SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017

Size: px
Start display at page:

Download "SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017"

Transcription

1 Project No , Contract No. E7-09 SECTION 0090 ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. JULY 2, 207 This Addendum No. ( Addendum ) as dated above modifies certain Bidding Documents issued by the El Dorado Irrigation District ( District ) in connection with the District s Carson Creek 2 Lift Station Project. All capitalized terms not otherwise defined herein shall have the meanings provided in the Bidding Documents. There are no other amendments to the Bidding Documents other than expressly contained in this and any other Addenda issued by the District. The Bid Date, Opening Time, and Location are unchanged and remain as follows: Bid Date: July 25, 207 Bid Opening: 3:00 PM Local Time Bid Location: EID Main Offices 2890 Mosquito Road Placerville, CA Item : Attached is the sign-in sheet from the Mandatory Pre-Bid Meeting held on July 0, 207 (Attachment ). Item 2: The following pre-qualified contractors attended the mandatory Pre-Bid meeting on July 0, 207 and remain prequalified to bid on the project:. Auburn Constructors, Inc. 2. Clyde G. Steagall, Inc. 3. GSE Construction Co., Inc. 4. K. W. Emerson, Inc. 5. Mountain Cascade, Inc. 6. Pacific Mechanical Corporation 7. Preston Pipelines, Inc. 8. Syblon Reid 9. TNT Industrial Contractors, Inc. The three other firms that are listed in Section and did not attend the mandatory pre-bid meeting, are now disqualified from bidding Addenda

2 Project No , Contract No. E7-09 Item 3: Section 000 (Summary of Work) Paragraph.7 Permits and Storm Water ADD new paragraph D. as follows: D. The Contractor shall obtain an Encroachment Permit from El Dorado County for the abandonment of the Business Park 3 Lift Station water lateral at the water main in Hillsdale Circle. Item 4: Section (Earthwork) Paragraph 3.0 C Surplus Material ADD new paragraph 5 as follows: 5. Contractor may dispose of excess soil material within the Carson Creek Unit 2 development as directed by Lennar. Contractor shall be solely responsible for all loading and hauling to the designated location. Item 5: Section (Reinforced Concrete Block Masonry) Paragraph.03 A.. ADD the following sentence to the end of the existing paragraph: The desire is to match the color and texture of the CMU blocks used at Lennar s existing Carson Creek Unit development located along Carson Crossing Drive. Item 6: Section 500 (Valves & Miscellaneous Components) Paragraph 2.0 B. REPLACE the first sentence in its entirety with the following new sentence: The plug valves shall be full port, rounded or rectangular. Item 7: Section 500 (Valves & Miscellaneous Components) Paragraph 2.0 K.. REPLACE the phrase Dezurik type with the phrase Dezurik PEF 00% Port. Item 8: Section 700 (General Requirements, Instrumentation).0 E. ADD Technical Systems Inc. and Tesco Control, Inc. as an approved integrator. Item 9: Drawings G003, C050, C05, C052, C053, C00, C0, C02, C03, C6, C62, C63, C20, C203, M050, M02, M03, B5, B52, and B53 CHANGE the scale at the bottom of the drawing to AS SHOWN. Item 0: Drawing M0 REPLACE in its entirety with the attached Drawing M0, Rev. (Attachment 2) Addenda

3 Project No , Contract No. E7-09 Item : Drawing M02, Section B CHANGE the size of the reducing tee from "6-inch x 4-inch" to "8-inch x 4-inch". Item 2: Drawing C202 REPLACE Note 3 in its entirety with the following new Note 3: "3. Remove the existing bollards, concrete pad and perimeter concrete curb prior to backfill. The concrete pad is at an elevation of approximately The top of existing concrete around the perimeter of the depression (bottom of curb) varies between an elevation of along the west side to an elevation of along the east side." Item 3: Drawing C202 REPLACE Note 6 in its entirety with the following new Note 6: "6. The existing water service to the lift station has been shut-off. There is no active water service at the Business Park 3 lift station. However the lateral to the lift station is still active. The Contractor shall abandon the lateral at the corporation stop at the water main in Hillsdale Circle. The Contractor shall obtain an encroachment permit from El Dorado County for this work and restore the street per County requirements." Item 4: Drawing S004, Detail S264 CHANGE the O.D. of the sleeves from "2.88 inches" to "2.375 inches" and the I.D. of the sleeves from "2.47 inches" to "2.067 inches". Item 5: Drawing S20, Roof Framing Plan CHANGE the sheathing material from "/2 inch CD-X Plywood" to "/2 inch radiant barrier oriented strand board (OSB) sheathing with foil side down"., Mike Kink, PE Supervising Civil Engineer 7//a/'/ z Date Attachments:. Mandatory Pre-Bid Sign-In Sheet (3 pages) 2. Revised Drawing M0, Rev.. ( sheet) END OF SECTION Addenda

4

5

6

7 N FM S:\COMMON\PROJECTS\62-EID\026-CARSON CREEK 2\04-DESIGN\DRAWINGS\04-MECHANICAL\ MECHANICAL-CARSON CREEK 2.DWG LIFT STATION PLAN WET-WELL ELEVATIONS LIFT STATION SECTION M /2/7 ADD #: CHANGED TO 8" DISCHARGE PIPING ELJ MWJ REV. DATE DESCRIPTION BY APP'D DRAWN BY: CHECKED BY: SCALE: AGP MWJ AS SHOWN EL DORADO IRRIGATION DISTRICT 2890 MOSQUITO ROAD - P.O. BOX 047 PLACERVILLE, CALIFORNIA CARSON CREEK 2 LIFT STATION MECHANICAL CC2 LIFT STATION PLAN & SECTION DATE: PROJECT NO.: DWG. NO. JUN SHEET 20 OF 53 SHEETS

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,

More information

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK PROJECT LOCATION FOR 3MG ELEVATED STORAGE TANK AT SAN ISIDRO SUBDIVISION CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK engineers architects surveyors below. Knowwhat's Call beforeyoudig.

More information

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum. ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015 ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I G-1 GENERAL NOTES AND LEGEND SHEILA VANDERHOEF C-1 EXISTING CONDITIONS PLAN BOARD OF SELECTMEN C-2 PROPOSED WATER STORAGE TANK SITE PLAN CD - 2 CONSTRUCTION

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

OFFICE OF MANAGEMENT AND FINANCE

OFFICE OF MANAGEMENT AND FINANCE CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement

More information

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE San Francisco Water Power Sewer SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS CONTRACT NO. WW-654 ADDENDUM NO. 3 Signatures: 9i;,.,,:.._\

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

Duteau Creek Water Treatment Plant UV Upgrades. Regional District of North Okanagan ADDENDUM # 3 ISSUE FOR TENDER

Duteau Creek Water Treatment Plant UV Upgrades. Regional District of North Okanagan ADDENDUM # 3 ISSUE FOR TENDER Project Client Tender No. Duteau Creek Water Treatment Plant UV Upgrades Regional District of North Okanagan 2017-E372.09.04 Date August 09, 2017 ADDENDUM # 3 ISSUE FOR TENDER INSTRUCTIONS Tenderers are

More information

744 Kent Minh, Project Engineer

744 Kent Minh, Project Engineer San Francisco Water Power Sewer Senricos of the San Francisco Public Utilities Commis 'on SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE Seivices of the San Francisco Public Utilities Commission Signatures: OCEANSIDE WATER

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

CITY OF CHELAN LIFT STATION IMPROVEMENTS CITY OFFICIALS. Mike Cooney Mayor. Kelly Allen Ray Dobbs Tim Hollingsworth. Ty Witt City Council

CITY OF CHELAN LIFT STATION IMPROVEMENTS CITY OFFICIALS. Mike Cooney Mayor. Kelly Allen Ray Dobbs Tim Hollingsworth. Ty Witt City Council CHELAN COUNTY CITY OFFICIALS Mike Cooney Mayor Kelly Allen Ray Dobbs Tim Hollingsworth Wendy Isenhart Erin McCardle Servando Robledo Ty Witt City Council Jake Youngren Dwane Van Epps Mike Jackson City

More information

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

RE: City of Summersville, Glade Creek Phase llb

RE: City of Summersville, Glade Creek Phase llb STAFFORD CONSULTANTS INCORPORATED Engineering, Design, and Consulting Planning and Environmental Services To: Armstrong Utilities Chojnacki Construction CI Thornburg Cooks Excavating Contractor s Association

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

STORM SEWER SCHEDULE STRUCTURES ALIGNMENT CODES: 'CW'= COMANCHE WAY PIPES BURNING WOOD, COMANCHE, 4TH SHEET NO. UTIL W RESURF ASSESSMENT DISTRICT-2015 U-3 PROJECT NO. 53W1930 COMANCHE WAY STORM SEWER SCHEDULE

More information

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic

More information

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder. ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: 2018 Interior Renovations Jeffersonville Township Public Library Jeffersonville Facility Jeffersonville, Indiana Project No.: 1723.01 Date: April 12, 2018 This addendum is

More information

Article 1-2: Specification Section CLOSEOUT PROCEDURES: A, Warranty: Reference to Division shall be changed to

Article 1-2: Specification Section CLOSEOUT PROCEDURES: A, Warranty: Reference to Division shall be changed to 35 TH ID NATIONAL GUARD READINESS CENTER FT. LEAVENWORTH, KS PROJECT NO. 200101 PROJECT NO. 200101 35 TH ID NATIONAL GUARD READINESS CENTER FT. LEAVENWORTH, KS CONTRACT AMENDMENT NO. 1 August 9, 2018 NOTICE

More information

I. MINUTES OF THE PRE-BID CONFERENCE

I. MINUTES OF THE PRE-BID CONFERENCE Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No. 17118 1401 Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland,

More information

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS Date 6/1/18 STANDARD DRAWINGS UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed WATER STANDARD DRAWINGS Title Drawing Number Current Date Fire Hydrant and Appurtenance Locations, Improved Streets with Curb

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Plan Submittal and Review Checklist

Plan Submittal and Review Checklist Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

PALM COAST WASTEWATER TREATMENT PLANT NO. 2

PALM COAST WASTEWATER TREATMENT PLANT NO. 2 ITB-CD-CME--0 ADDENDUM NO. PALM COAST WASTEWATER TREATMENT PLANT NO. ISSUE DATE: December 0, 0 BID DATE: January 0, 0 SUBJECT: Statements, Questions and Answers INTENT: This addendum is issued prior to

More information

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16

More information

PIP STF05121 Anchor Fabrication and Installation Into Concrete

PIP STF05121 Anchor Fabrication and Installation Into Concrete June 2017 Structural PIP STF05121 Anchor Fabrication and Installation Into Concrete PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

Garage Design Guide. October 2018

Garage Design Guide. October 2018 Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER

SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER The Developer's engineer shall prepare system improvement plans that are clear, concise,

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

APPLICATION FORM FOR INFRASTRUCTURE NOC

APPLICATION FORM FOR INFRASTRUCTURE NOC APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others

More information

Residential Room Additions

Residential Room Additions Residential Room Additions The purpose of this information sheet is to provide information regarding building code and permit processing requirements for RESIDENTIAL ROOM ADDITION(S) in the City of Poway.

More information

Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA

Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA BUILDING THE FUTURE Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA 19107-3780 May 25, 2017 Dear Sir/Madam: Subject: Sealed Bid No. 17-00093-AMZK Enclosed please

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

MILL HILL ARTS VILLAGE

MILL HILL ARTS VILLAGE OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,

More information

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2 City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No.

More information

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223 PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028 THE CENTER FOR RESEARCH AND EDUCATION IN ADVANCED TRANSPORTATION ENGINEERING SYSTEMS (CREATEs) ISSUED FOR BID - CONTRACT - 02 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028 ALL DIMENSIONS MUST BE VERIFIED

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

9. Pay for the power consumed until the project has been accepted as substantially complete.

9. Pay for the power consumed until the project has been accepted as substantially complete. 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:

More information

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40,000.00 $40,000.00 $22,072.00 $22,072.00 102 18-Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $275.00 $288,200.00 $334.00 $350,032.00

More information

Issue Date: August 2018 Revision: 03

Issue Date: August 2018 Revision: 03 ENGINEERING CADD MANUAL Issue Date: August 2018 Revision: 03 Developed For: Metra Engineering Department 547 West Jackson Blvd. Chicago, Illinois 60661 Developed By: Chandra Mahalingam CADD System Administrator

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information