1 70 Reverse-Power Leakage Suppression Winding for Differential CTs, Bütow, 1925 History is the tutor of life Generator Protection, AEG

2 by Walter Schossig Protection 71 History Special protection functions have been developed for bigger generators. The first developments in generator protection have been discussed in the last issue of PACW. Since the machines became bigger special protection functions have been developed and will be discussed in this article. Reverse-Power Protection In the first years a reverse power has been indicated by an annunciation only. H&B produced a reverse-current and direction-of-current indicator in 1894 (Fig. 1). The rotating red disk in front of white plate showed the irregularity. Directional relays have been used to distinguish between short-circuits at busbar or in feeders and failures in the generator. They could detect if the current flows from the generator into the grid or in reverse direction. These relays used current transformers in the generator circuit breakers; this location was the border where the overcurrent should trip without time delay. A combined overcurrent and reverse-power relay for generators was shown by AEG in 1903 (Fig. 5). An aluminum-disk was driven by a magnetic three-leg core. The outer legs have been excited by the voltage, the middle one by current. At normal direction of current even in case of a huge overcurrent the relay is delayed, in case of reverse current Generator Protection Overvoltage, Differential, Turn-to-Turn-Fault it operates more or less immediately. In 1920 generators were equipped with at least two-phase or better three-phase reverse-current tripping device with sensitive setup: the relays should only trip in case of internal faults. Backup protection was realized by high-current tripping devices with a long delay. In case of tripping of the generator circuit-breaker the generator had to be de-excited. This avoids fire in the winding of the generators. Only one power relay was used at this time because the engineers thought that only in case of a failure a power in that direction could occur. Such a "reverse power" is possible in case of power swing, bad synchronization or during a short circuit with up to 15% of the nominal power of the generator. Such reverse relays should not endanger normal operation. The setting should be above the value mentioned or with a time longer than the power swing (1.5 s). Of course in that case the efficiency of the protection was quite poor. The clearing time was long (for a generator protection) and the relay operates only in case of a terminal short-circuit because the voltage collapses and an active power of more than 10% could not be measured anymore. This "dead zone" could be avoided particularly with a directional relay used in a 30 - or Biography Walter Schossig (VDE) was born in Arnsdorf (now Czech Republic) in He studied electrical engineering in Zittau (Germany), and joined a utility in the former Eastern Germany. After the German reunion the utility was renamed as TEAG, now E.ON Thueringer Energie AG in Erfurt. There he received his Masters degree and worked as a protection engineer until his retirement. He was a member of many study groups and associations. He is an active member of the working group Medium Voltage Relaying at the German VDE. He is the author of several papers, guidelines and the book Netzschutztechnik [Power System Protection]. He works on a chronicle about the history of electricity supply, with emphasis on protection and control.

3 72 1 Reversecurrent & direction-of-current indication V&H, scheme. Now the relay starts up even in case of inductive reactive currents during unequal excitation. On Ascension Day 1924 a disaster occurred in a steam station in Erfurt (Germany) during the taking of a generator out of service. The bolt of the trip valve was full of salt and could not interrupt completely the steam supply. Now the rotor was accelerated and the new installed generator was destroyed completely. In the 1920s AEG developed the RR2 power relays. See Fig. 2. They consist of two induction driving elements with a common Ferraris-disk. Springs hold them in the middle position. The driving elements work in Aaron-circuit. An arm moved according to the amount and direction of power. It was more or less a wattmeter with a contact. The switching capacity was poor and an auxiliary relays was necessary. Reverse power protection was later used for protection of steam turbines. The turbine operates as a synchronous motor and it could be damaged. Circuit and view of a 2-pole reverse-power protection CG90c (BBC) is shown in Fig. 3 and Fig. 10. To avoid a tripping of the protection in case of turbine blade salt deposits, the tripping signal is active only if the valve 2 is closed (Fig.4). ZPA produced the reverse-power relay GSCT12 (Fig. 9) in the early 1970s. For measuring a ferrodynamic relay SW in Figure 8 was used. An advantage of this device was the sensitivity for harmonics because it trips on the mean value of the products of voltage and current. A torque was produced only in case of equal fundamental or harmonic. These relays could be used for earth-fault detection too. The successor was the static relay GSCT12X in BBC produced a static PPX110/111 (Fig. 6) in the 1970s. This relay was used for supervision and tripping of generators, but it also could detect if a generator still receives energy in case of a leak valve. Another usage was for huge changes of load which could cause an out-of-step of the generator. All these conditions could be supervised and evaluated with a counter. 5 Combined overcurrent and reverse-power relay, AEG, 1903 A definite time reverse power relay, type WCG, produced by GEC in 1988 is shown in Fig. 11. Differential Protection Effective short-circuit protection became possible with the introduction of differential protection. First developments and the usage for transformer and line protection have been covered in the last issues of this magazine. The most common basic connections in the 1930s are shown in Fig. 15. Unlike transformer differential the same transformers (type, construction, ratio) could be used in star point, 2 Direction of power relays RR2, AEG approximately Reverse-power 4 Circuit of reversepower protection rent transformer 6 Power relays PPX Differential cur- protection CG90c BBC, 1943 BBC, 1968 BBC, 1978 AEG, 1927

4 Effective and fast shortcircuit protection became possible with the introduction of differential relays. matching transformers and tap changers were not needed. Due to missing no-load current a more sensitive setup was possible. The differential relay produced by AEG in 1925 (DR in Fig. 14) worked without timing element. It operates with Ferraris' principle and tripped with a time delay for small currents and instantaneously with large currents. According to the requirements from the customers two- and three-phase devices with a time range of 1 up to 6 seconds have been produced. An appropriate circuit was the magnetic differential (Byrd-transformer as shown in Fig. 15c). An iron core was connected at the beginning and the end of every leg. The secondary winding was connected to differential relays (in that case sensitive overcurrent relays). The neutral point is created beyond the transformer group. Other devices such as overcurrent relays and measuring devices (not shown in the figure) could be connected too. Conventional differential schemes use six CTs transforming the nominal current of the transformer (e.g A) to 5 A. Here the winding D was connected in a special manner to achieve highest sensitivity. The impedance of the winding was selected the same as the relay's. Instead of a ratio 1000 A/5 A = 200, ratio of 25 has been used and so the sensitivity (or the safety against disturbances) was 8 times higher. If every iron core got only one winding, false currents occurred even in case of equal primary currents due to non-symmetrical configuration of the conductors. Dr. W. Bütow proposed in 1925 (DRP and ) a leakage suppression winding. The iron core (shown on the spread) carried 18 coils, couples connected in series. These groups have been connected in parallel to the differential relays (clamp D). In case of one electromagnetic force bigger than the other one (because it was near to a primary conductor and that s why in a stronger field) the equalizing current flows to the coil with the smaller electromagnetic force. The magnetic field of the equalizing current superimposes the field of the primary currents, the magnetic flux in all cross-sections of the core was equal as long as the primary currents are equal. The flux has been moved from a stronger magnetic point in the core to a lighter magnetized one. With such CTs differential currents as low as 0.1 % of the nominal current could be safely detected. For instance the four kva generators in the Vermuntwerk (Austria) and the two kva generators in the pump-storage power station Herdecke (Germany) have been equipped with such a protection. These CTs never became popular because the customers preferred standard transformers. In connection with stator earth fault protection BBC recommended in 1945 a simplified differential protection using single pole differential relays (Fig. 16). In case of phase-to-phase short circuit this protection was quite fast, while during two phase-to-earth faults it operates only in some cases. BBC introduced their TG generator differential relays in Figure 18 shows the further development TG3. The 10 Circuit of Reverse-Power Protection BBC, Definite time reverse power relay WCG, GEC, Reverse-power 9 Reverse-power relays GSCT12-S1 relays GSCT-S1 wiring diagram, ZPA, 1976 ZPA, 1976

5 U V W 0 T S R Interturn short-circuit protection RA2c with Chain of reactors b (Siemens, 1936) a C b 14 Simple differential protection, AEG, 1925 EM - Excitation Machine; FA - Field Surpression; RR - Reverse Relay; S - Oil-Breaker; Sp - connected to Voltage Transformer; St - Current Transformer; UMZ - definite time.overcurrent relays; DR single phase differential connection for generators in delta-connection and the required circuit for primary and secondary transformers are shown in Figure 17. In the 1960s ASEA produced the differential protection RYDHA with high-impedance-stabilization. The differential measuring elements have been equipped with big series impedance working as a surge voltage protector. Choosing a suitable operating point could avoid undesired tripping due to saturation of current transformers without balanced-beam relays or delays. Operating time was 15 ms (without the tripping time of the auxiliary relays). Primary pickup-value was 2% of the nominal current of the CT. The device was a Interturn faults require the immediate switch-off of the generator in order to prevent further damage. 3-pole one, for every phase an overcurrent relays RRID works as a differential element with rectifier and a series impedance. The supply of the relays was with silicon rectifiers. The RRIDs had no possibility for setup, nevertheless different values could be achieved by changeover of the connectors. In 1965 Oerlikon proposed a solution for coarse and fine differential protection (Fig. 21). According to the rules in Switzerland, Austria and Germany current transformers in high voltage switchgears have to be earthed on the secondary side. That is why the interposing transformers 8 were realized in an wye/delta-circuit. In 1989 AEG produced the static generator protection SQG. The choice of the characteristic curve of the error-current stabilization was performed by solder bridges. (Fig. 19). High impedance differential protection such as the FAC produced by GEC in 1988 is quite popular in the Anglo-Saxon language area (Fig. 20). Turn-to-Turn Fault Protection In case of interturn faults it is essential to switch off the generator immediately due to local overload caused by equalizing currents in the windings, especially in case of several conductors in a single slot. In transformers such a failure could be detected by the Buchholz-protection, however this is not that easy to detect in generators. The faulty line operates as a primary winding of a transformer with short-circuited secondary winding. If the phase of the transformer is equipped with 500 windings and two of them are short-circuited the current is 250 times higher than the normal current flowing through this phase (leackage 13 Interturn fault protection (R. Bauch, SSW) 15 Basic Connections of generatordifferential, Simplified differential protection 17 Differential protection for generators with: BBC, 1945 Delta-Connection, BBC, 1952 G S R

6 is not considered). It is not possible to detect this fault by a differential protection because the currents at the beginning and at the end of the winding are equal. B. Bauch (SSW) patented in 1925 (DRP ) the circuit shown in Fig. 13. The generator to be protected (G) is connected to the auxilliary inductor (S). This is an image of the generator and consists of a transformer with a primary winding in star connected to the neutral of the generator. The neutral points are connected via the relays R. At the beginning these relays have been simple overcurrent devices. The inductor was equipped with a delta connection. In case of a turn-to-turn fault the phase-voltage decreased. The star point of the generator moves, the star point of the inductor moves with the impact of the delta-winding into the triangle of the voltages. Since a third harmonic current flows in the connection of the neutrals, R. Bauch used the wattmetric relay R in Fig. 13 with two coupled systems connected to the sinusoidal voltages U 12 and U 23. Siemens used a circuit for interturn short-circuit protection in The RA2 (c) worked with a chain of reactors (b). See Fig. 12. Details and characteristic of frequency (current limiting as a function of the frequency) is shown in Fig. 24, it was used to keep off the third harmonic. A combined differential- and interturn short-circuit protection (5 and 6) for generators with two parallel windings 1 is shown in Fig. 26. Interturn faults cause equalizing currents between the neutral points, flowing though the equalizing winding 4 to the relays 6. In the 1950s SSW used the circuit shown in Fig. 25. The open delta winding was used for the interturn short-circuit protection, connected to moving-coil relays with a rectifier and a filter network (for the 3rd harmonic). The secondary was realized as a wye connection. Measuring devices and relays have been connected to the supporting coil. For generators with two windings instead of the coils the "double phantom circuit" was used (Fig. 28). Over-Voltage Protection An increase of voltage was dangerous especially at hydro generators since it may result in huge increases of speed. In 1936 Siemens produced an increase-of-voltage-relay (RV5, Fig. 23). It worked properly for increases up to 200% of the nominal voltage. In 1984 Siemens produced a static relay with two stages 7RE21-Z1 (Fig. 29). When the short-circuit currents in the high voltage grids became bigger this caused especially problems in effectively grounded systems due to high fault currents for phase-to-ground faults. A limitation was possible with isolation of different neutral points of transformers. This became common at unit transformers. In case of opening the circuit breaker between the unit and the grounded grid (e.g. in case of load-shedding) dangerous over-voltages could occur. The first nuclear power stations in Switzerland (Beznau I and II which NOK put into operation in 1969 and 1971) have been equipped with a star-point breaker developed by AEG (4 in Fig. 27). The effective power of both power stations together was 700 MW. Generators operated as one unit (1 and 2); four 18 Differential Relays TG3, BBC, Generator differential protection, AEG, High impedance 21 Coarse and fine differential protection, GEC, 1988 tion, Oerlikon, differential protec The choice of the characteristic curve is performed by solder bridges. 22 Chain of reactors for: Interturn Short-Circuit Protection RA2, Siemens, 1936

7 76 24 Circuit and characteristic of frequency, Siemens 120 a b 26 Combined differential and interturn short-circuit protection for generators with parallel windings, BBC, Penetrability of current% Hz a Supporting Reactance b Relays three-phase transformers (220 MVA, 15,5/250 kv) supplied into the 220-kV-grid. Neutral points on the high side have been protected by lightning arresters (3) and could be earthed by neutral earthing switch (4). They have been tripped at the same time with the circuit breaker. With their operating time of 19 ms they have been earthed before the contact separation of the circuit breaker (Fig. 27). Earth fault protection and other devices for generator protection will be covered in a later issue of PAC World. walter.schossig@pacw.org 5 & 6 - A combined differential- and interturn short-circuit protection 1 - Generators with two parallel windings 4 - Equalizing winding 6 - Relays Neutral earthing Switch, AEG, & 2 - Generator and Transformer 3 - Lightning arresters 4 - Neutral earthing switch 5 - Circuit breaker Increase of voltage relay RV5 Siemens, Interturn short circuit protection, SSW, um Double phantom circuit for detection of Interturn short-circuits for generators with parallel windings per Ph. 29 Increase of voltage relay 7RE21 Siemens, 1984 G S G Generator S Open delta winding

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network Preface p. iii Introduction and General Philosophies p. 1 Introduction p. 1 Classification of Relays p. 1 Analog/Digital/Numerical p. 2 Protective Relaying Systems and Their Design p. 2 Design Criteria

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

Transformer Protection

Transformer Protection Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing

More information

Power systems Protection course

Power systems Protection course Al-Balqa Applied University Power systems Protection course Department of Electrical Energy Engineering 1 Part 5 Relays 2 3 Relay Is a device which receive a signal from the power system thought CT and

More information

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21 Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering) R10 Set No. 1 Code No: R41023 1. a) Explain how arc is initiated and sustained in a circuit breaker when the CB controls separates. b) The following data refers to a 3-phase, 50 Hz generator: emf between

More information

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8]

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8] Code No: RR320205 Set No. 1 1. (a) Explain about Bewley s Lattice diagrams and also mention the uses of these diagrams. [6+2] (b) A line of surge impedance of 400 ohms is charged from a battery of constant

More information

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number:  Address: NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information

More information

NERC Protection Coordination Webinar Series July 15, Jon Gardell

NERC Protection Coordination Webinar Series July 15, Jon Gardell Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

SCHEME OF COURSE WORK ( ) Electrical & Electronics Engineering. Electrical machines-i, II and power transmission engineering

SCHEME OF COURSE WORK ( ) Electrical & Electronics Engineering. Electrical machines-i, II and power transmission engineering SCHEME OF COURSE WORK (2015-2016) COURSE DETAILS: Course Title Course Code Program Branch Semester Prerequisites Course to which it is prerequisite Switchgear and Protection 15EE1116 B.Tech Electrical

More information

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS 2-1. General but less than locked-rotor amperes and flows only Electrical power systems must be designed to serve in the normal circuit path. a variety of

More information

Power System Protection Manual

Power System Protection Manual Power System Protection Manual Note: This manual is in the formative stage. Not all the experiments have been covered here though they are operational in the laboratory. When the full manual is ready,

More information

Transformer Protection

Transformer Protection Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary

More information

Generator Protection GENERATOR CONTROL AND PROTECTION

Generator Protection GENERATOR CONTROL AND PROTECTION Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault

More information

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY WN U-60 Attachment C to Schedule 152, Page 1 SCHEDULE 152 APPLICATION FOR INTERCONNECTING A GENERATING FACILITY TIER 2 OR TIER 3 This Application is considered complete when it provides all applicable

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,

More information

COPYRIGHTED MATERIAL. Index

COPYRIGHTED MATERIAL. Index Index Note: Bold italic type refers to entries in the Table of Contents, refers to a Standard Title and Reference number and # refers to a specific standard within the buff book 91, 40, 48* 100, 8, 22*,

More information

Power System Protection. Dr. Lionel R. Orama Exclusa, PE Week 3

Power System Protection. Dr. Lionel R. Orama Exclusa, PE Week 3 Power System Protection Dr. Lionel R. Orama Exclusa, PE Week 3 Operating Principles: Electromagnetic Attraction Relays Readings-Mason Chapters & 3 Operating quantities Electromagnetic attraction Response

More information

1% Switchgear and Substations

1% Switchgear and Substations 1% Switchgear and Substations Switchgear and substations are not always matters of concern for transmitter designers, -because they are often part of the facilities of a typical installation. However,

More information

889 Advanced Generator Protection Technical Note

889 Advanced Generator Protection Technical Note GE Grid Solutions 8 Series 889 Advanced Generator Protection Technical Note GE Publication Number: GET-20056 Copyright 2017 GE Multilin Inc. Overview The Multilin 889 is part of the 8 Series platform that

More information

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative:  Address: Fax Number: Interconnection of a Customer-Owned Renewable Generation System of Greater than 100 KW and Less than or Equal to 1 MW to the LCEC Electric Grid Tier 3 Application and Compliance Form Instructions: Complete

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

PART 1 OWNER/APPLICANT INFORMATION

PART 1 OWNER/APPLICANT INFORMATION CALHOUN COUNTY ELECTRIC COOP. ASSN. Application for Operation of Customer-Owned Generation This application should be completed as soon as possible and returned to the Cooperative in order to begin processing

More information

3. What is hysteresis loss? Also mention a method to minimize the loss. (N-11, N-12)

3. What is hysteresis loss? Also mention a method to minimize the loss. (N-11, N-12) DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE 6401 ELECTRICAL MACHINES I UNIT I : MAGNETIC CIRCUITS AND MAGNETIC MATERIALS Part A (2 Marks) 1. List

More information

BUS2000 Busbar Differential Protection System

BUS2000 Busbar Differential Protection System BUS2000 Busbar Differential Protection System Differential overcurrent system with percentage restraint protection 1 Typical Busbar Arrangements Single Busbar Double Busbar with Coupler Breaker and a Half

More information

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation This application is to be completed and returned to the Cooperative member service representative in order to begin

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

SYNCHRONOUS MACHINES

SYNCHRONOUS MACHINES SYNCHRONOUS MACHINES The geometry of a synchronous machine is quite similar to that of the induction machine. The stator core and windings of a three-phase synchronous machine are practically identical

More information

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

CHAPTER 3 OVER CURRENT AND EARTH FAULT RELAY COORDINATION

CHAPTER 3 OVER CURRENT AND EARTH FAULT RELAY COORDINATION 18 CHAPTER 3 OVER CURRENT AND EARTH FAULT RELAY COORDINATION 3.1. OVERVIEW OF RELAY COORDINATION Relay coordination has to be carried out based on many other power system studies and Equipment Sizing calculation,

More information

FERRORESONANCE SIMULATION STUDIES USING EMTP

FERRORESONANCE SIMULATION STUDIES USING EMTP FERRORESONANCE SIMULATION STUDIES USING EMTP Jaya Bharati, R. S. Gorayan Department of Electrical Engineering Institute of Technology, BHU Varanasi, India jbharatiele@gmail.com, rsgorayan.eee@itbhu.ac.in

More information

Power Plant and Transmission System Protection Coordination Fundamentals

Power Plant and Transmission System Protection Coordination Fundamentals Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and

More information

IV/IV B.Tech (Regular) DEGREE EXAMINATION. Electrical &Electronics Engineering

IV/IV B.Tech (Regular) DEGREE EXAMINATION. Electrical &Electronics Engineering Hall Ticket Number: 14EE704 November, 2017 Seventh Semester Time: Three Hours Answer Question No.1 compulsorily. Answer ONE question from each unit. IV/IV B.Tech (Regular) DEGREE EXAMINATION Electrical

More information

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy UProtection Requirements Ufor a Large scale Wind Park Shyam Musunuri Siemens Energy Abstract: In the past wind power plants typically had a small power rating when compared to the strength of the connected

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Cork Institute of Technology Bachelor of Science (Honours) in Electrical Power Systems - Award Instructions Answer FIVE questions. (EELPS_8_Y4) Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Examiners:

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (AUTONOMOUS) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (AUTONOMOUS) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (AUTONOMOUS) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING ASSIGNMENT Name : Electrical and Electronics Engineering Code : A30203 Class : II B. Tech I Semester Branch

More information

Busbars and lines are important elements

Busbars and lines are important elements CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection

More information

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre.

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre. General PQ: Power Quality has multiple issues involved. Thus, need to have some benchmarking standards. Very little is spoken about the LT supply installation within an industry. There is need to understand

More information

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012 SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM Unit Objectives Describe the structure of an atom. Identify atoms with a positive charge and atoms with a negative charge. Explain

More information

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION Sr. No. Course Content 1.0 Fault Current Calculations 1.1 Introduction to per unit and percentage impedance 1.2

More information

CHAPTER 4. Distribution Transformers

CHAPTER 4. Distribution Transformers CHAPTER 4 Distribution Transformers Introduction A transformer is an electrical device that transfers energy from one circuit to another purely by magnetic coupling. Relative motion of the parts of the

More information

Excitation Systems THYRIPART. Compound-Excitation System for Synchronous Generators. Power Generation

Excitation Systems THYRIPART. Compound-Excitation System for Synchronous Generators. Power Generation Excitation Systems Compound-Excitation System for Synchronous Generators Power Generation Operating Characteristics Load dependent Short circuit supporting Low voltage gradient dv/dt Black start capability

More information

PIPSPC. Prepared by Eng: Ahmed Safie Eldin. And. Introduction. Protection Control. Practical. System. Power

PIPSPC. Prepared by Eng: Ahmed Safie Eldin. And. Introduction. Protection Control. Practical. System. Power PIPSPC Practical Introduction Power System Protection Control Practical Introduction To Power System Protection And Control Prepared by Eng: Ahmed Safie Eldin 2005 Contents POWER SYSTEMS PRINCIPALS. 1

More information

Earth Fault Protection

Earth Fault Protection Earth Fault Protection Course No: E03-038 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774

More information

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad

More information

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems This application should be completed as soon as possible and returned to the Cooperative in order to

More information

~=E.i!=h. Pre-certification Transformers

~=E.i!=h. Pre-certification Transformers 7 Transformers Section 26 of the electrical code governs the use and installations of transformers. A transformer is a static device used to transfer energy from one alternating current circuit to another.

More information

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION This application should be completed and returned to in order to begin processing the request for interconnecting as required by

More information

XD1-T Transformer differential protection relay. Manual XD1-T (Revision A)

XD1-T Transformer differential protection relay. Manual XD1-T (Revision A) XD1-T Transformer differential protection relay Manual XD1-T (Revision A) Woodward Manual XD1-T GB Woodward Governor Company reserves the right to update any portion of this publication at any time. Information

More information

Transformer Protection Principles

Transformer Protection Principles Transformer Protection Principles 1. Introduction Transformers are a critical and expensive component of the power system. Due to the long lead time for repair of and replacement of transformers, a major

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. 2) The model answer and the answer written by candidate

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78) Power Plant and Transmission System Protection Coordination Loss-of of-field (40) and Out-of of-step Protection (78) System Protection and Control Subcommittee Protection Coordination Workshop Phoenix,

More information

CHIEF ENGINEER REG III/2 MARINE ELECTROTECHNOLOGY

CHIEF ENGINEER REG III/2 MARINE ELECTROTECHNOLOGY CHIEF ENGINEER REG III/2 MARINE ELECTROTECHNOLOGY LIST OF TOPICS 1 Electric Circuit Principles 2 Electronic Circuit Principles 3 Generation 4 Distribution 5 Utilisation The expected learning outcome is

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

O V E R V I E W O F T H E

O V E R V I E W O F T H E A CABLE Technicians TESTING Approach to Generator STANDARDS: Protection O V E R V I E W O F T H E 1 Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments

More information

Substation applications

Substation applications Substation applications To make it easy to choose the right for a protection application, the most typical applications are presented with the type of for them. Each sample application is presented by:

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements User s Guide General Most faults in power systems can be detected by applying

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

thepower to protect the power to protect i-gard LITERATURE Low and medium voltage

thepower to protect  the power to protect i-gard LITERATURE Low and medium voltage thepower to protect i-gard LITERATURE Low and medium voltage distribution systems Arc Flash Hazards and High Resistance Grounding Grounding of Standby and Emergency Power Systems Neutral Grounding Resistors

More information

I -limiter The world s fastest switching device

I -limiter The world s fastest switching device I S -limiter 2 I S -limiter The world s fastest switching device Reduces substation cost Solves short-circuit problems in new substations and substation extensions Optimum solution for interconnection

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection System Protection and Control Subcommittee

More information

Generator Advanced Concepts

Generator Advanced Concepts Generator Advanced Concepts Common Topics, The Practical Side Machine Output Voltage Equation Pitch Harmonics Circulating Currents when Paralleling Reactances and Time Constants Three Generator Curves

More information

Application of Low-Impedance 7SS601 Busbar Differential Protection

Application of Low-Impedance 7SS601 Busbar Differential Protection Application of Low-Impedance 7SS601 Busbar Differential Protection 1. Introduction Utilities have to supply power to their customers with highest reliability and minimum down time. System disturbances,

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Utility Interconnection and System Protection

Utility Interconnection and System Protection Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Power System Protection Where Are We Today?

Power System Protection Where Are We Today? 1 Power System Protection Where Are We Today? Meliha B. Selak Power System Protection & Control IEEE PES Distinguished Lecturer Program Preceding IEEE PES Vice President for Chapters melihas@ieee.org PES

More information

Conventional Paper-II-2011 Part-1A

Conventional Paper-II-2011 Part-1A Conventional Paper-II-2011 Part-1A 1(a) (b) (c) (d) (e) (f) (g) (h) The purpose of providing dummy coils in the armature of a DC machine is to: (A) Increase voltage induced (B) Decrease the armature resistance

More information

Electrical Power Systems

Electrical Power Systems Electrical Power Systems CONCEPT, THEORY AND PRACTICE SECOND EDITION SUBIR RAY Professor MVJ College of Engineering Bangalore PHI Learning Pfcte tofm Delhi-110092 2014 Preface xv Preface to the First Edition

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

Excitation Systems RG3 - T4. Transistorized Excitation Systems for Synchronous Generators. Power Generation

Excitation Systems RG3 - T4. Transistorized Excitation Systems for Synchronous Generators. Power Generation Excitation Systems RG3 - T4 Transistorized Excitation Systems for Synchronous Generators Power Generation Operating Characteristics Reliability High availability Digital control facilities Very good control

More information

Electrical Description

Electrical Description History of this Document Rev. no.: Date: Description of change 0 First edition 2 2003-10-08 Section 3: The rated power of the transformer can be increased by 40% if they are equipped with 6 fans for forced

More information

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection 133 1. Pilot wire differential relays (Device 87L) The pilot wire differential relay is a high-speed

More information

NTG MULTIFUNCTON GENERATOR PROTECTION RELAY. NTG-Slide

NTG MULTIFUNCTON GENERATOR PROTECTION RELAY. NTG-Slide NTG MULTIFUNCTON GENERATOR PROTECTION RELAY 1 NTG Digital protection relay that integrates a number of functions required r for the protection of generators. It is used in power stations from gas, steam,

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Transformer Fault Categories

Transformer Fault Categories Transformer Fault Categories 1. Winding and terminal faults 2. Sustained or uncleared external faults 3. Abnormal operating conditions such as overload, overvoltage and overfluxing 4. Core faults 1 (1)

More information

Design a Power System Simulator Model and Implement the Generator and Motor Controlling

Design a Power System Simulator Model and Implement the Generator and Motor Controlling Design a Power System Simulator Model and Implement the Generator and Motor Controlling G.U De Silva, G.B Alahendra, A.C.P Aluthgama, P.G.L Arachchi Supervised by: Prof. J Rohan Lucas, Eng. J. Karunanayake

More information

Transformer protection IED RET 670

Transformer protection IED RET 670 Gunnar Stranne Transformer protection IED RET 670 Santiago Septiembre 5, 2006 1 Transformer protection IED RET670 2 Introduction features and applications Differential protection functions Restricted Earth

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities

More information

Unit Protection Differential Relays

Unit Protection Differential Relays Unit Protection PROF. SHAHRAM MONTASER KOUHSARI Current, pu Current, pu Protection Relays - BASICS Note on CT polarity dots Through-current: must not operate Internal fault: must operate The CT currents

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Catastrophic Relay Misoperations and Successful Relay Operation

Catastrophic Relay Misoperations and Successful Relay Operation Catastrophic Relay Misoperations and Successful Relay Operation Steve Turner (Beckwith Electric Co., Inc.) Introduction This paper provides detailed technical analysis of several catastrophic relay misoperations

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Power System Protection Part VII Dr.Prof.Mohammed Tawfeeq Al-Zuhairi. Differential Protection (Unit protection)

Power System Protection Part VII Dr.Prof.Mohammed Tawfeeq Al-Zuhairi. Differential Protection (Unit protection) Differential Protection (Unit protection) Differential Protection Differential protection is the best technique in protection. In this type of protection the electrical quantities entering and leaving

More information

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections

More information

Sizing Generators for Leading Power Factor

Sizing Generators for Leading Power Factor Sizing Generators for Leading Power Factor Allen Windhorn Kato Engineering 24 February, 2014 Generator Operation with a Leading Power Factor Generators operating with a leading power factor may experience

More information

Electric Power Systems 2: Generators, Three-phase Power, and Power Electronics

Electric Power Systems 2: Generators, Three-phase Power, and Power Electronics 15-830 Electric Power Systems 2: Generators, Three-phase Power, and Power Electronics J. Zico Kolter October 9, 2012 1 Generators Basic AC Generator Rotating Magnet Loop of Wire 2 Generator operation Voltage