1 COMMONWEALTH OF KENTUCKY DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION INVITATION TO BID NO: RFB FOR: Upgrade to the Fiber Optic Network Western State Nursing Facility Western State Hospital Hopkinsville, Kentucky DATE: May 21, 2015 ADDENDUM NO. One (1) BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID. Item 1. Item 2. Refer to hardcopy addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings. Attached to addendum issued by Lynn Imaging is the prebid sign in sheet. END OF ADDENDUM Invitation to Bid No. For: RFB Upgrade to the Fiber Optic Network Western State Nursing Facility Western State Hospital Hopkinsville, Kentucky Kristi Sharp, CPPB, Strategic Procurement Specialist I Division of Engineering and Contract Administration

2 Date: May 21, 2015 Biagi, Chance, Cummins, London, Titzer, Inc. Consulting Engineers WESTERN STATE NURSING FACILITY IT INFRASTRUCTURE FOR UPGRADE TO THE FIBER OPTIC NETWORK RFB J. Keith London, P.E. Dennis R. Verkamp, P.E., L.S. William J. Hosmon, P.E., LEED BD+C James B. Brooks Carl J. Muensterman James E. Meadows, P.E., LEED AP L. Thomas Sorrell, RCDD, LEED BD+C Eric S. Nunning, P.E., LEED BD+C Richard D. Long, HFDP, CPD, CxA Shaminda M. Hubert, P.E., LEED AP Kris A. Campbell, CxA, LEED BD+C Samuel R. Schenk, CPD 1. All low voltage cables shall be plenum rated. 2. Provide 1 inch conduit sleeve as detailed on E-311 for all wall penetrations unless noted otherwise. The following are responses to Contractor s questions: 3. Drawing No. E403 Multimode Optics section specifies fiber optic splice cassette, 12 strand, 50 micron, OM3, 6 duplex LC connectors with part number CCH-CP12-E4. This part number is an adapter panel only with 12 LC ports that does not contain pigtails or chamber for splicing. Contractor s Question: Is actual pigtailed splice cassette modules requested, or is contractor to provide fiber pigtails and connect to the listed part number CCH-CP12-E4 using additional CJH splice housings mounted in each rack to contain the splice trays taking up more rack units? BCCLT, Inc. RESPONSE: Fiber optic splice cassette shall be part number OM3 CCH-CS12-E4-P00TE. 4. Drawing No. E403 Single-mode Optics section specifies fiber optic splice cassette, 12 strand, SM, 6 duplex LC connectors with part number CCH-CP12-A9. This part number is an adapter panel only with 12 LC ports that does not contain pigtails or chamber for splicing. Contractor s Question: Is actual pigtailed splice cassette modules requested, or is contractor to provide fiber pigtails and connect to the listed part number CCH-CP12-A9 using additional CJH splice housings mounted in each rack to contain the splice trays taking up more rack units? BCCLT, Inc. RESPONSE: Fiber optic splice cassette shall be part number OS2 CCH-CS12-A9-P00RE. 5. In reference to Delegated-Design Submittal Contractor s Question: Is seismic-restraints details to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation required on this project? BCCLT, Inc. RESPONSE: Clarification of ; 1.5 B, C: Manufacturer s standard data for seismic-restraint shall be submitted to comply with performance requirements and design criteria. All installation shall meet required seismic criteria. Evansville, IN N.W. Second Street 812/ Shelbyville, KY Main Street 502/ Louisville, KY Marksfield Road, Suite / Vineland, NJ E. Chestnut Avenue, Bldg. 7A 856/ Fort Wayne, IN Transportation Drive 260/ Indianapolis, IN W. 10 th Street, Suite C / Professionals Fred E. Gilles, P.E. Anthony V. Lisinicchia, P.E. Daniel J. Simon, P.E., CxA, LEED AP Jess T. Park, P.E.

3 WESTERN STATE HOSPITAL IT INFRASTRUCTURE May 21, 2015 Page 2 6. In reference to Delegated-Design Submittal Question: If required, can degree and detail be provided as what is actually required per section as this would be analysis actually performed on site and submitted for approval before physical installation would begin, possibly affecting the period of performance? BCCLT, Inc. RESPONSE: Refer to previous response. 7. Contractor s Question: Should contractor provide a ground bar in each rack to provide a grounding point for customer provided electronics? BCCLT, Inc. RESPONSE: Yes 8. Contractor s Question: Please clarify if STI FS100 fire-stop assemblies as listed on drawing E403 fire-stop detail are required for all 1-inch wall penetrations? BCCLT, Inc. RESPONSE: Yes. 9. In reference to Section , 1.8, A, 1, 2. and 3. Contractor s Question: Can clarification or detail be provided as what the extra material listed actually is: 1. Patch-Panel Units? 2. Connecting Blocks? 3. Device Plates? BCCLT, Inc. RESPONSE: Provide extra materials as specified. 10. Contractor s Question: Is plenum cable required in any buildings? BCCLT, Inc. RESPONSE: Plenum cable required in all buildings. Refer to Drawing E-403 Cat. 6 UTP shall be Syxtimax number 2071EOR423W1000 Orange. Fiber cable shall be as specified. 11. Contractor s Question: Is any cable removal required, as not listed in specifications or prints? BCCLT, Inc. RESPONSE: No. 12. Contractor s Question: Please clarify is contractor will be responsible for installing any active equipment in racks? BCCLT, Inc. RESPONSE: No. 13. Clarify manufacturers listed in Contract Documents. BCCLT, Inc. RESPONSE: Manufacturers, subject to compliance with requirement, are not limited to the manufacturers listed. Manufacturers as listed are the basis of design. All materials shall comply with the performance requirements. 14. Drawing notes show a 3 x12 cable tray. Drawing E403 approved material list part number CF54/300EZ is for a 2 x12 cable tray? Which one is correct? BCCLT, Inc. RESPONSE: Cable tray shall be 2 x12 as specified in material appendix.

4 WESTERN STATE HOSPITAL IT INFRASTRUCTURE May 21, 2015 Page Drawing E200 Building 31 in the hallway outside patient bedroom 140 should there be a core drill above the hallway double doors? 16. Drawing E200 Building 33 in the hallway outside women s bath 185 should there be a core drill above the hallway double doors? 17. Drawing E200 Building 31 in the hallway outside of storage 310 should there be a core drill above the hallway door? 18. Drawing E200 Building 33 in the hallway outside of storage 353 should there be a core drill above the hallway door? 19. Drawing E200 Building 31 in the hallway outside of patient room 207 should there be a core drill above the hallway door? 20. Drawing E200 Building 33 in the hallway outside of women s bath 278 should there be a core drill above the hallway door? 21. Drawing E200 Building 32 should there be core drills and conduit through one of the stairwells to get to the IDF? BCCLT, Inc. RESPONSE: No. 22. Are we to supply EZ33 s for the existing paths between floors in the electric rooms? BCCLT, Inc. RESPONSE: Provide fireproof seal for existing conduits. 23. If the General Contractor bidding this project is a 8(a) MDBE, responsible for overall project management including full time on-site Superintendent is requirement for DBE subcontractor participation of 10% still required? BCCLT, Inc. RESPONSE: Contractor should check the box on the non-authentication page that they are in fact the minority. 24. Drawing E300 Note 3 contractor shall provide 12 strand of multimode as specified. Is there supposed to be Multimode fiber? BCCLT, Inc. RESPONSE: Delete Note 3 from E3300.

5 WESTERN STATE HOSPITAL IT INFRASTRUCTURE May 21, 2015 Page Drawing E401 Patch Cords required detail, references multimode between the IDF and MDF should this be single mode? BCCLT, Inc. RESPONSE: Provide single-mode. 26. Drawing EU100 The conduit path following the exterior of buildings 60, 61, 62, and 63. What is the specified size or fill ratio for this conduit? BCCLT, Inc. RESPONSE: In accordance with BISCI Standards. 27. Drawing EU100 Single mode fiber from building 31, and 33 to building 60 attaches to the existing utility poles. Are the poles privately owned or is the contractor liable for pole attachment permitting. BCCLT, Inc. RESPONSE: Privately owned. Is there specifications on distances from existing communications cables or any other cables? BCCLT, Inc. RESPONSE: Fiber cable maybe routed near existing communication cables. Maintain code require clearance from electric circuits and clearance above roadways. Based on above answers if there are any attachment requirements that cause make ready work who is liable for this? BCCLT, Inc. RESPONSE: Project contractor s responsibility. 28. Drawing E220 WP in room 107 does not show a path are core drills required? BCCLT, Inc. RESPONSE: Serve from Building 31, core drill wall between 31 and 30, Note 3 on E200 applies. 29. Drawing E220 WP in room 100 does not show a path are core drills required? BCCLT, Inc. RESPONSE: Serve from Building 31, core drill wall between 31 and 30, Note 3 on E200 applies. 30. Building 31, 33, & 60 what size core drill is required for the single-mode fiber to enter the buildings? BCCLT, Inc. RESPONSE: Size as required for cable. 31. If asbestos if found in any of the buildings whose responsibility is it? BCCLT, Inc. RESPONSE: Refer to General Conditions, Item Most sincerely yours, Biagi, Chance, Cummins, London, Titzer, Inc. Shaminda M. Hubert, P.E., LEED AP Principal

6

7

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R. ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings

More information

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

Effective this date, this addendum forms part of the contract documents and modifies the original RFP.

Effective this date, this addendum forms part of the contract documents and modifies the original RFP. ADDENDUM # 02 Date: April 6, 2017 Reference: Network Electronics RFP Number: 117-24-4-19 The following questions were submitted for clarification and/or to request additional information. All questions

More information

B. The designated coverage areas shall include both indoor and outdoor coverage.

B. The designated coverage areas shall include both indoor and outdoor coverage. Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

Communications Integrators, Inc. June S. Wilson Street, Suite 105 Tempe, Arizona Toll Free (800) Web Site

Communications Integrators, Inc. June S. Wilson Street, Suite 105 Tempe, Arizona Toll Free (800) Web Site Communications Integrators, Inc. June 2008 2625 S. Wilson Street, Suite 105 Tempe, Arizona 85282 Toll Free (800) 679-9711 Web Site www.ciinet.com Product Guide Specification Specifier Notes: This product

More information

Company. Signed: Date:

Company. Signed: Date: ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET

More information

Campus Cable Plant Specification for Year 1 Wireless Coverage (Phase I)

Campus Cable Plant Specification for Year 1 Wireless Coverage (Phase I) Campus Cable Plant Specification for Year 1 Wireless Coverage (Phase I) July 17, 2017 1. General 1.1. Overview This document identifies and describes the specification supporting the installation of data

More information

9. Pay for the power consumed until the project has been accepted as substantially complete.

9. Pay for the power consumed until the project has been accepted as substantially complete. 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

B. Division-16 Basic Materials and Methods section apply to work specified in this section. Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

Merrick Pet Care New Distribution Center Hereford, Texas

Merrick Pet Care New Distribution Center Hereford, Texas Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007 Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007 INTRODUCTION Use the following Guidelines in conjunction with the Traffic

More information

SPECIFICATIONS FOR TENDER # SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH

SPECIFICATIONS FOR TENDER # SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH SPECIFICATIONS FOR TENDER # 0171-0838 SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH CLOSING DATE: 21 March 2008 CLOSING TIME: 11:00 AM (Newfoundland Time) Invitation to

More information

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1)

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1) CELRL-PM-R July ARCOS BULLITEN - SUBJECT: IT Design. REFERENCE: a. Army Reserve IT Manual, Change b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-/ IT Design Whitepaper, Jun ( ENCLOSURE

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS Part 1 General 1.1 Summary 1.1.1 This section shall govern the products and installation of identification and labeling of all required parts, pieces and accessories of the communications cabling system,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

FIBER OPTIC CABLE ASSEMBLIES

FIBER OPTIC CABLE ASSEMBLIES FIBER OPTIC CABLE ASSEMBLIES QUALITY CONNECTIONS START HERE Improve the quality of your connections with America Ilsintech s line of SM & MM SC, ST, LC and MPO/MTP cable assemblies. America Ilsintech manufactures

More information

McKenzie County Healthcare Systems

McKenzie County Healthcare Systems McKenzie County Healthcare Systems Hospital Replacement and Long-Term Care Replacement Watford City, North Dakota Request for Proposal (RFP) for Distributed Antenna System Table of Contents Introducti

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade LAKE COUNTY SCHOOLS Leading our Children to Success Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Susan

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 34 59 (August 2008) Change 1-11/12 --------------------------- Preparing Activity: USACE Superseding UFGS-08 34 59 (April 2006) UFGS-08 34 53.00 40 (June 2006) UNIFIED

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR RFQ/RFP 15P40 Campus Center East HVAC Unit Replacement CHAFFEY COMMUNITY COLLEGE DISTRICT February 26, 2015 CHAFFEY COMMUNITY

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

FEATURED PRODUCTS SECTION 1COMMSCOPE

FEATURED PRODUCTS SECTION 1COMMSCOPE SECTION 1COMMSCOPE 1 FEATURED PRODUCTS FiberGuard (tm) For installations where conduit or innerduct are typically installed, CommScope offers premise and indoor/outdoor fiber optic cables inside an interlocking

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 41 33 PART 1 - GENERAL 1.1 SYSTEM DESCRIPTION A. Furnish and install a complete and fully operational Television Signal Distribution System capable of delivering up to 158 video channels (6

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017 RESIDENTIAL ADDENDUM NUMBER ONE August 28, 2017 The following additions to, deletions from, and clarifications of the Contract Documents govern insofar as they apply and shall take precedence over those

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE Approval Amendment Record Approval Date Version Description 22/03/2017 1 Initial Issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 11 Table of Contents 1. Purpose...

More information

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL

More information

Steel Raceways BASE SECTIONS. SnapMark SMS3000 Series FITTINGS, CONNECTORS & BOXES RIGID COUPLING COUPLING BLANK END FITTING ENTRANCE END

Steel Raceways BASE SECTIONS. SnapMark SMS3000 Series FITTINGS, CONNECTORS & BOXES RIGID COUPLING COUPLING BLANK END FITTING ENTRANCE END 22 BASE SECTIONS SMS3000 GRAY BASE - 10FT. (3m).050 galvanized steel. Knockout pattern (.5 [12mm] &.75 [19mm]) in back of raceway, 11 (275 mm) on center. Internal area: 4.90 2 (124mm 2 ) (Order SMS3003

More information

THE NEW WYNCOTE ELEMENTARY SCHOOL #1204 SECTION STRUCTURED CABLING FOR VOICE AND DATA - INSIDE-PLANT

THE NEW WYNCOTE ELEMENTARY SCHOOL #1204 SECTION STRUCTURED CABLING FOR VOICE AND DATA - INSIDE-PLANT PART 1 - GENERAL 1.1 SECTION INCLUDES SECTION 271005 STRUCTURED CABLING FOR VOICE AND DATA - INSIDE-PLANT A. Telecommunications service entrance to building(s). B. Distribution frames, cross-connection

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-27 21 10.00 40 (February 2011) ----------------------------------- Preparing Activity: NASA Superseding UFGS-27 21 10.00 40 (November 2008) UNIFIED FACILITIES GUIDE

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS 510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures.

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures. PAGE 271200-1 SECTION 271200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre April 12, 2019 COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations 19-10 - To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre The attached information, questions and

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

CHAPTER 29 PROJECT COMPLETION DOCUMENTS CHAPTER 29 PROJECT COMPLETION DOCUMENTS PROJECT COMPLETION Upon completion of traffic control signal system and lighting projects, there are forms and checklists to ensure that the project is closed out

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Alma Salcedo Corporate Buyer

More information

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. SECTION 26 05 19 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. 1.2 CONTRACTOR SUBMITTALS A. The

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms INTRODUCTION Use the following Guidelines in conjunction with the ITS & Signals Scope of work provided in the Project Scoping

More information

PHOENIX, ARIZONA SITE SURVEY REPORT. PROVEN SOLUTIONS THAT DRIVE EFFICIENCY AND PRODUCTIVITY IN YOUR SUPPLY CHAIN

PHOENIX, ARIZONA SITE SURVEY REPORT.   PROVEN SOLUTIONS THAT DRIVE EFFICIENCY AND PRODUCTIVITY IN YOUR SUPPLY CHAIN AB&R (American Barcode and RFID) 3431 E Elwood St, Phoenix AZ 85040 Phone: (602) 651-1600 Fax: (602) 651-1611 Website: Contact: solutions@abr.com SITE SURVEY REPORT PHOENIX, ARIZONA Prepared By: Curt Squires

More information

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION SECTION 16715 COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION PART 1 - GENERAL 1.01 SECTION DESCRIPTION AND BASIC REQUIREMENTS A. The Electrical Power Distribution System provides power distribution from

More information

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement Following are the questions submitted on or before September 29, 2017, in accordance with RFP specifications. Responses to questions, clarifications of material, or corrections are indicated in green after

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY SECTION 280553-IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION A. This specification section covers the furnishing and installation of nameplates, labels, wire markers,

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.: KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

New Co-Brand Convenience Store McPherson, Kansas SECTION BASIC METHODS AND REQUIREMENTS PART 1 - GENERAL 1.1 GENERAL CONDITIONS:

New Co-Brand Convenience Store McPherson, Kansas SECTION BASIC METHODS AND REQUIREMENTS PART 1 - GENERAL 1.1 GENERAL CONDITIONS: SECTION 16050 - BASIC METHODS AND REQUIREMENTS PART 1 - GENERAL 1.1 GENERAL CONDITIONS: A. The General Conditions, Supplementary General Conditions, General Requirements, and Special Conditions shall be

More information

SECTION COMMUNICATIONS COPPER OSP CABLING

SECTION COMMUNICATIONS COPPER OSP CABLING SECTION 27 13 14 COMMUNICATIONS COPPER OSP CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna Fabrication and Supply of Cable Tray at CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna BROADCAST ENGINEERING CONSULTANTS INDIALIMITED 14-B, I. P. Estate, Ring Road, New Delhi CONTENTS Sr. No Title

More information

SECTION BUILDING WIRE AND CABLE

SECTION BUILDING WIRE AND CABLE SECTION 260519 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Building wire and cable. 2. Wiring connectors and connections. B. RELATED SECTIONS 1. Section 26 05 53 Electrical Identification. 2. Section

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification