1 SECTION ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK: A. Definition: Rough carpentry includes carpent~y work not specified as part of other sections and which is generally not exposed, except as otherwise indicated. Types of work in this section include rough carpentry for: 1. Wood framing. 2. Wood grounds, nailers and blocking. 3. Subflooring. 1.2 SUBMITTALS: A. Wood Treatment Data: Submit chemical treatment manufacturer's instructions for handling, storing, installatioil and finishing of treated material. I. Preservative Treatment: For each type specified, include certification by treating plant stating type of preservative solution and pressure process used, net amount of preservative retained and coilforinance with applicable standards. 2. For water-borne Treatment include statement that moisture content of treated materials was reduced to levels indicated prior to shipment to project site. 1.3 PRODUCT HANDLING: A. Delivery and Storage: Keep material under cover and dry. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber as well as plywood and other panels; provide for air circulation within and around stacks and under temporary coverings including polyethylene and similar material. 1. For lumber and plywood pressure treated with waterborne chemicals, sticker between each course to provide air circulation. 1.4 PROJECT CONDITIONS: A. Coordination: Fit carpently work to other work; scribe and cope as required for accurate fit. Correlate location of furring, nailers, blocking, grounds and similar supports to allow attachment of other work. 2. PRODUCTS 2.1 LUMBER, GENEML: A. Lumber Standards: Manufacture lumber to comply with PS 20 "American Softwood Lumber Standard" and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee's (ALSC) Board of Review. (ST. JAMES.0113) ROUGH CARPENTRY
2 B. Grade Stamps: Factory-mark each piece of lumber with grade stamp of inspection agency evidencing compliance with grading rule requirements and identifying grading agency, grade, species, moisture content at time of surfacing and mill. 1. For exposed lumber, apply grade stamps to ends or back of each piece, or omit grade stamps entirely and issue certificate of grade compliance from inspection agency in lieu of grade stamp. C. Noininal sizes are indicated, except as shown by detail dimensions. Provide actual sizes as required by PS 20, for moisture content specified for each use. 1. Provide dressed lumber, S4S, unless otherwise indicated. 2. Provide lumber with 15% maximum moisture content at time of dressing and shipment for sizes 2" or less in nominal thickness, unless otherwise indicated. 2.2 DIMENSION LUMBER: A. For light framing, provide "Stud" or "Standard" grade lumber for stud framing (2" to 4" thick, 2" to 2" wide, 10' and shorter) and "Standard" grade for other light framing (2" to 4" thick, 2" to 4" wide), any species. 2.3 BOARDS: A. Concealed Boards: Where boards will be concealed by other work, provide lumber of 19% maximum moisture content (S-DRY). 2.4 MISCELLANEOUS LUMBER: A. Provide wood for support or attachment of other work including cant strips, bucks, nailers, blocking, furring, grounds, stripping and similar members. Provide lumber of sizes indicated, worked into shapes shown, and as follows: 1. Moisture Content: 19% maximum for lumber items not specified to receive wood preservative treatment. B. Grade: Standard Grade light framing size lumber of any species or board size lumber as required. No. 3 Common or Standard grade boards per WCLIB or WWPA rules or No. 3 boards per SPIB rules. 2.5 CONSTRUCTION PANELS: A. Construction Panel Standards: Comply with PS 1 "U.S. Product Standard for Construction and Industrial Plywood" for plywood panels and, for products not manufactured under PS 1 provisions, with American Plywood Association (APA) "Performance Standard and Policies for Structural-Use Panels", Form No. E445. B. Trademark: Factory-mark each construction panel with APA trademark evidencing compliance with grade requirements. C. Plywood Underlayment for Flooring: For underlaytnent for indicated thickness, provide plywood panels with fully sanded face. (ST. JAMES.Oll.3) ROUGH CARPENTRY
3 2.4 MISCELLANEOUS NLATERIALS: A. Fasteners and Anchorages: Provide size, type, material and finish as indicated and as recommended by applicable standards, complying with applicable Federal Specifications for nails, staples, screws, bolts, nuts, washers and anchoring devices. Provide metal hangers and framing anchors of the size and type recornmended by the inanufacturer for each use including recommended nails. 1. Where rough carpentry work is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners and anchorages with a hot-dip zinc coating (ASTM A 153). 3. EXECUTION 3.1 INSTALLATION, GENERAL: A. Discard units of material with defects which might impair quality of work, and units which are too small to use in fabricating work with minimum joints or optimum joint arrangement. B. Set carpentry work to required levels and lines, with members plumb and true to line and cut and fitted. C. Securely attach carpentry work to substrate by anchoring and fastening as shown and as required by recognized standards. Countersink nail heads on exposed carpentry work and fill holes. D. Use common wire nails, except as otherwise indicated. Use finishing nails for finish work. Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting of wood; predrill as required. 3.2 WOOD GROUNDS, NAILERS, BLOCKING AND SLEEPERS: A. Provide wherever shown and where required for screeding or attachment of other work. Forin to shapes as shown and cut as required for true line and level of work to be attached. Coordinate location with other work involved. B. Attach to substrates as required to support applied loading. Countersink bolts and nuts flush with surfaces, unless otherwise indicated. Build into masonry during installation of masonry work. Where possible, anchor to formwork before concrete placement. C. Provide permanent grounds of dressed, preservative treated, key-bevelled lumber not less than 1 112" wide and of thickness required to bring face of ground to exact thickness of finish material involved. Remove temporary grounds when no longer required. 3.3 WOOD FURRING: A. Install plumb and level with closure strips at edges and openings. Shim with wood as required for tolerance of finished work. (ST. JAMES.0113) ROUGH CARPENTRY
4 3.4 WOOD FIbAMING, GENERAL: A. Provide framing members of sizes and on spacings shown, and frame openings as shown, or if not shown, comply with recommendations of "Manual for House Framing" of National Forest Products Association (N.F.P.A.). Do not splice structural members between suppotts. B. Allchor and nail as shown, and to comply with "Recommended Nailing Schedule" of "Manual for House Framing" and "National Design Specifications for Wood Construction" published by N.F.P.A. 3.5 FLOOR JOIST FRAMING: A. General: Provide framing of sizes and spacing shown. Install with crown edge up and support ends of each member with not less than 1 112" of bearing on wood or metal, or 3" on masonry. Attach to wood bearing members by toe nailing or metal connectors; frame to wood supporting members with wood ledgers as shown, or if not shown, with metal connectors. Fire-cut members built into masonly (if any). Frame openings with headers and trimmers supported by metal joist hangers; double headers and trimmers where span of header exceeds 4'. Do not notch in middle third of joists; limit notches to 116- depth of joist, 113 at ends. Do not bore holes larger than 113-depth of joist or locate closer than 2" from top or bottom. Provide solid blocking (2" thick by depth of joist) at ends of joists unless nailed to header or brand member. B. Lap members framing from opposite side of beams, girders or partitions not less than 4" or securely tie opposing members together. Provide solid bloclting (2" thick by depth of joist) over s11pp01ts. C. Anchor members paralleling masonry with 114" x 1 114" metal strap anchors spaced not more than 8' O.C. Extend anchors at least 4" into masonly, turn up 4" and extend over and fasten to 3 joists. D. Under jamb studs at openings, provide solid blocking between joist. E. Under non-load-bearing partitions, provide double joists separated by solid blocking equal to depth of studs above. 1. Provide triple-joists separated as above, under paltitions receiving ceramic tile and similar heavy finishes or fixtures, unless otherwise indicated. F. Provide bridging between joists where nominal depth-to-thickness ratio exceeds 4, at intervals of 8'. Use bevel cut 1" x 4" or 2'' x 3" wood bracing, double-crossed and nailed both ends to joists, or use solid wood bridging 2" thick by depth of joist, end nailed to joist. 3.6 RAFTER AND CEILING JOIST FUMING: A. Ceiling Joists: Provide member size and spacing shown, and as previously specified for floor joist framing. Face nail to ends of parallel rafters. 1. Where principal ceiling joists are at right angles to rafters, frame as indicated with additional shoit joists from wall plate to first joist; nail to ends of rafters and to top plate and nail to long joists or anchor with fsaming anchors or metal straps. Provide 1 x 8 or 2 x 4 stringers spaced 4' O.C. crosswise over principal ceiling joists. B. Rafters: Provide member size and spacing shown. Notch to fit exterior wall plates and toe nail or use special metal framing anchors. Double rafters to form headers and trimmers at openings in roof (ST. JAMES.0113) ROUGH CARPENTRY
5 framing (if any), and support with metal hangers. Where rafters abut at ridge, place directly opposite each other and nail to ridge member or use metal ridge hangers. 1. At valleys, provide valley rafter of size shown, or if not shown, provide rafter twice as thick as regular rafters and 2" deeper. Bevel ends of jack rafters for full bearing against valley rafter. 2. At hips, provide hip rafters of size shown, or if not shown, provide of same thicltness as regular rafters and 2" deeper. Bevel ends of jack rafters for full bearing against hip rafters. C. Provide collar beams (ties) as shown, or if not shown, provide 1" x 6" boards between every third pair of rafters. Locate below ridge member, one-third of distance to ceiling joists. Cut ends to fit slope and nail to rafters. D. Provide special framing as shown for eaves, overhangs, dormers and similar conditions, if any. 3.7 BOARD SUBFLOORING: A. Install boards with end joints staggered over supports, and with each piece extending over at least 2 spaces between supports. Nail with 8 d common nails, spaced 2 per support for board widths or 6" and less, 3 per support for widths of 8" and more. END OF SECTION (ST. JAMES.0113) ROUGH CARPENTRY
6 THIS PAGE INTENTIONALLY LEFT BLANK
A. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More information2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc.
06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationSECTION ROUGH CARPENTRY
SECTION 06 10 00- ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Contracting Requirements and Division 1 Specification Sections, apply
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 06 1053 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Division 01 Specification
More informationFT DIX ELEMENTARY SCHOOL PHASE VII, CLASSROOM ADDITION PEMBERTON TOWNSHIP REGAN YOUNG ENGLAND BUTERA, PC PROJECT #5349A
SECTION 061050 - MISCELLANEOUS CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationSECTION ROUGH CARPENTRY
SECTION 06100 ROUGH CARPENTRY PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. The work includes furnishing all labor, materials and equipment required to complete the Rough Carpentry work as shown on the Drawings
More informationSECTION CARPENTRY
SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative
More informationCollins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY
PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply
More informationDIVISION 6 WOODS AND PLASTICS SECTION ROUGH CARPENTRY
DIVISION 6 WOODS AND PLASTICS SECTION 06 10 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSECTION ROUGH CARPENTRY
SECTION 06100 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide Rough Carpentry as shown and detailed on the Drawings and
More informationB. Related Sections: The following Sections contain requirements that relate to this Section:
SECTION 06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 061000 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The General Conditions, any Supplementary General Conditions and Division 1, General Requirements, are hereby made a part of
More informationA. Boards or Strips: Lumber of less than 2 inches nominal size in least dimension.
HIGGINSVILLE HABILITATION CENTER MISC. BUILDING RENOVATIONS STATE OF MISSOURI HIGGINSVILLE, MISSOURI SECTION 061000 - ROUGH CARPENTRY PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions
More informationA. Product Data: For each type of process and factory-fabricated product indicated.
SECTION 06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationRAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION 2012
SECTION 06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationAsh Brook Golf Course Scotch Plains, New Jersey
SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationSECTION INTERIOR FINISH CARPENTRY
SECTION 06 20 23 PART 1 - GENERAL 1.01 SUMMARY A. Section includes the following items for field-applied paint finish: 1. Interior standing and running trim. 2. Interior plywood paneling. B. Related Sections
More information1.03 QUALITY ASSURANCE A. Inspection Agencies: 1. SPIB: Southern Pine Inspection Bureau; for all structural framing of roof joists and headers.
DIVISION 6 - WOOD AND PLASTICS SECTION 06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Rough carpentry for: a. Wood framing and sheathing for the new Rest Area building additions.
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More informationSECTION INTERIOR FINISH CARPENTRY. A. Lumber grading agencies, and the abbreviations used to reference them, include the following:
SECTION 06 2023 PART 1 GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Interior standing and running trim. 2. Interior stairs. 1.2 DEFINITIONS A. Lumber grading agencies, and the abbreviations
More informationB. Related Requirements: 1. Section "Interior Painting" for priming and backpriming of interior finish carpentry.
1 ~GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY
More informationSECTION FINISH CARPENTRY
SECTION 06200 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationDIVISION 6 WOOD, PLASTICS AND COMPOSITES
DIVISION 6 WOOD, PLASTICS AND COMPOSITES PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 06 1000 ROUGH CARPENTRY A. Rough opening framing for doors, windows, and roof openings. B. Roofing nailers. C. Preservative
More informationExterior Wall Fastener Schedule
City of Republic Community Development Department Exterior Wall Fastener Schedule REVISION DATE: JANUARY 2017 Design and construction (2012 IRC Section R602.3): Exterior walls of wood frame construction
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationSECTION (06100) - ROUGH CARPENTRY
PART 1 GENERAL 1.01 SUMMARY SECTION 06 10 00 (06100) - ROUGH CARPENTRY A. This Section includes the following: 1. Framing with the following: a. Dimension Lumber b. Engineered Wood Products 1) Laminated
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationSECTION ROUGH CARPENTRY
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 06 10 00 ROUGH CARPENTRY SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the
More informationDIVISION 6 WOODS AND PLASTICS SECTION FINISH CARPENTRY
DIVISION 6 WOODS AND PLASTICS SECTION 06 20 23 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT #
ADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT #13-046 10-23-2013 Bidders shall acknowledge receipt of this Addendum on the Bid Form, in the
More information3 for handling, storing, installing, and finishing treated materials: 5 unless otherwise specified. 34. Air-infiltration barriers.
SECTON 06100 - ROUGH CARPENTRY 3 PART -GENERAL 3 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationSECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.
SECTION 06200 - FINISH CARPENTRY PART 1 GENERAL 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section. 1.2 RELATED SECTIONS A. Section 06100 - Rough Carpentry:
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings (see Section
More informationSECTION INTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 062023 - INTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.
SECTION 06 10 53 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationSECTION ROUGH CARPENTRY
SECTION 06 10 00 ROUGH CARPENTRY PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Framing with dimension lumber. 2. Wood blocking and nailers. 3. Plywood backing panels. 1.02 ACTION SUBMITTALS A.
More informationA. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.
SECTION 061000- ROUGH CARPENTRY PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 I Specification Sections,
More informationA. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.
SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and
More informationTrusted ICC ES PASLODE, Evaluation. report, or as to any. ICC-ES Evaluation
0 ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.orgg Most Widely Accepted and Trusted ESR 3072 Reissued 09/2018 Revised 10/2018 This report is subject to renewal 09/2020.
More informationA. Provide all finish carpentry needed for a complete and proper installation.
SECTION 06200 - PART ONE GENERAL 1.1 SECTION INCLUDES A. Provide all finish carpentry needed for a complete and proper installation. B. Provide all wood, nails, bolts, screws, and all other items needed
More information3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?
Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationProject Specifications Section SECTION ROUGH CARPENTRY Issued Final:
Project Specifications Section 061000 ROUGH CARPENTRY SECTION 061000 - ROUGH CARPENTRY Issued Final: 02-01-17 PART 1 - GENERAL 1.1 SUMMARY A. Scope: 1. Provide rough carpentry items where shown on the
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationSections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES
2 Sections & Details WOOD SILL and FLOOR CONSTRUCTION NOTES 1 Commonly Used Lumber Common LENGTHS include: 8, 10, 12, 14, 16 NOMINAL SIZES 2 x 4 2 x 6 2 x 8 2 x 10 2 x 12 ACTUAL SIZES 1 ½ x 3 ½ 1 ½ x 5
More informationCoordinate installation of rough carpentry members specified in other sections.
1 1.03 Preservative treated wood materials. Concealed wood blocking, nailers, and C. Miscellaneous wood nailers, furring, and grounds. PART2 2.01 See Section 01 30 00 =Administrative Requirements, for
More informationB. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.
SECTION 061000- ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationAttachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016
Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder Installation Instructions Revised 9/2/2016 SBCA has been the voice of the structural building components industry
More informationSECTION 06130: TIMBER FRAMING MASTER SPECIFICATION (VERSION 85/2431/2011)
SECTION 06130: TIMBER FRAMING MASTER SPECIFICATION (VERSION 85/2431/2011) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of contract, including general and supplementary conditions
More informationIntroducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA
The SIMPLE FRAMING SYSTEMSM INSTALLATION GUIDE USA for Floors This Installation Guide is intended to provide general information for the designer and end-user. For further information, please refer to
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationSECTION HOLLOW METAL DOORS AND FRAMES
SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material
More informationCarpentry Level 1, 2014
A Correlation of Carpentry Level 1, Utah Core Curriculum for Resource Title: Carpentry Publisher: Pearson Education publishing as Prentice Hall ISBN: SE: 9780133403800 Media (text, software, internet,
More informationCarpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%
EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden
More informationMain Floor Revisions: 38' 0" Rm1 H3 50' 0" Bk1 B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 Bk1 B1 (5)-5 Rm4 Bk1 Rm3 Bk1 24' 0" 6' 0" 20' 0" START FRAMIN
Main Floor Revisions: 38' 0" Rm1 H3 50' 0" B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 B1 (5)-5 Rm4 Rm3 24' 0" 6' 0" 20' 0" START FRAMING HERE 18" BCI 90'S @ 16"OC Products PlotID Net Qty Product Length
More informationMaterial List for Log Complete Packages
Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers
More informationSECTION ARCHITECTURAL WOOD CASEWORK
SECTION 06410 - ARCHITECTURAL WOOD CASEWORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Wood cabinets for opaque finish. B. Flush wood paneling for transparent finish. C. Factory finishing. 1.02 RELATED REQUIREMENTS
More informationSTORAGE SHED. Storage Shed SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION
STORAGE SHED SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION P.O. BOX 641700 KENNER, LA 70064-1700 (504) 443-4464 FAX (504) 443-6612 www.southernpine.com Storage Shed
More informationPryda Timber Connectors
Pryda Timber Connectors Pryda Lintel Guide Engineered Steel Wall Lintels March 2014 ESSENTIAL NOTES PRYDA PRODUCT GUIDES INTRODUCTION The information in this Product Guide is provided for use in Australia
More informationVERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA
INSTALLATION GUIDE VERSA-LAM BCI LIMIT STATES DESIGN CANADA The information in this document pertains use in the CANADA ONLY, Limit States Design. Refer the appropriate Specifier Guide US for use in the
More informationStrands & Standards CARPENTRY 2
Strands & Standards CARPENTRY 2 COURSE DESCRIPTION This is the second in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden structures and fixtures
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationA. Product Data: For each type of process and factory-fabricated product. a. Include statement indicating costs for each certified wood product.
Copyright 2003 and 2005 AIA MASTERSPEC Short Form 11/03 (R 05/07) SECTION 061000 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Framing with dimension lumber.
More information4. Metal roof jacks at penetrations and attachments
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 06 2023 - INTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationE-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'
E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame shed with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in
More informationSECTION MISCELLANEOUS ROUGH CARPENTRY
SECTION 06 1053 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationCore Curriculum Carpentry 1 Carpentry 2 Carpentry 3
A Correlation of Core Curriculum Carpentry 1 Carpentry 3 To the Carpentry II Course Standards and Objectives to the Content Standards Resource Title: Core Curriculum: Introductory Craft Skills, Fifth Edition
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationWall and Ceiling Framing
Student Edition Developed by the Curriculum and Instructional Materials Center for the Trade and Industrial Education Division Oklahoma Department of Career and Technology Education 00-00000 TI3674 Copyright
More informationPART 1 GENERAL FINISH CARPENTRY
SECTION 06 20 00 (06200) PART 1 GENERAL 1.1 SUMMARY A. Section Includes:. 1. Wood Millwork a. Interior Standing and Running Trim 2. Wood Stairs 3. Shelving 4. Composition Siding and Soffits and Trim a.
More informationDescription. Lesson Outcomes. Assumptions. Build a Floor. Carpenter
Carpenter Description Floors are an integral part of residential construction and must be built to specifications that meet building code requirements. In this Activity Plan, students will be cutting and
More informationWith Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans
12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed
More informationSECTION CUSTOM CASEWORK
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 06 41 00 CUSTOM CASEWORK A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections,
More informationSECTION TRAFFIC SIGNAGE
SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling
More informationDECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.
DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationLindenwold Boro Hall Lindenwold, NJ. Bishop & Smith Architects Laurel Springs, NJ. August 2, 2012 PART 1 - GENERAL 1.1 SUMMARY. A.
SECTION 061000 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Wood blocking and nailers. 2. Wood furring and grounds. 3. Plywood backing panels. 1.2 ACTION SUBMITTALS A. Product
More informationStudent Services & Classroom Addition
SECTION 105116 - WOOD LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationAPA Performance Rated Rim Boards
D a t a F i l e APA Performance Rated Rim Boards A Rim Board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationeb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233
eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233 Dr. Jason E. Charalambides fkqolar`qflk Heavy timber construction consists
More informationThe City of Winnipeg Section St. Vital Park Pavilion Page 1 of 1
The City of Winnipeg Section 06 10 13 WOOD BLOCKING AND CURBING St. Vital Park Pavilion Page 1 of 1 Part 1 General 1.1 SECTION INCLUDES.1 Roof curbs..2 Blocking in wall and roof openings..3 Wood furring
More informationICC-ES Evaluation Report
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-2608 Reissued January 2016 This report is subject to renewal January 2017. A Subsidiary of the International Code Council DIVISION:
More informationLIBERTY STATION Heber City, UT
LIBERTY STATION Heber City, UT SECTION 06100 - ROUGH CARPENTRY PART 1 - GENERAL: See structural drawings general notes. 1.0 RELATED DOCUMENTS A. The general provisions of the contract, including General
More informationSECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY
SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related
More information.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.
PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation
More information