ROOM smooth cement f.f FLOOR LAYOUT
|
|
- Roy Long
- 5 years ago
- Views:
Transcription
1 3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f ,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM
2 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1, NORTH ELEVATION WEST ELEVATION ELEVATIONS CARTAKERS ROOM
3 300 2, ,984 Roof Details Roof slope 23 o Half round G.I ridge cap on, GCI sheets on, 50x50mm purlins on, 100x50mm softwood rafters on, 100x50mm tie beam on, 100x50mm wall plate 100x50mm collar 80x80mm king post VRC Lintol 500mm eaves projection 900x2100 timber door Timber ledged braced and battened door Mud blocks walling VRC Ground Beam 500 ROOM 3,300 1,100 1,000 1, x1 aluminium sliding window 100mm concrete slab Rubble stone foundation walling; see S.E. details. Foundation depth to be determined on site 400 3, Floor details mm thick compacted hardcore fill on, Levelled compacted formation level with anti-termite treatment SECTIONAL ELEVATION SECTION CARTAKERS ROOM
4 4, , ,000 4, ,600 2,000 6,000 B CONTROL ROOM Generator Plinth 1 Fuel supply Generator Plinth 2 GENERATOR ROOM A RAMP 2,000 6,000 MAIN ENTRY FLOOR LAYOUT GENERATOR SHED
5 Gauge 28 prepainted iron resincot roofing sheets: IT4 box profile, nailed on sawn hardwood structure. Roof pitch =22 o. For structure; see S.E. details. Timber framework mm hollow block walling with plaster and paint , ,025 Heavy guage fabric mesh wire Purpose built CHS gate with heavy duty fabric mesh Ramp Slope 10 o mm thick R.C. floorslab with B.R.C. mesh and D.P.M. cast on well compacted hardcore with blinding layer; see S.E. details. RCC plinth. R.C. strip footing and foundation walling, see S.E. details. SECTION GENERATOR SHED
6 50 DETERMINED ON SITE MIN.1 D.P.C. B.R.C. MESH A GAUGE POLYTHENE D.P.M. 25mm MURRAM BLINDING 250mmTHK. MIN. WELL COMPACTED HARDCORE +450 GRD. LEVEL Y B2 ROOF PLAN 600 Y B1 50mm CONCRETE BLINDING Legend Direction of fall SECTION A-A 1:25 FOUNDATION FOOTING DETAIL B.R.C. MESH A GAUGE POLYTHENE D.P.M. 25mm MURRAM BLINDING mmTHK. MIN. WELL COMPACTED HARDCORE TRUSS LAYOUT SECTION D-D 1:25 RAMP DETAILS DETAILS GENERATOR SHED
7 300 1,400 1,000 1,178 2,000 1,222 SOUTH ELEVATION EAST ELEVATION 100 1, , ,400 NORTH ELEVATION WEST ELEVATION ELEVATION GENERATOR SHED
8 L = D.O.S (min 1) 50 6 D.O.S (min 1) 20no. Y no. Y High Level Water Tank of 30M3 Capacity (8M Height) TITLE Civil Engineer: MoMRW_UNDP, South West State Of Somalia, Location: Baidoa - Somalia 300 Y (2+2)no. -07-B Water bar 21no.-07-B2&T2 21no.-07-B1&T1 21no.-07-B2&T2-13-EF 84no. -12-EF F1 F1 Sect' no. -06-B1 21no.-07-B1&T1 Storage tank Section- RC details 3400 Twl 2390 F1 Founda on - Layout 250 L = F B B Ground level High level tank-elevation High level tanks cover slab (RC details) Slab thicnkness is mm no Manhole cover slab depth is 50mm thick 2no no. -11 Column Bracing beams (220x450) 16 no. BS mesh A142 2no. Y16-09 \\NAIDC01\Units\SOK_WatHab\WATHAB PROJECTS\ Mogadishu_Keysaney_new OT\B Designs\50-Blocs\260mm-Emblem_of_the_ICRC_svg.jpg B no. -05-B1 8no no. Y no. Y16-09 Tank Beams (600x300) 4 no B1 Column - RC details 4 no. Base F1-RC details 4 no. 50x50x3mm L mm thick cover slab. 50mm thick Man hole cover slab Column bracing all beams are (450x220) High level tanks Base slab (RC details) Slab thickness is mm Notes Detail at man hole 1.All dimensions are in millimetres 2.The reinforcement bars are square twisted high tensile steel bar s B1 - Bottom one (First bottom layer) B2 - Bottom two (Second bottom layer) T1 - Top one (First top layer) T2 - Top two (Second top layer) Y - Diameter of steel Bar
9 S S Concrate Masonry wall. 20 liter 20 liter Concrate Masonry wall. Concrate GL GL Hardcore Side Elevation Section S Soak Pit GL Front Elevation Floor Plan DETAILS WATER KIOSK
PROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -
: - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY GOVERNMENT. - GARBAHAREY DISTRICT - N O : SEPT. 2016 DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT 01. 01/15 Cover Page.. /15 Drawing Index. 03.
More informationTypical Drawings for Schools
0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationGROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)
3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"
More informationGSPublisherVersion PROPOSED REHABILATATION DR.AYUB FOOTBALL STADIUM IN - BAIDOA -
GSPublisherVersion 0.0.00.00 PROPOSED REHILTTION DR.YU FOOTLL STDIUM IN - IDO - PROPOSED REHILITTION DR.YU FOOTLL STDIUM IN - IDO - 0. 0. 0. 04. SHEET N O 0/4 0/4 0/4 04/4 DRWING N O June 08 DRWING INDEX
More informationSHED PACK Step 1: Choose your shed type.
SHED PACK Step 1: Choose your shed type. Industrial Shed Open FarmShed Shed Pack / Types of Sheds Drawing # S0104.A001 Hanger Shed =DISCLAIMER= Please read and agree to Purlin Brackets Terms and Conditions
More informationbedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.
0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.
More informationDESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations
ELEMENT NO.1 SUBSTRUCTURES Excavations B Clear site of all shrubs and undergrowth including grubbing up of roots and dispose off as directed. Excavate oversite average 150mm deep and cart away as directed
More informationSHED PACK. Sheds are commonly constructed using portal frames.
SHED PACK Sheds are commonly constructed using portal frames. This pack relates to purchasing portal frame purlin bracket sets. Ruest our free generic engineered and certified shed plans. SHED PACK Step
More informationGeneral Layout. Eng. Maha Moddather
General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationTECHNICAL DRAWING. SECTION A: will consist of (30) questions drawn from the general principles, techniques and uses of plane and solid geometry.
TECHNICAL DRAWING EXAMINATION SCHEME There will be three papers, Papers1, 2 and 3 all of which must be taken. Papers 1 and 2 will be a composite paper to be taken at one sitting. PAPER 1: will consist
More informationNepal Housing Reconstruction Programme
Nepal Housing Reconstruction BUILDING DESIGN Submitted By Nepal Housing Reconstruction September, 2016 MODEL SMC None TECHNICAL DETAIL (Progressive Expansion Provision) Build Change FRONT ELEVATION RIGHT
More informationPROPOSED REHABILATION FOR DEYNILE POLICE STATION CENTER PROPOSED REHABILATATION POLICE STATION CENTER IN -DEYNILE- DISTRICT PROJECT: IMPLEMENTED BY:
PROJECT: PROPOSED REHABILATATION CENTER IN -DEYNILE- DISTRICT IMPLEMENTED BY: CLIENT: PROPOSED REHABILATION FOR DEYNILE CENTER PROPOSED REHABILATION CENTER IN - DEYNILE DISTRICT - MAY 2018 DRAWING INDEX
More informationMichigan Heritage Barns 2012 Barn Kit Prices
Michigan Heritage Barns 2012 Barn Kit Prices You can build a post and beam barn kit like this one. It is easy to build a post and beam barn kit. If you are comfortable using some simple power and hand
More information24 X32 3 CAR GARAGE POLE BARN STYLE FRAME
24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationGable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting
INSTALLATION GUIDE Gable HomeshedsTM LARGE SPAN BEFORE YOU START Council Approval It is important to contact your local council before building your Stratco Gable Homeshed. You will have already received
More informationBlokes Shed INSTALLATION INSTRUCTIONS Custom Design & Build. Nationwide Delivery
Blokes Shed 10 Year Guarantee On Sanders workmanship Made in NZ Using NZ timber supplies 40+ Years Experience In business since 1975 Professional Install Available NZ wide Nationwide Delivery Available
More informationArchitect. Architect.
The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationA1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN
-2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationLong Sutton Studio, Hampshire Studio, workshop
Long Sutton Studio, Hampshire Project information Introduction Completion date: May 0 Building type: Location: Hampshire Client: Tom Lloyd Architect: Cassion Castle Architects with Tom Lloyd Set at the
More informationSubstation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm.
General Notes Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. All structural drawings should be read in conjunction
More informationB03 3 Bay Garage with 50 Gable End Roof
B03 3 Bay Garage with 50 Gable End Roof Supplied as a Building Kit in 100% Green Oak (including Air Dried Oak Pegs). KIT SPECIFICATION Dimensions include 230mm 3-course brick plinth Height: 5995mm Width:
More informationEast African Roofing Systems Ltd.
East African Roofing Systems Ltd. Iron Sheet Super Tiger sheets are made from pre-painted galvanized iron sheets and combines increased longevity with low maintenance costs. Super Tigersheets are suitable
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationPractical Information Sheet. awnings. Public Information Sheet N 6
awnings Practical Information Sheet Public Information Sheet N 6 Contents Foreword... 4 Failure modes under the effects of wind and seismic activity... 5 Choice of materials... 10 Bracing... 12 Dimensioning
More informationWHY YOU SHOULD USE TUFFLOOR. components
Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative
More information6x6 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationHow to make a Wendy house Part One: The Floor and the Frame
How to make a Wendy house Part One: The Floor and the Frame The Wendy House. This wendy house is basically a playhouse with a few feminine touches added. A wendy house can give children hours of enjoyment.
More information8x8 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationAPPENDIX 1 : Post and Beam Model
Good Practice Guide to Hut Building Prepared by Reforesting Scotland s Campaign for a Thousand Huts (5th Draft) APPENDIX 1 : Post and Beam Model Peter Caunt & Bernard Planterose June 2017 www.thousandhuts.org
More information12x12 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationGALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m
INSTRUCTIONS FOR: GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m MODEL NO: GSS2323G Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these instructions,
More informationE N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS
GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated
More informationPAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:
EKURHULENI TECH COLLEGE. No. 3 Mogale Square, Krugersdorp. Website: www. ekurhulenitech.co.za Email: info@ekurhulenitech.co.za TEL: 011 040 7343 CELL: 073 770 3028/060 715 4529 PAST EXAM PAPER & MEMO N3
More informationAUSTRALIAN HARDWOOD AND CYPRESS
AUSTRALIAN HARDWOOD AND CYPRESS 1 Expressed Hardwood Structures Trusses, Cathedral Ceilings, Post and Beam Frames SCOPE This guide provides ideas and design information to assist in the development of
More informationPOST FRAME CONSTRUCTION MANUAL
POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade
More informationSTRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE
STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE INSTALL GUIDE BEFORE YOU START COUNCIL APPROVAL It is important that you have local council approval before building your Stratco
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationWALCOOM. Walcoom Corporation POST ANCHOR.
WALCOOM Walcoom Corporation Walcoom is a corporate that specialized in producing and selling various wire mesh and relative accessories. The production base of Walcoom Corp. is located in Anping county,
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 0065213 -Session-1986-87 -Superclass- -Title- TM STRUCTURAL
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationVENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4
ROOF PANEL GABLE FLASHING FASTENER @ 24" C/C MAX. ROOF PURLIN BUTYL SEALANT TAPE FLASH AB-1, AB-2, AB-3, OR AB-4 FASTENER @ EVERY MAJOR RIB OR 12" C/C MAX. F-J TRIM FABRAL ALUMINUM SOFFIT FASTENER 24"
More information10x10 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationCIVIL TECHNOLOGY. 9. For the purpose of this paper, the size of a brick should be taken as 220 mm 110 mm 75 mm.
NATIONAL SENIOR CERTIFICATE EXAMINATION NOVEMBER 2014 CIVIL TECHNOLOGY Time: 3 hours 200 marks PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY 1. This question paper consists of 12 pages, a Formula Sheet
More informationHow-To-build guide carport
How-To-build guide carport What you can build using this guide This guide will show you how to build a free-standing, open-sided single carport. Before you begin building Contact your local territorial
More informationTimber to Timber - Timber to Concrete - Timber to Steel
01/2017 TIMBER CONNECTORS NOT TO BE USED IN EXTERIOR SITUATIONS Stainless Steel alternatives are available where stated Timber to Timber - Timber to Concrete - Timber to Steel MiTek manufactures and markets
More informationExpressed Hardwood Structures
Expressed Hardwood Structures Introduction This guide provides ideas and design information to assist in the development of expressed native timber structures in buildings. Basic information on how to
More informationAcademic Plan Building Construction 2
Academic Plan Building Construction 2 Orientation to the Trade PACING: 3 weeks Unit Number: 1 Construction lab/ shop rules. Safety Contract Tool usage procedures. 1. Describe the history of the carpentry
More informationStandard 25 Wide Structure
Standard 25 Wide Structure Truss Arch Style 2 piece 12ft c/c typical Arch Depth 12 Webbing Diameter 1/2 1 run straight 2 runs straight Wind Brace - up to 120 8 Wind Brace - up to 192 12 Wind Brace - over
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationTRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT
TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read
More informationMODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height
1. SAFETY INSTRUCTIONS INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 3 x 3 x 2.1m MODEL No: GSS3030G Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used
More informationWith Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans
12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed
More informationINSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1
INSTALL IN 2 DAYS *Assumes 3-man fitting team equinox Tiled roof system Installation guide ISSUE 1 Equinox tiled roof system Installation guide Contents Pre-installation checks 1. Installing the framework
More informationF I X I N G B R O C H U R E
F I X I N G B R O C H U R E Joist Hangers Joist Hangers on Steel Beams Fixing Masonry Hangers Speedy Joist Hangers Lateral Restraint Straps Roof Tie Down Straps Herring Bone Joist Strut Bat 'U' Nail Plate
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More information4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS
4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line, Elec.
More informationDesign Guidelines for Hurricane Resistant Buildings
Design Guidelines for Hurricane Resistant Buildings Date : October 20, 2017 INTRODUCTION These design guidelines were produced in the aftermath of Hurricane Hugo, which devastated the U.S. Virgin Islands
More informationBUILDERS RESPONSIBILITY
BUILDERS RESPONSIBILITY August 2015 Key Builder Responsibilities Before roof tiles can be loaded onto the roof frame, the following must be completed unless otherwise specified in the roof contract: 1.
More informationRESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM
RESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM 2005-2006 1.1 Enabling Works The enabling works include erecting scaffolding on the external of the facades and all around the clock tower for roof
More informationLOS ANGELES COUNTY FIRE DEPARTMENT RECRUIT TRAINING
LOS ANGELES COUNTY FIRE DEPARTMENT RECRUIT TRAINING BUILDING CONSTRUCTION By: Capt Michael Coggins And Fire Fighter Patrick Meyer BEFORE AFTER PRE 1933 1918 MASONARY BRICK LIGHTWEIGHT HIGH RISE CONCRET
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationInstallation guide for 20/20
Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British
More informationSuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter
SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm
More informationGLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.
A useful collection of definitions for commonly used terms in tile roofing. Abutment Where the roof tiles meet a structure rising above the roof. Accessory A concrete or terracotta product used to finish
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More informationGRAAD 12 NATIONAL SENIOR CERTIFICATE GRADE 12
GRD 12 NTIONL SENIOR CERTIFICTE GRDE 12 CIVIL TECHNOLOGY FEBRURY/MRCH 2015 MRKS: 200 TIME: 3 hours This question paper consists of 18 pages, 6 answer sheets and a formula sheet. Civil Technology 2 DBE/Feb.
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationJoshua Woodsman
CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you
More informationINSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4
the unique loft conversion & flooring system INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 Unit 6, Devizes Trade Centre, Hopton Park, Devizes, Wiltshire, SN10 2EH t 01380 739000 e info@telebeam.co.uk
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationCONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE
The Outside, Inside CONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE Thank you for purchasing a Premier Sheep House. Please take the time to carefully read through this Construction Guide before
More informationDesign Guide Pryda Connectors for Steel Framing
Pryda Connectors for Steel Framing Copyright: (c) Pryda Australia A Division of ITW Australia November 2012 November 2012 Design Guide Pryda Connectors for Steel Framing INDEX General Notes General information
More informationnineteen Wood Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2016 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631
APPLIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS FALL 2016 lecture nineteen wood construction and design Wood Construction 1 Timber Construction all-wood framing systems
More informationSTRUCTURAL INSULATED PANEL SYSTEMS STANDARD CONSTRUCTION DETAILS
STRUCTURAL INSULATED PANEL SYSTEMS STANDARD CONSTRUCTION DETAILS General arrangement: GA01 Through section SIPFIT BUILDING SYSTEM STANDARD DETAILS Foundations: F01 details to be added Wall details: W01
More informationTECHNICAL DRAWING GUIDE
Budapest University of Technology & Economics (BME) Faculty of Architecture Department of Building Constructions 2017 + TECHNICAL DRAWING GUIDE Edited by Dr Zsuzsanna Fülöp and Aryan Choroomi based on
More information10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE
More informationMODERN PERGOLA INSTALLATION GUIDE. When only the best will do.
MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if
More informationDouble Beam Freestanding Pergola Installation Guide
Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and
More informationSTORAGE SHED. Storage Shed SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION
STORAGE SHED SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION P.O. BOX 641700 KENNER, LA 70064-1700 (504) 443-4464 FAX (504) 443-6612 www.southernpine.com Storage Shed
More informationCarpentry/Carpenter CIP Task Grid
1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationDeluxe Cabana INSTALLATION INSTRUCTIONS. INSTALLATION Deluxe INSTRUCTIONS Cabana
INSTALLATION Deluxe INSTRUCTIONS Cabana 1 Deluxe Cabana 10 Year Guarantee On Sanders workmanship Made in NZ Using NZ timber supplies 40+ Years Experience In business since 1975 Professional Install Available
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationCity of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE
1.0 GENERAL 1.1 Scope 1.1.1 The work shall consist of supply and installing chain link fence, including braces and gates, as shown on the plans and specifications at the locations designated by the Engineer.
More informationAttached/Detached Patio Cover
1 Attached/Detached Patio Cover NOTE: Check with your homeowners association and architectural review committee for Conditions, Covenants & Restrictions (CC&R s). The San Joaquin County has no regulatory
More informationGeneral Installation Guidelines
General Installation Guidelines The following basic safety rules and work practices should be observed when working with the product. Although Nutec Ceiling Boards are manufactured without asbestos as
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationTENDER ISSUE GH GUARD HUT PLAN SCALE 1:25. Guard Hut RL = Driveway NOTES KEY FOR WALL REFERENCE KEY FOR FLOOR FINISHES
800 00 NOTES. Confirm all dimensions on site prior to construction. Whole of exterior and interior of new building to be painted as per rchitects. ll floor tiles to be laid as per rchitects Planter Sliding
More informationoptimisation of pre-cast support beams
optimisation of pre-cast support beams Design Optimisation of Pre-cast Support Beams Investigation into pile and beam systems for a client in the civil engineering industry with the following objectives:
More information