1 2/28/2015 5:05:15 PM d k(01).dgn MANAGER Dave Covington, P.E. (540) VA. 29 1K(1) TRANSPORTATION OPERATIONS (TO) PLAN A). THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: 1. POST A LIST OF LOCAL EMERGENCY RESPONSE AGENCIES INSIDE THE S CONSTRUCTION OFFICE/TRAILER. 2. EMERGENCY INCIDENT MANAGEMENT PLAN AND EQUIPMENT / MATERIALS TO IMPLEMENT THE PLAN PRE-STAGED AS NEEDED 3. DESIGN-BUILDER SHALL HAVE TWO (2) ARTICULATING WHEEL LOADERS WITH MINIMUM 3.0 CUBIC YARD BUCKET AND TRAFFIC LANE CONTROL EQUIPMENT AVAILABLE TO ASSIST VDOT CULPEPER DISTRICT MAINTENANCE SECTION IN SNOW REMOVAL OPERATIONS DURING WINTER MONTHS WHEN LANES OR SHOULDERS ARE RESTRICTED. COORDINATE WITH VDOT CULPEPER DISTRICT MAINTENANCE SECTION. 4. COORDINATE WITH VDOT CULPEPER DISTRICT MAINTENANCE SECTION ON REGULAR MAINTENANCE ITEMS SUCH AS MOWING, WILDFLOWER BEDS AND ACCIDENT DAMAGE. AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. B). THE PROCESS TO NOTIFY THE REGIONAL TRANSPORTATION OPERATIONS CENTER (TOC) TO PLACE LANE CLOSURE INFORMATION ON THE 511 SYSTEM AND VA-TRAFFIC WILL BE: 1. CONTRACTOR TO ADVISE THE INSPECTOR AND/OR DESIGN BUILD CONSTRUCTION MANAGER OF PLANNED LANE CLOSURES A MINIMUM OF 7 DAYS IN ADVANCE OF THE PROPOSED LANE CLOSURE. 2. THE INSPECTOR AND/OR DESIGN BUILD CONSTRUCTION MANAGER CALL THE REGIONAL TRANSPORTATION OPERATIONS CENTER. A STAFF MEMBER WILL ENTER THE DATA INTO THE 511 AND VA-TRAFFIC SYSTEMS. C). TRAFFIC BACKUP NOTIFICATION THE REGIONAL TRAFFIC OPERATIONS MANAGER ( ) SHALL BE NOTIFIED OF MAJOR TRAFFIC BACKUPS RELATED TO THE WORK BY THE CONTRACTOR. THE TOC WILL MAKE ALL ENTRIES INTO SYSTEMS THAT FEED THIS INFORMATION INTO 511. THE TOC WILL ALSO MAKE NOTIFICATIONS TO DEPARTMENT STAFF. THE STAFF NOTIFICATIONS SHALL INCLUDE BUT NOT BE LIMITED TO THE AREA CONSTRUCTION ENGINEER. VDOT MANAGERS, REGIONAL TRAFFIC ENGINEER, REGIONAL TRAFFIC OPERATIONS MANAGER, REGIONAL INCIDENT MANAGEMENT COORDINATOR, AND PUBLIC AFFAIRS MANAGER OF ANY INCIDENTS AND EXPECTED TRAFFIC DELAYS. D). PROCEDURES TO RESPOND TO TRAFFIC INCIDENTS THAT MAY OCCUR IN THE WORK ZONE ARE OUTLINED IN THE INCIDENT MANAGEMENT PLAN. E). DURING THE FIRST DAY OF THE NEW WORK ZONE TRAFFIC PATTERN, THE CONTRACTOR S WORK ZONE SAFETY COORDINATOR, MOT INSPECTOR AND RK&K TRAFFIC ENGINEER SHALL INSPECT THE WORK ZONE TO ENSURE COMPLIANCE WITH THE TMP. ON THE THIRD TO FIFTH DAY OF IMPLEMENTATION OF THE TMP S NEW WORK ZONE TRAFFIC PATTERN, THE MOT INSPECTOR SHALL CONDUCT AN ON-SITE REVIEW OF THE WORK ZONE S PERFORMANCE AND RECOMMEND TO THE CONTRACTOR ALL REQUIRED CHANGES TO THE TMP FOR IMPLEMENTATION TO ENHANCE THE WORK ZONE S SAFETY AND MOBILITY. ALL SUCH CHANGES SHALL BE DOCUMENTED. AN ON-SITE REVIEW OF THE S WORK ZONE TRAFFIC CONTROL BY THE CONTRACTOR S WORK ZONE SAFETY COORDINATOR, MOT INSPECTOR AND RK&K TRAFFIC ENGINEER SHALL BE CONDUCTED WITHIN 48 HOURS OF ANY FATAL INCIDENT/CRASH WITHIN THE WORK ZONE. THE PURPOSE OF THIS REVIEW IS TO IMPLEMENT LESSONS LEARNED FROM INCIDENTS. INCIDENT MANAGEMENT PLAN THIS WILL UTILIZE A TIERED INCIDENT MANAGEMENT PLAN. THIS PLAN INVOLVES FOLLOWING THE COMMUNICATIONS PLAN AND COORDINATING WITH VDOT, ALBEMARLE COUNTY AND LOCAL EMS AND STAKEHOLDERS. THE TIER OF INCIDENTS IS AS FOLLOWS: 1. A LIMITED INCIDENT IS ONE WHICH WILL TAKE FIFTEEN (15) MINUTES OR LESS TO RETURN TO NORMAL OPERATIONS. IN THIS TYPE OF EVENT, EXPECTED PRIMARILY DUE TO A MINOR ACCIDENT OR A PLANNED EVENT, RESPONSE BY LOCAL RESPONSE TEAMS WOULD BE REQUIRED WITH SUPPORT, AS NECESSARY, BY THE CONTRACTOR. THIS WILL BE CLASSIFIED AS A SHORT-TERM EVENT. 2. AN INCIDENT WHICH WILL IMPACT TRAFFIC BETWEEN FIFTEEN (15) AND SIXTY (60) MINUTES, BUT WITH NO REQUIRED WAY CLOSURES OR DETOURS, WILL BE CONSIDERED A MINOR EVENT. THE CONTRACTOR WILL RESPOND WITH TRAFFIC CONTROL DEVICES, COORDINATE WITH VDOT PER THE COMMUNICATIONS PLAN, AND ASSIST VDOT IN IMPLEMENTING SIGNAL TIMING ADJUSTMENTS TO CLEAR TRAFFIC, AS NECESSARY. LOCAL RESPONSE TEAMS WILL SUPPORT AS NECESSARY. CONTACT LISTS WILL BE UTILIZED AS NECESSARY AND CLOSE COORDINATION WITH FIRST RESPONDERS AND OTHER PRIMARY STAKEHOLDERS WILL BE IMPLEMENTED. 3. AN INCIDENT WHICH WILL TAKE GREATER THAN SIXTY (60) MINUTES TO CLEAR WILL BE CONSIDERED A MAJOR INCIDENT. IN THIS CASE, DETOUR S WILL BE IMPLEMENTED AS NECESSARY AND TRAFFIC CONTROL DEVICES, SIGNAL ADJUSTMENTS AND OTHER OPERATIONAL SUPPORT WILL BE IMPLEMENTED AS DESCRIBED IN THE RESPONSE TO MINOR INCIDENTS IN ITEM 2. IN THE CASE OF MAJOR INCIDENTS, CONTACT LISTS WILL BE FULLY UTILIZED TO NOTIFY IMPACTED STAKEHOLDERS, FIRST RESPONDERS, LOCAL HOSPITALS AND OTHER CRITICAL FACILITIES. IN ALL OF THE ABOVE INCIDENTS, CLOSE COORDINATION WITH VDOT NORTHWEST REGIONAL TRAFFIC OPERATIONS CENTER (NWRO TOC) WILL BE MAINTAINED. F). PERIODIC REVIEWS WITH DESIGN STAFF AND CONTRACTOR STAFF SHALL BE CONDUCTED THROUGHOUT THE LIFE OF THE TO IDENTIFY POTENTIAL PROBLEMS. G). THE EMERGENCY CONTACT FOR THIS SHALL BE 911. H). THE FOLLOWING IS A LIST OF LOCAL EMERGENCY RESPONSE AGENCIES: ORGANIZATION CONTACT PHONE ALBEMARLE COUNTY POLICE ALBEMARLE COUNTY FIRE 911 CALL CENTER HAZMAT CENTER (IF SPILL INVOLVED) ALBEMARLE COUNTY NON-EMERGENCY VIRGINIA POLICE N/A N/A (434) (434) (434) (434) PUBLIC COMMUNICATIONS PLAN THE PUBLIC COMMUNICATION PLAN SHALL CONSIST OF THE FOLLOWING ACTIONS: 1. VDOT WILL NOTIFY THE PUBLIC OF CONSTRUCTION START/END DATES, EXTENT OF CONSTRUCTION AND POTENTIAL TRAFFIC DELAYS THROUGH THE USE OF LOCAL NEWSPAPERS AND OTHER MEDIA. 2. THE CONTRACTOR SHALL ADVISE THE INSPECTOR AND/OR DESIGN BUILD CONSTRUCTION MANAGER A MINIMUM OF 48 HOURS IN ADVANCE OF ANY PLANNED CONSTRUCTION ACTIVITY OR WORK PLAN THAT WILL CAUSE TRAFFIC DELAYS. 3. PROVIDE THE CULPEPER DISTRICT OFFICE OF PUBLIC AFFAIRS INFORMATION FOR TRAFFIC ALERTS WHENEVER THERE ARE NEW IMPACTS TO MOTORISTS. ALL INFORMATION FOR TRAFFIC ALERTS MUST BE SUBMITTED AT LEAST SEVEN DAYS IN ADVANCE OF THE TRAFFIC IMPACT. 4. ANY REQUESTS TO CLOSE A LANE OUTSIDE THE WORK HOURS SHALL BE SUBMITTED TO THE VDOT MANAGER AT LEAST TWO WEEKS PRIOR TO THE PLANNED WORK FOR REIVEW AND APPROVAL. 5. THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE INSPECTOR, TRAFFIC OPERATIONS CENTER AND THE PUBLIC AFFAIRS STAFF OF ANY UNSCHEDULED TRAFFIC DELAYS. 6. THE FOLLOWING IS A LIST OF LOCAL EMERGENCY RESPONSE AGENCIES: ORGANIZATION CONTACT PHONE VDOT MANAGER DAVID COVINGTON (434) VDOT RESIDENCY ADMINISTRATOR TBD VDOT PUBLIC AFFAIRS MANAGER LOU HATTER (434) VDOT PUBLIC AFFAIRS OFFICE TBD (540) LOCAL PUBLIC SAFETY AGENCIES TBD VDOT REGIONAL TRAFFIC OPERATIONS CENTER (TOC) ROY REID (540) VDOT REGIONAL TRAFFIC ENGINEER TERESA GARDNER (540) VDOT DISTRICT WORK ZONE SAFETY COORDINATOR FORESTER WRIGHT (540) VDOT CULPEPER DISTRICT MAINTENANCE TBD 6:1 WEDGE DETAIL FILLET OF MATERIAL FILLET MATERIAL- No. 21B WAY 6:1SLOPE $DATE$ d k(01).dgn 1K(1)
2 3/4/2015 1:18:38 AM d k(02).dgn MANAGER Dave Covington, P.E. (540) DESIGN BY Rummel Klepper & Kahl, LLP (804) VA. 29 1K(2) AND ARE NOT TO BE USED FOR ANY TYPE OF CONSTRUCTION. Phase 1 - Day Work Construct proposed widening that is behind the existing curb approaching the Rio Road/US-29 intersection. Phase 1 - Night Work Remove existing curb and install proposed pavement that ties into pavement installed during Phase I - Day Work. Close lane adjacent tocurb removal utilizing TTC 16.0 Remove existing islands in the NW and SE quadrants of the Rio Road/US-29 intersection and install new full depth pavement. Close lane adjacent tocurb removal utilizing TTC 1.0 Install piles for proposed retaining walls. Pile installations shall be covered with steel plates at the end of the night work period. Close left lanes approaching RioRoad/US-29 intersection utilizing TTC 18.0 Construct temporary crossovers at Myers Drive/US-29, Berkmar Drive/US-29, and Rio Road east of US-29 (at Hardee s Driveway) Close adjacent lanes totemporarycrossovers using TTC 17.0 Construct temporary pavement on the right shoulder of SB US-29 from Sta to Close adjacent lane utilizing TTC 16.0 Phase 2 Construct Rio Road bridge over US-29 Depressed Roadway (DPR), retaining walls to separate US-29 DPR from US-29 local lanes, and US-29 DPR Implement ful closure of RioRoad/US-29 intersection while maintaining on US-29 3 lanes northbound and 2 lanes southbound. Perform these closures using TTCs 16.0, 17.0, and Remove existing signals on US-29 at Fashion Square Drive/Shoppers World and at Albemarle Square Drive. In order toremove signal utilize TTCs 1.0 and Phase 3 Complete remaining wall and barrier construction along the US-29 Depressed Roadway. This workmayutilize permanent shoulder closures and temporarylane closures, including the depressed roadwaytravel lanes. Al lane closures shal take place during alowable lane closure hours (9 PM - 6 AM) Construct proposed curb and sidewalk along US-29 approaching Rio Road. Al workis totake place during alowable lane closure hours (9 PM - 6 AM) utilizing TTC 16.0 Close temporary crossovers and reconstruct median at Myers Drive, Berkmar Drive, and at the commercial driveway (Hardee s). Al workis totake place during alowable lane closure hours (9 PM - 6 AM) utilizing TTC 17.0 Note that the above work shall not occur during the same work period and at no time shall TTCs 16.0 and 17.0 be in place during the same work period. $DATE$ d k(02).dgn 1K(2)
3 Curve SBTHRUTRANA01 PI = SE = NORMAL CROWN V = 45 MPH d k(03).dgn 11:14:40 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - DAY WORK 1K(3) 3820' 1450' MATCHLINE SHEET 1K(5) G20-1 (V) 60" X 24" RIO RD WB Curve SBL2904 PI = END Curve SBL2901 PI = Curve SBTHRUTRANA02 SE = NORMAL CROWN V = 45 MPH Curve SBL2902 PI = Curve SBL Curve RIO02 SE =MATCH EXISTING V=40 MPH 260 PT PC MATCHLINE SHEET 1K(4) STATION (RTE. 29 CONSTR. BASELINE) PC PC PT PRC PT POT PC PT PRC PC ' Paved Shoulder Req'd. PRC PT PT PC PT PC PRC Variable WidthPaved Shoulder Req'd. W20-1 () FASHION SQUARE DR Curve NBTHRUTRANA01 PI = T = ' L=208.90' R =2,489.00' PC = PRC = Curve NBTHRUTRANA02 Curve NBL2901 PI = Curve NBL2902 PI = End Ret. Wal Sta (19' Rt.) Rte. 29 NBLConstr. B 164 RIO RD EB 163 PC Curve RIO03 PI = SE =MATCH EXISTING V=40 MPH Curve NBL2903 PI = Curve ML2901 PI = MATCHLINE SHEET 1K(6) 1K(3)
4 d k(04).dgn 11:14:47 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - DAY WORK 1K(4) MATCHLINE SHEET 1K(3) STATION (RTE. 29 CONSTR. BASELINE) Curve ML2901 PI = PT PT Curve SBL Curve SBL2905 PI = T = 88.15' L = ' R = 1,050.00' PC = PRC = 267 PC PC ALBEMARLE SQUARE Curve SBTHRUTRANB01 PI = PC PRC PT Curve NBTHRUTRANB01 Curve NBTHRUTRANB PRC Curve SBL2906 PI = T =68.14' L=135.96' R =806.00' PRC = PT = PI = Curve SBTHRUTRANB PT PRC Curve SBTHRUTRANB02 PI = T =87.48' L=174.92' R =3,489.00' PRC= PT = PT MYERS DRIVE END G20-1 (V) 60" X 24" W20-1 (48" X 48") 525' 4475' 1K(4)
5 BERKMAR DRIVE END d k(05).dgn 11:14:53 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - DAY WORK 1K(5) MATCHLINE SHEET 1K(3) W20-1 (48" X 48") RIO EB 157 PRC PC POT RIO WB G20-1 (V) 60" X 24" 400' 1K(5)
6 PT POT END d k(06).dgn 11:14:57 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - DAY WORK 1K(6) G20-1 (V) 60" X 24" RIO EB RIO WB MATCHLINE SHEET 1K(3) 166 ALBEMARLE SQUARE W20-1 (48" X 48") 1K(6)
7 d k(07).dgn 11:07:57 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(7) GREENBRIER DR POT CONSTRUCTION SIGNING DETAIL 13 WESTFIELD RD 14 W4-2 () PIONEER CIRCLE MATCHLINE SHEET 1K(8) STATION (RTE. 29 CONSTR. BASELINE) LANE ENDS MERGE RIGHT W 9-2R 350ft 350ft 350ft W 20-1 W 20-5aL CLOSED LEFT LANES 2 R4-V7R W 4-2 Sta (Shown Above) 0 50' 100' 1K(7)
8 d k(08).dgn 11:08:01 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(8) MATCHLINE SHEET 1K(7) STATION (RTE. 29 CONSTR. BASELINE) 22 16' BRANCHLANDS BLVD W4-2 () WESTFIELD RD AMBER ARROW, TYPE C 40' SPACING 31 ILLUMINATED FLASHING 225' TAPER 32 DOMINION DRIVE ' TANGENT MATCHLINE SHEET 1K(9) STATION (RTE. 29 CONSTR. BASELINE) 1K(8)
9 POT POT d k(09).dgn 11:08:05 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(9) MATCHLINE SHEET 1K(8) STATION (RTE. 29 CONSTR. BASELINE) 36 G20-1 (V) 60" X 24" END 37 FASHION SQUARE DR SHOPPERS WORLD ILLUMINATED FLASHING AMBER ARROW, TYPE C BERKMAR DRIVE ' TANGENT 225' TAPER 260' BUFFER SPACE 40' SPACING NOTE: TEMPORARY SIGNAL AT BERKMAR DR. SHALL ALSO BE CONSTRUCTED DURING THIS PHASE, UTILIZING TTC 50.0 FOR TEMPORARY FULL CLOSURES. FOR TEMPORARY SIGNAL PLAN, SEE SHEET 1L(XX). PHASE 1TEMP. GOODYEAR PARKING LOT PHASE 1 PERM. UTILITY ' MATCHLINE SHEET 1K(10) STATION (RTE. 29 CONSTR. BASELINE) 0 50' 100' 1K(9)
10 d k(10).dgn 11:08:11 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(10) MATCHLINE SHEET 1K(15) MATCHLINE SHEET 1K(9) STATION (RTE. 29 CONSTR. BASELINE) PROP. PERM. UTILITY NOTE: ONCE TEMPORARY SIGNAL HAS BEEN CONSTRUCTED AT BERKMAR DRIVE, THE SIGNAL AT FASHION SQUARE DRIVE NORTH MAY BE TAKEN OUT OF OPERATION AND REMOVED. AT THIS POINT, MEDIAN CONSTRUCTION ON THE WEST LEG MAY COMMENCE. 50 PC FASHION SQUARE DR Paved Shoulder Req'd. 51 Curve NBTHRUTRANA01 SE = NORMAL CROWN V = 45 MPH POT PRC PC PC Curve NBTHRUTRANA02 PRC PC Curve NBL2901 PI = PRC Variable WidthPaved Shoulder Req'd. W1-4L PT PRC PT PT DEVICES (CONE) PROP. TEMP. PHASE 1 TEMP. PHASE 1 TEMP. PHASE 1 PERM. UTILITY PHASE 1 PERM. UTILITY PROP. R/W PROP. PERM. MAINT. PHASE 1 TEMP. CHANNELIZING PROP. PERM. MAINT. 154PT Curve NBL2902 PI = ' Paved Shoulder Req'd. End Ret. Wal Sta (19' Rt.) Rte. 29 NBLConstr. B PC PC PT PC SE =MATCH EXISTING PHASE 1 TEMP. PROP. PERM. DRAINAGE PHASE 1 TEMP. Prop. R/W PROP. TEMP. PROP. PERM. DRAINAGE PHASE 1 TEMP. Prop. R/W PHASE 1 TEMP. PHASE 1 PERM. UTILITY RIO EB Prop. R/W 25' PHASE 1 TEMP. RIO WB V=40 MPH 163 PC PROP. PERM. MAINT. PHASE 1 PERM. UTILITY CHANNELIZING DEVICES 40' SPACING CHANNELIZING DEVICES (CONE) PROP. PERM. MAINT V=40 MPH 61 PT SE =MATCH EXISTING 160 CHANNELIZING DEVICES (CONE) Curve NBL PT Prop. R/W RIO EB PC ' Paved Shoulder Req'd. PROP. TEMP ' Paved Shoulder Req'd. 2' Paved Shoulder Req'd. PROP. PERM. MAINT. Prop. R/W 25' RIO WB PHASE 1 PERM. UTILITY 8' Paved Shoulder Req'd. 8' Paved Shoulder Req'd. Curve SBL2904 PI = CHANNELIZING DEVICES 40' SPACING UTILITY PHASE 1 PERM MATCHLINE SHEET 1K(1) STATION (RTE. 29 CONSTR. BASELINE) PHASE 1 TEMP. MATCHLINE SHEET 1K(16) 1K(10)
11 d k(11).dgn 11:08:18 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(11) MATCHLINE SHEET 1K(10) STATION (RTE. 29 CONSTR. BASELINE) 264 Curve ML2901 PT Prop. R/W PHASE 1 PERM. UTILITY 265 2' Paved Shoulder Req'd. 8' Paved Shoulder Req'd. Curve SBL2904 8' Paved Shoulder Req'd. 2' Paved Shoulder Req'd. PHASE 1 TEMP. 266 PROP. TEMP. PROP. PERM. DRAINAGE PROP. STORMWATER Curve SBL PROP. PERM. MAINT. PC ALBEMARLE SQUARE Curve SBTHRUTRANB01 Variable WidthPaved Shoulder Req'd. (CONE) PC PHASE 1 TEMP. PHASE 1 PERM. UTILITY TEMP. Prop. R/W 69 PRC PROP. TEMP. Curve NBTHRUTRANB PRC COMMENCE. Curve SBL2906 PI = T =68.14' L=135.96' Prop. R/W Variable WidthPaved Shoulder Req'd. PT DRAINAGE PHASE 1 TEMP. PROP. PERM Curve NBTHRUTRANB02 Curve SBTHRUTRANB PT CONSTRUCTED AT MYERS DRIVE, THE PRC NOTE: ONCE TEMPORARYSIGNALHAS BEEN SIGNALAT ALBEMARLE SQUARE MAYBE TAKEN OUT OF OPERATION AND REMOVED. AT THIS POINT, MEDIAN CONSTRUCTION MAY Curve SBTHRUTRANB02 PI = T =87.48' L=174.92' R =3,489.00' PRC= PT = PHASE 1 PERM. UTILITY PHASE PHASE 1 PERM. UTILITY ' 72 PT PHASE 1 TEMP NOTE: TEMPORARY SIGNAL SHALL ALSO BE CONSTRUCTED DURING THIS PHASE, UTILIZING TTC 50.0 FOR TEMPORARY FULL CLOSURES. FOR TEMPORARY SIGNAL PLAN, SEE SHEET 1L(XX). 40' SPACING 360' BUFFER SPACE MYERS DRIVE ' TAPER MATCHLINE SHEET 1K(12) STATION (RTE. 29 CONSTR. BASELINE) 1K(11)
12 POT END d k(12).dgn 11:08:24 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(12) MATCHLINE SHEET 1K(1) STATION (RTE. 29 CONSTR. BASELINE) ' SPACING POT ILLUMINATED FLASHING AMBER ARROW, TYPE C 225' TAPER 82 G20-1 (V) 60" X 24" 83 W4-2 () 84 WOODBROOK DRIVE ' TANGENT ' MATCHLINE SHEET 1K(1) STATION (RTE. 29 CONSTR. BASELINE) 1K(12)
13 d k(13).dgn 11:08:29 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(13) MATCHLINE SHEET 1K(12) STATION (RTE. 29 CONSTR. BASELINE) ' TANGENT 93 40' SPACING ' TANGENT ILLUMINATED FLASHING AMBER ARROW, TYPE C 96 W4-2 () ' TANGENT GANDER DRIVE ' 105 MATCHLINE SHEET 1K(14) STATION (RTE. 29 CONSTR. BASELINE) 1K(13)
14 106 d k(14).dgn 11:08:33 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(14) MATCHLINE SHEET 1K(13) STATION (RTE. 29 CONSTR. BASELINE) W4-2 () 40' SPACING POT ILLUMINATED FLASHING AMBER ARROW, TYPE C 1000' TANGENT 225' TAPER CONSTRUCTION SIGNING DETAIL W 4-2 (Shown Above) R4-V7R 3 LEFT LANES CLOSED W 20-5aL W ft 350ft 350ft LANE ENDS MERGE RIGHT W 9-2R 0 50' 100' 1K(14)
15 BERKMAR DRIVE END d k(15).dgn 11:08:38 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(15) MATCHLINE SHEET 1K(10) W20-1 (48" X 48") 40' SPACING NOTE: SIGNAL UPGRADES AT RIO AND BERKMAR DRIVE SHALL BE COMPLETED DURING THIS PHASE, UTILIZING TTC 50.0 FOR TEMPORARY FULL CLOSURES. FOR SIGNAL PLAN, SEE SHEET 14(X) RIO EB 157 PRC PC POT RIO WB G20-1 (V) 60" X 24" 400' 1K(15)
16 PT POT END d k(16).dgn 11:08:43 AM MANAGER Dave Covington, P.E. (540) PHASE 1 - NIGHT WORK 1K(16) G20-1 (V) 60" X 24" RIO EB RIO WB MATCHLINE SHEET 1K(10) 166 ALBEMARLE SQUARE W20-1 (48" X 48") 1K(16)
17 d k(17).dgn 11:07:28 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(17) CONSTRUCTION SIGNING DETAIL 27 W4-2 () ' SPACING ' TAPER ILLUMINATED FLASHING AMBER ARROW, TYPE C ' SPACING ' BUFFER SPACE 16' 35 MATCHLINE SHEET 1K(18) STATION (RTE. 29 CONSTR. BASELINE) LANE ENDS MERGE RIGHT W 9-2R 350ft 350ft 350ft W 20-1 W 20-5aL CLOSED LANE LEFT R4-V7R W 4-2 Sta (Shown Above) 0 50' 100' 1K(17)
18 POT POT d k(18).dgn 11:06:04 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(18) MATCHLINE SHEET 1K(17) STATION (RTE. 29 CONSTR. BASELINE) FASHION SQUARE DR SHOPPERS WORLD G20-1 (V) 60" X 24" END 1035' BUFFER SPACE 80' SPACING ' W1-4R BERKMAR DRIVE ' LANE SHIFT 47 4" CLASS F, TYPE I PAVEMENT MARKINGS 48 GOODYEAR PARKING LOT 49 MATCHLINE SHEET 1K(19) STATION (RTE. 29 CONSTR. BASELINE) 1K(18)
19 d k(19).dgn 11:06:09 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(19) MATCHLINE SHEET 1K(23) 158 MATCHLINE SHEET 1K(18) STATION (RTE. 29 CONSTR. BASELINE) 50 PC FASHION SQUARE DR 51 Curve NBTHRUTRANA01 W1-4R SE = NORMAL CROWN V = 45 MPH POT PRC ' 100' PC PC Curve NBTHRUTRANA ' LANE SHIFT PRC PC Curve SBTHRUTRANA Curve NBL2901 PI = PRC PT PRC ' LANE SHIFT W1-4L Curve SBL PT PT PT Curve NBL2902 PI = ' SPACING 4" CLASS F, TYPE I PAVEMENT MARKINGS " CLASS F, TYPE I PAVEMENT MARKINGS ' SPACING PC PC ' 10' 259 PT PC Curve RIO02 SE =MATCH EXISTING V=40 MPH TYPE III BARRICADE 24" CLASS F, TYPE I PAVEMENT MARKINGS 163 PC TYPE III BARRICADE St'd. CG-12 Type M1 Req'd. 10' Curve RIO PT SE =MATCH EXISTING 160 Curve NBL2903 PI = PT R =3,000.00' PC = PC " CLASS F, TYPE I PAVEMENT MARKINGS Curve SBL MATCHLINE SHEET 1K(20) STATION (RTE. 29 CONSTR. BASELINE) 10' 10' 10' MATCHLINE SHEET 1K(24) 1K(19)
20 d k(20).dgn 11:06:47 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(20) MATCHLINE SHEET 1K(19) STATION (RTE. 29 CONSTR. BASELINE) ' PT PT ' 10' 80' SPACING Curve ML Curve SBL2904 PI = " CLASS F, TYPE I PAVEMENT MARKINGS 4" CLASS F, TYPE I PAVEMENT MARKINGS W1-4L 67 Curve SBL ' SPACING ' LANE SHIFT PC PC ALBEMARLE SQUARE Curve SBTHRUTRANB01 PC PRC ' LANE SHIFT PT Curve NBTHRUTRANB01 Curve NBTHRUTRANB PRC W1-4R R =1,050.00' Curve SBTHRUTRANB02 PI = PT PRC ' 10' Curve SBTHRUTRANB02 T =87.48' L=174.92' R =3,489.00' PRC= PT = PT ' BUFFER SPACE MYERS DRIVE MATCHLINE SHEET 1K(21) STATION (RTE. 29 CONSTR. BASELINE) 1K(20)
21 POT END d k(21).dgn 11:06:57 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(21) MATCHLINE SHEET 1K(20) STATION (RTE. 29 CONSTR. BASELINE) ' BUFFER SPACE ' SPACING 80' SPACING 180 POT ILLUMINATED FLASHING AMBER ARROW, TYPE C ' TAPER 82 G20-1 (V) 60" X 24" W4-2 () WOODBROOK DRIVE ' TANGENT ' ' TAPER MATCHLINE SHEET 1K(22) STATION (RTE. 29 CONSTR. BASELINE) 1K(21)
22 d k(22).dgn 11:07:02 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(22) MATCHLINE SHEET 1K(21) STATION (RTE. 29 CONSTR. BASELINE) ' TAPER 93 40' SPACING 94 ILLUMINATED FLASHING AMBER ARROW, TYPE C 95 W4-2 () CONSTRUCTION SIGNING DETAIL W 4-2 Sta (Shown Above) 96 R4-V7R 97 2 LEFT LANES CLOSED 98 W 20-5aL W ft 350ft 350ft LANE ENDS MERGE RIGHT W 9-2R 0 50' 100' 1K(22)
23 BERKMAR DRIVE d k(23).dgn 11:07:09 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(23) MATCHLINE SHEET 1K(19) W4-2L 40' SPACING 12' RIO EB 157 PRC PC POT RIO WB END G20-1 (V) 60" X 24" CONSTRUCTION SIGNING DETAIL W 4-2 Sta (Shown Above) R4-V7R 2 LEFT LANES CLOSED W 20-5aL W ft 350ft 350ft LANE ENDS MERGE RIGHT W 9-2R 0 50' 100' 1K(23)
24 PT POT d k(24).dgn 11:07:15 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(24) G20-1 (V) 60" X 24" END MATCHLINE SHEET 1K(19) MATCHLINE SHEET 1K(25) RIO EB TEMP TYPE III BARRICADE 250' BUFFER SPACE 16' 225' TAPER RIO WB ' SPACING 80' SPACING 4" CLASS F, TYPE I PAVEMENT MARKINGS 80' SPACING ALBEMARLE SQUARE W1-4R 1K(24)
25 d k(25).dgn 11:07:23 AM MANAGER Dave Covington, P.E. (540) PHASE DAY CLOSURE 1K(25) RIO EB RIO WB CHANNELIZING DEVICES 40' SPACING 225' TAPER MATCHLINE SHEET 1K(24) W4-2 CONSTRUCTION SIGNING DETAIL LANE ENDS MERGE RIGHT W 9-2R 300ft 300ft 300ft W 20-1 W 20-5aL CLOSED LANE LEFT R4-V7R W 4-2 (Shown Above) 0 50' 100' 1K(25)
26 d k(26).dgn 11:21:28 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(26) W4-2 () CONSTRUCTION SIGNING DETAIL ILLUMINATED FLASHING AMBER ARROW, TYPE C 30 40' SPACING ' TAPER 1100' TAPER MATCHLINE SHEET 1K(27) STATION (RTE. 29 CONSTR. BASELINE) LANE ENDS MERGE RIGHT W 9-2R 350ft 350ft 350ft MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC 11.0 W 20-1 W 20-5aL CLOSED LANE LEFT R4-V7R W 4-2 Sta (Shown Above) 1K(26)
27 POT POT d k(27).dgn 11:21:33 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(27) MATCHLINE SHEET 1K(26) STATION (RTE. 29 CONSTR. BASELINE) 36 G20-1 (V) 60" X 24" END 37 FASHION SQUARE DR SHOPPERS WORLD ' BUFFER SPACE BERKMAR DRIVE ' BUFFER SPACE GOODYEAR PARKING LOT MATCHLINE SHEET 1K(28) STATION (RTE. 29 CONSTR. BASELINE) 0 50' 100' MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC K(27)
28 :21:40 AM d k(28).dgn MANAGER DESIGN BY Dave Covington, P.E. (540) Rummel Klepper & Kahl, LLP (804) CONSTRUCTION SIGNING DETAIL W 4-2 Sta (Shown Below) PHASE 3 R4-V7R 2 LEFT LANES CLOSED W 20-5aL W 20-1 MATCHLINE SHEET 1K(32) 1K(28) 158 MATCHLINE SHEET 1K(27) STATION (RTE. 29 CONSTR. BASELINE) 50 PC FASHION SQUARE DR 350ft 350ft 350ft 51 Curve NBTHRUTRANA01 PI = W1-4R SE = NORMAL CROWN V = 45 MPH POT LANE ENDS MERGE RIGHT ' TAPER PRC PC PC Curve NBTHRUTRANA W 9-2R 40' SPACING PRC PC SE = NORMAL CROWN Curve NBL2901 PI = PRC PT PRC ILLUMINATED FLASHING AMBER ARROW, TYPE C PT PT PT Curve NBL2902 PI = End Ret. Wal Sta (19' Rt.) Rte. 29 NBLConstr. B W PC PC Curve SBL PT PC Curve RIO02 SE =MATCH EXISTING V=40 MPH 163 PC V=40 MPH 61 PT SE =MATCH EXISTING 160 Curve NBL PT PC MATCHLINE SHEET 1K(29) STATION (RTE. 29 CONSTR. BASELINE) 14' MATCHLINE SHEET 1K(33) 0 50' 100' MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC K(28)
29 d k(29).dgn 11:21:59 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(29) MATCHLINE SHEET 1K(28) STATION (RTE. 29 CONSTR. BASELINE) Curve ML2901 PI = PT PT W4-2 Curve SBL2904 PI = T =102.81' L=205.54' R =2,929.00' ' SPACING PC PC PC PT ALBEMARLE SQUARE PI = PRC Curve NBTHRUTRANB PRC Curve NBTHRUTRANB02 Curve SBTHRUTRANB PT PRC CONSTRUCTION SIGNING DETAIL Curve SBTHRUTRANB02 PI = PT = ' TAPER 360' BUFFER SPACE PT W 9-2R RIGHT MERGE LANE ENDS MYERS DRIVE MATCHLINE SHEET 1K(30) STATION (RTE. 29 CONSTR. BASELINE) 350ft 350ft 350ft MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC 11.0 W 20-1 W 20-5aL 2 LEFT LANES CLOSED R4-V7R W 4-2 Sta (Shown Above) 1K(29)
30 POT d k(30).dgn 11:22:10 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(30) MATCHLINE SHEET 1K(29) STATION (RTE. 29 CONSTR. BASELINE) END G20-1 (V) 60" X 24" 180 POT ' TAPER 40' SPACING ILLUMINATED FLASHING AMBER ARROW, TYPE C WOODBROOK DRIVE MATCHLINE SHEET 1K(31) STATION (RTE. 29 CONSTR. BASELINE) 0 50' 100' MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC K(30)
31 d k(31).dgn 11:22:16 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(31) MATCHLINE SHEET 1K(30) STATION (RTE. 29 CONSTR. BASELINE) W4-2 () 97 CONSTRUCTION SIGNING DETAIL 98 W 4-2 Sta (Shown Above) 99 R4-V7R 100 LEFT LANE CLOSED 101 W 20-5aL W ft 350ft 350ft MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC 11.0 LANE ENDS MERGE RIGHT W 9-2R 1K(31)
32 BERKMAR DRIVE d k(32).dgn 11:22:22 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(32) MATCHLINE SHEET 1K(28) W20-1 RIO EB 157 PRC PC POT RIO WB END G20-1 (V) 60" X 24" 0 50' 100' MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC K(32)
33 PT POT d k(33).dgn 11:22:27 AM MANAGER Dave Covington, P.E. (540) PHASE 3 1K(33) G20-1 (V) 60" X 24" END MATCHLINE SHEET 1K(28) RIO EB 166 RIO WB ALBEMARLE SQUARE W ' 100' MILL AND OVERLAY NOTE: MILL AND OVERLAY SHALL BE PERFORMED ONE LANE AT A TIME UTILIZING TTC K(33)
Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3
Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable
More informationBOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST
BOSTON HORIZON WAY ALFORD ST BROADWAY BOSTON CITY LINE CITY LINE MANHOLE #101 (STA 5+00) BOW ST DEXTER ST ST LYNDE ST THORNDIKE ST COURTLAND ST RIVER PROP (TYP) ROBIN ST BETTY ST 50 500 1. BASELINE STATIONING
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationDEVELOPMENT PLAN CHECKLIST
Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature
More informationHIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT
HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationDIVISION PAVEMENT MARKINGS AND MARKERS
DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition
More informationConstruction Plan Reading Basics & Applications
Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project
More informationSurvey Data and TOPO Checklist
Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand
More informationWashington County Road Engineering Plan Submittal/Review Checklist
Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationCurrently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)
INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication
More informationMACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017
MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationPlan Preparation Checklist
Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC
More informationCHAPTER 1: TITLE SHEET and GENERAL LAYOUT
CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations
More informationProject Name: County File No.: Checked by: For: Date:
Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction
More informationCITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:
CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationSECTION 3 IMPROVEMENT PLAN REQUIREMENTS
SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,
More informationE:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM
600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationTYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.
FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88
More informationPROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED:
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STREET IMPROVEMENT PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STREET IMPROVEMENT PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO.
More information112" 72" 40" BIKE LANE MARKING SHARED LANE MARKING PAVEMENT MARKING DETAILS N.T.S. GENERAL NOTES
8 SB RTE ON RAMP " 0" GENERAL NOTES 7" SHARED LANE MARKING ' ' ' BIKE LANE MARKING PAVEMENT MARKING DETAILS N.T.S. YIELD LINE. ALL SIGNS SHALL HAVE A MINIMUM CLEARANCE BETWEEN THE EDGE OF SIGN AND THE
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationPlan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA
Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationSan Antonio Wrong Way Driver Initiative
San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More informationLetter of Submittal & Attachments
ORIGINAL Letter of Submittal & Attachments State Project No.: (NFO) 0035-087-112, PE-101, RW-201, C-501, B-604 Federal Project No.: BR-087-5(014) Contract ID Number: C00081457DB57 September 11, 2013 submitted
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationSITE PLAN APPLICATION
SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationROADWAY PLANS LOCATIONS: NC 86 (MARTIN LUTHER KING JR. BOULEVARD) AT AIRPORT DRIVE AND BOLINWOOD DRIVE
ROADWAY PLANS CHAPEL HILL WN LIMITS LOCAONS: NC 86 (RN LUTHER KING JR. BOULEVARD) AT AIRPORT AND BOLINWOOD TYPE OF WORK: INSTALLAON OF S, RKINGS, SIGNING I-40 INDEX OF SHEETS SHEET NO. TLE SERVICES 86
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationKing Mill Lambert DRI# 2035 Henry County, Georgia
Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.
More informationOhio Department of Transportation Office of Roadway Engineering January 18, 2013
Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen
More informationAPPLICATION FOR SITE PREPARATION PERMIT
Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.
More informationPUBLICATION 213. Think Safety First
PUBLICATION 213 (67 PA CODE, CHAPTER 212) Think Safety First Pub 213 (02-08) Appendix Appendix A - Temporary/Portable
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationLOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)
MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More information2017 San Juan College Luminarias 6:00pm - 11:30pm
Parking For Walking available north side of college campus 2017 San Juan College Luminarias 6:00pm - 11:30pm Drive-Thru Entrance (2 Lanes) Drive-Thru Entrance starts at 30th Street & Butler Avenue * sign
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationWe will study all three methods, but first let's review a few basic points about units of measurement.
WELCOME Many pay items are computed on the basis of area measurements, items such as base, surfacing, sidewalks, ditch pavement, slope pavement, and Performance turf. This chapter will describe methods
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationSECTION 6A ROADWAY PLAN PREPARATION
SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4
More informationWork Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition
Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing
More informationSIGN PERMIT APPLICATION
SIGN PERMIT APPLICATION Chocolay Charter Township Planning and Zoning Department 5010 US 41 South Marquette, MI 49855 Phone: 906-249-1448 Fax 906-249-1313 PERMIT #SP- Permanent $ 50.00 Temporary $ 30.00
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationSection 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2
Section 4-02 Typical Sections TABLE OF CONTENTS INTRODUCTION...2 General...2 DRAFTING GUIDELINES...3 General...3 Drawing Typical Sections...3 Attaching a Sheet...3 Text Size and Spacing...4 Labeling of
More informationDeep Creek Canyon US Highway 12
Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location
More informationCity of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16
City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010
I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third
More informationExhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia
Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia
More informationStep 1 Calculate the square feet of roadway covered with tack 1,000 ft. x 12 ft. = 12,000 square feet
Tack Rate Problem # CRS-2 Tack (Specific Gravity=.00) was applied to the roadway. The temperature measured from the tack distributor was 25 F. The length of the application was 000 feet. The width of the
More informationTURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2
TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationLARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)
3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County
More informationTRAFFIC ENGINEERING DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: Radio Systems/Highway Signs SPECIFIC SUBJECT: Use of Radio Systems by VDOT & Localities: HAR and TIS Informational
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationMICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER
1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project
More informationCHAPTER 26 SITE PLAN REVIEW
CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More informationMinor Site Plan Application
Section 496-11.3.6 of the City Code: Minor Site Plan Review allows for review of the site design of routine development applications that are eligible to be processed administratively. Procedure 1. If
More informationTOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE
TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationTemporary Sign Permit
36725 Division Road, P.O. Box 457, Richmond, MI 48062 Building and Planning Department 586-727-7571 ext. 228 586-727-2489 Fax Temporary Sign Permit Application and Regulations Page 1 Updated: 15OCT15 Temporary
More informationDESIGN PUBLIC HEARING
DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55
More informationMINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M.
MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M. CALL TO ORDER ROLL CALL Chair Palmer called the meeting to order at 3:34 p.m. The following persons were
More information2018 District 1 Highway Construction Program
District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last
More informationSUBMITTAL REQUIREMENTS RCV D REJECT PENDING
1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationAppendix E-4. City of Fort Collins. Requirements for Utility Plans
Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development
More informationSection 101. Street Design
Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended
More informationCHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS
CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1
More informationPlease remove and replace the entire Table of Contents, Section A to Section J and all Appendices.
Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination
More informationAppendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)
Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained
More informationOVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION
OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION Application information below to be completed by Applicant/Agent//Owner APN PROPERTY ADDRESS PROPERTY LOCATION (if no address) APPLICANT S NAME
More informationGeneral Wireless Permit Package Submission and Review Guidelines. Non VDOT (Existing and New) Structures within VDOT Right of Way
General Wireless Permit Package Submission and Review Guidelines Non VDOT (Existing and New) Structures within VDOT Right of Way January 1, 2018 This document applies to new wireless installations on new
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More informationSubdivision Application Checklist
City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application
More informationAppendix B: Noise Study
Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationTYPICAL SECTION OF IMPROVEMENT
...\plans\0_prelim\07c_sh0.dgn /8/009 DIV. STATE COUNTY FILE OJECT TYPICAL CTION OF IMOVEMENT SC 7.0658A8 I-7 NORTHBOUND I7 SOUTHBOUND I7 8 8 0 8 VARIABLE (E CROSS CTIONS) : CONST..5.5 CONST. (
More informationUTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES
Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE
More informationMODULE 1 HAZARDOUS EMERGENCY DECISIONS
MODULE INTRODUCTION Accidents, natural disasters, and terrorism produce chaotic homeland security situations that require a coordinated response based on sound information. GIS, when applied to these emergencies,
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More informationDEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3
DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to
More information