Critical Design Review

Size: px
Start display at page:

Download "Critical Design Review"

Transcription

1 1 Critical Design Review

2 2 Table Of Contents 1.0 Introduction Purpose Scope Definitions and Acronyms References Overall Description Product Perspective Product Functions User Characteristics Constraints Assumptions & Dependencies Specific Requirements Test Plan 22

3 3 1.0 Introduction The purpose of this document is to define the exact design of the Land Challenge Robot submitted by the Kiski Area High School Engineering Club. This document is to be used as a communication tool with the customer, which in this case is the Electro-Optic Center (EOC) team, so that every complexity of the Kiski Land Challenge Team s (KLCT) robot is understood by both parties. In addition, this document outlines the overall description of the robot, including details regarding the product perspective, product functions, user characteristics, constraints, and assumptions and dependencies. Specific requirements that were assigned by the EOC team are also listed.

4 4 1.2 Purpose The purpose of the design is to complete the challenge proposed by the customer. The KLCT was challenged to build a robot that can autonomously complete an obstacle course, knock down five targets located in unknown positions, navigate unspecified course obstacles, and determine when the course is completed, all in a shorter length of time compared to the other contestants. The challenge defined by the customer has many tasks and complexities that will have to be overcome.

5 5 1.3 Scope The KLCT robot will be programmed to run autonomously with a four-wheel motor. The robot will navigate the course using three line trackers, a motion detector, and a bumper switch. The robot will travel continuously forward unless it encounters a break in the law, a turn, or a tick mark. If the robot encounters a break in the line, it will use the motion detector to continue traveling through the course. The robot will have to differentiate a 90 degree angel in the line between sensing a turn or tick mark. If the robot recognizes it as a turn, it will change direction. If the robot recognizes as a tick mark, it will know that a target is located directly across from where the tick mark is located. When the robot encounters the tick mark, the program will tell the robot to move backwards slightly and to extend it s arm and knock over the target. If the arm extends more than seven inches to hit a target, the robot will know to retract the arm and move on. If the arm does not extend past the wall seven inches, then the robot will move backwards and forwards, trying again at each new stop, until the target is hit. All parts and operations will comply with the $750 budget.

6 6 1.4 Definitions and Acronyms Critical Design Review - (CDR) The CDR is this document. EasyC V4 Software - (EasyC) This is the software that was issued by the customer to program Kiski s autonomous robot. The software license number issued was 628F-D4RU-CSNV Electro-Optic Center - (EOC) The EOC sponsors the Land Challenge. Global Positioning System - (GPS) GPS is used in the description of the targets. Kiski Land Challenge Team - (KLCT) KLCT evolved from Kiski Area High School s Engineering Club. This is the team put together to accomplish the challenge of building a robot for the EOC Land Competition. Preliminary Design Review - (PDR) The CDR is an updated version of the PDR.

7 7 1.5 References People: Francis DeSantis: Mr. DeSantis is the sponsor of the and has advised the students on the team regarding the designs and programming of the robot. His past experience as an electrical engineer has aided his ability to advise the students. Christine Palmiero: Ms. Palmiero is the sponsor of the KLCT. She has dedicated her time to advise and assist the students with the design of the robot, and she has also aided them in the writing of their PDR and CDR. Jeff Searle: Mr. Searle, a software engineer, met with the KLCT to introduce the competition and better explain the specific challenges that the robot will have to overcome. Jason Mizgorski: Mr. Mizgorski, the Technical Lead of Specialty Sciences and Engineering, responded to s from the team and set-up the Google Docs page for the KLCT to access. Lori Harvey: Mrs. Harvey, the Senior Program Coordinator, has provided answers to weekly questions proposed by the KLCT via . Websites: VEX: ( The KLCT utilized this website to learn more about the products they were considering to purchase for the robot. Note: The website was only used for research purposes, the KLCT did not buy any parts. This was done so the team could be absolutely sure about the products they wanted to include in the CDR. Intelitek: ( The KLCT referred to this website for programming tutorials in EasyC.

8 8 2.0 Overall Description This part of the document contains the description of the product perspective, product functions, user characteristics, constraints, and assumptions and dependencies.

9 9 2.1 Product Perspective For this project, the KLCT chose to utilize VEX products. The KLCT plans to construct a robot that is 9.5 inches in width and 9 inches in length. Width is defined by the distance from wheel to wheel across the robot, while length is defined by distance from front wheel to back wheel. The robot will have an arm that uses a motor to knock over the targets, three line trackers, a motion detector powered by a servo motor, and a bumper sensor. The team started with a basic VEX Cortex Controller. This was loaned to the KLCT by the EOC. Then, KLCT continued with the VEX theme and chose to use the VEX Clawbot Kit. The Clawbot Kit included: (3) 2-wire motors (1) claw kit assembly (includes motor) (21) shaft collars (4) shaft coupler (8) 3 inch long shafts (18) bearing flats (2) 12-tooth spur gears (6) 60-tooth spur gears (2) 84-tooth spur gears (4) 4 wheels (2) 20 hole bars (2) 20 hole chassis bumpers (4) 16 hole chassis rales (2) 1x2x1x15 hole c- channels (1) 1x2x1x20 hole c- channels (2) 29 motor controllers (1) 2 pack battery strap (32) 8-32 x 1/4 long screws (14) 8-32 x 1/2 long screws (2) 8-32 x 1 1/2 long screws (6) 6-32 x 1/4 long locking screws (6) 6-32 x 1/2 long locking screws (42) 8-32 keps nuts (6) 4.6mm shaft spacers (50) 4 tie wraps (32) Bearing Pop- Rivets (2) 5/64 Allen Wrenches (2) 3/32 Allen Wrenches (2) VEX Open-Ended Wrenches (1) Clawbot Quick Start Guide Rationale: The team needs the Clawbot as a base kit to start building their robot. This kit contains all the basic parts to start with the initial construction of the robot.

10 10 To meet the arm design requirements, the KLCT chose the VEX made Linear Motion Kit. This kit included: (2) 12 inch long linear slide tracks (2) 17.5 in long linear slide tracks (4) inner delrin slide tracks (2) rack brackets (1) outer derlin slide Rationale: These parts enable the team to design an arm that can extend and knock over the targets. Along with the Linear Motion Kit, the team also chose the Advanced Gear Kit, which includes: (8) 19-tooth rack gears (2) 12-tooth pinion gears (4) worm gears (4) worm wheels (1) differential frame (7) 24-tooth bevel gears (16) 6-32 by 1/4 inch button head screws Rationale: This kit is needed to because the gears of the other kits are not the sizes that the KLCT wishes to use in the construction of the the robot. Also, the KLCT chose the VEX Limit Switch 2-Pack, which includes: (2) Limit Switch Sensors (4) /8 Screws (4) Keps Nut (1) Inventor s Guide Insert Rationale: The limit switches will be used in addition to the arm as a way to know when the target has been knocked over.

11 11 Next, the KLCT chose the Sensor Kit, which includes: (1) Line Tracking Kit (1) Ultra Sonic Range Finder (1) Light Sensor (2) Optical Shaft Encoders (2) Potentiometers Rationale: All of these sensors will be used in the construction of the robot. Specific details on each of these sensors can be found in the Product Functions of the CDR. Lastly, the KLCT chose two 3-Wire Servo Motors. This kit includes: (1) VEX Servo Motor (1) VEX Servo Motor Gear Set (4 total gears, 1 replacement for each gear inside) (2) 6-32 x 1/4 Screws (2) 6-32 x 1/2 Screws (1) Clutch (1) Clutch Post Rationale: The servo motors will be used in conjunction with the motion detector. One will be needed as a spare.

12 Product Functions The KLCT s robot will autonomously complete the course designed by the EOC, knock over five targets successfully, navigate effectively, know when the course is completed, all while trying to obtain the fastest time among all the other competitors. The following is a list with detailed descriptions regarding each aspect of the robot that will allow the previous statement to occur. 1. Arm: Objects will be knocked over by an arm that moves in a linear motion. Each end of the arm will have a hinge with a limit switch attached. The hinge will prohibit the switches from going towards the robot, but will allow them to move upwards 90 degrees (See Figure Below). When the arm is extended, the limit switches will change state by hitting either the targets or the wall. The switch position and the arm linear motion detector (rotary encoder) determines whether the switch has hit something past seven inches away from its starting position. If this occurs, it has hit a target, and it is free to move to the next target. If the switch hits the wall, which will be only seven inches away, it will be programmed to move backward or forward in order to hit the target. Preliminary Drawing of Arm:

13 13 2. Sensors: There are two types of sensors used in the navigation of KLCT s robot. First, the primary navigation input is the line trackers. The backup navigation input is the motion detector. There is one type of sensor used in the extension of the arm, which is called the rotary encoder Line Trackers: The KLCT chose to use line trackers because the description of the challenge states that a high contrast line will be placed in the center of the track. Therefore, the team will be able to utilize the line tracker sensor output to navigate the course. Tick marks, which signal the location of a target, will protrude from the high contrast line. The KCLT s line trackers will sense these tick marks to locate where the targets are. Also, using line trackers can prevent mistakes associated with the overextension of the high contrast line at a turning point. There will be three line trackers strategically placed on the underside of the robot. They will be placed in the center of the robot, from front to back, and be in a row, similar to the figure to the left. They will be placed so that the line can be seen at all times by one of the trackers. If only the center line sensor sees the line, the robot is on track and will continue moving forward. If only the left or right senses the line, the robot will be programmed to veer in the opposite direction until it is back on track. If none of the sensors pick up the line, the motion detector will be used to get the robot back on track. The line trackers will sense the line drawn in the center of the course. The line trackers will also be used to recognize the difference between a tick mark (meaning a target is directly across from it) or a turn in the line. In order to differentiate between a turn and a target, a motion detector will be used in conjunction with the line sensors. If the motion detector sees a wall seven inches away in front of the robot, the robot will know that it has come to a turn and will proceed to make a left or right turn. To make a right turn, the right and center sensor will sense the line, and when this happens in the program, the robot will make a 90 degree right turn. The turn will be exactly 90 degrees because each wheel will turn at the same speed. To make a left turn, the left and center sensor will sense the line, and when this happens in the program, the robot will make a 90 degree left turn. These three sensors will be the main navigation of the robot through the course Motion Detector: The team chose to use a motion detector in order to differentiate between turns and targets. Also, there exists a possibility of breaks in the high contrast line. If there is a break in the line, the motion detector will rapidly rotate using a servo motor to keep the robot in the center of the course. It will do this by knowing that the center of the robot needs to stay 7 inches away from either wall at all times. The motion detector will sense if the robot is getting too close to a wall, and it will be able to tell the robot to center itself back onto the line. Also, the motion detector will be used to determine when the course is over. The KLCT was assured that that the course finish line is when the robot detects no walls to either the right or left side. The motion detector will monitor the distance to the closest wall, and if it is greater than 14 inches, the robot will stop. Overall, the motion detector will be used to keep the robot on track during the

14 14 course. The motion detector will also be used as a back up if the line trackers were to malfunction. The motion detector will be assembled near the top of the robot and be run by a servo motor. The rationale behind choosing the servo motor is that it is less programming, inexpensive, and equally efficient compared to using multiple stationary motion detectors Rotary Encoder: The KLCT chose the rotary encoder to supplement the motor attached to the arm. The rotary encoder stores the number of revolutions as a variable so that the revolution number can be used in a program to determine arm position. This way, the programming can prompt the motor to run until the desired number of rotations is reached. The revolution number will also be useful in telling the robot how far the arm extends before the limit switch is activated. 3. Switches and Other Input Devices 3.1. Limit Switch: The KLCT decided to use limit switches to determine when the targets have been hit. Limit switches were chosen because they require less force to activate, and they will allow the team to know when the target has been hit. Each end of the arm will have a hinge with a limit switch attached. The hinge will prohibit the switches from moving towards the robot, but will allow them to move upwards 90 degrees. When the arm is extended, the limit switches will change state by hitting either the targets or the wall. The switch positions along with the arm linear motion detector (rotary encoder) determines whether the switch has hit something past seven inches away from it s starting position. If this occurs, it has hit a target and it is free to move to the next target. If the switch hits the wall, which will be only seven inches away, it will be programmed to move backward or forward in order to hit the target Bumper Switch: The KLCT decided to use a bumper switch as safety precaution. Depending on the speed the robot is traveling, the robot could easily miss a turn. For instance, if the robot missed a turn in the line and ran into the wall, the bumper switch, located on the front of the robot, would be hit and therefore would activate a loop in the program that would tell the robot to back up and turn. This action will be programmed as a precaution to keep the robot on track. The bumper switch will also be used as a safety net to the line trackers malfunctioning Jumper Switch: The course will have a high-contrast line for the robot to follow. However, it was not specified whether this would be a dark line on a light surface or a light line on a dark surface. Therefore, the KLCT decided to use a jumper switch to easily adjust the program for either situation.

15 Potentiometer: In addition to determining the contrast, the KLCT decided a potentiometer will be needed to adjust the threshold between light and dark. Because the intensity of the high contrast line was not clarified by the customer, the potentiometer will allow the KCLT to make last minute adjustments to the program, enabling the vehicle to pick up any line intensity. 4.0 Wheels: The KLCT assumed that the course obstacles listed in the requirements would consist mainly of terrain obstacles. Therefore, the team chose to focus on the wheels. The wheels chosen for the robot are four inches in diameter and have a sturdy tread. The wheels raise the robot approximately one and a half inches off the ground. This aspect of the design allows the robot to simply run over small terrain obstacles, such as pebbles or stones. Next, the wheels on the robot are big enough to handle any loose terrain, while still having good traction. However, they are also small enough to fit within the dimensions of the course. In addition, the center of mass of the robot has been designed so that if small inclines are encountered, the robot will be averse to tipping. NOTE: We decided against the use of any type of GPS. This is because we believe that commercial GPSs can only register different points within a meter apart. Because the course is only 14 wide, it is illogical to use GPS tags. CADD drawings of robot

16 16 :

17 User Characteristics The robot designed for the competition will be autonomous and programmed using EasyC. The EasyC software allows the functions to be programmed faster and easier. Forward, backward, left turn, right turn, and stop functions will be created. The robot will complete these simple directions by using the correct programming.

18 Constraints 1. The major constraint is that the KLCT cannot spend over $750. The following table is a breakdown of the cost of every part the KLCT chose to fulfill and build this design. Product Price Quantity Cumulative Total VEX Cortex Controller $ $0.00 VEX Clawbot Kit $ $ VEX Linear Motion Kit $ $ Advanced Gear Kit $ $ Limit Switches $ $ Sensor Kit $ $ Wire Servo $ $ Total $ The robot cannot be bigger than 9.5 by 9 so that the robot can make the 90 degree serpentine turns 3. Although we were given the option of a remote controlled robot, rather than the autonomously programmed robot, we chose the autonomous option because points will be deducted for remote controlled robots. 4. The battery pack capacity must supply power for the full duration of the course.

19 Assumptions & Dependencies The following is a detailed list of assumptions and dependencies that have been either defined by the costumer or hypothesized by the KLCT. 1. Course Layout 1.1.The land course will be a serpentine, 90 degree turn layout The course walls will be 14 from inside to inside The targets will be no more than 10 from the center of the course The course will have 5 targets that will need to be knocked over. These targets will be located on both the left and right sides of the course The course will have terrain obstacles that the vehicle must be able to transverse. 1.6.The course will have a high contrast line painted down the center. The line will have a minimum width of 1/4 and a maximum width of There are no restrictions on the size of the robot, other than it has to fit in the course. 2. Target Definition 2.1.There will be five targets that will be needed to be knocked over. These targets will be located on both the left and right sides of the course There will not be targets on both sides at the same time The targets will be no more than 10 from the center of the course Targets will be located inside a break in the wall.

20 The targets will be perpendicular to a tick mark in the high contrast line Targets will have a GPS tag associated with them Targets will be found by using a mark in the high contrast line Turning points will be GPS tagged The targets will be lightweight. 3. Line Definition 3.1.There will be a high contrast line to follow The line will have a minimum width of 1/4 and a maximum width of There will be breaks in the line. 3.4.There will be a high contrast tick mark directly across (perpendicular) from where the targets are located It is possible for the line to overextend past turns.

21 Specific Requirements The following is a list of specific requirements requested by the customer. 1. Autonomously complete the course. 2. Successfully knock over all five targets. 3. Successfully navigate different types of course obstacles. 4. Be able to distinguish when course is over. 5. Complete the course in the faster than all of the other contestants. NOTE: Users may control the robots remotely but will be deducted points.

22 Test Plan In order to test the KLCT s robot, the team will first set up an area to test the line trackers. They will tape white paper onto a lab bench. Then, they will use black electrical tape to make the line. This situation will create a high contrast line that will stimulate the one that will be at the competition. To test the motion detector, the team plans to set up cardboard walls around the high contrast line that they will create on the lab bench. Also, to test the wheels for terrain obstacles, the team will put pebbles or small stones on the homemade course. During the testing, the team will wear googles to protect their eyes. In addition, they will be careful with moving gears so that they do not hurt their fingers during the testing of the robot.

PoeBot Building Instructions CCISD. Upper Gripper. Lower Gripper/ Spatula. PoeBot Instructions PLTW. Clear Creek ISD

PoeBot Building Instructions CCISD. Upper Gripper. Lower Gripper/ Spatula. PoeBot Instructions PLTW. Clear Creek ISD Upper Gripper Lower Gripper/ Spatula PoeBot Instructions PLTW Clear Creek ISD 1. Chasis Construction (Split Group with half starting Step 1 and half starting Step 13.) Note: These flat bearings are offset

More information

Spare Parts. Contents. Contents Contents

Spare Parts. Contents. Contents Contents Spare Parts 2013 Spare Parts Contents Contents Contents LEGO Education StoryStarter 3 LEGO Education WeDo 4 Machines and Mechanisms 5 LEGO MINDSTORMS Education 6-8 TETRIX by Pitsco 9-16 LEGOeducation.us

More information

How to Build the Robotics++ V2 Robot. Last Edited Nov

How to Build the Robotics++ V2 Robot. Last Edited Nov How to Build the Robotics++ V2 Robot Last Edited Nov. 15-2014 www.roboticscity.com 1 Completed Robotics++ V2 Robot. More views of completed robot can be found at the end of this instructions manual The

More information

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT BACKGROUND Proper alignment of the transmission input shaft to the crankshaft centerline is required in order to achieve the best results

More information

LEGO Mindstorms Class: Lesson 1

LEGO Mindstorms Class: Lesson 1 LEGO Mindstorms Class: Lesson 1 Some Important LEGO Mindstorm Parts Brick Ultrasonic Sensor Light Sensor Touch Sensor Color Sensor Motor Gears Axle Straight Beam Angled Beam Cable 1 The NXT-G Programming

More information

Budget Robotics Octabot Assembly Instructions

Budget Robotics Octabot Assembly Instructions Budget Robotics Octabot Assembly Instructions The Budget Robotics Octabot kit is a low-cost 7" diameter servo-driven robot base, ready for expansion. Assembly is simple, and takes less than 15 minutes.

More information

18600 Angular Momentum

18600 Angular Momentum 18600 Angular Momentum Experiment 1 - Collisions Involving Rotation Setup: Place the kit contents on a laboratory bench or table. Refer to Figure 1, Section A. Tip the angular momentum apparatus base on

More information

Introduction to the VEX Robotics Platform and ROBOTC Software

Introduction to the VEX Robotics Platform and ROBOTC Software Introduction to the VEX Robotics Platform and ROBOTC Software Computer Integrated Manufacturing 2013 Project Lead The Way, Inc. VEX Robotics Platform: Testbed for Learning Programming VEX Structure Subsystem

More information

VEX Robotics Platform and ROBOTC Software. Introduction

VEX Robotics Platform and ROBOTC Software. Introduction VEX Robotics Platform and ROBOTC Software Introduction VEX Robotics Platform: Testbed for Learning Programming VEX Structure Subsystem VEX Structure Subsystem forms the base of every robot Contains square

More information

Deriving Consistency from LEGOs

Deriving Consistency from LEGOs Deriving Consistency from LEGOs What we have learned in 6 years of FLL and 7 years of Lego Robotics by Austin and Travis Schuh 1 2006 Austin and Travis Schuh, all rights reserved Objectives Basic Building

More information

V-MOTION LITE USER GUIDE. Rat Rig All rights reserved.

V-MOTION LITE USER GUIDE. Rat Rig All rights reserved. V-MOTION LITE USER GUIDE Rat Rig 2017. All rights reserved. PACKAGE CONTENTS 1 1x V-Motion Motor 2 1x Belt 3 1x 3mm Hex Key 4 1x AA Battery Pack (for 8x AA batteries)* 5 1x V-Motion Controller 6 2x Knob

More information

Roborodentia Robot: Tektronix. Sean Yap Advisor: John Seng California Polytechnic State University, San Luis Obispo June 8th, 2016

Roborodentia Robot: Tektronix. Sean Yap Advisor: John Seng California Polytechnic State University, San Luis Obispo June 8th, 2016 Roborodentia Robot: Tektronix Sean Yap Advisor: John Seng California Polytechnic State University, San Luis Obispo June 8th, 2016 Table of Contents Introduction... 2 Problem Statement... 2 Software...

More information

ELECTRIC RACER BASIC BUILD

ELECTRIC RACER BASIC BUILD Page 1 Name: Set: Date: This guide will take you through the process of creating a basic electric racer. After you finish this build, you should be able to experiment, design and engineer your own racer.

More information

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4

More information

Medb ot. Medbot. Learn about robot behaviors as you transport medicine in a hospital with Medbot!

Medb ot. Medbot. Learn about robot behaviors as you transport medicine in a hospital with Medbot! Medb ot Medbot Learn about robot behaviors as you transport medicine in a hospital with Medbot! Seek Discover new hands-on builds and programming opportunities to further your understanding of a subject

More information

ORTOP Modular Robot v3.0 Arm Assembly

ORTOP Modular Robot v3.0 Arm Assembly Base Plate Assembly Parts Needed: Arm Assembly BAG 1 2 Socket Head Cap Screw, 1-1/4" 2 Socket Head Cap Screw, 1/2" 2 Button Head Cap Screw, 3/8" 6 Nuts 1 Gear Hub Spacer 1 Flat Building Plate 1 Single

More information

the complete parts reference bricks

the complete parts reference bricks the complete parts reference Here s a detailed overview of all the pieces in your LEGO BOOST kit. You can also identify LEGO elements precisely by their LEGO ID, which is printed on the LEGO BOOST test

More information

LA502 Assembly guide Main PCB Resistors - (2)

LA502 Assembly guide Main PCB Resistors - (2) LA502 Assembly guide Safety warning The kits are main powered and use potentially lethal voltages. Under no circumstance should someone undertake the realisation of a kit unless he has full knowledge about

More information

3,500/4,500lb. Vertical Cable Feighner Lift

3,500/4,500lb. Vertical Cable Feighner Lift 3,500/4,500lb. Vertical Cable Feighner Lift CAUTION - PUT SAFETY FIRST 1. Before attempting to install or operate this lift, study and fully understand the proper operating procedures and safety precautions

More information

FLL Coaches Clinic Chassis and Attachments. Patrick R. Michaud

FLL Coaches Clinic Chassis and Attachments. Patrick R. Michaud FLL Coaches Clinic Chassis and Attachments Patrick R. Michaud pmichaud@pobox.com Erik Jonsson School of Engineering and Computer Science University of Texas at Dallas September 23, 2017 Presentation Outline

More information

Lange Crank Hoist-a-top Assembly Instructions

Lange Crank Hoist-a-top Assembly Instructions Lange Crank Hoist-a-top Assembly Instructions Installation Time: 1-4 Hours depending on skill level Tools Required: Cordless Drill Level Stud Finder Ratcheting wrench 9/16 socket or wrench 11/16 socket

More information

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR 53-87 FORD FLARESIDE TRUCKS Vise Grip Clamps C-clamps Sharpie Marker Ball Peen Hammer Center Punch 3/8 or 1/2 Drill 5/32, 7/32, 9/32, and 3/8 Drill Bits

More information

FACTORY CAT TOMCAT CORPORATION

FACTORY CAT TOMCAT CORPORATION FACTORY CAT RPS TOMCAT CORPORATION Artificial Turf and Carpet Sweeping Install Kit #349-641 & #349-642 1. Detach batteries so that there is no power running through the machine before starting. 2. Start

More information

400GTO Lubrication Guide

400GTO Lubrication Guide 400GTO Lubrication Guide Lubrication Guidelines for the following equatorial mounting: 400GTO Servo with GTOCP2 or CP3 Controller For other 400 models please review other postings as they become available.

More information

Wind Pump Construction

Wind Pump Construction What Will You Need? Page 1 The following components can be found in your kit, and are needed to build one wind pump: 50 Tooth Gear* 40 Tooth Gear* 20 Tooth Gear* 10 Tooth Gear* Wheel Hub 300mm (~12in)

More information

Project Identity. Assistive Robotic Arm Week 9 March April 4, 2007 Megan Madariaga

Project Identity. Assistive Robotic Arm Week 9 March April 4, 2007 Megan Madariaga Project Identity Assistive Robotic Arm Week 9 March 28 2007- April 4, 2007 Megan Madariaga Work Completed: On Friday March 30 th we filled out the return sheet for our large base motor then traveled to

More information

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 HERITAGE F-150/250LD 2WD, 97-04, 04 HERITAGE 4WD WD EXPEDITION/ WD EXPEDITION PART INSTALLATION INSTRUCTIONS 3 BULL BAR PART #B-F1971;B-F2971 PARTS LIST: 1 Bull Bar 2 12-1.75mm x 130mm x 40mm Hex Bolts 1 Driver/Left Mounting Bracket 4 12-1.75mm x 35mm Hex Bolts 1 Passenger/Right Mounting

More information

TeacherGeek Sumo Bot Vehicle Application Guide

TeacherGeek Sumo Bot Vehicle Application Guide SUMO BOT VEHICLE EXAMPLE BUILD TeacherGeek Sumo Bot Vehicle Application Guide TeacherGeek, 011 SUMO BOT VEHICLE EXAMPLE BUILD TeacherGeek TeacherGeek s Sumo Bot Vehicle Activity is the perfect way to encourage

More information

Installation for Full Size Polaris Ranger Crew Doors

Installation for Full Size Polaris Ranger Crew Doors Installation for Full Size Polaris Ranger Crew Doors Order of Installation: Heater Doors Wiper on to Windshield Windshield Top & Back Panel Note: Most of the steps in these instructions need to be repeated

More information

Installation Guide for Rough Country 1.25 inch Body Lift Kit w/o Shocks (07-15 Wrangler JK 4 Door) Item # J10048 Option B; Manual

Installation Guide for Rough Country 1.25 inch Body Lift Kit w/o Shocks (07-15 Wrangler JK 4 Door) Item # J10048 Option B; Manual Installation Guide for Rough Country 1.25 inch Body Lift Kit w/o Shocks (07-15 Wrangler JK 4 Door) Item # J10048 Option B; Manual Installation Time: 3 Hours Tools Required: Jack (Tall enough to reach body

More information

Service Manual for XLE/XLT Series Laser Engravers

Service Manual for XLE/XLT Series Laser Engravers Service Manual for XLE/XLT Series Laser Engravers Table of Contents Maintenance...1 Beam alignment...3 Auto focus alignment...8 Bridge alignment...10 Electronics panel replacement...11 X motor change...12

More information

MAKER: Development of Smart Mobile Robot System to Help Middle School Students Learn about Robot Perception

MAKER: Development of Smart Mobile Robot System to Help Middle School Students Learn about Robot Perception Paper ID #14537 MAKER: Development of Smart Mobile Robot System to Help Middle School Students Learn about Robot Perception Dr. Sheng-Jen Tony Hsieh, Texas A&M University Dr. Sheng-Jen ( Tony ) Hsieh is

More information

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage.

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage. LANDING GEAR 1. Fit landing gear into slots on bottom of fuselage. 4. Use channel-lock pliers to press blind nuts into position (note: drilled hole should be slightly smaller than shaft of blind nut for

More information

Where C= circumference, π = 3.14, and D = diameter EV3 Distance. Developed by Joanna M. Skluzacek Wisconsin 4-H 2016 Page 1

Where C= circumference, π = 3.14, and D = diameter EV3 Distance. Developed by Joanna M. Skluzacek Wisconsin 4-H 2016 Page 1 Instructor Guide Title: Distance the robot will travel based on wheel size Introduction Calculating the distance the robot will travel for each of the duration variables (rotations, degrees, seconds) can

More information

Rotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions

Rotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions Rotary Fixture M/V/X CLASS LASER SYSTEMS Installation and Operation Instructions 02/01/2000 Introduction The Rotary Fixture controls in the Printer Driver are used along with the optional Rotary Fixture

More information

Parts List. Robotic Arm segments ¼ inch screws Cable XBEE module or Wifi module

Parts List. Robotic Arm segments ¼ inch screws Cable XBEE module or Wifi module Robotic Arm 1 Legal Stuff Stensat Group LLC assumes no responsibility and/or liability for the use of the kit and documentation. There is a 90 day warranty for the Sten-Bot kit against component defects.

More information

Figure 1. Overall Picture

Figure 1. Overall Picture Jormungand, an Autonomous Robotic Snake Charles W. Eno, Dr. A. Antonio Arroyo Machine Intelligence Laboratory University of Florida Department of Electrical Engineering 1. Introduction In the Intelligent

More information

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1 HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions QF09775 The pole upgrade kit can be used with or without the QF09700 HQ Precison-Glide track upgrade kit. What s Included

More information

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MantelMount TMA Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS TM Thank you for choosing the MantelMount television wall mount. Please read this entire manual before

More information

Implement a Robot for the Trinity College Fire Fighting Robot Competition.

Implement a Robot for the Trinity College Fire Fighting Robot Competition. Alan Kilian Fall 2011 Implement a Robot for the Trinity College Fire Fighting Robot Competition. Page 1 Introduction: The successful completion of an individualized degree in Mechatronics requires an understanding

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Trans4mer Grille Guard/Winch Mount For Chevrolet Silverado 1500HD & 2500 Kit 68162 This WARN Trans4mer system can be customized to give your Chevy Silverado a wide variety of

More information

Ultimatum. Robotics Unit Lesson 5. Overview

Ultimatum. Robotics Unit Lesson 5. Overview Robotics Unit Lesson 5 Ultimatum Overview In this final challenge the students will deploy their TETRIX rescue robot up the mountain to rescue the stranded mountain climbers. First the rescue robot has

More information

The Robot Olympics: A competition for Tribot s and their humans

The Robot Olympics: A competition for Tribot s and their humans The Robot Olympics: A Competition for Tribot s and their humans 1 The Robot Olympics: A competition for Tribot s and their humans Xinjian Mo Faculty of Computer Science Dalhousie University, Canada xmo@cs.dal.ca

More information

Hatchback Wing Riser Kit

Hatchback Wing Riser Kit Hatchback Wing Riser Kit 2015-06-11 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation of aftermarket

More information

4-Piece Table Tennis Table

4-Piece Table Tennis Table Item# 45-6074 4-Piece Table Tennis Table Please keep this instruction manual for future reference If you have any problems with your new product, please contact Triumph Sports USA at 1-866-815-4173, or

More information

Gael Force FRC Team 126

Gael Force FRC Team 126 Gael Force FRC Team 126 2018 FIRST Robotics Competition 2018 Robot Information and Specs Judges Information Packet Gael Force is proof that one team from a small town can have an incredible impact on many

More information

2.007 Design and Manufacturing I

2.007 Design and Manufacturing I MIT OpenCourseWare http://ocw.mit.edu 2.007 Design and Manufacturing I Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Fabrication of a Simple

More information

This document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field.

This document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field. This document will provide detailed specifications, BOM information, and assembly instructions for the Official Field. Teams who do not need an official field should refer to the separate low-cost field

More information

User Instructions Multiline Otter Scoreboard Caddy Assembly

User Instructions Multiline Otter Scoreboard Caddy Assembly List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)

More information

Hubble GOTO Installation Instruction (1.3, 04/30/2014)

Hubble GOTO Installation Instruction (1.3, 04/30/2014) Hubble GOTO Installation Instruction (1.3, 04/30/2014) 1. Preparation... 1 1.1 Tools required... 1 1.2 AZ GOTO Drive Parts List...1 1.3 ALT GOTO Drive Parts List... 1 2. The Azimuth motor drive installation...2

More information

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C) Follow the instructions below to replace the reciprocator in the SWF Compact series machines. The tools required can be found in the tool kit that came with the machine. Preparation 1. First, place the

More information

Building a FIRST Robotics team Utilizing the VEX System and Recognized Team Building Methods

Building a FIRST Robotics team Utilizing the VEX System and Recognized Team Building Methods Building a FIRST Robotics team Utilizing the VEX System and Recognized Team Building Methods Written and Presented by: Ken and Donna Rillings TEAM BLITZ 2007 DENVER REGIONAL ROOKIE ALL STAR WINNER 2007

More information

Morse Code Autonomous Challenge. Overview. Challenge. Activity. Difficulty. Materials Needed. Class Time. Grade Level. Learning Focus.

Morse Code Autonomous Challenge. Overview. Challenge. Activity. Difficulty. Materials Needed. Class Time. Grade Level. Learning Focus. Overview Challenge Students will design, program, and build a robot that communicates with Morse code. The robot must use its communication system to tell the operator when the robot completes each task

More information

HA-2 INDUSTRIAL UNDERCUTTER INSTRUCTIONS. Caution!

HA-2 INDUSTRIAL UNDERCUTTER INSTRUCTIONS. Caution! HA-2 INDUSTRIAL UNDERCUTTER INSTRUCTIONS Caution! The Outrigger Assembly MUST be supported and the Pawl Finger, on the Safety Pawl, engaged in the rack BEFORE loosening the two (2) Clamping Bolts. Personal

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" SLIDING COMPOUND MITER SAW

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 SLIDING COMPOUND MITER SAW PAGE 1 OF 6 BASE ASSEMBLY 00 0 CATALOG NO. EXAMPLE: SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 6955-20 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510 M5 x 12mm Flat Head T-20 Screw (5) 3 05-81-0135

More information

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently. This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently. Don t be put off by the size of the instruction manual as the large diagrams

More information

Program Your Robot to Perform a Task

Program Your Robot to Perform a Task Youth Explore Trades Skills Description In this activity, students gain hands-on experience with programming a robot to perform tasks. This activity includes seven task challenges. Students will work in

More information

MODEL 36 Di-Acro Hand Shear

MODEL 36 Di-Acro Hand Shear OPERATOR S MANUAL & INSTRUCTIONS MODEL 36 Di-Acro Hand Shear Di-Acro, Incorporated PO Box 9700 Canton, Ohio 44711 3713 Progress Street N.E. Canton, Ohio 44705 330-455-1942 330-455-0220 (fax) Revised 01/02

More information

RC4WD Diablo V2 Instruction Manual

RC4WD Diablo V2 Instruction Manual Version 1.1 RC4WD Diablo V2 Instruction Manual Thank you for your purchase. Welcome to the RC4WD family. This kit is a combination of many specially engineered and manufactured parts. Enjoy your build.

More information

PRS Retro Z-Axis Installation

PRS Retro Z-Axis Installation PRS Retro Z-Axis Installation Page -1- PRS Retro Z-Axis Installation This document is a guide to installing the PRS Retro Z-axis on early ShopBot models. It describes installation for PR models with PK299

More information

Robot Olympics: Programming Robots to Perform Tasks in the Real World

Robot Olympics: Programming Robots to Perform Tasks in the Real World Robot Olympics: Programming Robots to Perform Tasks in the Real World Coranne Lipford Faculty of Computer Science Dalhousie University, Canada lipford@cs.dal.ca Raymond Walsh Faculty of Computer Science

More information

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide Tools Required: two adjustable wrenches, pliers, ¾ socket wrench recommended Note: please do assembly near your vehicle as you Can

More information

Durham Woodworking Club. January 25, 2016

Durham Woodworking Club. January 25, 2016 Durham Woodworking Club January 25, 2016 The drill press has primarily been a metal working machine since its first incarnation. The purpose of the modern day drill press has been to provide woodworkers

More information

ECE 511: FINAL PROJECT REPORT GROUP 7 MSP430 TANK

ECE 511: FINAL PROJECT REPORT GROUP 7 MSP430 TANK ECE 511: FINAL PROJECT REPORT GROUP 7 MSP430 TANK Team Members: Andrew Blanford Matthew Drummond Krishnaveni Das Dheeraj Reddy 1 Abstract: The goal of the project was to build an interactive and mobile

More information

Instructions & Parts SM100B SM400 K025S1 K005

Instructions & Parts SM100B SM400 K025S1 K005 Instructions & Parts SM100B SM400 K025S1 K005 Table of Contents 2 SM100B/SM400 Manual Engraver Machine Diagram Pantograph Operation Setup & Layout Engraving & Changing Cutters Adjusting Depth of Cut &

More information

RRevo. Written By: Bradley Hanstad TOOLS: PARTS:

RRevo. Written By: Bradley Hanstad TOOLS: PARTS: RRevo RRevo Robot Kit Version 2 Complete build and setup guide for the RRevo Robot Kit. From 15 pound combat to robot hockey, this kit is designed to be the perfect starting platform to get in the competition

More information

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: 175 SERIES FIXED STAIR CABLE RAIL - INSTALLATION INSTRUCTIONS PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: FIXED STAIR TOP RAIL (1) A FIXED STAIR BOTTOM RAIL (1) B D UPPER SADDLE BRACKET (1) C BRACKET

More information

MobileTrak5 Installation Instructions

MobileTrak5 Installation Instructions MobileTrak5 Installation Instructions PLEASE OPEN ALL BOXES & CHECK TO MAKE SURE YOU HAVE ALL PIECES REQUIRED READ ALL INSTRUCTIONS BEFORE STARTING Tools Required for Assembly 7/16, 1/2 Wrench Phillips

More information

Wagon Vise Retrofit Installation Instructions. American Craft Woodworks. Wagon Vise

Wagon Vise Retrofit Installation Instructions. American Craft Woodworks. Wagon Vise Wagon Vise Retrofit Installation Instructions American Craft Woodworks Wagon Vise Wagon Vise Retrofit Installation Instructions 2 Retrofit Installation Instructions Before you get started, please read

More information

63601 PARTS LIST ILLUS NO. PART NO. DESCRIPTION QTY.

63601 PARTS LIST ILLUS NO. PART NO. DESCRIPTION QTY. 63601 PARTS LIST DRAWING NO. 1 1 W-A63601730 Right Cover 1 M-O63601150 Right Hand Insulation 1 2 W-A63601735 Left Cover 1 M-O63601149 Left Hand Insulation 1 3 M-S63601080 48XLO50 Belt 1 4 M-S63601081 Motor

More information

model tsa-sa48 Sliding Crosscut Table installation guide

model tsa-sa48 Sliding Crosscut Table installation guide model tsa-sa48 Sliding Crosscut Table installation guide A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

Kossel Rev B Build Guide V1.0

Kossel Rev B Build Guide V1.0 Kossel Rev B Build Guide V1.0 1 Table of Contents: Step 1: BASE ASSEMBLY Gathering parts: Building the Corners and Base: Step 2: UPPER ASSEMBLY Building Upper: Step 3: VERTICAL RAIL INSTALLATION Building

More information

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions INTRODUCTION Congratulations! You are the owner of the finest rotary-style gasket cutter in the world. Originally developed and patented

More information

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL. TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL. Telescopic gates have been manufactured for many years essentially in the same way they are largely today. In recent years hardware suppliers have

More information

Deck Mount Installation with Bench

Deck Mount Installation with Bench Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out

More information

Inventory (Figure 2)

Inventory (Figure 2) MODEL T10127 12" SPIRAL CUTTERHEAD INSTRUCTIONS The Model T10127 indexable insert spiral cutterhead is designed to replace the straightknife cutterhead from the Grizzly jointer Model G0609. The total procedure

More information

ECE 203 LAB 2 CONTROL FUNDAMENTALS AND MAGNETIC LEVITATION

ECE 203 LAB 2 CONTROL FUNDAMENTALS AND MAGNETIC LEVITATION Version 1.1 1 of 13 ECE 203 LAB 2 CONTROL FUNDAMENTALS AND MAGNETIC LEVITATION BEFORE YOU BEGIN PREREQUISITE LABS All 202 Labs EXPECTED KNOWLEDGE Fundamentals of electrical systems EQUIPMENT Oscilloscope

More information

SE5a Instrument Board part 2 - rev 1.1

SE5a Instrument Board part 2 - rev 1.1 SE5a Instrument Board part 2 - rev 1.1 Fuel (Petrol) Valve This valve uses two circular name plates, eight brass screws, one black plastic base, copper wire and two black plastic risers. You can pick any

More information

Parts and tools needed for installation- Cleaning and Painting -

Parts and tools needed for installation- Cleaning and Painting - Thank you for the purchase of our JK Rear Trail Doors. We have made these from 6061-T6 aluminum and reinforced them with stiffeners at the top that double as a comfortable armrest and support for Rugged

More information

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16 R K C T I Repair Kit Product Compatibility Repair Kit # Linear Actuator Assembly # LACPACC-002 LACPACC-003 LACP-16TxxLP5 (0.5-in lead screw pitch) LACP-16TxxL1 (1-in lead screw pitch) C P I R K 4 ea Flanged

More information

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.

More information

OPERATIONS MANUAL. Port-O-Slitter

OPERATIONS MANUAL. Port-O-Slitter Tapco Products Company The World Leader in Specialty Tools for the Professional Port-O-Slitter OPERATIONS MANUAL General instructions, set up, accessories and guide to using your portable precision slitting,

More information

Easy Engineering Guide

Easy Engineering Guide Index: Unleash Your Creativity! Page 1: The Basics Page 2: Sorting Dowels Page 3: Measuring and Cutting Page 4: Dowels and Holes (Reaming Holes) Page 5: Reaming, Screws, Slide-Stop Material Page 6: Hydraulics/Pneumatics

More information

Metroboard Pulley Replacement Procedure

Metroboard Pulley Replacement Procedure Metroboard Pulley Replacement Procedure 1) Remove the two transmission cover screws (1/8 allen driver). Then remove the transmission cover. Note there is a split lock washer and flat washer as well, so

More information

I.1 Smart Machines. Unit Overview:

I.1 Smart Machines. Unit Overview: I Smart Machines I.1 Smart Machines Unit Overview: This unit introduces students to Sensors and Programming with VEX IQ. VEX IQ Sensors allow for autonomous and hybrid control of VEX IQ robots and other

More information

Robodyssey Mini Roach

Robodyssey Mini Roach Robodyssey Mini Roach Assembly Instructions Version 1.1 Robodyssey Systems, LLC. Phone/Fax: 609-585-8535 20 Quimby Avenue Web: www.robodyssey.com Trenton, New Jersey 08610 Email: info@robodyssey.com Copright

More information

Field Specs & Assembly Instructions

Field Specs & Assembly Instructions VEX Robotics Sack Attack Field Specs & Assembly Instructions 4/13/2012 Copyright 2012. VEX Robotics Inc. VEX Robotics Sack Attack A Introduction A P P E N D I X Game Field This document will provide detailed

More information

SpeedCell Installation Instructions

SpeedCell Installation Instructions SpeedCell Installation Instructions ***Installation typically requires two people*** Required Tools 1 2 3 (3a) 5 6 7 7(a) 8(a) 8(b) 8(c) 1. Philips Screw Driver 2. Crescent Wrench 3. 3/8 Socket Wrench

More information

Western Kansas Lego Robotics Competition April 16, 2018 Fort Hays State University

Western Kansas Lego Robotics Competition April 16, 2018 Fort Hays State University Western Kansas Lego Robotics Competition April 16, 2018 Fort Hays State University WELCOME FHSU is hosting our 12 th annual Lego robotics competition. The competition is open to all area middle school

More information

WorkBee CNC. Mechanical Assembly Instructions - Screw Driven

WorkBee CNC. Mechanical Assembly Instructions - Screw Driven WorkBee CNC Mechanical Assembly Instructions - Screw Driven Table of Contents 1.0 Getting Started 2 1.1 About The Kit 3 1.2 Check Product Contents 3 1.3 Tools Required 3 1.4 Notes on Assembly 3 2.0 Assembly

More information

Installation Tutorial

Installation Tutorial Installation Tutorial 1. Remove the finger parts, if the film, tear off the surface of the film, the number of parts were 1 4 4 5 5 2. First assemble the big finger parts, use M2X3 screws, M2X6 copper

More information

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job

More information

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Introduction Thank you for purchasing the Rocky Mountain Westy Swing Away Carrier Kit. We pride ourselves in the products we develop

More information

For Experimenters and Educators

For Experimenters and Educators For Experimenters and Educators ARobot (pronounced "A robot") is a computer controlled mobile robot designed for Experimenters and Educators. Ages 14 and up (younger with help) can enjoy unlimited experimentation

More information

INSTALLATION GUIDE Rear Bumper. Jeep JL Wrangler

INSTALLATION GUIDE Rear Bumper. Jeep JL Wrangler INSTALLATION GUIDE Rear Bumper Jeep JL Wrangler Dual Swing System 1A From the stock bumper you removed from vehicle, you ll need to take the parking sensor wiring from it and feed it into the new bumper.

More information

MAT MASTER TM SYSTEMS

MAT MASTER TM SYSTEMS FrameCo MAT MASTER TM SYSTEMS #14225 BEVEL MOUNT CUTTERS Welcome and thank you for purchasing a FrameCo Mat Master System. Through these instructions we will endeavour to show you the benefits of the system

More information

SpeedCell Installation Instructions

SpeedCell Installation Instructions SpeedCell Installation Instructions ***Installation typically requires two people*** Required Tools 1 2 3 (3a) 4 5 6 7 7(a) 8(a) 8(b) 8(c) KEY 1. Philips Screw Driver 2. Crescent Wrench 3. 3/8 Socket Wrench

More information

Assembly Guide for Printrbot - Simple Maker s Edition 1405

Assembly Guide for Printrbot - Simple Maker s Edition 1405 Assembly Guide for Printrbot - Simple Maker s Edition 1405 Last update: March 2016 Please Note: be careful on the steps that are underlined 1 Contents Tools Needed:... 3 First step: Check components and

More information

30DC Speed Lathe Manual

30DC Speed Lathe Manual 30DC Speed Lathe Manual The Crozier Model 30DC Speed Lathe is our most popular model. It has many standard features not found on any other machine in its class or price range. Standard Features 3/4 HP

More information

4Post and 2Post Sliding Rails for Lenovo/IBM M5

4Post and 2Post Sliding Rails for Lenovo/IBM M5 Patent(s) Pending 4Post and 2Post Sliding Rails for Lenovo/IBM M5 4Post Page 2 2Post Center Page 4 Installation Instructions Kit P/N: 122-4818 Kit Contents Kit Contents: (2) (Left & Right) (2) Inner Rail

More information