|
|
- Gabriella Henry
- 5 years ago
- Views:
Transcription
1
2
3
4
5
6
7
8
9 1 LEVELS DISPLAYED ACC: 48IA1A:/usr/d FILE:.DGN STANDARD DETAIL SHEET DRAWN BY: DATE: DESIGN FILE FEDERAL AID PROJECT NO. STATE DIST. COUNTY TEXAS CONT. SECT. JOB HIGHWAY NO. SHEET NO.
10 1 LEVELS DISPLAYED ACC: 48IA1A:/usr/d FILE:.DGN STANDARD DETAIL SHEET DRAWN BY: DATE: DESIGN FILE FEDERAL AID PROJECT NO. STATE DIST. COUNTY TEXAS CONT. SECT. JOB HIGHWAY NO. SHEET NO.
11 PRODUCT NAME A TOP OF SLOPE B EDGE OVERLAP C JUNCT OVERLAP D TERMINAL END E TNSV CHECK F PERIMETER EDGE G STAPLE PATTERN G1 STAPLE TYPE REMARKS Western Ecelsior CC-4 Etend the blanket 2 - ecavate a deep X Staple pattern repeated for both top and bottom of the blanket. Center 18".5" 2 Center Staple pattern repeated for both top and bottom of the blanket. Staples in the body of the blanket are placed in a 2-3 pattern every 18 inches. Staples shall be Western Ecelsior SR-1 Etend the blanket 2 - ecavate a deep X Staple pattern repeated for both top and bottom of the blanket. Center 18".5" 2 Center Staple pattern repeated for both top and bottom of the blanket. Staples in the body of the blanket are placed in a 2-3 pattern every 18 inches. Staples shall be Southern Environmental SEC-S2 Etend the blanket 2 - ecavate a deep X Compacted Fill 2"(min) When blankets must be spliced down the slope, place blankets end over end (shingle style), with minimum overlap. Staple through overlapped area approimately 12" apart. (min) The bottom of the blanket is folded under and stapled according to TTI standard procedure " 4 total Staples shall be Rhino Erosion King Single Net (2:1) Etend the blanket 2 - ecavate a deep X 2"(min) When blankets must be spliced down the slope, place blankets end over end (shingle style), with minimum overlap. Staple through overlapped area approimately 12" apart. (min) The bottom of the blanket is folded under and stapled according to TTI standard procedure " For Clay 8" For Sand The pattern is a pattern which is repeated every 5 feet. Each row is 1.25 feet from each other. Manufacture specs call for 8 gauge staples for the sand, however Steve Lawko from Rhino sent instructions for us to use 11 gauge staples for his 2:1 test. Staples shall be for Clay and 8" for Sand Rhino Erosion King Double Net (2:1) Etend the blanket 2 - ecavate a deep X 2"(min) When blankets must be spliced down the slope, place blankets The bottom of the end over end (shingle style), with minimum overlap. Staple blanket is folded through overlapped area under and stapled approimately 12" apart. according to TTI standard procedure. (min) 1 2.5" For Clay 8" For Sand The pattern is a pattern which is repeated every 5 feet. Each row is 1.25 feet from each other. Manufacture specs call for 8 gauge staples for the sand, however Steve Lawko from Rhino sent instructions for us to use 11 gauge staples for his 2:1 test. Staples shall be for Clay and 8" for Sand NOTES: 1. Grade area of installation. Remove all rocks and other obstructions so the material will have direct contact with soil. 2. Install product in direction of water flow unless otherwise noted. 3. Apply seed/fertilizer as specified by TDOT specifications. CLASS 1 - SLOPE PROTECTION TYPES A, B, C, D QL/JM JULY OF 8
12 PRODUCT NAME A TOP OF SLOPE B EDGE OVERLAP C JUNCT OVERLAP D TERMINAL END E TNSV CHECK F PERIMETER EDGE G STAPLE PATTERN G1 STAPLE TYPE REMARKS Terra Nova Earthguard Fiber Matri with Conwed Hydromulch 1000 wood fiber & Tascon Pro Mat Paper Fiber Water added to hydroseeder and then earthguard. Allow to mi for 5min. then add wood and paper fiber. Mi for an additional 5-10min. then sprayed on. 1500lbs. Wood Fiber 1500lbs. Paper Fiber 12 Gallons Earthguard /Acre on Sand 1500lbs. Wood Fiber 1500lbs. Paper Fiber 10 Gallons Earthguard /Acre on Clay Beds tested at a 2:01 slope. HydroStraw 2000lbs./ acre application rate 100 gallons water for each 60lbs of mulch Hydrostraw was applied with the Hydroseeder, allowed to dry for at least 24 hours and then tested. NOTES: 1. Grade area of installation. Remove all rocks and other obstructions so the material will have direct contact with soil. 2. Install product in direction of water flow unless otherwise noted. 3. Apply seed/fertilizer as specified by TDOT specifications. CLASS 1 - SLOPE PROTECTION TYPES A, B, C, D QL/JM JULY OF 8
13 1 PRODUCT NAME A TOP OF SLOPE B EDGE OVERLAP C JUNCT OVERLAP D TERMINAL END E TNSV CHECK F PERIMETER EDGE G STAPLE PATTERN G1 STAPLE TYPE REMARKS 2000lbs./ acre application rate Geoskin Cotton 75 gallons water for each 50lbs of Geoskin hydromulch Hydromulch Geoskin was applied with the Hydroseeder, allowed to dry for at least 24 hours and then tested. The standard 25% loss factor for the mulch was calculated into the batch. Erosion Control Blanket.com S31 SINGLE NET BLANKET Etend the blanket 2 - ecavate a deep X 18" When blankets must be spliced down the slope, place blankets end over end (shingle style), with minimum overlap. Staple through overlapped area approimately 12" apart. The bottom of the blanket is tucked under 24" and is stapled at the end with a staple check each 1 foot across the blanket. 18" 18" The staple pattern follows a 3-2 pattern every 3 feet. The row of 3 staples are placed at the outside 18 inches from each side of the test bed. 3 Staples Staples shall be Erosion Control Blanket.com S32 Double Net Straw Etend the blanket 2 - ecavate a deep X 18" When blankets must be spliced down the slope, place blankets end over end (shingle style), with minimum overlap. Staple through overlapped area approimately 12" apart. The bottom of the blanket is tucked under 24" and is stapled at the end with a staple check each 1 foot across the blanket. 2 18" 18" The staple pattern follows a 3-2 pattern every 2 feet. The row of 3 staples are placed at the outside 18 inches from each side of the test bed. 3 Staples Staples shall be Profile Products Fleterra 3500lbs./ acre application rate 125 gallons water for each 50lbs of mulch Fleterra was applied with the Hydroseeder, allowed to dry for at least 24 hours and then tested. The standard 25% loss factor for the mulch was calculated into the batch. Tested at the 2:1 slope American Ecelsior AEC Primier Straw Etend the blanket 2 - ecavate a deep X When blankets must be spliced down the slope, place blankets end over end (shingle style), with minimum overlap. Staple through overlapped area approimately 12" apart. The terminal end is folded under and stapled every 12" across the blanket 27" 18" 18" The first row is a row of 3 staples placed on the 2 outside edges and in the middle across the blanket. The second row is a row of two placed 1.5 from each side of the blanket. There is 2.25" between each row. Repeat pattern for the entire blanket LEVELS DISPLAYED ACC: 48IA1A:/usr/d FILE:.DGN NOTES: 1. Grade area of installation. Remove all rocks and other obstructions so the material will have direct contact with soil. 2. Install product in direction of water flow unless otherwise noted. 3. Apply seed/fertilizer as specified by TDOT specifications. Staples shall be STANDARD DETAIL SHEET CLASS 1 - SLOPE PROTECTION TYPES A, B, C, D DRAWN BY: QL/JM DATE: JULY 2002 DESIGN SHEET FEDERAL AID PROJECT NO. FILE NO. 6 OF 8 STATE DIST. COUNTY TEXAS CONT. SECT. JOB HIGHWAY NO.
Attached/Detached Patio Cover
1 Attached/Detached Patio Cover NOTE: Check with your homeowners association and architectural review committee for Conditions, Covenants & Restrictions (CC&R s). The San Joaquin County has no regulatory
More informationerosion control HasTec KGW 400 advantages: usage: For surface protection and greening of slopes in landscaping and traffic route engineering.
HasTec KGW 400 For surface protection and greening of slopes in landscaping and traffic route engineering. Surface covered with HasTec KGW 400. Fixing with nails of wood or steel (suggestion: 2-4 pieces
More informationINSTALLATION OF PYRAMAT FOR CHANNELS
PYRAMAT PERPENDICULAR CHANNEL INSTALLATION AND MAINTENANCE GUIDELINES Thank you for purchasing our PYRAMAT High Performance Turf Reinforcement Mat (HPTRM) or Turf Reinforcement Mat (TRM) by Propex Operating
More informationARTIFICIAL GRASS GENERAL PROJECT INSTALLATION TIPS. Buy or Rent HAND TOOLS & POWER EQUIPMENT. SHOP ONLINE or AT YOUR LOCAL HOME DEPOT STORE
Awesome for Kids ARTIFICIAL GRASS GENERAL PROJECT INSTALLATION TIPS Buy or Rent HAND TOOLS & POWER EQUIPMENT SHOP ONLINE or AT YOUR LOCAL HOME DEPOT STORE Find Quality TUNDRA BRAND Artificial Grass Installation
More informationConstructing Wire Fences
1 of 6 12/3/2010 9:48 AM University of Missouri Extension G1192, Reviewed October 1993 Constructing Wire Fences Richard E. Phillips Department of Agricultural Engineering This guide will provide some basic
More informationFlex Fence Instruction Manual
The Safer Stronger Smarter Choice Flex Fence Instruction Manual Table of contents 2 3 4 4 5 5 6 7 8 10 10 11 11 12 13 13 15 18 18 19 20 22 Table of contents Supplies, tools and equipment Introduction Laying
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationIntroduction. Planning
Introduction Since fencing is such an important part of a livestock grazing system, the USDA- Natural Resources Conservation Service (NRCS) has developed specific designs and specifications for landowners
More informationINSTALLATION OF PYRAMAT ON SLOPES
PYRAMAT SLOPE INSTALLATION AND MAINTENANCE GUIDELINES Thank you for purchasing our PYRAMAT High Performance Turf Reinforcement Mat (HPTRM) or Turf Reinforcement Mat (TRM) by Propex Operating Company, LLC
More informationTECHNICAL NOTE - PARALLEL CHANNEL INSTALLATION AND MAINTENANCE GUIDELINES - PYRAMAT 25
PARALLEL CHANNEL GUIDELINES-PYRAMAT 25 Thank you for purchasing the Pyramat 25 Turf Reinforcement Mat (TRM) by Propex Operating Company, LLC (Propex). This document provides installation and maintenance
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationPRODUCT EVALUATION Effective July 1, 2009 RC-204
TEXAS DEPARTMENT OF INSURANCE Engineering Services / MC 103-3A 333 Guadalupe Street P.O. Box 149104 Austin, Texas 78714-9104 Phone No. (512) 322-2212 Fax No. (512) 463-6693 PRODUCT EVALUATION Effective
More informationGEOTEXTILE INS TALL ATION GUIDE
GEOTEXTILE INS TALL ATION GUIDE TITAN ENVIRONMENTAL CONTAINMENT TE NON WOVEN GEOTEXTILE Rev. May, 2016 Unloading & Storage: The geotextile shall be labeled, stored, and handled in accordance with ASTM
More informationMinor Site Plan Application and Checklist Land Disturbing Activities
Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based
More informationInformation for File # RMM
Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:
More informationCONTINUOUS COUNTERPOISE ON POLES
Project Procedure CONTINUOUS COUNTERPOISE ON POLES 07/25/2011 PAGE 1 OF 5 1.0 PURPOSE The purpose of this procedure is to provide guidance and direction for the installation of continuous counterpoise
More informationEvaluation of Effectiveness and Cost-Benefits of Woolen Roadside Reclamation Products
Evaluation of Effectiveness and Cost-Benefits of Woolen Roadside Reclamation Products Rob Ament, Western Transportation Institute, Montana State University Monica Pokorny and Stuart Jennings, KC Harvey
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationProduct Dimensions (Width x Length x Height) (inches)
Mr. Dennis Hallahan, P.E. Infiltrator Water Technologies 4 Business Park Road P.O. Box 768 Old Saybrook, CT 06475 RE: Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing
More informationCompensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014
Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014 i. Project Overview 1. USACE # # SPK 2013 00851 2. Permittee:
More informationTOOLS NEEDED FOR PREGRA ARTIFICIAL GRASS INSTALLATION
TOOLS NEEDED FOR PREGRA ARTIFICIAL GRASS INSTALLATION 1. Removal of existing sod. Gas powered sod cutter Pick axe 2. Base installation. Wheelbarrow Flat shovel 4 flat rake Garden hose Gas powered plate
More informationVertical Offset Base and Safety Rail System Installation Instructions
Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat
More informationCambridge English Application Instructions
Cambridge English Application Instructions ROOF SLOPE: Never apply asphalt shingles to roof slopes less than 2:12. For slopes 2:12 to 4:12 (LOW SLOPE), see special underlayment requirements outlined below.
More informationApplication Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division
Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section
More informationSelected Answers for Core Connections, Course 2
Selected Answers for Core Connections, Course 2 Lesson 6.1.1 6-6. x x + 1 3 = 2 b: 2x 2 + 4x x + 2 3 = 2x 2 + 3x 1 6-7. Parts a, c, and d match the perimeter. 6-8. a: 23 20 or 1 3 20 d: 19 15 or 1 4 15
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationENVYPET 1(800) How to Install Your Turf 2013 Edition
ENVYPET 1(800) 334-8873 How to Install Your Turf 2013 Edition Tools needed for Base Prep: Shovel Rake Garden Hose You will also need to rent a compactor or water roller Tools needed for Turf Install: Razor
More informationDigitally Signed 06/02/2015
Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY
More informationInstallation Instructions
Installation Instructions SLICKER MAX RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Top of Wall Detail 5 Bottom of Wall Detail 6 Wall Corner Detail
More informationHousing Authority of Utah County
Legend Springville Site Vicinity Map (not to scale) Planning Department 110 South Main Street Phone (801) 491-7861 Fax (801) 489-2716 Community Development Director - J Fred Aegerter Public Works Department
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationTown of Westlake Construction Plans Review Checklist
CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile
More informationBEDSPREADS BEDSPREADS
12653 - BEDSPREADS 12653-1 PART ONE: GENERAL 1.1 Description BEDSPREADS 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the
More information7 x 14 flybed tramp. VISIT LINK BELOW FOR INSTALL VIDEO
in-ground installation instructions & user guide 7 x 14 flybed tramp VISIT LINK BELOW FOR INSTALL VIDEO https://www.maxairtrampolines.com/pages/support-information-videos Page 2 TABLE OF CONTENTS Materials,
More informationQUANTITY SURVEYS. Introduction
QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as
More information10 x 12 home air pro. VISIT LINK BELOW FOR INSTALL VIDEO
in-ground installation instructions & user guide 10 x 12 home air pro VISIT LINK BELOW FOR INSTALL VIDEO https://www.maxairtrampolines.com/pages/support-information-videos Page 2 TABLE OF CONTENTS Materials,
More informationASPHALT T E C H N O L O G I E S
ASPHALT T E C H N O L O G I E S Evaluation of Active Ventilation Products Inc. Aura-D (AV-24) Ventilator in Accordance With FLORIDA BUILDING CODE PROTOCOL TAS 100(A)-95 TEST PROCEDURE FOR WIND AND WIND
More information4th Grade Common Core Math Vocabulary
+ = + = + = + = + 4th Grade Common Core Math Vocabulary Created by Alexis Sergi Alexis Sergi http://www.teachersnotebook.com/shop/mathmojo = + = + + = + = + 1 Table of Contents!!!!!!!!!!!! Page Number
More informationSection 1. Introduction
Overview of Manual Acknowledgements i x Section 1. Introduction 1.0 Overview of Section 1 1-1 1.1 The GESC and DESC Permits 1-2 1.2 Reasons for the GESC and DESC Permits 1-2 1.3 Legislative Mandate 1-3
More informationMeasurement and Data Core Guide Grade 4
Solve problems involving measurement and conversion of measurements from a larger unit to a smaller unit (Standards 4.MD.1 2) Standard 4.MD.1 Know relative sizes of measurement units within each system
More informationNorthern York County School District Curriculum
Northern York County School District Curriculum Course Name Grade Level Mathematics Fourth grade Unit 1 Number and Operations Base Ten Time Frame 4-5 Weeks PA Common Core Standard (Descriptor) (Grades
More informationCountry Cabin. Assembly Manual. HomePlace Structures
Country Cabin Assembly Manual Country Cabin Assembly Manual revised 3/20/10 Dear Customer, Thank you for your purchase of our Country Cabin. The craftsmanship and detail in this building is unmatched.
More informationDETAIL CROFT FARM OUTBUILDING RESTORATION TOWNSHIP OF CHERRY HILL, NEW JERSEY
2x DIMENSIONAL LUMBER SISTER/SCAB REINFORCEMENT MEMBER 060523 3/8" A304 BOLT @ 8" O.C., STAGGERED EXISTING FRAMING MEMBER SECTION PROVIDE MIN EDGE DISTANCES AS SHOWN, TYP. ELEVATION REFER TO IFICATION
More informationMaking a Kick Net by Hand
Making a Kick Net by Hand Kick nets are great tools for collecting insects in streams. They consist of a rectangular sheet of netting that s supported on either side with poles. They typically require
More informationEssential Mathematics Practice Problems for Exam 5 Chapter 8
Math 254B Essential Mathematics Practice Problems for Eam 5 Chapter 8 Name Date This eam is closed book and closed notes, ecept for the Geometry Formula sheet that is provided by the instructor. You can
More informationCentral. Fabric. Dot to Dot Quilt. Supplies Needed. Instructions. Skill Level 2: Experience necessary. Project Instructions
Fabric Project Instructions Central Dot to Dot Quilt Skill Level 2: Experience necessary Crafting Time: Weekend Project Supplies Needed 1 Fabric Central Dot Bundle 1 1 Fabric Central Dot Bundle 2 Fabric
More informationNEED HDD TOOLS, PARTS & ACCESSORIES?
NEED HDD TOOLS, PARTS & ACCESSORIES? Visit us on-line at straightlinehdd.com STRAIGHTLINE Produce Profitable Solutions In All Ground Conditions. THE RIGHT REAMER AVAILABLE FOR EVERY DRILL. StraightLine
More informationYavapai County Development Services
Yavapai County Development Services Prescott Office 1120 Commerce Dr., Prescott, AZ 86305 (928) 771-3214 Fax: (928) 771-3432 Cottonwood Office 10 S. 6 th Street, Cottonwood, AZ 86326 (928) 639-8151 Fax:
More informationSW Region Asset Specifications: Four Strand Barbed Wire Fence Specifications
Lands Division Sustainable Resource Development SW Region Asset Specifications: Four Strand Barbed Wire Fence Specifications Prior to commencement of construction, contact must be made with the following
More informationKing And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)
King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal
More informationI. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.
ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationConstruction Concerns: Roofing Materials
Construction Concerns: Roofing Materials By Gregory Havel For www.fireengineering.com Photos by author. Over the centuries, people have opted for roofing materials that are less easily ignitable. If it
More informationStep 1 Calculate the square feet of roadway covered with tack 1,000 ft. x 12 ft. = 12,000 square feet
Tack Rate Problem # CRS-2 Tack (Specific Gravity=.00) was applied to the roadway. The temperature measured from the tack distributor was 25 F. The length of the application was 000 feet. The width of the
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationA B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN.
BORROW AS NECESSARY TO CONSTRUCT RIVERWARD SEE NOTE EL.. (MIN.) (MIN.) NEW UNCOMPACTED EL. EARTH C L C C C TYPICAL SECTION AND BORROW NO SCALE. CDF FLAT POOL EL.. JULJRP/REH AS CONSTRUCTED Approved Description
More informationInstallation Manual. Things to remember. - Page 3 - The Technotill Seeding System. Assembling an Opener. - Page
Installation Manual Things to remember - Page 1 - The Technotill Seeding System - Page 2 - Assembling an Opener - Page 3 - Technotill Seeding System Installation - Page 4 Opener Position and Packer Plate
More informationSection 808. FENCING
808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire
More information14 x 14 super quad. VISIT LINK BELOW FOR INSTALL VIDEO
in-ground installation instructions & user guide 14 x 14 super quad VISIT LINK BELOW FOR INSTALL VIDEO https://www.maxairtrampolines.com/pages/support-information-videos Page 2 TABLE OF CONTENTS Materials,
More informationWestern Excelsior Website Updated ECTC Communicator New Edition Available Release Date: 3/26/07 Western Excelsior is committed to continuously improving the support of its distributor network by providing
More informationTurada Hardwood Shingles and Shakes Installation instructions
1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced
More informationGENERAL MEETING OF THE BOARD OF DIRECTORS OF THE NORTH EAST TEXAS REGIONAL MOBILITY AUTHORITY RESOLUTION NO
GENERAL MEETING OF THE BOARD OF DIRECTORS OF THE NORTH EAST TEXAS REGIONAL MOBILITY AUTHORITY RESOLUTION NO. 16-91 WHEREAS, the North East Texas Regional Mobility Authority ( NET RMA ) was created pursuant
More informationCOMPONENTS INSTALLATION
PIPE BRACE ASSEMBLY - 8' FIXED-KNOT FENCE Brace posts... 14'x 2 7/8" Structural Tubing Cross Members... 10'x 2 3/8 Structural Tubing Angle Brace... 12'x 2 3/8 Structural Tubing Angle Brace Foot... 6' x
More informationSubdivision Application Checklist
City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application
More informationChemCurb System. The ChemCurb penetration pieces consist of the following sizes:
ChemCurb System The ChemCurb penetration pieces consist of the following sizes: ChemCurb Straights 6" & 12" straight sections used to lengthen the ChemCurb. Fit both curb sizes. F1304P (6" - Gray) -Contains
More informationCompost Mound. What You Need. Maintaining Your Compost Pile. Building a Compost Mound. Adding Wastes
Compost Mound Yard wastes can be composted without a bin if you don t mind the appearance of an uncontained compost mound in your yard. The only costs are your time and work. shovel or pitchfork 3 FEET
More informationBright stripes provide an unexpected departure from traditional holiday colors for these soft flannel sheets.
By Jennifer Gigas Snuggled beneath these holiday flannel sheets, visions of sugarplums will no doubt be dancing through the dreams of your special little one. Non-traditional colors and cheerful trims
More information11/06/2014 Pay Items - 1
Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...
More informationHEXAGONAL DOUBBLE TWISTED GABION & ROCK FALL MATRESSES
Menufatchurar of HEXAGONAL DOUBBLE TWISTED GABION & ROCK FALL MATRESSES As per IS 16014 (2012): Mechanically woven, double -twisted, hexagonal Wire Mesh Gabions, Revet Mattresses and Rock fallnetting(
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationGeneral Layout Design and Trackwork
General Layout Design and Trackwork Introduction This information is written for someone who is starting to design their track layout and who has limited on no experience in this work. It covers all the
More informationLap Quilt. Project Needs & Notes:
Lap Quilt Display your favorite embroidery on a homemade lap quilt! This project tutorial demonstrates how to embroider on quilt blocks, then assemble to make your own blanket. Project Needs & Notes: -
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationPROJECT INSTRUCTIONS Roofing
PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not
More informationRIVET-RAK STEEL SHELVING SOLUTIONS FOR STORAGE
RIVET-RAK STEEL SHELVING SOLUTIONS FOR STORAGE RIVET-RAK STEEL SHELVING Tri-Boro delivers both ease of assembly and unobstructed access with RIVET-RAK. It is available in the widest range of sizes in the
More informationViva Synthetic Thatch Installation Instructions
Viva Synthetic Thatch Installation Instructions Overview Structure This instruction manual is for the installation of VIVA on an open battened roof frame. Structure should be framed with weatherable wood
More informationUSE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS
USE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS Larry Shively The Shelly Company Ohio Asphalt Paving & North Central User Producer Group Conference Columbus, Oh February 2, 2011 Background 10 million
More informationSled Kite Plan (Allison)
Sled Kite Plan (Allison) Light to Moderate (4mph to 18mph) Crochet or button hole thread (1) 24" x 30" plastic trash bag (kitchen size) (2) 16" x 1/8" wooden dowels ALTERNATIVE: Use match-stick bamboo
More informationRe-Roofing Policy SPECIAL REQUIREMENTS AND NOTES
CITY OF MANTECA COMMUNITY DEVELOPMENT DEPARTMENT 1001 West Center Street Manteca, CA 95337 FAX (209) 923-8949 Building Safety Division (209) 456-8550 Planning Division (209) 456-8500 Public Works/Engineering
More informationHERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationRatios and Rates Common Assessment (7 th grade)
Name Score /38 pts. Multiple Choice: Circle the letter choice that best completes the statement or answers the question. (1 pt. each) 1. Gabby can assemble 7 music books in 4 minutes. At this rate, how
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationName Class Date. 1. On a map, 1 inch equals 5 miles. Two cities are 8 inches apart on the map. What is the actual distance between the cities?
Name Class Date Practice 8-5 Maps and Scale Drawings 2-5 Maps and Scale Drawings 1 On a map, 1 inch equals 5 miles Two cities are 8 inches apart on the map What is the actual distance between the cities?
More informationROOFING VENTILATION. Euramax Canada, Inc. Pro-Master Ridge Vent. Pro-Master Highpoint Series 5 & 7 Ridge Vents. Standard Box Vents
ROOFING VENTILATION Pro-Master Ridge Vent Pro-Master Highpoint Series 5 & 7 Ridge Vents Standard Box Vents Euramax Canada, Inc. (800) 461-5706 www.euramaxcanada.com RIDGE VENTTM Pro-Master Ridge Vent is
More informationMOCCASINS. Dancing- To feel the drumbeat entering my soul A power overwhelming all thoughts. Sometimes at first There is a feeling of loneliness.
NEVADA NATIVE TOOLS AND HOUSEHOLD ITEMS MOCCASINS Dancing- To feel the drumbeat entering my soul A power overwhelming all thoughts. Sometimes at first There is a feeling of loneliness. As I enter the arena
More informationBlue Heron Wall Hanging
Blue Heron Wall Hanging Are you dreaming of the ocean with its breath-taking views? Why dream when you can have that view in your home. Spread your wings and come fly with me while we create this wall-hanging
More informationCHAPTER 1: TITLE SHEET and GENERAL LAYOUT
CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations
More informationBarrel Vault Counter Batten and Batten
Barrel Vault Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)
BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND
More informationINDEX PAGE RELEASE SECTION NUMBER DATE
INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001
More informationCOST ESTIMATE CALCULATION WORKSHEET
COST ESTIMATE CALCULATION WORKSHEET The following tables from Chapter 5 of the December 22, 2000 Solid Waste Financial Assurance Program Report may be used to calculate cost estimates for closure and post-closure.
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationeco-shake INSTALLATION INSTRUCTION
1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,
More informationInstallation Instructions
Installation Instructions SLICKER CLASSIC RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Insulation Board Installation 5 EIFS Installation 6 Top of
More informationChapter 10. Shingles and Shakes
Chapter 10. Shingles and Shakes Definitions and Measurements 112 Exposure and Coverage 112 Square and Bundle 112 Weight112 Estimating Cubic Volume Equivalents 112 Method 1. From area coverage Method 2.
More informationModule 1 Study Guide
1. John is filling a bathtub that is 18 inches deep. He notices that it takes two minutes to fill the tub with three inches of water. He estimates it will take ten more minutes for the water to reach the
More informationModel Perimeter. So, the perimeter of the figure is 16 units. centimeters. centimeters. centimeters. centimeters
Lesson 11.1 Reteach Model Perimeter Perimeter is the distance around a figure. Find the perimeter of the figure. Step 1 Choose a unit to begin counting and label it 1. 1 1 unit Step 2 Count each unit around
More informationOnlot System Component Matrix
Onlot System Component Matrix Absorption Area Component Classification and Secondary / Advanced Treatment Options Slope Minimum Suitable Soil Depth to a Seasonal High-Water Table Limiting Zone Minimum
More information