TENDER ISSUE GH GUARD HUT PLAN SCALE 1:25. Guard Hut RL = Driveway NOTES KEY FOR WALL REFERENCE KEY FOR FLOOR FINISHES
|
|
- Moses Wright
- 5 years ago
- Views:
Transcription
1 NOTES. Confirm all dimensions on site prior to construction. Whole of exterior and interior of new building to be painted as per rchitects. ll floor tiles to be laid as per rchitects Planter Sliding gate refer to siteworks drawings for schedule & details W D W W Guard Hut RL =.00 rea = 8.sqm Counter top power point sss W Planter KEY FOR WLL REFERENCE KEY FOR FLOOR FINISHES new mm conc. blockwall plastered & painted as per rchitects Selected Ceramic floor tiles to be supplied by client, Contractor to install including adhesive. (rdex - X6) & grout. llow for steel trowel with soft broom finish,refer details for slab thickness & reinforcement Refer siteworks drawings for fixing Planter 0 KEY TO EXTERIOR ELEVTIONS 90 C D GURD HUT PLN SCLE dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 NOTES DTE LND TRNSPORT UTHORITY GURD HUT FLOOR PLN PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD LS DRWN DTE SCLE M.P/S.X.N.0.8 S SHOWN NO. 7-0 GH
2 NOTE. Contractor to confirm all opening sizes on site prior to fabricating doors / windows. Check all boundary pegs prior to construction C. Confirm all dimensions on site prior to construction D. Exact R.L to be confirmed on site, may vary to drawing KEY NUMER REFERENCE. Colorbond flashing. Window / door as per schedule. Timber fascia board as per roof details W RL =.00 GL D W. mm blockwall plastered & painted from bothsides as per rchitects, refer structural drawing for reinf.. 80 dia. P.V.C downpipe, allow to bracket to ctrs & paint to suite wall colour 6. RPFL Superdek color - bond roof cladding over 0 double sided sisalation install as per manufacturers ELEVTION - SCLE 0 ELEVTION - SCLE 0 7. x colorbond gutter 0mm ctrs. 6 7 RL =.00 GL W W ELEVTION - C SCLE 0 ELEVTION - D SCLE dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 LND TRNSPORT UTHORITY PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD LS. ELEVTION DRWN DTE SCLE S.S.N S SHOWN NO. 7-0 GH
3 refer sheet GH6 for detail RL =.00 RL =.00 SECTION SCLE 0 GH SECTION SCLE 0 GH FIN. NOTE KEY NUMER REFERENCE. Contractor to confirm all opening sizes on site prior to fabricating doors / windows. Check all boundary pegs prior to construction C. Confirm all dimensions on site prior to construction D. Exact R.L to be confirmed on site, may vary to drawing E. ll Walls nd Ceiling With Gib board Joints / Edges To Have P 0 Shadowline s Per Detail. Colorbond flashing. Window / door as per schedule. Timber fascia board as per roof details. mm blockwall plastered & painted from bothsides as per rchitects, refer structural drawing for reinf.. 80 dia. P.V.C downpipe, allow to bracket to ctrs & paint to suite wall colour 6. RPFL Superdek color - bond roof cladding over 0 double sided sisalation install as per manufacturers 7. x colorbond gutter 0mm ctrs. 8. Timber purlins, refer structural drawing for size & fixing 9. Timber rafter, refer structural drawing for size & fixing 0. 6mm hardiflex board on timber framing, boards to be painted as per rchitects s. Concrete beam plastered & painted as per rchitects, refer structural drawing for reinf.. mm gib board ceiling on timber framing, boards to be painted as per rchitects. Concrete slab refer structural drawings. Fin. 90 x mm black painted timber skirting. Selected x ceramic floor tiles. Contractor to install including adhesive (rdex - X6) & grout. 6. Contractor to fill planter with garden soil all planting to be done by others FIN. 90 SKIRTING DETIL SCLE dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 LND TRNSPORT UTHORITY PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD LS. SECTION DRWN DTE SCLE M.P/S.S.N.0.8 S SHOWN NO. 7-0
4 NOTE. ll Ceiling Heights re From Finished Floor Level. llow To Use Proprietary Rods & rackets For Ceiling Hangers. Grid setout for suspended ceiling to be confirm on site 00 LEGENDS. mm Gib oard On Timber Framing With Different Ceiling Heights, oards To e Painted s Per rchitects Instructions uilding Line elow. 6mm Hardiflex oard On Timber Framing, oards To e Painted s Per rchitects Instructions KEY NUMER REFERENCE uilding Line elow uilding Line elow. RPFL Superdek color - bond roof cladding over 0 double sided sisalation install as per manufacturers. x colorbond gutter 0mm ctrs.. Colorbond flashing uilding Line elow 00 REFLECTED CEILING PLN SCLE 0 ROOF PLN SCLE dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 LND TRNSPORT UTHORITY PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD LS. REFLECTED CEILING & ROOF PLN DRWN DTE SCLE S.S.N S SHOWN NO. 7-0 GH
5 9 0 Selected Door Closer D TYPICL SECTION SCLE DOOR REF. No DOOR TYPE DOOR FINISH FRME TYPE FRME FINISH HRDWRE X D luminium Door with 0.8 Laminated clear glass Powder Coated lack Finish 00mm Commercial Grade luminium Frame Powder Coated lack Finish Lockwood Entry Set (90 SC Series) allow for door stopper & pairs stainless steel hinges with 77 SIL door closer & handles TYPICL SECTION SCLE.8 Z W ( - OFF) (FT,) Y 7 FFL 00 CONCRETE COUNTER DETIL SCLE TYPICL SECTION SCLE 6 DETIL SCLE 00 CONCRETE SL blades Y X Z W ( - OFF) (FT,,L,LC,SS) 00 DETIL SCLE 8 Y 0 KEY NUMER REFERENCE. luminium - Sub Sill Flashing all around mm x 0 clear laminated glass blades with polished edges 7..8 Laminated clear glass 8. llow for steel trowel with soft broom finish, refer details for slab thickness & reinforcement 9. uilding Line 9 CONCRETE SL 0. Door as per schedule. Selected floor tiles refer finishes plan. Selected bull nose tiles. Selected x ceramic tiles on conc. bench. Selected ceramic tiles on conc. bench...t Trims- Mosaic External Corner (Code- EC- -) 6...T Trims- Mosaic Corner ngle (Code- MC- 0--) 7. Plaster & paint underside bench 8. Plaster & paint from bothsides 9. Supascreen security mesh 0 grade fixed from outside using security mm ctrs 0. Cut off the part of sub sill flashing only on window head as shown in dotted. Window Carrier Handle Finish Floor Line NOTE. Contractor to confirm all opening sizes on site prior to fabricating doors / windows. luminium contractor to provide shop drawing to rchitect / Engineer for approval prior to fabrication C. luminium profile to be approved by rchitect D. luminium contractors to wrap all aluminium frames with plastic covering prior Installation on site E. Provide malthoid d.p.c where timber comes in contact with concrete, d.p.c to be approved by rchitect F. WIND SPEED The regional wind speed (V00) for design of cladding and glazing shall be taken to be 70m/s or as required by Engineer. The builder shall provide a producer statement confirming glazing, mullions, transoms and the connections between each of these and to the structure shall be capable of resisting the design wind speed. G. IMPCT RESISTNCE The windows, doors and cladding shall be shown to be capable of resisting impact loading equivalent to i. Timber member of kg mass with nominal xon at 8m/s for horizontal trajectories and 7m/s for vertical trajectories. H. lternatively shuttering capable of resisting the above mentioned impact shall be provided. The builder shall provide certified producer statements indicating the impact resistance of the glazing or shuttering. J. Number of blades on handle to be confirmed by rchitect K.Doors to have pair stainless steel hinges per door leaf unless noted elsewhere L. Door lock finish to be satin chrome with selected door handles M.llow for floor mounted rubber door stoppers to all doors. Stoppers to be selected by rchitect J. llow for Raven weather strip to suit exterior doors LEGEND FRME TYPE FT 00mm aluminium frame with powder coated black finish, sample to be approved by rchitect LOUVRE LDES L 6.8mm x 0mm clear laminated glass blades with polished edges LOUVRE CRRIER LC Palmair louvre carrier with black plastic clips FIXED GLSS Laminated clear glazing SUPSCREEN SECURITY MESH SS Supascreen security mesh fixed from outside using security mm ctrs KEY mm fixed laminated clear glazing glass.8.8mm fixed laminated clear glazing glass KEY NUMER REFERENCE. mm blockwall plastered & painted from bothsides as per rchitects, refer structural drawing for reinf.. luminium surrounded frame. Palmair weather strip. 0G x 00mm Long stainless steel grade 6 screw 0mm ctrs max. & 0mm away from corners 7-0 NO. M.P/S.X.N DRWN DOOR WINDOW & FINISHES DETILS DTE S SHOWN SCLE LND TRNSPORT UTHORITY PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD, LS. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately.
6 mm thick solid blockwall plastered & painted bothsides D vertical bars at ctrs GH6 D bar R0 ties at 00mm ctrs lap with mesh D vertical bars at ctrs mm blockwall GL. MIN. 00 -D bars R0 ties at 00 mm ctrs 0 FW- SCLE 0 D horiz. bars in bond blocks at every nd course 66 mesh well compacted fill 00 micron visqueen C or approved equivalent water-proof membrane on 0mm sand blinding and 00mm hardcore fill 00 MIN. - D6 bars R0 mm ctrs x PD ELEVTION - P SCLE GL. D dia at ctrs bothways with 7mm cover from bottom x rc beam reinf. with - D dia bars R0 dia ties at 00 ctrs mm thick solid blockwall plastered & painted bothsides (ll cavities filled) NOTE LL LOCKWORK TO E FULLY GROUTED D horiz. bars at ctrs bothways D horiz. bars in bond blocks at every nd course D vertical bars at ctrs CONCRETE COUNTER DETIL SCLE 0 7 x 0 timber ctrs 00 blockwall - dia bars 6 dia ties at 00mm ctrs CORNER binding detail for 00//00 blockwall LOCK INDING DETIL Scale x r.c.beam pryda roof brace 0 P FW- FW- FW- FW- GURD HUT FOUNDTION PLN SCLE D mm ctrs bothways COLUMN SECTION SCLE 0 PD PLN - P SCLE 0 GH x r.c.beam x r.c.beam x r.c.beam 00 GURD HUT ROOF FRMING PLN SCLE 0 x 0 ctrs pryda roof brace dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 LND TRNSPORT UTHORITY PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD LS. GURD HUT STRUCTURL DETILS DRWN DTE SCLE M.P/M.S.R S SHOWN NO. 7-0 GH6
7 Selected infill strip Colorbond flashing with flashguard x 0mm rafter refer roof framing for spacing 6mm MS plate drilled for - 6 dia holes for "U" bolt 7 x 0 purlin strapped with x.mm galv. strap,nailed with -0 x. dia bugle headednail in each leg RPFL Superdek color - bond roof cladding over 0 double sided sisalation install as per manufacturers 7 x 0 purlin strapped with x.mm galv. strap,nailed with -0 x. dia bugle headednail in each leg x 0mm rafter refer roof framing for spacing 6mm MS plate drilled for - 6 dia holes for "U" bolt RPFL Superdek color - bond roof cladding over 0 double sided sisalation install as per manufacturers Selected infill strip Ex. 0 x 0mm fascia board x x 0.8mm Colorbond gutter 0 ctrs. 6mm hardiflex board on timber framing, boards to be painted as per rchitects s -6 dia 'U' bolt cast 00mm into R.C beam x rc beam reinf. with - D6 dia bars R0 dia ties at 00 ctrs D dia. vertical mm ctrs. mm gib board ceiling on timber framing,boards to be painted as per rchitects mm conc. wall plastered & painted from bothsides mm gib board ceiling on timber framing,boards to be painted as per rchitects -6 dia 'U' bolt cast 00mm into R.C beam x rc beam reinf. with - D6 dia bars R0 dia ties at 00 ctrs mm conc. wall plastered & painted from bothsides 6mm hardiflex board on timber framing, boards to be painted as per rchitects s D dia. vertical mm ctrs. Ex. 0 x 0mm fascia board DETIL SCLE 0 DETIL SCLE 0 x 0mm timber rafters 7 x 0mm timber purlins strapped to rafters with x.mm galv. straps & nailed with -0 x. dia bugle headed nails in each leg Colorbond flashing with flashguard 0 (min) x 0mm rafter refer roof framing for spacing RPFL Superdek colorbond roof cladding over 0 double sided sisalation install as per manufacturers s. 7 x 0mm timber purlins strapped to rafters with x.mm galv. straps & nailed with -0 x. dia bugle headed nails in each leg 6 dia. "u" bolt cast 00 mm into concrete beam with 6mm ms. plate over x 0mm timber rafter 0 TYPICL PURLIN FIXING DETIL SCLE 0 6 "U" OLT PLTE DETIL SCLE 6mm MS plate drilled for - 6 dia holes for "U" bolt x 0mm timber rafter Ex. 0 x 0mm fasica board x 0 packing piece 0 x 0mm timber ctrs bothways 6mm hardiflex board on timber framing, boards to be painted as per rchitects s x rc beam reinf. with - D6 dia bars R0 dia ties at 00 ctrs DETIL SCLE 0 mm gib board ceiling on 0 x 0mm timber ctrs bothways P 0 shadowline stopping angle all around dia. mm ctrs. R C beam min TYPICL RFTER FIXING DETIL SCLE 0 dimensions on site. ll discrepancies shall be reported to the RCHITECT immediately. RCHITECTS, CONSULTNTS, MNGERS,INTERIOR ERS 6 MR ROD, P.O.OX 6, NUSORI, FIJI ISLNDS PH.- 87, FX. - 8 LND TRNSPORT UTHORITY PROPOSED DMINISTRTION & TECHNICL UILDING ULILEK ROD LS. GURD HUT STRUCTURL DETILS DRWN DTE SCLE M.S.R.0.8 S SHOWN NO. 7-0
S.NO Description Quantity Rate Amount
INTERIOR WORKS NANDIMANDALAM BRANCH S.NO Description Quantity Rate Amount 1 Full height partition with laminate finish and glass. Providing & fixing partly glazed partly paneled Dry Wall Partition with
More informationROOM smooth cement f.f FLOOR LAYOUT
3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f 168 900 1,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1,091 900
More informationC.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit
Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800
More informationSystem for 2+ Level Buildings
Issued Sept 205 Contact Info@symonite.co.nz System for 2+ Level Buildings Typical Details Issued: September 205 TYPICAL DETAILS CONTENTS.0 TYPICAL VERTICAL JOINTS 2.0 EXT. CORNER / TYPICAL HORIZONTAL JOINT
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More informationMethod of Build 1. General
Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationHow-To-build guide carport
How-To-build guide carport What you can build using this guide This guide will show you how to build a free-standing, open-sided single carport. Before you begin building Contact your local territorial
More informationGable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting
INSTALLATION GUIDE Gable HomeshedsTM LARGE SPAN BEFORE YOU START Council Approval It is important to contact your local council before building your Stratco Gable Homeshed. You will have already received
More informationDesign Features INTRODUCTION SERIES 702 PERFORMANCE SlideMASTER SLIDING DOOR. Australian Registered Design
Design Features INTRODUCTION DATE JUN 06 REPLACES NOV 04 SCALE NOT TO SCALE This high performance sliding door has been tested for compliance with the relevant Australian Standards. Achieved a very high
More informationSection 11 CABLE & ROD SYSTEMS, SIGN FIXING & SIGN STANDOFFS. Web. acrylicdesign.ie .
Section 11 CABLE & ROD SYSTEMS, SIGN FIXING & SIGN STANDOFFS Web. acrylicdesign.ie Email. sales@acrylicdesign.ie Acrylic Design 2004-2015 Mobile Cable System Components Single panel clamp Stand Off for
More informationTypical Drawings for Schools
0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)
More information24 X32 3 CAR GARAGE POLE BARN STYLE FRAME
24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1
More informationKS SERIES - VERTICAL INSTALLATION
CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationDESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations
ELEMENT NO.1 SUBSTRUCTURES Excavations B Clear site of all shrubs and undergrowth including grubbing up of roots and dispose off as directed. Excavate oversite average 150mm deep and cart away as directed
More informationSHED PACK. Sheds are commonly constructed using portal frames.
SHED PACK Sheds are commonly constructed using portal frames. This pack relates to purchasing portal frame purlin bracket sets. Ruest our free generic engineered and certified shed plans. SHED PACK Step
More informationTRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT
TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read
More informationPROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -
: - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY GOVERNMENT. - GARBAHAREY DISTRICT - N O : SEPT. 2016 DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT 01. 01/15 Cover Page.. /15 Drawing Index. 03.
More informationALPINE TRAY. To get the best from this product please follow these recommendations.
F I X I N G D E TA I L S ALPINE TRAY The standing seam roofing profile is designed to withstand some of New Zealand s harshest weather in our toughest environments. To get the best from this product please
More informationC D. Secondary Glazing Fixed Unit. Do not scale 1 to 1. Frame 301 Face Fix. 19.8mm. Typical Elevation. Top hung over fixed.
Secondary Glazing Fixed Unit 19.8mm 14.0mm Frame 301 Face Fix Top hung over fixed Fixed unit Fixed unit using overlap section 310 Glazing available in 4mm 6mm and 6.4mm Laminate Glass o not scale 1 to
More informationMethod of Build 1. Fire. Sound
Method of Build 1 General Viso Fire & Acoustic in the solid form differs from most other systems as it can be erected using 12.5mm & 15.0mm boards within the same Aluminium framework. Also hidden fix board
More informationQuantum Sliding Door. Features & Benefits. Trend Windows & Doors Design Manual Q-Mk-1 May 2014
Quantum Sliding Door Features & Benefits 110 FRAME Robust 102mm semi commercial aluminium door frame. Combine with windows or can be used in integrated with Trend s Crestlite commercial applications. PANELS
More informationFibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.
Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm
More informationAPPENDIX FENCE GENERAL NOTES
APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.
More informationA101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN
A00 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" A00 A0 A0 A B C D E F G ' - 0" 8' - 0" 9' - 0" 9' - 0" 9' - 0" 8' - 0" OVERHANG OF ROOF ABOVE RECESSED PEDI-MAT AT ENTRANCE MECH ENCL 0 0 WOMENS
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationSHED PACK Step 1: Choose your shed type.
SHED PACK Step 1: Choose your shed type. Industrial Shed Open FarmShed Shed Pack / Types of Sheds Drawing # S0104.A001 Hanger Shed =DISCLAIMER= Please read and agree to Purlin Brackets Terms and Conditions
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationInstallation Instructions
TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions
More information28.00 Rmt sqm sqm
SEALED BID FORMAT FOR THE INTERIOR FURNISHING WORKS AT SBI CHALAKUDY BRANCH. Sl No. Description of item Quantity Unit Rate Amount 1 Counter Table :- The width and height of the table is 100cm and 75cm
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationINSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED
INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.
More informationA1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN
-2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14
More informationGROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)
3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"
More informationENARC CONSULTANTS. M. G. ROAD, THRISSUR - 1 Ph. : &
ENARC CONSULTANTS M. G. ROAD, THRISSUR - 1 Ph. : 2441901 & 2441905 SCHEDULE FOR INTERIOR FURNISHING WORK FOR RASMECC BRANCH (FIRST FLOOR) SBI, CONSTRUCTION OF BUILDING AT THRISSUR - 1 Fully Glazed Partitions
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationW L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.
H Standard Sizes: H 2.125m underside of gutters. 2.280m total height. L L 5.450m roof. 6.050m roof. 7.250m roof. W W 3.000m roof/2.640m between posts. 3.600m roof/3.240m between posts. 5.400m roof/5.040m
More information182.1 INTRODUCTION SERIES 462 ARCHITECTURAL COMMERCIAL SLIDING WINDOW. Design Features : Australian Registered Design.
INTRODUCTION DATE JUN 06 REPLACES NOV 04 SCALE NOT TO SCALE Design Features : The 26mm thick heavy duty sliding window sashes have been fitted into custom head and sill and jamb inlay adaptor that snaps
More informationUlltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.
Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction
More informationEMAC 001 ACCESS PANEL
EMAC 001 ACCESS PANEL 900 x 600* 1200 x 600* Picture covers uneven edges Beaded can be taped and jointed for skimming Ensure the structural opening (panel size +10mm) is lined with timber or steel section.
More informationHow-To-build guide Garden shed
How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to
More informationQUOTATION FOR THE INTERIOR FURNISHING WORK OF BANK OF INDIA, BALARAMAPURAM BRANCH.
QUOTATION FOR THE INTERIOR FURNISHING WORK OF BANK OF INDIA, BALARAMAPURAM BRANCH. Date:- Si.No. Description of work Qty Units Rate Amount I DOORS & PARTITIONS :- 1 FULLY GLAZED FULL HEIGHT PARTITION WITH
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationFolding sliding doors
Folding sliding doors Standard program overview Folding sliding doors Folding sliding doors single and double-skinned Product Dimensions in mm width/height Leaf thickness Min. headroom Min. lateral projection
More informationMADE IN OAK. Traditional Oak Buildings for Contemporary Living. Garage & Outbuilding Specifications
MADE IN OAK Traditional Oak Buildings for Contemporary Living Garage & Outbuilding Specifications 01666330182/822234 info@madeinoak.com www.madeinoak.com Oak We only use structurally graded green oak from
More informationDUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL
DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 4 Step 2a Footing Set-Out for Concrete
More informationAlexandra Secondary College Refurbishment Project No: 1507 SECTION MANUFACTURED CASEWORK - SHOP BUILT 12300/1
SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/1 PART I GENERAL 101 Scope The work of this Section covers the supply and installation of manufactured casework items. It includes but is not limited
More informationOur Ref: SRO/BM/C Date:
Our Ref: SRO/BM/C Date: 03.04.2009 Subject: 1.Extension of existing partition and providing false ceiling in HSROL Sect. 2. Providing Partition and false ceiling in Sample Cell. To: Dear Sir(s), Quotation(s)
More informationASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m
ASSEMBLY INSTRUCTIONS SS50 BASE SIZE:.50m x.00m CONGRATULATIONS ON PURCHASING A SMART STORE SHED. BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS: BEFORE YOU START: Read all instructions
More informationbedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.
0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.
More information2013 Feeney (2/14) # B. Aluminum Railing Systems
2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationExtrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.
Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions
More informationStainless SHS stanchions with glass infill and offset handrail
Stainless SHS stanchions with glass infill and offset handrail design elements C4 Min 180 100 40 Min 1000mm 100 100 Stainless SHS stanchions with glass infill and offset handrail C4 design Stainless steel
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationHardware Fitting Accessories Door Seals
Areas of application Protection against cold, draught and vermin Reduces light leakage, sound insulation Smoke control, fire resistance Reduces the energy consumption of air conditioning systems (see following
More informationINSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS
INSTALLATION GUIDE Outback VERAnDAHS PATIOS CARPORTS Flat Attached BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationDHS-500 IMPACT SYSTEM INSTALLATION MANUAL
DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE
More informationInstallation Guide Contemporary Alfresco V1.3 LU
Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More information1 P a g e THIS IS A GENERIC MANUAL AND MAY NOT BE INDICATIVE OF YOUR CONSTRUCTION.
1 P a g e INDEX SECTION DESCRIPTION PAGE 1 TOOLS REQUIRED 3 2 GENERAL PARTS IDENTIFICATION.... 4 2.1 Structural Members 4 2.2 Brackets.. 4 2.3 Fasteners and Bolts 5 2.4 Roof and Wall Cladding.. 5 2.5 Gutters
More informationOUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS
BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback Flat Verandah. It is the builder s responsibility to ensure any
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationGSPublisherVersion PROPOSED REHABILATATION DR.AYUB FOOTBALL STADIUM IN - BAIDOA -
GSPublisherVersion 0.0.00.00 PROPOSED REHILTTION DR.YU FOOTLL STDIUM IN - IDO - PROPOSED REHILITTION DR.YU FOOTLL STDIUM IN - IDO - 0. 0. 0. 04. SHEET N O 0/4 0/4 0/4 04/4 DRWING N O June 08 DRWING INDEX
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationPRODUCT INFORMATION MANUAL SECTION: 16 FIXED METAL AWNINGS FIXED METAL AWNINGS
FIXED METAL AWNINGS Fixed Metal Awnings BAHAMA Maximum Width Minimum Width Minimum projection Minimum Drop TS - Truss Support Maximum Overhang Minimum Overhang Unlimited 500mm TS=1601mm PS=2847mm PS=
More informationSeries 525 LouvreMASTER Adjustable Louvre Window
Series 525 LouvreMASTER Adjustable Louvre Window DESIGNER SERIES Photo courtesy of Hanlon Windows Australia DATE: NOVEMBER 2009 REPLACES: AUGUST 2003 DESIGNER SERIES Series 525 KEY EATURES / PERORMANCE
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More information8 x 10 Timber-frame Garden Shed
8 x 10 Timber-frame Garden Shed Includes: Step-By-Step Instructions, Complete Details & Materials Lists Timber-framing is a traditional building method that uses a simple framework of heavy timber posts
More informationSeries Sloped glazed Curtain wall. Installation Instructions
Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End
More informationINSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4
the unique loft conversion & flooring system INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 Unit 6, Devizes Trade Centre, Hopton Park, Devizes, Wiltshire, SN10 2EH t 01380 739000 e info@telebeam.co.uk
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationDescription of Item Unit Quantity
Page 1 of 6 a) Façade of Entrance Door (Refer Drawing 11) Providing and fixing in place Aluminum Composite Panel Cladding of approved quality / shade / colour / make (Euroband / Altobond / Alucobond) per
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationASSEMBLY INSTRUCTIONS SS2010. BASE SIZE: 2.020m x 1.020m
ASSEMBLY INSTRUCTIONS SS010 BASE SIZE:.00m x 1.00m CONGRATULATIONS ON PURCHASING A SMART STORE SHED. BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS: BEFORE YOU START: Read all instructions
More informationBovard Studios Inc. Section April 6, 2004 Page 1
April 6, 2004 Page 1 This section includes solid flush and surface articulated wood doors, may have veneer facing, solid or glazed (stained glass) design, factory pre-fit, may be factory finished or site
More informationExtension Standard building 03/15
Extension Standard building 03/15 8 Wide Evolution Extension Assembly Instructions Contents: Introduction Base Preparation Overview Base Assembly Side Assembly Front Assembly Extension Installation Rear
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationInstallation Instructions
Installation Instructions Alcove Enclosure Before Installation please check that your shower enclosure system is undamaged Please read these instructions carefully March 2015 TOOLS REQUIRED Electric or
More informationStandard program overview Steel smoke-proof doors
Smoke-proof doors Standard program overview Steel smoke-proof doors Pos. Product 1 RS-1 Steel door (thin rebated) Smoke-proof door in accordance EN 1634-3 / DIN 18095 Dimensions W 625-1350 H 1750-2500
More information2015 Feeney (8/15) # D. Aluminum Railing Systems
2015 Feeney (8/15) #2012-425D Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationTimber to Timber - Timber to Concrete - Timber to Steel
01/2017 TIMBER CONNECTORS NOT TO BE USED IN EXTERIOR SITUATIONS Stainless Steel alternatives are available where stated Timber to Timber - Timber to Concrete - Timber to Steel MiTek manufactures and markets
More informationGABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete
More informationASSEMBLY INSTRUCTIONS GL75. BASE SIZE: 2.190m x 1.520m
ASSEMBLY INSTRUCTIONS GL75 BASE SIZE: 2.190m x 1.520m CONGRATULATIONS ON PURCHASING A DURATUF GUARDIAN SHED. BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS: BEFORE YOU START: Read all
More informationSTRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE
STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE INSTALL GUIDE BEFORE YOU START COUNCIL APPROVAL It is important that you have local council approval before building your Stratco
More informationA Shell construction
A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill
More informationINSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING
JANUARY, 2014 1 INSTALLATION Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING INSTRUCTIONS 2 FRAME ASSEMBLY JANUARY, 2014 601442 SHEAR BLOCK BALL BEARING NRP BUTT (FACTORY APPLIED
More informationDoor Hinges Drill-in Hinges
Drill-in hinge StarTec Frame part For timber lining frames For rebated doors Maintenance-free friction bearing To use in combination with receiver Max. door weight: 40 kg Knuckle: Ø15 mm Drilling bit Ø7.2
More information.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.
PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation
More informationArchitectural Information Page: Series 602 Magnum Sliding Window Introduction. Design Features : Date: Aug 03 Replaces: Scale: Not to scale
Design eatures : Architectural Information Page: 17. 1 Introduction Date: Aug 03 Replaces: Scale: Not to scale This high performance sliding window has been designed to complement our existing high quality
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9
More informationCFDTT-01. Control Joint Study (General)
Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area
More informationSTRAIGHT SLIDING PACER AND FLEXIROL DOOR SYSTEMS
PACER AND FLEXIROL STRAIGT SLIDING DOOR SYSTEMS The main advantage of using a straight sliding system is that it saves room space, as the door does not require a swing or stacking space to open. Using
More informationKestrel Aluminium Systems Limited. Product Manual Section 22 TB Commercial Door. Manual Version
Kestrel Aluminium Systems Limited Product Manual Section 22 TB Commercial Door Manual Version 23.0.1 PAS24: 2012 Section 22.01 Product Specification 22.01.01 sheet 1 Product specification 22.01.01 sheet
More informationSliding Door Hardware-Glass Bottom Rolling System
Sliding Door Hardware-Glass Silent Aluflex 0 Maximum door weight: 0 kg ( lbs.) Maximum internal height:,500 mm (9 / ) Mullions are recommended for doors taller than 000 mm ( 3/ ) Door width: 500 500 mm
More informationLE7000 Provincial Built-in (Zero Clearance) Kit Instructions.
LE7000 Provincial Built-in (Zero Clearance) Kit Instructions. LE7000 Provincial ZC Kit contains: Part No. Quantity Description Picture 503259 4 Self Threading Screw 13mm 503459 6 Self Threading Screw Timbertites
More informationCurtain Wall Installation Guide
Curtain Wall Installation Guide Curtain Wall Installation Guide 1 IMPORTANT NOTICES! Important Notices & Information Manufacturer s Notes: The building envelope must be correctly prepared with weather
More information