Contents. Build the Spitfire: Step-By-step

Size: px
Start display at page:

Download "Contents. Build the Spitfire: Step-By-step"

Transcription

1 Pack 2 Stages -20

2 Contents Stage Page Number Editorial and design by Continuo Creative, 9- North Road, London N7 9DP All rights reserved 20 De Agostini Publishing USA, 95 Broadway, Suite 609, NEW YORK, NY 000 BUILD THE SPITFIRE complies with CE regulations. Items may vary from those shown. NOT SUITABLE FOR CHILDREN UNDER THE AGE OF. THIS PRODUCT IS NOT A TOY AND IS NOT DESIGNED OR INTENDED FOR USE IN PLAY. ITEMS MAY VARY FROM THOSE SHOWN.

3 Stage 2 This stage s parts - Wing rib 2 - Wing rib 5 - Wing rib 6 - Wooden strips x 5 x 00mm You will need Pencil Sandpaper Wood glue Triangle or T-square 2 Sand the wing ribs to smooth and remove splinters. Take the three wing ribs provided in Stage 0 and number them to with a pencil. 8 Have the spar supplied with Stage 9 at hand, along with rib.

4 5 2 Hold the spar upright and apply glue to the fifth notch from the left. Place rib into the notch, as shown. 5 6 Check that the lower projections of the spar and the rib are level. Check that the upper part of the rib is flush with the top of the spar. 9

5 7 8 90º 2 Before the glue dries, check with a triangle or T-square that the rib is at a 90 angle to the spar. Position the ribs from this stage, as shown, and number them Apply glue to the seventh notch on the main spar and have rib at hand. 5 6 Place rib into place in the seventh notch. Then, repeat this process to glue ribs 5 and 6 into the ninth and th notches. Here is how the pieces that you have assembled should look at this stage. 0

6 Stage 2 2 This stage s parts You will need - Wing rib 2 - Wing rib 2 - Wing rib - Wooden strips x 5 x 00mm Sandpaper Wood glue Triangle or T-square Block of wood or similar Pencil 2 Apply glue to the third notch in the main spar and have rib 2 from Stage 0 ready. Insert rib 2 into place, checking the projections at the bottom, and the top edges are flush.

7 90 o Check that the rib is at 90 to the spar when it dries. 5 Place something underneath the ribs to raise the entire rear portion of the wing, making sure the projections at the rear of the ribs aren t touching the work surface. Prepare the ribs from this stage in the same way as before, sanding them smooth and marking their numbers (-) on them. 6 Apply glue to the fourth notch of the spar, between ribs 2 and. Place rib 2 into the fourth notch, making sure it is resting on the block holding the rear of the ribs up and the top of the rib is flush with the spar. 2

8 7 8 Make sure the rear of rib 2 is centered between the adjacent ribs. 9 Before the glue has dried, check that the tops of the rib and the spar are flush. 0 Now take wing rib and apply glue to the sixth notch in the spar, as shown. Place the rib into the notch, checking that it is flush with the spar and centered between the adjacent ribs. Here is how the pieces that you have assembled should look at this stage. As always, keep any unused materials to the side.

9 Stage 2 This stage s parts - Wing rib 2 - Wing rib 5 - Wooden strips x 5 x 00mm - Wooden strips x x 00mm You will need Glue Ruler Saw/knife File or sanding block 2 Test-fit rib in the corresponding notch on the spar, adjust if necessary and then apply glue. Insert the rib into the notch. Check that it is centered between the adjacent ribs and that it is flush with the top of the spar before it dries.

10 Now take rib 5, test-fit and adjust it if necessary, then apply glue to the notch " Insert the rib into place in the notch on the spar. Take the x mm strips provided with Stage 0 and cut into three.5-inch lengths. 5

11 6 Test-fit the strips of wood in the notches in the two frames highlighted by arrows in the photo, and then apply glue to the notches. 7 8 Glue the strips flush with the second frame. Once dry, remove any strips that extend past the first frame. 6

12 9 0 Cut away the part of the wooden strip at the top of the fuselage that extends past frame. Use a file or sanding block to smooth the strips cut in Step 8 flush with the frame. Also, smooth the end of the strip from the previous step. This is how the wing and fuselage should look at this stage. Keep any spare material to one side. 7

13 Stage 2 This stage s parts - Spar rear wing 2 - Wing rib 7 - Wing rib 6 - Wooden strips x x 00mm You will need Glue Triangle or T-square Take wing rib 7, test-fit it, and apply glue to the highlighted notch in the spar. 8 Place the rib into the spar. Check that the projections are resting on your work surface and that the tops of the rib and spar are aligned.

14 90º Use a triangle to make sure that the rib is positioned at a right-angle to the spar. Take rib provided with Stage 2. Insert it into the spar, but do not glue. 5 6 Apply glue to the notches (arrowed) of the ribs that have projections on the underside of them. Have the rear spar to hand. Place the rear spar over the notches on the tops of the ribs, as shown. Before fitting into position, look at the next step. 9

15 7 8 Rib should be positioned at an angle to the other ribs. Move into the correct position as you push the rear spar down into the notches. 9 Raise the back of the wing up and make sure that the tops of the ribs are all aligned with the rear spar. Apply glue to the ribs that weren t glued in Step 5, as well as both notches of rib. 0 Now take rib provided with Stage 0 and apply glue to the ends of the two wing spars. Place rib onto the ends of the spars. Note that the ends of the spars are angled so the rib won t sit perfectly horizontally. Your wing should now appear like this. Don t forget to set aside unused materials and mark any ribs with their numbers. 50

16 Stage 5 2 This stage s parts - Wing rib Wing rib 9 - Wing rib 0 - Wooden strips x 5 x 00mm You will need Glue Triangle or T-square 2 Take rib 8 and test-fit in the highlighted notch on the spar. Then apply glue to the notch. 5 Slide the rib down into the notch in the spar, making sure that the projections rest flush with your work surface.

17 2 Make sure that the rib dries at a right angle to the spar. Apply glue to the highlighted notch on the spar and have rib 9 ready Slide rib 9 into place on the spar until the projections on the bottom of the rib are flush against the work surface. Position rib 9 so that it is at a right angle to the spar. 52

18 7 8 Test-fit and glue rib 0 into place at the end of the spar, making sure that it is parallel to rib 9. 9 Test-fit a x mm wooden strip from a previous stage in the groove along the tops of the ribs, behind the spar. Apply glue to the notches of the ribs highlighted by the dotted line. 0 Now insert the strip into the groove along the top of the ribs. The end of the strip should be positioned halfway across rib 6. Adjust the position if necessary. Keep any unused pieces to one side and check that your wing looks the same as the one shown here. 5

19 Stage 6 2 This stage s parts - Wing rib Wing rib 8 - Wing rib 9 - Wing tip You will need Pencil Knife Glue 2 Place a x mm wooden strip into the notches behind the spar on the underside of the wing. Position it flush with the side of the second rib. 5 At the other end of the strip, make a mark aligned with the side of the notch (see Step ) and cut off the length past this mark.

20 Apply glue to the notches of the ribs where the strip will be positioned (dotted red line). Insert the strip into position in the notches of the ribs, aligning it in the same way as Steps and 2. 5 Test-fit a length of x mm strip in the highlighted area (dotted line) and then apply glue along the spar. 55

21 6 Place the strip in the groove of the first rib up against the spar and the end of the strip in the second rib. 7 8 Leave to dry, making sure that the strip remains aligned with the strip in the second rib. Test-fit the wing tip in place against the rib at the end of the wing. Then apply glue along the line. 56

22 9 0 Push the wing tip into place in the rib. Until the wing tip is fixed in place, make sure it remains at an even distance from your work surface. Your wing should now look like this. Don t forget to set aside any spare material. 57

23 Stage 7 2 This stage s parts - Rear spar 2 - Wing tip ribs (upper) - Wooden strips x 5 x 00mm You will need Sandpaper Glue Pencil Knife Clamp 2 Test-fit the spar into place against the ribs shown, make any adjustments and then apply glue to the contact points. 58 Re-fit the spar, making sure that it is fully engaged with the ribs.

24 Now take rib 6 provided with Stage. Test-fit it in place in the two notches (arrows). Look at the next step to see how to fit it. First insert the rear part of the rib into the groove of the rear spar. Then push down into the main spar, engaging the notches Now take ribs 7, 8 and 9 provided in the previous stage and test-fit into the arrowed notches. Apply glue to the contact points for rib 7 and fit into the spars in the same way as Step. 59

25 Then, glue ribs 8 and 9 into place as well. Take a strip of x mm wood provided in a previous stage and place it on top of the wing up against the existing x mm strip. Make a mark on the strip, in line with the last rib. 0 Cut the strip to length and apply glue to the cutouts in the ribs behind the main spar. Glue the strip into position. You may want to hold it there with a clamp while it dries. Your wing should now look like this. Set aside any unused materials. 60

26 Stage 8 2 This stage s parts - Wing tip ribs (lower) 2 - Wooden strips x 5 x 00mm - Tube You will need Pencil Knife Glue Sandpaper Saw 2 Take a x mm wooden strip and place it along the groove behind the main spar on the underside of the wing, up against the existing x mm wooden strip. Make a mark in line with the last rib. 6 Cut the strip to length, apply glue to the contact points and fix into place.

27 E F F A G B E D C A B C D Take the upper wing tip rib sheet that came with the previous stage. Identify the parts and mark with a pencil, as shown. Remove the pieces from the sheet. You can leave rib G in the sheet for the moment. 5 6 D B C D A B C F A Test-fit ribs A-D in the wing tip, along the dotted lines and adjust if necessary. Glue ribs A-D into place. E 62

28 7 8 E F Test-fit ribs E and F in place in the larger holes at the front of the wing tip. Apply glue to the contact areas of E and glue into place. Before E dries, glue F into place up against it. 9 0 Remove rib G from the sheet and test-fit in the notches of A-F. Apply glue along the line. G Place rib G firmly into position. Now cut the excess from the wooden strips protruding from the first rib. This is how the wing should appear after this stage. Set aside any spare parts. 6

29 Stage 9 2 This stage s parts - Left wing main spar 2 - Rib reinforcement sheet You will need Pencil Knife Sandpaper Glue 2 D F E C D C B A G A B Take the lower wing tip rib sheet that came with the previous stage. Identify the parts and mark with a pencil, as shown. 6 Remove ribs A, B, C and D from the parts sheet.

30 D C B A F E Test-fit ribs A-D in place on the underside of the wing tip. Glue into place. Now test-fit and glue ribs E and F into place, in the same way as Step 7, page 6. 5 Remove rib G from the sheet, test-fit and glue into place over the other ribs. G 65

31 6 7 2 Now take the reinforcement sheet provided with this stage and remove the individual pieces. Sand off any burrs or splinters from the wood. Apply glue to the front of the fifth rib along the dotted lines. 8 9 Place one of the two shorter reinforcements flush with the lower edge of the rib. Then place the second reinforcement flush with the upper edge. Now apply glue along the top of the rib. 66

32 0 Place the long reinforcement flush with the top of the rib. This is how the wing should look after this stage. Remember to set any unused parts to one side. 67

33 Stage 20 2 This stage s parts - Wing rib 2 - Wing rib 2 - Rib reinforcement sheet - Wooden strip x x 00mm You will need Sandpaper Pencil Glue Triangle or T-square Remove any burrs or splinters from the ribs and then mark their numbers ( and 2) on them. 68 To help you assemble the second wing correctly, have the first close by to refer to. Place rib 2 and the spar supplied with Stage 9 in front of you.

34 Test-fit rib 2 in position on the spar. Apply glue to the second notch in the spar along the dotted line. Place the rib into the notch. Make sure the projections at the bottom of the rib are flush with the work surface º Check that the top of the rib is aligned with the top of the spar. Hold a triangle up against the rib and the spar to ensure that it dries at a right angle. 69

35 7 Retrieve the tube provided with Stage 8 and the right wing assembly. Pass the tube down the wing through the holes in the front of the ribs. 8 9 Stop passing the tube along the wing when it reaches approximately halfway between the first and the second ribs. Hold the tube up against the corner at the bottom of the holes in the ribs. Apply glue to the tube and ribs to secure in place. 70

36 0 When the tube is glued to the ribs, you will notice that the tube extends past the end of the wing. Do not remove yet. Your wings should appear as above. Store any spare materials. 7

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30 Pack Stages 2-0 Contents Stage Page Number 2 72-74 22 75-78 2 79-8 24 82-84 25 85-88 26 89-9 27 92-94 28 95-97 29 98-00 0 0-05 Editorial and design by Continuo Creative, 9-4 North Road, London N7 9DP All

More information

Build the Spitfire: Step-By-step. Pack 4 Stages 31-40

Build the Spitfire: Step-By-step. Pack 4 Stages 31-40 Pack 4 Stages 31-40 1 Contents Stage Page Number 31 106-108 32 109-111 33 112-115 34 116-118 35 119-122 36 123-125 37 126-128 38 129-132 39 133-136 40 137-139 Editorial and design by Continuo Creative,

More information

Build the Spitfire: Step-By-step. Pack 7 Stages 61-71

Build the Spitfire: Step-By-step. Pack 7 Stages 61-71 Pack 7 Stages 61-71 1 Stage Contents Page Number 61 212-215 62 216-218 63 219-221 64 222-224 65 225-228 66 229-231 67 232-235 68 236-238 69 239-241 70 242-245 71 246-249 Editorial and design by Continuo

More information

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat USS CONSTITUTION Build the The world s oldest commissioned naval vessel afloat 04 Build the USS STAGE CONSTITUTION Contents PAGE Wooden strips and a ladder 63 9 Wooden strips and nails 6 30 Wooden strips

More information

BUILD THE. Soleil Royal. Pack 1. The flagship of King Louis XIV.

BUILD THE. Soleil Royal. Pack 1. The flagship of King Louis XIV. BUILD THE Soleil Royal The flagship of King Louis XIV www.model-space.com Pack 1 Stage 1 Assembly Guide Hull frame, false keel and first deck half A 4 2 5 1 6 7 1A Smooth the surfaces of all the pieces

More information

SAN FELIPE: Step by Step Pack 2

SAN FELIPE: Step by Step Pack 2 Pack 2 Your parts Stern reinforcement Bulkheads The poop deck Bulkhead planks Planks Tools and equipment Knife Pencil Wood glue Sandpaper File a Using leftover 5 x 5-mm wooden strips, measure and cut beams

More information

(Build Instructions)

(Build Instructions) (Build Instructions) Specifications * Wingspan: 58cm * Length: 50cm * Flying Weight: 59 grams * Channels: 3 (Rudder Elevator Throttle) * Suggested Receiver: 4Ch Micro * Motor: 8mm GearDrive * Prop: GWS

More information

San Felipe: Step by Step Pack 6

San Felipe: Step by Step Pack 6 Pack 6 Your parts Framing Tools and equipment Glue Knife Sandpaper Superglue Tweezers Clear varnish a Retrieve the grating that you assembled on Page 100. Cut two pieces of 2 x 3 mm wooden strip to fit

More information

USS Enterprise Instructions

USS Enterprise Instructions USS Enterprise Instructions If things don t fit right, double check the placement. Because all lasers are different, you may have to sand or file for a perfect fit. Clamp these pieces together and glue

More information

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled Yamato: Step-by-step 49 The base of the bridge and strakes a c b d a Base of the bridge b Base of the bridge c Base of the bridge d Strakes x 10 THE BASE OF THE BRIDGE 1Smooth 1 to 3, first using the metal

More information

BUILD YOUR OWN. Pack 01

BUILD YOUR OWN. Pack 01 BUILD YOUR OWN TM Pack 01 01 CONTENTS Assembly Guide 03 Stage 1: The fuel tank Stage 2: The cylinder head cover and breather Stage 3: The front wheel and the instruments Stage 4: The handlebars Editorial

More information

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat USS CONSTITUTION Build the The world s oldest commissioned naval vessel afloat 05 Build the USS STAGE CONSTITUTION Contents PAGE 39 Bow frames 87 40 Stern frames 89 4 Grating strips, wooden strips and

More information

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat USS CONSTITUTION Build the The world s oldest commissioned naval vessel afloat 08 Build the USS STAGE CONSTITUTION Contents PAGE 7 Gun port lids, wooden strips and guns 7 7 Gun port lids, wooden strip

More information

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website Grade 11 Woods Lift Lid Coffee Table Based on Under the big Top from Popular Mechanics Website TABLE TOP 1. Select enough lumber to construct a top that is between 22 ½ and 24 wide after jointing. Ensure

More information

BUILD YOUR OWN. Pack 12

BUILD YOUR OWN. Pack 12 BUILD YOUR OWN TM Pack 12 177 CONTENTS Assembly Guide 179 Stage 38: The right crankcase half Stage 39: The IR sensor board Stage 40: The left crankcase half Editorial and design by Continuo Creative, 39-41

More information

3Position the hull of the ship as

3Position the hull of the ship as Yamato: Step-by-step 25 The hull and stern deck c b d a b d c e e f a Rear frame b Stern deck x 2 c Stern deck x 2 d Side wall x 2 Wood glue Sandpaper (no. 400 grain) Craft knife Pliers d Side wall x 2

More information

San Felipe: Step by Step Pack 3

San Felipe: Step by Step Pack 3 Pack 3 Your parts Bulwarks Gun port covers x 2 Tools and equipment Wood glue Sandpaper Brushes Wood stain Hammer Pin pusher/nails Razor saw a Remove the longer bulwark and test-fit it in place at the bow

More information

BUILD YOUR OWN. Pack 02

BUILD YOUR OWN. Pack 02 BUILD YOUR OWN TM Pack 02 17 CONTENTS Assembly Guide 19 Stage 5: The headlight case Stage 6: The left fork Stage 7: The right fork Editorial and design by Continuo Creative, 39-41 North Road, London N7

More information

Hobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions

Hobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions Materials needed: 15 or 30 minute epoxy Medium CA Masking tape Scotch tape Servo Tape Wax paper Tools Needed: Pencil or marker Flat building surface Hobby knife or razor blade 7/64" or 3mm drill bit 3/16"

More information

3Insert the second rod no. 4

3Insert the second rod no. 4 Yamato: Step-by-step 37 The stern block and searchlight control towers a b c d e f Recommended tools and materials Wood glue Sandpaper (no. 800 grain) Metal file Putty Craft knife For metal: Super Glue

More information

The Hamlin Assembly Instruction By Laser Dollhouse Designs

The Hamlin Assembly Instruction By Laser Dollhouse Designs The Hamlin Assembly Instruction By Laser Dollhouse Designs NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also gives

More information

SE5a Wing Panels rev 1.0

SE5a Wing Panels rev 1.0 SE5a Wing Panels rev 1.0 The top and bottom wings are different. They might look the same but the bottom wing has one less rib and some rib spacing difference. This is due to where the wooden interplane

More information

1Take the keel (3) and

1Take the keel (3) and 1 The hull and the bridge 1Take the keel (3) and apply PVA wood glue in the second slot from the left: a toothpick may make it easier. Take care: the left end is the one that has a projection. THE HULL

More information

Build the. Steam Locomotive. Pack 06

Build the. Steam Locomotive. Pack 06 Build the Steam Locomotive Pack 06 Build the Steam Locomotive Contents Step by step Stage 38: The boiler band Stage 39: Sand spreader pipe main cocks Stage 40: Building up the dome Stage 41: The sand spreader

More information

High performance 90mm fiberglass jet

High performance 90mm fiberglass jet High performance 90mm fiberglass jet Assembly manual For intermediate and advanced fliers only! Specs Wingspan: 1255mm Fuselage length: 1250mm Flying weight: 2600-3000g Wing area: 22.6 dm² Wing loading:

More information

STAGE PAGE. 6 The left front door interior The right front wheel The right front seat back The right front wheel 37

STAGE PAGE. 6 The left front door interior The right front wheel The right front seat back The right front wheel 37 Pack 2 STAGE PAGE 6 The left front door interior 25 7 The right front wheel 29 8 The right front seat back 33 9 The right front wheel 37 10 The right front door 41 11 The right front door window 45 12

More information

BUILD YOUR OWN. Pack 22

BUILD YOUR OWN. Pack 22 BUILD YOUR OWN TM Pack 22 01 CONTENTS Assembly Guide 339 Stage 70: The front brake lever Stage 71: The oil hose and the twistgrip Stage 72: Fitting the front fork assembly Editorial and design by Continuo

More information

uin RC FPRC ZERO Specificationss Empty Weight

uin RC FPRC ZERO Specificationss Empty Weight Flying Pengu uin RC FPRC ZERO Specificationss Wing Span 42.75 (1085 mm) Fuselage length 30.5 ( 775 mm) Empty Weight 9.5 10 oz. (150 160g) Estimated Flying Weight 20 255 oz. (320 400g) Wing Area: 151 sq.

More information

BUILD AND DRIVE THE RADIO-CONTROLLED MODEL SCALE 1:16

BUILD AND DRIVE THE RADIO-CONTROLLED MODEL SCALE 1:16 BUILD AND DRIVE THE RADIO-CONTROLLED MODEL 7 SCALE 1:16 CONTENTS STAGE PAGE 34 The fourth stowage pannier 81 35 The gun, mantlet cover and track 83 36 The recoil mechanism 85 37 The infrared receiver 87

More information

Hubble Space Telescope Paper Model Directions Downloads, patterns, and other information at:

Hubble Space Telescope Paper Model Directions Downloads, patterns, and other information at: Hubble Space Telescope Paper Model Directions Downloads, patterns, and other information at: www.hubblesite.org/go/model Materials: model pattern printed onto cardstock/coverstock instructions printed

More information

Mold #328. Roller Bot. Nail Bot. You will need the following. pieces from mold #328 for this robot. mold #328 for this robot.

Mold #328. Roller Bot. Nail Bot. You will need the following. pieces from mold #328 for this robot. mold #328 for this robot. Nail Bot mold #328 for this Mold #328 Roller Bot mold #328 for this Stand the piece up and glue the tanks onto the back of the piece. Be sure to center the tanks. Lay these two pieces down on a flat surface

More information

The Olympic DLG. (Discus launch glider) by Chris Brislin

The Olympic DLG. (Discus launch glider) by Chris Brislin The Olympic DLG (Discus launch glider) by Chris Brislin 1 Contents Parts List/ What you need 3 Before you begin 4 Wing Construction 5-9 Pod Construction 9-13 Tail assembly 13-? Control linkages 9-10 Finishing

More information

EXTREME LOAD no. TWO

EXTREME LOAD no. TWO 1602 - EXTREME LOAD no. TWO Kit Features: 22' 4 " x 14' x 3'-6 Oversize Load 49mm (1.9") actual height Bolt Head Details Welded Load Mounting Fins Painting Handles Tools Required: Hobby Knife Tweezers

More information

F100 Super Sabre instructions.

F100 Super Sabre instructions. F100 Super Sabre instructions. The F100 is a Jet model for the Wemotec 480 Minifan. Start with taking the parts out of the sheet and sand of the connection tabs. Instructions RBCkits F100 Super Sabre 1

More information

Build your own. Stages 7-10: See Robi s head move for the first time

Build your own. Stages 7-10: See Robi s head move for the first time Build your own Pack 03 Stages 7-10: See Robi s head move for the first time Build your own All rights reserved 2015 Published in the UK by De Agostini UK Ltd, Battersea Studios 2, 82 Silverthorne Road,

More information

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger Citabria Pro Aerobatic Parkflyer by Joel Dirnberger Revision C: December 21, 2004 Citabria Pro Building Instructions Length: Wingspan: Wing Area: Flying Weight: Wing Loading: Functions: Specifications:

More information

96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED

96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED 96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED GENERAL INSTRUCTIONS Should you elect to use the recommended Door Skin, which is 1/8 mahogany plywood measuring 36 x 88. Have it cut

More information

1Use the metal file to smooth

1Use the metal file to smooth Yamato: Step-by-step 85 Parts of the bridge and the hull a b c d e f a Part of the bridge b Part of the bridge c Part of the bridge d Radar x 2 e Part of the bridge x 2 f Wire Recommended tools and materials

More information

1/16" Square balsa strip stock is used for the fuselage and tail surfaces structure. 10T 11T 11B (2) 10B. Pec Bea. Wingspan - 18"

1/16 Square balsa strip stock is used for the fuselage and tail surfaces structure. 10T 11T 11B (2) 10B. Pec Bea. Wingspan - 18 1/16" Square balsa strip stock is used for the fuselage and tail surfaces structure. 10T 9T 8 11T 12 7T 6T F-1 7 11 (2) 10 9 6 13 Pec ea CAD Drawing by Paul radley Sheet 1 of 8 Nose plug is a lamination

More information

For Barrel Tapers. Installation and Operating Instructions for use with table saws and large disk sanders

For Barrel Tapers. Installation and Operating Instructions for use with table saws and large disk sanders Tim s Taper Tool For Barrel Tapers Installation and Operating Instructions for use with table saws and large disk sanders Your taper tool is capable of making barrel tapered shafts. The term barrel is

More information

Slimline Pro Single Tube Click Pen

Slimline Pro Single Tube Click Pen Slimline Pro Single Tube Click Pen Contributed by: Tom Wilson A.K.A Jolly Red This tutorial was downloaded from http://www.penturners.org The International Association of Penturners - 2016 MAKING THE SLIMLINE

More information

WRIGHT FLYER 1 INSTRUCTIONS FOR THE D10LC KIT

WRIGHT FLYER 1 INSTRUCTIONS FOR THE D10LC KIT WRIGHT FLYER 1 INSTRUCTIONS FOR THE D10LC KIT Manufactured in the USA by Easy Built Models PO Box 681744, Prattville, AL 36068-1744 Visit us at www.easybuiltmodels.com Easy Built Models GLUE METHODS Always

More information

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below Radiator rev 1.1 The SE5a s radiator is one of the most recognized radiators in WW1. It is one of the components that defines the SE5a. The original SE5a has seen multiple radiator designs used during

More information

Australian Vintage Radio Society Inc.

Australian Vintage Radio Society Inc. Australian Vintage Radio Society Inc. (Incorporated in Victoria A0050003S) P.O. Box 3099, Syndal L.P.O., Victoria, 3150, Australia. Cabinet assembly instructions for the AVRS 10 th Anniversary construction

More information

Specifications Wingspan: 43cm Flying Weight: 33 grams (with battery) Channels: 3 Suggested Receiver: 4Ch Micro Motor: 7mm Brushed Geardrive

Specifications Wingspan: 43cm Flying Weight: 33 grams (with battery) Channels: 3 Suggested Receiver: 4Ch Micro Motor: 7mm Brushed Geardrive Specifications Wingspan: 43cm Flying Weight: 33 grams (with battery) Channels: 3 Suggested Receiver: 4Ch Micro Motor: 7mm Brushed Geardrive Airframe Kit (Included Contents) * Airframe Parts Sheets (Depron)

More information

The Lansdowne One Car Garage Assembly Instruction by Laser Dollhouse Designs

The Lansdowne One Car Garage Assembly Instruction by Laser Dollhouse Designs The Lansdowne One Car Garage Assembly Instruction by Laser Dollhouse Designs NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and

More information

RESolution V2 Manual

RESolution V2 Manual RESolution V2 Manual Note for the German Manual: Yellow Bottle thick CA Pink Bottle Med CA Blue tube 5 minute Epoxy Green tube 90 Minute Epoxy Construction of the Fuselage Step 1: Cover the plan with a

More information

Building Tips This model can be built using the following types of adhesives:

Building Tips This model can be built using the following types of adhesives: Page 1 Building Tips This model can be built using the following types of adhesives: Epoxy (with or without microballons) Odorless cyanoacrylate (CA) with accelerator UHU Creativ for Styrofoam (or UHU

More information

BUILD AND DRIVE THE RADIO-CONTROLLED MODEL SCALE 1:16

BUILD AND DRIVE THE RADIO-CONTROLLED MODEL SCALE 1:16 BUILD AND DRIVE THE RADIO-CONTROLLED MODEL 4 SCALE 1:16 CONTENTS STAGE PAGE 17 The air outlet and track 41 18 The external fuel tanks 43 19 The track and air inlets 45 20 The track and engine access panel

More information

Big Oz. Rocket. User Guide V0313

Big Oz. Rocket. User Guide V0313 Big Oz Rocket User Guide 59824 V0313 Materials Included The Big Oz Rocket Kit should include the following materials. If something is missing, contact Customer Service at 800-358-4983. 20-ounce plastic

More information

Assembly Manual - Flamenco Guitar Kit

Assembly Manual - Flamenco Guitar Kit Assembly Manual - Flamenco Guitar Kit Index Contents (pg. 3) Soundboard assembly (pg. 4) Neck to top assembly (pg. 5) Preparation of the sides (pg. 6) Preparation of the back (pg. 7) Body assembly (pg.

More information

Articulated Ladder Truck

Articulated Ladder Truck Special Vehicle Series : 05 Articulated Ladder Truck View of completed model * This model was designed for Papercraft and may differ from the original in some respects. Tools tip Scissors Ruler, set square

More information

FORWARD FUSELAGE SIDES & REAR TOP SKINS

FORWARD FUSELAGE SIDES & REAR TOP SKINS FORWARD FUSELAGE SIDES & REAR TOP SKINS WORK REPORT Step No. Check Parts / Tools Qty Preparations. 1 [ ] 6F5-3 Upper Front Longerons 2 2 [ ] 6F5-5 Heel Support 1 3 [ ] 6F5-2 Front Floor Skin 1 3 [ ] Firewall

More information

Assembly instructions for the Simple Marble Machine

Assembly instructions for the Simple Marble Machine Assembly instructions for the Simple Marble Machine Page number 1 Parts layout Page number 2 Please note: All the assembly can be done with PVA glue. Don't apply it from the bottle or tube but put a blob

More information

10. Wing prep and subassembly

10. Wing prep and subassembly Date Section Objective: Construct and fabricate the sub-assemblies of the wing panel. Required Parts: Wing left 11gal PN104-300, Wing right 1gal PN104-400, Wing left 15 gal option PN104-322, Wing right

More information

The Ballistic Blaster Rocket Kit should contain the following items. If anything is missing, call Customer Service at

The Ballistic Blaster Rocket Kit should contain the following items. If anything is missing, call Customer Service at Ballistic Blaster User Guide Materials Included The Ballistic Blaster Rocket Kit should contain the following items. If anything is missing, call Customer Service at 800-358-4983. Body tube, 6-1/2" long,

More information

Kentucky 4H Wood Science Plans Notebook. Plans Level 1

Kentucky 4H Wood Science Plans Notebook. Plans Level 1 Kentucky 4H Wood Science Plans Notebook Plans Level 1 MATERIALS NEEDED: 1 piece wood 3/4" x 2 x 2 1 piece wood 3/4" x 3 x 3 1/2" 1 wooden spring-type clothespin 2-1 1/2" nails 1-1/2 woodscrew Wood Glue

More information

A Day House. A View of One Way to Finish the Exterior of The Day House. Read these instructions all the way through before beginning this project.

A Day House. A View of One Way to Finish the Exterior of The Day House. Read these instructions all the way through before beginning this project. A Day House A View of One Way to Finish the Exterior of The Day House Read these instructions all the way through before beginning this project. General Comments For the purposes of this project, the standard

More information

Build your own. Pack. Stages 19-22: Continue building Robi s left arm

Build your own. Pack. Stages 19-22: Continue building Robi s left arm Build your own Pack 06 Stages 19-22: Continue building Robi s left arm Build your own All rights reserved 2015 Published in the UK by De Agostini UK Ltd, Battersea Studios 2, 82 Silverthorne Road, London

More information

Framework joints FABRICATION - WOOD JOINTS. Corner joints. Tee joints. Worksheet 15a. Cable Educational Ltd

Framework joints FABRICATION - WOOD JOINTS. Corner joints. Tee joints. Worksheet 15a. Cable Educational Ltd FABRICATION - WOOD JOINTS The word: fabricate means to join together. Most wooden products are held together with adhesive. Adhesive works very well when the edge of a piece of wood is being glued to the

More information

S.E.5a (Build Instructions)

S.E.5a (Build Instructions) S.E.5a (Build Instructions) Specifications Wingspan: 38 cm Length: 31cm Flying Weight: 41 Channels: 3 (Rudder Elevator Throttle) Suggested Receiver: 3Ch Brick Motor: 7mm Geared Motor Airframe Only Kit

More information

BUILD AND DRIVE THE RADIO-CONTROLLED MODEL SCALE 1:16

BUILD AND DRIVE THE RADIO-CONTROLLED MODEL SCALE 1:16 BUILD AND DRIVE THE RADIO-CONTROLLED MODEL 6 SCALE 1:16 CONTENTS STAGE PAGE 28 The second stowage pannier and track 67 29 The right skirt 69 30 The third stowage pannier and track 71 31 The smoke mortars

More information

Adjustable Hammered Dulcimer Stand

Adjustable Hammered Dulcimer Stand Adjustable Hammered Dulcimer Stand Musicmaker s Kits (Hwy 36 behind Joseph s Restaurant) P.O. Box 2117 Stillwater MN 55082 651 439 9120 www.harpkit.com PARTS LIST: 1 Set of Assembly Instructions A. 2 front

More information

Max Launch Abort System Prod. No *Kevlar is a registered trademark of Dupont

Max Launch Abort System Prod. No *Kevlar is a registered trademark of Dupont Flying Model Parts List Max Launch Abort System Prod. No. 3014 A 11820 - Body Tube 3.5 Diam x 5.5" Long B 11824 - Orange Capsule Base Shoulder Ring C 16032 - Laser-cut Ring motor mount rear D 16033 - Laser-cut

More information

Piper Cherokee /3 scale. Construction Manual

Piper Cherokee /3 scale. Construction Manual Piper Cherokee 140 1/3 scale Construction Manual STAB CONSTRUCTION 1. Remove foam cores from cradle and place on flat surface. Inspect pieces before you epoxy halves together making sure leading and trailing

More information

RSM DISTRIBUTION Presents

RSM DISTRIBUTION Presents RSM DISTRIBUTION Presents MOSQUITO By Jack Sheeks Photo _ Jack Sheeks Semi Scale Twin Stunter Wing Span: 58" Length: 37-3/4 Area: 579 sq. in. Engine: Two.35 -.40 www.rsmdistribution.com Call (951) 678

More information

1. Build the bottom first - make sure your table is flat. Build the entire plane using foam safe CA and kicker. The best technique is to spray kicker

1. Build the bottom first - make sure your table is flat. Build the entire plane using foam safe CA and kicker. The best technique is to spray kicker Wxá zç uç `tçué 1. Build the bottom first - make sure your table is flat. Build the entire plane using foam safe CA and kicker. The best technique is to spray kicker on one part and apply a sparing amount

More information

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN BUILD YOUR OWN Pack 11 Anything you can imagine, you can make! 3D PRINTER Compatible with Windows 7 & 8 Mac OS X 3D technology is now available for you at home! BUILD YOUR OWN 3D PRINTER CONTENTS PACK

More information

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Note: These instructions vary from those provided by the manufacturer of the rocket kits. There is also considerable varying discussion

More information

FLOW HIVE ASSEMBLY GUIDE. If we look after the bees they will look after us, and the honey really is an amazing bonus. Flow Hive Hybrid 3 Frame

FLOW HIVE ASSEMBLY GUIDE. If we look after the bees they will look after us, and the honey really is an amazing bonus. Flow Hive Hybrid 3 Frame AUSTRALIAN MADE If we look after the bees they will look after us, and the honey really is an amazing bonus. FLOW HIVE ASSEMBLY GUIDE Flow Hive Hybrid 3 Frame Read all instructions first. If you are unfamiliar

More information

FireFighter.21 Building Instructions

FireFighter.21 Building Instructions A Tom Moorehouse design. Thank-you for purchasing the FireFighter.21. I believe that you will find it to be the best.21 rigger kit available. It has won 1 st place in the 2006 AMPBA nationals! It was designed

More information

The Universal Table Saw Sled

The Universal Table Saw Sled The Universal Table Saw Sled Do Precision Work Even with Inexpensive Table Saws! Table saw blades always tend to move the wood while the cut is being made. This is why it's so difficult to get accurate

More information

29mm Priority Cinco. Glue all along seam. Tape

29mm Priority Cinco. Glue all along seam. Tape 29mm Priority Cinco The 29mm Priority Cinco is a companion to the 29mm Priority Stealth which is made from a used, U.S. Postal Service Priority Mail cardboard box. A clean pizza box would work just as

More information

Hudson Dresser [1] Hudson Dresser Published on Ana White ( Submitted by dan-k [2] on Fri, :43 [1]

Hudson Dresser [1] Hudson Dresser Published on Ana White (  Submitted by dan-k [2] on Fri, :43 [1] [1] Submitted by dan-k [2] on Fri, 2011-03-11 11:43 [1] If you plan on staining this piece, it is recommended that you stain all of the drawer face materials before assembly for a more professional look.

More information

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit.

More information

PROJECT PLANS WOODEN GIFT BOX

PROJECT PLANS WOODEN GIFT BOX PROJECT PLANS WOODEN GIFT BOX Make the gifts you give even more special by presenting them in this one-of-a-kind gift box. In fact, the box may be valued more than whatever it contains. The box is sized

More information

GENERAL NOTES: Page 1 of 9

GENERAL NOTES: Page 1 of 9 Laminating A Zia Into A Turning Blank by W. H. Kloepping, Jan. 2009 This describes how a zia (the New Mexico state symbol) can be laminated into a turning blank. Materials needed: Square Turning Block

More information

The model boasts of twin fuselages and three fins

The model boasts of twin fuselages and three fins An Experimental Twin Tractor One of the Most Unique and Finest Fliers Ever Presented. If You Want Something Different, Build and Fly This One By FELIX GUTMANN The model boasts of twin fuselages and three

More information

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue Written by: Sean Cole September 19, 2008 When fitting the stiffener use 3/32 clecos to hold it in place, it makes a smaller hole and is easier to work with. Only use the amount needed to hold the stiffener

More information

129 KITCHEN BASE CABINET 480

129 KITCHEN BASE CABINET 480 129 KITCHEN BASE CABINET 480 There are two sorts of kitchen cabinets: base cabinets, which sit on the floor, and wall cabinets. Base cabinets provide both storage space and work surfaces. They often house

More information

STICK 2 IT. Fuselage Construction:

STICK 2 IT. Fuselage Construction: RCCD 2014 CLUB PROJECT STICK 2 IT Fuselage Construction: The fuselage is constructed without the use of a set of plans. The fuselage will be constructed on your previously prepared work surface and by

More information

C-180 Builder s Manual

C-180 Builder s Manual C-180 Builder s Manual. May 20, 2002 Last revised July 11, 2002 Copyright! 2002 Douglas Binder, Mountain Models www.mountainmodels.com sales@mountainmodels.com (719) 630-3186 1 Required Equipment! Xacto

More information

Seamed Undermount Bowls

Seamed Undermount Bowls CUTOUT TEMPLATES MAKING CUTOUT TEMPLATES 7.1 CUTOUT TEMPLATES The use of an accurate template is one of the most essential elements to the successful completion of a cutout in Corian. For the completion

More information

Assembly Instructions to make the box organiser for the board game Perditions Mouth

Assembly Instructions to make the box organiser for the board game Perditions Mouth Assembly Instructions to make the box organiser for the board game Perditions Mouth With a craft knife and sandpaper, remove the pieces from the sheets of plywood as you do each tray. The pieces are almost

More information

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design.

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design. Stabilizer rev 1.2 The SE5a stabilizer is the heartbeat of the tail and is recreated like the full scale version. All tail pieces depend on the stabilizer. It uses the steel fittings, pulleys, inspection

More information

Tough warrior. The author's many years of intensive competition are your guarantee of a sturdy, fliable design with all "bugs" eliminated.

Tough warrior. The author's many years of intensive competition are your guarantee of a sturdy, fliable design with all bugs eliminated. Tough warrior. The author's many years of intensive competition are your guarantee of a sturdy, fliable design with all "bugs" eliminated. LAST month we described the construction of the fuselage and motor

More information

Instruction manual. ALOUETTE 3 For 600 size

Instruction manual. ALOUETTE 3 For 600 size Instruction manual ALOUETTE 3 For 600 size Dear customer, Thank you for purchasing a Smartmodel fuselage All our team wishes you a lot of fun for building and good flights. For 600 size or 50 Nitro power

More information

90 WING SPAN P-51D MUSTANG (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED

90 WING SPAN P-51D MUSTANG (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED 90 WING SPAN P-51D MUSTANG (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED GENERAL INSTRUCTIONS This design is basically an enlargement of the very popular fun scale Mustang 60 Size. You can build it light

More information

CENTER WING SECTION (CWS) WORK REPORT

CENTER WING SECTION (CWS) WORK REPORT CENTER WING SECTION (CWS) WORK REPORT No. Check Parts / Description Qty PHASE 1: Preparations 1 [ ] 6V1-3 Rear ribs 2R & 2L 1 [ ] L Angle 6 2 [ ] 6V2-1 Rear Ribs.032 2R & 2L 2 [ ] 6V5-1 Gear Rib Doubler

More information

FUSELAGE CONSTRUCTION

FUSELAGE CONSTRUCTION FUSELAGE CONSTRUCTION Note: prior to building and gluing on the work surface use protective covering on your building surface. (wax paper or clear wrap) Fit the laser cut Fuselage Front and Fuselage Rear

More information

LUNAR EXPRESS. Little

LUNAR EXPRESS. Little Little LUNAR EXPRESS The Little Lunar Express kit contains all the parts necessary* to build a flying high power rocket: 1) Pre-slotted boattail 1) Airframe 5.5" long 1) Nose cone 2) Main fins 2) Stabilizer

More information

A Class A Gas Model That Looks Like a Full Scale Plane and Performs Like a Contest Ship

A Class A Gas Model That Looks Like a Full Scale Plane and Performs Like a Contest Ship A Class A Gas Model That Looks Like a Full Scale Plane and Performs Like a Contest Ship By SAL TAIBI 1941 NATIONAL WINNER The little plane glides in with all the realism of a full scale craft The plans

More information

Metal Aircraft Landing Light Installation Instructions

Metal Aircraft Landing Light Installation Instructions Metal Aircraft Landing Light Installation Instructions This landing light kit was designed for the Thorp T-18 as a method of installing a halogen landing light in the leading edge of the outer bay of the

More information

Seascape Bungalow Assembly instructions. Laser Dollhouse Designs

Seascape Bungalow Assembly instructions. Laser Dollhouse Designs Seascape Bungalow Assembly instructions Laser Dollhouse Designs NOTE: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also

More information

woodworkersjournal.com MATERIAL LIST

woodworkersjournal.com MATERIAL LIST MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side

More information

BOBS CARD MODELS. De Haviland Dash-8 water-bomber (1:72)

BOBS CARD MODELS.   De Haviland Dash-8 water-bomber (1:72) BOBS CARD MODELS www.bobscardmodels.com De Haviland Dash-8 water-bomber (1:72) A Canada de Haviland Dash-8 fitted with a large water tank, complements the French aerial firefighters' fleet of Canadairs

More information

Taylorcraft Indoor / Cul-De-Sac Flyer

Taylorcraft Indoor / Cul-De-Sac Flyer Taylorcraft Indoor / Cul-De-Sac Flyer Taylocraft Specifications Wingspan: 28.0 in. Wing Area: 117 sq. in. Weight (Ready to Fly): 3.0 3.1 oz. Wing Loading: 3.7 3.8 oz. / sq. ft. LIABILITY RELEASE In that

More information

Print template tiles and put together with clear tape to complete template.

Print template tiles and put together with clear tape to complete template. Print template tiles and put together with clear tape to complete template. Cut each pattern out with scissors or use a razor and strait edge ruler. Use the ruler as a guide for the razor to get nice strait

More information

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES 1 RUDDER Plan and parts: 2 Assembly steps: Photo above: glue together rudder spar, ribs and trailing edge. Clamp spar to a flat surface (chipboard on the photo) and make sure the straight aligment of the

More information

Assembly Instructions for Busted Bricks Marble Machine #1

Assembly Instructions for Busted Bricks Marble Machine #1 Assembly Instructions for Busted Bricks Marble Machine #1 Ver. 2 instructions Page number 1 Required for assembly: Wood glue (PVA or aliphatic resin recommended) and/or Cyanoacrylate (CA) glue Clamps or

More information