1 Available Transfer Capability (ATC) EE 521 Analysis of Power Systems Chen-Ching Liu Washington State University i
2 Available Transfer Capability (ATC) ATC measures the residual transfer capability in the physical transmission i network for the purpose of further commercial activity over existing transmission commitments.
3 Transmission commitments Recallable transmission service: Transmission service which a transmission provider has the right to interrupt in whole or in part under the terms and conditions of the open access transmission tariff. Non-recallable transmission service: Transmission service which cannot be interrupted by a transmission provider for economic reasons, but that can be curtailed for reliability reasons.
4 Transmission commitments (cont.) Non-recallable transmission service has priority over recallable transmission service. Reserved(or scheduled) recallable transfers may be recalled for non-recallable transfer requests.
5 Transmission Reliability Margin (TRM) TRM is kind of a safety margin to ensure reliable system operation as system conditions change. Uncertainty exists in future system topology, load demand and power transactions. TRM could be 8% or 10% of the Total Transfer Capability (TTC).
6 NERC: Available Transfer Capability (ATC) MW A->B Nonrecallable Reserved TRM Recallable Scheduled Recallable ATC TRM Nonrecallable ATC Recallable ATC Recallable Reserved Transmission Reliability Margin Nonrecallable Available Transfer Capability Total Transfer Capability (TTC) ATC measures the residual transfer capability in the physical transmission network for the purpose of further commercial activity over existing transmission commitments. Nonrecallable Scheduled Nonrecallable Reserved Operating Horizon Planning Horizon Time
7 NERC: Available Transfer Capability (ATC) ATC is mathematically defined as the Total Transfer Capability (TTC) less the Transmission Reliability Margin (TRM), less the sum of committed transmission uses including retail customer service and the Capacity Benefit Margin (CBM*). ATC = TTC TRM Existing Transmission i Commitments t * Capacity Benefit Margin: CBM is defined as that amount of transmission transfer capability reserved by load serving entities to ensure access to generation from interconnected systems to meet generation reliability requirements. Its use is intended only for the time of emergency generation deficiencies.
8 Total Transfer Capability (TTC) Power system conditions Critical contingencies Parallel path flows Non-simultaneous and simultaneous transfers Transmission line capacities
9 Procedure to calculate TTC 1. Start with a base case power flow 2. Increase generation in area A and dincrease demand din area B by the same amount 3. Check the normal thermal, stability and voltage constraints 4. Evaluate the first contingency event and ensure that the emergency operating limits are met 5. When the emergency limit is reached for a first contingency, the corresponding (pre-contingency) transfer amount from area A to area B is the TTC
10 Example [2] Calculate ATC from area A to area B. It is assumed that one of two lines between area A and area C is the critical single contingency. Area A Thermal Limit: 2 x 1100 MW Thermal Limit: 2 x 1000 MW Area B Thermal Limit: it Area C 2 x 1000 MW
11 1. Base case power flow. Example [2] Area A 100 MW 100 MW 100 MW 100 MW Area B 100 MW 100 MW Area C
12 Example [2] 2. Increase generation in area A and increase demand in area B by the same amount. Net power transferred from area A to area B in the base case : 2834 MW Increase generation in area A by 2834 MW. 750 MW Area A 667 MW 667 MW 750 MW Increase demand in area B by 2834 MW. Area B 667 MW 667 MW Area C
13 Example [2] 3. Check the normal thermal, stability and voltage constraints. 4. Evaluate the first contingency event and ensure that the emergency operating limits are met. 5. When the emergency limit is reached for a first contingency, the corresponding (pre-contingency) transfer amount from area A to area B is the TTC. Area A Fault on line 917 MW 1000 MW 917 MW Area B 500 MW 500 MW Area C
14 First Contingency Incremental Transfer Capability (FCITC) First Contingency Total Transfer Capability (FCTTC) First Contingency Incremental Transfer Capability (FCITC) is the amount of electric power, incremental above normal base power transfers that can be transferred over the interconnected transmission systems in a reliable manner First Contingency Total Transfer Capability (FCTTC) is the sum of normal base power transfers and FCITC. FCTTC is the total amount of electric power that can be transferred between two areas of the interconnected transmission systems in a reliable manner
15 Calculation of FCTTC and FCITC FCTTC : Net power transferred from area A to area B at thermal limit = 2834 MW FCITC = FCTTC - the scheduled power transferred from area A to area B in the base case = 2834 MW 0 MW = 2834 MW
16 Conclusions ATC measures the residual transfer capability in the physical transmission network for the purpose of further commercial activity over existing transmission commitments. ATC and TTC depends on system generation dispatch and system load level, power transfers between areas, network topology, and the limits imposed on the transmission network due to thermal, voltage and stability constraints The purposes of ATC s: to deliver electric power reliably to provide flexibility for changing g system conditions to reduce the need for installed generating capacity to allow trading of electric power among systems
17 References 1. North American Electric Reliability Council, Available Transfer Capability Definitions and Determination, June North American Electric Reliability Council, Transmission Transfer Capability, May 1995.
Standard MOD Area Interchange Methodology
A. Introduction 1. Title: Area Interchange Methodology 2. Number: MOD-028-2 3. Purpose: To increase consistency and reliability in the development and documentation of Transfer Capability calculations
More informationTTC/ATC 1.0 DEFINITIONS
TTC/ATC In this section: Definitions Total Transfer Capability (TTC) Available Transfer Capability (ATC) Counterflow ATC Postbacks in Pre-schedule of Grandfathered Agreements Real-Time Grant Remaining
More informationTechnical Challenges of Computing Available Transfer Capability (ATC) in Electric Power Systems
Technical Challenges of Computing Available Transfer Capability (ATC) in Electric Power Systems Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign
More informationFOUR TOTAL TRANSFER CAPABILITY. 4.1 Total transfer capability CHAPTER
CHAPTER FOUR TOTAL TRANSFER CAPABILITY R structuring of power system aims at involving the private power producers in the system to supply power. The restructured electric power industry is characterized
More informationPower Transfer Distribution Factor Estimate Using DC Load Flow Method
Power Transfer Distribution Factor Estimate Using DC Load Flow Method Ravi Kumar, S. C. Gupta & Baseem Khan MANIT Bhopal E-mail : ravi143.96@rediffmail.com, scg.nit.09@gmail.com, baseem.khan04@gmail.com
More informationNortheast Power Coordinating Council, Inc. Glossary of Terms. Approved by the Reliability Standards Committee
Northeast Power Coordinating Council, Inc. Glossary of Terms Approved by the Reliability Standards Committee October 26, 2011 Revision History Version Date Action Change Tracking (New, Errata or Revisions)
More informationPlanning Criteria. Revision 1.4 MAINTAINED BY: Transmission Working Group System Protection and Control Working Group Supply Adequacy Working Group
Planning Criteria Revision 1.4 MAINTAINED BY: Transmission Working Group System Protection and Control Working Group Supply Adequacy Working Group PUBLISHED: 10/9/2017 LATEST REVISION: Effective 7/25/2017
More informationTransmission Services
Available Transfer Capability Implementation Document MOD-001-1a 1. Purpose The Available Transfer Capability Implementation Document (ATCID) provides for the documentation of required information as specified
More informationVAR Outreach Presentation
VAR Outreach Presentation Soo Jin Kim, NERC Standards Developer November 4, 2013 Administrative Items NERC Antitrust Guidelines It is NERC s policy and practice to obey the antitrust laws and to avoid
More informationTransmission Services
Available Transfer Capability Implementation Document MOD-001-1a 1. Purpose The Available Transfer Capability Implementation Document (ATCID) provides for the documentation of required information as specified
More informationTTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line
TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line Vince Leung March 27, 2017 Reviewed by Johnny Nguyen Table of Contents Background 2 Objective 3 Base Case Assumptions
More informationEnhancement of Available Transfer Capability by the use of UPFC in Open Power Market
INDIAN INSTITUTE OF TECHNOLOGY KHARAGUR 7 DECEMBER 7-9 46 Enhancement of Available Transfer Capability by the use of UFC in Open ower Maret K.S.Verma Abstract- In deregulated power systems Available transfer
More informationLecture 15 EMS Application II Automatic Generation Contol. Davood Babazadeh
Lecture 15 EMS Application II Automatic Generation Contol Davood Babazadeh 2015-12-03 Outline Generation Control - Why - How AGC design - Area Control Error - Parameter Calculation 2 Course road map 3
More informationDUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning
DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation
More informationTable 1 - Assignment of BA Obligations... 8
Dynamic Transfer Reference Guidelines Version 2 June 2010 Table of Contents Table of Contents Chapter 1 Overview... 3 Purpose... 3 Terms... 3 Chapter 2 Dynamic Schedule Versus Pseudo-tie Fundamentals...
More informationAMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Ameren Missouri, Ameren Illinois, and Ameren Transmission Company of Illinois)
AMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Missouri, Illinois, and Transmission Company of Illinois) TRANSMISSION PLANNING CRITERIA AND GUIDELINES March 28, 2003 Revised April
More informationATTACHMENT Y STUDY REPORT
Dynegy Marketing and Trade, LLC Wood River Units 4 & 5: 473 MW Retirement: June 1, 2016 ATTACHMENT Y STUDY REPORT March 23, 2016 PUBLIC / REDACTED PUBLIC VERSION EXECUTIVE SUMMARY An Attachment Y notification
More informationModule 7-4 N-Area Reliability Program (NARP)
Module 7-4 N-Area Reliability Program (NARP) Chanan Singh Associated Power Analysts College Station, Texas N-Area Reliability Program A Monte Carlo Simulation Program, originally developed for studying
More informationMonitored Facilities: Dorsey-Roseau 500kV line Glenboro-Rugby 230kV line Richer-Roseau 230kV line Letellier-Drayton 230kV line
MISO Investigation Report on the NERC TLR Level 5 Event Manitoba Hydro Flowgate 6002: MHEX_S Interface October 26, 2007 Report submitted to NERC on: November 21, 2007 This report is submitted in accordance
More information[Thota*, 4(8): August, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785
IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY GENETIC ALGORITHM BASED AVAILABLE TRANSFER CAPABILITY CALCULATIONS Thota Swathi*, K.Vimala Kumar M.Tech student, Department of
More informationIntegration of Wind Generation into Weak Grids
Integration of Wind Generation into Weak Grids Jason MacDowell GE Energy Consulting NERC ERSTF Atlanta, GA December 10-11, 2014 Outline Conventional and Power Electronic (PE) Sources Stability limitations
More informationMerchant Transmission and the Reliability of the New York State Bulk Power System Part I: Thermal Transfer Limit Analysis
1 Merchant Transmission and the Reliability of the New York State Bulk Power System Part I: Thermal imit Analysis Mahmoud K. Elfayoumy 1, Member, IEEE, Ramon R. Tapia 2, Member, IEEE, and Roger Clayton
More informationDocument C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting
Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.
More informationMidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above
MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above March 13, 2018 Issued by: Dehn Stevens, Director System Planning and Services 1.0 SCOPE This document defines the criteria
More informationTitle: Path 24, Sierra Summit (PG&E) Intertie Number: NVN TOP 019. TOP Response to Transmission Limit Violations
NV Energy Electrical System Control Center Title: Path 24, Sierra Summit (PG&E) Intertie Number: NVN TOP 019 TOP 008 1 Response to Transmission Limit Violations NERC Standards: EOP 001 0 Emergency and
More informationOPERATING PROCEDURE. Table of Contents
Table of Contents PURPOSE... 1 1.0 CAISO DISPATCHER RESPONSIBILITIES... 2 Monitor Loads and Generators... 2 Monitor Balancing Areas... 2 Operate CAISO Controlled Grid Voltage Equipment... 3 Voltage Schedules...
More informationFrequency Response Characteristic Survey Training Document
Frequency Response Characteristic Survey Training Document Training Document Subsections Frequency Response Characteristic Response to Internal and External Generation/Load Imbalances Frequency Bias versus
More informationArea Control Error (ACE) Equation Special Cases
Area Control Error (ACE) Equation Special Cases Purpose: It is the obligation of each Balancing Authority to manage its Area Control Error in accordance with NERC reliability standards. This Standard provides
More informationATC ENHANCEMENT THROUGH OPTIMAL PLACEMENT OF TCSC USING WIPSO TECHNIQUE
ATC ENHANCEMENT THROUGH OPTIMAL PLACEMENT OF TCSC USING WIPSO TECHNIQUE R. Sripriya and R. Neela Department of Electrical Enneering, Annamalai University, India E-Mail: sripriyavineeth@gmail.com ABSTRACT
More informationITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/
ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...
More informationCentral Hudson Gas & Electric Corporation. Transmission Planning Guidelines
Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents
More informationGrid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017
Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the
More informationImplementation Plan Project Alignment of Terms
Revisions to Defined Terms in the NERC Glossary of Terms Used in Reliability Standards The drafting team proposes modifying the following Glossary of Terms definitions: Blackstart Resource
More informationStability Issues of Smart Grid Transmission Line Switching
Preprints of the 19th World Congress The International Federation of Automatic Control Stability Issues of Smart Grid Transmission Line Switching Garng. M. Huang * W. Wang* Jun An** *Texas A&M University,
More informationEffect of Topology Control on System Reliability: TVA Test Case
21, rue d Artois, F-758 PARIS CIGRE US National Committee http : //www.cigre.org 214 Grid of the Future Symposium Effect of Topology Control on System Reliability: TVA Test Case X. LI P. BALASUBRAMANIAN
More informationROSE - Real Time Analysis Tool for Enhanced Situational Awareness
ROSE - Real Time Analysis Tool for Enhanced Situational Awareness Marianna Vaiman V&R Energy Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved. WECC JSIS Salt Lake City, UT October
More informationTable of Contents Error! Bookmark not defined.
Table of Contents Table of Contents... 1 Introduction... 2 Background... 2 Rationale by Requirement... 204 Requirement 1... 204 Background and Rationale... 204 Requirement 2... 268 Background and Rationale...
More informationNPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements
NPCC Regional Reliability Reference Directory # 12 Under frequency Load Shedding Program Requirements Task Force on System Studies Revision Review Record: June 26 th, 2009 March 3 rd, 2010 Adopted by the
More informationStandard VAR Voltage and Reactive Control
A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-3 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained within
More informationOverview. The Principles of Power System Operation module presents the following topics:
Course Outline 1. Introduction to WECC 2. Fundamentals of Electricity 3. Power System Overview 4. Principles of Generation 5. Substation Overview 6. Transformers 7. Power Transmission 8. System Protection
More informationVoltage and Reactive Procedures CMP-VAR-01
Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationA. Introduction. VAR Voltage and Reactive Control
A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4.2 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained
More informationVAR Voltage and Reactive Control
VAR-001-4 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are
More informationVAR Voltage and Reactive Control. A. Introduction
VAR-001-5 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-5 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are
More informationGridLiance Reliability Criteria
GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances
More informationIndustry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017
Industry Webinar Reactive Power Planning NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Webinar Topics Reliability Guideline on Reactive Power Planning Webinar Topics Fundamentals of
More informationRajasthan Technical University, Kota
COURSE FILE POWER SYSTEM ENGINEERING Name Branch Session Semester : Dr. Dinesh Birla : Electrical Engineering : 2012-13, Odd Semester : B. Tech VII Semester Index: Course File Sr. No. 1 Students Detail
More informationGeoff Brown & Associates Ltd
Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared
More informationE N G I N E E R I N G M A N U A L
1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn
More informationLinear State Estimation
Linear State Estimation Marianna Vaiman, V&R Energy marvaiman@vrenergy.com WECC JSIS Meeting Salt Lake City, UT October 15 17, 2013 Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved.
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationAlberta Reliability Standard Frequency Response and Frequency Bias Setting BAL-003-AB-1.1
1. Purpose The purpose of this reliability standard is to: (a) require sufficient frequency response from the ISO to maintain Interconnection frequency within predefined bounds by arresting frequency deviations
More informationRecently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.
December 7 th, 2010 NPCC Full Member Committee; Please find attached a draft revised NPCC Regional Reliability Directory #12 Underfrequency Load Shedding Program Requirements and a draft revised NPCC UFLS
More informationMonitoring and Situational Awareness Conference. Improving EMS Reliability Denver, CO September 18, 2013
Monitoring and Situational Awareness Conference Hani Alarian Improving EMS Reliability Denver, CO September 18, 2013 Director, Power Systems Technology Operations, CAISO California ISO by the numbers 57,963
More informationFrequency Response Standard Background Document November, 2012
Frequency Response Standard Background Document November, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of Contents... 1 Introduction...
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-17. BC - ALBERTA INTERCONNECTION Supersedes 7T-17 dated 07 January 2015
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-17 BC - ALBERTA INTERCONNECTION Supersedes 7T-17 dated 07 January 2015 Review Year: 2019 APPROVED BY: Original signed by: Paul Choudhury, General Manager,
More informationSystem Operating Limit Definition and Exceedance Clarification
System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion
More informationRELIABILITY: Our Advantages, Challenges, and Opportunities
RELIABILITY: Our Advantages, Challenges, and Opportunities NERC Reliability Leadership Summit March 21, 2017 Edmund O. Schweitzer, III Ph.D. President, Schweitzer Engineering Laboratories, Inc. Copyright
More information(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in
A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationAugust 25, 2017 VIA ELECTRONIC FILING
!! August 25, 2017 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation
More informationVoltage Stability Assessment at the EMS
Voltage Stability Assessment at the EMS Jay Giri i-pcgrid San Francisco, March 26 th, 2013 GRID EMS Overview DSA Integration Load Load (area) meas. Forecast SCADA AGC Division Load & Loss Status & Analog
More informationHOOSIER ENERGY REC, INC. Requirements for Connection of Generation Facilities. to the HE Transmission System
HOOSIER ENERGY REC, INC Requirements for Connection of Generation Facilities to the HE Transmission System January 2009 Table of Contents 1.0 INTRODUCTION...1 2.0 TYPES OF CONNECTED CIRCUIT CONFIGURATIONS...6
More informationAugust 25, Please contact the undersigned if you have any questions concerning this filing.
!! August 25, 2017 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric
More informationEnergy-Based Damping Evaluation for Exciter Control in Power Systems
Energy-Based Damping Evaluation for Exciter Control in Power Systems Luoyang Fang 1, Dongliang Duan 2, Liuqing Yang 1 1 Department of Electrical & Computer Engineering Colorado State University, Fort Collins,
More informationEE 742 Chapter 9: Frequency Stability and Control. Fall 2011
EE 742 Chapter 9: Frequency Stability and Control Fall 2011 Meeting demand with generation Large and slow changes (24 hr) in power demand are met by unit commitment Medium and relatively fast changes (30
More informationCAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24
RC0120A - RC IRO-010 Data Specification NOTE: Changes from Peak's Attachment A are highlighted in red in columns C through G Section Category Number Responsible Pa Data Item Data Transfer Method 1.1 Transmission
More informationMETERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE
METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE Author: AXLIU Origination Date: 05/07/2010 Version: 8.3 Revised By: Approver s Name: OXPAIS REROMAK REROMAK 1 PURPOSE Revision Date: 9/12/2016
More informationCalculating and Using Reporting ACE in a Tie Line Bias Control Program
Calculating and Using Reporting ACE in a Tie Line Bias Control Program Introduction: Tie Line Bias 1 (TLB) control has been used as the preferred control method in North America for 75 years. In the early
More informationCOS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1
Outage Coordination Process Version 1.0 NERC Reliability Standard IRO-017-1 COS MANUAL March 24, 2017 www.peakrc.com. Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...
More information15.2 Rate Schedule 2 - Payments for Supplying Voltage Support Service
15.2 Rate pport Service This Rate Schedule applies to payments to Suppliers who provide Voltage Support Service to the ISO. Transmission Customers and Customers will purchase Voltage Support Service from
More informationEstimating the Active Power Transfer Margin for Transient Voltage Stability
1 Estimating the Active Power Transfer Margin for Transient Voltage Stability J. Tong and K. Tomsovic Abstract-- On-line security analysis is one of the important functions for modern power system control
More informationECEN 615 Methods of Electric Power Systems Analysis Lecture 8: Advanced Power Flow
ECEN 615 Methods of Electric Power Systems nalysis Lecture 8: dvanced Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering Texas &M University overbye@tamu.edu nnouncements Read Chapter
More informationSystem Impact Study PID MW Plant
System Impact Study PID 233 150MW Plant Prepared by: Southwest Power Pool Independent Coordinator of Transmission 415 N. McKinley, Suite140 Little Rock, AR 72205 Rev Issue Date Description of Revision
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description
More informationVisualization of Flows and Transfer Capability in Electric Networks
Visualization of Flows and Transfer Capability in Electric Networks Abstract Thomas J. Overbye James D. Weber overbye@uiuc.edu jd-weber@uiuc.edu Department of Computer and Electrical Engineering University
More informationAgenda Item 3h Attachment 9
Agenda Item 3h Attachment 9 BALANCING AND FREQUENCY CONTROL (Part 1) A Technical Concepts Document Prepared by the NERC Resources Subcommittee November 9, 2009 Table of Contents Introduction... 3 Background...
More informationIssued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY
WN U-60 Attachment C to Schedule 152, Page 1 SCHEDULE 152 APPLICATION FOR INTERCONNECTING A GENERATING FACILITY TIER 2 OR TIER 3 This Application is considered complete when it provides all applicable
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationControllable Generation UCAP determination. Eligibility WG September 12, 2017
Controllable Generation UCAP determination Eligibility WG September 12, 2017 Purpose and objective The objectives of this presentation include: Recap the installed capacity (ICAP) and unforced capacity
More informationStandard BAL Frequency Response and Frequency Bias Setting
A. Introduction Title: and Frequency Bias Setting Number: BAL-003-1 Purpose: To require sufficient from the Balancing (BA) to maintain Interconnection Frequency within predefined bounds by arresting frequency
More informationSmart Grid Panel Presentation
Smart Grid Panel Presentation Robert J. Thomas Cornell University PSerc Summer Workshop Lake Tahoe, CA August 4, 2008 Smart Grid Values (Why are we doing this?) Some reasons A more reliable grid - power
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-3 3. Purpose: To ensure generators provide reactive support and voltage control, within generating
More information1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report
1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Rich Bauer Associate Director Reliability Risk Management / Event Analysis Mid C Seminar July 19, 2017 Western Interconnection
More informationCanadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)
Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles involving
More informationFrom: Roger Clayton Re: Notes from FERC DER Technical Conference, April Panel 4 Collection and availability of data on DER installations
Memorandum From: Roger Clayton Re: Notes from FERC DER Technical Conference, April 11 2018 Panel 4 Collection and availability of data on DER installations Q1 Type of information? Q2 Current data & sharing?
More informationImplementation Plan Project Balancing Authority Reliability-based Controls - Reserves
Implementation Plan Project 2010-14.1 Balancing Authority Reliability-based Controls - Reserves Implementation Plan for Approvals Required Prerequisite Approvals None Revisions to Glossary Terms The following
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December
More informationPractical PMU Applications for Utilities
Practical PMU Applications for Utilities University of Washington EE Graduate Seminar November 1 st, 2012 Manu Parashar Douglas Wilson SynchroPhasor Technology Phasor Measurement Units (PMUs) Next generation
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-4 3. Purpose: To ensure generators provide reactive support and voltage control, within generating
More informationAgent-Based Modeling Tools for Electric Power Market Design
Agent-Based Modeling Tools for Electric Power Market Design Implications for Macro/Financial Policy? Leigh Tesfatsion Professor of Economics, Mathematics, and Electrical & Computer Engineering Iowa State
More informationVENTILATION CONTROL OF THE BLANKA TUNNEL: A MATHEMATICAL PROGRAMMING APPROACH
- 19 - VENTILATION CONTROL OF THE BLANKA TUNNEL: A MATHEMATICAL PROGRAMMING APPROACH Pořízek J. 1, Zápařka J. 1, Ferkl L. 1 Satra, Czech Republic Feramat Cybernetics, Czech Republic ABSTRACT The Blanka
More informationDemand Dispatch with Heterogeneous Intelligent Loads
Demand Dispatch with Heterogeneous Intelligent Loads HICSS 5, January 6, 217 Sean P. Meyn Florida Institute for Sustainable Energy Joel Mathias, UF & Ana Bušić, Inria Department of Electrical and Computer
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationOnline Dynamic Assessment of Transmission Ratings for Transmission Constraint Management in Power System and Market Operations
Online Dynamic Assessment of Transmission Ratings for Transmission Constraint Management in Power System and Market Operations Kwok W. Cheung, Ph.D., PE, PMP, FIEEE R&D Director, Network Management Solutions
More informationLONG-RANGE TRANSMISSION PLAN
LONG-RANGE TRANSMISSION PLAN 2011-2020 Transmission and Substation Engineering Department August 15, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY Page i I. OVERVIEW 1 A. Factors Affecting the Long Range Transmission
More informationEndorsed Assignments from ERS Framework
ERSTF Completion Endorsed Assignments from ERS Framework Ref Number Title ERS Recommendatio n Ongoing Responsibility 1 Synch Inertia at Interconnection Level Measure 2 Initial Frequency Deviation Measure
More information