Service Manual for XLE/XLT Series Laser Engravers

Size: px
Start display at page:

Download "Service Manual for XLE/XLT Series Laser Engravers"

Transcription

1 Service Manual for XLE/XLT Series Laser Engravers

2 Table of Contents Maintenance...1 Beam alignment...3 Auto focus alignment...8 Bridge alignment...10 Electronics panel replacement...11 X motor change...12 Encoder replacement...13

3 XLT/XLE maintenance Maintaining the XLT/XLE is important to assure the proper function of the system. The optics are the most important component for maintenance. Even the smallest particle of dust on an optic can cause a problem. Imagine what happens when even a small piece of dust that has settled on an optic is then hit with a 1000 degree laser beam. Each time this happens there is a tiny explosion and the coating on the optic is slightly damaged. Through time as this occurs over and over the coating on the optic will become ineffective. Each optic must be cleaned regularly. How often depends on the material being engraved and the environment that the system is in. If the machine is in a naturally dusty shop environment it will need to be cleaned more often. CLeaning The Optics The Optics on the XLT/XLE laser can be easily removed for cleaning and inspecting. There are up to seven optics that will need regular maintenance in order to keep the machine in optimal running condition. 4 mirrors (blue holder) 1 combinor for diode pointer (gold holder) 1 collimating lens (black holder) 1 focus lens (red holder) Removing the Optics To remove the mirror, simply pull it out of the assembly as shown on the below. Cleaning the Optics Clean the optics with the acetone solution that is included in the cleaning kit. Below is the proper method for cleaning: 1. Remove, clean and replace one mirror at a time to ensure that each is placed back in its proper place. 2. After removing a mirror/lens, blow on it gently to remove any loose particles. 3. Using acetone and the lint free cloths provided, gently wipe the mirror/lens surface. 4. Then, using a dry portion of the cloth, gently wipe the remaining acetone from the mirror/lens 1

4 Belts The belts on the motion system can be cleaned with a damp rag. The axis to be most concerned with is the X axis because of its position over the material as it is being engraved. Y axis belt X axis belt 2

5 Beam Alignment for the XLT/XLE Series Laser The laser beam on the XLT/XLE series laser is directed from the tube to the table via 4 mirrors. The laser beam reflects off of each mirror in order to reach the engraving material and therefore it is important that the beam is properly aligned. This process is very important because this will affect many aspects of the engraving. The following document will explain in detail how to properly align the beam. It is extremely important that each step be followed exactly as outlined. Where are the mirrors? The XLT/XLE series laser engraver has a total of: - 4 mirrors (blue holder) - 1 collimating lens depending on power level (black holder) - 1 combiner mirror (gold holder) - 1 lens (red holder) For the purpose of this document, all we will be concerned about are the 4 mirrors. The diagram below illustrates the location of the 4 mirrors. Mirror #4 Mirror #2 Mirror #3 Mirror #1 3

6 Moving the beam to the left is shown below. We do this because screw #8 will only move the mirror to the right. - Slightly loosen the #5 screw. You still want a great deal of tension on this screw to properly adjust the beam. - Back out the #8 set screw as much as necessary for the amount you wish to move to the left. - With your fingers move the mirror holder as shown below. - Tighten the #5 screw just enough to be snug but still allow for the #8 set screw to move it, then use the #8 screw to adjust the mirror to the right. TIP: Always try to align the beam by using the #8 set screw to move to the right. If you go too far follow the steps above to move the beam back to the left of center then start over with #8 set screw moving it right. Turn the mirror holder in this direction to reset position. Aligning the beam from mirror #1 to mirror #2 1. Make sure that mirror #1 is clean before getting started. 2. Place the laser in beam alignment mode as previously described. Use a power of 5 to 7 and a time duration of one second. 3. Carefully remove the collimating lens and insert a small piece of paper in the slot where the lens was. 4. Fire the laser beam. 5. Once complete, without removing the paper from the holder, visually compare the position of the burn mark with that of the opening of the mount holder. What you want to see is the burn mark in the CENTER of the opening. (It is ok if the beam is centered left to right but more toward the front.) 6. If it is not in the center, make a mental note of its position. Move back to the screws of mirror #1 and carefully adjust them to place the beam in the center. 7. Once you have made minor adjustments to mirror #1, replace the paper and re-fire the beam. 8. Repeat as needed until the burn mark is in the center of the opening. This will ensure that the beam is hitting the center of mirror #2. 8. Once complete, replace the collimating lens in its proper position and clean mirror #2. 4

7 Aligning the beam from mirror #2 to mirror #3 The alignment process of mirror #2 to mirror #3 is a little more involved, but nothing that we can t handle. The only added step in this process is to make certain the beam fires in the same place on our piece of paper when the mirrors are closest and when they are furthest apart. Remember that this step can be time consuming but not impossible so have patience. Ok lets get started! By this point, we know that the beam is centered (or close to it) on mirror #2. 1. Place the laser in beam alignment mode as previously described. Use a power of 5-7 and a time duration of 1 second. 2. Carefully remove the #3 mirror and insert a small piece of paper in the slot where the mirror was. Make sure that it is secure and will not shift when you jog the bridge. 3. Manually move the bridge to toward the back of the machine. Move it as far as it will go. This will put mirros #2 and #3 in their closest position. 4. Fire the beam. (It is preferable to have a brown spot without burning through the paper) 5. Do not remove the paper or move it in any way!!!!! 6. Carefully check to see that the beam made a mark on the paper. If it did not leave a mark, fire the beam again with a slightly higher power. 7. Once the beam leaves a mark on the paper, use the touch screen to move the bridge to appoximately halfway down the table. 8. Leaving the paper just as it has been, fire the beam again at a slightly higher power. Watch as the beam fires to see if the mark that is left is in the same postition as the first mark. 9. Make a note of where the second mark is made on the paper. We need both marks to be in the same position. When they are, the beam is traveling in a straight line. 10. Using the adjustment screws on the second mirror assembly, make minor adjustments to the beam so it hits the first mark. 11. Fire the beam again and check results. Repeat steps 1 through 10 until the beam is hitting the same spot from both positions. Once the beam is firing in the same spot from back to middle of the table: 1. Remove the paper. 2. Replace the paper with a fresh one. Move the bridge to the back of the machine once again. This will put mirrors #2 and #3 in their closest position. Repeat steps 1 through 10 above, except this time instead of moving the bridge to the center of the table, you will move it to the very front of the table. This will ensure that the beam is traveling in a straight line down the length of the table. Once the beam is firing in the same spot from back to front of the table: 1. Remove the paper. 2. Clean mirror #3 3. Replace mirror #3 in its proper position. 5

8 Screw #6 Screw #2 Screw #3 Screw #8 (inside slot at 45% angle..050 allen) Screw #7 Screw #1 Screw #5 Screw #4 How to adjust mirror #3 Screw #2 and set screw #3 will move the beam up and down. - Tightening screw #2 and at the same time loosening screw #3 will move the beam down. - Loosening screw #2 and at the same time tightening screw #3 will move the beam up. Moving the beam to the back involves a few different screws. - Screw #4 should always be tight. - Screw #5 should be fairly tight until the back to front alignment is complete, then tighten completely. - Screw #8 is the set screw used to move the beam back. Moving the beam to the front is shown below. We do this because set screw #8 will only move the mirror to the back. - Slightly loosen the #5 screw. You still want a great deal of tension on the screw to properly adjust the beam. - Back out the #8 screw as much as necessary for the amount you wish to move to the front. - With your fingers move the mirror holder as shown below. - Tighten the #5 screw just enough to be snug but still allow for the #8 set screw to move it, then use the #8 set screw to adjust the mirror to the right. TIP: Always try to align the beam by using the #8 set screw to move it to the back. If you go too far, follow the steps above to move the beam back to the front of center, then start over with #8 set screw moving it back. Turn the mirror holder in this direction to reset position 6

9 Aligning the beam from mirror #3 to mirror #4 To align the beam from mirror #3 to mirror #4 follow the same steps illustrated for alligning mirror #2 to mirror #3. Instead of putting paper in place of mirror #4 you can put a piece of post-it note or tape over the hole entering the head as shown below. Aligning beam to the center of this hole will center beam on mirror #4 7

10 How to align the auto focus pointer The auto focus switch on the XLE/XLT series laser is an optical switch. There is a diode pointer on the left side of the bridge that fires a red beam through the plunger on the head, then into a receptical on the right side of the bridge. When the pin in the plunger is pushed up it blocks the beam activating the switch. This document explains how to properly align the pointer beam through the plunger and into the receptical on the right side. Location of components and adjustment screws Screw #1 Screw #2 Output for diode pointer Screw #3 Screw #4 Hole in plunger Photo Transistor Pin in plunger 8

11 - Screws #1 and #2 control the front to back movement of the pointer beam. - Tightening screw #1 or loosening screw #2 moves the beam toward the front of the machine. - Tightening screw #2 or loosening screw #1 moves the beam toward the back of the machine. - Screws #3 and #4 control the up and down movement of the pointer beam. - Tightening screw #3 or loosening screw #4 moves the beam up. - Tightening screw #4 or loosening screw #3 moves the beam down. Adjusting the pointer beam 1. Jog the head to the right side of the table. 2. Using screws #1-#4 align pointer beam to the center of the hole in the plunger. 3. Once it is passing through the hole in the plunger begin to aling the pointer beam to the receptical. 4. Holding the tip of the allen wrench over the hole for the receptical allows you to see if the beam is centered in the hole. Tip: Try to tighten the adjustment screws rather than loosen as much as possible so that the pointer is firmly held in place. Testing the pointer: 1. Go to the service menu on the touchpad 2. Select check limits 3. Push up on the plunger pin with your finger. 4. When pin is pushed up Z low should darken, and when released it should be normal. 9

12 How To Square the Bridge on the XLT/XLE Laser If the bridge is not square to the table on the system the engraving will not line up with the X axis ruler, and a square box will engrave as a trapezoid. This document explains how to adjust the bridge to the table. The first thing to check is the table to make sure that it is square with the motion system. This is done by either using the diode pointer or engraving a line down the Y axis ruler. If the diode pointer, or engraved line does not follow the Y axis ruler exactly, then the table is out of square and needs to be adjusted. (see table adjustment document) Once you know that the table is square to the motion system you can check the bridge against the table. This is done in the same manner as the Y axis by either using the diode pointer or engraved line compared to the X axis ruler. If the diode pointer or the engraved line does not follow the ruler follow the steps below. 1. Go to the service menu, select beam alignment (this unlocks the motors) 2. Loosen the drive shaft coupler. 3. Push the bridge back so that the diode pointer is on the edge of the ruler. 4. Push the head left and right to see which way the bridge needs to be adjusted. 5. Put your left hand on the left side of the bridge by the motor and your right hand on the right side by the encoder and manually adjust the bridge. 6. Once you have adjusted the bridge so that the pointer follows the edge of the X ruler, tighten the drive shaft coupler and exit beam alignment mode. (be sure to clear home) X axis ruler Bridge Drive shaft coupler (you can use any one of the four on the system.) Head Drive shaft coupler Y axis ruler (if diode pointer does not follow Y ruler the table needs to be adjusted) X axis ruler Bridge Head 10

13 How to replace electronics panel Removal 1. Remove all the cables from the panel bulkhead. (fig 1) 2. Remove the mount bolt. (fig 1) 3. Lift the front of the panel and slide forward. (fig 2) 4. Slide the panel to the right until it clears the door opening. (fig 3) 5. Pull panel forward to remove the blue ethernet cable, grey ribbon cable, and beige touchscreen cable. (fig 4) Installation 1. Attach the blue ethernet cable, grey ribbon cable, and the beige touchscreen cable. 2. Slide the panel left with the front tilted up to clear the mount bracket. 3. Make sure that none of the cables get hooked into the mount bracket before sliding panel into place. (fig 5) 4. Once the panel is in position re-attach the cables to the bulkhead and re-install the mount bolt. Tip: When putting the panel back in place feel under the panel with your free hand to make sure that all of the cables in the back and on the left side are clear so that the panel can sit flat. Fig 1 Mount bolt Panel bulkhead Fig 2 Fig 3 Fig 4 Fig 5 11

14 Changing the X axis motor The X axis motor is mounted on the left side of the bridge. It is held on by three screws that screw in from the bottom of the mount plate. Changing the X axis motor requires unbolting the bridge from the Y axis and flipping it over to remove the mount screws. All work should be done with the machine turned off and unplugged. Screw locations Motor plug Fig 1 Fig 2 Bridge screw 1 Bridge screw 3 Bridge screw 2 Bridge screw 4 Motor screw 1 Motor screw 2 Motor screw 3 Fig 3 Removing the motor 1. Unplug the white motor plug. (Fig 1) 2. Remove the 4 bridge screws. (Fig 1-2) 3. With the 4 bridge screws removed gently flip the bridge over to give access to the motor screws. (Fig 3) 4. Remove the motor screws. 5. With the motor screws removed you can tilt the motor and roll the belt off of the pulley. Installing the new motor Reverse the steps above. Make certain that you mount the new motor in the same positon (clocked correctly) to assure that all of the cables reach properly and clear the motion system. (Fig 1) 12

15 How to change the encoder on an XLT/XLE laser 1. Turn off the machine 2. Cut zip tie that holds the connector for the encoder and unplug. (Fig 1) 3. Loosen the set screw on the collar of the encoder. (Fig 2) 4. Remove the two 4/40 button head screws that hold the encoder in place. (Fig 3) 5. Slide encoder up and off of the shaft. 6. Slide new encoder onto shaft. 7. Install the two 4/40 button head screws. 8. Tighten the set screw on the collar of the encoder. 9. Plug the connector in and fasten with zip tie. (Fig 4) Set screw on collar Connector Fig 1 Fig 2 Make sure this wire is not hanging down where it will hit mirror #2 when bridge moves back. 4/40 button head screws Fig 4 Fig 3 Make sure this wire is under bridge so it will not hit mirror #2 when bridge moves back 13

Tools Needed 3/32 Allen Wrench which is located in your accessory kit Masking Tape

Tools Needed 3/32 Allen Wrench which is located in your accessory kit Masking Tape Beam Alignment Overview Proper alignment of the beam is an important part of laser preventive maintenance. If the beam is out of alignment it is possible to lose power on the table, which will yield poor

More information

Removing outter components

Removing outter components Y Axis Motor Replacement Replacing the Y axis motor is a process that requires the individual to be somewhat mechanically inclined and can follow detailed instructions. If any of the following steps are

More information

ABM International, Inc.

ABM International, Inc. ABM International, Inc. Lightning Stitch required 1 1.0: Parts List head and motor assembly (Qty. 1) Reel stand (Qty. 1) Needle bar frame clamp (Qty. 1) Motor drive (Qty. 1) 2 Cable harness with bracket

More information

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine. Installation of Gum and Mint Tray for National 147, 157, 167 Important Note: Please read all instructions thoroughly before continuing with installation of kit. If you are having problems installing the

More information

Rotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions

Rotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions Rotary Fixture M/V/X CLASS LASER SYSTEMS Installation and Operation Instructions 02/01/2000 Introduction The Rotary Fixture controls in the Printer Driver are used along with the optional Rotary Fixture

More information

Assembly Instructions

Assembly Instructions P/N 8650/8655 Assembly Instructions NOTE: Your Sherline CNC Cam Grinder is double boxed and secured to a wooden shipping frame. Upon delivery, check the outer box for damage. If the box is damaged, take

More information

Assembly Guide for Printrbot - Simple Maker s Edition 1405

Assembly Guide for Printrbot - Simple Maker s Edition 1405 Assembly Guide for Printrbot - Simple Maker s Edition 1405 Last update: March 2016 Please Note: be careful on the steps that are underlined 1 Contents Tools Needed:... 3 First step: Check components and

More information

ABM International, Inc. Navigator Assembly Manual

ABM International, Inc. Navigator Assembly Manual ABM International, Inc. 1 1.0: Parts List Tablet (Qty. 1) Tablet mount (Qty. 1) NOTE: Mount may appear and operate different then image below Control Box (Qty. 1) Motor Power Supply (Qty. 1) 2 X-axis motor

More information

APES HD-7700 Version Operator s Training Manual

APES HD-7700 Version Operator s Training Manual APES-14-77 HD-7700 Version Operator s Training Manual Issue A1 09/03 P/N 900599 Performance Design Inc. 2350 East Braniff St. Boise Idaho 83716 This manual contains very important safety information and

More information

Removing the Z-Axis lead screw

Removing the Z-Axis lead screw Page 1 of 8 TITLE: Sabre Z-Axis Lead Screw Replacement Procedure Gerber FastFact #: 5048 Supplied by: Gerber Hardware Support Last Modified: June 14, 2007 Summary: Tools used: The following procedure explains

More information

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C) Follow the instructions below to replace the reciprocator in the SWF Compact series machines. The tools required can be found in the tool kit that came with the machine. Preparation 1. First, place the

More information

Removing and Replacing the Y-truck

Removing and Replacing the Y-truck Service Documentation Removing and Replacing the Y-truck To remove and replace the Y-truck you will need the following tools: 4mm Allen wrench 12mm stamped flat wrench #2 Phillips screwdriver (magnetic

More information

machines 608 Trestle Point Sanford, FL Phone Fax

machines 608 Trestle Point Sanford, FL Phone Fax Alignment for BOSSLASER machines 608 Trestle Point Sanford, FL 32771 Phone 888-652-1555 Fax 407-878-0880 www.bosslaser.com Table of Contents Four Corner Test. Error! Bookmark not defined. Vertical Alignment...

More information

Electric Skein Winder

Electric Skein Winder Electric Skein Winder Assembly and Use Package Contents 1 - Triangular Body (w/ motor) 1 - Cross Arm 1 - Left Foot (w/ yarn guide) 1 - Right Foot 1 - Adjustable Finger (w/ yarn clip) 3 - Adjustable Fingers

More information

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual Legacy Woodworking Machinery a division of Phantom Engineering The Legacy CNC Assembly Manual New Orientation of the Legacy Step one: Re-orientation of the machine Remove the X-axis screw and supports.

More information

BIGBOT ASSEMBLY INSTRUCTIONS. 1/18/2017 V0.5

BIGBOT ASSEMBLY INSTRUCTIONS.  1/18/2017 V0.5 BIGBOT ASSEMBLY INSTRUCTIONS www.bigbot-3d.com 1/18/2017 V0.5 FOREWORD: PLEASE TAKE CARE WHEN HANDLING THE GANTRY. THE ASSEMBLY SHOULD BE HANDLED ONLY BY THE ALUMINUM FRAME, AND AVOID TOUCHING OR LIFTING

More information

3. X-axis assembly. 3. X-axis assembly. Written By: Jakub Dolezal manual.prusa3d.com/ Page 1 of 13

3. X-axis assembly. 3. X-axis assembly. Written By: Jakub Dolezal manual.prusa3d.com/ Page 1 of 13 3. X-axis assembly Written By: Jakub Dolezal 2018 manual.prusa3d.com/ Page 1 of 13 Step 1 Tools necessary for this chapter Needle-nose pliers for zip tie trimming. 2.5mm Allen key for M3 screws 2mm Allen

More information

Print Head Installation Guide

Print Head Installation Guide Print Head Installation Guide MCS Raptor 6 (MCS Eagle AMS Software) is copyright of MCS Incorporated. 2015 MCS Incorporated. 1 Contents Tools... 4 Warnings... 4 Introduction... 4 Section One - Pillar Installation...

More information

HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750

HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750 HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750 Important Note: Upgrading the track system on the HQ Studio Frame requires the use of this 2 Extension Kit (Part #QF09750),

More information

Z-Truck Up-and-Down Motion. Y-Truck Side-to-Side Motion. Head. Squaring Plate. Sliding Plate FIGURE 1: THE CARVEWRIGHT MACHINE

Z-Truck Up-and-Down Motion. Y-Truck Side-to-Side Motion. Head. Squaring Plate. Sliding Plate FIGURE 1: THE CARVEWRIGHT MACHINE Setup and use of CarveWright CO2 Powered Dragster Jig The CO 2 powered Dragster Jig will arrive from the factory fully assembled, calibrated, and squared. In order to get the best results, your CarveWright

More information

Hatchback Wing Riser Kit

Hatchback Wing Riser Kit Hatchback Wing Riser Kit 2015-06-11 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation of aftermarket

More information

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1 HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions QF09775 The pole upgrade kit can be used with or without the QF09700 HQ Precison-Glide track upgrade kit. What s Included

More information

ACCESS COVER INSTALLATION INSTRUCTIONS (Kit #601 for 2006 Honda Ridgeline)

ACCESS COVER INSTALLATION INSTRUCTIONS (Kit #601 for 2006 Honda Ridgeline) ACCESS COVER INSTALLATION INSTRUCTIONS (Kit #601 for 2006 Honda Ridgeline) NOTE TO INSTALLER: IMPORTANT READ BEFORE ATTEMPTING INSTALLATION. Allow extra time, up to 2 hours to install this cover. Disassembly

More information

Hardware and Components:

Hardware and Components: Hardware and Components: (A) 5/16 x 2 Hex Bolt (B) 5/16 x 2-1/4 Hex Bolt (C) 5/16 x 2-1/2 Hex Bolt (D) 4X 5/16 x 3/4 Hex Bolt (E) 4X 5/16 x 1-1/4 Hex Bolt (F) 11X 5/16 Flat Washer (G) 12X 5/16 Nylock Nut

More information

FACTORY CAT TOMCAT CORPORATION

FACTORY CAT TOMCAT CORPORATION FACTORY CAT RPS TOMCAT CORPORATION Artificial Turf and Carpet Sweeping Install Kit #349-641 & #349-642 1. Detach batteries so that there is no power running through the machine before starting. 2. Start

More information

re3d Assembling Gigabot: "Flatpack"

re3d Assembling Gigabot: Flatpack re3d Assembling Gigabot: "Flatpack" Your Gigabot was assembled, calibrated, tested, and taken apart for shipping purposes. All you need to do is reassemble it, and you're ready to go! Written By: Chris

More information

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 XL Quilting Frame 1 Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 Foot frame Printed 2 June 2014 Updated

More information

Side Winder R o u t e r L i f t.

Side Winder R o u t e r L i f t. Woodpeckers PRECISION WOODWORKING TOOLS Side Winder R o u t e r L i f t. INSTALLATION INSTRUCTIONS The wrench handle must be pointing left in order to fully insert or remove it. Lift Wrench Once fully

More information

INSTALLATION LS MODEL

INSTALLATION LS MODEL INSTALLATION LS MODEL Page 2 TABLE OF CONTENTS Section 1: Included parts... pg 4 Section 2: Installing the Shirley Stitcher II on Quilt Frame.. pg 5 Section 3: Connecting Shirley Stitcher II to Tin Lizzie

More information

Droplit v2 Frame Assembly

Droplit v2 Frame Assembly SeeMeCNC Guides Droplit v2 Frame Assembly Droplit v2 Frame Assembly Written By: JJ Johnson 2017 seemecnc.dozuki.com Page 1 of 22 Step 1 Droplit v2 Frame Assembly Locate the Projector Plate, Projector Joining

More information

Written By: Brook Drumm

Written By: Brook Drumm Simple 1401 Assembly For kits produced between 1/15/14-6/1/14. This guide is for kits with the Fan Shroud. Instructions for metal and wood extruder (and bed) included below. Written By: Brook Drumm TOOLS:

More information

Please read these instructions before use and keep for future reference

Please read these instructions before use and keep for future reference Wardrobe Assembly Guide Allen Key Provided (if required) Philips Screwdriver Required Hammer Required Please read these instructions before use and keep for future reference Caution! Two Person Assembly

More information

STOP! READ THIS FIRST

STOP! READ THIS FIRST STOP! READ THIS FIRST Page 1 of 37 Getting Started With Your Pantograms GS1501 Embroidery Machine (the quick guide) Thank you for choosing Pantograms for your embroidery system provider. We encourage you

More information

Procedure 5: Hammer Bank Removal

Procedure 5: Hammer Bank Removal T6215 Maintenance Manual Procedure 5: Hammer Bank Removal The Hammer Driver CBA has components which are static sensitive! Use the appropriate ESD grounding procedures when handling the Hammer Bank Assembly.

More information

The Queen Quilter Professional Quilters Kit Frame

The Queen Quilter Professional Quilters Kit Frame The Queen Quilter Professional Quilters Kit Frame Assembly Instructions Table of Contents: Before you begin......................... Pg. 2 Wood parts............................. Pg. 3 Hardware..............................

More information

SHERLINE Mill Digital Readout

SHERLINE Mill Digital Readout SHERLINE Mill Digital Readout P/N 8100 (Inch) Digital Readouts in the modern machine shop Digital readouts are popular on full-size shop mills because they make the life of a machinist much simpler. They

More information

Bend-Tech Dragon Assembly Manual

Bend-Tech Dragon Assembly Manual p.1 Bend-Tech Dragon Assembly Manual IMPORTANT: Please read before unpacking. Place shipping container in a wide open area where you will have room to work and assemble this product. Shipping The Dragon

More information

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK Page 1 of 5 PORTA-DOCK, INC. A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to model* Thank you for purchasing our product! *Please read these instructions and follow

More information

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 ) P/N: 001-7057 Rev ( /0 ) The Bowflex Revolution XP Home Gym Assembly Instructions 2 Table of Contents Before You Start... 2 Tools You Will Need / Hardware Contents... 3 Box Contents... 6 Assembling Your

More information

STENCIL MACHINE OPERATION uline.com H-259, H-347 H-408 CUTTING THE OIL BOARD INSERTING THE OIL BOARD

STENCIL MACHINE OPERATION uline.com H-259, H-347 H-408 CUTTING THE OIL BOARD INSERTING THE OIL BOARD H-259, H-347 H-408 π STENCIL MACHINE 1-800-295-5510 uline.com OPERATION NOTE: No assembly is necessary after you unpack your machine. INSERTING THE OIL BOARD 1. Move the release lever to the right. This

More information

Replacing a Wheel on the Pinch Wheel assembly

Replacing a Wheel on the Pinch Wheel assembly 14140 NE 200th St - Woodinville, WA. 98072 - PH: (425) 398-8282 - Fax: (425) 398-8383 Replacing a Wheel on the Pinch Wheel assembly Determine which pinch wheel assembly your plotter or cutter has. See

More information

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4

More information

Z-Axis Assembly Replacement / Adjustment

Z-Axis Assembly Replacement / Adjustment Z-Axis Assembly Replacement / Adjustment TOOLS NEEDED: 1 Set of L-Shaped Allen Wrenches 3 blocks of wood, plastic, or acrylic cut to approximately 2 inches by 3 inches Household grade White Lithium grease

More information

MACHINE QUILTING FRAME

MACHINE QUILTING FRAME MACHINE QUILTING FRAME YOU WILL NEED TO PURCHASE: 5 pieces of 1-1/4 thin wall metal conduit (EMT) cut to your preferred length for the rollers. (Maximum 120 ) DETERMINING YOUR ROLLER LENGTH: Determine

More information

PERSONAL RECORD KEEPING

PERSONAL RECORD KEEPING PRO3700 2 P R O 3 7 0 0 A s s e m b l y i n s t r u c t i o n s PERSONAL RECORD KEEPING Tip: Record the serial numbers of your Octane Fitness elliptical in the spaces below. This will make it easier for

More information

Inventory (Figure 2)

Inventory (Figure 2) MODEL T10127 12" SPIRAL CUTTERHEAD INSTRUCTIONS The Model T10127 indexable insert spiral cutterhead is designed to replace the straightknife cutterhead from the Grizzly jointer Model G0609. The total procedure

More information

MODEL T " HELICAL CUTTERHEAD INSTALLATION INSTRUCTIONS

MODEL T  HELICAL CUTTERHEAD INSTALLATION INSTRUCTIONS MODEL T27696 12" HELICAL CUTTERHEAD INSTALLATION INSTRUCTIONS For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Introduction The Model T27696 indexable

More information

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004 The Useless Machine DIY Soldering Edition Instruction Guide v0004 TM For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: Soldering

More information

GO TO Table of Contents

GO TO Table of Contents GO TO PRELIMINARY 03-13-2008 16008 North 81 st Street Scottsdale, Arizona 85260 480.483.1214 www.ulsinc.com Help 0000 - Contact the ULS Technical Support Department 0010 - Performing Professional Series

More information

Elimination of Elevator Bounce

Elimination of Elevator Bounce For the Agilent Archon Autosampler Rework Instructions CAUTION This kit is intended for use by Agilent Service personnel only. Elevator Removal 1 Open top cover. 2 Open front lower door. 3 Remove vial

More information

Metroboard Pulley Replacement Procedure

Metroboard Pulley Replacement Procedure Metroboard Pulley Replacement Procedure 1) Remove the two transmission cover screws (1/8 allen driver). Then remove the transmission cover. Note there is a split lock washer and flat washer as well, so

More information

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS INSTALLATION AND CARE INSTRUCTIONS Skylight Manually Operated Honeycomb Shades 20 C8-10-1806 2/15 1 INTRODUCTION Thank you for purchasing our product. Your new shade has been custom built for you from

More information

PERSONAL RECORD KEEPING

PERSONAL RECORD KEEPING 2 P R O 3 7 0 A s s e m b l y i n s t r u c t i o n s PERSONAL RECORD KEEPING Tip: Record the serial numbers of your Octane Fitness elliptical in the spaces below. This will make it easier for you to obtain

More information

Anti-Chattering Retrofit Assembly

Anti-Chattering Retrofit Assembly Anti-Chattering Retrofit Assembly Please follow through these instructions carefully and thoroughly. If you have questions, feel free to contact a Bend-Tech service representative at our office 651-257-8715

More information

Special Z-Axis Ballscrew Replacement

Special Z-Axis Ballscrew Replacement To replace Z-axis ballscrew without removing X-axis components When rebuilding an OmniTurn slide, all the precision components are replaced. The tooling plate and saddle are removed to gain access to the

More information

Slitter/E-Prom Upgrade for Duplo CC-228

Slitter/E-Prom Upgrade for Duplo CC-228 This Service Bulletin covers the upgrade of the Post Card Slitter and E-Prom for the Duplo CC-228 machines at Staples locations nationwide. Be sure to review and follow ALL of these instructions. Failure

More information

model tsa-sa48 Sliding Crosscut Table installation guide

model tsa-sa48 Sliding Crosscut Table installation guide model tsa-sa48 Sliding Crosscut Table installation guide A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide The following guidelines should be followed to lubricate the three main parts of the 400QMD mount. The QMD stands for Quartz Micro-Drive controller.

More information

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

MODEL H  BYRD SHELIX CUTTERHEAD INSTRUCTIONS MODEL H9291 12" BYRD SHELIX CUTTERHEAD INSTRUCTIONS The Model H9291 12" Byrd Shelix cutterhead is designed to replace the straight-knife cutterhead on the Grizzly jointer Model G0609. The total procedure

More information

MS25 OPERATION MANUAL

MS25 OPERATION MANUAL SAFETY INSTRUCTIONS SPECIFICATIONS OPERATING INSTRUCTIONS MAINTENANCE ADJUSTMENTS REPLACEMENT OF PARTS MS25 DIAGRAM MS25 PARTS LIST MS25 OPERATION MANUAL SAFETY INSTRUCTIONS Please read these instructions

More information

HEIGHT ADJUSTABLE WORKBENCH

HEIGHT ADJUSTABLE WORKBENCH HEIGHT ADJUSTABLE WORKBENCH Model 91 ASSEMBLY and Operating Instructions Visit our website at: http://www.harborfreight.com Read this material before using this product. Failure to do so can result in

More information

ROMAN AND. Roller Lift System Continuous Cord Loop GETTING STARTED BRACKET INFORMATION INSIDE MOUNT. A few simple tools are required:

ROMAN AND. Roller Lift System Continuous Cord Loop GETTING STARTED BRACKET INFORMATION INSIDE MOUNT. A few simple tools are required: ROMAN AND WOVEN WOOD SHADES Roller Lift System Continuous Cord Loop GETTING STARTED BRACKET INFORMATION A few simple tools are required: The brackets you received with your product are REQUIRED for proper

More information

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2. The Phoenix Professional Quilting Frame Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.1 1 The Phoenix Professional Quilting Frame Parts List Box 1...3 Box

More information

Replacing the Reciprocator on an SWF Multi-head.

Replacing the Reciprocator on an SWF Multi-head. Replacing the Reciprocator on an SWF Multi-head. Follow the instructions below to replace the reciprocator in the SWF multi-head machines. The tools required are found in the tool kit that came with the

More information

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058 INSTALLATION INSTRUCTIONS 2009-13 DODGE RAM 2 & 4WD 1500 PART # P5058 PARTS LIST: Qty Description Qty Description 1 Grille Guard 12 12-1.75mm Hex Nuts 2 Upper Frame Mounting s (for trucks without tow hooks

More information

Printrbot Simple (Model 1403) Rev F Printrboard

Printrbot Simple (Model 1403) Rev F Printrboard Printrbot Simple (Model 1403) Rev F Printrboard Printrbot Simple is currently shipping with the Rev F Printrboard. Check which rev Printrboard your Simple kit includes and use the corresponding instructions.

More information

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2 INSTALLATION INSTRUCTIONS GRILLE GUARD PART # 5058/5058-2 PARTS LIST: Qty Description Qty Description 1 Grille Guard 8 12-1.75mm x 35mm Hex Bolts 2 Upper Frame Mounting s (for trucks without tow hooks

More information

BELGIAN EXT. REC DINING TABLE

BELGIAN EXT. REC DINING TABLE BELGIAN EXT. REC DINING TABLE Date: Williams 20 Jul. 2015 Sonoma Product Information Dept. www.williams sonoma.com Page 1 of 5 Page 1 of 5 Important Safety Instructions: Please read all instructions carefully

More information

Build your own. Stages 7-10: See Robi s head move for the first time

Build your own. Stages 7-10: See Robi s head move for the first time Build your own Pack 03 Stages 7-10: See Robi s head move for the first time Build your own All rights reserved 2015 Published in the UK by De Agostini UK Ltd, Battersea Studios 2, 82 Silverthorne Road,

More information

WARNING: Failure to follow these warnings and assembly instructions could

WARNING: Failure to follow these warnings and assembly instructions could OXFORD BUNK BED TWIN OVER TWIN & FULL OVER FULL For Bunk Bed Twin Over Twin WARNING: Failure to follow these warnings and assembly instructions could result in serious injury or death. To help prevent

More information

Basic steps to time the Gammill quilting machine s rotary sewing hook

Basic steps to time the Gammill quilting machine s rotary sewing hook Basic steps to time the Gammill quilting machine s rotary sewing hook 1.) Turn the machine off and unplug it. 2.) With the needle bar in the raised position, remove the bobbin and bobbin case. 3.) Remove

More information

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips

More information

Shapeoko XXL Assembly Guide

Shapeoko XXL Assembly Guide Shapeoko XXL Assembly Guide 04/27/2016 XXL Packing LIst Item Qty Description Y-Carriage (left) 1 Y-Carriage (right) 1 X/Z Assembly 1 40 Rail 3 1 rail has mounting holes for controller Wasteboard Half 2

More information

INSTALLATION MANUAL PBL-UMP

INSTALLATION MANUAL PBL-UMP INSTALLATION MANUAL PBL-UMP Table of Contents Warning Statements... 4 Parts List... 5 Installation Tools... 5 Features... 7 Projector Preparation... 8 Bracket Installation... 10 Leveling the Mounting Bracket...

More information

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN BUILD YOUR OWN Pack 11 Anything you can imagine, you can make! 3D PRINTER Compatible with Windows 7 & 8 Mac OS X 3D technology is now available for you at home! BUILD YOUR OWN 3D PRINTER CONTENTS PACK

More information

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42 - 60 Plasma Screens Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be

More information

MyStudio VS53 Versa Sweep Setup Instructions

MyStudio VS53 Versa Sweep Setup Instructions MyStudio VS53 Versa Sweep Setup Instructions MISSION STATEMENT Pro Cyc, Inc. is the world leader in design and sales of modular infinity backgrounds. Our studio systems are recommended by every major company

More information

SPRINT 5000 BOOKLETMAKER OPERATION MANUAL

SPRINT 5000 BOOKLETMAKER OPERATION MANUAL SPRINT 5000 BOOKLETMAKER OPERATION MANUAL Sprint5000HCS-USA.doc3.doc Page 1 01/05/2002 CONTENTS 1. Introduction. 2 2. Specification. 2 3. Initial setting up. 3 4. Operation. 4 4.1 Loading staples. 5 4.2

More information

Tin Lizzie 18 Assembly Instructions

Tin Lizzie 18 Assembly Instructions Tin Lizzie 18 Assembly Instructions Revision: 07/29/16 Table of Contents Aides 3 Before You Begin 5 Aides 5 Tools 6 Perfect Stitch Parts 2 12 Modify the Machine 12 Prepare Drill Templates 12 Front Display

More information

Sliding Crosscut Table installation guide

Sliding Crosscut Table installation guide Sliding Crosscut Table installation guide model tsa-sa48 A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

Problem/Procedure Description. Requirements. Problem/Procedure Solution. How-To Document. Updated on: 11/13/2008 By:Christopher Ware

Problem/Procedure Description. Requirements. Problem/Procedure Solution. How-To Document. Updated on: 11/13/2008 By:Christopher Ware Problem/Procedure Description Performing maintenance on 95s, 95sII and H100 Requirements Ball Bearing Grease (LPKF P/N 106976) Tri-Flow Teflon lubricant aerosol. 3-in-1 Multi-purpose Oil Electronic Component

More information

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.

More information

B9Creator Build Table Calibration Process

B9Creator Build Table Calibration Process B9Creator Build Table Calibration Process Summary This document explains the process to calibrate the B9Creator Build Table. Things to Know The purpose of the Build Table calibration is to ensure the red

More information

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART # INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART # PARTS LIST: Qty Description Qty Description 1 Grille Guard 8 12-1.75mm x 35mm Hex Bolts 2 Brackets (for trucks without 22 12mm x 30.1mm OD

More information

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator. SatNOGS SatNOGS Rotator v3 Mechanical Assembly This is the assembly guide for the third version of the SatNOGS Rotator. Written By: Pierros Papadeas 2017 satnogs.dozuki.com Page 1 of 19 INTRODUCTION Notes:

More information

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16 R K C T I Repair Kit Product Compatibility Repair Kit # Linear Actuator Assembly # LACPACC-002 LACPACC-003 LACP-16TxxLP5 (0.5-in lead screw pitch) LACP-16TxxL1 (1-in lead screw pitch) C P I R K 4 ea Flanged

More information

AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017

AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017 AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017 Please read this entire document before printing parts or building this frame Disclaimer: This guide is for informational purposes

More information

Science Olympiad Optics LSS Tips and Tricks Alan Chalker September 2011

Science Olympiad Optics LSS Tips and Tricks Alan Chalker September 2011 Science Olympiad 2011-2012 Optics LSS Tips and Tricks Alan Chalker alan@chalker.org September 2011 NOTE: COMPETITORS ARE NOT REQUIRED TO BUILD AN LSS. EVENT SUPERVISORS WILL PROVIDE ONE DURING THE COMPETITION.

More information

US RACK, Inc Falcon Drive, Madera, CA

US RACK, Inc Falcon Drive, Madera, CA US RACK, Inc. - 2850 Falcon Drive, Madera, CA 93637-559-661-3050 INSTRUCTIONS for MOTORCYCLE RACK with Cradling Wheel Chocks WARNING: Do NOT attempt to install or use this rack without following all instructions.

More information

INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE:

INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE: INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE: 268 June 22, 2010 TOOLS NEEDED COMPONENTS INCLUDED P2 Tip 3/8" Drill Rubber Gasket(s) x 2 Bracket(s) x 2 1/2" Drill Bit Bulkhead Flange #2 Phillips

More information

Powermatic Model 31A Combination Belt-Disk Sander

Powermatic Model 31A Combination Belt-Disk Sander OPERATING PROCEDURE FOR: Powermatic Model 31A Combination Belt-Disk Sander INTRODUCTION: The combination belt-disk sander is used to sand the edges of boards. It can be used to smooth the edge or to remove

More information

Installing CNC Stepper Motor Mounts On A Sherline Lathe

Installing CNC Stepper Motor Mounts On A Sherline Lathe Installing CNC Stepper Motor Mounts On A Sherline Lathe P/N 6720 (6725 Metric) 4000/4100/4500/4600 Lathes P/N 6730 (6735 Metric) 4400/4410 Lathe USING THE TEMPLATE BLOCKS TO LOCATE NEW MOUNTING HOLES FOR

More information

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job

More information

The Useless Machine. Parts Only - Build Guide v0001

The Useless Machine. Parts Only - Build Guide v0001 TM The Useless Machine Parts Only - Build Guide v0001 For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: One phillips screwdriver,

More information

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED RAMPAGE P R O D U C T S 84 (+/- 1/4 ) INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO 1966-1977 TOOLS REQUIRED 3/8 WRENCH 7/16 WRENCH ½ WRENCH #2 PHILLIPS SCREWDRIVER 1/8 DRILL

More information

Germ City Storage Box Inventory

Germ City Storage Box Inventory Germ City Storage Box Inventory 4 Wide connector bars 11 Thin connector bars (4 with Velcro on one side) 12 Channel parts (6 with extensions) 1 Black fabric exhibit cover 2 Black decorated burlap panels

More information

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms BABY WOLF LOOM Assembly Instructions for Knocked-Down Looms BEFORE YOU BEGIN Please read through the directions before beginning to assemble your loom. Unpack the loom parts carefully. Do not throw away

More information

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS.  DOORS/DRAWERS/LIDS DOORS/DRAWERS/LIDS 55 56 NOTES DOORS/DRAWERS/LIDS Swing s 73 74 NOTES INSTALLATION OF A GDM-SWING DOOR Phillips Head Screwdriver (2) - 1/8" Drift Punches (forged) Top Bracket NOTE: It may be necessary

More information

Vinyl Cutter Instruction Manual

Vinyl Cutter Instruction Manual Vinyl Cutter Instruction Manual 1 Product Inventory Inventory Here is a list of items you will receive with your vinyl cutter: Product components (Fig.1-4): 1x Cutter head unit complete with motor, plastic

More information