1 Installation Manual Pitchglaze Roof Window
2 Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage 3. Weathering 16 Interior finishing 25 2
3 Delivery The Pitchglaze unit should arrive on site in undamaged packaging consisting of sterling board edge protection and poly foam to protect the glass. The complete package should be securely wrapped using Glazing Vision branded packing tape. A separate box containing the installation hardware should be received, and also a second package containing the flashing kit if specified. Please inspect the packaging and unit and advise Glazing Vision within 48 hours from signing the receipt of your delivery of any damage or shortfall. Standard Installation Hardware Enclosed within the hardware box for each unit you should find the following: Stainless steel countersink woods screws Low modulus anthracite/grey silicone Flashing Kit If a Flashing Kit is specified, the following items should also be included: Lead sheet: Head flashing (150mm wide) Cill flashing (450mm wide) Lead for soakers (450mm wide) Roofing underlay: Head apron (1m wide) Jamb aprons (1m wide) Butyl tape 50mm wide 3
4 Pre-Installation Please ensure all pre-installation checks are carried out prior to commencing installation. CAUTION! These products can be very heavy. Due consideration should be given to getting the product onto the roof safely and extreme care taken during installation. Pre-Installation Roof Checks After checking you have received the required installation hardware and product(s) it is important to ensure that the area of installation is suitably prepared. The area surrounding the aperture should be clear to provide safe access during the installation works. Note that this product is installed from the outside and that suitable provisions should be made for safe handling of the product, including all relevant PPE and safety systems for working at heights if necessary. The supporting rafters and horizontal trimmers, or alternative support frame for the product, should be checked for specification and dimensional accuracy. The aperture should be prepared as described below prior to installation. Preparation of the roof prior to installation will vary depending on roof type and roofing materials. A few common scenarios are included in this manual. Please follow the applicable steps for your configuration. Glazing Vision strongly recommend a dry run (without any silicone) before committing to the final installation. Sales Drawings Sales drawings should accompany this installation manual. If you do not have them then do not continue the installation without them. Sales drawings can be obtained by contacting Glazing Vision. The following pages on preparation of the roof recommend the relevant sales drawings for each installation type. Study them carefully before beginning the installation. 4
5 Preparation of the Roof Standard Installation Typically for cold-roof construction the Pitchglaze will sit directly upon the outside of the rafters. Sales drawings: Installation (double-glazed) 201-ASS-001 Installation (triple-glazed) 201-ASS-004 Fixing dimensions (both) 201-ASS-007 Supporting trimmer Pitchglaze to sit on face of rafters and trimmers Supporting rafter Fig. A Example of standard installation When preparing rafters, consider how the ends of the battens will be supported at the jambs of the Pitchglaze. Study the sales drawings of the Pitchglaze carefully when designing the size of the aperture. Fig A is for illustrative purposes only and may not be suitable for your installation. CAUTION! These products can be very heavy. Glazing Vision strongly recommend that a structural engineer is consulted when designing the structure(s) that will support the Pitchglaze and the surrounding roof. Nothing in this manual constitutes a structural proposal. Before continuing onto the installation instructions: The rafters and horizontal trimmers that will support the Pitchglaze should be complete and in place. The surrounding roof should not yet be felted or battened, this will be covered in the installation instructions. 5
6 Preparation of the Roof Sunken Installation Typically for cold-roof construction with thin roofing materials, such as slate the Pitchglaze will sit on the outside of a separate frame sunken below the outside level of the rafters. Sales drawings: Installation (double-glazed) 201-ASS-002 Installation (triple-glazed) 201-ASS-005 Fixing dimensions (both) 201-ASS-007 Pitchglaze to sit on face of sunken frame Secondary fillet (see sales drawing) Fig. B Example of sunken installation Secondary frame sunken below the level of the rafters Study the sales drawings of the Pitchglaze carefully when designing the size of the main aperture and secondary sunken frame. Fig B is for illustrative purposes only and may not be suitable for your installation. CAUTION! These products can be very heavy. Glazing Vision strongly recommend that a structural engineer is consulted when designing the structure(s) that will support the Pitchglaze and the surrounding roof. Nothing in this manual constitutes a structural proposal. Before continuing onto the installation instructions: The sunken frame that will support the Pitchglaze, and the surrounding rafters and horizontal trimmers should be complete and in place. The surrounding roof should not yet be felted or battened, this will be covered in the installation instructions. 6
7 Preparation of the Roof Raised Installation Typically for warm-roof construction the Pitchglaze will sit on a frame built up from the rafters. Sales drawings: Installation (double-glazed) 201-ASS-003 Installation (triple-glazed) 201-ASS-006 Fixing dimensions (both) 201-ASS-007 Pitchglaze to sit on face of packers Fig. C Example of raised installation Packers added to raise the Pitchglaze away from the rafters When preparing rafters, consider how the insulating sarking and the ends of the battens will be supported at the jambs of the Pitchglaze. Study the sales drawings of the Pitchglaze carefully when designing the size of the aperture and packers. Fig C is for illustrative purposes only and may not be suitable for your installation. CAUTION! These products can be very heavy. Glazing Vision strongly recommend that a structural engineer is consulted when designing the structure(s) that will support the Pitchglaze and the surrounding roof. Nothing in this manual constitutes a structural proposal. Before continuing onto the installation instructions: The raised frame that will support the Pitchglaze, and the surrounding rafters and horizontal trimmers should be complete and in place. The insulating sarking (the insulation installed outside the rafters) and the counter battens of the surrounding roof should be complete and in place. The surrounding roof should not yet be felted or battened, this will be covered in the installation instructions. 7
8 Installation Instructions Before committing to an installation, Glazing Vision strongly recommend that a dry run is completed of the installation process without using silicone. Note that the installation shown here is a standard installation, using interlocking tiles at 150mm gauge. Other installations differ superficially, but the installation process is similar. Fig. D Example of standard installation (duplication of Fig. A) All of the images in this guide are illustrative. They should be used as a reference only, and may not be a true representation of your installation. Ensure that you have read and understood the entire Installation Instructions section before commencing your install. Glazing Vision strongly recommends that the installation is carried out by competent roofers and lead-workers. 8
9 Stage 1 Preparation of the Aperture Step 1. Install, trim and finish the roofing underlay (felt or membrane) Trim and then fold the underlay back on itself as shown The underlay should be folded back on the structure that will support the Pitchglaze see sales drawing If a sunken installation is used, the secondary fillet should be underneath the underlay see sales drawing Cut edge of underlay folded back Fig. 1 Roofing underlay installed and prepared Step 2. Install the cill tilting fillet Install a tilting fillet as shown (not supplied) Fix the fillet to the rafters Glazing Vision recommends a hardwood or treated softwood fillet is used Consider the distance required between the cill of the Pitchglaze and the fillet (fig.2 gap A) see sales drawing Gap A Cill fillet (primary) Fig. 2 Cill tilting fillet installed 9
10 Step 3. Batten up to the cill In addition to normal considerations, consider how the tiling/slates will fit around the Pitchglaze when determining the gauge of the battens Fig. 3 Cill battens installed Step 4. Prepare the cill flashing Place the cill flashing as shown The flashing should be at least 300mm longer than the external width of the Pitchglaze and should be installed centrally The flashing should lap under the cill of the Pitchglaze by at least 50mm Use the cill flashing supplied as part of the flashing kit (if specified), otherwise use Code 4 (nominally 1.8mm thick) flashing lead Cill flashing Flashing length Fig. 4 Cill flashing in position 10
11 Step 5. Silicone the cill flashing Stage 2 Fitting the Pitchglaze If performing a dry run, omit the silicone from this step. Run a continuous thick bead of silicone along the cill, between the aperture and the cill tilting fillet (fig. 5a) Use the silicone supplied as standard with the Pitchglaze Silicone along cill of aperture Fig. 5a Cill siliconed for cill flashing Place the cill flashing in position - brass or stainless steel nails (not supplied) can be used to tack the lead in place in the area that will be overlapped by the Pitchglaze Run a continuous thick bead of silicone along the flashing, up the jambs and across the head as shown (fig. 5b) Silicone around head, jambs and cill of aperture Fig. 5b Aperture siliconed for Pitchglaze 11
12 Step 6. Place the Pitchglaze in position Two alternatives are laid out in this step, read both before continuing. These products can be very heavy. Due consideration should be given to getting the product onto the roof safely and extreme care taken during installation. Place the Pitchglaze centrally over the aperture (fig. 6a) Adjust the Pitchglaze to its final position screws through some of the fixing holes into the rafters below can be used to temporarily hold the Pitchglaze in place (fig. 6b) Clean away any excess silicone Fig. 6a Pitchglaze placed in position Fixing holes Fig. 6b Fixing holes of Pitchglaze 12
13 Alternatively, a jig can be fashioned to hold the Pitchglaze in place as shown, refer to the sales drawing for relevant dimensions (fig. 6c & 6d) Weight of Pitchglaze supported by horizontal member Example jig See warnings below Fig. 6c Example of jig that could be used to place Pitchglaze The fixings holding the jig in place on the roof must not pierce the cill flashing. The jig must not pinch the cill flashing. Weight of Pitchglaze supported by jig on this edge - see warnings above Fig. 6d Close-up of Pitchglaze showing edge to be supported by jig These products can be very heavy. Glazing Vision strongly recommend that a structural engineer is consulted when designing any structure(s) that will support the Pitchglaze. Nothing in this manual constitutes a structural proposal. 13
14 If performing a dry run, the position of the Pitchglaze can be marked and the Pitchglaze removed. The installation can then begin. Step 7. Fix the Pitchglaze in position Do not remove any temporary screws that are holding the Pitchglaze in place. Complete this step with the remaining fixing holes. Then remove the temporary screws and repeat this step for those fixing holes. All fixing holes should be siliconed. Using the Pitchglaze fixing holes as a guide, drill a pilot hole for each fixing screw Inject silicone through each fixing hole into the pilot hole and between the layers of the folded back roofing underlay to prevent water ingress Install and tighten the fixing screws through the wet silicone Use the silicone and screws supplied as standard with the Pitchglaze Fill fixing and pilot holes with silicone Install fixing screws through wet silicone Fig. 7a - Injection of silicone Whilst still wet, excess silicone can be removed by spraying on a small amount of soapy water and wiping with a cloth or paper towel. Fig. 7b - Fixing screws 14
15 Step 8. Silicone the head and jambs Run a continuous thick fillet of silicone along the entire length of the jambs and head as shown Fill the countersinks of the fixing holes with silicone leaving the surface flush Use the silicone supplied as standard with the Pitchglaze Fig. 8a Head, jambs and fixings siliconed Screw heads siliconed over Continuous fillet of silicone around head and Fig. 8b Head, jambs and fixings siliconed 15
16 Stage 3 Weathering Step 9. Apply Butyl tape to the jambs Apply butyl tape to the full length of the gutter lip on both sides as shown Use butyl tape supplied as part of the flashing kit (if specified) otherwise use approx 1.5mm double sided butyl tape Fig. 9a Butyl tape applied to jambs Apply butyl to full length of gutter lip Lay butyl tape over gutter lip Fig. 9b Butyl tape applied to jamb 16
17 Step 10. Place the jamb aprons in position Place the jamb aprons in position as shown The apron should be at least 150mm longer than the outside span of the Pitchglaze The bottom edge of each apron should lap over the cill flashing The bottom edge of each apron should align with the bottom edge of the Pitchglaze cill The aprons may be tacked in position to the rafters/counter battens below For the jamb aprons, use the roofing underlay supplied as part of the flashing kit (if specified) otherwise use roofing underlay of at least 1m in width Difference of at least 150mm Length of jamb apron Fig. 10a Jamb aprons positioned Bottom edge of jamb apron to align with cill edge of Pitchglaze and overlap cill flashing Fig. 10a Jamb apron adhered to butyl tape 17
18 Step 11. Batten up the jambs Batten to either side of the Pitchglaze as shown The battens should be fixed in place ready for tiling/slating Fig. 11 Jamb battens installed Step 12. Install the head tilting fillet Install the tilting fillet as shown (not supplied) Glazing Vision recommends a hardwood or treated softwood fillet is used Fix the fillet to the rafters Head fillet Fig. 12 Head tilting fillet 18
19 Step 13. Install the head flashing Install the head flashing as shown The flashing should be at least 300mm longer than the external width of the Pitchglaze and should be installed centrally Use the lead flashing supplied as part of the flashing kit (if specified), otherwise use Code 4 (nominally 1.8mm thick) flashing lead Head flashing Fig. 13a Head flashing installed Head flashing tucked into head gutter of Pitchglaze Head flashing tucked underneath battens Fig. 13b Head flashing installed 19
20 Step 14. Install the head apron Place the head apron in position as shown The apron should cover the tops of both jamb aprons entirely The bottom edge of the apron should lap over the head flashing by at least 50mm The top edge of the apron should lap under the underlay of the roof by at least 50mm If the underlay supplied/recommended does not reach then a second piece should be used as an intermediary, lapped over the original piece and lapped under the underlay of the roof For the roof apron, use the roofing underlay supplied as part of the flashing kit (if specified), otherwise use roofing underlay of at least 1m in width The head apron must be lapped into the roof underlay as described in this step. Refer to sales drawing for details. Head apron lapped over head flashing Fig. 14 Head apron installed 20
21 Step 15. Batten the head Batten the roof above the Pitchglaze Fig. 15 Battens above the head installed Stage 4 Tiling Before tiling, take the opportunity to check the weathering (overlap) of the aprons and flashings and to check the silicone sealing the jambs. Step 16. Tile up to the cill Tile up to the batten below the Pitchglaze Fold and boss the cill flashing into final position Fig. 16 Cill tiled and cill flashing finished 21
22 Step 17. Prepare the soakers The soakers should tuck approximately 100mm between the tiles/slates as shown The soakers should touch the inside of the hidden gutter of the Pitchglaze as shown The soakers should overlap by at least 50mm as shown Use the flashing lead supplied as part of the flashing kit (if specified), otherwise use Code 4 (nominally 1.8mm thick) flashing lead. Fig. 17a Example of installed soakers for interlocking tiles 22
23 This area to sit between tiles Top end Length = gauge + lap of tiles 100mm approx Flange folded around top of tile to hold soaker in place Bottom end This edge to sit in gutter of roof window Fig. 17b Example of soaker Glazing Vision strongly recommends that the manufacture and installation of soakers is carried out by a competent lead-worker. Fig. 17a & 17b are presented only as an example. The soakers described in step 17 may not be suitable for your roof. 23
24 Step 18. Tile up the jambs Tile to either side of the Pitchglaze, installing the soakers Fig. 18 Jambs tiled and soakers installed Step 19. Tile the head Tile above the Pitchglaze Glazing Vision recommends that eaves tiles are used immediately above see sales drawing Eaves tiles are recommended for use immediately above the Pitchglaze see sales drawing Fig. 19 Roof tiled above the head 24
25 Interior Finishing The inside edge of the foam tape is designed to remain flush with the surface of the interior finish. Glazing Vision stipulates that the following details are observed when completing your internal finishes: The finish must be built out to at least 19mm beyond the aluminium frame of the Pitchglaze. No interior metal component (for example edging strips for plastering) may touch or be in close proximity to the aluminium frame of the Pitchglaze. Contravention of either of these stipulations will severely undermine the thermal efficiency of the Pitchglaze. Double glazed unit Powder coated aluminium frame Factory applied insulating foam tape Structural trimmer (by others) Surface of internal finish (by others) Fig. F Section detail of double glazed unit - see sales drawing 25
26 Conformity EN :2006+A1:2010 For more, refer to the separate declaration of performance documentation, or see the marking affixed to the Pitchglaze. For technical support please call or visit us at or us at 26
GV Standard Pitchglaze
GV Standard Pitchglaze Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings. 201-INST-101
More informationGV Standard PitchVent
GV Standard PitchVent Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings. 202-INST v1.0
More informationGuardian warm roof conversion system. Installation Guide
Guardian warm roof conversion system Installation Guide 2 www.guardianroof.co.uk Conservatory walls consist largely of glazed elements including windows and doors that may include structural mullions or
More informationINSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns
More informationREDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions
REDLAND DRY VALLEY Installation Instructions for Redland Dry Valley Version: 6 Date: May 2013 Author: Department: Redland Technical Solutions Redland Technical Solutions 1 Introduction 1.1 TECHNICAL DATA
More informationGV Standard Three Wall Box
GV Standard Three Wall Box Installation Instruction Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.
More informationInstallation guide for 20/20
Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British
More informationThe Leka System Installation Guide
Installation Guide The Leka System Installation Guide The following guide has been created to assist in the fabrication and installation of the Leka System. Please note that each roof is individual and
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationC.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit
Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800
More informationASS 70 FD folding / sliding door. Installation Guide
ASS 70 FD folding / sliding door Installation Guide IMPORTANT! These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the installation.
More informationTRISO-SUPER 10 Installation Guidelines
V 2007 ACTIS THIN MULTIFOIL INSULATION Installation Guidelines ROOFS ATTICS 2 Contents Technical characteristics 2 Essential rules of installation 3 Over rafter installation 4 Under rafter installation
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 2 CONTENTS 1. Preparing the ring beam 2 2. Installing the framework 3 3. How to install structural support posts 7 4. Insulation and waterproofing 8 5. Tile application:
More informationShingle Installation Guide
Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors
More informationINSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1
INSTALL IN 2 DAYS *Assumes 3-man fitting team equinox Tiled roof system Installation guide ISSUE 1 Equinox tiled roof system Installation guide Contents Pre-installation checks 1. Installing the framework
More informationInstallation Guide. for E-Series/Eagle Clad Hinged Inswing French Door
Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.
More informationInstallation Guide GRP Dormer
Installation Guide GRP Dormer To ensure optimum performance please follow the correct fitting procedures outlined in this installation guide. Site safety and good building practice should be adhered to
More informationWARNING. Not suitable for children under 36 months Contents
For domestic and family use only Children of any age should not be left to play unsupervised Retain Instructions for future reference WARNING. Not suitable for children under 36 months Contents Length
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9
More informationFIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)
FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed) Thank you for choosing to purchase a ROOF Maker Fixed Flat Rooflight. Assembly Procedure Guidance Please take precaution when moving
More informationInstallation. ng Kitt
Installation Instructions Alpha SolarSmart 100 Roof Integrated Flashi ng Kitt for the Installation of Alpha Solar Collectors into Tiled Roofs 1 Integrated Flashing kit for Alpha SolarSmart 1000 CONTENTS
More informationASS 70 FD folding/sliding door installation guide
ASS 70 FD folding/sliding door installation guide 2 Preparation IMPORTANT These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the
More informationBlock Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.
Effective Date: 10/1/17 Tools Needed Kit Contents Safety Glasses Cordless Drill Phillips Screw Bit Two-step Drill Bit (3/8-1/8 ) Utility Knife Interior Mullion Exterior Mullion Cover Hardware Kit Clamps
More information4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.
Effective Date: 10/1/2017 Tools Needed Kit Contents Hardware Kit Safety Glasses Cordless drill Phillips screw bit Two-step drill bit (3/8-1/8 ) utility knife Interior Mullion Exterior Mullion Cover clamps
More informationINSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)
for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationequinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT
equinox INSTALLATION GUIDE Issue 3 CONTENTS 1. Preparing the ring beam 2 2. Installing the eaves beam 3 3. How to install structural support posts 7 4. Insulating and waterproofing 8 5. Tile application:
More informationGallium 03 Installation Instructions & Parts List
Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed
More informationROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION
ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION It is the responsibility or roofers, building
More informationINSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. While the use of
More informationRead guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.
Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed
More informationEagle clad double-hung window installation instructions
Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationN/A. General Instructions. For Assistance Please Contact Customer Care on Overlap Cladding. Solid Sheet Roof. No Windows.
General Instructions Please retain product label and instructions for future reference N/A Overlap Cladding Shiplap Cladding Fixed Windows Opening Windows No Windows Solid Sheet Floor T&G Floor Solid Sheet
More informationN/A. General Instructions 14/01/2014. For Assistance Please Contact Customer Care on Overlap Cladding. Solid Sheet Roof.
General Instructions 14/01/2014 Please retain product label and instructions for future reference N/A Overlap Cladding Shiplap Cladding Fixed Windows Opening Windows No Windows Solid Sheet Floor T&G Floor
More informationIntegrity Polygon and Round Top Installation and Finishing Instructions
Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon
More informationInstallation Guide. Bi-fold Doors
Installation Guide Bi-fold Doors Installation Guide Components box 1. 6. 2. 3. 7. 5. 4. 8. Contents 1. Fixing plugs 2. Wedge gasket 3. Bottom trolley 4. Top trolley 5. Magnetic keep (x 2 if door height
More informationGV Standard Sliding Over Roof Installation Instruction Manual
GV Standard Sliding Over Roof Installation Instruction Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.
More informationSpecial Roofs and Vertical Slating
Special Roofs and Vertical Slating Roofs falling into the category of "special" roofs have the following characteristics: (a) any roof slope equal to or greater than the minimum pitch for the size of slate
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationFibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.
Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm
More informationN/A. General Instructions 14/01/2014. For Assistance Please Contact Customer Care on Overlap Cladding. Solid Sheet Roof.
General Instructions 4/0/204 Please retain product label and instructions for future reference N/A Overlap Cladding Shiplap Cladding Fixed Windows Opening Windows No Windows Solid Sheet Floor T&G Floor
More informationGV Standard Skyhatch Installation Instruction Manual
GV Standard Skyhatch Installation Instruction Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.
More informationGeneral Instructions. Please retain product label and instructions for future reference 7X5 OVERLAP APEX
General Instructions 7X5 OVERLAP APEX x2 Please retain product label and instructions for future reference All building s should be erected by two adults Winter = High Moisture = Expansion Summer = Low
More informationBasic Fitting Details No. 1
No. 1 Fixing free edges of flashings A. Clips for flashings over interlocking tiles B. Clip to ridge or hip roll C. Clip to apron flashings Clips should be made from quarter hard copper, 0.6mm thick, terne
More informationInstallation Instructions of HomeTech Fakro Skylights
Installation Instructions of HomeTech Fakro Skylights EH Flashing Suitable for corrugated, concrete tile and pressed metal tile roof types 15-75 For roofs with minimum pitch 15 and maximum pitch 75 IMPORTANT:
More information8x4 SpaceSaver Garden Shed Assembly Manual
8x4 SpaceSaver Garden Shed Assembly Manual Revision #8 July 5, 2010 Thank you for purchasing an 8x4 SpaceSaver Garden Shed. Please take the time to identify all the parts prior to assembly. Safety Points
More informationInstallation Guide for E-Series/Eagle Clad Mechanically Fastened Windows
Guide for E-Series/Eagle Clad Mechanically Fastened Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions
More informationButyl Flash. Installation Instructions. Prep & General Conditions
Prep & General Conditions All surfaces must be clean, dust free, smooth and dry. Do not apply over sealants or uncured caulks containing plasticizers or solvents. This includes most silicones and polyurethane
More informationInstallation Recommendations for Finless Frame Doors
Installation Recommendations for Finless Frame Doors These installation recommendations are made available by MI Windows and Doors, LLC (MI) to assist with the integration of finless or flange sliding
More informationMulti-layer Insulation Blanket for
Pitched roof insulation Fully certificated Thermally tested in accordance with EN12667 High thermal resistance of 2.71m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective
More informationHinge Door + Side Panel
Hinge Door + Side Panel Instruction Manual KL+ KR Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according
More informationINSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233
INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay
More informationWall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun
Decem Sliding Door (Corner Fitting) Instruction Manual DXT Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed
More informationHow-To-build guide Garden shed
How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to
More informationHinge Door + One Inline Panel
inge Door + One Inline Panel Instruction Manual KLD + KL Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed
More information900 SERIES WALL PANELS
CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationPotting Store Assembly Instructions
Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly. Certain
More informationINSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. Read these instructions
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationThree layer Felt Roofing using cold applied adhesive
Three layer Felt Roofing using cold applied adhesive Useful tips - Skill level - Safety - Felt Roofing Materials - Tools and Equipment Laying a felt roof is within the capabilities of most diy people providing
More informationYWY M08 The new VELUX solution
YWY M08 The new VELUX solution VELUX roof windows and vertical window elements installed as a dormer in roof pitches between 42º and 52º YWY M08 is available as a double or triple unit and can be installed
More informationInstallation Instructions
Installation Instructions Alpha SolarSmart On Roof Kits for the Installation of Alpha Solar Collectors onto Tile and Slate Type Roofs For Technical help or for Service call... ALPHA HELPLINE Tel: 0 77
More informationINSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS
for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay
More informationInstallation guide. Step-by-step instructions
Installation guide Step-by-step instructions Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam
More informationChapter 12 - Windows and Doors
Chapter 12 - Windows and Doors Contents Chapter 12 - Windows and Doors... 12-1 Timing & Prerequisites... 12-2 Verifying Windows and Doors Orders... 12-3 Windows... 12-4 Prepare the Window Openings... 12-4
More information(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS
Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard
More informationHeavenScape Premium Skylightys Installation Instructions
HeavenScape Premium Skylightys Installation Instructions Information Sheet Updated: 11/04 Quality You an Trust Since 1886... From North America s Largest Roofing Manufacturer S T O P!!! PLEASE READ!!!
More informationXenon 05 Installation Instructions & Parts List
Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably
More informationGV Standard Free Standing Box
GV Standard Free Standing Box Installation Instruction Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.
More informationSee Through Indoor / Outdoor Framing and Window Installation Instructions
See Through Indoor / Outdoor Framing and Window Installation Instructions These Instructions are an addendum to the DaVinci Fireplace Installation Manual This addendum is only for use with the Indoor /
More informationDaVinci Fireplace See Through Indoor / Outdoor Framing and Window Installation Instructions
DaVinci Fireplace See Through Indoor / Outdoor Framing and Window Installation Instructions These Instructions are an addendum to the DaVinci Fireplace Installation Manual This addendum is only for use
More informationSuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter
SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm
More informationtile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:
redi DOOR INSTALLATION INSTRUCTIONS tile redi Redi Swing g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE: 2900V Door-Panel No header, offset pivot hinges, u-channel
More informationINSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232
INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232 QCI5232 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay
More informationSafety First! Review the Safety Checklist before performing tasks in this chapter.
Chapter 17. Cabinets 17.1 LAYING OUT KITCHEN CABINET UPPER UNITS 17.2 INSTALLING KITCHEN CABINET SUPPORT STRIPS 17.3 INSTALLING KITCHEN CABINET UPPER UNITS 17.4 INSTALLING RANGE HOOD 17.5 INSTALLING KITCHEN
More informationwindow installation TECHNICAL GUIDE Everbrite House, Greenway, Harlow Business Park, Harlow, Essex CM19 5QJ
TECHNICAL GUIDE window installation Everbrite House, Greenway, Harlow Business Park, Harlow, Essex CM19 5QJ T: 0845 4567668 F: 01279 629924 E: info@everbritedirect.com PART OF THE EVERBRITE GROUP CMS 1065*
More informationDouble Frameless Swing Door QCI5247
INSTALLATION INSTRUCTIONS Double Frameless Swing Door QCI5247 WALL MOUNT HINGES QCI5247 REV. 0 Page 1 Certified 06/16/2016 Parts List with wall mount hinges *Quantities may vary **Quantities double where
More informationHinge Door + Inline Panel + Return Panel
Hinge Door + Inline Panel + Return Panel Instruction Manual DXL2HDR + DXL2HR + DXR Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing
More informationTo Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call
Data Sheet for Fitting Superquilt Under or over Rafters to Roofs To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call 0844 9919949 From outside the UK Call 0044 1143230474
More informationINSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the
More informationFrameless Inline Door QCI5254
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied
More informationHow To Install Windows: Nail-Fin Application
How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:
More informationFrameless Heavy Glass Door with Wall Mount Hinges
INSTALLATION INSTRUCTIONS Frameless Heavy Glass Door with Wall Mount Hinges QCI-5245 QCI5245 REV. 0 Page 1 Certified 06/16/16 Frameless Door with Wall Mount Hinges ITEM NUMBER DESCRIPTION QUANTITY 1 DOOR
More informationAQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM
AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM The following guide covers the technique for the Mechanically Fixed System. This system is best employed when an overlay
More informationThis installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.
1.00 - Introduction This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format. Please note, each roof has been individually designed to meet specific
More informationInstallation Guide. PrivacyShield Window Seal Kit Grenoble Road Richmond, VA Toll Free: For every environment of your life.
The following installation instructions are given as a general guide to avoid common errors. Installer should follow best practices for construction and workmanship. Acoustical Solutions bears no responsibility
More informationInstallation - Sub Cills
Installation - Sub Cills Fitting of Subcill Drainage paths through the sub-cill can be seen on the illustration alongside so care must be taken to ensure they are not obstructed and that screw fixings
More informationFrameless Door QCI5284
Frameless Door QCI5284 F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com INSTALLATION INSTRUCTIONS Frameless
More informationPlayaway Swiss Cottage Assembly Instructions
Playaway Swiss Cottage Assembly Instructions English SS288C IMPORTANT SAFETY INFORMATION Adult assembly is required. Checks and maintenance needs to be carried out on the main parts (fixings etc.) at regular
More informationALPINE TRAY. To get the best from this product please follow these recommendations.
F I X I N G D E TA I L S ALPINE TRAY The standing seam roofing profile is designed to withstand some of New Zealand s harshest weather in our toughest environments. To get the best from this product please
More informationMulti-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market
Multilayer Insulation Blanket for Roofs, Walls & Floors e The Highest Performing Certificated MultiFoil on the Market MultifoilInsulation.com UK and European Distributors Specialising in Multifoil Insulation
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationChapter 12 - Windows and Doors
Chapter 12 - Windows and Doors Contents Chapter 12 - Windows and Doors... 12-1 Timing & Prerequisites... 12-2 Verifying Windows and Doors Order... 12-3 Windows... 12-4 Prepare the Window Openings... 12-4
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationInstallation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window
Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn
More informationCONSERVATORY ROOF INSTALLATION GUIDE Issue
CONSERVATORY ROOF INSTALLATION GUIDE Issue 3 CONTENTS 1. Statements 2. General assemblies 3. Victorian / Edwardian roof installation 4. Jack rafter installation 5. P-shaped roof installation 6. Lean-to
More informationInstallation Instructions
Installation Instructions Alcove Enclosure Before Installation please check that your shower enclosure system is undamaged Please read these instructions carefully March 2015 TOOLS REQUIRED Electric or