CAREER PATHWAY CARPENTRY CIP Code Pennsylvania's Targeted Industry Cluster: Architecture & Construction
|
|
- Moses Norton
- 6 years ago
- Views:
Transcription
1 CAREER PATHWAY CARPENTRY CIP Code Pennsylvania's Targeted Industry Cluster: Architecture & Construction
2 Potential Careers Carpenters Helpers - Carpenters National and State Occupational Outlook Trends (Based on Department of Labor and Industry Reports) Employment United States Percent Change ¹Job Openings 2011 Median Annual Wage Carpenters 1,001,700 1,197, % 40,830 $40,000 Pennsylvania Employment Percent Change ¹Job Openings 2011 Median Annual Wage Carpenters 55,100 55,650 +1% 800 $38,500 ¹Job Openings refers to the average annual job openings due to growth and net replacement Carpenters Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required. Shape or cut materials to specified measurements, using hand tools, machines, or power saws. Follow established safety rules and regulations and maintain a safe and clean environment. Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge. Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools. Verify trueness of structure, using plumb bob and level. Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools. Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue. Remove damaged or defective parts or sections of structures and repair or replace, using hand tools. Inspect ceiling or floor tile, wall coverings, siding, glass, or woodwork to detect broken or damaged structures. Skills and Abilities Critical Thinking Using logic and reasoning to identify the strengths and weaknesses of alternative solutions, conclusions or approaches to problems. Equipment Selection Determining the kind of tools and equipment needed to do a job. Operation Monitoring Watching gauges, dials, or other indicators to make sure a machine is working properly. Manual Dexterity The ability to quickly move your hand, your hand together with your arm, or your two hands to grasp, manipulate, or assemble objects. Multilimb Coordination The ability to coordinate two or more limbs (for example, two arms, two legs, or one leg and one arm) while sitting, standing, or lying down. It does not involve performing the activities while the whole body is in motion. Problem Sensitivity The ability to tell when something is wrong or is likely to go wrong. It does not involve solving the problem, only recognizing there is a problem. Static Strength The ability to exert maximum muscle force to lift, push, pull, or carry objects. Trunk Strength The ability to use your abdominal and lower back muscles to support part of the body repeatedly or continuously over time without 'giving out' or fatiguing. Finger Dexterity The ability to make precisely coordinated movements of the fingers of one or both hands to grasp, manipulate, or assemble very small objects. Near Vision The ability to see details at close range (within a few feet of the observer). Arm-Hand Steadiness The ability to keep your hand and arm steady while moving your arm or while holding your arm and hand in one position. Deductive Reasoning The ability to apply general rules to specific problems to produce answers that make sense. Information Ordering The ability to arrange things or actions in a certain order or pattern according to a specific rule or set of rules (e.g., patterns of numbers, letters, words, pictures, mathematical operations).
3 Character Traits for Workplace Success Attention to Detail Job requires being careful about detail and thorough in completing work tasks. Dependability Job requires being reliable, responsible, and dependable, and fulfilling obligations. Initiative Job requires a willingness to take on responsibilities and challenges. Cooperation Job requires being pleasant with others on the job and displaying a good-natured, cooperative attitude. Integrity Job requires being honest and ethical. Independence Job requires developing one's own ways of doing things, guiding oneself with little or no supervision, and depending on oneself to get things done. Leadership Job requires a willingness to lead, take charge, and offer opinions and direction. Analytical Thinking Job requires analyzing information and using logic to address work-related issues and problems. Concern for Others Job requires being sensitive to others' needs and feelings and being understanding and helpful on the job. Innovation Job requires creativity and alternative thinking to develop new ideas for and answers to work-related problems. Somerset County Technology Center - Program of Study/Units of Instruction (3-Year Program) Unit Number & Title 100 Safety/Occupational Orientation 800 Framing Wall Construction 200 Hand Tools 900 Framing Roof Construction 300 Power Tools 1000 Exterior Finish 400 Blueprint Reading 1100 Interior Finish 500 Site Preparation and Layout 1200 Estimation 600 Footings and Foundations 1300 Lumber Identification 700 Framing Floor Construction 1400 Fasteners and Adhesives High School Courses Recommended For Career And Technical Education Students 9th Grade 10th Grade 11th Grade 12th Grade English I English II English III English IV Algebra I or Geometry Geometry or Algebra II Algebra II, Trigonometry or Pre-Calculus Pre-Calculus, Trigonometry or Calculus Biology I Chemistry I Physics AP Science Geography/State History World History American History Economics/Government Required Electives: PE, Art/Music, Foreign Language, Computer Technology Program s Math Skill Level Required Electives: PE, Foreign Language, Computer Technology Career and Technology Scope and Sequence Required Electives: PE Career and Technology Scope and Sequence Required Electives: PE Career and Technology Scope and Sequence Students must be able to complete math curriculum (10th 12th) that incorporates an understanding of basic math skills. Students will be required to do estimating, and stair and rafter calculations.
4 Certifications/Licensures Pennsylvania Skills Certificate (NOCTI) National Association of Home Builders (NAHB) Certification Master Shingle Applicator OSH 10-hour Safety Training Continuing Education/College Options Articulation Agreements Additional College/Continuing Education Options Commonwealth Technical Institute Delaware County Community College Johnson College Students who complete the Carpentry curriculum can earn college credit. SCTC s Carpentry program has articulation agreements with colleges across Pennsylvania through the SOAR program. For more information on the SOAR program, please visit: Prerequisites, Safety, and Equipment Requirements Leather work shoes (steel toes are NOT required) Tape measure (at least 16 feet) Appropriate dress for weather conditions. Willingness to adhere to SCTC Shop Safety requirements and appropriate protective clothing and equipment. Program Details Theory Structure Small group lectures based on grade level. Class lectures based on house assignments. Two tests per 9-week grading period. Textbook and Supplemental Reading Materials Residential Construction Academy (RCA) Modern Carpentry Competency information sheets and safety materials. Various electronic and Internet based materials (some with post-secondary reading level) Lab Experience 10th grade students are expected to complete safety, hand tools, and portable power equipment. 11th grade students are expected to complete all stationary power equipment, and competencies into residential construction. 12th grade students will complete construction competencies and prep for NOCTI test. All students will participate in the construction of the modular house. Homework Students are expected to complete tasks within the set completion dates. At times this requires students to complete tasks outside of the school day. Projects and some project preparation work are also required outside of the school day. Co-op Requirements (Grades 11-12) Satisfactory attendance records. C average. Instructor s recommendation. Transportation
5 Job Ready Assessment Blueprint Carpentry Test Code: 4015 / Version: 01 Measuring What Matters
6 Specific Competencies and Skills Tested in this Assessment: Safety Demonstrate safe material handling practices Display comprehension of workplace/job-site safety procedures Exhibit knowledge of MSDS and personal protective equipment (PPE) Tools and Accessories Use and maintain hand tools Use and maintain power tools Use and maintain measuring, layout, and marking tools Display understanding of tool safety issues Blueprint Reading and Estimation Demonstrate awareness of building codes Display comprehension of dimensions and scales Read and understand various views and elevations Display understanding of symbols, lines, and details Extrapolate information from a set of plans Estimate materials quantities Foundations, Forms, and Concrete Lay out foundation Construct and align footing and foundation forms Install, brace, and align and remove formwork Understand concrete characteristics Page 1 of 7
7 Specific Competencies and Skills continued: Rough Framing Lay out and install floor systems Calculate rough openings; lay out and construct wall systems Calculate, lay out, and install roof systems Calculate, lay out, and install stairs and other specialty components Exterior Finish Identify and install cornice and trim Calculate and install roofing Identify, prepare, and install windows and doors Calculate, lay out, and install siding Interior Systems Installation Install insulation Install and finish interior walls Interior Finish Install interior doors Install standing and running trim Install hardware Carpentry Related Mathematics Perform basic mathematical operations; whole numbers, fractions, and decimals Perform linear, square, and cubic computations Perform algebraic and geometric functions Page 2 of 7
8 Written Assessment: Administration Time: 3 hours Number of Questions: 150 Areas Covered Page 3 of 7
9 Sample Questions: OSHA regulations require that a trench be sloped, shored, or protected by a trench box when it exceeds A. 2 feet B. 5 feet C. 10 feet D. 20 feet Sill plates setting on concrete should be A. air-dried to 15 percent m.c. softwood B. quarter sawn hardwood C. kiln-dried southern yellow pine D. pressure or chemically treated lumber Concrete walls are generally anchored to footings by means of A. epoxy and bonding agents B. keyways or steel dowels C. rich grout and aggregate D. structural steel The framing member that supports the tail joists is called a A. cripple B. header C. joist D. trimmer The standard exposure of an asphalt or fiberglass three-tab shingle is A. 3 inches B. 4 inches C. 5 inches D. 6 inches Page 4 of 7
10 Performance Assessment: Administration Time: 2 hours and 40 minutes Number of Jobs: 7 Areas Covered: 17% Tool and Material Identification Accuracy of identification of saws, bits, saw blades, wrenches, nails, fasteners, lumber, finishing tools, layout tools, marking tools, and time to complete Job 1. 9% Square Layout Handling of equipment, project layout techniques used, accuracy of side length and diagonals, and time to complete Job 2. 8% Builder s Level Set up and handling of instrument, techniques used to determine top of foundation, accuracy of level marks, and time to complete Job 3. 21% Blueprint Reading/Sole Plate Layout Layout of plate, interpretation of plans, length of plate, door centerline, door rough opening, bi-fold door centerline, bi-fold door rough opening, closet partition intersection, stud spacing, used standard markings, hall closet depth, and time to complete Job 4. 18% Rafter Lay Out Layout of rafter, use of tools, interpretation of plans, placement of rafter crown, ridge plumb cut, rafter line length, plate line plumb cut, overhang length, tail plumb cut mark, fascia plumb cut deduction mark, ridge plumb cut deduction mark, bird s mouth location and layout, and time to complete Job 5. 10% Stairway Stringer Layout of 3-tread stringer, use of tools, interpretation of plans, riser height, tread run, stringer marking at floor level, tread thickness, and time to complete Job 6. Page 5 of 7
11 Areas Covered continued: 17% Interior Frame Procedures for installing, shimming, and nailing frame, procedures for installing trim, operation of miter saw, use of hand tools, safety, window plumb and level, window shims, quality of trim cuts, tightness of joints, quality of nailing, reveal allowance, and time to complete Job 7. Page 6 of 7
12 Sample Job: Maximum Time: Participant Activity: Builder s Level 20 minutes The test participant will set up and use the builder s level to establish the height of the instrument. Based on calculations, the participant will establish an elevation height of 100 feet, 8 inches. The Association for Career and Technical Education (ACTE), the leading professional organization for career and technical educators, commends all students who participate in career and technical education programs and choose to validate their educational attainment through rigorous technical assessments. In taking this assessment you demonstrate to your school, your parents and guardians, your future employers and yourself that you understand the concepts and knowledge needed to succeed in the workplace. Good Luck! Page 7 of 7
Job Ready Assessment Blueprint. Carpentry. Test Code: 4215 / Version: 01. Copyright All Rights Reserved.
Job Ready Assessment Blueprint Carpentry Test Code: 4215 / Version: 01 Copyright 2017. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information Written Assessment
More informationEntry Level Assessment Blueprint Carpentry
Entry Level Assessment Blueprint Test Code: 4115 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Safety Demonstrate safe material handling practices Display comprehension of workplace/job-site
More informationEntry Level Assessment Blueprint Carpentry
Entry Level Assessment Blueprint Carpentry Test Code: 4215 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Safety Demonstrate safe material handling practices Display comprehension
More informationCAREER PATHWAY ELECTRICAL OCCUPATIONS CIP Code Pennsylvania's Targeted Industry Cluster: Architecture & Construction
CAREER PATHWAY ELECTRICAL OCCUPATIONS CIP Code 46.0399 Pennsylvania's Targeted Industry Cluster: Architecture & Construction Potential Careers 47-1011 Supervisors-Construction Trades & Extraction Workers
More informationAssessment Blueprint
Assessment Blueprint Carpentry Basic 8326- Online Version 8327- Paper/Pencil Version Copyright 2009. All Rights Reserved. General Assessment Information Home Builders Institute Carpentry Basic General
More informationExperienced Worker Assessment Blueprint Carpentry
Blueprint Carpentry Test Code: 0207 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Hand Tools Use and maintain fastening and prying tools Use and maintain sawing and cutting
More informationSTATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES
STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES Articulation Agreement Identifier: CAR 111 & CAR 114 (2006-1) Identifier is the postsecondary course prefix followed by Plan-of-
More informationStrands & Standards CARPENTRY 2
Strands & Standards CARPENTRY 2 COURSE DESCRIPTION This is the second in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden structures and fixtures
More informationPassaic County Technical Institute CARPENTRY II JANUARY 2004
Passaic County Technical Institute CARPENTRY II JANUARY 2004 CARPENTRY II I. DESCRIPTION Carpentry two is a full year course which is intended to introduce the student to the proper and safe use of materials,
More informationCarpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%
EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden
More informationCarpentry/Carpenter CIP Task Grid
1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify
More informationFraming Tech 1
Western Technical College 31410366 Framing Tech 1 Course Outcome Summary Course Information Description Career Cluster Instructional Level Total Credits 3.00 Total Hours 108.00 This course introduces the
More informationSTATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES
STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES Articulation Agreement Identifier: BUC 110 (2007-1) Identifier is the postsecondary course prefix followed by Plan-of- Instruction
More informationCore Curriculum Carpentry 1 Carpentry 2 Carpentry 3
A Correlation of Core Curriculum Carpentry 1 Carpentry 3 To the Carpentry II Course Standards and Objectives to the Content Standards Resource Title: Core Curriculum: Introductory Craft Skills, Fifth Edition
More informationPassaic County Technical Institute CARPENTRY III JANUARY 2004
Passaic County Technical Institute CARPENTRY III JANUARY 2004 CARPENTRY II I. DESCRIPTION Carpentry three is a full year course will further develop skills established in the 9 th and 10 th grades. Emphasis
More informationCarpentry Level 1, 2014
A Correlation of Carpentry Level 1, Utah Core Curriculum for Resource Title: Carpentry Publisher: Pearson Education publishing as Prentice Hall ISBN: SE: 9780133403800 Media (text, software, internet,
More informationMeasuring What Matters in. Job Ready Assessment Blueprint. Cabinetmaking
Measuring What Matters in Job Ready Assessment Blueprint Cabinetmaking Test Code: 3014 / Version: 01 Copyright 2010 General Assessment Information Blueprint Contents General Assessment Information Written
More informationConstruction Trades Foundation
PRECISION EXAMS Construction Trades Foundation EXAM INFORMATION Items 65 Points 82 Prerequisites NONE Grade Level 10-12 Course Length ONE YEAR DESCRIPTION This course will focus on the foundation of construction
More informationAcademic Plan Building Construction 2
Academic Plan Building Construction 2 Orientation to the Trade PACING: 3 weeks Unit Number: 1 Construction lab/ shop rules. Safety Contract Tool usage procedures. 1. Describe the history of the carpentry
More informationStrands & Standards CONSTRUCTION TRADES FOUNDATION
Strands & Standards CONSTRUCTION TRADES FOUNDATION COURSE DESCRIPTION A course that generally prepares individuals in the following areas: basic safety, introduction to blueprint reading, introduction
More informationArchitectural Drafting
Measuring What Matters in Job Ready Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Copyright 2012 General Assessment Information Blueprint Contents General Assessment Information
More informationConstruction III Curriculum Maps
Curriculum Maps Unit 1: Shop Safety Unit 2: Shop Equipment and Tool Review Unit 3: Project I Unit 4: Building Plans and Materials Unit 5: Footings and Foundations Unit 6: Floor Framing Unit 7: Wall Framing
More informationUnit 9. Wall and Ceiling Framing
Unit 9 Wall and Ceiling Framing Wall construction Wall framing includes the assembly of horizontal and vertical members that make up exterior walls and interior partitions. Theses walls support the ceilings
More informationDave's Glossary of Construction Terms. by Dave Osborne (www.daveosborne.com)
Dave's Glossary of Construction Terms by Dave Osborne (www.daveosborne.com) 5/4" A thickness of decking material between 1 x 6 and 2 x 6. Although it is called 5/4 x 6, it is actually 1" thick and 5 1/2"
More informationTotal Test Questions: 65 Levels: Grades Units of Credit: 1.0
DESCRIPTION This course will focus on the foundation of construction trades. Students will learn and practice basic safety skills. They will need to understand and demonstrate basic math skills. Students
More information2018 MICHIGAN SKILLSUSA CHAMPIONSHIPS TASK & MATERIALS LIST SKILL OR LEADERSHIP AREA:
2018 MICHIGAN SKILLSUSA CHAMPIONSHIPS TASK & MATERIALS LIST SKILL OR LEADERSHIP AREA: CARPENTRY CONTEST LOCATION: DeVos Place 303 Monroe Ave NW Grand Rapids, MI 49503 616.742.6500 http://devosplace.org/
More information10x10 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationA. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.
SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and
More informationMaterial List for Log Complete Packages
Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers
More informationCARPENTRY. ELIGIBILITY Open to active SkillsUSA members enrolled in programs with carpentry as the occupational objective.
CARPENTRY PURPOSE To evaluate each contestant s preparation for employment and to recognize outstanding students for excellence and professionalism in the field of residential and commercial carpentry.
More informationGrade Level Benchmarks and Components
Grade Level Benchmarks (GLB) describe the concepts and skills we want students to know and be able to demonstrate in each grade level and each course. Teachers will assess student academic performance
More informationWith Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans
12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationCommercial Systems
Western Technical College 31410360 Commercial Systems Course Outcome Summary Course Information Description Career Cluster Instructional Level Total Credits 1.00 Total Hours 36.00 In this course, students
More informationWoodworking. EXAM INFORMATION Items. Points. Prerequisites. Grade Level. Course Length EXAM BLUEPRINT. Career Cluster. Performance Standards
EXAM INFORMATION Items 66 Points 66 Prerequisites NONE Grade Level 10-12 Course Length ONE SEMESTER Career Cluster ARCHITECTURE AND CONSTRUCTION MANUFACTURING Performance Standards INCLUDED Certificate
More informationWall and Ceiling Framing
Student Edition Developed by the Curriculum and Instructional Materials Center for the Trade and Industrial Education Division Oklahoma Department of Career and Technology Education 00-00000 TI3674 Copyright
More informationRecommended Work Keys Scores for Precision Machining
Great Oaks Precision Machining Essential Skills Profile This profile provides an outline of the skills required for successful completion of this career program. Additional information is located on the
More information6x6 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationIndustrial Technology Curriculum
Industrial Technology Curriculum Written 2009-2010 Mission Statement: Industrial Technology The Mission of the Oskaloosa Community School Industrial Technology Department is to provide opportunities to
More informationF r a m i n g ( 1 1 B )
9 1 8 9 F r a m i n g ( 1 1 B ) 30S/30E/30M A Carpentry Course 9 1 8 9 F r a m i n g ( 1 1 B ) 3 0 S / 3 0 E / 3 0 M Course Description In this course, students will learn basic framing techniques. It
More informationAbout 32 percent of all carpenters the largest construction trade were selfemployed.
http://www.bls.gov/oco/ocos202.htm Carpenters Nature of the Work Training, Other Qualifications, and Advancement Employment Job Outlook Projections Data Earnings OES Data Related Occupations Sources of
More informationBTR 100. Blueprint Reading
BTR 100 Blueprint Reading Approved: December 3, 2010 EFFECTIVE DATE: Fall 2011 COURSE PACKAGE FORM Team Leader and Members Ken Kramer, Frank Port, Curtis Clough, Andra Goldberg Date of proposal to Curriculum
More informationCourse Outline CIAO 123 Cleveland Street Orange, NJ 07050
Course Outline CIAO 123 Cleveland Street Orange, NJ 07050 Teacher: Mr. Daniel Email: danielra@orange.k12.nj.us Phone: 973-673-0746 Course Syllabus Woodworking I Full Year Course COURSE DESCRIPTION: Woodshop
More informationCONSTRUCTION / HOUSING
CONSTRUCTION / HOUSING - PRINCE EDWARD ISLAND APPLIED MATHEMATICS 80A Table of Contents Construction/ Housing Reading a Tape Measure (Imperial)... - Using a Carpenter s Square... -5 Checking for Squareness
More informationPOS Perkins Statewide Articulation Agreement Documentation Coversheet
POS Perkins Statewide Articulation Agreement Documentation Coversheet Student Name: Secondary School Name: Secondary School Address: CTE Program of Study: CIP # CIP Program Name Grade 9 1. CAREER AND TECHNICAL
More informationRoof Framing. Student Edition
Student Edition Developed by the Curriculum and Instructional Materials Center for the Trade and Industrial Education Division Oklahoma Department of Career and Technology Education 00-00000 TI3673 Copyright
More information12x12 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationA. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationCourse Outcome Summary
Course Information: Description: Carpentry This class introduces students to basic carpentry practices, such as the use of hand and power tools, measurement, and layout practices. Skills will then be used
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationG r a d e 1 1 A F o u n d a t i o n s a n d F l o o r F r a m i n g
G r a d e 1 1 A F o u n d a t i o n s a n d F l o o r F r a m i n g G r a d e 1 1 A : F o u n d a t i o n s a n d F l o o r F r a m i n g Course Description Carpentry 11A: Foundations and Floor Framing
More information8x8 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationPerkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet
Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student
More informationBAA ADVANCED JOINERY FRAMEWORK 12
BAA ADVANCED JOINERY FRAMEWORK 12 DISTRICT NAME: Coquitlam DISTRICT NUMBER: SD#43 DEVELOPED BY: Dave Jones DATE DEVELOPED: April 20, 2006 SCHOOL NAME: Dr. Charles Best PRINCIPAL S NAME: Brian Fichter BOARD/AUTHORITY
More informationSTORAGE SHED. Storage Shed Project Plan #854 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.
STORAGE SHED Project Plan #854 Sheet 1 of 6 Enjoying your backyard can be relaxing, but it can also get crowded. There s lawn furniture, gardening tools and supplies, camping gear, maybe even pool equipment.
More informationJOB SKILLS TRAINING CURRICULUM
PROJECT: DISCOVERY JOB SKILLS TRAINING CURRICULUM SAMPLES EXCERPTS PROVIDED: 1. Competencies...(1 page front and back) 2. Outline Chart - Scope and Sequence...(3 pages front and back) 3. Pre-Post Test...(1
More information& Carpentry. Building. Resources
& Carpentry Building Resources Carpentry Second Canadian Edition Floyd Vogt Michael Nauth 9780176502737 Welcome to the Second Canadian Edition of Carpentry. The 2010 National Building Code of Canada is
More informationAssessments: 3003 Finish Carpenter 3005 Frame Carpenter. Aligned to NCCER National Standards and HBI Residential Standards & Key Requirements
Carpentry Study Guide Assessments: 3003 Finish Carpenter 3005 Frame Carpenter Aligned to NCCER National Standards and HBI Residential Standards & Key Requirements Endorsed By: Overview This study guide
More informationSECTION ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK:
SECTION 061000 - ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK: A. Definition: Rough carpentry includes carpent~y work not specified as part of other sections and which is generally not exposed, except as otherwise
More informationElectrical Occupations
Job Ready Assessment Blueprint Electrical Occupations Test Code: 3029 / Version: 01 Copyright 2011. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information
More informationInstallation Instructions for. Before You Begin TOOLS REQUIRED
Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationCabinetmaking & Millwork CIP Task Grid
1 Secondary Task List 100 FOLLOW RULES FOR WORKING IN THE CABINETMAKING LAB. 101 Review and discuss school rules. 102 Review and demonstrate knowledge of cabinetmaking lab rules. 103 Complete all theory
More informationCarpentry. Full Time Job Title: Cabinet Installer Job Number: 3547 Hours/Days: Monday-Friday Salary: $15+DOE Location:
Full Time Job Title: Cabinet Installer Job Number: 3547 Hours/Days: Monday-Friday Salary: $15+DOE Greater Los Angeles, CA Requirements: Skills Requirements: Experienced with finish carpentry and/or experience
More informationWisconsin Technical College System. Curriculum Standards & Program Design Summary CARPENTRY APPRENTICE (ABC)
Program Information Program Curriculum Standards & Program Design Summary 50-410-9 CARPENTRY APPRENTICE (ABC) Carpenters make up the largest building trades occupation in the industry and those with all-around
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationSUPPLEMENT TO THE APPLICATION FOR CARPENTER I (JOURNEYMAN)
(Carpenter I Page 1 of 11) Name SUPPLEMENT TO THE APPLICATION FOR CARPENTER I (JOURNEYMAN) TO ALL APPLICANTS: This form is used to obtain information about your knowledge, skill and ability to perform
More information4. Components and Stairs
4. Components and Stairs 4.1 BUILDING WINDOW AND DOOR COMPONENTS 4.2 BUILDING STAIRS Tools needed by volunteer: Hammer Nail apron Tape measure Square Utility knife Pencil Tools and equipment needed: Materials
More informationBritish Columbia Carpenter Apprenticeship Program
British Columbia Carpenter Apprenticeship Program Level 3 Line H Competency H-7 Build Intersecting Roofs 7960003573 Ordering Crown Publications, Queen s Printer PO Box 9452 Stn Prov Govt 563 Superior St.
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationChapter 1. Beam and Sill Plates
Chapter 1. Beam and Sill Plates 1.1 ESTABLISHING SQUARE SILL PLATE CHALK LINES 1.2 INSTALLING TREATED SILL PLATES 1.3 INSTALLING LAMINATE BEAM Tools needed by volunteers: Hammer Nail apron Tape measure
More informationCarpentry. Full Time
Full Time Cabinet Maker Manufacturing Job Number: 3643 Shop Production Worker Installer Millwork Hours/Days: Monday-Friday Salary: $16.00/hr. Requirements: Los Angeles, CA Skills Requirements: Minimum
More informationOverview and Working Conditions of the Carpentry and Joinery Trades
Youth Explore Trades Skills Overview and Working Conditions of the Carpentry and Joinery Trades Description There are two fields of woodworking trades within the construction industry in British Columbia:
More informationSTORAGE SHED. Storage Shed SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION
STORAGE SHED SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION P.O. BOX 641700 KENNER, LA 70064-1700 (504) 443-4464 FAX (504) 443-6612 www.southernpine.com Storage Shed
More informationSECTION CARPENTRY
SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative
More informationA Step-by-Step How To Guide
HOW TO REMODEL YOUR STAIR A Step-by-Step How To Guide Add new life to your staircase and achieve professional results. 1 Renovating your staircase is more than a remodel, it s a transformation of your
More informationChapter 7 - Porch Framing
Chapter 7 - Porch Framing Contents Chapter 7 - Porch Framing... 7-1 Timing & Prerequisites... 7-2 Concrete Porches Caps (Contractor)... 7-3 Organize the Porch Framing Lumber... 7-3 Types of Porch Roofs...
More informationSkillsUSA California Carpentry 2019 Regional Competition SCOPE OF THE COMPETITION:
SkillsUSA California Carpentry 2019 Regional Competition SCOPE OF THE COMPETITION: - Knowledge Performance The contest will include a written test that assesses the knowledge of carpentry including but
More informationMach Wall Installation Instructions
Mach Wall Installation Instructions Planning the Job Since Mach Wall is an innovative product that accomplishes 3 tasks at the same time (frame, insulate and drywall) and it replaces traditional framing,
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationinstallation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper
More informationSTACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS
STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions
More informationWall Framing & Sheathing
16 Wall Framing & Sheathing Section 16.1 Wall-Framing Materials Section 16.2 Wall Layout Section 16.3 Assembling & Erecting Walls Section 16.4 Special Framing Details Chapter Objectives After completing
More informationMultiple Category Scope and Sequence: Scope and Sequence Report For Course Standards and Objectives, Content, Skills, Vocabulary
Multiple Category Scope and Sequence: Scope and Sequence Report For Course Standards and Objectives, Content, Skills, Vocabulary Wednesday, August 20, 2014, 2:27PM District Basic Woodworking (48.0701)
More informationAdvanced Computer Aided Design COURSE OUTLINE
Advanced Computer Aided Design COURSE OUTLINE 1. Course Title: Advanced Computer Aided Design 2. CBEDS Title: Computer Aided Drafting/Design 3. CBEDS Number: 5705 4. Job Titles: Framers Construction Inspectors
More informationTotal Test Questions: 74 Levels: Grades Units of Credit:.50. Identify career opportunities in the furniture and cabinetmaking industries.
DESCRIPTION Furniture Design and Manufacturing (522) is the second instructional course in a sequence that prepares students to apply technical knowledge and skills to prepare and execute furniture design
More informationChapter 3. Wall Layout
GFCAHFH March 15, 2018 Construction Manual Version 18.0 Chapter 3. Wall Layout 3.1 LAYING OUT EXTERIOR WALLS 3.2 CUTTING EXTERIOR WALL PLATES 3.3 MARKING WINDOW AND DOOR LOCATIONS ON EXTERIOR WALL PLATES
More informationVinyl Gazebo Instructions
P a g e 1 Vinyl Gazebo Instructions 10 Vinyl Gazebo Shown Thank you for the purchase of your New Gazebo. Depending on the size of your Gazebo, installation can usually be completed in 1 to 2 days. These
More informationLESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS
LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS INTRODUCTION In this lesson, you ll learn about the different types of drawings used in the construction industry, and how to read floor plans, section drawings,
More information1 Exam Prep Carpentry and Building Construction Manual, 2010 Edition Tabs and Highlights
1 Exam Prep Carpentry and Building Construction Manual, 2010 Edition Tabs and Highlights These 1 Exam Prep Tabs are based on the Carpentry and Building Construction Book, 2010 Edition. Each 1 Exam Prep
More informationItem #BUILD SHED. build your shed today HOW TO BUILD A SHED. Copyright windows.
WWW.SHED-WINDOWS.COM build your shed today Item #BUILD SHED HOW TO BUILD A SHED www.shed-windows.com 1 These shed plans will show you how to build a 10 x14 storage shed using T1 11 for sheathing and asphalt
More informationSECTION INTERIOR FINISH CARPENTRY. A. Lumber grading agencies, and the abbreviations used to reference them, include the following:
SECTION 06 2023 PART 1 GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Interior standing and running trim. 2. Interior stairs. 1.2 DEFINITIONS A. Lumber grading agencies, and the abbreviations
More informationQuestions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS
Questions for Blueprint-Reading Exams Paul Ross Wallach Published by Hearlihy P.O. Box 1747 Pittsburg, KS 66762 866-622-1003 www.hearlihy.com 81861 V7198 Copyright 2007 by Hearlihy. Except for making transparencies
More informationAssembly Book. the Fairview. Building Size 12'x12' Revised July 25, 2012
Assembly Book Revised July 25, 2012 the Fairview Building Size 12'x12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationChapter 6 - Walls & Stairs
Chapter 6 - Walls & Stairs Contents Chapter 6 - Walls & Stairs... 6-1 Timing & Prerequisites... 6-3 Wall Panel Components... 6-5 Headers... 6-7 Box Headers... 6-7 Solid Wood Headers... 6-8 Non-Load Bearing
More information