Goethe-Astor Apartments. Parking Studies, Preliminary Floor Plans, Door Details Title. Chicago, IL Geographic Location. design drawing Drawing Type
|
|
- Evan Armstrong
- 5 years ago
- Views:
Transcription
1 Project Name Goethe-Astor Apartments Building Name RX23664/ AIC Reference Number Parking Studies, Preliminary Floor Plans, Door 50 sheets Jul 57-Oct 59 graphite and colored pencil on vellum and tracing paper design drawing 22 x 36 (varies) dirt, discolorations, creases, folds, tears, adhesive stains Tannenbaum, J. Swann, JS, AC, JB, Drawn RAB, By: C. Kite Goldberg T (former tube 233) At Astor and Goethe Streets. Some are obsolete or voided. Shows Parking Ramps and Sections, Layout of 1st Basement and Ground Floors, Rolling Door and Louvers, Incinerator and Chute, 1st, 2nd and 4th Basement Floor Plans, Tenant Storage Plan - 1st Floor Basement with Alternates, Tile Mural in Elevator Lobby, Storage Floor Plan - 5th Floor, Sub Sidewalk Layout, Parking Studies with Alternates, 2nd Basement Parking, Scheme #2 Basement and Upper Floor Parking, Typical Floor Plan, Horizontal and Vertical Sections - Alternate #3 and 4, Inner Core
2 RX23664/ Structural Drawings 15 sheets Dec 58-Jun 59 graphite and colored pencil on vellum structural drawing 21 x 36 dirt, discolorations, creases, folds, tears, tape Tannenbaum, RAB, DT, JS, JB Goldberg T (former tube 234) At Astor and Goethe Streets. Some are obsolete or voided. Shows 1st and 2nd Basement and Ground Floor Framing and Schedules, Ramp Plan and Sections, Foundation Procedure, Core - Typical, Penthouse and 26th Floors, Core- East/West Exterior Walls, Basement Walls, Section and, Basement and Foundation Construction Sequence
3 RX23664/ Door 44 sheets Aug 58-Oct 61 graphite on vellum detail drawing 11 x 8.5 dirt, creases, folds, tears Goldberg T (former tube 237) At Astor and Goethe Streets. Shows Detail of Door Frame for 5 1/4 Partition, 2 1/2 Steel Studs, Staggered-Rocklath-Plaster, Head Detail, Dropped Ceiling, 2 Partition, Detail of Trash Room Door Jamb and End Wall, Jamb Detail of Stairway Doors #1 and 2, Head Detail of Stairway Door, Detail of Plywood at Floor Line, Vertical Section at End Walls of Lobby, Detail of Wall at Lobby Entrance, 1st Floor Lobby Floor Detail, Corner Detail above Height of Door, Double Swinging Door, Door Frame Revisions for Door #29-32
4 RX23664/ Design and Mechanical Drawings 23 sheets Jul 58-Mar 61 graphite and colored pencil on vellum and tracing paper detail drawing, mechanical drawing varies dirt, creases, folds, tears, discolorations, losses RAB, GB, JHH, G Begay, TP Goldberg T (former tube 237) At Astor and Goethe Streets. Shows Column Sketches, Sheet, Roof Plans, Apt Floor Plan, Window and Roof, Structural Plans and, Plumbing Riser Diagram, 23rd Floor Water Plan, Mechanical Heating and Ceiling Piping, Plumbing Plan for 1st, 2nd and 4th Basements, Sprinkler Plan for 1st and 4th Basements, Lobby Floor Panel Coil, Core Plans and Ceiling Diffuser, Ventilation - Typical Apt Floor
5 RX23664/ Structural Drawings 15 sheets Apr 60-Mar 61 graphite on vellum structural drawing 22 x 34 dirt, discolorations, creases, folds, tears, tape LB, RAB, JPP, Tannenbaum Goldberg T (former tube 235) At Astor and Goethe Streets. Some are obsolete or voided. Shows Typical Floor and Roof Framing and, Ground Floor, 1st and 2nd Basement Plans and, Core- Stairs- General, Core-1st Basement and Ground Floor Plans, Core-2nd, 3rd, 4th and 5th Floors, Core - Typical and 29th Floors, Core-Penthouse Floors, Core- NSEW Exterior Walls, Core-EW Exterior Walls, Core-Sections Looking North and South, Misc., Misc. Structural
6 RX23664/ Piping Plans 12 sheets Jun-Jul, 59 graphite on vellum mechanical drawing 22 x 34 dirt, discolorations, creases, folds, tears RAB, EG Goldberg T (former tube 239) At Astor and Goethe Streets. Shows Fire Protection Installations, Grade Site Plan, 1st and 2nd Basements Floor Plans, Typical Bathroom and Apt Kitchen Piping, 29th Floor Plan Showing Instantaneous H.W. Heating Piping, Misc., Mechanical Equipment Room, Riser Diagram from 5th to 2nd Basement and 26th to Penthouse Roof and 6th to 25th Floors Showing Drain, Soil, Waste and Vents, Risers, C.W., DHWS and DHWR
7 RX23664/ Mechanical Drawings 23 sheets Jun 59-Oct 63 graphite on vellum mechanical drawing 22 x 34 dirt, discolorations, creases, folds, tears, tape RAB, TP, GB, JGM Goldberg T (former tube 239A) At Astor and Goethe Streets. Shows Mechanical Schedules, Det. Floor Plan Rev (12-27 Floors), 28th Floor Ceiling Piping Arrangement, Schematic Control Diagrams, Cooling Tower Penthouse Roof Plan, 32nd Floor Boiler Room Equip and Piping Layout, 30th Floor Refrigeration Equip and Piping, 29th Floor Panel System Zone Control and Condensate Equip, Typical Apt Floor Plan Mechanical Facilities and Equip, 5th Floor Storage Rooms Mech Equip and Distribution Piping, 5th Floor Storage Room Panel Heating, 2nd and 3rd Floor Core Plan and Sections - AC
8 RX23664/ Plumbing Drawings 13 sheets Jun 59-Aug 64 graphite on vellum mechanical drawing 22 x 34 dirt, discolorations, creases, folds, tears HR, TP, OEG, PM, OG, JAH, HD Goldberg T (former tube 239B) At Astor and Goethe Streets. Shows Restaurant and Toilet Room Plumbing Diagram, Domestic H. W. System Modification, 1st and 2nd Basements Floor and Sprinkler Plans, Kitchen Plumbing Diagram, Canopy Roof Drains, Riser Diagram, Typical Apt Floor Plans, Misc Floor Plans, Ground Floor Plan
9 Project Name Maxim s Building Name Alterations RX23664/ AIC Reference Number 3 sheets Sept 1, 1974 graphite on tracing paper 12 x 20 design drawing dirt, discolorations, creases, folds, tears Goldberg T (former tube 238) At Astor and Goethe Streets. Shows North Wall Elevation, Plan of Private Dining Room, New Opening Dining Room Face Elevation
10 RX23664/ Floor Plans, Stair Designs sheets Apr 60 - Sept 66 graphite on vellum design and detail drawings 22 x 34, varies JB, RAB, AI, RB, JJS, TG, BTH, RWK, Drawn HPS, By: R Bernardini dirt, discolorations, creases, folds, tears, tape Goldberg T (former tube 238) At Astor and Goethe Streets. Shows Storage Floor Plan, 28th Floor Plan, Utility Closet and Trash Chute, Door Schedule and, Apt Plan and Kitchen Elevations, Apt Interior Elevations and - General and for 2 BR Apts Floors 12-27, Plan of Linen Chute, Kitchen Cabinets Apts 1-7, 2nd Basement Parking, Alternate Floor Plan for Floors 12-27, 5th Floor Topping Plan, Laminated Wood Counter Tops, Circular Stair Plan, Elevation and, Vanitories, Medicine Cabinets Lighting Arrangements, Bedroom Shelving Units in Apts 7
11 RX23664/ Locker Room Plans, Apt Floor Plans 15 sheets Aug 60 - May 63 graphite on paper and tracing paper design and detail drawings varies dirt, discolorations, creases, folds, tears, tape RCM Goldberg T (former tube 240A) At Astor and Goethe Streets. Shows Marble Countertops, Proposed Layout for Men s Locker Room in 2nd Basement Plan, 1st and 2nd Basement Plans, Sketch #1-4 for 1 and 2 BR Apt Floor Plans, Preliminary Design for Maxim s and Doorman s Stations at Hotel Service Desk and Entrance, Bottle Sketch
12 RX23664/ Floor Plans, Jamb, Detail Drawings 52 sheets Feb 59 - Oct 63 graphite, zip-a-tone and colored pencil on vellum and tracing paper design and detail drawings, shop drawings varies RAB, BTH, RDP, R Bernardini, DC, Drawn LB By: dirt, discolorations, creases, folds, tears, tape Goldberg T 06.1 (former tube 242) At Astor and Goethe Streets. Shows Gutter, Jamb, Spandrel, Mullion and Window by Roll Form Die and Engineering Co, Passage Thru 20 E Goethe St, Index Sheet for Project (FHA # ), Sign Sketches, Curtain Wall Insert Locations, Sidewalk Curb and Lights, Proposed Surface Mounted Medicine Cabinet, Elevator Cab Elevations, Revisions to SS Kitchen Units, 5th Floor Suspension Sleeve and Metal Deck Layout, Scheme #1 - Basement Parking, Exterior Door at Elevator #2 Rear Exit, Plans-Restaurant Level-1st Basement, Typical Floor Plan, 2nd Basement
13 RX23664/ Restaurant 15 sheets Jun 63 - Mar 64 graphite on vellum design and detail drawings 22 x 34 dirt, discolorations, creases, folds, tears, tape Mizera, LB, VL, ED Goldberg T 06.2 (former tube 247) At Astor and Goethe Streets. Shows Caves-du- Jour, Magazine Rack, Marble Lavs, Kitchen Exhaust Stack and Banquette, 2nd Basement Floor Plan, Restaurant 2nd Level Plans and, Kitchen Equipment List and Schedules, Wine Display Rack, Service Bar and Checkers Stand, Kitchen Sink Elevations and, Reflected Ceiling Plan North, Restaurant Dining Room Plan and Caves du Jour Interior Wall Sections
14 Project Name Maxim s Building Name Restaurant Plans and RX23664/ AIC Reference Number 33 sheets Mar 63 - Feb 64 graphite and colored pencil on vellum and tracing paper design and detail drawings and sketches varies dirt, discolorations, creases, folds, tears, tape RAB, HDS, R Bernardini, Mizera, NF Goldberg T 06.2 (former tube 247A) At Astor and Goethe Streets. Shows Seating Sketch, Vertical Section thru Wall and Door, Lobby Ceiling Plan, Revisions to 2nd Basement Plan, Wine Rack and Bar Sketch, Section thru Banquettes, Plan of Mens and Womens Toilets, Marble Measurements for Mens and Womens Lavatory Units, Bar Seating Sketch, Hotel Doorman Phones and Key Cases, Timecard Clock and Punch Area Sketch, Steel Door Sketch, Lunch, Dinner,Supper and Benefit Seating Layouts, Interior Decor Schedule, Restaurant Kitchen Plan, Job Schedule, Caves
15 Project Name Maxim s Building Name Floor Plans RX23664/ AIC Reference Number 2 sheets Mar - Jun 1963 graphite on vellum design drawings varies dirt, discolorations, creases, folds, tears, tape RAB Goldberg T 06.2 (former tube 247B) At Astor and Goethe Streets. Shows Restaurant Level Plans
16 RX23664/ Electrical Plans 24 sheets Jun 59 - Jun 63 graphite and ink on vellum and tracing paper electrical drawing 22 x 34, varies dirt, discolorations, creases, folds, tears, tape A, K, WJN, VL, AL, MBC Goldberg T 06.3 (former tube 248) At Astor and Goethe Streets. Shows Restaurant- Dining Room Plans, Ground, 1st and 2nd Basement Floor Plans, Site Plan, 28th Floor Plan, Typical Telephone Layout, Roof Light Conduit thru Elevator Hatch, 29th-32nd Floor Plans and Penthouse Roof, 12th thru 27th Floor Plan, Telephone and Intercomm Risers, Schedules, Main Power Diagram, Stairwell Lighting and 27th Floor Riser Diagrams, 26th-29th Floor Plans and Penthouse Roof, Apt Riser Diagram and Panel Schedule, Typical Apt Plan, Storage Floor Plan and Exit Sign Bldg Risers, Lobby Areas Electrical
17 RX23664/ Structural Drawings 7 sheets Aug 61 - Oct 63 graphite and colored pencil on vellum structural drawing 22 x 34 dirt, discolorations, creases, folds, tears LB, Murphy, NF, D Urany, NM Goldberg T 06.3 (former tube 236) At Astor and Goethe Streets. Shows Framing Plan for Hoisting Equipment, Canopy Plans and, Circular Stair, Core Wall Penetration, NSEW Walls, Framing to Support Ground Floor Slab Occasioned by Removal of Column C2
18 RX23664/ Boiler Room, Elevator Cab and Floor Plans 6 sheets Dec 58 - Dec 61 graphite and colored pencil on vellum and tracing paper design drawing 22 x 34, 14 x 26 dirt, discolorations, creases, folds, tears RB, KDP, RAB Goldberg T 06.3 (former tube 240) At Astor and Goethe Streets. Shows Basement Boiler Room and Coal Vault, Elevator Cabs, Storage Floor Plan, Core - 2nd Basement and Ground Floor
19 RX23664/ Restaurant Designs, Floor Plans, Lobby Equipment and Detail Drawings 21 sheets Apr 63 - Jan 79 graphite and colored pencil on vellum and tracing paper design drawings and sketches 22 x 34, varies dirt, discolorations, creases, folds, tears, tape TEM, Mizera, Bernardini, RAB, HDS Goldberg T 06.3 (former tube 241) At Astor and Goethe Streets. Shows Restaurant (Kitchen) Floor Plan, Wine and Storage Rack, Restaurant Interiors, Dining Room and Men s and Women s Toilet Room, Cocktail Bar Interior Elevation (nice), Private Dining Rooms Interior Elevations, Dining Rooms Reflected Ceiling, Main Bar, 2nd Basement Plan Parking, Lobby Area, PBX Cabinet and Upper Desk, Office Floor Plan Sketch, Lobby Screen, East Lobby Auxiliary Heating, Kitchen Study, Storage Floor Plan, 2 BR Unit, 12th-27th Apt Floor Plan, Restaurant Floor Revisions
20 RX23664/7.410 Window Washing Cart July 8, 1963 graphite on vellum design drawing 22 x 34 dirt, discolorations, creases, folds, tears JB At Astor and Goethe Streets. Goldberg T 06.3 (former tube N-55)
21 RX23664/ Tenant Storage Plan and Ground Floor Plan 2 sheets June, 1958 graphite and sepia on paper 21 x 36 design drawing dirt, discolorations, creases, folds, tears Goldberg T 06.4 (former tube 233) At Astor and Goethe Streets. One is voided. Shows Ground Floor Plan/Site Plan with Zoning Table.
22 RX23664/ One Unit Floor Plan 2 sheets May, 1959 blueline, graphite and colored pencil on paper design sketch 17 x 22 dirt, discolorations, creases, folds, tears Goldberg T 06.4 (former tube 233) At Astor and Goethe Streets. Shows Sketch #3 and Area Measurements.
23 RX23664/7.425 Plat of Survey Oct 13, 1961 blueline on paper site plan 28 x 36 dirt, discolorations, creases, folds Goldberg T 06.4 (former tube 233) Not BGA. Anton Kozak, Land Surveyor. At Astor and Goethe Streets.
24 RX23664/ Earlier Architect s Drawings for Proposed Apt Bldg 12 sheets Jun-Oct, 1955 blueprint design drawing 14 x 22.5, 20 x 30.5 dirt, discolorations, creases, folds, tears Goldberg T 06.4 (former tube 233) Not BGA. Irving M Karlin & Son. At Astor and Goethe Streets. Shows Typical Floor and Basement Plans, 22 Floor Section, 1st, 2nd, 3rd Floor and Penthouse Plans
25 RX23664/ rd Basement Floor Plan S-12 Dec 3, 1958 blackline and graphite on mylar 21 x 36 design drawing dirt, discolorations, creases, folds, tears DT Goldberg T 06.5 (former tube 234) At Astor and Goethe Streets. Shows Beam Schedule and Slabs
26 RX23664/ Structural Drawings 3 sheets April, 1960 graphite and sepia on paper 21 x 36 structural drawing dirt, discolorations, creases, folds, tears, tape RAB Goldberg T 06.4 (former tube 235) At Astor and Goethe Streets. All are voided. Shows Piers, Columns and Footings Schedule, Test Boring Report, 5th Floor Framing, Typical Floors and Roof Framing
27 RX23664/ Structural Drawings 3 sheets Apr 60 - Feb 61 graphite and blackline on mylar 23 x 37 structural drawing dirt, discolorations, creases, folds RAB Goldberg T 06.5 (former tube 235) At Astor and Goethe Streets. All are voided. Shows Piers, Columns and Footings Schedule, Test Boring Report, 5th Floor Framing, Core - Foundations and 2nd Basement Floor
28 RX23664/7.445 Structural Drawings S-14 Aug 60 - Aug 61 graphite, colored pencil and sepia on film structural drawing 22 x 34 dirt, discolorations, creases, folds Goldberg T 06.5 (former tube 235) At Astor and Goethe Streets. Shows Piers, Columns and Footings Schedule, Test Boring Report
29 RX23664/7.446 Site Plan A-1 Apr 60 - Mar 62 graphite and blackline on mylar 22 x 34 site plan dirt, discolorations, creases, folds RAB At Astor and Goethe Streets. Goldberg T 06.5 (former tube 236)
30 RX23664/ Structural Drawings 16 sheets Apr 60 - Aug 63 graphite and sepia on film 22 x 34 structural drawing dirt, discolorations, creases, folds, tears, tape, losses RAB, JPP, LB Goldberg T 06.5 (former tube 236) At Astor and Goethe Streets. Shows Core- Foundations and 2nd Basement Floor, Core-1st Basement and Ground Floor Plans, Core-2nd, 3rd, 4th and 5th Floors, Core-Typical and 29th Floors, Core-Penthouse Floors, Core-NSEW Exterior Walls, Core-Sections Looking North and South, Core-Stairs, General, Ground Floor, 1st and 2nd Basements Plans and, Misc, Typical Floor and Roof Framing and, 5th Floor Framing
31 RX23664/ Mechanical and Electrical Drawings 6 sheets Jul 58 - Jan 59 graphite and sepia on paper 21 x 36 mechanical, electrical drawings dirt, discolorations, creases, folds, tears GB, Harrison, AC Goldberg T 06.4 (former tube 237) At Astor and Goethe Streets. Some are void. Shows HVAC, Electrical Layout, 1st, 2nd and 3rd Floor Basements Ventilation, Sprinkler Plan and Riser Diagram, Apt Floor Plan
32 RX23664/7.469 Lighting Plan blueline on paper electrical drawings 14 x 22 dirt, discolorations, creases, folds, tears Goldberg T 06.4 (former tube 237) At Astor and Goethe Streets. Shows Lighting Frame and Candelabra Sockets
33 RX23664/ Floor Plans and 14 sheets Jul 58 - Apr 59 blackline on paper design and detail drawing 24 x 34 dirt, discolorations, creases, folds, tears JS, J Swann, AC Goldberg T 06.4 (former tube 237) At Astor and Goethe Streets. Shows Ground Floor Marble and Trim, Typical Apt Floor Lobby, Apt Plan and Elevations, Typical Apts Elevations and, Apt Cabinet, Kitchen Cabinet, Utility Closet, Chute and Stack Shaft, Rolling Door, Louver and Misc, Window, Stainless Steel Column Jacket, Door Schedule and, Ground Floor Elevations and Sections, Lobby and Misc
34 RX23664/ Floor Plans and 12 sheets Apr 60 - Dec 62 graphite and blackline on mylar 22 x 34 design and detail drawing dirt, discolorations, creases, folds, tears RAB, AI Goldberg T 06.5 (former tube 238) At Astor and Goethe Streets. Shows 1st and 2nd Basements Floors, Typical Section Looking South, Stair and Ladder, Rolling Door, Ground Floor Marble Trim, Typical Apt Floor Lobby, Ground Floor Plan, Roof Plan and, Penthouse Plan, Section and, Exterior Elevations, Typical Floor Plan
35 RX23664/ Floor and Site Plans 4 sheets Apr 60 - Feb 64 graphite and sepia on film 22 x 34 design drawing dirt, discolorations, creases, folds, tears, losses RAB Goldberg T 06.5 (former tube 238) At Astor and Goethe Streets. Shows 1 BR Apts - 6th thru 11th Floors, Site Plan, 2nd Basement Plan and General Revisions, Restaurant Level Plan
36 RX23664/ Window 5 sheets Nov 60-Sept 62 graphite and sepia on paper 22 x 34 detail drawing dirt, discolorations, creases, folds, tears, tape JC At Astor and Goethe Streets. Goldberg T 06.6 (former tube 238)
37 RX23664/ Plaza Paving and 2nd Basement Renovations 3 sheets August, 1979 graphite and sepia on paper and vellum design drawing 22 x 34 dirt, discolorations, creases, folds, tears, tape RAB, EC Goldberg T 06.6 (former tube 238) At Astor and Goethe Streets. Shows Plaza Paving and Alternate
38 RX23664/7.508 Plat of Survey Feb 12, 1959 blackline on paper site plan 28 x 36 dirt, discolorations, creases, folds, tears Goldberg T 06.6 (former tube 238) Not BGA. Anton Kozak, Land Surveyor. At Astor and Goethe Streets.
39 RX23664/ Sprinkler Plans 2 sheets June, 1959 graphite on mylar mechanical drawing 22 x 34 dirt, discolorations G Begay Goldberg T 06.7 (former tube 239) At Astor and Goethe Streets. Shows 1st and 2nd Basements Sprinkler Plans
40 RX23664/ Mechanical Drawings 10 sheets Jun 59 - Oct 63 graphite and sepia on mylar mechanical drawing 22 x 34 dirt, discolorations JAL, PC, JGM, Mizera, TP, GB Goldberg T 06.7 (former tube 239A) At Astor and Goethe Streets. Shows Entrance Lobby Heating and Cooling, 2nd Basement Parking, Storage Floor Plan, Revised 12th-28th Floor Plans, Ground Floor Plans, Restaurant Level, 1st and 2nd Basement Plans and, Restaurant Dining Room and Kitchen Floor Plans, 25th Floor Ceiling Plan Piping Distribution
41 RX23664/ Plumbing Plans 10 sheets Apr 60 - Oct 63 graphite and sepia on mylar and film mechanical drawing 22 x 34 dirt, discolorations JAL, BTH, TEM, HG, Mizera, TP, DEJ, Drawn OEG By: Goldberg T 06.7 (former tube 239B) At Astor and Goethe Streets. Shows Restaurant Level - 1st Basement Plan, 2nd Basement Parking, Restaurant Kitchen, Dining Room and 2nd Level Floor Plans and, Revised 12th thru 28th Floor Plans, Storage Floor Plan, Stand Pipe Installations
42 RX23664/ Floor Plans 3 sheets Feb- Nov, 1959 graphite and sepia on paper 22 x 34 design drawing dirt, discolorations, creases, folds, tears BEW Goldberg T 06.6 (former tube 240) At Astor and Goethe Streets. Shows 1st Basement Floor Plan, 2nd Basement Parking, Storage Floor Plan
43 RX23664/7.534 Ambassador East Floor Plan October, 1926 blueprint design drawing 36 x 41 dirt, discolorations, creases, folds, tears, tape Goldberg T 06.6 (former tube 240) Not BGA. Robert DeGoryer and Company. At 1301 N. State Street. Shows Basement Plan.
44 RX23664/ Basement Pump Plan and Men s and Women s Locker Room Layout 2 sheets Apr - May, 1963 blueline on paper design drawing varies dirt, discolorations, creases, folds, tears JC Goldberg T 06.6 (former tube 240A) At Astor and Goethe Streets. Shows Detail - 1st Basement Pump Plan, Proposed Layout for Men s and Women s Lockers in 2nd Basement
45 Project Name Maxim s Building Name Restaurant Floor Plan RX23664/7.537 AIC Reference Number R-0 Jul-Nov, 1963 sepia on paper design drawing 22 x 34 dirt, discolorations, creases, folds Bernardini At Astor and Goethe Streets. Goldberg T 06.6 (former tube 241)
46 RX23664/ Floor Plans 4 sheets Apr 60 - Aug 63 graphite and sepia on mylar 22 x 34 design drawing dirt, discolorations, creases, folds Mizera, TEM, AI Goldberg T 06.7 (former tube 241) At Astor and Goethe Streets. Shows Restaurant Dining Room and Kitchen Plans, Lobby and Misc., Ground Floor Elevations and Sections
47 RX23664/7.542 Ground Floor Plan A-4 revised Apr 60 - Nov 63 graphite and sepia on film 22 x 34 design drawing dirt, discolorations, creases, folds, tears, losses RAB At Astor and Goethe Streets. Goldberg T 06.7 (former tube 241)
48 RX23664/7.543 Restaurant Level 1st Basement Plan AX-4a revised January 2, 1963 graphite and sepia on film 22 x 34 design drawing dirt, discolorations, creases, folds, tears BTH Goldberg T 06.7 (former tube 242) At Astor and Goethe Streets. Shows Material Legend. Used for Permit.
49 Project Name Maxim s Building Name Restaurant Floor Plans and RX23664/ AIC Reference Number 6 sheets May - Sept 1963 graphite and sepia on mylar 22 x 34 design drawing dirt, discolorations, creases, folds Mizera, VL, ED Goldberg T 06.7 (former tube 247) At Astor and Goethe Streets. Shows Restaurant Dining Room Seating Plan, Wine and Storage Rack, Restaurant Floor Plan and Schedules, Restaurant Ceiling Plan, Riser Diagram and Schedules
50 Project Name Maxim s Building Name Disco Plans RX23664/7.550 AIC Reference Number Sept 18, 1972 graphite, sepia and ink on paper 22 x 34 design drawing dirt, discolorations, creases, folds, tears Bernardini Goldberg T 06.6 (former tube 247A) At Astor and Goethe Streets. Shows Dance Floor, Seating and Cocktail Bar
51 RX23664/7.551 Piping for Restaurant Level Mar - Apr, 1963 graphite, colored pencil and blueline on paper mechanical drawing 22 x 34 dirt, discolorations, creases, folds, tears RAB Goldberg T 06.6 (former tube 247B) At Astor and Goethe Streets. Shows Existing Piping at Ceiling and Ceiling Heights for Restaurant Level Plan
52 Project Name Maxim s Building Name Plumbing, Mechanical and Electrical Plans RX23664/ AIC Reference Number 3 sheets August, 1980 ink and blueline on paper varies mechanical and electrical drawings dirt, discolorations, creases, folds, tears Goldberg T 06.6 (former tube 247B) At Astor and Goethe Streets. Shows Plumbing and Ventilation Changes to Existing System for Remodeling Work for New Restaurant Office Suite, Electrical Plans
53 Project Name Maxim s Building Name Wall Design Sketches RX23664/ AIC Reference Number 11 sheets June, 1963 blueline and ink on paper varies design sketch dirt, discolorations, creases, folds, tears Goldberg T 06.6 (former tube 247B) At Astor and Goethe Streets. Shows Walls B, C, D and E 2nd Alternate, Walls A, C and D 1st Alternate, East Wall Showing Closure of Orchestra Space
54 Project Name Maxim s Building Name Paris Maxim s Designs RX23664/ AIC Reference Number 9 sheets Dec 43 - Dec 49 sepia on paper design drawing varies dirt, discolorations, creases, folds M Martelet Goldberg T 06.6 (former tube 247B) Not BGA. Shows Sides A (left and right sides), B, C,E, G, H, I and J, New Ground Floor Plan
55 Project Name Maxim s Building Name RX23664/ AIC Reference Number Cartoon Detail Designs for Circular Stair Railings 2 sheets xerograph on paper design sketch 23 x 18 dirt, discolorations, creases, folds, tears At Astor and Goethe Streets. Goldberg T 06.6 (former tube 247B)
56 Project Name Maxim s Building Name Remodeled Office Plans and RX23664/ AIC Reference Number 9 sheets Aug 79 - Oct 80 graphite on mylar design drawing 15 x 21 dirt, discolorations, creases, titles cut out of some Goldberg T 06.7 (former tube 247B) At Astor and Goethe Streets. Some are printed on Health Sciences Center Sheets. Shows Plan and Elevations, and Sections, Office Suite, Bathroom/Closet/Dressing Room
57 Project Name Maxim s Building Name RX23664/7.420 AIC Reference Number Cartoon Detail Design for Circular Stair Railings xerograph on paper design sketch 23 x 18 dirt, discolorations, creases, folds, tears At Astor and Goethe Streets. Goldberg T 06.6 (former tube 247B)
RX23664/130.1 Project Name Building Name AIC Reference Number. Patient Room Plans Title BGA Job Number. Milwaukee, WI. Geographic Location
RX23664/130.1 Patient Room Plans A-37, 1 of 3 6-15-73 graphite on mylar working drawing dirt S.T. Chen F 01.01 RX23664/130.2 Patient Room Elevations A-39, 2 of 3 6-15-73 graphite on mylar working drawing
More informationBertrand Goldberg Archive. Inscription. Details. Prentice Women s Hospital Project Name. Institute of Psychiatry RX23664/103.1
Project Name Institute of Psychiatry Building Name RX23664/103.1 AIC Reference Number Typical Nursing Floor, Clinic Level, Plaza Level - isometric view graphite, ink and zip-a-tone on vellum presentation
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationHall of Waters List of Historic Drawings
List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More information1. Name the horizontal member that rests on the foundation wall to support other wood members.
Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests
More informationDimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationJohann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647
3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More information214 Wilshire Blvd., Suite 102 Santa Monica California 90401
Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE
More informationEXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca
Zero lot line home requires window to be removed. #10901 Half Mudroom Nook 12'11" x 9'11" 14'3" x 14'11" Foyer Zero lot line home requires window to be removed. #10901 Walk-in Closet Master edroom 15'11"
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationSECOND FLOOR 1159 sq. ft.
Nook 9'11" x 11'11" Great Room 12'11" x 11'11" Walk-in Closet Master 12'5" x 12'11" Half room Walk-in Closet Shelves Foyer Linen onus Room 13'5" x 12'11" D W FRONT GARAGE HOME TWO STOREY ATHROOMS 2.5 EDROOMS
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationMarcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationS T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD
\\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWhat Plans Do I Need for a Building Permit?
What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationBUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS
Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,
More informationRIT CAD Specifications
RIT CAD Specifications The design team shall provide RIT with Revit, AutoCAD, and PDF files that capture the construction conditions of the associated project. This document outlines requirements for submitting
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationGregg, Edd R., Architectural drawings, COLLAB- ORATOR (ROLE) PROJECT TYPE
MSS AR G89 Gregg, Edd R., 897-96 ural drawings, 939-956 BOX # FLDR # PROJECT NAME/ CLIENT/ TITLE PROJECT # (Class #) LOCATION CITY, COUNTY, OR STATE DATE Residence for Mr. and Mrs. Marshall Barnes -- basement
More informationRobert Fulton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCHARLESTON. excelhomes.ca IN MAHOGANY FRONT DRIVE HOME. 3 Bedrooms 21/2 Baths Two Storey 2354 sq. ft. finished sq. ft. unfinished basement
FRONT DRIVE HOME HRLESTON IN MHOGNY Last updated on September 3, 2015 3 edrooms 21/2 aths Two Storey 2354 sq. ft. finished + 696 sq. ft. unfinished basement Main Floor 1053 sq. ft. Second Floor 1301 sq.
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More informationCOTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC
GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More informationNathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJoseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623
3 W 3st St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationFriedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657
39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationNew Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the
More informationBRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB
BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS
More informationSECOND FLOOR 1353 sq. ft.
Master edroom 12'4" x 13'3" Nook 13'5" x 9'5" Great Room 13'5" x 12'11" Walk-in Closet W D Laundry edroom 4 9'11" x 10'2" FRONT GRGE HOME Pantry Mudroom Half Flex Room 10'11" x 10'2" Foyer 12'4" x 13'9"
More informationStep 1: General Customer information
Call: 877-533-5582 Fax: 732-961-5259 Email: sales@woodcabinetsonline.com Website: www.woodcabinetsonline.com Designing the perfect kitchen can be a big task! From matching colors, designing layout, and
More informationLangston Hughes Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPerspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653
33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationApex Kitchen and Bath
Apex Kitchen and Bath You Dream It, We Build It. HOW TO MEASURE YOUR KITCHEN A guide to planning and creating the heart of your home. www.apexgraniteoutlet.com Kitchen Cabinet Granite Countertop Sink Faucet
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSECOND FLOOR 960 sq. ft.
Great Room 13'3" x 12'3" Flex Room 8'6" x 7'10" Bedroom 2 10'4" x 11'5" Nook 10'2" x 9'6" Bedroom 3 10'4" x 10'11" W D Laundry Mudroom DW 11'5" x 15'0" Half Ensuite Linen FRONT GARAGE DUPLEX BATHROOMS
More informationDaniel S Wentworth Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEmmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationARCH 405bL SPRING 2016 LUCY EGBE + NICK HALSEY + KELLY LYNCH ERIN YAMASHITA ISSUED 04/26/16. Site Plan. Site Plan 1" = 50'-0" 1" = 50'-0" SCALE A-500
04/6/6 Site Plan " = 50'-0" Site Plan " = 50'-0" A-500 LOWLINE PARK WARHOL MUSEUM BASEMENT 6.67% Up 6.67% Down 03/0/6 Level P /3" = '-0" UP TYPICAL PARKING PLAN /3" = '-0" A-50P ESSEX ST. MARKET WARHOL
More informationRufus M Hitch Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationCharles N Holden Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Harvard Elementary School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationKitchen and Bath Design Planner
2017 Kitchen and Bath Design Planner How to Measure Your Kitchen or Bath for New Cabinets Measuring your space is a critical step in determining your room layout. Having accurate measurements of your kitchen
More informationJohn Milton Gregory Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago Charter - Carter G Woodson
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL
Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationJoseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationPaul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620
82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationFranklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610
22 W Evergreen Ave Chicago, IL 1 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJoseph E Gary Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRichard J Oglesby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationKevin O'Connor Design Kevin O'Connor CKD, CBD, CID
SCOPE OF LABOR GENERAL: SUPPLY AND MANAGE TRASH AND DAILY CLEAN UP PROTECT EXISTING WOOD FLOORING, STAIRS AND DOORWAYS SUPPLY AND MAINTAIN PORTABLE TOILET FOR DURATION OF PROJECT KITCHEN: DEMO EXISTING
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationTri-County Commercial Application Checklist
TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services
More informationUniversity of Chicago Charter - NKO
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDRAFT FOR INTERNAL DISCUSSION ONLY
Jameson St. 2 Riser Room Cistern Base Men's Locker Room Women's Locker Room Mud Room Stair Elev. Entry Lobby Shipping and Receiving Stair EO/IO Breakdown A40 Shop / Warehouse Alley Gilman Pl. Storage Room
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationWendell Smith Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationHiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationGeorge Washington High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationBuilt to Benchmark Specifica ons.
Decora ve rectangle vent in large gable Eave returns as shown Shingle through in large gable Board & Ba en siding on front eleva on and large gable as shown 4-over-1 window grids throughout 3 pairs of
More informationA101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN
A00 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" A00 A0 A0 A B C D E F G ' - 0" 8' - 0" 9' - 0" 9' - 0" 9' - 0" 8' - 0" OVERHANG OF ROOF ABOVE RECESSED PEDI-MAT AT ENTRANCE MECH ENCL 0 0 WOMENS
More informationGeorge Washington Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629
3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More information