assignment 3: Rbt Mtin, Game Thery Questins t Rng Yan(yanrng@cs.cmu.edu) Out: 2/21/06 Due: 3/7/06 Name: Andrew ID: Please turn in yur answers n this assignment (etra cpies can be btained

More information

Flux Bender Equalizer

Flux Bender Equalizer Lightning By Audi Flux Bender Equalizer Users Guide 2014 Revised 2015 Cngratulatins n an excellent purchase! This guide was put tgether t help yu get the mst ut f yur investment. Please read this thrughly

More information

COMP 110 INTRODUCTION TO PROGRAMMING WWW

COMP 110 INTRODUCTION TO PROGRAMMING WWW COMP 110 INTRODUCTION TO PROGRAMMING WWW http://cmp110www.web.unc.edu Fall 2011 Hmewrk 3 Submissin Deadline: 10:59 AM, Oct 24 Overview Validating Multiple Chess Mves n a Chessbard Fr this assignment yu

More information

Fitting instructions for all. Sita balcony outlets, extension units and accessoires

Fitting instructions for all. Sita balcony outlets, extension units and accessoires Fitting instructins fr all Sita balcny utlets, extensin units and accessires Fitting instructin Cntents General infrmatin...3 1. Sita balcny utlet with cnnectin sleeve... 4 2. Sita balcny utlet with screw-n-flange...

More information

TROUBLESHOOTING GUIDE

TROUBLESHOOTING GUIDE TROUBLESHOOTING GUIDE Dcument revisin 1.3 Last revised: December 6, 2017 Recn Wireless Blckage and Flw Mnitr Trubleshting Guide 2014-2017 Intelligent Agricultural Slutins All Rights Reserved. Recn Wireless

More information

Roof Safe Netting CONTENTS

Roof Safe Netting CONTENTS Rf Safe Netting CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 3 Technical Data... 4 Size Range Available...

More information

INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC)

INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC) LMI DECEMBER PUZZLE TEST PUZZLES & CHESS -2. DECEMBER 200. INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC) SUBMISSION: http://lgicmastersindia.cm/m2002p 0 PUZZLES 70 MINUTES POINTS TABLE CHESS BATTLESHIPS

More information

Don't let anyone rush you. Take careful notes of everything you see, and go over the notes again before you leave.

Don't let anyone rush you. Take careful notes of everything you see, and go over the notes again before you leave. Bring: Level, nightlight, measuring tape, flashlight Dn't let anyne rush yu. Take careful ntes f everything yu see, and g ver the ntes again befre yu leave. Overall: Check flrs fr signs f misture Lk fr

More information

Lab 1 Load Cell Measurement System

Lab 1 Load Cell Measurement System BME/ECE 386 Lab 1 Lad Cell Measurement System GOALS Lab 1 Lad Cell Measurement System 1) Build and test a lad cell amplifier. 2) Write an Arduin prgram t: a. Acquire data frm a lad cell amplifier b. Cmpute

More information

National Curriculum Programme of Study:

National Curriculum Programme of Study: Natinal Curriculum Prgramme f Study: Cunt in steps f 2, 3, and 5 frm 0, and in tens frm any number, frward and backward. Recall and use multiplicatin and divisin facts fr the 2, 5 and 10 multiplicatin

More information

Waves Review Outline

Waves Review Outline 5.1 Mechanical Waves Waves Review Outline 5.1.1A-B Oscillating Systems T = 1 f perid the time that it takes fr ne scillatin t ccur frequency the number f scillatins that take place in ne secnd 5.1.2A-B

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

A Quick & Dirty Guide to Revising your Novel

A Quick & Dirty Guide to Revising your Novel Sz's Revisins, Lessn 4 1 A Quick & Dirty Guide t Revising yur Nvel Lessn 4: Planning the attack. S, yu figured ut what yur Perfect Bk wuld be in Lessn 3. Nw we're ging t take that and apply it t yur nvel.

More information

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1 Altis Flight Manager PC applicatin fr AerbTec devices AerbTec Altis v3 User Manual 1 Table f Cntents Intrductin...3 Requirements...3 Installatin...3 Applicatin...3 USB Driver fr Altis v3 interface ALink...4.NET

More information

FG-03: Hand Burn Profile

FG-03: Hand Burn Profile FG-03: Hand Burn Prfile Page 1 f 9 SAFETY FIRST Fllw all Caterpillar facility safety standards when perfrming this task. An explsive hazard exists if acetylene leaks when wrking in a cnfined space r if

More information

Non-binding recommended retail-price 2,30. autumn / winter 2011

Non-binding recommended retail-price 2,30. autumn / winter 2011 Nn-binding recmmended retail-price 2,3 autumn / winter 211 348 349 35 351 352 OVERTOP WITH HOOD IN EROICA Size: 36/4, 42/46 Instructins are gien fr size 36/4, with larger sizes in parentheses. 348 Materials:

More information

Design and fabricate a lamp using the given electrical component.

Design and fabricate a lamp using the given electrical component. Lamp Prject: Design and fabricate a lamp using the given electrical cmpnent. Cmplete the fllwing: Preliminary sketches Bill f Materials Dcument Hardware List Dcument Labr Time Estimate Dcument What is

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

Foam Rocket. Rocket Activity. Objective Students will learn about rocket stability and trajectory with rubber band-powered foam rockets.

Foam Rocket. Rocket Activity. Objective Students will learn about rocket stability and trajectory with rubber band-powered foam rockets. Rcket Activity Fam Rcket Objective Students will learn abut rcket stability and trajectry with rubber band-pwered fam rckets. Descriptin Students will cnstruct rckets made frm pipe insulating fam and use

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

Drawing Canvas Word 2007

Drawing Canvas Word 2007 Drawing Canvas Wrd 2007 This is nt an fficial training handut f the Educatinal Technlgy Center, Davis Schl District The Drawing Canvas... 2 Creating the Drawing Canvas... 2 Shapes... 2 Inserting a Shape...

More information

APPENDIX B: DESIGN RATING SURVEYS (DRS)

APPENDIX B: DESIGN RATING SURVEYS (DRS) APPENDIX B: DESIGN RATING SURVEYS (DRS) 1. Is the device handheld? Yes, it s handheld N Nt Explicitly Stated MILK FROTHER DRS (if nt handheld) 2. If the device is NOT handheld, what des it lk like? it

More information

PAPER SPACE AND LAYOUTS

PAPER SPACE AND LAYOUTS PAPER SPACE AND LAYOUTS There are tw distinct wrking envirnments in AutCAD namely: Mdel Space and Paper space. Prjects can be develped by either wrking in the mdel space thrugh the use f MVSETUP r PAPER

More information

Tube Change for PANalytical X-Pert Pro

Tube Change for PANalytical X-Pert Pro Tube Change fr PANalytical X-Pert Pr Hw t change x-ray tube fr PANalytical X-Pert Pr in CSL 1011 @ Flrida State University Dr Thayumanasamy Smasundaram, Senir Research Assciate Flrida State University

More information

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet Twnship f Derry Dauphin Cunty, Pennsylvania Residential Deck Additin Submittal Guide and Cnstructin Fact Sheet The text and illustratins included in this guide represent tables and illustratins frm the

More information

Pre-Installation Preparation Job Aid

Pre-Installation Preparation Job Aid Summary This Jb Aid cvers: ViaSat Installatin Standards Equipment Necessary fr ViaSat Service installatin Installatin Tls Safety: IDU Safety: ODU Safety: Persnal Safety: Wrking Arund Electricity Safety:

More information

Effective Presentations

Effective Presentations Effective Presentatins Surce: Effective Presentatins by Erin B. Lindsay URL: http://www.research.ucla.edu/era/present/sld001.htm Preparatin Effective Slides Graphics Graphs, Diagrams, and Tables Arrangement

More information

I I I I. Assembly Instructions:

I I I I. Assembly Instructions: Tls required: A. Wrenches r ratchets, used fr attaching the elements t the bm and the bm t the mast. 1. 7/16" 2. 1/2" 3. 9/16" B. A 3/8" nut driver, r small crescent wrench fr the feedpint 10-24 nuts.

More information