1 2015 / 2016 STATUS REPORT IRRIGATION REHABILITATION PROGRAM Agriculture and Forestry

2 IRRIGATION REHABILITATION PROGRAM 2015/2016 STATUS REPORT Prepared by Irrigation Secretariat Lethbridge, Alberta January 2017

3 ACKNOWLEDGEMENT Beau Hay of Alberta Agriculture and Forestry s Basin Water Management Section provided much of the information contained in this report as part of Mr. Hay s monitoring of the construction activities of the irrigation districts. We greatly appreciate and acknowledge the significant assistance provided by Mr. Hay in the completion of this report. LIST of ACRONYMS IRP Irrigation Rehabilitation Program ICW Irrigation Capital Works Major Works PS Planning Studies IIMS Irrigation Infrastructure Management System 15/16 Construction Period 2

4 ABSTRACT This annual Irrigation Rehabilitation Program (IRP) Status Report summarizes the expenditures and status of all IRP projects that were active during the construction period. The IRP began in 1969 and is a cost shared program between Alberta Agriculture and Forestry and Alberta s irrigation districts. Since 1969 funding levels have varied between $600,000 and $33,400,000 per year. The 2015 funding allocations are shown in Table 1. The provincial/irrigation district cost share ratio has varied since 1969, starting at 86 province - 14 irrigation district, changing to in 1994/95 and to in 1995/96 and remains at that ratio today. Irrigation Rehabilitation Financing Agreements are prepared annually between the Minister and each irrigation district. s must be approved by Irrigation Council prior to any project costs being paid for with cost shared funds, and all eligible project expenditures must be documented by Progress Certificates. Circumstances may arise that require an irrigation district to change project priorities from time to time. As well, actual costs may differ from estimated costs because of various circumstances, i.e. poor working conditions due to weather, construction cost inflation, etc. Information contained in this report was gathered from random monitoring (field visits) of project construction sites, records from the Basin Water Management Section and the Irrigation Secretariat and information from irrigation district personnel. The IRP funding is provided to the districts according to an inter-district allocation formula. 3

5 AETNA IRRIGATION DISTRICT (AID) During this reporting period the AID expended $3,269 of IRP cost shared funds on one project in the ICW category, which involved engineering and design work. AID - IRP Construction Summary IRP # ICW PS 2322 ICW Name C10 Pipeline Enhancement Approved Construction Start in 15/16 to July 31/16 Rehabilitation Liners Pipe N/A 2 2 (Engineering only) Earth 4

6 BOW RIVER IRRIGATION DISTRICT (BRID) During this reporting period the BRID expended $3,823,227 of IRP cost shared funds on eight projects in the ICW and PS categories. Expenditures involved pipeline installation, cleanup of previously completed IRP projects or engineering for upcoming projects. BRID - IRP Construction Summary IRP # ICW PS *2227 PS 2236 ICW 2264 ICW 2297 ICW 2299 ICW 2309 PS 2317 PS 2319 ICW Name Irrigation Demand Model (IDM) Lateral M1 (Hays Block) Lateral D-4 (West Block) Lateral C-7 (Hays Block) Lateral H-6-3, K-11-A,K-11-C, K-11-D, K-11-E (Vauxhall Block) Badger Reservoir Dam Safety Review Aerial Photography 2015 Lateral B (West Block) Approved Construction Start in 15/16 to July 31/ N/A Rehabilitation Liners Pipe , , N/A N/A ,374 Earth NOTE: * indicates Special Funding used towards this project. The funding was allocated to BRID in 2011/12. 5

7 EASTERN IRRIGATION DISTRICT (EID) During this reporting period the EID expended $10,471,668 of IRP cost shared funds on six projects in the ICW and PS categories. Expenditures involved fencing and cleanup of previously completed IRP projects or engineering for upcoming projects. EID - IRP Construction Summary IRP # ICW PS Name Approved Construction Start in 15/16 to July 31/16 *2226 Irrigation Water PS Quality Assessment 2292 ICW J West Bantry ICW 21 North Branch ICW 25 North Branch Rehabilitation Liners Pipe 2314 ICW 01 Bow Slope , ICW 11B Springhill N/A ,850 Earth NOTE: * indicates Special Funding used towards this project 6

8 LEAVITT IRRIGATION DISTRICT (LID) During this reporting period the LID expended $26,509 of IRP cost shared funds on one project in the ICW category, which involved the installation of an inlet screen. LID - IRP Construction Summary IRP # ICW PS 2316 ICW Name Lateral D Screen Upgrades Approved Construction Start in 15/16 to July 31/ Rehabilitation Liners Pipe Earth 7

9 LETHBRIDGE NORTHERN IRRIGATION DISTRICT (LNID) During this reporting period the LNID expended $3,916,545 of cost shared funds on two projects in the ICW category, which involved the installation of a pipeline and preliminary work. LNID - IRP Construction Summary IRP # ICW PS Name Approved Construction Start in 15/16 to July 31/16 Rehabilitation Liners Pipe 2202 ICW Laterals H3/H , ICW Laterals H N/A 4 4 6,270 Earth 8

10 MAGRATH IRRIGATION DISTRICT (MID) During this reporting period the MID expended $55,541 of cost shared funds on two projects in the ICW category. MID - IRP Construction Summary IRP # ICW PS 2104 ICW 2237 ICW Name High Line Seepage Control (Phase 2) Lowline Lateral Pipeline Approved Construction Start in 15/16 to July 31/16 Rehabilitation Liners Pipe Earth m of tile drain installed N/A

11 MOUNTAIN VIEW IRRIGATION DISTRICT (MVID) No funds were expended by the MVID during this reporting period. 10

12 RAYMOND IRRIGATION DISTRICT (RID) During this reporting period the RID expended $795,836 of IRP cost shared funds on three projects in the ICW and PS categories, which involved the installation of a pipeline, preliminary work and aerial photography. RID - IRP Construction Summary IRP # ICW PS 2307 ICW 2308 PS 2321 ICW Name Welling Lateral #5 - Phase 4 RID Digital Aerial Photography (2015) Welling Lateral #5 - Phase 5 Approved Construction Start in 15/16 to July 31/16 Rehabilitation Liners Pipe , N/A N/A 2 2 2,661 Earth 11

13 ROSS CREEK IRRIGATION DISTRICT (RCID) No new IRP projects were carried out by the RCID during this reporting period. 12

14 ST. MARY RIVER IRRIGATION DISTRICT (SMRID) During this reporting period the SMRID expended $4,919,236 of IRP cost shared funds on fifteen projects in the ICW and PS categories. Expenditures involved cleanup of previously completed IRP projects, pipeline and structure installations, dam safety reviews and aerial photography. SMRID - IRP Construction Summary IRP # ICW PS Name Approved Construction Start in 15/16 to July 31/16 Rehabilitation Liners Pipe 1799 ICW Bow Island Lateral , ICW West Medicine Hat Lateral N/A < ICW South Grassy Main ICW Cameron Lateral N/A < ICW Coaldale Lateral ICW 2271 ICW 2272 PS 2273 PS 2288 ICW 2289 ICW 2290 PS 2310 PS 2311 ICW 2312 ICW West Medicine Hat Lateral 13A and 13D Chin Lateral 10 Canal Armouring and structure replacement Forty Mile Reservoir, Dam Safety Review NE reservoir dam safety review Bow Island Lateral 7 Pipeline Aquatic Weed and Algae Control Structures 2015 Dam Safety Review for Stafford, Grassy Lake, and Lateral 10 Reservoirs Dam Safety Reviews for Seven Persons. Klaudt and Stornham Reservoirs Aquatic Weed and Algae Control Structures Program 2015/2016 SMRID Digital Aerial Photography N/A <1 100 Earth , N/A N/A N/A N/A sites N/A ,403 3,038 13

15 TABER IRRIGATION DISTRICT (TID) During this reporting period the TID expended $3,237,640 of IRP cost shared funds on eleven projects in the ICW and PS categories. Expenditures involved cleanup of previously completed IRP projects, pipeline and structure installations and aerial photography. TID - IRP Construction Summary IRP # ICW PS Name Approved Construction Start in 15/16 to July 31/ ICW Big Bend Main Canal Rehabilitation Liners Pipe 2239 ICW Lateral E-3 Big Bend Pipeline N/A <1 < ICW Lateral 3 East Horsefly < ICW Lateral G Big Bend SW W < ICW Aquatic Weed & Algae Control <1 100 Structures (2015) 2285 ICW Overshot Control Gate Taber Main Canal at Lateral ICW Overshot Control Gate East Horsefly Main Canal at Lateral ICW Lateral 18 Taber , ICW 2315 PS 2323 ICW Aquatic Weed and Algae Control Structures (2016) Digital Aerial Photography Lat 7 East Horsefly & Lat 20 Taber Structure Replacements N/A N/A 2 2 Earth 4 gabion walls and 2 mechanical screen cleaners 7,009 14

16 UNITED IRRIGATION DISTRICT (UID) During this reporting period the UID expended $467,362 of IRP cost shared funds on four projects in the ICW category. Expenditures involved cleanup of previously completed IRP projects, pipeline installation and preliminary work for upcoming projects. UID - IRP Construction Summary IRP # ICW PS Name Approved Construction Start in 15/16 to July 31/16 Rehabilitation Liners Pipe 2263 ICW Lateral E , ICW Lateral A1d ICW Lateral A N/A ICW Lateral A N/A ,743 Earth 15

17 WESTERN IRRIGATION DISTRICT (WID) During this reporting period the WID expended $4,504,100 of IRP cost shared funds on six projects in the ICW category. Expenditures involved cleanup of previously completed IRP projects or engineering for upcoming projects. WID - IRP Construction Summary IRP # ICW PS 2108 ICW 2278 ICW 2279 ICW 2304 ICW 2305 ICW Name Sublateral 74T4 & 84T4A (Cemetery Hill) A Canal Sublateral 81F11 North Cluny Lateral 83H6 Standard Lateral 85N7, 85N8, 85N9 Standard Lateral 85N6 Approved Construction Start in 15/16 to July 31/ < < Rehabilitation Liners Pipe , N/A ,627 Earth 16

18 TABLES 17

19 The following tables summarize the results of district activities for 2015/2016: Table 1: Table 2: Table 3: Table 4: Table 5: Irrigation Rehabilitation Program Funding o Lists the IRP grant funding received by each district together with the district s contribution. Irrigation Rehabilitation Program Construction o Lists the IRP projects having substantial construction in each district with statistical data for each project. Irrigation Rehabilitation Program Summary of Funding and Expenditures o Lists each district s Major Works (), Irrigation Capital Works (ICW) and Planning Study (PS) expenditures, total funding allocation, and total expenditures. The expenditures are calculated from progress certificates submitted for the construction period. Irrigation Rehabilitation Program Summary of Existing Rehabilitated Lengths o Lists the length of the irrigation districts current distribution systems, rehabilitated lengths in each district to July 31, 2015, the length of rehabilitation within the 2015/2016 construction period, and the total length rehabilitated to July 31, Irrigation Rehabilitation Program Summary of Lengths and Type of Rehabilitation o Historical summary of total length and type of rehabilitation completed from 1969 to July 31,

20 Table 1. Irrigation Rehabilitation Program Funding 2015 The following table lists IRP grants received by each district together with each district s contribution. District Base Funding Provincial Grant Special Funding Base Funding District Contribution Total Program AID $65,253 $0 $21,751 $87,004 BRID $2,909,770 $0 $969,923 $3,879,693 EID $4,543,787 $265,000 $1,514,596 $6,323,383 LID $74,794 $0 $24,931 $99,725 LNID $2,067,418 $0 $689,139 $2,756,557 MID $213,669 $0 $71,223 $284,892 MVID $71,417 $0 $23,806 $95,223 RID $511,699 $0 $170,566 $682,265 RCID $20,741 $0 $6,914 $27,655 SMRID $4,984,804 $0 $1,661,601 $6,646,405 TID $1,012,594 $0 $337,531 $1,350,125 UID $491,553 $0 $163,851 $655,404 WID $1,767,500 $0 $589,167 $2,356,667 TOTALS $18,734,999 $265,000 $6,244,999 $25,244,998 NOTE: Base Funding Grants are cost shared 75 provincial/25 irrigation d Base Funding Grants are based on the Inter-District Allocation Formula as follows: - 50 of the funds allocated on the basis of the number of irrigation acres in each district, and - 50 of the funds allocated on the basis of the infrastructure replacement cost of specified infrastructure in each district $265,000 Special Funding Grant to EID in support of an Irrigation Water Quality Assessment 19

21 Table 2. Irrigation Rehabilitation Program Construction Rehabilitation District # ICW Name Approval Construction Start In 15/16 Complete To July 31/16 Liners Pipe Earth (Length In Metres) BRID 2297 ICW Lateral C ,220 BRID 2299 ICW Lateral H-6-3, K- 11-A, C, D, E ,154 EID 2314 ICW 01 Bow Slope ,850 LID 2316 ICW Lateral D Screen Upgrades LNID 2202 ICW Laterals H3/H , MID 2104 ICW High Line Seepage Control m (drain tile) RID 2307 ICW Welling Lateral # ,661 SMRID 1799 ICW SMRID 2198 ICW Bow Island Lateral 26 South Grassy Main , SMRID 2271 ICW Chin Lateral ,038 SMRID 2311 ICW Aquatic Weed and Algae Control Structures sites TID 2303 ICW Lateral 18 Taber ,009 TID 2313 ICW Aquatic Weed and Algae Control Structures gabion walls and 2 mechanical screen cleaners UID 2263 ICW Lateral E ,206 UID 2300 ICW Lateral A1d WID 2304 ICW Standard Lateral 85N7, 85N8, 85N , ,937 3,038 TOTAL: metres 20

22 Table 3. Irrigation Rehabilitation Program Summary of Funding and Expenditures District 2015 Total Funding Gov't & District 2015/16 Expenditures 2015/16 ICW + PS Expenditures 2015/16 Total Expenditures AID $87,004 $0 $3,269 $3,269 BRID $3,879,693 $0 $3,823,227 $3,823,227 EID $6,323,383 $0 $10,471,668 $10,471,668 LID $99,725 $0 $26,509 $26,509 LNID $2,756,557 $0 $3,916,545 $3,916,545 MID $284,892 $0 $55,541 $55,541 MVID $95,223 $0 $0 $0 RID $682,265 $0 $795,836 $795,836 RCID $27,655 $0 $0 $0 SMRID $6,646,405 $0 $4,919,236 $4,919,236 TID $1,350,125 $0 $3,237,640 $3,237,640 UID $655,404 $0 $467,362 $467,362 WID $2,356,667 $0 $4,504,100 $4,504,100 Total $25,244,998 $0 $32,220,933 $32,220,933 NOTE: (1) The total expenditures do not equal the total program funding as construction may occur in a different year (or years) than the year the funds were allocated. (2) Special Funding is included (if any) in total funding. (3) Some districts accrue funds to construct a larger project in the future. (4) Expenditures are categorized as either: (Major Works) - includes storage reservoirs and dams or conveyance works and seepage control where the design capacity is 6 m 3 /s or greater, ICW (Irrigation Capital Works) - all other irrigation district infrastructure, or PS (Planning Studies) - studies and digital or photographic imagery used in an irrigation district's overall rehabilitation planning. 21

23 Table 4. Irrigation Rehabilitation Program Summary of Rehabilitated Lengths to July 31, 2016 District Total District Systems (Km) Total Systems Rehabilitated To July 31, 2015 (Km) 2015/2016 Rehabilitation (Km) Total To July 31, 2016 (Km) Of Total District System Rehabilitation AID BRID EID 1, LID LNID MID MVID RID RCID SMRID 1, , , TID UID WID 1, TOTALS 7, , , NOTES: (1) Lengths in AID, BRID, EID, LNID, SMRID, UID, & WID exclude Main Canals that were rehabilitated under Alberta Environment and Parks Water Management Systems Improvement Program. (2) Total Systems Rehabilitated for EID does not include Bank Rebuilding s constructed from 1977 to (3) Total Systems Rehabilitated for WID does not include "Tree Removal" s. (4) Totals do not include drainage works. (5) Totals do not include works rehabilitated by a district using its own funds. (6) Total length differs from Table 5 (Totals) due to recurrent rehabilitation. (7) Total Systems Rehabilitated under the IRP to July 31, 2015, and Total District Systems are based on the Basin Water Management Section current 2016 IIMS database. 22

24 Table 5. Irrigation Rehabilitation Program Summary of Length and Type of Rehabilitation 1969 to July 31, 2016 Concrete Lining (Km) Membrane Liners (Km) Pipelines (Km) 23 Earth Canals (Km) Total Conveyance (Km) Open Drains (Km) 69/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / TOTALS , , , of Total NOTES: (1) Open drains designate earth drains used to channel irrigation spill water: lengths do not include deep interceptors, toe drains, tile drains or tile grid systems. (2) Drains are not included in Total. (3) Total length differs from Table 4 due to recurrent rehabilitation.

Fat vs. Thin. MPE Engineering 2018 Irrigation Technical Conference

Fat vs. Thin. MPE Engineering 2018 Irrigation Technical Conference Fat vs. Thin MPE Engineering Precast or Cast-in-Place Concrete Why should we consider Precast Concrete for Control Structures? Do we want to potentially save money? Do we have project time constraints?

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

Irrigation District Database Analysis 1

Irrigation District Database Analysis 1 Irrigation District Database Analysis 1 A report prepared for Cameron County Irrigation District No. 2 November 22, 2002 by David Flahive and Guy Fipps 2, P.E. 1 A portion of this study was funded by Texas

More information

Black Dot shows actual Point location

Black Dot shows actual Point location 207 Plate 1 Use of scanned archive aerial photographs, digital photogrammetry and GIS to plot river channel erosion along the Afon Trannon, Wales (part of the study by Mount et al 2000, 2003). Plate 2

More information

Northeast Florida Coastal Wetland Restoration Program A Partnership Based Regional Approach for Estuary Habitat Restoration

Northeast Florida Coastal Wetland Restoration Program A Partnership Based Regional Approach for Estuary Habitat Restoration Northeast Florida Coastal Wetland Restoration Program A Partnership Based Regional Approach for Estuary Habitat Restoration Paul Haydt Restore America s Estuaries November 15, 2010 St Johns River Water

More information

Hanna Region Transmission Development: Cassils to Ware Junction

Hanna Region Transmission Development: Cassils to Ware Junction Hanna Region Transmission Development: Cassils to Ware Junction Preferred and alternate routes selected November 2010 olume 2 WARE JNCTION 132S 862 Why are you receiving this newsletter? 36 Re dd ee r

More information

Lab #8: Topographic Map Lab

Lab #8: Topographic Map Lab NAME: LAB TIME: TA NAME: Lab #8: Topographic Map Lab Topography is the shape of the land. Topographic maps are used to aid in the visualization of the shape of the land. Topographic maps include the accurate

More information

On-Site Sewage Disposal Application Packet

On-Site Sewage Disposal Application Packet On-Site Sewage Disposal Application Packet This packet of materials should include all you need to begin your residential or commercial application for on-site sewage disposal: Site feasibility Installation

More information

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department February 2, 2015 Fox River and Lower Green Bay Cat Island Chain - 1938 Cat Island Brown County Aerial Photography,

More information

Introduction to Aerial Photographs and Topographic maps (Chapter 3)

Introduction to Aerial Photographs and Topographic maps (Chapter 3) GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 3) For this assignment you will require: a calculator and metric ruler. Objectives:

More information

Aerial Image Acquisition and Processing Services. Ron Coutts, M.Sc., P.Eng. RemTech, October 15, 2014

Aerial Image Acquisition and Processing Services. Ron Coutts, M.Sc., P.Eng. RemTech, October 15, 2014 Aerial Image Acquisition and Processing Services Ron Coutts, M.Sc., P.Eng. RemTech, October 15, 2014 Outline Applications & Benefits Image Sources Aircraft Platforms Image Products Sample Images & Comparisons

More information

Western Alberta Transmission Line

Western Alberta Transmission Line Western Alberta Transmission Line July 010 Who can you contact for more information? To learn more about the proposed project you can contact: AltaLink at 1-877-67-5973 (toll-free) E-mail: westernline@altalink.ca

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

Palm Beach County. Estuarine Habitat Mapping

Palm Beach County. Estuarine Habitat Mapping Palm Beach County Estuarine Habitat Mapping Coastal Habitat Integrated Mapping and Monitoring Program (CHIMMP) April 29, 2014 Eric Anderson, Environmental Analyst Palm Beach County Department of Environmental

More information

SWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1

SWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1 SWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1 1. General Description Figure 1 provides a map of the Swan Lake Watershed. The watershed is characterized by two major parallel

More information

Asia and Pacific Commission on Agricultural Statistics

Asia and Pacific Commission on Agricultural Statistics October 2012 Asia and Pacific Commission on Agricultural Statistics Twenty-fourth Session Da Lat, Viet Nam, 8-12 October 2012 Agenda Item 7 RURAL, AGRICULTURAL & FISHERY CENSUS IN VIETNAM 1 1 Prepared

More information

Fidler Substation and Transmission Line

Fidler Substation and Transmission Line Fidler Substation and Transmission Line November 2009 Who can you contact for more information? To learn more about the proposed project you can contact: How can you provide input? We want your input so

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Peace Project Water Use Plan. Physical Works Terms of Reference. GMSWORKS-26 Communications and Safety Improvements Williston, Dinosaur and Peace

Peace Project Water Use Plan. Physical Works Terms of Reference. GMSWORKS-26 Communications and Safety Improvements Williston, Dinosaur and Peace Peace Project Water Use Plan Physical Works Terms of Reference GMSWORKS-26 Communications and Safety Improvements Williston, Dinosaur and Peace April 21, 2008 Peace Water Use Plan Physical Works Terms

More information

Phone: Gold SW, Suite 111 Fax:

Phone: Gold SW, Suite 111 Fax: Phone: 505-843-7643 610 Gold SW, Suite 111 Fax: 505-246-2232 Albuquerque, New Mexico, 87102 Web: WaterBank.com vember 30, 2010 John D. Armijo, Thomas Armijo William J. Gurule Contact: John D. Armijo P.O.

More information

Golden Eagle (Aquila chrysaetos) Management Indicator Species Assessment Ochoco National Forest

Golden Eagle (Aquila chrysaetos) Management Indicator Species Assessment Ochoco National Forest Golden Eagle (Aquila chrysaetos) Management Indicator Species Assessment Ochoco National Forest I. Introduction The golden eagle was chosen as a terrestrial management indicator species (MIS) on the Ochoco

More information

CanImage. (Landsat 7 Orthoimages at the 1: Scale) Standards and Specifications Edition 1.0

CanImage. (Landsat 7 Orthoimages at the 1: Scale) Standards and Specifications Edition 1.0 CanImage (Landsat 7 Orthoimages at the 1:50 000 Scale) Standards and Specifications Edition 1.0 Centre for Topographic Information Customer Support Group 2144 King Street West, Suite 010 Sherbrooke, QC

More information

Peace Project Water Use Plan. Williston Air Photos and DEM. Reference: GMSWORKS #14. Williston Air Photos and DEM 2011

Peace Project Water Use Plan. Williston Air Photos and DEM. Reference: GMSWORKS #14. Williston Air Photos and DEM 2011 Peace Project Water Use Plan Williston Air Photos and DEM Reference: GMSWORKS #14 Williston Air Photos and DEM 2011 Study Period: May 2011 to December 2011 Les Giles Transmission Engineering, Photogrammetry

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

7000 Fifteen Mile Road Sterling Heights, Michigan

7000 Fifteen Mile Road Sterling Heights, Michigan 7000 Fifteen Mile Road Sterling Heights, Michigan Industrial Building With Excess Land and Rail Access As exclusive agents, we are pleased to offer the following property for lease: 128,648 Sq. Ft. Completely

More information

AVISTA CORPORATION ' FEDERAL STORAGE CLAIM A-1

AVISTA CORPORATION ' FEDERAL STORAGE CLAIM A-1 AVISTA CORPORATION 2126.5' FEDERAL STORAGE CLAIM A-1 AVISTA CORPORATION 2126.5' FEDERAL STORAGE CLAIM EXHIBIT A-2 AVISTA CORPORATON 2126.5' FEDERAL STORAGE CLAIM EXHIBIT A-3 AVISTA CORPORATION 2126.5'

More information

RO SIX MILE COULEE 48TH AVENUE PLAN 961 0600 ENVIRONMENTAL RESERVE EASEMENT N.W. 1/4 SEC. 15-8 - 21-4 ARBOUR R I DG E GR E E N ARBOUR R I DGE GREEN ARBOUR WAY ARBOUR LANE ARBOUR RIDGE DRIVE ARBOUR BLVD.

More information

Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)

Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition) GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition) For this assignment you will require:

More information

ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES

ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES The Tacoma Hydroelectric Project is located about 20 miles north of Durango, Colorado, on a high intermountain plateau west of

More information

BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT

BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 513 BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 September 2015 PUGET SOUND ENERGY

More information

Wintering Corn Buntings

Wintering Corn Buntings Wintering Corn Buntings Title Wintering Corn Bunting 1992/93 Description and Summary of Results The Corn Bunting Emberiza calandra is one of a number of farmland birds which showed a marked decline in

More information

IF YOU WERE GIVEN the task of installing a drainage

IF YOU WERE GIVEN the task of installing a drainage Applying Profile Leveling Techniques IF YOU WERE GIVEN the task of installing a drainage system, how would you determine the slope needed to keep the water flowing? Profile leveling is an option. As part

More information

Salt Lake County (Utah). Planning and Development Services Aerial Photographs, Series #PD-001

Salt Lake County (Utah). Planning and Development Services Aerial Photographs, Series #PD-001 Salt Lake County (Utah). Planning and Development Services Aerial Photographs, 1946-1979 Series #PD-001 Processed by: Ronda Frazier Date Completed: December, 2008 Updated: October, 2015 Salt Lake County

More information

SAVITRIBAI PHULE PUNE UNIVERSITY

SAVITRIBAI PHULE PUNE UNIVERSITY S- 165/2014 SAVITRIBAI PHULE PUNE UNIVERSITY EXAMINATION CIRCULAR No. 165 of 2014 Programme of the M.E. 2013 Credit Pattern (Sem. I & II ) (All Branches) Examination, Nov. - 2014. Instructions to the Candidates:

More information

SE Region Asset Specifications Four Strand Barbed Wire Fence Specifications

SE Region Asset Specifications Four Strand Barbed Wire Fence Specifications Lands Division Sustainable Resource Development SE Region Asset Specifications Four Strand Barbed Wire Fence Specifications 1. Project Materials The contractor is to supply all the labour, tools and equipment

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical - NA Protection & Control - NA \\Q 30 JuLy Transmission & Distribution - NA Telecontrol System Planning - NA Replace MDR-4000 Microwave

More information

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Relief Well Spacing

GEO-SLOPE International Ltd, Calgary, Alberta, Canada   Relief Well Spacing 1 Introduction Relief Well Spacing Relief wells are commonly installed on the downstream side of an earth dam to control the seepage and pore-pressures (e.g. levee; Figure 1). A key design requirement

More information

Technical Memorandum ECO-7

Technical Memorandum ECO-7 To: Woody Frossard, TRWD From: Bob Brashear, CDM This document is released for the purpose of interim review under the authority of Robert Brashear, P.E., TX license 80771 on 21-Mar-2005. It is not to

More information

Contents. Acknowledgments. Map. Passage to Wonderland 1. J. E. Stimson, Photography, Rephotography, and Me 7

Contents. Acknowledgments. Map. Passage to Wonderland 1. J. E. Stimson, Photography, Rephotography, and Me 7 Contents Acknowledgments ix Map xiv 1 Passage to Wonderland 1 J. E. Stimson, Photography, Rephotography, and Me 7 2 History of the Cody Road to Yellowstone 29 3 Photographs and Rephotographs 51 4 Afterword

More information

CLASSIFICATION OF HISTORIC LAKES AND WETLANDS

CLASSIFICATION OF HISTORIC LAKES AND WETLANDS CLASSIFICATION OF HISTORIC LAKES AND WETLANDS Golden Valley, Minnesota Image Analysis Heather Hegi & Kerry Ritterbusch 12/13/2010 Bassett Creek and Theodore Wirth Golf Course, 1947 FR 5262 Remote Sensing

More information

Budget Office of the Federation Federal Ministry of Finance FGN Budget - Proposal

Budget Office of the Federation Federal Ministry of Finance FGN Budget - Proposal SUMMARY FEDERAL MINISTRY OF COMMUNICATION AND TECHNOLOGY TOTAL PERSONNEL COST TOTAL OVERHEAD COST TOTAL TOTAL CODE MDA RECURRENT TOTAL CAPITAL ALLOCATION =N= =N= =N= =N= =N= 0123001 MAIN MINISTRY 454 082

More information

Appendix B: Example Research-Activity Description

Appendix B: Example Research-Activity Description Appendix B: Example Research-Activity Description To qualify as a research activity, work must advance the understanding of scientific relations or technologies, address scientific or technological uncertainty,

More information

MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES

MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES Jey K. JEYAPALAN, Dr. Jeyapalan & Associates, (USA), jkjeyapalan@earthlink.net ABSTRACT Most underground cable owners would

More information

TUMARIA RESERVOIR Report

TUMARIA RESERVOIR Report 1 TUMARIA RESERVOIR Report Uttarakhand State spreads over an area of about 5.566 Mha. It is bounded by Himalayan range in north. The population of state is over 8 million. It has hilly Bhavar and Tarai

More information

Application of Satellite Imagery for Rerouting Electric Power Transmission Lines

Application of Satellite Imagery for Rerouting Electric Power Transmission Lines Application of Satellite Imagery for Rerouting Electric Power Transmission Lines T. LUEMONGKOL 1, A. WANNAKOMOL 2 & T. KULWORAWANICHPONG 1 1 Power System Research Unit, School of Electrical Engineering

More information

Overview of the C-NLOPB and the Can-NL Offshore Oil and Gas Industry. Sean Kelly MA, APR, FCPRS May 15, 2017

Overview of the C-NLOPB and the Can-NL Offshore Oil and Gas Industry. Sean Kelly MA, APR, FCPRS May 15, 2017 Overview of the C-NLOPB and the Can-NL Offshore Oil and Gas Industry Sean Kelly MA, APR, FCPRS May 15, 2017 Safety Moment - Working in the harshest environment in the world demands the highest regard for

More information

Urban Classification of Metro Manila for Seismic Risk Assessment using Satellite Images

Urban Classification of Metro Manila for Seismic Risk Assessment using Satellite Images Urban Classification of Metro Manila for Seismic Risk Assessment using Satellite Images Fumio YAMAZAKI/ yamazaki@edm.bosai.go.jp Hajime MITOMI/ mitomi@edm.bosai.go.jp Yalkun YUSUF/ yalkun@edm.bosai.go.jp

More information

Irrigation tanks becoming Important Bird Areas Study of three tanks in Mysore city : Kukkarahalli, Ligambudhi, Karanji lakes

Irrigation tanks becoming Important Bird Areas Study of three tanks in Mysore city : Kukkarahalli, Ligambudhi, Karanji lakes Irrigation tanks becoming Important Bird Areas Study of three tanks : Kukkarahalli, Ligambudhi, Karanji lakes Marion LECONTE Université Lumière Lyon 2 (France), Laboratoire EVS Environnement-Ville-Société.

More information

Responsibilities of parish cemetery operators The Archdiocese has created a set of regulations for parish operators of a cemetery (see Appendix A).

Responsibilities of parish cemetery operators The Archdiocese has created a set of regulations for parish operators of a cemetery (see Appendix A). POLICY 7.5 Cemeteries In the teachings of the Catholic Church, burying the dead is understood to be one of the seven corporal works of mercy (Mt. 25: 31-46). For millennia, the Catholic cathedral and parish

More information

Spectrum Utilization Policy Decisions for the Band MHz

Spectrum Utilization Policy Decisions for the Band MHz December 2012 Spectrum Management and Telecommunications Spectrum Utilization Policy Decisions for the Band 1435-1525 MHz Aussi disponible en français PS 1435 MHz Contents 1. Intent... 1 2. Background...

More information

Section 1. Introduction

Section 1. Introduction Overview of Manual Acknowledgements i x Section 1. Introduction 1.0 Overview of Section 1 1-1 1.1 The GESC and DESC Permits 1-2 1.2 Reasons for the GESC and DESC Permits 1-2 1.3 Legislative Mandate 1-3

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

population and housing censuses in Viet Nam: experiences of 1999 census and main ideas for the next census Paper prepared for the 22 nd

population and housing censuses in Viet Nam: experiences of 1999 census and main ideas for the next census Paper prepared for the 22 nd population and housing censuses in Viet Nam: experiences of 1999 census and main ideas for the next census Paper prepared for the 22 nd Population Census Conference Seattle, Washington, USA, 7 9 March

More information

ASSESSMENT REPORT. Regarding Community concerns in relation to IFC s enso Hydro Project (#30979) in Albania. November 2015

ASSESSMENT REPORT. Regarding Community concerns in relation to IFC s enso Hydro Project (#30979) in Albania. November 2015 ASSESSMENT REPORT Regarding Community concerns in relation to IFC s enso Hydro Project (#30979) in Albania November 2015 Office of the Compliance Advisor Ombudsman (CAO) for the International Finance Corporation

More information

Field size estimation, past and future opportunities

Field size estimation, past and future opportunities Field size estimation, past and future opportunities Lin Yan & David Roy Geospatial Sciences Center of Excellence South Dakota State University February 13-15 th 2018 Advances in Emerging Technologies

More information

Orbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018

Orbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018 Community Information Sessions 18 & 19 September 2018 Site location 9/14/2018 2 Ownership Update APA Orbost Gas Plant Pty Ltd (APA) purchased the plant and the export pipeline from Cooper Energy (CoE)

More information

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District February 2, 04 MEMORANDUM TO: FROM: File Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District SUBJECT: Proposed minimum

More information

Basic Surveying. Kabul, Afghanistan February 2011

Basic Surveying. Kabul, Afghanistan February 2011 Basic Surveying Kabul, Afghanistan February 2011 1 This watershed rehabilitation and restoration training was prepared by the U.S. Department of Agriculture (USDA) team of Jon Fripp (Civil Engineer USDA/NRCS),

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

Sector Delaware Bay/District 5NR - Coast Guard Auxiliary Patrol Areas. Eastern Area

Sector Delaware Bay/District 5NR - Coast Guard Auxiliary Patrol Areas. Eastern Area Enclosure (2) to SECDELBAYINST 16790.1F Sector Delaware Bay/District 5NR - Coast Guard Auxiliary Patrol Areas STA Manasquan Inlet: (Div 16) Eastern Area Station (Small) Shark River: AREA 1 Shark River

More information

J.F. Shea Co. collection,

J.F. Shea Co. collection, http://oac.cdlib.org/findaid/ark:/13030/c83n2859 No online items Finding aid prepared by Gina C Giang. Manuscripts Department The Huntington Library 1151 Oxford Road San Marino, California 91108 Phone:

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

Aquaculture Regulation CHAPTER ONE Purpose, Scope, Legal Basis, and Definitions

Aquaculture Regulation CHAPTER ONE Purpose, Scope, Legal Basis, and Definitions Purpose Aquaculture Regulation CHAPTER ONE Purpose, Scope, Legal Basis, and Definitions ARTICLE 1 The purpose of this Regulation is to ensure planned investments and efficient production control in aquaculture

More information

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider.

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider. Nate Hatleback Project Manager City of Thornton 303 538 7694 Nate.Hatleback@cityofthornton.net Re: Topgolf Review The City of Thornton has provided comments regarding several submittals on June 14 th,

More information

Wanaket Wildlife Area BCS number: 48-30

Wanaket Wildlife Area BCS number: 48-30 Oregon Coordinated Aquatic Bird Monitoring: Description of Important Aquatic Bird Site Wanaket Wildlife Area BCS number: 48-30 Site description author(s) M. Cathy Nowak, ODFW, Ladd Marsh Wildlife Area

More information

PWC SUMMER INTERN JOB DESCRIPTIONS 2019

PWC SUMMER INTERN JOB DESCRIPTIONS 2019 PWC SUMMER INTERN JOB DESCRIPTIONS 2019 Finance Division Accounting/Audit Internal Auditor/Accounting Clerk: Student should be working toward a degree in Finance, Accounting or Business. Duties include

More information

BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS

BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS NON-AGENDA September 1, 2017 Board Policy: EL-7 Communication and Support to the Board The BAOs shall inform and support the Board in its work. Page # CEO BULLETIN / NEWSLETTERS 4 CEO Bulletin: 08/25/17

More information

2007 Year Review File: c Date: December Slide Location

2007 Year Review File: c Date: December Slide Location 2007 YEAR REVIEW OF GEOHAZARD SITES TABLE 1: LISTING OF SITES AND RISK ASSESSMENT (2007) Slide Site Name 2007 Active Inactive Site GP1 Hwy 40:42 Wapiti Hill (5 km S. of Wapiti River Bridge) 11 * 4 44 GP2

More information

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District

Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District February 4, 2003 MEMORANDUM TO: FROM: SUBJECT: File Doug Leeper, Senior Environmental Scientist Resource Conservation and Development Department Southwest Florida Water Management District Proposed minimum

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

PROJECT LOCATION PROJECT DESCRIPTION

PROJECT LOCATION PROJECT DESCRIPTION APPLICATION: Environmental Authorisation for Prospecting Activities REF NO: NW 12443 PR APPLICANT: Khuma Mining and Exploration (Pty) Ltd MINERALS: Gold, Silver and associated precious metals LOCATION:

More information

LOON FLOATING NEST PLATFORMS 2014 ANNUAL REPORT

LOON FLOATING NEST PLATFORMS 2014 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 507 LOON FLOATING NEST PLATFORMS 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 September 2015 PUGET SOUND

More information

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus Surveying Unit-II Important Questions Define Surveying and Leveling Differentiate between Surveying and Leveling. Explain fundamental Principles of Surveying. Explain Plain and Diagonal Scale. What is

More information

Remarks by Mr. Sun Chengyong. Head of Delegation. Ministry of Science and Technology, China. May 15-16, 2017

Remarks by Mr. Sun Chengyong. Head of Delegation. Ministry of Science and Technology, China. May 15-16, 2017 Remarks by Mr. Sun Chengyong Head of Delegation Ministry of Science and Technology, China the 2 nd Annual Multi-Stakeholder Forum on Science, Technology and Innovation for Sustainable Development May 15-16,

More information

Scientific and Technological (S&T) Activities of Provincial Governments and Provincial Research Organizations, 2000/2001 to 2004/2005

Scientific and Technological (S&T) Activities of Provincial Governments and Provincial Research Organizations, 2000/2001 to 2004/2005 Catalogue no. 88F0006XIE No. 004 ISSN: 1706-8967 ISBN: 0-662-43525-7 Working Paper Science, Innovation and Electronic Information Division Scientific and Technological (S&T) Activities of Provincial Governments

More information

Biographies: Members of the TSM Independent Review Task Force

Biographies: Members of the TSM Independent Review Task Force Biographies: Members of the TSM Independent Review Task Force Dr. Michael Davies, P.Eng/P.Geo Dr. Michael Davies has an undergraduate degree in Geological Engineering along with Masters and PhD degrees

More information

ONLINE MAPPING PROJECT How to Use the Online Historical Maps of Snohomish County

ONLINE MAPPING PROJECT How to Use the Online Historical Maps of Snohomish County ONLINE MAPPING PROJECT - 2017 How to Use the Online Historical Maps of Snohomish County The mapping system available throughout LOSCHO is extremely powerful designed to allow the user to answer virtually

More information

Fall 2001 Whooping Crane Migrational Survey Protocol Implementation Report

Fall 2001 Whooping Crane Migrational Survey Protocol Implementation Report Fall 2001 Whooping Crane Migrational Survey Protocol Implementation Report Prepared by Executive Director s Office For Committee s of the Platte River Cooperative Agreement June 5, 2002 I. Introduction

More information

BACKGROUND INFORMATION

BACKGROUND INFORMATION Build an Island INTRODUCTION For this assignment, you will be creating a topographic map and three-dimensional model of a fictional island that you have designed. You will start by exploring some basic

More information

Item 10F 1 of 87

Item 10F 1 of 87 MEETING DATE: June 8, 2016 PREPARED BY: Jim Gilliam, Arts Administrator DEPT. DIRECTOR: Karen P. Brust DEPARTMENT: City Manager s Office CITY MANAGER: Karen P. Brust SUBJECT: Proposal for Public Art at

More information

McKay Creek National Wildlife Refuge BCS number: 48-19

McKay Creek National Wildlife Refuge BCS number: 48-19 Oregon Coordinated Aquatic Bird Monitoring: Description of Important Aquatic Bird Site McKay Creek National Wildlife Refuge BCS number: 48-19 Site description author(s) Howard Browers, Supervisory Wildlife

More information

NWP of 9 Enclosure

NWP of 9 Enclosure A l b a n y Linn County Tax Lots S03W8BD0050 S03W8BA003 S03W8BA00700 Albany, OR 973 G e o R e s o u r c e s, L L C 000 0 000 000 Feet Scale: :,000 FIGURE : LOCATION MAP Scale: " =,000' Source: Albany GIS

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

SITE PLAN APPLICATION

SITE PLAN APPLICATION SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Sediment Transport Workshop, Utah State University, 1 August 2017 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I. Goals for learning and discussion:

More information

Rattling Brook Hydro Plant Refurbishment. Table of Contents. 1.0 Introduction Background Electrical Works...7

Rattling Brook Hydro Plant Refurbishment. Table of Contents. 1.0 Introduction Background Electrical Works...7 Table of Contents Page 1.0 Introduction...1 2.0 Background...2 3.0 Civil Works...3 3.1 Penstock...3 3.1.1 Optimum Penstock Diameter...4 3.1.2 Penstock Replacement Options...4 3.2 Surge Tank...5 3.3 Civil

More information

Western Gas Partners, LP. Third-Quarter Review. November 12, 2008

Western Gas Partners, LP. Third-Quarter Review. November 12, 2008 Western Gas Partners, LP November 12, 2008 Western Gas Partners, LP Cautionary Language Re: Forward-Looking Statements This presentation contains forward-looking statements within the meaning of Section

More information

Discovery Report Appendix L Dams and Floodplain Structures Lake Ontario St. Lawrence Watershed HUC

Discovery Report Appendix L Dams and Floodplain Structures Lake Ontario St. Lawrence Watershed HUC Discovery Report Appendix L Dams and Floodplain Structures Lake Ontario St. Lawrence Watershed HUC 04150309 July 2016 Federal Emergency Management Agency Department of Homeland Security 26 Federal Plaza

More information

Eastern Seaboard Development Program

Eastern Seaboard Development Program IV JICA/OECF Joint Evaluation Thailand Eastern Seaboard Development Program Project Sites Laemchabang 1. Background and Objectives of Evaluation Survey Through the Japan International Cooperation Agency

More information

SECOND LAO CENSUS OF AGRICULTURE

SECOND LAO CENSUS OF AGRICULTURE SECOND LAO CENSUS OF AGRICULTURE 2010-2011 Savanh Hanphom Deputy Director General Department of Planning Ministry of Agriculture and Forestry Twenty-forth Session Asia and Pacific Commission on Agricultural

More information

MONITORING RUBBLE-MOUND COASTAL STRUCTURES WITH PHOTOGRAMMETRY

MONITORING RUBBLE-MOUND COASTAL STRUCTURES WITH PHOTOGRAMMETRY ,. CETN-III-21 2/84 MONITORING RUBBLE-MOUND COASTAL STRUCTURES WITH PHOTOGRAMMETRY INTRODUCTION: Monitoring coastal projects usually involves repeated surveys of coastal structures and/or beach profiles.

More information

Subject: Recreational Use Survey Data Report Demens Channel

Subject: Recreational Use Survey Data Report Demens Channel A Technical Memorandum To: From: Stormwater Quality Standards Task Force CDM Date: Subject: Recreational Use Survey Data Report Demens Channel Introduction To support basin planning efforts in the Santa

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

September 16, Hi,

September 16, Hi, September 16, 2014 State of New Jersey Department of Environmental Protection Natural Heritage Data Request Form The New Jersey Natural Heritage Program DEP-Office of Natural Lands Management Mail Code

More information

C. A. D. STANDARDS. Projection. NAD 1983 Rhode Island State Plane US Feet. Scale 1 = 100. Layers. Appendix H - 1

C. A. D. STANDARDS. Projection. NAD 1983 Rhode Island State Plane US Feet. Scale 1 = 100. Layers. Appendix H - 1 C. A. D. STANDARDS The Authority requires that all CAD drawings be submitted in accordance to the following standards. Using these standards will allow the Authority to efficiently import and attribute

More information

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT)

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Annex III - 3 Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Desiring to promote international transport of goods and passengers through

More information

McKenzie Trails (good for loons, ducks, herons, osprey, kingfisher, warblers, sparrows, beaver, muskrat)

McKenzie Trails (good for loons, ducks, herons, osprey, kingfisher, warblers, sparrows, beaver, muskrat) Directions to Various Birding Places in Red Deer By Judy Boyd Speaker at Bird Study Group meeting March 7, 2007. Kerry Wood Nature Centre Just after Gasoline Alley on hwy 2, go north on Gaetz Ave. Follow

More information

Parkland, FL Eruv. Boundaries: North: Loxahatchee Canal till 441and SW 18 th till turnpike South: Sawgrass East: Tunrpike West: Wall at Everglades

Parkland, FL Eruv. Boundaries: North: Loxahatchee Canal till 441and SW 18 th till turnpike South: Sawgrass East: Tunrpike West: Wall at Everglades Boundaries: North: Loxahatchee Canal till 441and SW 18 th till turnpike South: Sawgrass East: Tunrpike West: Wall at Everglades DRIVING DIRECTIONS FOR ONE PERSON TO CHECK EVERYTHING Starting Point: Closed

More information

Tiered Species Habitats (Terrestrial and Aquatic)

Tiered Species Habitats (Terrestrial and Aquatic) Tiered Species Habitats (Terrestrial and Aquatic) Dataset Description Free-Bridge Area Map The Department of Game and Inland Fisheries (DGIF s) Tiered Species Habitat data shows the number of Tier 1, 2

More information