1 CHAPTER-10 DESIGN OF EHVAND UHV SUB-STTAION 10.1 Introduction Large hydro-electric generating stations at remote feasible sites are being planned. Transmission at EHV/UHV level may be required providing for heavy transmission ties for bulk loads transfer from remote generating stations. Special considerations are involved in designing such substation for selection of single line diagram, switching schemes and busbar arrangements, electrical clearances to be adopted and layout of equipment in the switchyard. Shielding of control cables and other special problems in the design of EHV/UHV substations are also briefly outlined. The discussion covers the step-up substation at generating stations, step-down stations at load ends as well as switching stations sometimes necessary for paralleling long EHV/UHV lines. Discussions are made with special reference to EHV substations of Beas Project Switching Schemes for EHV Substations Types of Substations EHV substations may be sub-divided into three types (Figure 10.1) as given below: i) Step-up substation at generation end ii) Transformer substation at load ends of the system iii) Switching substations located along the lines to parallel them Criteria for the selection Major considerations for the selection of a suitable switching scheme for an EHV and are given below: UHV sub-station i) The scheme should fit in the planning criteria used to design the connected transmission system. System should be stable if a permanent fault occurs on a line. It is, therefore, important to limit as much as possible the system un-stability caused by outage of line, transformer or generators due to sub-station faults. ii) Repair or maintenance of the equipment should be possible without interruption of power supply. iii) iv) Expansion of sub-station should be easily possible. Large clearances are required at EHV and UHV level. Therefore in order to obtain lower structures and facilitate maintenance it is also important to design sub-stations, preferably with not more than two levels of bus bar. v) Practical site consideration at a particular location e.g. lack of adequate flat area for layout of equipment in the sub-station may also sometimes influence the choice of layout. The switching schemes suitable for each type of sub-station are discussed below. Based on paper by Author in 44 th Annual Research Session of Central Board of Irrigation & Power (1975) Step-up Substations: Step-up substations at generation ends may have unit connected transformers or else EHV transformers may be used to step-up the power from bus-bars at lower voltage in the switchyards of generating stations. The later type of substation is similar to the transformer step-down substation at load ends and will be discussed along with that type. For generating units connected directly to their step-up transformers, discussions are made with special reference to Dehar Power Plant of Beas Project where six units each of 165 MW are being installed and 4 units will be directly connected to their step-up 420 kv transformers. The other two units are connected to 245 kv system through unit connected transformer. An interlinking transformer 245/420 kv was proposed. Main single line diagram is shown in figure

2 GEN. INTERLINKUNG TRANSFORMER 1 1 STEU-UP SUB-STATION 2 SWITCHING SUB-STATION 3 TRANSFORMER SUB-STATION 2 3 Figure 10.1: Types of Substation Figure 10.2 to Figure 10.5 show the single line diagram, plan views and elevation (one circuit only) for four different schemes which were considered for this substation for 420 kv portion: i) A double bus single breaker scheme as shown in Figure 10.2 (scheme 1). ii) A single bus (sectionalized) with two generating units and one outgoing transmission line connected to each bus section as shown in figure 10.3 (scheme 2). iii) A double bus one and a half breaker scheme, figure 10.4 (scheme 3). 438

3 iv) Incoming lines from generator transformers, connected to two 420 kv buses by single breakers. The outgoing lines connected by two breakers to both the buses. The scheme corresponds to a single sectionalized bus for incoming lines and a two bus two breaker scheme for outgoing lines, figure 10.5 (scheme 4). v) Other schemes ring bus and double bus double breaker schemes were not considered due to lack of space and costs Discussion for Selection of Bus Scheme for Dehar Step-up Substation Forced Outage of Generator-Transformer Unit: In all the schemes capacity equal to one unit is lost when a generator transformer unit is forced out. Bus Section Fault :Generating capacity to the extent of four units (660 MW) may be forced out under certain conditions in case of a fault on 420 kv bus under scheme (1) Figure Outage of this large bulk of power amounting to about 22 percent of the maximum demand (3000 MW approximately) at that time may cause frequency dips which may trip generating units, loads and inter-regional tie lines by the operation of under frequency relays if installed and may upset system stability and was, therefore, not considered desirable. In schemes (2) Figure 10.3 and (4) Figure10.5 maximum power forced out will be to the extent of 2 units (330 MW) while in case of scheme (3) Figure 10.4 circuit breaker connected with the bus will trip but normally no outage of generating capacity will be caused. Figure 10.2: 420 kv Double Bus Single Breaker Scheme Substation Layout (Source: CBIP Paper by Author) 439

4 Figure 10.3: 420 kv Single Bus Single Breaker Scheme Substation Layout (Source: CBIP Paper by Author) 440

5 Figure 10.4: 400 kv One and a Half Breaker Scheme Substation Layout (Source: CBIP Paper by Author) 441

6 Figure 10.5: 420 kv Two Bus Two Breaker Scheme for outgoing Feeder and Single Breaker for Incoming Two Generators (Source: CBIP Paper by Author) 442

7 Transmission Line Outages: No power generating capacity is required to be shut down in case of a fault on 245 kv line (245 kv Bus) while in case of fault on 420 kv feeder (during the first stage of operation) power generation to the extent of about one unit may have to be shut down so as to achieve stability. In case of a bus section or circuit breaker fault there is a forced outage of 420 kv transmission line under schemes (1) Figure 10.2 and scheme (2) Figure It is possible to re-energise the line through bus coupler in case of scheme (1) but not so in scheme (2) Figure In scheme (2) figure 10.3, for carrying out maintenance of the 420 kv feeder breaker, the transmission line has to be forced out. In scheme (3) figure 10.4 when one of the generators is shut down, the advantage of second breaker for 420 kv line is lost as only one breaker will be controlling the transmission line. In scheme (4) figure 10.5 under first stage of operation when a 420 kv line is out due to line fault, power generation to the extent of one unit (165 MW) is automatically switched off and gives stability to the system even in case of limited rotating reserve available. In view of the above discussions, scheme (1) figure 10.2 and (2) figure 10.3 were found to be unsuitable to our requirements and were left out from further considerations. Other Considerations for Adopting Scheme (4) (figure 10.5) a) Requirement of space for switchyard under scheme (4) figure 10.5 will be much less than that for scheme (3) figure b) Requirement of control cables for relaying and inter-locking will be less for scheme (4) figure c) Switching operations for isolating a breaker or a bus section for maintenance in case of a fault are less under scheme (4) figure d) Two levels of busbars are possible in a substation of this type by placing circuit breakers outside the busbars (figure 10.5). e) Number of breakers required for scheme (4) figure 10.5 are less as compared to scheme (3) figure Transformer Substations: For transformer substations at the generating end or the load end, a single breaker double bus, a double breaker double bus (figure 10.6), a one and a half breaker (figure 10.4) or a ring bus (figure 10.7) schemes can be considered. However, only later three schemes generally meet the service continuity criteria. 443

8 Figure 10.6: 400 kv Double Bus Double Breaker Scheme Substation Layout (Source: CBIP Paper by Author) Figure 10.7: 420 kv Ring Bus Scheme Substation Layout (Source: CBIP Paper by Author) 444

9 Ring bus scheme requires only one breaker per circuit and is most economical. It is quite common in Canada and has been utilized in a slightly modified from for EHV/UHV system of Hydro-Quebec and that of Peace River Systems in USA. In simple ring bus scheme provision of protection becomes more complicated if number of circuits increase to more than six and its scope gets, therefore restricted. From the point of view of future expansion of the sub-station, one and a half breaker scheme and double breaker scheme is more suitable. Former requires lesser number of breakers and isolators and has been Figure 10.8: Main Single Line Diagram (Dehar Power Plant) (As Designed)proposed for the ultimate stage of receiving end transformers substation at Panipat. Initially, i.e. till more than 6 bays are required in the substation, layout shall be that for one and a half breaker scheme but shall be operated in ring bus with omission of some breakers and isolators and jumper connections of two circuits to the bus bars. Single line diagram for Dehar Hydro Power Station is at Figure Switching Station For a switching station all single line diagrams (sophisticated or otherwise) with only one busbar for paralleling two or more lines figure 10.3 must be rejected because a fault on this bus or on any equipment connected to it would put more than one line out of service. Neither ring-bus nor one-and a half breaker scheme meet the criteria for a switching station, because a fault on one circuit breaker can cause two lines to be lost. For a sub-station with incoming and outgoing lines, the double breaker scheme (Figure 10.6) is the only one that ensures the service continuity required by the criteria. To construct this kind of substation with only two levels of busbras, the circuit breakers are placed outside the busbars. 445

10 Single Line Diagram of a typical receiving end 420 kv Substation with shunt reactor installation is at Figure Electrical Clearances for Installing EHV/UHV Equipment In Field Space requirements and layout of electrical equipment in switchyard depends upon various types of air clearances required to be provided for laying the equipment of different rated voltages. Following basic clearances govern the sub-station design. (i) Earth clearance i.e. phase to ground clearance. (ii) Phase clearance i.e. phase to phase clearance. (iii) Safety clearance i.e. (a) Ground clearance. (b) Section clearance. Initial designs of substations are based on the air clearances worked out in accordance with the then recent CIGRE Study Committee Report which provides a correlation between the insulation levels and the minimum air clearances to ground and between phases. Tentative clearances for Dehar and Panipat 420 kv substations were, however, based on the similar test data as available earlier. For transmission systems of nominal system voltage below 300 kv sub-station clearances is governed only by lightning impulse over-voltages or BIL of the equipments and bus bars. For transmission system of 300 kv and above, sub-station clearances is mainly governed by internal over voltage i.e. switching impulse over-voltage and dynamic 420kV 420kV 50MVAR 50MVAR 50MVAR 4x105MVA DETAILS AT A 245kV M-1 M-2 T TRANSFER BUS 4x245kV 420kV SIDE 420kV AUX. BUS 33kV SPARE SINGLE PHASE UNIT 36kV 245kV AUX. BUS 245kV SIDE 4x25MVAR DETAILS 'A' Figure 10.9: Single Line Diagram of a Typical 420 kv Substation (Source: CBIP Manual on Sub-station) 446

11 over voltage. In order to reduce clearances and equipment insulation, internal overvoltage including switching impulse over voltages, have to be limited by using one or two step preinsertion resistors, single pole reclosing, synchronous closing of breakers, shunt reactors etc (Figure 10.9). The ratio of controlled switching impulse over voltages to the peak value of highest phase to ground system voltage varies from 2.5 in EHV system to 1.5 in UHV system. IEC publication 71 defines insulation levels for highest voltages for equipment of 300 kv and above as a combination of two components. The rated switching impulse withstands voltages and the rated lightning impulse withstands voltage. Accordingly the minimum clearances shall be the higher of the following and the section clearance will then be based on it. i) Minimum clearance from the consideration of the lightning insulation levels to be adopted for the sub-station equipment. ii) Minimum clearance computed from switching surge requirements Minimum Phase to Ground Clearances Clearances are discussed with special reference to 420 kv, based on the data available at the time of design. For higher voltage i.e. 525 kv and 765 kv level substation similar considerations can be applied based on the data available at the time of design. Insulation Levels and Withstand phase to ground Air Clearances Standard insulation levels for the highest voltage of 420 kv and above as per IS: and IEC recommendation are given in Table In this voltage range the performance of insulation and ground clearances are based on phase to phase switching impulse unless specifically required otherwise. Phase to ground clearance for switching over-voltages in EHV range may be estimated using the following formula. 0.6 d = U w 500K ( 1 1.3σ ) Where, d is the clearance in meters U w is the switching impulse withstand voltage in kv, K is the gap factor characterizing the shape of electrodes and σ is the standard deviation equal to 0.6 for switching impulse tests. For the types of electrodes existing in sub-station design it is possible to associate a value of phase-toground air clearance to each value of rated switching or lightning impulse withstand voltage. the requisite phase to ground clearance for switching and lightning impulse over voltages can be determined using the above formulae and graphs given in the CIGRE Committee report. It is seen that impulse withstand voltage of an air gap depends also on the shape of the electrodes and has been designated as gap factor K in the committee report. The gap factor K depends upon electrodes configuration and is influenced by geometrical dimensions of the gap, including the grounded surroundings configuration are given in table Minimum Phase to Ground Clearances for various Insulation Levels Sub-stations show mainly three types of phase to ground clearances. i) Distances between conductors and beam. ii) Distances between live parts of apparatus and beams. iii) Distance between conductor and ground. 447

12 The electrode configuration found for the first type of clearances is clearly identified, and can be regarded as being of the conductor structure, type, associated with a value of about 1.30 for the gap factor k. As regards the second type of air clearances, it is very difficult to identify a precise electrode configuration and the value of K is varying between 1.10 and Gap factor k=1.10 is characteristic for a configuration similar to rod-structure, e.g. open disconnecting switches near structures. Gap factor k=1.30 corresponds to the conductor-structure configuration, e.g. closed disconnecting switches near structures. As regards the third type of air clearances, conductor-ground configurations, normally the clearances are sufficiently high because bus-bar conductors are supported by metal supports and post insulators. In every case, this configuration is covered by the gap factor Table 10.3 gives the correlation between the various combinations of insulation levels shown in Table 10.1 and corresponding to k-=1.10 and 1.30 the minimum air clearances which are the highest values for each combination, calculated either for the switching or lightning impulse level. This table does not take into account the possibility/ electrodes getting closer together e.g. because of short circuit or wind. Minimum values of phase to earth clearances as per IS based on switching impulse withstand is given in table These values may be used for first approximation. Highest voltage for equipment Um Base for pu values Um 2 3 Table 10.1 Rated switching impulse withstand voltage (peak) Ratio between lightning and switching impulse withstand voltages kv kv p.u. kv 1.11 kv Rated lightning impulse withstand voltage (peak) Table-10.2 Electrode Configurations Rod Plane 1.00 Rod-Structure (Under) 1.05 Conductor Plane 1.15 Conductor Window 1.25 Conductor Strcuture (Under) 1.30 Rod-rod (h-3 m, under) 1.30 Conductor struicture (over and laterally) 1.35 Rod-rod ( h 6m, under) K

13 Conductor-rope 1.40 Conductor crossarm end 1.65 Conductor rod (h = 3m; under) 1.65 Conductor rod (h = 6m; under) 1.90 Conductor rod (over) 1.90 Insulation Level Rated Switching Impulse withstand voltage (kv) Table-10.3 Rated lightning impulse withstand voltage (kv) Minimum phase-to-ground Air Clearance (m) K=1.30 K= Phase-to-Ground Clearances for Dehar Sub-station Lightning impulse level of 1425 kv with a corresponding basic switching impulse level of 1175 for power transformers for Dehar 420 kv E.H.V. system was proposed for first stage installations. Lightning insulation level for circuit breakers and other apparatus connected to the bus bars with the b us bars themselves was proposed for Beas Project as for insulation class about 10% higher i.e kv. Minimum phase to ground air clearances for Beas Project sub-stations for initial designs based upon test data previously available and according to procedure outlined is given in table Table 10.4 (a) Minimum Phase to Ground Clearance Clearance in meters calculated as per latest data Adopted (Meters) (i) (ii) (iii) Conductors and Beams Line parts of apparatus and beams. Conductor and ground to or more 9.0 (b) Minimum Phase to Phase Clearance (ii) Minimum Rigid Bars Spacing (iii) Minimum strain Bus bars spacing (iv) Phase to Phase Spacing for equipment (v) Minimum spacing between 2 sets of bus bars to SAFETY CLEARANCES Safety clearance consists of ground clearance and section clearance. The ground clearance is the minimum clearance from any point on or about the permanent equipment where a man may be required to stand (measured from the position of feet) to the nearest part not at earth potential of an insulator supporting a line conductor and the same was taken as 2.59 m, which is the dimension for a tall man with arms outstretched below the conductor. 449

14 The section clearance is the minimum clearance from any point on or about the permanent equipment where a man may be required to stand (measured from the position of feet) to the nearest unscreened live conductor in air. The section clearance for 420 kv systems was determined as 6 m by adding 2.5 m to minimum phase-to-ground clearance of 3.5 m Height of bus bars above ground within sub-station premises The minimum conductor clearance from ground was obtained by adding ground clearance, earth clearance (2.59 meters height of a tall man with outstretched hands) and height of bus bar supporting clamps on the post insulator. In consideration to it, minimum height of bus bar was proposed to be 7.0 meters, which may be raised to 9.5 meters to correspond to the terminal height of 420 kv circuit breakers (Air blast circuit breakers). SF6 breakers are now used Conductor clearance from roadways within sub-station premises Minimum clearance between over-head conductors and roadways within sub-station premises was computed to be as Ground Clearance plus 6.25 meters. This dimension provides for a truck with a man standing on its top meters = meters PHASE TO PHASE CLEARANCES Insulation levels Phase to phase faults cause severe system disturbances and are, therefore, least desirable. As such phase spacing adopted should be such as to cause flashover to ground instead of phase-to-phase. For this purpose distance between phases is made to exceed that to ground to the extent that flashover can occur only to ground. The distance between systems e.g. between two bays are not only determined by their electrical strength the but also by necessity to carry out maintenance work. Lightning surge stresses between phases will normally not be higher than the lightning surge stresses to ground. Therefore, minimum phase to phase spacing are governed by switching impulse withstand voltage. Owing to the fact that phase-to-phase over-voltage peak is subjected to considerable variations, depending upon the following: (i) The waves shape (time to crest) of the phase-to ground switching over voltages having opposite polarity on adjacent phases. (ii) The ratio and time delay between these two components. It is possible to determine a ratio P between the maximum overvoltage between phases and the maximum overvoltage to ground only by means of TNA or field measurements. The theoretical maximum value of P is equal to 2, provided that the two-phase-ground components have opposite polarity and synchronous peak values equal to maximum overvoltage to ground. In practice, however, P will be lower because these conditions are not fulfilled. According to a number of TNA and field measurements the control of the over voltages to ground increases the ratio P; the higher the control, the higher the value of P, The ratio P = 1.66 to 1.7 of the rated switching impulse withstand voltage to ground between 1050 and 1175 kv was chosen as this generally leads to conservative values of the clearance. With this factor P and according to the standardized IEC values for the impulse levels, the switching impulse withstand voltage between phases start-over characteristics of ring-ring and rod-rod gaps is shown in table 10.5, for 420 kv voltage system. 450

15 Rated Switching impulse withstand voltage to Ratio between phase-to-phase and phase-to-ground switching impulse withstand voltage Table 10.5 Switching impulse voltage between phases (kv) 50% switching impulse flashover voltage between phases (kv) Minimum phase-tophase air clearance (m) ring-rod-ring rod. ring-ring rod-rod ground Phase to Phase Air Clearances In sub-stations mainly three types of phase to phase air clearances may be present depending upon electrode configuration: (i) (ii) (iii) Clearances between conductors Clearances between conductor and apparatus Clearances between poles of apparatus The first type of air clearances is found between the phases of line entrances and bus-bars. Occasionally, the conductor electrode may be sub substantially modified by hardware. The second type includes the conductor-disconnecting switch air clearances; the third type comprises the between breaker-poles, between disconnecting switch poles and between poles of current transformer kind of air clearance and clearances between line-traps. In general, the second and third type of air clearances presents electrodes configurations that are difficult to define. The rod-rod gap can be assumed to be representative for the practical geometrical conditions in the lower voltage, range, whilst the ring-ring gap with a given geometrical dimensions may be considered to be typical for the higher voltage range and be used for first type of air clearance. Many of the second and third type air clearances (clearances between the poles of apparatus i.e. disconnecting switches, breakers, etc.) might be considered proper to the apparatus, just as in the case of phase-to-ground air insulations, even when the apparatus is essentially single phase. The minimum clearance between phases, assuring a given insulation level, should, in this case, be specified by the manufacturer and checked by a type test. It is, therefore unnecessary to fix the minimum air clearances between the poles of apparatus which have the most widely varied electrode configurations. Table 10.6 gives the recommended minimum clearances between phases for rod-rod and ring-ring configuration in 420 kv in.e.h.v. range. Corona shield ring was assumed to have a diameter of 630 mm. Strain bus spacing were obtained by adding 0.7 meters to the spacing for rigid bus as per American practice. Other spacing adopted is shown in figure ELECTRICAL CLEARANCES FOR INSTALLING EHV/UHV EQUIPMENT AS PER CBI & P RECOMMENDATIONS CBI & P manual Entitled substation layout stipulates that air clearances for 420 kv and higher voltage switching over voltages are the governing factor. For determination of phase-to-ground air clearance, the rod-structure configuration is the worst electrode configuration normally encountered in practice; the conductor-structure configuration covers a large range of normally used configuration. But the necessary inter-phase clearance is more related to the rodconductor and conductor-conductor configuration. The unsymmetrical rod-conductor configuration is the worst configuration normally encountered in service. The conductor-conductor configuration covers all symmetrical configurations with similar electrode shapes on the two phases. 451

16 The phase to earth clearances is the higher value of the clearances determined for the rod structure configuration for the standard lightning impulse and for the standard switching impulse withstands voltages. The phase to phase clearance is the higher value of the clearances determined for the rod structure configuration for the standard lightning impulse and for the standard switching impulse withstands voltages. The CBI & P recommended values of clearance for substation up to 800 kv is as follows: Highest System Voltage (kv) Lightning impulse voltage (kvp) Table 10.6 Switching Minimum Clearances $ Impulse Voltage (kvp) Safety clearances (mm) Between phase & earth (mm) Between phase (mm) 3400* ** 6400* 9400** (Ph-E) 1575 (Ph-Ph) (Ph-E) 2550 (Ph-Ph) * Based on Rod-structure air gap. ** Based on Rod-Conductor air gap. $ This value of air clearances are the minimum values dictated consideration and do not include any addition for construction tolerances, effect of short circuits, wind effects and safety of personnel, etc LAYOUT OF EQUIPMENT IN THE SUB-STATION Layout of equipment for various types of single line diagram is shown in figure 10.2 to figure Due to practical considerations of space etc. the layout tentatively proposed for Dehar Sub-station is shown in Figure The layout of equipment at Panipat was proposed for one and a half breaker scheme SHIELDING OF CONTROL CABLES In the control cables and the secondary wiring passing through E.H.V. Sub-station dangerous high voltages are liable to be induced by opening and closing of E.H.V disconnects which may be especially dangerous for static/numerical relays. Accordingly such cables are required to be properly shielded. One of the power utility of U.S.A is using unarmoured cables and provides shielding by running heavy grounded conductor at the top of each cable trench. The portion of control cables in air (outside trenches) is, however shielded by armouring. Magnetic armouring has been used by C.E.G.B. in U.K. and is being adopted on Beas Project on the advice of supplier of protective equipment although effectiveness of magnetic armouring is reduced under short circuit conditions and may be examined in due course by site measurements. 452

17 REFERENCE 1. Thapar, OD,: Stability EHV system CBI & P Annual Reasearch Session, Publication No. 121, pp ,June R. Prourget Selecting a single line Diagram Hydro Quebec Symposium Extra High Voltage and Ultra High Voltage. October R.H. Hill and J.C. Stevens B.C. Hydro E.H.V. Transmissions System Design and construction Line and Station. Maintoba E.H.V. Symposium September, L. Paris, A. Taschini, K.H. Schneider and K.H. Weck Phase-to-Ground and Phase-to-Phase Air Clearances in Sub-stations CIGRE No. 29, 1973l; PP A.I.E.E. Committee Report Interim Report-Minimum Electrical Clearances based on Switching Surge Requirements AIEE Vol. PAS 1963 PP. 6. I.E.E.E. Committee Report Second Interim Report-Minimum Electrical Clearances Sub-station based on May 1965, PP I.E.C. Publication 71 Insulation Coordination Chapters I & II 5 th Edition. 8. Thapar, OD, and Saksena, RB,: Equipment Insulation Coordination in Developing 400 kv EHV System 1974 Issues of Power Engineer. 9. Thapar, OD and Saksena, RB,: Relaying for 400 kv EHV System Proceeding CBI & P Annual Reasearch Session, Publication No Howard, J. Sutton: Transients Induced in Control Cables Located in EHV Substation. IEEE, PAS-89, July-August Stanlay, H. Horowitz and Harold, T. Seeley: Relaying the AEP 765 System. IEEE, PAS July Central Board of Irrigation & Power Manual on Substations Pub Appendix 1.1 List of Indian Standards, Guides, Codes etc. required for Reference IS: 5 Colour for ready mix paints IS: Method of test for carbon type (PNA) Analysis of Mineral oils by Infrared (1991) Spectrophotometer IS: 375 IS: 1367 Marking & arrangement of swgr. bushbars main connections and auxiliary Wiring. Hot dip galvanized cooling on threaded fasteners. IS: 2147 Degree of protection provided by enclosures for low voltage switchgear And control gear. IS: 3347 Dimensions of porcelain transformer bushings for use in lightly polluted Atmospheres IS: 3637 Gas operated relays IS: 3639 Fitting & accessories for Power Transformers IS: 6272 Industrial cooling fans IS: 6600 Guide for loading of oil immersed transformers IS: 8603 Dimensions for porcelain transformer bushing for use in heavily Polluted atmosphere (36 kv class). Dimensions for oil filled porcelain transformer bushings for use in medium polluted atmospheres. IS: 9434 Guide for sampling and analysis of free and dissolved gas in oil filled Atmosphere. 453

18 IS: Code of practice for selection, installation and maintenance of trans- Former IS: 335 IS:325 IS:398(Pt-1) New insulating oils for transformer (Test procedure) Three-phase induction motors Aluminium conductors for overhead transmission purposes; Pt 1- Aluminium stranded conductors IS: 398(Pt-2) Aluminium conductors for overhead transmission purposes : Pt.2- Aluminium conductors, galvanized steel reinforced IS: 398(Pt-5) Aluminium conductors - galvanized steel reinforced for extra high voltage (400 kv and above) IS: 692 Paper insulated lead sheathed cables for rated voltage up to and including 33 kv - specification IS: 694 PVC insulated cables for working voltages up to and including volts. IS: 731 Porcelain insulators for overhead power lines with a nominal voltage greater than 1000 volts IS: 802 IS: 875 (Pt 1-5) IS:933 IS:934 IS: IS: 1248 IS: 1255 IS:1554(Pt-1) Use of structural steel in overhead transmission line towers - Code of practices. Code of practice for design loads (other than earthquake) for buildings and structures Portable chemical fire extinguisher, foam type Portable chemical fire extinguisher, soda acid type Three-phase distribution transformers up to and including 100 kva, 11 kv, outdoor type Direct acting indicating analogue electrical measuring instruments and their accessories Code of practice for installation and maintenance of paper insulated power cables (Up to and including 33 kv) PVC insulated (heavy duty) electric cables Part-1, for working voltages up to and including volts 18:1 554 (Pt-2) Specification for PVC insulated (heavy duty) electric cables Part-2, for working voltages from 3.3 kv up to and including 1 1 kv IS: 1866 IS: 2026 IS: 2062 IS: 2099 IS: 2121 IS: IS: 2190 IS: 2309 IS: 2486 Code of practice for maintenance and supervision of mineral insulating oil in equipment Power transformer Steel for general structural purposes - Specification Bushings for alternating voltages above volts Conductors and earth wire accessories for overhead power lines Insulation coordination Code of practice for selection, Installation and maintenance of portable first-aid fire extinguishers Code of practice for protection of buildings and allied structure against lightning Insulator fittings for overhead power lines with nominal voltage greater than 1000V 454

19 IS: 2544 IS: 2629 IS: 2633 IS: 2705 IS: 3034 IS:3070(Pt.1) IS: 3070 (Pt.2) IS: IS: 3156 IS: 3716 IS: 4004 IS: 4146 IS: 4201 IS: 5082 IS:5216(Pt.1&2) IS: 5547 IS:5553(Pt.1&2) IS: 5561 IS: 5578 IS: 6005 IS:8437(Pt.1&2) IS: 9921 IS:10028(Pt-1,Pt2&3) Porcelain post insulators for systems with nominal voltages greater than 1000 volts Recommended practice for hot-dip galvanizing of iron and steel Methods for testing uniformity of coating of zinc coated articles Current transformers Code of practice for fire safety of industrial building, electrical generating and distributing stations Lightning arresters for alternating current systems non-linear resistor type lightning arrester Metal oxide surge arresters without gaps for alternating current systems Earthing transformers Voltage transformers Application guide for insulation coordination Application guide for non-linear resister type surge arresters without series gap for AC system Application guide for voltage transformers Application guide for current transformers Wrought aluminium and aluminium alloy bars, rods, tubes and sections for electrical purposes Guide for safety procedures and practices in electrical work Application guide for capacitor voltage transformers Shunt reactors Specifications for electrical power connectors Guide for marking of insulated conductors Code of practice for phosphating of iron and steel Guide on effects of currents passing through human body Alternating current disconnections (isolators) for voltages above 1000 volt Code of practice for selection, installation and maintenance of transformers 15:10118 Code of practice for selection, installation and maintenance of switchgear and control gear 13:10136 Code of practice for selection of disc insulator fittings for highest system voltages of 72.5 kv and above 13:10162 Spacers and spacer dampers for twin horizontal bundle conductors. 15: Application guide for power transformers IS: (Pt-2) Graphical symbols used in electro-technology : conductors and connecting device's IS: 12032(Pt-4) Graphical symbols used in electro-technology : Passive components 455

20 IS: 12032(Pt-6) Graphical symbols used in electro-technology : Production and Conversion of electrical energy 13: (Pt-7) Graphical symbols used in electro-technology : Switchgear, control gear and protective devices IS: Voltage bands for electrical installations including preferred voltages and frequency IS: Classification of degrees of protection provided by enclosures of electrical equipment IS: S:13118/IEC: 56 IS: IS: (Pt.1 to 5) Guide for selection of Insulators in respect of pollution conditions. Specification for high voltage AC circuits breakers Methods of synthetic testing of high voltage AC circuit breakers LV switchgear and control gear Appendix 1.2 List of IEC Standards IEC: Fluids for electromechanical applications Unused mineral insulating oils for transformers and switchgear IEC IEC : (P1 to P9) IEC (Part 1 to Part 5) IEC I EC IEC IEC-1129 Instrument Transformers: Measurement of Partial Discharges Recommendations for Direct Acting indicating-analogue electrical measuring instruments and their accessories. Power Transformers Determination of Transformer and Reactor Sound Levels Metal oxide surge arresters without gaps Alternating Current Disconnectors (Isolators) and Earthing switches Alternating Current Earthing Switches Induced Current switching IEC Insulated bushings for alternating voltages above 1000 V. IEC IEC IEC IEC IEC (Part 1 to part 23) IEC (Part 1 & Part 2) Tests on indoor and outdoor post insulators of ceramic material or glass for Systems with Nominal Voltages Greater than 1000 V Guide to the Selection of High Voltage Cables On-Load Tap-Changers Tests on Hollow Insulators for use in electrical equipment. Electrical relays High Voltage switches 456

21 IEC IEC IEC IEC (Pt to P4) IEC IEC IEC IEC IEC IEC (P1 & P2) IEC IEC IEC IEC IEC IEC IEC I EC IEC IEC I EC IEC I EC IEC IEC Characteristics of indoor and outdoor post insulators for systems with nominal voltages greater than 1000V Reactors Dimensions of mechanical structures of the 482.6mm (19 inches) series Specification and Acceptance of New Sulphur Hexafloride Radio Interference Test on High Voltage Insulators Artificial Pollution Tests on High Voltage Insulators to be used on AC Systems Common Specification for High Voltage Switchgear & Control gear Standards Guide for the Selection of Insulators in respect of Polluted Conditions Short Circuit Current - Calculation of effects Loading Guide for Oil - Immersed power transformers High Voltage Alternating Current Circuit Breakers Synthetic Testing of High Voltage alternating current circuit Breakers Pressurized Hollow Column Insulators Coupling capacitors and capacitor dividers Coupling Devices for power Line Carrier Systems Degree of Protection provided by enclosures Line traps for A.C. power systems Coupling Devices for power line carrier systems Single sideboard power line carrier terminals Planning of (single Side-Band) power line carrier systems Expression of the performance of electrical & electronic measuring equipment Symbols for Alternating-Current Electricity meters Man machine interface (MMI) - Actuating principles Class 0.5, 1 and 2 alternating current watt hour metres 457

22 IEC IEC Modular plug-in Unit and standard 19-inch rack mounting unit based on NIM Standard (for electronic nuclear instruments) Insulators for overhead lines with nominal voltage above 1000 V-ceramic or glass insulator units for a.c. systems Characteristics of String Insulator Units of the cap and pintype IEC-60372(1984) Locking devices for ball and socket couplings of string insulator units: dimensions and tests. IEC (P1 and P2) Insulators for overhead lines with a nominal voltage above 1000 V. IEC IEC IEC (P1 to P7) IEC IEC IEC (P1 to P3) IEC IEC (P1 to P3) IEEE: 32 Characteristics of string insulator units of the long rod type Dimensions of Clevis and tongue couplings of string insulator units Polyvinyl Chloride insulated cables of rated voltages up to and including 450/750V Conductors of insulated cables Impulse tests on cables and their accessories Calculation of the continuous current rating of cables (100% load factor) Standard colours for insulation for low-frequency cables and wires Tests on electric cables under fire conditions IEEE standard requirement terminology and test procedure for neutral Grounding device. 458

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

EE 1402 HIGH VOLTAGE ENGINEERING

EE 1402 HIGH VOLTAGE ENGINEERING EE 1402 HIGH VOLTAGE ENGINEERING Unit 5 TESTS OF INSULATORS Type Test To Check The Design Features Routine Test To Check The Quality Of The Individual Test Piece. High Voltage Tests Include (i) Power frequency

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

LIST OF IS STANDARDS FOR ELECTRICAL PROJECTS

LIST OF IS STANDARDS FOR ELECTRICAL PROJECTS SL NO. NAME OF SPECIFICATION IS 1 Specification for High-Voltage Alternating-Current Circuit-Breakers IS 13118 2 Guide for testing of circuit breakers with respect to out-of-phase switching IS 9135 3 Bushings

More information

Insulation Co-ordination For HVDC Station

Insulation Co-ordination For HVDC Station Insulation Co-ordination For HVDC Station Insulation Co-ordination Definitions As per IEC 60071 Insulation Coordination is defined as selection of dielectric strength of equipment in relation to the operating

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Appendix B to Working on Exposed Energized Parts

Appendix B to Working on Exposed Energized Parts Working on Exposed Energized Parts. - 1910.269 App B Regulations (Standards - 29 CFR) - Table of Contents Part Number: 1910 Part Title: Occupational Safety and Health Standards Subpart: R Subpart Title:

More information

Utility System Lightning Protection

Utility System Lightning Protection Utility System Lightning Protection Many power quality problems stem from lightning. Not only can the high-voltage impulses damage load equipment, but the temporary fault that follows a lightning strike

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

Substation: From the Outside Looking In.

Substation: From the Outside Looking In. 1 Substation: From the Outside Looking In. Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the presentation 3 Today s Presenter n Greg

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

Underground System Design TADP 547

Underground System Design TADP 547 Underground System Design TADP 547 Industry Standards, Specifications and Guides Presentation 6.4 Instructor: Frank Frentzas Industry Organizations Several professional organizations develop standards

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS TABLE OF CONTENTS PAGE 1.0 SCOPE... 2 2.0 STANDARDS... 2 3.0 DESIGN REQUIREMENTS... 2 3.01 Service Conditions... 2 3.02 Ratings... 3 4.0 Sectionalizer Construction... 4 5.0 Mechanism... 6 6.0 Solid Dielectric

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Earthing of Electrical Devices and Safety

Earthing of Electrical Devices and Safety Earthing of Electrical Devices and Safety JOŽE PIHLER Faculty of Electrical Engineering and Computer Sciences University of Maribor Smetanova 17, 2000 Maribor SLOVENIA joze.pihler@um.si Abstract: - This

More information

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS 1.0 SCOPE 2.0 BONDING METHODS 2.1 Introduction 2.2 Design 2.3 Single-Point Bonding 2.4 Cross Bonding 2.5 Sheath Sectionalizing Joints 2.6 Sheath Standing Voltage 2.7 Sheath Voltage at Through Fault 2.8

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems These design criteria have been established to assure acceptable

More information

High voltage engineering

High voltage engineering High voltage engineering Overvoltages power frequency switching surges lightning surges Overvoltage protection earth wires spark gaps surge arresters Insulation coordination Overvoltages power frequency

More information

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS M. Kondalu, Dr. P.S. Subramanyam Electrical & Electronics Engineering, JNT University. Hyderabad. Joginpally B.R. Engineering

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

Neutral Earthing. For permanent or temporary neutral earthing in HV systems Neutral Earthing Resistors RESISTORS For permanent or temporary neutral earthing in HV systems For continuous or temporary low-resistance neutral grounding in medium voltage systems Neutral point connection

More information

Welcome to the Session on. HT Distribution Network

Welcome to the Session on. HT Distribution Network Welcome to the Session on HT Distribution Network Learning Objective By the end of this session you will be able to: Explain the HT distribution network breakdown maintenance - possible faults, identification

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

ELEC Transmission i and

ELEC Transmission i and ELEC-1104 Lecture 5: Transmission i and Distribution ib ti Power System Layout Transmission and Distribution The transmission system is to transmit a large amount of energy from the power stations s to

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

Lecture 36 Measurements of High Voltages (cont) (Refer Slide Time: 00:14)

Lecture 36 Measurements of High Voltages (cont) (Refer Slide Time: 00:14) Advances in UHV Transmission and Distribution Prof. B Subba Reddy Department of High Voltage Engg (Electrical Engineering) Indian Institute of Science, Bangalore Lecture 36 Measurements of High Voltages

More information

Great Northern Transmission Line: Behind the (Electrical) Design

Great Northern Transmission Line: Behind the (Electrical) Design Great Northern Transmission Line: Behind the (Electrical) Design November 8, 2017 Christian Winter, P.E. Minnesota Power Sivasis Panigrahi, P.E. POWER Engineers, Inc. What is the Great Northern Transmission

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable: Reclosers NOVA Three-Phase Recloser Functional Specification Guide Functional specification for NOVA three-phase recloser 1. Scope This specification describes the features and ratings of the NOVA recloser.

More information

Transformers TRANS FORM ERS

Transformers TRANS FORM ERS Transformers TRANS FORM ERS Meiden Transformers are standard design, standard quality. Our Factories on world-wide supply chain Since its founding in 1897 Meidensha Corporation has not only built up a

More information

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery Application of EMI Diagnostics to Hydro Generators James Timperley Doble Global Power Services Columbus, Ohio jtimperley@doble.com

More information

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

Power Frequency Withstand Voltage On-site testing of 400 kv GIS Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:

More information

Modeling insulation in high-voltage substations

Modeling insulation in high-voltage substations 38 ABB REVIEW DESIGNED FOR SAFETY DESIGNED FOR SAFETY Modeling insulation in high-voltage substations The goal of insulation coordination is to determine the dielectric strength of transformers and other

More information

MINISTRY OF ELECTRICITY

MINISTRY OF ELECTRICITY MINISTRY OF ELECTRICITY IRAQ SUPERGRID PROJECTS 400/132 KV GIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007 LIST OF REVISIONS 1 2 3 4 5 Current Rev. Date 19.11.04 18.03.05 Aug 05 Oct 05 Jan 07

More information

Electrical Power Systems

Electrical Power Systems Electrical Power Systems CONCEPT, THEORY AND PRACTICE SECOND EDITION SUBIR RAY Professor MVJ College of Engineering Bangalore PHI Learning Pfcte tofm Delhi-110092 2014 Preface xv Preface to the First Edition

More information

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This

More information

I -limiter The world s fastest switching device

I -limiter The world s fastest switching device I S -limiter 2 I S -limiter The world s fastest switching device Reduces substation cost Solves short-circuit problems in new substations and substation extensions Optimum solution for interconnection

More information

Tab 8 Surge Arresters

Tab 8 Surge Arresters s en em Tab 8 Surge Arresters Si Distribution System Engineering Course Unit 10 2017 Industry Inc., All Rights Reserved Surge Arresters The main protective devices against system transient overvoltages.

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION 1. SCOPE : TECHNICAL SPECIFICATION FOR LIGHTNING ARRESTORS 1.1. This Specification covers design, manufacture, testing at manufacturer's Works, packing, supply, delivery of 42 KV

More information

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards. 8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage

More information

Secondary Arresters. Figure 1. Type L secondary surge arrester rated 175 Vac, 125 Vdc.

Secondary Arresters. Figure 1. Type L secondary surge arrester rated 175 Vac, 125 Vdc. Surge Arresters Secondary Arresters and Protective Gaps Electrical Apparatus 235-10 GENERAL INFORMATION The necessity of providing surge arrester protection on low-voltage circuits is fundamentally the

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 21 25 Sep $3,750 Dubai, UAE In any of the 5 star

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations Case Study 1 Power System Planning and Design: Power Plant, Transmission Lines, and Substations Lindsay Thompson, 5203120 Presented to Riadh Habash ELG 4125 11/10/2013 1.0 ABSTRACT A power plant delivers

More information

Busbars and lines are important elements

Busbars and lines are important elements CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection

More information

6B.6 Substation Grounding

6B.6 Substation Grounding 1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

Electrical Description

Electrical Description History of this Document Rev. no.: Date: Description of change 0 First edition 2 2003-10-08 Section 3: The rated power of the transformer can be increased by 40% if they are equipped with 6 fans for forced

More information

Hamdy Faramawy Senior Application Specialist ABB Sweden

Hamdy Faramawy Senior Application Specialist ABB Sweden Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy

More information

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS TRANSFORMER IN GRID When surge arres t ers are installed close to a power transformer, they provide protection against lightning overvoltage ABSTRACT The aim of this research article is to determine the

More information

ABSTRACTS of SESSION 6

ABSTRACTS of SESSION 6 ABSTRACTS of SESSION 6 Paper n 1 Lightning protection of overhead 35 kv lines by antenna-module long flashover arresters Abstract: A long-flashover arrester (LFA) of a new antenna-module type is suggested

More information

Distribution/Substation Transformer

Distribution/Substation Transformer Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Substation Design Volume VII

Substation Design Volume VII PDHonline Course E474 (5 PDH) Substation Design Volume VII Other Major Equipment Instructor: Lee Layton, P.E 2015 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

SPECIFICATION No SS-135/ kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS

SPECIFICATION No SS-135/ kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS -1- INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION June 2013 SPECIFICATION No 150 kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS I. SCOPE This specification

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Testing of 400 kv GIS

Testing of 400 kv GIS Testing of 400 kv GIS Robert le Roux, Dermot Dorgan, Brian Perry ESB International - Ireland Paper 028 1 Introduction The 400 kv transmission is designed for critical periods of low loading. Due to critical

More information

The Many Uses of Transmission Line Arresters

The Many Uses of Transmission Line Arresters Introduction It was not realized at the time, but the 1992 introduction of the polymer-housed transmission line arrester (TLA) was clearly a game changer in the practice of lightning protection of transmission

More information

DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM

DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM H. Huang V. Ramaswami D. Kumar Siemens AG Power Transmission and Distribution 91056 Erlangen, Germany TransGrid Solutions Inc., Winnipeg, Canada INTRODUCTION

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha

SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha EE2402 - PROTECTION & SWITCHGEAR SYLLABUS ELECTRIC POWER SYSTEM Electricity is generated at a power plant (1), voltage

More information

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT Electro-Mechanical Works Guidelines for Power Evacuation and Interconnection with Grid Sponsor: Ministry of New and Renewable Energy Govt. of India

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS

NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS Ljubomir KOJOVIC Cooper Power Systems - U.S.A. Lkojovic@cooperpower.com INTRODUCTION In steel facilities that use Electric Arc Furnaces (EAFs) to manufacture

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Transmission of Electrical Energy

Transmission of Electrical Energy Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors are usually aluminum cable steel reinforced (ACSR),

More information

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages Session Four: ractical Insulation Co-ordination Session Four: ractical Insulation Co-ordination for Lightning Induced Overvoltages Jason Mayer Technical Director, Energy Services, Aurecon Introduction

More information

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES 23 CHAPTER 2 v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES 2.1 INTRODUCTION For reliable design of power system, proper insulation coordination among the power system equipment is necessary. Insulation

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

Coil Products Beginnings 1960 State of the Art. Customer partnership around the globe. Continuous innovation since 1900

Coil Products Beginnings 1960 State of the Art. Customer partnership around the globe. Continuous innovation since 1900 Coil Products Coil Products Customer partnership around the globe More than 250,000 coil products delivered to more than 170 countries. More than 60 years of operational experience. 35,000 in Europe 13,000

More information

1. Introduction to Power Quality

1. Introduction to Power Quality 1.1. Define the term Quality A Standard IEEE1100 defines power quality (PQ) as the concept of powering and grounding sensitive electronic equipment in a manner suitable for the equipment. A simpler and

More information

ABSTRACT 1 INTRODUCTION

ABSTRACT 1 INTRODUCTION ELECTROMAGNETIC ANALYSIS OF WIND TURBINE GROUNDING SYSTEMS Maria Lorentzou*, Ian Cotton**, Nikos Hatziargyriou*, Nick Jenkins** * National Technical University of Athens, 42 Patission Street, 1682 Athens,

More information