6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

Size: px
Start display at page:

Download "6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room"

Transcription

1 6MSD Weekly Scheduling Meeting 1:30, MCC Conference Room October 26, ) Glance Back and 2-Week Look Ahead (F. Pilat) mins 2) Operations Recovery Status (A. Freyberger) mins 3) Key Service Provider Reports mins (a) Magnet Recovery Effort (K. Baggett) (b) Alignment (C. Curtis) (c) EESIC (O. Garza) (d) Software (M. Bickley) 4) Safety Report (R. Owen)... 2 mins 5) Hall A g2p Status (K. Slifer) mins 6) Meeting Recap and Action Items (All)... 2 mins

2 6MSD: Glance back & look ahead Fulvia Pilat 6MSD Meeting October 26, 2011

3 Progress Wed Oct 12 Wed Oct 26 Weeks: 24 down, 3 to go (24 days to November 19) Highlights: Civil construction, good progress (Tagger wall up possibly at the end of this week) Repair plan for the spreader magnets in progress Operations start-up: excellent progress in some area (i.e. high-current injector set-up) but lots of challenges in the RECO process more on the next talk C100 tests last week, still activity this week Areas of attention: Impact of RECO and system work on the start-up schedule C100 data on micro-phonics and neutron photo-production: impact on the C100 plan for test with beam and operability Overall plan for Hall A at Lab level

4 2 weeks look ahead Final phase of civil work, including Tagger wall Wrap-up of spreader magnets repairs RECO process Beam spin-up in the linacs Test of C100 with beam, then BBU studies Start of CEBAF 5.6 GeV set-up

5 Shut-down (s) Organization Formally 6MSD in place till November 19 Will be followed by a 12MSD Organization Transition phase: Day-to-day organization and priority focused on operations start-up Weekly 6MSD Thursday meetings Lessons learned process: management and technical Input from people, feedback Definition and discussion of 12 MSD Organization

6

7

8 Accelerator 6MSD YR Recovery Effort October 26, 2011

9 Event Overview Two YR magnets overheated while being powered up for the first time Heat level caused epoxy to melt and catch fire LCW valves were not turned on for these two YRs Temperature interlocks did not cause power supply to trip off Three teams assigned to event Investigation Recovery Response All three teams are currently making good progress Recovery going very well

10 Affected Magnets

11 Current Status of Recovery Initial assessment work completed - RADCON and IH assessment of area and clearance/direction to proceed with work effort Initial beam line clean up completed Diagnostic wiring removed Safety System components and wire removed DC power leads and other magnet connections removed Vacuum disconnected 2 YR magnets and 1 AN magnet removed to magnet measurement area And we can now see the light at end of tunnel - 2 YRs from spare inventory QC d and magnetically measured AN magnet repaired and re-measured YRs and AN installed 2A alignment completed Vacuum hooked up. Pump down underway Area diagnostics assessed, repaired and checked out ok DC power systems hooked up LCW hooked up BLMs being hooked up now

12 Re-installation

13 Remaining Effort Oct 24,2011 Oct 25,2012 Oct 26,2013 Oct 27,2014 Oct 28,2015 Monday Tuesday Wednesday Thursday Friday Install Dipoles AN, YRs Survey 2A DC power hookup Survey 2B Vacuum chamber connections Vacuum Pump down Diagnostics hookup Safety Systems Hookup Checklist inspections Complete Checklist inspections An integrated checklist has been put together This will be completed and handed over to accelerator at the completion of the recovery effort The checklist will use archive information from previous work in the spreader areas, expert feedback from the work teams, and input from the investigation team.

14 Shutdown Work Summary Organization: Alignment Name: Chris Curtis Date: 26th Oct, 2011 Last Week Work That Went Better Than / As Expected: Q-Weak target alignment completed, finals to do. Elevation tie between north linac and Tagger area completed. PEPPo initial alignment completed. West arc stack 15 dipole check completed. YR magnet initial alignment completed, finals to do. Hall C HKS removal elevation survey completed. Work That Went Slower Than Expected, Delays, and Issues: Hall D solenoid alignment delayed and re-started Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns 12GeV arcs X October Check on stack 15 dipoles Possibly check again this week 6 Gev machine X Oct 28 YR septa & region alignment This week Hall D X October Solenoid alignment Continuing this week Hall C Q-Weak X Nov Beamline & detector surveys Starting this week 6MSD weekly mtg - Align Oct-26-2 Page 1 of 3

15 Project & Customer Status Completion Tasks Comments/Concerns Hall D X Oct / Nov Berm elevation / photon pipe check Survey checks for contract completion Hall B X Oct / Nov Complete target /beamline Start next week alignment G2p X TBD Harp & Dump fiducialization Harp now available Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns Hall A - G2p X TBD Alignment of articulating Filler work? beamline Hall B X TBD Complete target /beamline Continuing alignment Hall C - Q-Weak X TBD Final alignment of detectors etc. Continuing into November New Work Requests Requiring Schedule Changes: YR area re-alignment Permits Not Already in Hand (hot work, lifting, blind penetrations): None Significant Problems Pending (delays, technical issues, resource issues, scheduling): OK Staffing Outlook: OK 6MSD weekly mtg - Align Oct-26-2 Page 2 of 3

16 6MSD weekly mtg - Align Oct-26-2 Page 3 of 3

17 Shutdown Work Summary Organization: EESIC Name: Omar Garza Date: Last Week Work That Went Better Than Expected: Work That Went Slower Than Expected, Delays, and Issues: Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns Hall C Qweak Cavity Electronics Hall A G2P Low Current BPM Electronics Hall A G2P Diagnostics Hall A G2P Motor Driver Chassis 12Gev SRF Vacuum Instrumentation X Ongoing Building Chassis Parts Order Complete Receiver Brds in Assembly 1 DAC Brd. Assembled X Ongoing Complete PC Brds. <2wks PC Brds. Completed Expedite order In-House assembly X Ongoing Cables completed Awaiting Driver Chassis Harp 1 installed, Harp 2 assembled, YAG assembled & tested X Ongoing Testing Unit delivered to Software X Ongoing SL23, 24, 25 Going Well Shutdown Work Summary Page 1 of 2

18 Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns Injector PePPo Ops AIPBSY (I to V) Module Accelerator Network Firewall Configuration Accelerator Maintenance X Ongoing Beam Scrappers wiring Faraday Cup wiring Viewer wiring completed BPMs X On-hold Assembly, Testing Software X Ongoing Phase I Segment config. Phase II Failover config. Phase III Rules configuration Phase IV Network Implementation X Ongoing Diagnostics SL, BSY Vacuum ACC. Repairs, Hall PM New Work Requests Requiring Schedule Changes: Permits Not Already in Hand (hot work, lifting, blind penetrations): Significant Problems Pending (delays, technical issues, resource issues, scheduling): Staffing Outlook: Will be completed on Friday Parts Complete Brds. Procured Phase I completed Going Well Controls complete BPMs complete Diagnostics complete Shutdown Work Summary Page 2 of 2

19 Shutdown Work Summary Organization: Controls Software Name: Matt Bickley Date: October 26, 2011 Last Week Work That Went Better Than/As Expected: PEPPo: Discriminator/scaler for data acquisition done 12 GeV: Low-level RF done CASA: MO monitor done Work That Went Slower Than Expected, Delays, and Issues: Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns PEPPo X? Viewers Ready to test with hardware PEPPo X? Dipole power supply controls Software development 5o% done; hardware design issues remain 12 GeV X 24-Oct-11 RF screens Ops fault screen installed tomorrow PSS/MPS X 15-Nov-11 CAEN power supply Under development Operations X 1-Nov-11 Control system write logging Wider installation Operations X 1-Nov-11 Confirm network changes do not impact accelerator or endstation operation 6MSD Bickley Page 1 of 2 Testing 80% complete; no problems found G2P X Jan 12 New harp controls Software testing ongoing

20 Project & Customer Status Completion Tasks Comments/Concerns G2P X Jan 12 New BPM controls Position and calibration algorithm to be developed; design out to fab G2P X Jan 12 Viewers Ready to test with hardware G2P X Jan 12 Septum magnet controls Waiting for information for last 5%; Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns 12 GeV X 14-Nov-11 IOC boot management Hall A X Jan 12 IOCs moved to accelerator network Implementation and 80% of testing done; testing remains for 20% Operations X? LCW monitoring Server purchased Operations X 14-Nov-11 Digital image management Camera and network ready; computer to be installed New Work Requests Requiring Schedule Changes: None Permits Not Already in Hand (hot work, lifting, blind penetrations): None Significant Problems Pending (delays, technical issues, resource issues, scheduling): None Staffing Outlook: OK 6MSD Bickley Page 2 of 2

21 g2p Status K. Slifer 10/26/2011

22 Septa Chicane Upside-down Girder Local Dump Polarized Target g2p Configuration Upstream mods Slow raster New BPMs/BCMs Tungsten Calorimeter

23 Polarized Target Status Two shorts to ground Arc to ground, mult. burnt wires Difficult to repair Figs./info courtesy C. Keith

24 Polarized Target Status Two shorts to ground Arc to ground, mult. burnt wires Difficult to repair Figs./info courtesy C. Keith Hall B Poltarg Magnet Feasibility study indicates that Hall B poltarg magnet is compatible with g2p rig Would allow to achieve most physics goals of g2p Retrofitting/testing would probably take till mid-feb.

25 Previously Planned Coverage 57 days : Septa In two highest kinematics require alot of days 54 days : Septa Out 42 days : Transition

26 Previously Planned Coverage 57 days : Septa In two highest kinematics require alot of days 54 days : Septa Out 42 days : Transition Delay to Feb.

27 What we can do with late start & Hall B coils Lose 2 highest Energies extend 2.2 Gev bands to large W Spend additional time on elastic Start commissioning after New year

28 Impact on E Projection for the LT spin polarizability

29 Impact on E We lose the highest interpolated Q 2 point

30 Impact on E Lost overlap Projection for GEp/GMp Lose overlap with large Q 2 run.

31 Installation Status

32 Septa In place, powered, LCW. B vs I curve next week.

33 Slow Raster assembled, in place. Final test needed. Tungsten Calorimeter Calib demonstrated 1% accuracy. Ready for physics Figs courtesy T. Mikalski

34 Chicane FZ VDC (PS) requires AI magnet in series to achieve desirable load on PS FZ VDC (PS) New vacuum chambers to contain beam path for all energy levels Draws from hall LCW for cooling (magnets and PSs) Figs courtesy T. Mikalski

35 Chicane Final full power test and alignment mid-nov. Figs courtesy T. Mikalski

36 Superharp 20 um wire for low current New fork design New controller chassis PC104 w/ new SW expect complete mid-nov. Figs courtesy T. Mikalski

37 BPM/BCM w New Recievers New 4 channel receiver design tailored for low current measurement M15 antenna style BPMs standard BCMs Dynamic Range - ( na) Resolution/Accuracy um Output Rate - 2 khz Bench tests performed. Looks promising. Expect built/tested in mid-nov.

38 g2people Post-Docs 7+ Students Postdocs Jixie Zhang Kalyan Allada James Maxwell Vince Sulkosky Aidan Kelleher Fac/Staff A. Camsonne J.P. Chen Doug Higinbothan Karl Slifer Grad Students Pengia Zhu Min Huan Melissa Cummings Ryan Zielinski Toby Badman Chao Gu Jie Liu

39 Detectors/DAQ Checkout underway. Gas Cer looks ok. 3 channels with low NPE Left extension to be installed. 3 rd Fastbus crate for each arm. Happex DAQ for low noise BPM/BCMs. Local Dump Installed Discussing with Radcon on best way to access. New spectrometer optics Full simulation (SNAKE+GEANT4) Planning for optics commissioning. involving many previous optics and septa experts. Third arm Detector Goal : supplementary 5% measurement of P b P T Scintillator, power supplies, GUI, cabling all identified. Shielding: 30 cm HDPE for line of sight from dump. Testing of PMTs and Scintillator looks good.

40 Summary Assuming Hall B coil package will be scavangeable and GEp runs at 7 degree instead of 20. Reduced target region of uniformity: 3 -> 2 cm DSV Adding in some extra kinematics for g2p at large W We can achieve the bulk of the physics goals of E and E E loses one Q2 point E loses the overlap with high Q2 data.

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room October 12, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service

More information

Installation! of! E (g 2p ) & E (G Ep /G Mp )! in Hall A! during the 6MSD!!"#$%&'(#

Installation! of! E (g 2p ) & E (G Ep /G Mp )! in Hall A! during the 6MSD!!#$%&'(# Installation! of! E08-027 (g 2p ) & E08-007 (G Ep /G Mp )! in Hall A! during the 6MSD!!"#$%&'(# E08-027 (g 2p )!! Measure the inelastic spin structure function g 2 of the proton in the low invariant momentum

More information

Alignment of the 12 GeV CEBAF Accelerator

Alignment of the 12 GeV CEBAF Accelerator Alignment of the 12 GeV CEBAF Accelerator Christopher Curtis Thomas Jefferson National Accelerator Facility, Newport News, Virginia, USA 1 Jefferson Lab Site c.2006 Jefferson Lab Site 2014 CEBAF 12 GeV

More information

CEBAF Overview June 4, 2010

CEBAF Overview June 4, 2010 CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications

More information

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

RF System LSD Work. William Merz

RF System LSD Work. William Merz RF System LSD Work William Merz LSD Re-Baseline Review Jefferson Lab Thomas Jefferson National Accelerator Facility Page 1 Outline What I will talk about 12 GEV RF power system installation and commissioning

More information

PREX- 2 Issues. April 11, Kent Paschke

PREX- 2 Issues. April 11, Kent Paschke PREX- 2 Issues April 11, 2014 Kent Paschke What We Learned in PREX-I What Worked: New Septum We now know how to tune it to optimize FOM A T false asymmetry A T is small (

More information

Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A

Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A This Radiological Safety Analysis Document (RSAD) will identify the general conditions associated

More information

R.Bachimanchi, IPAC, May 2015, Richmond, VA

R.Bachimanchi, IPAC, May 2015, Richmond, VA 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

Beam Loss Monitoring (BLM) System for ESS

Beam Loss Monitoring (BLM) System for ESS Beam Loss Monitoring (BLM) System for ESS Lali Tchelidze European Spallation Source ESS AB lali.tchelidze@esss.se March 2, 2011 Outline 1. BLM Types; 2. BLM Positioning and Calibration; 3. BLMs as part

More information

3.9 GHz System (AH1) XFEL WP46

3.9 GHz System (AH1) XFEL WP46 3.9 GHz System (AH1) XFEL WP46 14th European XFEL Machine Advisory Committee Meeting 02 May 2016 Paolo Pierini, INFN & DESY Elmar Vogel, DESY + INFN/DESY contributors PPT version 1 26/04/2016 Outline Status

More information

BCS UPDATE. j. welch 2/9/17

BCS UPDATE. j. welch 2/9/17 BCS UPDATE j. welch 2/9/17 TOPICS RP requirements Shutoff path Beam loss detection scheme Beam loss detectors and FPGAs Current monitors Dumps RP REQUIREMENTS Revised BCS PRD was circulated Tuesday for

More information

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem

More information

CLAS12 First Experiment Workshop Report

CLAS12 First Experiment Workshop Report CLAS12 First Experiment Workshop Report Latifa Elouadrhiri Jefferson Lab For more details about the workshop https://www.jlab.org/indico/event/201/ CLAS Collaboration Jefferson Lab March 28-31, 2017 1

More information

Status of the PRad Experiment (E )

Status of the PRad Experiment (E ) Status of the PRad Experiment (E12-11-106) NC A&T State University Outline Experimental apparatus, current status Installation plan Draft run plan Summary PRad Experimental Setup Main detectors and elements:

More information

Detector Checkout and Optics Commissioning

Detector Checkout and Optics Commissioning Detector Checkout and Optics Commissioning Jure Bericic Brad Sawatzky with SHMS optics working group Hall C Winter Collaboration Meeting January 20, 2017 overview HMS overview SHMS overview commissioning

More information

Hall C Infrastructure Projects Update

Hall C Infrastructure Projects Update Hall C Infrastructure Projects Update Outline Targets Input from tgt group Polarimetry Input from Dave G. Some Other Stuff Greg Smith JLab Jan. 2006 Target Upgrade- Basic Philosophy Need smaller SC for

More information

Light Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory

Light Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory Light Source Diagnostics Hywel Owen ASTEC Daresbury Laboratory This Talk Not a review of light source diagnostics Good summaries at EPAC/PAC/DIPAC, etc. J.Safranek (ICALHEPS 99) J.Clarke (EPAC 94) R.Hettel

More information

Beam Control: Timing, Protection, Database and Application Software

Beam Control: Timing, Protection, Database and Application Software Beam Control: Timing, Protection, Database and Application Software C.M. Chu, J. Tang 储中明 / 唐渊卿 Spallation Neutron Source Oak Ridge National Laboratory Outline Control software overview Timing system Protection

More information

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012 Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012 1. Møller Polarimeter 2. Compton Polarimeter Hall C 12 GeV Polarimetry Møller Polarimeter 6 GeV operation: uses 2 quads to

More information

12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A

12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A 12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT Upgrade Hall A Version 1.2 July 28, 2010 DESIGN SOLUTIONS DOCUMENT Upgrade Hall A APPROVALS Approved by: 12 GeV Upgrade Control Account Manager, Hall A

More information

FLASH II: an Overview

FLASH II: an Overview FLASH II: an Overview 1. Layout. 2. Status 1. Civil Construction 2. E-beamline 3. Photon Beamline 3. Timeplan 4. Finances 5. Personnel Situation 6. Simultaneous Operation of FLASH1 and 2 FLASH II is a

More information

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments Experimental Program Advisory Committee Roger Erickson for the SABER Design Team December 4, 2006 The Problem: FFTB is gone! The Final Focus

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main

More information

Electron Beam Properties and Instrumentation MOLLER Director s Review, Jan. 14, 2010 Mark Pitt, Virginia Tech

Electron Beam Properties and Instrumentation MOLLER Director s Review, Jan. 14, 2010 Mark Pitt, Virginia Tech Electron Beam Properties and Instrumentation MOLLER Director s Review, Jan. 14, 2010 Mark Pitt, Virginia Tech This talk will focus on the electron beam properties and beam instrumentation requirements

More information

Interfaces with MPS/PSS

Interfaces with MPS/PSS Interfaces with / European Spallation Source Accelerator Division TB, 16 November 2016, Lund, Sweden / interfaces 1/21 Outline 1 Introduction 2 3 4 Conclusions / interfaces 2/21 Outline 1 Introduction

More information

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009 Beam for LCLS Henrik Loos Workshop July 29-31, 29 1 1 Henrik Loos Overview Coherent Radiation Sources Timing THz Source Performance 2 2 Henrik Loos LCLS Layout 6 MeV 135 MeV 25 MeV 4.3 GeV 13.6 GeV σ z.83

More information

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009 DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY LCTW 09 Orsay, 3.-5. Nov. 2009 DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no

More information

Study the Compact Photon Source Radiation Using FLUKA

Study the Compact Photon Source Radiation Using FLUKA Study the Compact Photon Source Radiation Using FLUKA Jixie Zhang, Donal Day, Rolf Ent Nov 30, 2017 This is a summary of radiation studies done for both the UVa target alone (for electron and photon beams)

More information

Activities on Beam Orbit Stabilization at BESSY II

Activities on Beam Orbit Stabilization at BESSY II Activities on Beam Orbit Stabilization at BESSY II J. Feikes, K. Holldack, P. Kuske, R. Müller BESSY Berlin, Germany IWBS`02 December 2002 Spring 8 BESSY: Synchrotron Radiation User Facility BESSY II:

More information

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals

More information

Next Generation Space Atomic Clock Space Communications and Navigation (SCaN) Technology

Next Generation Space Atomic Clock Space Communications and Navigation (SCaN) Technology Next Generation Space Atomic Clock Space Communications and Navigation (SCaN) Technology John D. Prestage- 1 Next Generation Space Atomic Clock!! Hg Ion Clock Technology was selected as NASA OCT TDM!!

More information

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY Status of the European XFEL Accelerator Construction Project Reinhard Brinkmann, DESY European XFEL Introduction Some specifications Photon energy 0.3-24 kev Pulse duration ~ 10-100 fs Pulse energy few

More information

Why Consider a Toroid Spectrometer Built Around Existing Hardware?

Why Consider a Toroid Spectrometer Built Around Existing Hardware? Why Consider a Toroid Spectrometer Built Around Existing Hardware? Potentially a cleaver / faster / cheaper solution for going after some of the physics than the proposed ~50 M$s wish list worth of post

More information

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,

More information

Packaging of Cryogenic Components

Packaging of Cryogenic Components Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?

More information

Re-commissioning the Recycler Storage Ring at Fermilab

Re-commissioning the Recycler Storage Ring at Fermilab Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on Accelerator Operations The Fermi National Accelerator

More information

Summer / Fall 2004 Downtime AEG Week 4 Summary

Summer / Fall 2004 Downtime AEG Week 4 Summary Summer / Fall 2004 Downtime AEG Week 4 Summary BaBar Monitoring - Monday August 23 o This survey is designed to check the detector after the installation of the brass plates in the lower part of the detector.

More information

LHC Electronics irradiation tests in the CNGS side gallery September 2009

LHC Electronics irradiation tests in the CNGS side gallery September 2009 LHC Electronics irradiation tests in the CNGS side gallery September 2009 D.Kramer for the RADWG Thanks to B.Todd, E.Gousiou, E.Calvo, E.Effinger, R.Denz, K.Roeed, J.Lendaro, M.Brugger, EN/MEF, DG/SCR,

More information

Winter Meeting January 14-15, Stephen Wood

Winter Meeting January 14-15, Stephen Wood Winter Meeting January 14-15, 2015 Stephen Wood Publications and Students Separated Response Functions in Exclusive, Forward Electroproduction on Deuterium Phys. Rev. C 91, 015202 (2015) (from Fpi data)

More information

Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality

Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality Jonathan Dumas 1,2, Joe Grames 2, Eric Voutier 1 December 16, 28 JLAB-TN-8-86 1 Laboratoire de Physique

More information

Hall D Report. E.Chudakov 1. PAC43, July Hall D Group Leader. E.Chudakov PAC43, July 2015 Hall D Report 1

Hall D Report. E.Chudakov 1. PAC43, July Hall D Group Leader. E.Chudakov PAC43, July 2015 Hall D Report 1 E.Chudakov PAC43, July 2015 Hall D Report 1 Hall D Report E.Chudakov 1 1 Hall D Group Leader PAC43, July 2015 E.Chudakov PAC43, July 2015 Hall D Report 2 Outline 1 Physics program 2 Collaboration and staff

More information

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian Yerevan Physics Institute Yerevan Physics Institute S.Arutunian, VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION BIW 2008, Lake Tahoe, USA

More information

Accelerator Issues for PREX

Accelerator Issues for PREX Accelerator Issues for PREX Kent Paschke University of Virginia when name E b target, θ what s hard? Aug 2009 HAPPEX III 3.4 GeV 1 H, 12 o polarimetry Oct 2009 PV DIS 6 GeV 2 H, 12 o backgrounds Jan 2010

More information

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, FLASH 2 FEL seminar Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, 2016-03-22 Charge: 0.5 nc Overview 1. FLASH 2 Overview 1.Layout parameters 2. Operation FLASH2. 1.Lasing at wavelengths between

More information

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS A. Aryshev On behalf of QB group and THz collaboration 14 Outline THz project overview LUCX activity LUCX Projects Overview THz program LUCX Laser system LUCX

More information

Hardware Commissioning

Hardware Commissioning Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status

More information

BNL Collider Complex Overview. MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements

BNL Collider Complex Overview. MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements MPS Experience at BNL-RHIC BNL Collider Complex Overview MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements Operational Experience Summary BNL Collider Complex Overview

More information

Effects of Intensity and Position Modulation On Switched Electrode Electronics Beam Position Monitor Systems at Jefferson Lab*

Effects of Intensity and Position Modulation On Switched Electrode Electronics Beam Position Monitor Systems at Jefferson Lab* JLAB-ACT--9 Effects of Intensity and Position Modulation On Switched Electrode Electronics Beam Position Monitor Systems at Jefferson Lab* Tom Powers Thomas Jefferson National Accelerator Facility Newport

More information

Report of the PrimEx Readiness Review

Report of the PrimEx Readiness Review FINAL VERSION: Dec 17, 2003 Report of the PrimEx Readiness Review From: H. Areti, D. Armstrong, S. Christo, J. Domingo, J. Dunne, A. Freyberger, J. LeRose, D.J. Mack, B. Manzlak, B. Mecking, S. Teige,

More information

Polarized 3 He Target for A1n/d2n in Hall C

Polarized 3 He Target for A1n/d2n in Hall C Polarized 3 He Target for A1n/d2n in Hall C Jian-ping Chen, Jefferson Lab Experimental Readiness Review, March 19, 2018 Polarized 3 He target: introduction and overview Target for A1n/d2n Upgrade Make

More information

FLASH: Status and upgrade

FLASH: Status and upgrade : Status and upgrade The User Facility Layout Performance and operational o a issues Upgrade Bart Faatz for the team DESY FEL 2009 Liverpool, UK August 23-28, 2009 at DESY > FEL user facility since summer

More information

Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab

Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab C. J. Curtis, J. Dahlberg, W. Oren, J. Preble, K. Tremblay. Thomas Jefferson National Accelerator Facility, Virginia, U.S.A.

More information

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec. Design of the magnets for the MAX IV project Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, 01-04 Dec. 2014 MAX IV 3 GeV ring magnets key aspects: Relatively small magnet aperture

More information

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE 1 SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE F.Q. Wei, K. Dreyer, U. Fehlmann, J.L. Pochon and A. Wrulich SLS / Paul Scherrer Institute CH5232 Villigen PSI Switzerland ABSTRACT The Swiss Light Source

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Lars Hagge, Benno List SLAC, 31.03.2014 Agenda > Introduction: Collaborative Engineering > Collaborative Design &

More information

Status of the 12 GeV Upgrade and the SHMS R&D and PED Projects. Antje Bruell Hall C meeting, Jan Page 1

Status of the 12 GeV Upgrade and the SHMS R&D and PED Projects. Antje Bruell Hall C meeting, Jan Page 1 Status of the 12 GeV Upgrade and the SHMS R&D and PED Projects Antje Bruell Hall C meeting, Jan 26 2007 Page 1 Outline Status of the 12 GeV Upgrade New management structure Time lines Latest cost profile

More information

Polarimetry Concept Based on Heavy Crystal Hadron Calorimeter

Polarimetry Concept Based on Heavy Crystal Hadron Calorimeter Polarimetry Concept Based on Heavy Crystal Hadron Calorimeter for the JEDI Collaboration CALOR 216 May 17, 216 Irakli Keshelashvili Introduction JEDI Polarimetry Concept MC Simulations Laboratory and Beam

More information

The Ecloud Measurement Setup in the Main Injector

The Ecloud Measurement Setup in the Main Injector The Ecloud Measurement Setup in the Main Injector C.Y. Tan, M. Backfish, R. Zwaska 11 Oct 2010 Ecloud Workshop 2010 FILE: ecloud.odp / Oct 10, 2010 / Page 1 Overview The FNAL complex and Setup at MI-52

More information

CALICE AHCAL overview

CALICE AHCAL overview International Workshop on the High Energy Circular Electron-Positron Collider in 2018 CALICE AHCAL overview Yong Liu (IHEP), on behalf of the CALICE collaboration Nov. 13, 2018 CALICE-AHCAL Progress, CEPC

More information

Commissioning and operation of the CDF Silicon detector

Commissioning and operation of the CDF Silicon detector Commissioning and operation of the CDF Silicon detector Saverio D Auria On behalf of the CDF collaboration International conference on Particle Physics and Advanced Technology, Como, Italy, 15-19 October

More information

HPS Upgrade Proposal

HPS Upgrade Proposal HPS Upgrade Proposal HPS collaboration July 20, 2017 Analysis of the HPS engineering run data showed worse than expected reach in both the bump hunt and the vertexing searches. These reach discrepancies

More information

Installation of the Optical Replica Synthesizer (ORS) at FLASH

Installation of the Optical Replica Synthesizer (ORS) at FLASH Installation of the Optical Replica Synthesizer (ORS) at FLASH Who and What? G. Angelova, V. Ziemann- Task: Modulator and radiator undulators, participating in the Theoretical simulations with Genesis

More information

Monte Carlo Simulation of the PRad Experiment at JLab 1

Monte Carlo Simulation of the PRad Experiment at JLab 1 Monte Carlo Simulation of the PRad Experiment at JLab 1 Li Ye Mississippi State University for the PRad collaboration 1.This work is supported in part by NSF MRI award PHY-1229153, the U.S. Department

More information

DAQ & Electronics for the CW Beam at Jefferson Lab

DAQ & Electronics for the CW Beam at Jefferson Lab DAQ & Electronics for the CW Beam at Jefferson Lab Benjamin Raydo EIC Detector Workshop @ Jefferson Lab June 4-5, 2010 High Event and Data Rates Goals for EIC Trigger Trigger must be able to handle high

More information

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY FLASH Training: RF Gun FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously Siegfried Schreiber, DESY FLASH Training DESY 17-Mar-2017 FLASH1 RF Gun History RF Guns operated

More information

1 Status of the Hall A Møller Polarimeter

1 Status of the Hall A Møller Polarimeter 1 Status of the Hall A Møller Polarimeter 1 O. Glamazdin, 2 E. Chudakov, 2 J. Gomez, 1 R. Pomatsalyuk, 1 V. Vereshchaka, 2 J. Zhang 1 National Science Center Kharkov Institute of Physics and Technology,

More information

Status of the PRad Experiment (E )

Status of the PRad Experiment (E ) Status of the PRad Experiment (E12-11-106) NC A&T State University for the PRad collaboration Outline PRad Physics goals Experimental setup Current status Summary The Proton Charge Radius Puzzle New high

More information

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction THE LEP PROJECT - STATUS REPORT Herwig Schopper CERN 1211 Geneva 23, Switzerland Introduction LEP is an e + e - collider ring designed and optimized for 2 100 GeV. In an initial phase an energy of 2 55

More information

Reliability studies for a superconducting driver for an ADS linac

Reliability studies for a superconducting driver for an ADS linac Mol, Belgium, 6-9 May 2007 Reliability studies for a superconducting driver for an ADS linac Paolo Pierini, Luciano Burgazzi Work supported by the EURATOM 6 framework program of the EC, under contract

More information

Non-invasive Beam Profile Measurements using an Electron-Beam Scanner

Non-invasive Beam Profile Measurements using an Electron-Beam Scanner Non-invasive Beam Profile Measurements using an Electron-Beam Scanner W. Blokland and S. Cousineau Willem Blokland for the Spallation Neutron Source Managed by UT-Battelle Overview SNS Accelerator Electron

More information

LCLS Injector Diagnostics. Henrik Loos. Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties

LCLS Injector Diagnostics. Henrik Loos. Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties LCLS Diagnostics Tasks Charge Toroids (Gun, Inj, BC, Und) Faraday cups (Gun & Inj) Trajectory & energy Stripline BPMs (Gun,

More information

Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System

Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System 15 th ICALEPCS 2015, Melbourne, Australia K. Ha, Y. Tian, L. Yu, W. Cheng, L. Dalesio W. Levine, University of

More information

SPES Control System. M. Bellato

SPES Control System. M. Bellato SPES Control System M. Bellato Topics Update on LLRF Update on CB controls Update on network infrastructure Update on Software infrastructure Update on Software developments Topics Update on LLRF Update

More information

Status Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005

Status Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005 Status Alcator C-Mod Engineering Systems DoE Quarterly Review October 27, 2005 1 Outline Run campaign Up-to-Air Machine Status Lower Hybrid Cryopump Tungsten Tiles Schedule/Plans 2 FY2005 Run Campaign

More information

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii Acceleration of High-Intensity Protons in the J-PARC Synchrotrons KEK/J-PARC M. Yoshii Introduction 1. J-PARC consists of 400 MeV Linac, 3 GeV Rapid Cycling Synchrotron (RCS) and 50 GeV Main synchrotron

More information

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

Beam Condition Monitors and a Luminometer Based on Diamond Sensors Beam Condition Monitors and a Luminometer Based on Diamond Sensors Wolfgang Lange, DESY Zeuthen and CMS BRIL group Beam Condition Monitors and a Luminometer Based on Diamond Sensors INSTR14 in Novosibirsk,

More information

System Failure Operational Recovery

System Failure Operational Recovery System Failure Operational Recovery VLBI data acquisition is a complex technical challenge for operators using various electronic data acquisition systems, large radio telescopes that use various drive

More information

Totem Experiment Status Report

Totem Experiment Status Report Totem Experiment Status Report Edoardo Bossini (on behalf of the TOTEM collaboration) 131 st LHCC meeting 1 Outline CT-PPS layout and acceptance Running operation Detector commissioning CT-PPS analysis

More information

Precision Measurement of the Proton Elastic Cross Section at High Q 2

Precision Measurement of the Proton Elastic Cross Section at High Q 2 Precision Measurement of the Proton Elastic Cross Section at High Q 2 Longwu Ou (MIT) for the E12-07-108 Collaboration Hall A Collaboration Meeting December 8, 2014 Nucleon Form Factors The EM form factors

More information

The Qweak Experiment at Jefferson Lab

The Qweak Experiment at Jefferson Lab The Qweak Experiment at Jefferson Lab J. Birchall University of Manitoba for the Qweak Collaboration Elba XII, June 2012 1 Qweak: measurement of the weak charge of the proton Commissioning June - August,

More information

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem The MUSE experiment Technical Overview Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem MUSE is not your garden variety scattering experiment Low beam flux Large angle, non-magnetic

More information

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER C. Zhang, G.X. Pei for BEPCII Team IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China Abstract BEPCII, the second phase construction

More information

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07 Plan for Collimator Commissioning R. Assmann, CERN/AB 7/12/2007 for the Collimation Project LHC MAC RWA, LHC MAC 12/07 1) Installation Planning and Performance Reach Collimation is an performance-driven

More information

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Alex H. Lumpkin Accelerator Operations Division Advanced Photon Source Presented at Jefferson National Accelerator Laboratory

More information

High Current Measurements of a QB and QC Quadrupole

High Current Measurements of a QB and QC Quadrupole June 9, 05 JLAB-TN-05-037 1. Introduction High Current Measurements of a QB and QC Quadrupole T. Hiatt, K. Baggett, M. Beck, K. Sullivan and M. Wiseman Thomas Jefferson National Accelerator Facility, Newport

More information

Does the short pulse mode need energy recovery?

Does the short pulse mode need energy recovery? Does the short pulse mode need energy recovery? Rep. rate Beam power @ 5GeV 1nC @ 100MHz 500MW Absolutely 1nC @ 10MHz 1nC @ 1MHz 50MW 5MW Maybe 1nC @ 100kHz 0.5MW No Most applications we have heard about

More information

Dark current Monitor for the European XFEL D. Lipka, W. Kleen, J. Lund-Nielsen, D. Nölle, S. Vilcins, V. Vogel; DESY Hamburg

Dark current Monitor for the European XFEL D. Lipka, W. Kleen, J. Lund-Nielsen, D. Nölle, S. Vilcins, V. Vogel; DESY Hamburg Dark current Monitor for the European XFEL D. Lipka, W. Kleen, J. Lund-Nielsen, D. Nölle, S. Vilcins, V. Vogel; DESY Hamburg Content 2 Dark current Principle of detecting weakly charged bunches with resonator

More information

ABSTRACT 1 CEBAF UPGRADE CAVITY/CRYOMODULE

ABSTRACT 1 CEBAF UPGRADE CAVITY/CRYOMODULE Energy Content (Normalized) SC Cavity Resonance Control System for the 12 GeV Upgrade Cavity: Requirements and Performance T. Plawski, T. Allison, R. Bachimanchi, D. Hardy, C. Hovater, Thomas Jefferson

More information

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY

More information

Status of the ESS Accelerator Workpackage

Status of the ESS Accelerator Workpackage Status of the ESS Accelerator Workpackage Peter McIntosh STFC Daresbury Laboratory UK ESS Interactions and Opportunities Rutherford Appleton Laboratory 3 Dec 2014 The ESS Linac The European Spallation

More information

Frank Schmidt-Föhre, DESY

Frank Schmidt-Föhre, DESY Commissioning of the New Online- Radiation-Monitoring-System at the New European XFEL Injector with First Tests of the High-Sensitivity-Mode for Intra-Tunnel Rack Surveillance Frank Schmidt-Föhre, DESY

More information

Development of C-Mod FIR Polarimeter*

Development of C-Mod FIR Polarimeter* Development of C-Mod FIR Polarimeter* P.XU, J.H.IRBY, J.BOSCO, A.KANOJIA, R.LECCACORVI, E.MARMAR, P.MICHAEL, R.MURRAY, R.VIEIRA, S.WOLFE (MIT) D.L.BROWER, W.X.DING (UCLA) D.K.MANSFIELD (PPPL) *Supported

More information

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE S. M. Pattalwar, R. Bate, G. Cox, P.A. McIntosh and A. Oates, STFC, Daresbury Laboratory, Warrington, UK Abstract ALICE is a prototype

More information

Construction Status of SuperKEKB Vacuum System

Construction Status of SuperKEKB Vacuum System Construction Status of SuperKEKB Vacuum System Mt. Tsukuba SuperKEKB ( 3000 m) Damping Ring Linac KEK Tsukuba site Fourth Workshop on the Operation of Large Vacuum systems (OLAV IV) April 2, 2014 Kyo Shibata

More information

Cryogenic Operations at SLAC

Cryogenic Operations at SLAC Cryogenic Operations at SLAC J. G. Weisend II, A. Candia, W.W. Craddock, E. Thompson CryoOps 2006 5/30/2006 J. G. Weisend II 1 What Do We Do? Cryogenics at SLAC involve: Large scale He refrigerator operation

More information