1 Minnesota Department of Transportation 0 Greater Minnesota Construction Projects Warroad 4 Baudette Thief River Falls East Grand Forks 39 Crookston Detroit Lakes Fergus Falls Brainerd 00 Alexandria Little Falls 68 Saint 64 Cloud 57 Morris Montivideo Willmar Windom N Interstate 9 U.S. Highway Hinkley State Highway 6 New Ulm St. Peter Mankato 8 Misc. projects Blue Earth Albert Lea Rochester Austin Winona Red Wing Faribault Mn/DOT Districts District Boundary 0 Project Site Cities Metro Elk River 8 88 Twin Cambridge Worthington Redwood Falls Marshall Pipestone Granite Falls Virginia Duluth Hibbing Grand Rapids Bemidji Ely 05 Moorhead International Falls 5 5 April 0

2 0 Mn/DOT Greater Minnesota Construction Projects District Duluth/Virginia Hwy Location: South of Ely in Lake County, 5 miles Dates: July-Nov 0 Cost: $8,65,000 s, lane with Hwy Location: Ely to Isabella Description: Install reflective pavement markings Cost: $6,000 Impacts: Temporary lane 3 Hwy Location: At CR 6 in Cohasset Dates: May-Aug 0 Cost: $5,000 impacts 4 Hwy, Hwy 69 Location: Hwy and Hwy 69 in Itasca County Description: Install flashing lights Cost: $53,903 Impacts: Lane with 5 I-35 Location: Boundary Ave to 6th Ave East in Duluth, 0 miles Description: Replace and repair bridges and pavements (Duluth I-35 Mega Project) Dates: April 00-Nov 0 Total Cost: $66,876,987 0 Cost: $8 million, traffic crossovers, lane restrictions HUwww.dot.state.mn.us/duluthme gaproject/u 6 I-35 Location: At Hwy 33 and Hwy 3 near Cloquet and Sandstone Description: Re-deck bridges over I-35 Dates: April-June 0 Cost: $,48,856 Impacts: Bridge overpass and intermittent lane on I-35, short-term detour via Hwy 45 7 I-35 Location: CR 3 near Proctor Description: Repair four bridges Dates: July-Sept 0 Cost: $,764,76 Impacts: Single lane traffic 8 I-35 Location: Over Willow River in Pine County Description: Repair bridges Cost: $766,000 Impacts: Lane 9 I-35 Location: Moose Lake and Hinckley areas, 30 miles Description: Repair concrete pavement and bridges Dates: May-Nov 0 Cost: $5,39, Impacts: Lane, bypassed traffic will run adjacent to each other HUwww.dot.state.mn.us/d/project s/i35southofduluth/u 0 Hwy 37 Location: Penobscott Creek near Hibbing Dates: June 00-June 0 Total Cost: $55,980 0 Cost: $,000 Impacts: Lane with Hwy 53 Location: Miller Mall area in Duluth and Hermantown, one mile connector roads, intersections and s Dates: July 007-June 0 Total Cost: $3,499,6 0 Cost: $,000 Impacts: Shoulder Hwy 53 Location: Near Cotton, reconstruct intersection, replace bridge Cost: $3,358,3 Impacts: Bypass, temporary lane 3 Hwy 53, Hwy 69 Location: Near Central Lakes and Hibbing to Virginia Description: Seal surface Cost: $.5 million Impacts: Temporary lane Hwy 6 Location: Onion River area north of Tofte, four miles and replace bridge Dates: April 009-May 0 Total Cost: $,3,0 0 Cost: $50,000 Impacts: Daytime shoulder 5 Hwy 6 Location: Mount Josephine rest area near Grand Marais rest area Dates: Aug 00-Aug 0 Total Cost: $637,03 0 Cost: $46,000 6 Hwy 6 Location: Cascade River wayside near Grand Marais Description: Rehabilitate stone masonry wall Dates: Sept 00-June 0 Total Cost: $395,0 0 Cost: $33,000 7 Hwy 6 Location: Split Rock River to Chapins Curve south of Beaver Bay, four miles and replace bridge Dates: April 00l-July 0 Total Cost: $0,706,76 0 Cost: $3.9 million Impacts: Lane with HUwww.dot.state.mn.us/d/project s/hwy6_split_rock/index.htmlu 8 Hwy 6 Location: Lester River in Duluth Description: Repair and restore historic bridge Dates: May 00-July 0 Total Cost: $,460,05 0 Cost: $50,000 Impacts: Shoulder 9 Hwy 6 Location: Gooseberry Park, Schroeder, and Cutface Creek rest areas accessibility improvements Dates: Aug-Oct 0 Cost: $350,000 0 Hwy 6 Location: Baptism River rest area turn lanes, reconfigure parking lot, remodel building Dates: June 0-Aug 0 Total Cost: $6,89,000 0 Cost: $,73,000 Hwy 6 impacts, rest area closed Hwy 6 Location: Near Grand Portage turn lanes Dates: June 0 Cost: $36,7 Impacts: Lane with Hwy 65 Location: Nashwauk to Hwy, 3 miles and Dates: July 00-June 0 Total Cost: $0,478,934 0 Cost: $ million Impacts: Lane with

3 3 Hwy 65 Location: Near Silverdale in Koochiching County Dates: July 007-July 0 Total Cost: $4,4,070 0 Cost: $60,000 Impacts: Lane with 4 Hwy 65, Hwy 73 Location: Aitkin County Description: Install rumble strips Cost: $78,5 5 Hwy 70 Location: Hwy 07 to Hwy 36, nine miles, Dates: July-Oct 0 Cost: $3,384,88 Impacts: Lane with, detour 6 Hwy 73 Location: Hwy 73 in Floodwood deck Dates: June-Oct 0 Cost: $,07,7 Impacts: Single lane traffic 7 Hwy 69 Location: Taconite to Nashwauk, 5 miles and Dates: July 00-June 0 Total Cost: $7,678,605 0 Cost: $00,000 8 Hwy 69 Location: From Grand Rapids to Coleraine, five miles and Dates: June 00-June 0 Total Cost: $,790,989 0 Cost: $30,000 9 Hwy 69 Location: Hibbing and Grand Rapids accessibility improvements Dates: June-Oct 0 Cost: $489,000 Impacts: Temporary lane 30 Hwy 69 Location: West of Chisholm, one mile Description: Replace and strengthen pavement Dates: June 009-July 0 Total Cost: $7,408,407 0 Cost: $35,000 3 Various Highways Location: Hwys,, 70, 69, 00, 33 in northeast Minnesota Description: Replace culverts Dates: June-Nov 0 Cost: $,63,09 Impacts: Lane with 3 Various Highways Location: Hwys, 6, 35, 7 in northeast Minnesota Description: Replace culverts Dates: June 00-July 0 Total Cost: $,9,600 0 Cost: $50,000 Impacts: Lane 33 Various Highways Location: Hwys 3, 53, 6, I-35 in northeast Minnesota Description: Seal cracks Dates: July 00-June 0 Total Cost: $,558,606 0 Cost: $800,000 Impacts: Lane with 34 Various Highways Location: Hwys 3, 65, 0 in Aitkin and Carlton Description: Install reflective pavement markings Dates: May-July 0 Cost: $366,885 Impacts: Mobile lane with 35 Various Highways Location: Hwys 53, 6,69 in northeast Minnesota Description: Install intersection lighting Dates: May-July 0 Cost: $50,000 traffic impacts District Bemidji/Crookston 36 Hwy Location: West of Clearwater County line in Red Lake (00), paint, clean, landscape Dates: April-May 0 Total Cost: $. million 0 Cost: $40, Hwy Location: Oslo to Warren and Cost: $.5 million 38 Hwy Location: East of Crookston Total Cost: $6.6 million 0 Cost: $0, Hwy Location: Crookston curb ramps, install signals Cost: $500, Hwy 9 Location: South of Borup Description: Replace culvert Dates: June 0 Cost: $00,000 4 Hwy 9 Location: Polk/Norman county line to Hwy, Cost: $4.56 million 4 Hwy Location: Hwy 7 to Clementson, widen shoulders, -Aug 0 Cost: $7.5 million 43 Hwy Location: Clementson bridge deck, turf and erosion control Total Cost: $.95 million 0 Cost: $80,000 Impacts: Lane 44 Hwy 34 Location: Park Rapids to Akeley, Hwy 6 to Dorset, install turn lanes, Cost: $7.95 million 45 Hwy 64 Location: South junction to north junction of Hwy 87 Cost: $550,000 Impacts: Lane with pilot car 46 Hwy Location: CR 9 to CR 404 south of Bemidji, install turn lanes and traffic signal, construct bridge Cost: $3.3 million Impacts: Temporary bypass and minor lane 47 Hwy Location: Northome to Margie, replace culvert Cost: $5.5 million Impacts: Lane with pilot car 48 Hwy 7 Location: Waskish to.4 miles north, Cost: $4.06 million Impacts: Lane with and pilot car 49 Hwy Location: Stephen to Donaldson Cost: $. million Impacts: Single lane 50 Hwy Location: Hwy bypass at Crookston Description: Railroad crossing upgrade Cost: $50,000 5 Hwy Location: Climax to Crookston, install turn lanes, replace culverts Cost: $3.4 million

4 5 Hwy Location: South of Shelly (00), apply final surface on bridge deck, paint, landscape, Total Cost: $.5 million 0 Cost: $5, Hwy 89 Location: Grygla to eight miles west of Fourtown Dates: TBD Cost: $0,000 Impacts: Lane 54 Hwy 0 Location: Hwy to Hwy and Hwy 37, Cost: $5.6 million Impacts: Lane restriction, detour 55 Various Highways Location: Multiple Description: Install intersection lighting Cost: $35,000 lane restrictions 56 Various Highways Location: Multiple Description: Upgrade signing Cost: $30,000 lane restrictions District 3 Baxter/St. Cloud 57 Hwy 0 Location: St. Cloud to Clear Lake Description: Landscaping on WB lanes Dates: June 00-May 0 Total Cost: $ million 0 Cost: $0,000 Impacts: Periodic lane 58 Hwy 0 Location: Wadena, install turn lanes, pedestrian access improvements Cost: $.5 million, Hwy 0 Locations: East of Little Falls to south of Royalton ( miles); Hwy 0 - Golf Course Rd to 3rd St NW in Brainerd Description: Micro-surfacing Cost: $. million Impacts: Intermittent weekday lane, reduced speeds 60 Hwy 0 Location: 4.5 miles north of Hwy 5 to east end of Little Falls bypass, construct/extend turn lanes, install or repair culverts Dates: May-Aug 0 Cost: $9.7 million Impacts: Lane, reduced speeds 6 Hwy 0 Location: Big Lake to Elk River Description: Landscape Dates: Aug 00-May 0 Cost: $6.8 million 0 Cost: $,000 6 Hwy 0 Location: Clear Lake to Big Lake Description: Install temporary bypass lanes for 0 pavement replacement -Nov 0 Cost: $0.6 million 63 Hwy 0 Location: Hwy 0 / Hwy 5 intersection in Big Lake Description: Widen and resurface Hwy 0; realign and reconstruct Hwy 5 to the RR tracks; replace traffic signal /lighting Dates: May-Oct 0 Cost: $. million ($68,000 Mn/DOT share), detours 64 Hwy 3 Location: East of Wilson Ave in St. Cloud Description: Replace pedestrian bridge Dates: July-Oct 0 Cost: $.3 million s, lane 65 Hwy 3 Location: Hwy 95 east of St. Cloud to Foley fourlane highway, access roads, bridge, frontage roads, install utilities, resurface Hwy 5 in Foley Dates: June 0-Oct 0 Total Cost: $8.5 million 0 Cost: $.5 million Impacts: Lane,, detour HUwww.dot.state.mn.us/d3/hwy3/ index.html 66 Hwy 3/Hwy 70 Location: Hwy 55 in Paynesville to Richmond; Hwy 70 Hwy 65 to Hwy 07 Description: Seal coat road surface Cost: $48,80 Impacts: Lane,, pilot car 67 Hwy 5 Locations: Intersections at Sherburne CR / CR and Sherburne CR 7 east of Monticello Description: Widen intersections, install turn lanes Cost: $3.3 million,, detour 68 Hwy 8 Location: North of Swanville Description: Replace Swan River bridge Dates: July-Sept 0 Cost: $64, Hwy 47 Location: North of Bradford at 37th Ave Description: Repair frostdamaged pavement Cost: $400, Hwy 55 Location: Stearns CR 66 / CR 8 in Paynesville to east of Hwy 4, shoulders Cost: $. million Impacts: Periodic lane,, reduced speeds Hwy 65 Location: Anoka CR 4 to Hwy 3 in Mora Description: Replace road signs Cost: $50,000 7 Hwy 65 Location: Mora Lake to Hwy 7 in Woodland Description: Road repairs, landscape Dates: July 00-June 0 Cost: $7. million 0 Cost: $0,000, 73 Hwy Location: Owens Street to Hwy 55 in Belgrade Description: Replace drainage Cost: $83,000 (Mn/DOT share) Impacts: Shoulder 74 Hwy Location: Stearns CR 86 in Sauk Centre Cost: $0,000 I-94 Location: Wright and Stearns ; Hwy 0 St. Cloud to Little Falls; Hwy 5 in Benton County Description: Replace road signs Dates: Sept-Nov 0 Cost: $850,000 Impacts: Intermittent lane/shoulder 76 I-94 Location: East of Albany to Stearns CR at Collegeville Dates: Aug-Nov 0 Cost: $5.3 million 77 I-94 Location: Stearns CR at St. Joseph Description: Install lighting Dates: May 0 Cost: $350,000 3

5 78 I-94 Location: Wright CR in Monticello Description: Paint overpasses, landscape Dates: July 009-May 0 Cost: $. million 0 Cost: $00, I-94 Location: St. Augusta to St. Joseph; Hwy 4 - Clearwater to Clear Lake; Hwy 5 - Buffalo to Monticello Dates: July-Oct 0 Cost: $.3 million Impacts: Lane,, pilot car 80 I-94 Location: Stearns and Wright Description: Upgrade guardrail Dates: June 0 Cost: $360,000 8 I-94 Location: Wright CR 37 to Wright CR 9 in Albertville Description: Install interchange access improvements Dates: June 0-Spring 0 Cost: $5.7 million (Mn/DOT share) 8 Hwy 95 Location: Isanti CR /CR 70 in Cambridge Cost: $70, Hwy 95 Location: Mille Lacs CR 9 in Princeton Description: Paint bridges, landscape Dates: June 00-June 0 Cost: $5.9 million 0 cost: $00, Hwy 07 Location: Kanabec/Isanti county line in Braham to Hwy 3 west of Brook Park, shoulders, repair or replace culverts Cost: $3.6 million,, pilot car, detour 85 Hwy 69 Location: Garrison Concourse at Mille Lacs Lake Description: Restore historical masonry wall Dates: Oct 00-Nov 0 Cost: $85,000 (Mn/DOT share) Impacts: Overlook wall closed; parking and walleye statue open to public 86 Hwy 69 Location: SB Hwy 69/ Hwy 0 - Hwy 0 in Elk River bridge deck and upgrade railings Dates: June 0 Cost: $600,000 Impacts: Lane, bridge closure, detours 87 Hwy 7 Location: Seven miles east of Sebeka Description: Replace Cat River bridge Cost: $357,80 Impacts: Road closure, detour 88 Hwy 4 Location: EB I-94 ramp at St. Michael Dates: June 0 Cost: $60, Hwy 3 Location: Baxter to Nisswa, upgrade traffic signals, construct turn lanes, improve pedestrian access Dates: May-Aug 0 Cost: $8.4 million Impacts: Periodic lane,, access, night work HUwww.dot.state.mn.us/d3/hwy37 baxter-nisswa/ 90 Various Highways Location: Multiple Description: Install rumble strips and chevron signs Cost: $400,000, District 4 Detroit Lakes/Morris 9 Hwy 9 Location: Norman/Clay county line to Hwy 0, replace three bridges Dates: May-Aug 0 Cost: $6,094,08, lane 9 Hwy 9 Location: Morris to Stevens/Pope county line, Hwy 39, repair culverts Cost: $3,7,09 Impacts: Lane, detour 93 Hwy 0 Location:.5 miles west of Glyndon Description: Install weigh-inmotion Cost: $3,000 Impacts: Lane 94 Hwy 0 EB Location: Hawley to Detroit Lakes Cost: $,944,054 Impacts: Lane 95 Hwy 0 WB Location: Frazee to Detroit Lakes Cost: $800,000 Impacts: Lane 96 Hwy 0 EB, I-94 WB Location: Detroit Lakes to Frazee and from Douglas CR 7 to Hwy 7 Dates: Aug 0 Cost: $.6 million Impacts: Lane 97 Hwy 7 Location: Herman to Hoffman Cost: $5,63,97 Impacts: Lane, detour 98 Hwy 8 Location: West state line through Beardsley Cost: $. million Impacts: Lane 99 Hwy 9 Location: Hwy in Wadena to Hwy 0, Dates: July-Oct 0 Cost: $6,79,600 Impacts: Lane, detour 00 Hwy 9 Location: McKay Ave to 3rd Ave in Alexandria, add northbound lane Cost: $ million Impacts: Lane 0 Hwy 9, Hwy Location: Hwy 0 to Carlos and Hwy to Benson Description: Sealcoat shoulder Cost: $.5 million Impacts: Lane 0 Hwy 3 Location: Hwy 0 to Hwy 34 Description: Replace guardrail Dates: Fall 0 Cost: $30,000 Impacts: Lane 03 Hwy Location: Sand Lake to Prairie Lake outlet Dates: April-Sept 0 Cost: $0,000 Impacts: Shoulder 04 Hwy Location: 7th Ave S in Moorhead Description: Replace signal, improve accessibility Dates: Mid-summer 0 Cost: $60,000 Impacts: Lane 05 Hwy Location: Clay CR (60th Ave South) roundabout Cost: $. million 4

6 06 I-94 WB Location: Hwy 34 in Barnesville to Downer exit Dates: May-July 0 Cost: $5,76,850 Impacts: Lane, crossover 07 I-94 Location: Lake Iverson rest area Description: Demolish building Cost: $300,000 Impacts: Rest area permanently closed 08 I-94 Location: Over Douglas CR and paint bridges Dates: May-Oct 0 Cost: $ million Impacts: Lane 09 I-94 EB, Hwy 0 Location: Rothsay to Hwy and from I-94 to Otter Tail CR 8 (Pebble Lake Rd) Dates: Fall 0 Cost: $4,37,6 Impacts: Lane 0 Various Highways Location: Hwys 9, 7, 8, Description: Instlal rumble strips and pavement markings Cost: $500,000 Impacts: Lane Various Highways Location: Hwys 55, 08, 3 0 Description: Seal coat, resurface road Dates: Late summer 0 Cost: $.5 million Impacts: Lane Various Highways Location: Hwys 7,, 8, 54 Description: Replace, repair culverts Cost: $ million District 6 Rochester/Owatonna /Winona 3 Hwy Location: Hwy 5 to Marion Rd in Rochester Dates: May-Sept 0 Cost: $5,965,84 Impacts: Long-term lane HUwww.dot.state.mn.us/d6/project s/hwyinrochester/u Hwy Location: Kasson to Byron Description: Repair concrete Dates: May-July 0 Cost: $,5,978 Impacts: Long-term lane 5 Hwy Location: Winona County Description: Install pedestrian ramps for accessibility Cost: $99,673 6 Hwy Location: Waseca CR 5 to Steele CR 7 I- 35/Hwy interchange Dates: July 009-June 0 Cost: $5,744,4 0 Cost: $3,84,985 Impacts: lane, traffic delays, intermittent lane HUwww.dot.state.mn.us/d6/project s/i35owatonna/index.htmlu 7 Hwy 6 Location: Rushford to Houston Dates: Aug-Oct 0 Cost: $4,840,500 Impacts: Lane, 8 Hwy 30 Location: Steele and Waseca, Hwy 3 to Twp Rd 50 Dates: July-Oct 0 Cost: $,5,05 Impacts: Lane, 9 I-35 Location: Various locations in Freeborn, Rice and Steele Description: Install Intelligent Transportation System devices Dates: June-Oct 0 Cost: $. million 0 I-35 Location: Various locations in Freeborn, Rice and Steele Description: Clearing trees Dates: April-Oct 0 Cost: $97,79 I-35 Location: I-35/I-90 interchange Description: Install tower lighting Cost: $40,60 Hwy 43 Location: Rushford to I-90 Dates: May-July 0 Cost: $,38,30 Impacts: Daily lane with 3 Hwy 43 Location: Franklin St and Hwy 43 (Sarnia St) in Winona Cost: $7,385 Hwy 43 Location: Fillmore County Description: Install pedestrian ramps for accessibility Cost: $3,060 5 Hwy 44 Location: Spring Grove to Caledonia, culvert replacement. Dates: May-Oct 0 Cost: $5,45,097 Impacts: Lane with, detour 6 Hwy 5 Location: Willow Creek and Olmsted CR bridges, bridge deck Dates: June-Oct 0 Cost: $,487,40 Impacts: Lane 7 Hwy 5 Location: Olmsted County, 65th St NW to Pine Island Description: Install cable median barrier Dates: May-July 0 Cost: $87,778 8 Hwy 5 Location: Olmsted County, 85th St NW to Vintage Rd NW Description: Landscape Dates: Spring 0 Cost: $5,000 9 Hwy 5 Location: Olmsted County, Hwy 63 to I-90 Description: Upgrade signs Dates: April 0 Cost: $70,3 30 Hwy 5 Location: Near Pine Island new interchange and frontage road Dates: 0-0 Cost: $34.3 million 0 Cost: $0 million Impacts: Lane HUwww.dot.state.mn.us/elkrun/UH 3 Hwy 60 Location: Stream near Wabasha and approach road Cost: $,69,84 Impacts: Road closure, detour 3 Hwy 6 Location: Gilbert Creek in Lake City Dates: April-Sept 0 Cost: $3,485, Hwy 63 Location: Hwy 63/6th St intersection in Stewartville Description: Intersection safety improvements and traffic signal revisions Dates: April-July 0 Cost: $47,679 5

7 34 Hwy 63 Location: Wabasha CR 78 to Hwy 6 Cost: $,80,384 Impacts: Lane, 35 Hwy 76 Location: Houston County, Hwy 44 to Hwy 6, culvert replacements Dates: May-Sept 0 Cost: Include in Project 5 Impacts: Road closed, detour 36 Hwy 76 Location: Houston and Winona, Hwy 6 to I-90 Dates: Aug-Oct 0 Cost: Included in Project 7 Impacts: Daily lane with 37 I-90 Location: Hwy 63 to Olmsted CR 9 WB lanes Dates: July-Oct 0 Cost: $3,04,33 Impacts: Lane, 38 I-90 Location: Winona County, Hwy 43 to Hwy 76 EB lanes Dates: May-Sept 0 Cost: $8,667,467 Impacts: Long-term lane, interchange closure 39 Hwy 8 Location: Mower County, IA/MN state line to I-90 Dates: July-Sept 0 Cost: $3,533,8 Impacts: Lane, 0 Hwy 46 Location: Northfield to Nerstrand Dates: July-Sept 0 Cost: $3,09,48 Impacts: Lane,, pilot car Hwy 47 Location: Wabasha County Description: Install pedestrian ramps for accessibility Cost: $87,63 Hwy 48 Location: Altura to Hwy 6 Cost: $4,,897 Impacts: Road closed, detour 3 Various Highways Location: Fillmore, Houston and Wabasha Description: Install guardrail Dates: April-Oct 0 Cost: $6,5 4 Various Highways Location: Dodge, Fillmore, Freeborn, Goodhue, Mower, Olmsted, Rice, Wabasha and Winona Description: Seal cracks Dates: April-Oct 0 Cost: $473,73 Impacts: Lane, 5 Various Highways Location: Dodge, Goodhue, Mower, Olmsted and Steele Description: Seal coat Dates: April-Oct 0 Cost: $,44,44 Impacts: Lane, District 7 Mankato/Windom 6 Hwy 4 Location: South of Sleepy Eye over the Little Cottonwood River Dates: May-Sept 0 Cost: $,763,000 7 Hwy Location: Waseca bypass Description: Grading, construct bridges and four-lane expansion Dates: April-Sept 0 Total Cost: $56 million 0 Cost: $8 million HUwww.dot.state.mn.us/d7/project s/owatonna/u 8 Hwy Location: Lookout Drive in North Mankato to Nicollet CR 6 interchange with Nicollet CR 4 and two miles of expansion (Design-build) Dates: Aug 0-Aug 0 Cost: $5-8 million ($3 million local share) 0 Cost: $3 million Impacts: TBD HUwww.dot.state.mn.us/d7/project s/northmankato/u 9 Hwy 9 Location: New Prague by Hwy 3 north Dates: Oct 0 Cost: $5,000 delays, pilot car 50 Hwy Location: Gaylord to Hwy Cost: $,989,000 delays, pilot car 5 Hwy Location: LeSueur River Description: Bank stabilization Cost: $568,000 Impacts: Lane restrictions 5 Hwy Location: New Auburn and Hwy 30 in Darfur Description: Install pedestrian ramps Cost: $60,000 Impacts: Brief sidewalk 53 Hwy 5 Location: Belle Plaine bridge railing Dates: April-May 0 Cost: N/A Impacts: Lane restrictions 54 Hwy 30 Location: Amboy to Mapleton Description: Restore pavement Cost: $5,69,000 Impacts: Two-stage detour to local roads 55 Hwy 30 Location: Watonwan River west of Darfur Cost: $860, Hwy 30 Location: Westbrook and Hwy 6 by Fulda Cost: $340,000 delays, pilot cars 57 Hwy 60 Location: Bigelow to Worthington Description: Expand to fourlanes, replace railroad bridge Dates: March 0-March 03 Cost: $45 million 0 Cost: $8 million s HUwww.dot.state.mn.us/d7/project s/hwy60/u 58 Hwy 83 Location: Hwy 30 to Hwy Description: Restore pavement, resurface road Cost: $9,989,567 Hwy I-90 Location: West of Hwy, approximately one mile Cost: $00,000 Impacts: Lane restrictions 60 Hwy I-90 Location: Rest areas at Adrian and Jackson Description: Plant prairies (continuation of Prairie Passage) Dates: 0-03 Cost: $405,000 District 8 Willmar/Marshall/ Hutchinson 6 Hwy 9 Location: Hwy 3 to st Ave North in New London, install accessible pedestrian ramps and sidewalk Dates: Aug-Oct 0 Cost: $550,000 6

8 6 Hwy Location: 6th St E to 4th St in Willmar Dates: May 0 Cost: $389, Hwy 9 Location: Bruce St to jct of Hwy 3 in Marshall sidewalk and trail, install accessible pedestrian signals Dates: Aug-Oct 0 Cost: $5, Hwy 9 Location: West jct of Hwy /Hwy 67 Description: Restore historic retaining wall and guardrail Dates: May-Aug 0 Cost: $300,904 delays 65 Hwy 3 Location: West of Kandiyohi CR 6, west of 63rd Ave, east of Paynesville fourlane 7.7 mile divided highway bypass around Paynesville Dates: April 00-Aug 0 Total Cost: $3,04,3 0 Cost: $,570,000 impacts, detour HUwww.dot.state.mn.us/d8/project s/paynesvillebypass/u 66 Hwy 3 Location: Hwy to Kandiyohi CR 3 near New London Description: Seal coat Dates: Aug 0 Cost: $44,89 67 Hwy 3 Location: Spicer Description: Refurbish light poles Dates: June-Nov 0 Cost: $7,98 68 Hwy 3 Location: East jct of Hwy to Hwy 7 in Clara City Description: Repair concrete pavement Cost: $,7,54 69 Hwy Location: South of Clarkfield to Lyon CR 3 Description: Widen shoulders and line culverts Dates: June 0 Cost: $,05,79 delays 70 Hwy Location: North of Lyon CR 33 to Yellow Medicine CR 3 Cost: $,49,57 Hwy 67 Location: Hwy 3 to Yellow Medicine River Bridge Dates: Summer 0 Cost: $.9 million 7 Hwy Location: Renville CR 6 near Hector to Hwy near Glencoe Description: Grade, resurface, construct turn lanes Dates: May-Nov 0 Cost: $,379, HUwww.dot.state.mn.us/d8/project s/hwyhectorglencoe/index.ht mlu 73 Various Highways Location: Hwys 3,, and in Kandiyohi, Lincoln, Lyon and Pipestone Description: Install pavement markings Dates: April-Aug 0 Cost: $353,583 delays 74 Various Highways Location: Bird Island, Lyon, Marshall, Olivia and Renville Description: Install accessible pedestrian signals Dates: May-Aug 0 Cost: $5,9 delays Various Highways Location: Hwys,, 9, and in Lac qui Parle, Lyon, McLeod, Meeker, Murray and Yellow Medicine Description: Replace road signs Dates: April-June 0 Cost: $,886 Impacts: Intermittent shoulder 76 Various Highways Location: Hwys, 5, and 74 in Lincoln, Lyon, Meeker, McLeod, Murray and Yellow Medicine Description: Replace road signs Dates: June-September 0 Cost: $33, Various Highways Location: Hwys 4, 9,, 9, 4, 40,, 67, 68, 9, Description: Install enhanced curve delineation and chevrons at 47 locations Cost: $80,000 Impacts: Intermittent shoulder 78 Various Highways Location: Southwestern Minnesota Description: Install lighting at locations and flasher at Marshall High School Cost: $330,000 delays ULegend: CR County Road Jct Junction SB Southbound NB Northbound WB Westbound EB Eastbound UContact Info: District - John Bray District - Karen Bedeau District 3 - Judy Jacobs District 4 - Dana Hanson District 6 - Kristin Kammueller District 7 - Rebecca Arndt District 8 - Diane Beck

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation 2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation District 1 Duluth/Virginia 1 Hwy 1 Location: South of Ely in Lake County, 15 miles Dates: July-Nov 2011

More information

2012 MnDOT Greater Minnesota Construction Projects

2012 MnDOT Greater Minnesota Construction Projects 2012 MnDOT Greater Construction Projects District 1 Duluth/Virginia 1 Hwy 1 Location: Itasca County Description: Reconstruct Hwy 1 in Effie Total Cost: $1,565,000 2 Hwy 1 Location: Forest Rd 553 to Forest

More information

2018 District 1 Highway Construction Program

2018 District 1 Highway Construction Program District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last

More information

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996 MINNESOTA OFFICE OF THE STATE AUDITOR RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996 JUDITH H. DUTCHER STATE AUDITOR Ranking of County Expenditures October 27, 1998 Government Information

More information

Future Projects. District 3 Central Minnesota. mndot.gov/d3

Future Projects. District 3 Central Minnesota. mndot.gov/d3 Future Projects District 3 Central Minnesota 2019 2022 mndot.gov/d3 Lake 371 2019-2022 Construction 200 Walker 34 CASS 200 Remer 6 Central Minnesota MnDOT District 3 Hackensack 371 84 Longville 6 Hill

More information

2007 Construction Information/Season Notes

2007 Construction Information/Season Notes 2007 Construction Information/Season Notes Metro I-35 W Bridge On August 1, 2007 the I-35 W Bridge over the Mississippi River in Minneapolis collapsed. This had major impacts on traffic patterns in the

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part Two McLeod County Court House Glencoe, Minnesota Date photograph taken: 1909 Source: LakesnWoods.com McLeod County Court

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part One Grant County Courthouse (2012). Elbow Lake, Minnesota. Building constructed in 1906. Source: Gobonobo, photographer

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part Two McLeod County Court House Glencoe, Minnesota Date photograph taken: 1909 Source: LakesnWoods.com McLeod County Court

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part One Grant County Courthouse (2012). Elbow Lake, Minnesota. Building constructed in 1906. It is on the National Register

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Metro - Let me know about major weekend traffic impacts

Metro - Let me know about major weekend traffic impacts Highway 100 Construction Traffic Impacts Dates may change due to weather. West 36th St to Hwy 62 Currently April 4-mid Aug 50th St. ramp to NB Hwy 100 will close. The ramp will reopen in mid-august. Upcoming

More information

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12 Games Played Season 1. 33 Goodhue 2004 2. 32 Brainerd 2003 2. 32 St. Michael-Albertville 2009 4. 31 Rochester Mayo 1999 4. 31 St. Cloud Tech 1997 4. 31 Springfield 1994 4. 31 Wabasso 2008 4. 31 St. Anthony

More information

Updated: April 7, 2016

Updated: April 7, 2016 Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace

More information

Minnesota. County Assessor. Directory

Minnesota. County Assessor. Directory Minnesota County Assessor Directory PDF generated from MemberClicks database on October 29, 2012 http://www.mnmaao.org/ ALBERTSEN, A KEITH, CAE Membership: Regular Joined: 1982 DOUGLAS COUNTY DOUGLAS COUNTY

More information

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP)

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP) Minnesota Department of Transportation 2017-2020 State High (CIP) MnDOT s State Fiscal 2017-2020 State High (CIP) Table of Contents 1. Introduction Pg. 1 2. CIP Format...Pg. 2 3. Planned Information Pg.

More information

Currently Future Agency Used for Use for Classification Property

Currently Future Agency Used for Use for Classification Property Page 1 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Records for

More information

County Assessor Membership Directory. County Assessor Directory

County Assessor Membership Directory. County Assessor Directory County Assessor Membership Directory County Assessor Directory PDF generated from Memberclicks database on September 21, 2010 ALBERTSEN, A KEITH, CAE Membership: Regular Joined: 1982 DOUGLAS COUNTY DOUGLAS

More information

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction

More information

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways. WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House meeting is downstairs in the Foot Room November 2016 Plum/3rd Street Traffic Control Change Signal to All-Way Stop Plum

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

APPENDIX A Map Exhibits

APPENDIX A Map Exhibits APPENDIX A Map Exhibits (See attached) County Rd 0 County Rd 7 County Rd Map Document: (P:\007\gis\permit\Final\SPA_Exhibits\007doq0B_ex.mxd) 0//00 -- 0::7 AM 00 Westwood Professional Services, Inc. Section

More information

Charlton/Oxford Route 20 Reconstruction Project

Charlton/Oxford Route 20 Reconstruction Project Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting

More information

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2) Reprioritized Projects in the 2006-2010 Highway and Bridge Construction Schedule Introduction The information in this section is in accordance with the highlighted portion in the following section of the

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT ...\plans\0_prelim\07c_sh0.dgn /8/009 DIV. STATE COUNTY FILE OJECT TYPICAL CTION OF IMOVEMENT SC 7.0658A8 I-7 NORTHBOUND I7 SOUTHBOUND I7 8 8 0 8 VARIABLE (E CROSS CTIONS) : CONST..5.5 CONST. (

More information

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa 2016 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 10 June 2016 SUMMARY OF FINDINGS Each

More information

2015 MINNESOTA SPRING GROUSE SURVEYS

2015 MINNESOTA SPRING GROUSE SURVEYS SUMMARY OF FINDINGS 2015 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 17 June 2015 Each

More information

News from the Bench. Submitted by Kim Buechel Mesun, Minneapolis Public Schools

News from the Bench. Submitted by Kim Buechel Mesun, Minneapolis Public Schools News from the Bench Submitted by Kim Buechel Mesun, Minneapolis Public Schools Governor Dayton appointed Carol M. Hanks as a District Court Judge in Minnesota s Third Judicial District. This vacancy was

More information

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa 2014 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 19 June 2014 SUMMARY OF FINDINGS Each

More information

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division Arlington 1, 2, 3 and Paul Antonich Memorial Field -- 601 South Arlington Ave. Duluth, 55811.

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 The Asphalt Indexes for the Month of August 2016 are: ACI -

More information

Arrowhead Youth Soccer Association Fields Directory

Arrowhead Youth Soccer Association Fields Directory Name of Field Address Directions/Notes Arlington Fields 601 South Arlington Avenue On South Arlington Avenue between Trinity Road and Central Entrance in Duluth.Via Mesaba-Central Entrance: I-35N to Exit

More information

Minnesota State Chief Academic Affairs Officers Updated

Minnesota State Chief Academic Affairs Officers Updated Alexandria Technical and Community College Ross Santell Executive Vice President of Academic and Student 1601 Jefferson Street Alexandria, MN 56308 Phone: (320) 762-4404 Fax: (320) 762-4501 E-mail: rosss@alextech.edu

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C. August 18, 2016 FS-1604A US 70 Improvements, Johnston County VHB Engineering NC, P.C. Agenda Project Description and Location Purpose and Need Background Plans Local Plans Legislation Adjacent STIP Projects

More information

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018 SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic

More information

MAINTENANCE OF TRAFFIC &

MAINTENANCE OF TRAFFIC & 2/28/2015 5:05:15 PM d106136001k(01).dgn MANAGER Dave Covington, P.E. (540) 292-3802 VA. 29 1K(1) TRANSPORTATION OPERATIONS (TO) PLAN A). THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: 1. POST A LIST

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Environmental Consultants List Guidance Document 22

Environmental Consultants List Guidance Document 22 Environmental Consultants List Guidance Document 22 The Minnesota Department of Agriculture (MDA), Incident Response Unit provides the following listing of consultants solely as a service to Minnesota.

More information

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 35

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 35 008-009 CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML Top 8 s in League 6th Grade (9 s) Team * Wayzata Central Middle Plymouth 8 * Blake Hopkins 67 Roosevelt

More information

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY 2009 Produced by The Green Hills Regional Planning Commission 1 County: Caldwell Source: RTP Needs Assessment 06 Rt: US

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT TYPICAL CTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC MARION 7.0658A I-7 NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE OR END TREATMENT IS REQUIRED FOR 8 8 BRIDGE APOACH, ADD.5

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

2018 High School Overall Team Results

2018 High School Overall Team Results Division 1 Austin rules apply: Best 4 scores count toward season point total. There are no High School team scores from Austin race. Place Team Points Count? 1 Stillwater HS 16,509 3-Gamehaven Trail, Rochester

More information

Lake Henry!( Belgrade!( Mill & Regal. Overlay. Overlay. Mill & Overlay. Mill & Overlay. & Turn Lanes. New London. Conc. Rehab. Spicer 75!

Lake Henry!( Belgrade!( Mill & Regal. Overlay. Overlay. Mill & Overlay. Mill & Overlay. & Turn Lanes. New London. Conc. Rehab. Spicer 75! Hendricks ") 7 Madison ") 40 s Watson 277 ") Montevideo Dawson Clara City Trosky Bellingham Arco Rehab 14 Tyler Taunton Florence Tracy Lamberton Balaton Walnut Grove Garvin 14 Revere Sanborn Ruthton (Hwy330)

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

2018 Minnesota Spring Grouse surveys

2018 Minnesota Spring Grouse surveys 2018 Minnesota Spring Grouse surveys Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 5 June 2018 SUMMARY OF FINDINGS The Minnesota

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

Single Point Urban Interchange (SPUI) with Signals

Single Point Urban Interchange (SPUI) with Signals 1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large

More information

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY. BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ

More information

In 2017, we continued to focus on CMCU s three core pillars:

In 2017, we continued to focus on CMCU s three core pillars: ANNUAL REPORT 2017 CHAIR & CEO REPORT Dear Members, Another successful year for Central Minnesota Credit Union is in the books. As we continue to grow and strengthen each year, we like to take time to

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

MINNESOTA NAWCA PROJECTS

MINNESOTA NAWCA PROJECTS NAWCA S $40,343,809 $152,258,606 125 270,804 NAWCA GRANT AMOUNT TOTAL PARTNER CONTRIBUTION NUMBER OF S TOTAL ACRES Minnesota currently has 125 NAWCA projects either completed or underway. These projects

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-4 Section 4(f) Mitigation Master Plan IH 35E Managed Lanes Project Book 2 - Technical Provisions

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: 2552-03-058 EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018 Hearing Information

More information

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 37

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 37 009-00 CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML Top 8 s in League--6th Grade ( s) Team * Wayzata Central Middle Plymouth 90 * Oak Hill Elementary Saint

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010 I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

Planarization & Routing Guide

Planarization & Routing Guide Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

DIVISION PAVEMENT MARKINGS AND MARKERS

DIVISION PAVEMENT MARKINGS AND MARKERS DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Directions to GMC Middle School Game Sites (updated 8/20/13)

Directions to GMC Middle School Game Sites (updated 8/20/13) Bridgetown Bridgetown Middle School, 3900 Race Rd, Cincinnati I-275 West to 74 East to Rybolt Rd, turn left. At Harrison Avenue, turn right and follow to Race Rd. and turn right. School is on the left.

More information

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report

More information

Texas Water Safari Driving Directions

Texas Water Safari Driving Directions Texas Water Safari Driving Directions v4 Revised March 2014 While I try to make sure these directions are accurate and up to date...i make no promises. I try to update this each year so please send any

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

2019 Pharmacy Subdirectory

2019 Pharmacy Subdirectory 2019 Subdirectory for South Country Health Alliance programs: Families and Children* MinnesotaCare* Minnesota Senior Care Plus (MSC+) SingleCare (SNBC) SharedCare (SNBC) This directory is for the South

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

The Shoppes at Forney Crossings

The Shoppes at Forney Crossings F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"

More information

SCOPE OF WORK AND DELIVERABLES T.H.

SCOPE OF WORK AND DELIVERABLES T.H. Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044

More information

Directions to Away Schools

Directions to Away Schools Directions to Away Schools BEAR CREEK PARK- Take I-25 to US 24 west (exit 141). Continue traveling west on US 24. Turn left on 21 st Street. Drive south for approximately 1.5 miles. Turn left on Rio Grande

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017 MoDOT ACEC St. Louis Partnering Meeting September 14, 2017 Agenda Introductions & Department Update Bill Schnell Design/Planning Updates Tom Evers STL City Jeff Bohler STL North County Lisa Kuntz I-270

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST BOSTON HORIZON WAY ALFORD ST BROADWAY BOSTON CITY LINE CITY LINE MANHOLE #101 (STA 5+00) BOW ST DEXTER ST ST LYNDE ST THORNDIKE ST COURTLAND ST RIVER PROP (TYP) ROBIN ST BETTY ST 50 500 1. BASELINE STATIONING

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

ZOO INTERCHANGE PROJECT

ZOO INTERCHANGE PROJECT ZOO ITERCHAGE PROJECT GET AROUD GUIDE winter 0/0 - summer 0 TAKE A LOOK ISIDE FOR CLOSURE IFORMATIO, ALTERATE ROUTES, TRASPORTATIO OPTIOS, HOW TO STAY COECTED TO THE ZOO ITERCHAGE PROJECT AD MUCH MORE!

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES Yao Cheng*, Saed Rahwanji, Gang-Len Chang MDOT State Highway Administration University of Maryland,

More information

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman 1500 Scribner Avenue, NW Grand Rapids, MI 49504 The Board of County Road Commissioners of the County of Kent met in the Road Commission Offices. The regular meeting was called to order by Commissioner

More information

Arkansas State Highway and Transportation Department

Arkansas State Highway and Transportation Department Arkansas State Highway and Transportation Department Fayetteville Rotary Club Mermaids Restaurant Thursday, January 30, 2014 About AHTD The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per

More information

Storage and Naming Standards for Un-Rectified Image Products at the Minnesota DNR

Storage and Naming Standards for Un-Rectified Image Products at the Minnesota DNR Storage and Naming Standards for Un-Rectified Image Products at the Minnesota DNR Specifications for Product Storage, Naming and Organizing Principles July 17, 2003 Tim Loesch Minnesota DNR MIS Bureau,

More information

Sanford Health F-M Ambulance. ARMER 800 MHz Radio System Participation Plan

Sanford Health F-M Ambulance. ARMER 800 MHz Radio System Participation Plan Sanford Health F-M Ambulance ARMER 800 MHz Radio System Participation Plan Sanford Medical Services (FM Ambulance), North Dakota 800 MHz ARMER Radio Participation Plan Contents 1. Introduction and ARMER

More information

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Polk County

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Polk County IOWA ORNITHOLOGISTS' UNION - Birding Sites in Polk County Printed on 2/26/2019 Ashworth Park (ebird Hotspot) (Important Bird Area) GPS Coordinates: 41.5754971,-93.6830641 Ownership: City Big Creek SP (ebird

More information