1 6MSD Weekly Scheduling Meeting 1:30, MCC Conference Room October 26, ) Glance Back and 2-Week Look Ahead (F. Pilat) mins 2) Operations Recovery Status (A. Freyberger) mins 3) Key Service Provider Reports mins (a) Magnet Recovery Effort (K. Baggett) (b) Alignment (C. Curtis) (c) EESIC (O. Garza) (d) Software (M. Bickley) 4) Safety Report (R. Owen)... 2 mins 5) Hall A g2p Status (K. Slifer) mins 6) Meeting Recap and Action Items (All)... 2 mins
2 6MSD: Glance back & look ahead Fulvia Pilat 6MSD Meeting October 26, 2011
3 Progress Wed Oct 12 Wed Oct 26 Weeks: 24 down, 3 to go (24 days to November 19) Highlights: Civil construction, good progress (Tagger wall up possibly at the end of this week) Repair plan for the spreader magnets in progress Operations start-up: excellent progress in some area (i.e. high-current injector set-up) but lots of challenges in the RECO process more on the next talk C100 tests last week, still activity this week Areas of attention: Impact of RECO and system work on the start-up schedule C100 data on micro-phonics and neutron photo-production: impact on the C100 plan for test with beam and operability Overall plan for Hall A at Lab level
4 2 weeks look ahead Final phase of civil work, including Tagger wall Wrap-up of spreader magnets repairs RECO process Beam spin-up in the linacs Test of C100 with beam, then BBU studies Start of CEBAF 5.6 GeV set-up
5 Shut-down (s) Organization Formally 6MSD in place till November 19 Will be followed by a 12MSD Organization Transition phase: Day-to-day organization and priority focused on operations start-up Weekly 6MSD Thursday meetings Lessons learned process: management and technical Input from people, feedback Definition and discussion of 12 MSD Organization
6
7
8 Accelerator 6MSD YR Recovery Effort October 26, 2011
9 Event Overview Two YR magnets overheated while being powered up for the first time Heat level caused epoxy to melt and catch fire LCW valves were not turned on for these two YRs Temperature interlocks did not cause power supply to trip off Three teams assigned to event Investigation Recovery Response All three teams are currently making good progress Recovery going very well
10 Affected Magnets
11 Current Status of Recovery Initial assessment work completed - RADCON and IH assessment of area and clearance/direction to proceed with work effort Initial beam line clean up completed Diagnostic wiring removed Safety System components and wire removed DC power leads and other magnet connections removed Vacuum disconnected 2 YR magnets and 1 AN magnet removed to magnet measurement area And we can now see the light at end of tunnel - 2 YRs from spare inventory QC d and magnetically measured AN magnet repaired and re-measured YRs and AN installed 2A alignment completed Vacuum hooked up. Pump down underway Area diagnostics assessed, repaired and checked out ok DC power systems hooked up LCW hooked up BLMs being hooked up now
12 Re-installation
13 Remaining Effort Oct 24,2011 Oct 25,2012 Oct 26,2013 Oct 27,2014 Oct 28,2015 Monday Tuesday Wednesday Thursday Friday Install Dipoles AN, YRs Survey 2A DC power hookup Survey 2B Vacuum chamber connections Vacuum Pump down Diagnostics hookup Safety Systems Hookup Checklist inspections Complete Checklist inspections An integrated checklist has been put together This will be completed and handed over to accelerator at the completion of the recovery effort The checklist will use archive information from previous work in the spreader areas, expert feedback from the work teams, and input from the investigation team.
14 Shutdown Work Summary Organization: Alignment Name: Chris Curtis Date: 26th Oct, 2011 Last Week Work That Went Better Than / As Expected: Q-Weak target alignment completed, finals to do. Elevation tie between north linac and Tagger area completed. PEPPo initial alignment completed. West arc stack 15 dipole check completed. YR magnet initial alignment completed, finals to do. Hall C HKS removal elevation survey completed. Work That Went Slower Than Expected, Delays, and Issues: Hall D solenoid alignment delayed and re-started Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns 12GeV arcs X October Check on stack 15 dipoles Possibly check again this week 6 Gev machine X Oct 28 YR septa & region alignment This week Hall D X October Solenoid alignment Continuing this week Hall C Q-Weak X Nov Beamline & detector surveys Starting this week 6MSD weekly mtg - Align Oct-26-2 Page 1 of 3
15 Project & Customer Status Completion Tasks Comments/Concerns Hall D X Oct / Nov Berm elevation / photon pipe check Survey checks for contract completion Hall B X Oct / Nov Complete target /beamline Start next week alignment G2p X TBD Harp & Dump fiducialization Harp now available Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns Hall A - G2p X TBD Alignment of articulating Filler work? beamline Hall B X TBD Complete target /beamline Continuing alignment Hall C - Q-Weak X TBD Final alignment of detectors etc. Continuing into November New Work Requests Requiring Schedule Changes: YR area re-alignment Permits Not Already in Hand (hot work, lifting, blind penetrations): None Significant Problems Pending (delays, technical issues, resource issues, scheduling): OK Staffing Outlook: OK 6MSD weekly mtg - Align Oct-26-2 Page 2 of 3
16 6MSD weekly mtg - Align Oct-26-2 Page 3 of 3
17 Shutdown Work Summary Organization: EESIC Name: Omar Garza Date: Last Week Work That Went Better Than Expected: Work That Went Slower Than Expected, Delays, and Issues: Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns Hall C Qweak Cavity Electronics Hall A G2P Low Current BPM Electronics Hall A G2P Diagnostics Hall A G2P Motor Driver Chassis 12Gev SRF Vacuum Instrumentation X Ongoing Building Chassis Parts Order Complete Receiver Brds in Assembly 1 DAC Brd. Assembled X Ongoing Complete PC Brds. <2wks PC Brds. Completed Expedite order In-House assembly X Ongoing Cables completed Awaiting Driver Chassis Harp 1 installed, Harp 2 assembled, YAG assembled & tested X Ongoing Testing Unit delivered to Software X Ongoing SL23, 24, 25 Going Well Shutdown Work Summary Page 1 of 2
18 Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns Injector PePPo Ops AIPBSY (I to V) Module Accelerator Network Firewall Configuration Accelerator Maintenance X Ongoing Beam Scrappers wiring Faraday Cup wiring Viewer wiring completed BPMs X On-hold Assembly, Testing Software X Ongoing Phase I Segment config. Phase II Failover config. Phase III Rules configuration Phase IV Network Implementation X Ongoing Diagnostics SL, BSY Vacuum ACC. Repairs, Hall PM New Work Requests Requiring Schedule Changes: Permits Not Already in Hand (hot work, lifting, blind penetrations): Significant Problems Pending (delays, technical issues, resource issues, scheduling): Staffing Outlook: Will be completed on Friday Parts Complete Brds. Procured Phase I completed Going Well Controls complete BPMs complete Diagnostics complete Shutdown Work Summary Page 2 of 2
19 Shutdown Work Summary Organization: Controls Software Name: Matt Bickley Date: October 26, 2011 Last Week Work That Went Better Than/As Expected: PEPPo: Discriminator/scaler for data acquisition done 12 GeV: Low-level RF done CASA: MO monitor done Work That Went Slower Than Expected, Delays, and Issues: Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns PEPPo X? Viewers Ready to test with hardware PEPPo X? Dipole power supply controls Software development 5o% done; hardware design issues remain 12 GeV X 24-Oct-11 RF screens Ops fault screen installed tomorrow PSS/MPS X 15-Nov-11 CAEN power supply Under development Operations X 1-Nov-11 Control system write logging Wider installation Operations X 1-Nov-11 Confirm network changes do not impact accelerator or endstation operation 6MSD Bickley Page 1 of 2 Testing 80% complete; no problems found G2P X Jan 12 New harp controls Software testing ongoing
20 Project & Customer Status Completion Tasks Comments/Concerns G2P X Jan 12 New BPM controls Position and calibration algorithm to be developed; design out to fab G2P X Jan 12 Viewers Ready to test with hardware G2P X Jan 12 Septum magnet controls Waiting for information for last 5%; Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Project & Customer Status Completion Tasks Comments/Concerns 12 GeV X 14-Nov-11 IOC boot management Hall A X Jan 12 IOCs moved to accelerator network Implementation and 80% of testing done; testing remains for 20% Operations X? LCW monitoring Server purchased Operations X 14-Nov-11 Digital image management Camera and network ready; computer to be installed New Work Requests Requiring Schedule Changes: None Permits Not Already in Hand (hot work, lifting, blind penetrations): None Significant Problems Pending (delays, technical issues, resource issues, scheduling): None Staffing Outlook: OK 6MSD Bickley Page 2 of 2
21 g2p Status K. Slifer 10/26/2011
22 Septa Chicane Upside-down Girder Local Dump Polarized Target g2p Configuration Upstream mods Slow raster New BPMs/BCMs Tungsten Calorimeter
23 Polarized Target Status Two shorts to ground Arc to ground, mult. burnt wires Difficult to repair Figs./info courtesy C. Keith
24 Polarized Target Status Two shorts to ground Arc to ground, mult. burnt wires Difficult to repair Figs./info courtesy C. Keith Hall B Poltarg Magnet Feasibility study indicates that Hall B poltarg magnet is compatible with g2p rig Would allow to achieve most physics goals of g2p Retrofitting/testing would probably take till mid-feb.
25 Previously Planned Coverage 57 days : Septa In two highest kinematics require alot of days 54 days : Septa Out 42 days : Transition
26 Previously Planned Coverage 57 days : Septa In two highest kinematics require alot of days 54 days : Septa Out 42 days : Transition Delay to Feb.
27 What we can do with late start & Hall B coils Lose 2 highest Energies extend 2.2 Gev bands to large W Spend additional time on elastic Start commissioning after New year
28 Impact on E Projection for the LT spin polarizability
29 Impact on E We lose the highest interpolated Q 2 point
30 Impact on E Lost overlap Projection for GEp/GMp Lose overlap with large Q 2 run.
31 Installation Status
32 Septa In place, powered, LCW. B vs I curve next week.
33 Slow Raster assembled, in place. Final test needed. Tungsten Calorimeter Calib demonstrated 1% accuracy. Ready for physics Figs courtesy T. Mikalski
34 Chicane FZ VDC (PS) requires AI magnet in series to achieve desirable load on PS FZ VDC (PS) New vacuum chambers to contain beam path for all energy levels Draws from hall LCW for cooling (magnets and PSs) Figs courtesy T. Mikalski
35 Chicane Final full power test and alignment mid-nov. Figs courtesy T. Mikalski
36 Superharp 20 um wire for low current New fork design New controller chassis PC104 w/ new SW expect complete mid-nov. Figs courtesy T. Mikalski
37 BPM/BCM w New Recievers New 4 channel receiver design tailored for low current measurement M15 antenna style BPMs standard BCMs Dynamic Range - ( na) Resolution/Accuracy um Output Rate - 2 khz Bench tests performed. Looks promising. Expect built/tested in mid-nov.
38 g2people Post-Docs 7+ Students Postdocs Jixie Zhang Kalyan Allada James Maxwell Vince Sulkosky Aidan Kelleher Fac/Staff A. Camsonne J.P. Chen Doug Higinbothan Karl Slifer Grad Students Pengia Zhu Min Huan Melissa Cummings Ryan Zielinski Toby Badman Chao Gu Jie Liu
39 Detectors/DAQ Checkout underway. Gas Cer looks ok. 3 channels with low NPE Left extension to be installed. 3 rd Fastbus crate for each arm. Happex DAQ for low noise BPM/BCMs. Local Dump Installed Discussing with Radcon on best way to access. New spectrometer optics Full simulation (SNAKE+GEANT4) Planning for optics commissioning. involving many previous optics and septa experts. Third arm Detector Goal : supplementary 5% measurement of P b P T Scintillator, power supplies, GUI, cabling all identified. Shielding: 30 cm HDPE for line of sight from dump. Testing of PMTs and Scintillator looks good.
40 Summary Assuming Hall B coil package will be scavangeable and GEp runs at 7 degree instead of 20. Reduced target region of uniformity: 3 -> 2 cm DSV Adding in some extra kinematics for g2p at large W We can achieve the bulk of the physics goals of E and E E loses one Q2 point E loses the overlap with high Q2 data.
6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room
6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room October 12, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service
More informationInstallation! of! E (g 2p ) & E (G Ep /G Mp )! in Hall A! during the 6MSD!!"#$%&'(#
Installation! of! E08-027 (g 2p ) & E08-007 (G Ep /G Mp )! in Hall A! during the 6MSD!!"#$%&'(# E08-027 (g 2p )!! Measure the inelastic spin structure function g 2 of the proton in the low invariant momentum
More informationAlignment of the 12 GeV CEBAF Accelerator
Alignment of the 12 GeV CEBAF Accelerator Christopher Curtis Thomas Jefferson National Accelerator Facility, Newport News, Virginia, USA 1 Jefferson Lab Site c.2006 Jefferson Lab Site 2014 CEBAF 12 GeV
More informationCEBAF Overview June 4, 2010
CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications
More informationC100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint
1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >
More informationRF System LSD Work. William Merz
RF System LSD Work William Merz LSD Re-Baseline Review Jefferson Lab Thomas Jefferson National Accelerator Facility Page 1 Outline What I will talk about 12 GEV RF power system installation and commissioning
More informationPREX- 2 Issues. April 11, Kent Paschke
PREX- 2 Issues April 11, 2014 Kent Paschke What We Learned in PREX-I What Worked: New Septum We now know how to tune it to optimize FOM A T false asymmetry A T is small (
More informationRadiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A
Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A This Radiological Safety Analysis Document (RSAD) will identify the general conditions associated
More informationR.Bachimanchi, IPAC, May 2015, Richmond, VA
1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >
More informationBeam Loss Monitoring (BLM) System for ESS
Beam Loss Monitoring (BLM) System for ESS Lali Tchelidze European Spallation Source ESS AB lali.tchelidze@esss.se March 2, 2011 Outline 1. BLM Types; 2. BLM Positioning and Calibration; 3. BLMs as part
More information3.9 GHz System (AH1) XFEL WP46
3.9 GHz System (AH1) XFEL WP46 14th European XFEL Machine Advisory Committee Meeting 02 May 2016 Paolo Pierini, INFN & DESY Elmar Vogel, DESY + INFN/DESY contributors PPT version 1 26/04/2016 Outline Status
More informationBCS UPDATE. j. welch 2/9/17
BCS UPDATE j. welch 2/9/17 TOPICS RP requirements Shutoff path Beam loss detection scheme Beam loss detectors and FPGAs Current monitors Dumps RP REQUIREMENTS Revised BCS PRD was circulated Tuesday for
More informationSystem Integration of the TPS. J.R. Chen NSRRC, Hsinchu
System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem
More informationCLAS12 First Experiment Workshop Report
CLAS12 First Experiment Workshop Report Latifa Elouadrhiri Jefferson Lab For more details about the workshop https://www.jlab.org/indico/event/201/ CLAS Collaboration Jefferson Lab March 28-31, 2017 1
More informationStatus of the PRad Experiment (E )
Status of the PRad Experiment (E12-11-106) NC A&T State University Outline Experimental apparatus, current status Installation plan Draft run plan Summary PRad Experimental Setup Main detectors and elements:
More informationDetector Checkout and Optics Commissioning
Detector Checkout and Optics Commissioning Jure Bericic Brad Sawatzky with SHMS optics working group Hall C Winter Collaboration Meeting January 20, 2017 overview HMS overview SHMS overview commissioning
More informationHall C Infrastructure Projects Update
Hall C Infrastructure Projects Update Outline Targets Input from tgt group Polarimetry Input from Dave G. Some Other Stuff Greg Smith JLab Jan. 2006 Target Upgrade- Basic Philosophy Need smaller SC for
More informationLight Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory
Light Source Diagnostics Hywel Owen ASTEC Daresbury Laboratory This Talk Not a review of light source diagnostics Good summaries at EPAC/PAC/DIPAC, etc. J.Safranek (ICALHEPS 99) J.Clarke (EPAC 94) R.Hettel
More informationBeam Control: Timing, Protection, Database and Application Software
Beam Control: Timing, Protection, Database and Application Software C.M. Chu, J. Tang 储中明 / 唐渊卿 Spallation Neutron Source Oak Ridge National Laboratory Outline Control software overview Timing system Protection
More informationHall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012
Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012 1. Møller Polarimeter 2. Compton Polarimeter Hall C 12 GeV Polarimetry Møller Polarimeter 6 GeV operation: uses 2 quads to
More information12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A
12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT Upgrade Hall A Version 1.2 July 28, 2010 DESIGN SOLUTIONS DOCUMENT Upgrade Hall A APPROVALS Approved by: 12 GeV Upgrade Control Account Manager, Hall A
More informationFLASH II: an Overview
FLASH II: an Overview 1. Layout. 2. Status 1. Civil Construction 2. E-beamline 3. Photon Beamline 3. Timeplan 4. Finances 5. Personnel Situation 6. Simultaneous Operation of FLASH1 and 2 FLASH II is a
More informationFLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously
FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First
More informationA Facility for Accelerator Physics and Test Beam Experiments
A Facility for Accelerator Physics and Test Beam Experiments Experimental Program Advisory Committee Roger Erickson for the SABER Design Team December 4, 2006 The Problem: FFTB is gone! The Final Focus
More informationCommissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008
Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)
More informationLow-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY
Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main
More informationElectron Beam Properties and Instrumentation MOLLER Director s Review, Jan. 14, 2010 Mark Pitt, Virginia Tech
Electron Beam Properties and Instrumentation MOLLER Director s Review, Jan. 14, 2010 Mark Pitt, Virginia Tech This talk will focus on the electron beam properties and beam instrumentation requirements
More informationInterfaces with MPS/PSS
Interfaces with / European Spallation Source Accelerator Division TB, 16 November 2016, Lund, Sweden / interfaces 1/21 Outline 1 Introduction 2 3 4 Conclusions / interfaces 2/21 Outline 1 Introduction
More informationTHz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009
Beam for LCLS Henrik Loos Workshop July 29-31, 29 1 1 Henrik Loos Overview Coherent Radiation Sources Timing THz Source Performance 2 2 Henrik Loos LCLS Layout 6 MeV 135 MeV 25 MeV 4.3 GeV 13.6 GeV σ z.83
More informationNorbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009
DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY LCTW 09 Orsay, 3.-5. Nov. 2009 DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no
More informationStudy the Compact Photon Source Radiation Using FLUKA
Study the Compact Photon Source Radiation Using FLUKA Jixie Zhang, Donal Day, Rolf Ent Nov 30, 2017 This is a summary of radiation studies done for both the UVa target alone (for electron and photon beams)
More informationActivities on Beam Orbit Stabilization at BESSY II
Activities on Beam Orbit Stabilization at BESSY II J. Feikes, K. Holldack, P. Kuske, R. Müller BESSY Berlin, Germany IWBS`02 December 2002 Spring 8 BESSY: Synchrotron Radiation User Facility BESSY II:
More informationINSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM
INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals
More informationNext Generation Space Atomic Clock Space Communications and Navigation (SCaN) Technology
Next Generation Space Atomic Clock Space Communications and Navigation (SCaN) Technology John D. Prestage- 1 Next Generation Space Atomic Clock!! Hg Ion Clock Technology was selected as NASA OCT TDM!!
More informationStatus of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY
Status of the European XFEL Accelerator Construction Project Reinhard Brinkmann, DESY European XFEL Introduction Some specifications Photon energy 0.3-24 kev Pulse duration ~ 10-100 fs Pulse energy few
More informationWhy Consider a Toroid Spectrometer Built Around Existing Hardware?
Why Consider a Toroid Spectrometer Built Around Existing Hardware? Potentially a cleaver / faster / cheaper solution for going after some of the physics than the proposed ~50 M$s wish list worth of post
More informationPhysics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7
Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,
More informationPackaging of Cryogenic Components
Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?
More informationRe-commissioning the Recycler Storage Ring at Fermilab
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on Accelerator Operations The Fermi National Accelerator
More informationSummer / Fall 2004 Downtime AEG Week 4 Summary
Summer / Fall 2004 Downtime AEG Week 4 Summary BaBar Monitoring - Monday August 23 o This survey is designed to check the detector after the installation of the brass plates in the lower part of the detector.
More informationLHC Electronics irradiation tests in the CNGS side gallery September 2009
LHC Electronics irradiation tests in the CNGS side gallery September 2009 D.Kramer for the RADWG Thanks to B.Todd, E.Gousiou, E.Calvo, E.Effinger, R.Denz, K.Roeed, J.Lendaro, M.Brugger, EN/MEF, DG/SCR,
More informationWinter Meeting January 14-15, Stephen Wood
Winter Meeting January 14-15, 2015 Stephen Wood Publications and Students Separated Response Functions in Exclusive, Forward Electroproduction on Deuterium Phys. Rev. C 91, 015202 (2015) (from Fpi data)
More informationUpper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality
Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality Jonathan Dumas 1,2, Joe Grames 2, Eric Voutier 1 December 16, 28 JLAB-TN-8-86 1 Laboratoire de Physique
More informationHall D Report. E.Chudakov 1. PAC43, July Hall D Group Leader. E.Chudakov PAC43, July 2015 Hall D Report 1
E.Chudakov PAC43, July 2015 Hall D Report 1 Hall D Report E.Chudakov 1 1 Hall D Group Leader PAC43, July 2015 E.Chudakov PAC43, July 2015 Hall D Report 2 Outline 1 Physics program 2 Collaboration and staff
More informationVIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian
VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian Yerevan Physics Institute Yerevan Physics Institute S.Arutunian, VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION BIW 2008, Lake Tahoe, USA
More informationAccelerator Issues for PREX
Accelerator Issues for PREX Kent Paschke University of Virginia when name E b target, θ what s hard? Aug 2009 HAPPEX III 3.4 GeV 1 H, 12 o polarimetry Oct 2009 PV DIS 6 GeV 2 H, 12 o backgrounds Jan 2010
More informationFLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,
FLASH 2 FEL seminar Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, 2016-03-22 Charge: 0.5 nc Overview 1. FLASH 2 Overview 1.Layout parameters 2. Operation FLASH2. 1.Lasing at wavelengths between
More informationLUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS
LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS A. Aryshev On behalf of QB group and THz collaboration 14 Outline THz project overview LUCX activity LUCX Projects Overview THz program LUCX Laser system LUCX
More informationHardware Commissioning
Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status
More informationBNL Collider Complex Overview. MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements
MPS Experience at BNL-RHIC BNL Collider Complex Overview MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements Operational Experience Summary BNL Collider Complex Overview
More informationEffects of Intensity and Position Modulation On Switched Electrode Electronics Beam Position Monitor Systems at Jefferson Lab*
JLAB-ACT--9 Effects of Intensity and Position Modulation On Switched Electrode Electronics Beam Position Monitor Systems at Jefferson Lab* Tom Powers Thomas Jefferson National Accelerator Facility Newport
More informationReport of the PrimEx Readiness Review
FINAL VERSION: Dec 17, 2003 Report of the PrimEx Readiness Review From: H. Areti, D. Armstrong, S. Christo, J. Domingo, J. Dunne, A. Freyberger, J. LeRose, D.J. Mack, B. Manzlak, B. Mecking, S. Teige,
More informationPolarized 3 He Target for A1n/d2n in Hall C
Polarized 3 He Target for A1n/d2n in Hall C Jian-ping Chen, Jefferson Lab Experimental Readiness Review, March 19, 2018 Polarized 3 He target: introduction and overview Target for A1n/d2n Upgrade Make
More informationFLASH: Status and upgrade
: Status and upgrade The User Facility Layout Performance and operational o a issues Upgrade Bart Faatz for the team DESY FEL 2009 Liverpool, UK August 23-28, 2009 at DESY > FEL user facility since summer
More informationFiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab
Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab C. J. Curtis, J. Dahlberg, W. Oren, J. Preble, K. Tremblay. Thomas Jefferson National Accelerator Facility, Virginia, U.S.A.
More informationDesign of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.
Design of the magnets for the MAX IV project Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, 01-04 Dec. 2014 MAX IV 3 GeV ring magnets key aspects: Relatively small magnet aperture
More informationSURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE
1 SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE F.Q. Wei, K. Dreyer, U. Fehlmann, J.L. Pochon and A. Wrulich SLS / Paul Scherrer Institute CH5232 Villigen PSI Switzerland ABSTRACT The Swiss Light Source
More information(fb) Nevent/year for 50fb -1. s (GeV) ~ ~ qq q=t. ZZ cos <0.8 W + W tt 175GeV 500,00 5,000. Zh 120GeV. 230GeV. HA 400GeV 220GeV 410GeV
10 6 qq q=t (fb) 10 3 + ZZ cos
More informationALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory
ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting
More informationSupporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience
Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Lars Hagge, Benno List SLAC, 31.03.2014 Agenda > Introduction: Collaborative Engineering > Collaborative Design &
More informationStatus of the 12 GeV Upgrade and the SHMS R&D and PED Projects. Antje Bruell Hall C meeting, Jan Page 1
Status of the 12 GeV Upgrade and the SHMS R&D and PED Projects Antje Bruell Hall C meeting, Jan 26 2007 Page 1 Outline Status of the 12 GeV Upgrade New management structure Time lines Latest cost profile
More informationPolarimetry Concept Based on Heavy Crystal Hadron Calorimeter
Polarimetry Concept Based on Heavy Crystal Hadron Calorimeter for the JEDI Collaboration CALOR 216 May 17, 216 Irakli Keshelashvili Introduction JEDI Polarimetry Concept MC Simulations Laboratory and Beam
More informationThe Ecloud Measurement Setup in the Main Injector
The Ecloud Measurement Setup in the Main Injector C.Y. Tan, M. Backfish, R. Zwaska 11 Oct 2010 Ecloud Workshop 2010 FILE: ecloud.odp / Oct 10, 2010 / Page 1 Overview The FNAL complex and Setup at MI-52
More informationCALICE AHCAL overview
International Workshop on the High Energy Circular Electron-Positron Collider in 2018 CALICE AHCAL overview Yong Liu (IHEP), on behalf of the CALICE collaboration Nov. 13, 2018 CALICE-AHCAL Progress, CEPC
More informationCommissioning and operation of the CDF Silicon detector
Commissioning and operation of the CDF Silicon detector Saverio D Auria On behalf of the CDF collaboration International conference on Particle Physics and Advanced Technology, Como, Italy, 15-19 October
More informationHPS Upgrade Proposal
HPS Upgrade Proposal HPS collaboration July 20, 2017 Analysis of the HPS engineering run data showed worse than expected reach in both the bump hunt and the vertexing searches. These reach discrepancies
More informationInstallation of the Optical Replica Synthesizer (ORS) at FLASH
Installation of the Optical Replica Synthesizer (ORS) at FLASH Who and What? G. Angelova, V. Ziemann- Task: Modulator and radiator undulators, participating in the Theoretical simulations with Genesis
More informationMonte Carlo Simulation of the PRad Experiment at JLab 1
Monte Carlo Simulation of the PRad Experiment at JLab 1 Li Ye Mississippi State University for the PRad collaboration 1.This work is supported in part by NSF MRI award PHY-1229153, the U.S. Department
More informationDAQ & Electronics for the CW Beam at Jefferson Lab
DAQ & Electronics for the CW Beam at Jefferson Lab Benjamin Raydo EIC Detector Workshop @ Jefferson Lab June 4-5, 2010 High Event and Data Rates Goals for EIC Trigger Trigger must be able to handle high
More informationFLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY
FLASH Training: RF Gun FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously Siegfried Schreiber, DESY FLASH Training DESY 17-Mar-2017 FLASH1 RF Gun History RF Guns operated
More information1 Status of the Hall A Møller Polarimeter
1 Status of the Hall A Møller Polarimeter 1 O. Glamazdin, 2 E. Chudakov, 2 J. Gomez, 1 R. Pomatsalyuk, 1 V. Vereshchaka, 2 J. Zhang 1 National Science Center Kharkov Institute of Physics and Technology,
More informationStatus of the PRad Experiment (E )
Status of the PRad Experiment (E12-11-106) NC A&T State University for the PRad collaboration Outline PRad Physics goals Experimental setup Current status Summary The Proton Charge Radius Puzzle New high
More informationHerwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction
THE LEP PROJECT - STATUS REPORT Herwig Schopper CERN 1211 Geneva 23, Switzerland Introduction LEP is an e + e - collider ring designed and optimized for 2 100 GeV. In an initial phase an energy of 2 55
More informationReliability studies for a superconducting driver for an ADS linac
Mol, Belgium, 6-9 May 2007 Reliability studies for a superconducting driver for an ADS linac Paolo Pierini, Luciano Burgazzi Work supported by the EURATOM 6 framework program of the EC, under contract
More informationNon-invasive Beam Profile Measurements using an Electron-Beam Scanner
Non-invasive Beam Profile Measurements using an Electron-Beam Scanner W. Blokland and S. Cousineau Willem Blokland for the Spallation Neutron Source Managed by UT-Battelle Overview SNS Accelerator Electron
More informationLCLS Injector Diagnostics. Henrik Loos. Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties
Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties LCLS Diagnostics Tasks Charge Toroids (Gun, Inj, BC, Und) Faraday cups (Gun & Inj) Trajectory & energy Stripline BPMs (Gun,
More informationCommissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System
Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System 15 th ICALEPCS 2015, Melbourne, Australia K. Ha, Y. Tian, L. Yu, W. Cheng, L. Dalesio W. Levine, University of
More informationSPES Control System. M. Bellato
SPES Control System M. Bellato Topics Update on LLRF Update on CB controls Update on network infrastructure Update on Software infrastructure Update on Software developments Topics Update on LLRF Update
More informationStatus Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005
Status Alcator C-Mod Engineering Systems DoE Quarterly Review October 27, 2005 1 Outline Run campaign Up-to-Air Machine Status Lower Hybrid Cryopump Tungsten Tiles Schedule/Plans 2 FY2005 Run Campaign
More informationAcceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii
Acceleration of High-Intensity Protons in the J-PARC Synchrotrons KEK/J-PARC M. Yoshii Introduction 1. J-PARC consists of 400 MeV Linac, 3 GeV Rapid Cycling Synchrotron (RCS) and 50 GeV Main synchrotron
More informationBeam Condition Monitors and a Luminometer Based on Diamond Sensors
Beam Condition Monitors and a Luminometer Based on Diamond Sensors Wolfgang Lange, DESY Zeuthen and CMS BRIL group Beam Condition Monitors and a Luminometer Based on Diamond Sensors INSTR14 in Novosibirsk,
More informationSystem Failure Operational Recovery
System Failure Operational Recovery VLBI data acquisition is a complex technical challenge for operators using various electronic data acquisition systems, large radio telescopes that use various drive
More informationTotem Experiment Status Report
Totem Experiment Status Report Edoardo Bossini (on behalf of the TOTEM collaboration) 131 st LHCC meeting 1 Outline CT-PPS layout and acceptance Running operation Detector commissioning CT-PPS analysis
More informationPrecision Measurement of the Proton Elastic Cross Section at High Q 2
Precision Measurement of the Proton Elastic Cross Section at High Q 2 Longwu Ou (MIT) for the E12-07-108 Collaboration Hall A Collaboration Meeting December 8, 2014 Nucleon Form Factors The EM form factors
More informationThe Qweak Experiment at Jefferson Lab
The Qweak Experiment at Jefferson Lab J. Birchall University of Manitoba for the Qweak Collaboration Elba XII, June 2012 1 Qweak: measurement of the weak charge of the proton Commissioning June - August,
More informationThe MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem
The MUSE experiment Technical Overview Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem MUSE is not your garden variety scattering experiment Low beam flux Large angle, non-magnetic
More informationBEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER
BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER C. Zhang, G.X. Pei for BEPCII Team IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China Abstract BEPCII, the second phase construction
More informationR. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07
Plan for Collimator Commissioning R. Assmann, CERN/AB 7/12/2007 for the Collimation Project LHC MAC RWA, LHC MAC 12/07 1) Installation Planning and Performance Reach Collimation is an performance-driven
More informationNonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs
Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Alex H. Lumpkin Accelerator Operations Division Advanced Photon Source Presented at Jefferson National Accelerator Laboratory
More informationHigh Current Measurements of a QB and QC Quadrupole
June 9, 05 JLAB-TN-05-037 1. Introduction High Current Measurements of a QB and QC Quadrupole T. Hiatt, K. Baggett, M. Beck, K. Sullivan and M. Wiseman Thomas Jefferson National Accelerator Facility, Newport
More informationDoes the short pulse mode need energy recovery?
Does the short pulse mode need energy recovery? Rep. rate Beam power @ 5GeV 1nC @ 100MHz 500MW Absolutely 1nC @ 10MHz 1nC @ 1MHz 50MW 5MW Maybe 1nC @ 100kHz 0.5MW No Most applications we have heard about
More informationDark current Monitor for the European XFEL D. Lipka, W. Kleen, J. Lund-Nielsen, D. Nölle, S. Vilcins, V. Vogel; DESY Hamburg
Dark current Monitor for the European XFEL D. Lipka, W. Kleen, J. Lund-Nielsen, D. Nölle, S. Vilcins, V. Vogel; DESY Hamburg Content 2 Dark current Principle of detecting weakly charged bunches with resonator
More informationABSTRACT 1 CEBAF UPGRADE CAVITY/CRYOMODULE
Energy Content (Normalized) SC Cavity Resonance Control System for the 12 GeV Upgrade Cavity: Requirements and Performance T. Plawski, T. Allison, R. Bachimanchi, D. Hardy, C. Hovater, Thomas Jefferson
More informationDemonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team
Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY
More informationStatus of the ESS Accelerator Workpackage
Status of the ESS Accelerator Workpackage Peter McIntosh STFC Daresbury Laboratory UK ESS Interactions and Opportunities Rutherford Appleton Laboratory 3 Dec 2014 The ESS Linac The European Spallation
More informationFrank Schmidt-Föhre, DESY
Commissioning of the New Online- Radiation-Monitoring-System at the New European XFEL Injector with First Tests of the High-Sensitivity-Mode for Intra-Tunnel Rack Surveillance Frank Schmidt-Föhre, DESY
More informationDevelopment of C-Mod FIR Polarimeter*
Development of C-Mod FIR Polarimeter* P.XU, J.H.IRBY, J.BOSCO, A.KANOJIA, R.LECCACORVI, E.MARMAR, P.MICHAEL, R.MURRAY, R.VIEIRA, S.WOLFE (MIT) D.L.BROWER, W.X.DING (UCLA) D.K.MANSFIELD (PPPL) *Supported
More informationINSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE
INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE S. M. Pattalwar, R. Bate, G. Cox, P.A. McIntosh and A. Oates, STFC, Daresbury Laboratory, Warrington, UK Abstract ALICE is a prototype
More informationConstruction Status of SuperKEKB Vacuum System
Construction Status of SuperKEKB Vacuum System Mt. Tsukuba SuperKEKB ( 3000 m) Damping Ring Linac KEK Tsukuba site Fourth Workshop on the Operation of Large Vacuum systems (OLAV IV) April 2, 2014 Kyo Shibata
More informationCryogenic Operations at SLAC
Cryogenic Operations at SLAC J. G. Weisend II, A. Candia, W.W. Craddock, E. Thompson CryoOps 2006 5/30/2006 J. G. Weisend II 1 What Do We Do? Cryogenics at SLAC involve: Large scale He refrigerator operation