YWY M08 The new VELUX solution
|
|
- Prosper Small
- 5 years ago
- Views:
Transcription
1 YWY M08 The new VELUX solution VELUX roof windows and vertical window elements installed as a dormer in roof pitches between 42º and 52º YWY M08 is available as a double or triple unit and can be installed in roof pitches between 42º and 52º. 1/26 W-PRM MAS/I-SUP/ KNS
2 Components of YWY M08 YWY M K double unit YWY M K triple unit YWY M K (double unit) consists of 2 VELUX roof windows, 2 vertical window elements, 1 VELUX adjustable support rafter EBY and 1 flashing system. YWY M K (triple unit) consists of 3 VELUX roof windows, 3 vertical window elements, 2 VELUX adjustable support rafters EBY and 1 flashing system. Parts drawing of flashing system for YWY M K: 2/26 W-PRM MAS/I-SUP/ KNS
3 Step 1 Determine position of aperture Double unit Triple unit roof pitch roof pitch a = 42 a = 52 a = 42 a = 52 H (mm) Wi (mm) Try to allow for a clear view depending on what the room is used for. 2. Where necessary, sill height must be in accordance with current Building Regulations. 3. Based on 1 and 2 decide which tile should form the row immediately below YWY. 3/26 W-PRM MAS/I-SUP/ KNS
4 Step 2 Adjustment of aperture and installation of trimmers for roof construction If trimmers are necessary to carry the roof construction, they must be positioned in such a way that they do not obstruct the installation of trimmers for the dormer construction (see steps 3 and 8). Adjust the aperture at the sides in order to obtain an interior measurement of Wi mm (see table step 1). 4/26 W-PRM MAS/I-SUP/ KNS
5 Step 3 Installation of infill battens and bottom trimmer for the dormer construction Install infill battens as shown. Draw a mark (a) on the bottom infill batten 60 mm from the back edge of the batten below the aperture in the roof surface. Position the bottom trimmer for the dormer construction by measuring from mark (a) - see cross-section. (This mark will also be used for positioning of the side framing, see step 4). The dimensions of the bottom trimmer must be approx 50 x 250 mm. 5/26 W-PRM MAS/I-SUP/ KNS
6 Step 4 Preparation and installation of side framing Provide framing according to cross-section shown above. Dimensions must be approx 50 x 100 mm. Cut framing as shown before erecting. The internal face of the framing must be flush with the internal face of the aperture Wi (see step 2). 6/26 W-PRM MAS/I-SUP/ KNS
7 Step 5 Preparation and installation of side panel Prepare two identical triangular panels from waterproof plywood. Install one of the panels on the outside of the side framing. Overall thickness of framing plus plywood must not exceed 60 mm. 7/26 W-PRM MAS/I-SUP/ KNS
8 Step 6 Preparation and installation of right hand side framing and panel Prepare right hand framing and install second plywood panel. Position and adjust framing by means of the diagonal measures x and z. Double unit Triple unit Wo (mm) Step 7 Markings on uprights and upper frame members Draw a vertical line on both uprights 86 mm from the front edge and extend to the upper frame member. Draw two marks (1 and 2) on each upper frame member by means of the vertical lines and the template enclosed with the adjustable support rafter EBY. 8/26 W-PRM MAS/I-SUP/ KNS
9 Step 8 Positioning and installation of top trimmer and installation battens Note! Install the top trimmer so that it is at right angles to the side frame. The upper edge of the trimmer must be flush with the top of the side frame and the height of the trimmer must be min 175 mm. Note the measurements A, B and Z as they are to be used for adjusting the adjustable support rafter EBY (step 10). Position two installation battens between the side frames. Position the front batten so that the distance from the front edge of the batten to mark 1 is 1426 mm as shown in the cross-section above. 9/26 W-PRM MAS/I-SUP/ KNS
10 Step 9 Marking for positioning of adjustable support rafter EBY Mark the bottom and top trimmer for positioning of adjustable support rafter EBY. Double unit solutions: Measure the centre (a) of the bottom trimmer and find the centre (b) of the top trimmer by means of the diagonal measure x. Triple unit solutions: Start by finding the centre (a) and (b) as described above. Then mark for positioning of adjustable support rafter EBY 399 mm to each side of the centre on the bottom and the top trimmer. mm 10/26 W-PRM MAS/I-SUP/ KNS
11 Step 10 Adjustment of adjustable support rafter EBY Transfer the roof pitch Xº (by means of template) and measurements A mm, B mm and Z mm from step 8 to EBY. Cut EBY. NOTE! The measurement C mm must be maximum 40 mm when cutting out the EBY. Notch the batten also if C mm is greater than 40 mm. Step 11 Fitting of installation brackets for adjustable support rafter EBY Fit the installation bracket supplied with the EBY on the top trimmer. The measurement h must be approx 136 mm but has to be adjusted so that the web of the adjustable support rafter is flush with the upper face of the installation batten. 11/26 W-PRM MAS/I-SUP/ KNS
12 Step 12 Installation of adjustable support rafter EBY Fix temporary batten between the two side framings with the back edge at mark 2 on the upper framing members (see section 1-1 below and step 7). Position the EBY in the installation bracket on the top trimmer and at the mark on the bottom trimmer. Position the EBY so that the installation batten rests in the intersection between the webs (section 2-2). Fix the EBY to the bottom trimmer with screws. Extend the EBY to the top level of joists and fix to batten. The batten should be securely fixed to the joists on either side of the EBY. In each single case, this detail must be supported by static calculations. Remove the temporary batten once the EBY has been fixed. 12/26 W-PRM MAS/I-SUP/ KNS
13 Step 13 Preparation of roof windows Fit seals supplied into the two window rebates to be positioned onto the EBY adjustable support rafter. Fit corner and centre fixing brackets supplied with the roof windows on the side frames opposite the EBY (a, b). Fit the brackets supplied with the flashing on the side frames facing the EBY (c, d). 13/26 W-PRM MAS/I-SUP/ KNS
14 Step 14 Installation of the first roof window Position temporary batten with the back edge at mark 1 (see section 1-1 below and step 7). The roof window may rest on this batten during installation. If necessary, adjust the level of the roof window by placing wedges under the corner brackets. Fix the roof window to the EBY with screws through the plastic plates. On the side opposite the EBY, fix the roof window with screws in the brackets fitted. 14/26 W-PRM MAS/I-SUP/ KNS
15 Step 15 Installation of the second roof window Fix the roof window to the dormer construction with screws in the fixing brackets in the shown order (a, b, c). Remove the temporary batten (d) and fit the bracket supplied between the windows (e). Roof window adjustment: See instructions enclosed with the roof window. Step 16 Preparation of vertical window elements VF- Remove the sash of vertical window elements VF- as shown in the installation instructions for vertical window elements VFE/VFA/VFB. 15/26 W-PRM MAS/I-SUP/ KNS
16 Step 17 Installation of vertical window elements Position frames of VF- elements up against roof windows using wedges (a). Drill Ø 3 mm holes through top frame of vertical window elements and into the bottom frame of the roof windows. Then screw frames together with the screws supplied (b). Fix the frames of the VF- elements to the adjustable support rafter EBY with screws. 16/26 W-PRM MAS/I-SUP/ KNS
17 Step 18 Insulation of joints and cavities Insulate joints and cavities under covers. Step 19 Connection to roof underfelt Fit the underfelt collars (7039) and transverse drainage gutter (7303) supplied around the dormer construction and integrate with the underfelt in the roof construction. 17/26 W-PRM MAS/I-SUP/ KNS
18 Step 20 Fitting of bottom flashing section (7021) Before fitting the bottom flashing section (7021), fix a 20 x 20 mm triangular list below the vertical window elements. Fit the bottom flashing section (7021) to the plywood side panel with aluminium screws. Fix the bottom flashing section (7021) at the front with aluminium screws between the vertical window elements. 18/26 W-PRM MAS/I-SUP/ KNS
19 Step 21 Fitting of bottom frame cover (7329) over bottom flashing section Step 22 Positioning of side flashings (7061) against plywood side panels 19/26 W-PRM MAS/I-SUP/ KNS
20 Step 23 Marking and adjustment of the top side flashing (7061) Mark and cut the top side flashing (7061) so that it fits around the top corner of the plywood side panel. NOTE! Observe the approx 10 mm high upstand. Position the top side flashing (7061) allowing it to rest on the nearest batten above the dormer construction. Flatten down the middle rib and outer upstand approx 80 mm down from the top. 20/26 W-PRM MAS/I-SUP/ KNS
21 Step 24 Positioning of middle gutter (7320) and middle section (7317) between vertical window elements Step 25 Positioning of side covers (7072/7092) on vertical window elements 21/26 W-PRM MAS/I-SUP/ KNS
22 Step 26 Fitting of top covers on vertical window elements Trim end pieces (a) and fix covers (b). Note. These covers were removed from the vertical window elements in step 16. Step 27 Fitting of corner end caps (7317) on vertical window elements 22/26 W-PRM MAS/I-SUP/ KNS
23 Step 28 Fitting of securing strips (7330) for the dormer side covers Mark on Der the afsættes side covers markeringer of the vertical på window sidebeklædningerne elements app. 10 mm på behind the front facadelyselementerne edge for positioning ca. of securing strips tilbage (7330). fra forkanten til placering 10 mm af klemlister. Cut vertical securing strip (7330) at the top and bottom and fix with stainless steel screws. Cut securing strip (7330) to be positioned along side flashings at the top and bottom. Position the securing strip (7330) so that it forms a sharp corner. The distance from the strip to the side flashings must be fairly even. 23/26 W-PRM MAS/I-SUP/ KNS
24 Step 29 Fitting of dormer side covers (7061/7081) Cut the dormer side covers (7061/7081) using a template and slide it into the securing strips. Fix the dormer side covers along the top edge with stainless steel screws. Step 30 Fitting of middle section (7316), covers and corner end caps (7073/7093) Fit middle section (7316) (a). Trim and fix covers (1.1). Note. Covers supplied with vertical window elements. Fit corner end caps (7073/7093). 24/26 W-PRM MAS/I-SUP/ KNS
25 Step 31 Fitting of side covers (7071/7091) on roof windows Trim side covers at the top. At the bottom it may be necessary to adjust the folded edge to allow the side cover to be pressed into position. Step 32 Fitting of middle gutter (7103) and roof window covers See instructions enclosed with the roof windows. Note. Covers supplied with the roof windows. 25/26 W-PRM MAS/I-SUP/ KNS
26 Step 33 Fitting of top flashing section (7001) Cut top cover edges (a). Fit top flashing section (7) (b). Fold the top flashing section (7001) and trim the edge so that it fits around the upturned edge of the top side flashing (7061) (see step 23). Step 34 Fitting of top flashing section extension piece (7013) in securing strip (7014) Fit securing strip (7014) to the top flashing section app. 70 mm from the bottom edge of the top flashing section (1). Position extension (7013) in securing strip on top flashing section and fix with clamps (2). 26/26 W-PRM MAS/I-SUP/ KNS
How-To-build guide Garden shed
How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 2 CONTENTS 1. Preparing the ring beam 2 2. Installing the framework 3 3. How to install structural support posts 7 4. Insulation and waterproofing 8 5. Tile application:
More informationInstallation guide. Step-by-step instructions
Installation guide Step-by-step instructions Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam
More informationInstallation guide for 20/20
Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British
More informationINSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1
INSTALL IN 2 DAYS *Assumes 3-man fitting team equinox Tiled roof system Installation guide ISSUE 1 Equinox tiled roof system Installation guide Contents Pre-installation checks 1. Installing the framework
More informationGV Standard PitchVent
GV Standard PitchVent Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings. 202-INST v1.0
More informationC.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit
Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800
More informationExtrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.
Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions
More informationPV16 True View. PV16 True View. PV16 True View. PV16 True View. PV16 True View. PV16 True View. Close-coupled pair of panels 2274mm
3296 3152 336 992 3 2274 213 214 3 Disclaimer: F16-TL F16-TC F16-TR Close-coupled trio of panels 3296mm F16-TL flashing Close-coupled pair of panels 2274mm F16-TR flashing A 14.1.15 Fusion Flashing added
More informationContents. Stage 1. Preparation of the aperture 9. Interior finishing 25
Installation Manual Pitchglaze Roof Window Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage
More informationAssembly instructions
Assembly instructions Plannja Profiles 20 105, 20 75, Sinus 18, Sinus 51, 45, 45R, 19R, 35 including flashings and fittings 2017 Roofing Sheet & Wall Cladding TABLE OF CONTENTS Some words of advice...
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationSuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter
SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm
More informationMethod of Build 1. General
Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed
More informationFibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.
Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm
More informationREDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions
REDLAND DRY VALLEY Installation Instructions for Redland Dry Valley Version: 6 Date: May 2013 Author: Department: Redland Technical Solutions Redland Technical Solutions 1 Introduction 1.1 TECHNICAL DATA
More informationMethod of Build 1. Fire. Sound
Method of Build 1 General Viso Fire & Acoustic in the solid form differs from most other systems as it can be erected using 12.5mm & 15.0mm boards within the same Aluminium framework. Also hidden fix board
More informationGV Standard Pitchglaze
GV Standard Pitchglaze Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings. 201-INST-101
More informationFinesse Profiles. Nailstrip
Installation Details Profile and Lap Detail 265/465 38mm NAILSTRIP *other widths available CD GRADE PLYWOOD 19mm STRUCTURE SILICONE * MIN 20mm VENTILATION GAP * WHEN ROOF PITCH IS UNDER 7.5 OR TOTAL COMBINED
More informationTRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT
TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read
More informationVerge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip
Tolerance Detail (recommended) Verge Closure Verge Channel Verge Clip Verge Flashing VERGE CHANNEL RIVETTED TO EUROSEAM AT APPROX 400MM CENTRES USING 4.8 X 12MM RIVETS. NB: DO NOT RIVET AT HALTER POSITION
More informationInstallation Manual. This installation is for the Odyssey H1800 Series Ventilation System.
Installation Manual This installation is for the Odyssey H1800 Series Ventilation System. This installation is limited to roofs with pitches between 3 and 35. This instruction assumes that there is a power
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationREGENCY TIMBER BUILDINGS
REGENCY TIMBER BUILDINGS TEL 01948 830460 UNIT 22 PENLEY IND EST, PENLEY.WREXHAM. LL13 0LQ 1 Garage fitting instructions Tools needed handsaw, hammer, Stanley knife with hook blade, tape measure, battery
More informationInstallation Guide GRP Dormer
Installation Guide GRP Dormer To ensure optimum performance please follow the correct fitting procedures outlined in this installation guide. Site safety and good building practice should be adhered to
More informationThe Leka System Installation Guide
Installation Guide The Leka System Installation Guide The following guide has been created to assist in the fabrication and installation of the Leka System. Please note that each roof is individual and
More informationDUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL
DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 4 Step 2a Footing Set-Out for Concrete
More informationRecommended Slating Tools
Recommended Slating Tools Product Size L Sketch of Article No. Description 60-070 Scriber 60-00 Slater s Hammer 60-00 Slater Ripper 60-080 Parallel Shears 60-0 Slate Cutter Kwiksnip Slate Guuillotine Slate
More informationGuardian warm roof conversion system. Installation Guide
Guardian warm roof conversion system Installation Guide 2 www.guardianroof.co.uk Conservatory walls consist largely of glazed elements including windows and doors that may include structural mullions or
More informationPV SLATE ROOF INSTALLATION GUIDE
The PV Slate roof tile is designed to integrate into a roof clad with either natural or imitation slates. Initial Roof Batten Layout. The roof should be battened using 50x25mm batten at a spacing of 270mm.
More informationUniversal Installation Instructions. Preparation and Safety Information. Natural Lighting by Monodraught. Dust. Scaffolding
Natural Lighting by Monodraught Universal Installation Instructions Preparation and Safety Information Scaffolding For flat roofs and single storey buildings not exceeding 10 ft. ( m) in height, access
More informationS H E D A S S E M B L Y I N S T R U C T I O N S
T I T A N R A N G E S H E D A S S E M B L Y I N S T R U C T I O N S 8 X 10 ft Approx = 2550 x 3140 cm COMPONENT LIST Component illustrations are given as a visual guide only and are not in proportion PART
More informationJ; ('& ): J; )'& ): J; +'& ): J; +(+ ): J;,)& ): 9WXb[ i[j J;9JKI <_n_d] <P%' '& <_n_d] IP 7ii[cXbo 7Z`kijc[dj 9WbYkbWj_ed \ehckbwi
INdex ZERTIFIZIERT 4 INTERIOR DOOR SIMONSWERK TECTUS TE 210 3D for unrebated and rebated, flush-faced quality doors Hinge up to 40 kg Technical Data Load capacity Length (leaf/frame) Width (leaf/frame)
More informationInstallation Instructions
Installation Instructions Alpha SolarSmart On Roof Kits for the Installation of Alpha Solar Collectors onto Tile and Slate Type Roofs For Technical help or for Service call... ALPHA HELPLINE Tel: 0 77
More information8x12 SpaceMaker Garden Shed Assembly Manual
8x12 SpaceMaker Garden Shed Assembly Manual Version #6 Revised June / 2007 Thank you for purchasing a 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety
More informationROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION
ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION It is the responsibility or roofers, building
More informationINSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS
www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,
More informationINSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4
the unique loft conversion & flooring system INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 Unit 6, Devizes Trade Centre, Hopton Park, Devizes, Wiltshire, SN10 2EH t 01380 739000 e info@telebeam.co.uk
More informationPergola Installation Instructions
Pergola Installation Instructions TOOLS REQUIRED HAMMER DRILL 1/2 MASONRY BIT PENCIL DRILL 3/16 DRILL BIT LEVEL SQUARE LADDER WRATCHET & SOCKETS RUBBER MALLET 2 TAPE MEASURE Column/Post Placement Table
More informationBasic Fitting Details No. 1
No. 1 Fixing free edges of flashings A. Clips for flashings over interlocking tiles B. Clip to ridge or hip roll C. Clip to apron flashings Clips should be made from quarter hard copper, 0.6mm thick, terne
More informationHow To Build Decorative. Timber Awnings
How To Build Decorative Timber Awnings How to build a timber awning FOREWORD Timber awnings are a visually pleasing form of window shading. Properly built timber awnings can add value to your property
More informationTECTUS. The completely concealed hinge system
TECTUS The completely concealed hinge system It s still design even if there s nothing to be seen! TECTUS This Latin word for concealed signifies SIMONSWERK s newly developed, completely hidden hinge system.
More informationINSTALLATION MANUAL 32273/1205 C C-403 GB - F - D - NL - ES - I - S - SLO
INSTALLATION MANUAL 32273/1205 C-402 - C-403 GB - F - D - NL - ES - I - S - SLO 1A 1B ENGLISH GENERAL INFORMATION The Cassette toilet is available in 2 types: C-402 Cassette toilet with built-in water
More informationAssembly Instructions
Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C Selling Station Components (2) 2' x 6' Side s Have a channel
More informationPipe penetration refer CT15. Viking CertainTeed Shingles General Roof details
Vented ridge refer CT02 Substrate Viking SuperStrand or F11 Roofing ply Pipe penetration refer CT15 Valley details refer CT07 and CT08 refer CT17 and CT18 for requirements Drip-edge refer CT01 Barge detail
More informationInstallation Instructions of HomeTech Fakro Skylights
Installation Instructions of HomeTech Fakro Skylights EH Flashing Suitable for corrugated, concrete tile and pressed metal tile roof types 15-75 For roofs with minimum pitch 15 and maximum pitch 75 IMPORTANT:
More informationFIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)
FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed) Thank you for choosing to purchase a ROOF Maker Fixed Flat Rooflight. Assembly Procedure Guidance Please take precaution when moving
More informationSunhouse. Assembly Manual
Sunhouse Assembly Manual Thank you for your purchase of this sunhouse. Sunhouse Assembly Manual This manual is designed to simplify the assembly process, however we recommend having an experienced carpenter
More informationSeries 1500 Aluminum Door Canopy
Series 500 Aluminum Door Canopy with Sidewings It is our recommendation that you read instructions carefully prior to assembly and installation. Series 500 with Sidewings mounting bar (A) top trim (B)
More informationINTRODUCTION. EqunioxRoof.com. Pro Tip
INSTALLATION MANUAL INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system
More informationINSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)
INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DO SYSTEM (180º INSTALLATION) 28539 Industry Drive, Valencia, CA 91355 Toll Free Phone: (877) 728-3874 Toll Free Fax: (888) 440-9567 Phone: (661) 775-1675
More informationInstallation. ng Kitt
Installation Instructions Alpha SolarSmart 100 Roof Integrated Flashi ng Kitt for the Installation of Alpha Solar Collectors into Tiled Roofs 1 Integrated Flashing kit for Alpha SolarSmart 1000 CONTENTS
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationCROSSBAR RAFTER ISOMETRIC
Super Sky Products' typical glazing system consists of glass panels or "lites" which are attached to the main framing members using extruded aluminum "retainers" or "pressure plates". These retainers are
More informationShingle Installation Guide
Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors
More informationlindab cover line installation instructions lindab roca Lindab CoverlineTM Lindab Roca Installation instructions
lindab cover line installation instructions lindab roca Lindab CoverlineTM Lindab Roca Installation instructions Preparation Before you start Before starting work, read the installation instructions in
More informationAustin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions
Austin Standing Seam Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle
More informationINSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns
More informationCOMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE
INTRODUCING THE CLICKFAST FASCIA AND GUTTER SYSTEM The Clickfast Fascia and Gutter System was originally designed by Stratco and has proven to be the most successful fascia and gutter system in Australia
More information1. Tile Roof Installation:!
1. Tile Roof Installation:! * Solar Roof Fan have a different base plate and ventilation opening size. This will require different measurements and allowances to those shown as pictures. Materials Needed:
More informationPocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.
Pocket Door Kit PD1 / PD2 Installation Instructions Kit Contents. 1, Create Rough Opening In Stud Wall Construct rough opening ensuring all sides are square and level. Rough opening should be; Height =
More informationShed Assembly Instructions
Shed Kit Contents The shed kit includes all the parts needed to assemble your shed except for tools and fasteners such as screws and nails. The various pieces are pre-cut and many are marked to indicate
More informationTYPICAL BARGE DETAIL - CROSS SECTION
SELECTED OWENS CORNING ASPHALT SHINGLES APPLY A BEAD OF BITUMASTIC ADHESIVE/SEALANT METAL BARGE DRIP EDGE FLASHING No15 RAG FELT ROOF UNDERLAY PLYWOOD ROOF FRAME BARGE BOARD SOFFIT LINING (IF APPLICABLE)
More information10 Octagon Cedar Gazebo Assembly Instructions
10 Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/22/09 10 Cedar Gazebo Assembly Instructions
More informationThe WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 1 October 2012 Ver. 1.2 Window Association of New Zealand Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening
More informationHow to make a Wendy house Part One: The Floor and the Frame
How to make a Wendy house Part One: The Floor and the Frame The Wendy House. This wendy house is basically a playhouse with a few feminine touches added. A wendy house can give children hours of enjoyment.
More informationSmartVent Eave Edge Installation Instructions
SmartVent Eave Edge Installation Instructions STEP 1: Cut a slit 1 wide (or a series of 1 ¾ holes at 3 on center) into the roof decking 6 to 7 up from the drip edge. SmartVent is rated 9NFA. Ensure drip
More informationSeries 1100 Aluminum Door Canopy
Series 00 Aluminum Door Canopy with Support Arms It is our recommendation that you read instructions carefully prior to assembly and installation. Series 00 with Support Arms MOUNTING BAR (A) TOP TRIM
More informationOriental Pagoda Assembly Instructions
Oriental Pagoda Assembly Instructions English SS136A Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction
More informationSunTrackerTwo Preparation
TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs
More informationVertical Offset Base and Safety Rail System Installation Instructions
Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat
More informationChapter 9. Windows and Exterior Doors
Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail apron
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationmanthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e
manthorpe building products Roll-Out Dry Fix Ridge System Fixing Instructions MBP 8265e Ridge Details Fig A. Assembly View of Dry Ridge Detail s/s screw clamping plate rubber washer foam spacer ridge tile
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More information6 1/2 x 6 1/2 Wood Grain Flat Top Pergola
/ x / Wood Grain Flat Top Pergola A S S E M B LY G U I D E Models: Lakewood OPTIONAL ACCESSORY Bolt Down Bracket Kit V.-09 Ta b l e o f Co n t e n t s The PAGE Introduction & Overview.......................................................
More informationTitan Series Awning Assembly and Installation Instructions
Titan Series Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle them.
More information8x12 SpaceMaker Garden Shed Assembly Manual Revision #20 June 27th, 2017
8x12 SpaceMaker Garden Shed Assembly Manual Revision #20 June 27th, 2017 Thank you for purchasing our 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety
More information10 x 10 Flat Top Two Tone Pergola
0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00
More informationSpecial Roofs and Vertical Slating
Special Roofs and Vertical Slating Roofs falling into the category of "special" roofs have the following characteristics: (a) any roof slope equal to or greater than the minimum pitch for the size of slate
More informationinstallation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper
More informationCOMPOSITE RAILING INSTALLATION
COMPOSITE RAILING INSTALLATION Tools All you ll need is a hammer and screw gun, circular saw (carbidetipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line.
More informationA Shell construction
A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill
More informationInstallation Guide Contemporary Alfresco V1.3 LU
Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit
More informationEZ Shed. Tool eeded ST MER SER I E
00 EZ Shed PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION Tool eeded ST MER SER I E 203 591-9032 - 30-5 30 INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD
More informationTHERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)
THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) fig.3 Casement, Awning, Fixed Casement, Direct-Set, Double-Hung, Single-Hung & Horizontal Slider Windows Materials
More informationSLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE
Set A Set B PFD30 SG Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors SUGGESTED TOOLS DRILL G-CLAMP TAPE MEASURE (Image for reference only) HACKSAW POCKET
More informationAQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM
AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM The following guide covers the technique for the Mechanically Fixed System. This system is best employed when an overlay
More informationPINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS
PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS GARDEN PRODUCTS www.pinehavensheds.co.nz 5/16 hex drive bit, By asking about our products at your nearest DIY or gardening store www.pinehavensheds.co.nz
More information6 1/2 x 6 1/2 Flat Top Pergola
6 / x 6 / Flat Top Pergola A S S E M B L Y G U I D E Models: Portland, Liberty O P T I O N A L A C C E S S O R Y Bolt Down Bracket Kit V.-0506 Ta b l e o f Co n t e n t s PAGE The Introduction & Overview......................................................
More informationGABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete
More informationTHIS DRAWING IS INDICATIVE ONLY AND BY NO MEANS COMPREHENSIVE
BRANZ Appraised Appraisal No. 547 [2007] NURALITE Nuralite Waterproofing Ltd. 53A Victoria Street, Onehunga, Auckland 1061, Zealand TEL: (64) (9) 579-2046 FAX: (64) (9) 579-5136 email: info@nuralite.co.nz
More informationInstructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760
Lightway, s.r.o. Registered office: Ledvinova 1714, 149 00 Praha 4 Offices: Za Humny 1054/4a, 161 00 Praha 6 tel.: 235 300 694, fax: 235 300 218 Company ID No.: 63669366, Tax ID No.: CZ63669366 Bank: KB
More informationCorner Potting Store Assembly Instructions
Corner Potting Store Assembly Instructions English SS225E Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The
More informationIF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST
Set A Set B PFD60 Fire Door Kit FITTING INSTRUCTIONS IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST SUGGESTED
More informationPRODUCT INFORMATION MANUAL SECTION: 16 FIXED METAL AWNINGS FIXED METAL AWNINGS
FIXED METAL AWNINGS Fixed Metal Awnings BAHAMA Maximum Width Minimum Width Minimum projection Minimum Drop TS - Truss Support Maximum Overhang Minimum Overhang Unlimited 500mm TS=1601mm PS=2847mm PS=
More informationENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH
ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH RAFTER PREPERATION RAFTER PREPARATION A FRAME PREPERATION AND ASSEMBLY A FRAME PREPARATION AND ASSEMBLY... Open boxes, remove
More informationSUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves
More information