1 IBS SCORING IN MALAYSIA HOW CAN CIDB AND INDUSTRY PLAYERS WORK HAND IN HAND TO PROMOTE USAGE OF IBS IBS SCORING SYSTEM & CASE STUDY 1
2 CONTENT : 1) IBS SCORING SYSTEM 2) CASE STUDY 1 RESIDENTIAL 3) CASE STUDY 2 NON-RESIDENTIAL 4) FURTHER ENHANCEMENT TO IBS SCORE SYSTEM 5) CONCLUSION 2
3 1. IBS Scoring System IBS Score First Published : January 2005 First Revision : April 2010 Objective :- To provide a systematic and structured assessment system to measure the usage of IBS in a consistent way. 3
4 2. Emphasis of IBS Scoring System Setia Precast Sdn Bhd - The use of fabricated and precast components. - Off-site production of components - The use of standardised components - Repeatability - Modular Coordination (MC) in building MS1064 4
5 Components of IBS Scores Part 1 Structural Systems (Table 1) (50 IBS Points) Full IBS Factors : - Precast Concrete Columns, Beams & Slabs - Prefabricated Steel Structures - Timber Framed System Partial IBS Factors : - Reusable System Formworks for insitu concrete structures Nil IBS Factor : - Timber Formwork 5
6 IBS Scoring Attributes Setia Precast Sdn Bhd Components of IBS Scores Part 1 Roof (Table 1A) Full IBS Factors : - Prefab Timber Roof Truss - Prefab Metal Roof Truss Partial IBS Factors : - Precut Metal Roof Truss Nil IBS Factors : - Timber Roof Trusses 6
7 IBS Scoring Attributes Setia Precast Sdn Bhd Total Score for Part 1 7
8 Components of IBS Scores Part 2 Wall Systems (20 IBS Points) Full IBS Factors : - Precast Concrete Panel - Wall Cladding - Prefabricated Timber Panel - Full Height Galss Panel - Dry Wall System - Pre-Assemble Blockwall Partial IBS Factors : - In-situ Concrete With Reusable System Formwork - Blockwork System Nil IBS Factors : - Common Brickwall 8
9 IBS Scoring Attributes Setia Precast Sdn Bhd Total Score for Part 2 9
10 Components of IBS Scores Part 3 Other Simplified Construction Solutions (30 IBS Points) Emphasis on : - Utilisation of MS1064 Guidelines - Horizontal & Vertical Repetition - Buildability 10
11 Case Study 1 - Residential Seri Jati Apartment, Setia Alam 948 Units, 6 Blocks, 10 Storey Apartment in a single phase development 11
12 Prefabricated Steel Roof Trusses Precast Walls for Roof In-Situ Typical Floor Slabs Precast Components - Precast Load Bearing Walls - Precast Non-Bearing Walls - Precast Staircases & Landing Slabs - Precast Lift Core Walls - Precast Bathroom Slabs - Precast Air-Cond Ledges Conventional Construction - Foundation - Ground Floor - Transfer Beam - RC Slab CONSTRUCTION SYSTEMS 12
13 IBS Score for Seri Jati Part 1 : Scoring point : Part / 50 Use Precast Structural Frames with in-situ concrete floor using Reusable System Formwork 13
14 IBS Score for Seri Jati Part 2 & 3: Part / 20 Scoring point : Part / /100 Use Precast Walls Follow MS1064 Vertical & Horizontal Repetition 14
15 IBS Score Advantages - Project has high degree of repetitions for both horizontal and vertical plain. - Architectural and Structural designs with precast intention to capitalise on precast advantages. - High economy of scale with >900 units apartment with a single unit layout. - Construction logistic is fully considered at planning stage e.g. wall layout, work sequencing, crane s capacity and movement. 15
16 IBS Score Disadvantages - Brickwork/plastering in stand alone amenities building, box-out for M&E services/risers and kitchen/yard walls. - Non-compliance in Modular Coordination for structural elements and architectural design input. 16
17 An exciting external facade with different architecture features reduce the monotonous of the internal repetitive layout. 17
18 Steel moulds provide consistent quality in architecture features No columns and projected beams Consistent squareness Consistent quality 18
19 Case Study 2 Non-Residential Hospital Kuala Lumpur (SACCHKL) FLOOR HEIGHT : 9 STOREYS FLOOR AREA USAGE OTHERS : 600,000 SQ : DAY CARE SPECIALIST CENTRE COME WITH OPERATION THEATRES : BUILT IN 3 FLOORS OF INTERNAL CARPARKS : SEPARATE M&E BLOCKS 19
20 ACCHKL - Method to Achieve 70% IBS Score Requirement a) Columns : Sizes are too heavy for lifting if in precast components. Cast in-situ using aluminium formwork b) Beams : Precast components by Setia Precast c) Slabs : All wet areas are in-situ construction Other areas used Precast Hollow Core Slab by Eastern Pretech supported by PC Beams from Setia Precast 20
21 ACCHKL - Method to Achieve 70% IBS Score Requirement d) Walls : Structural walls used aluminium formwork & other internal and external walls Lightweight Blocks e) Staircases : Precast 21
22 IBS Score : Part / 50 Part / 30 Part / 20 Total 70.2 /100 22
23 Logistic Planning to resolve proximity of existing buildings and roads Area 1 : Construction up to Roof Level Crane Passage Area 2 : Remain void for crane movement while constructing Area 1. : Construct each bay up to RF and crane retreat to next bay and repeat sequence. Area 1 Area 1 Area 2 Area 1 Area 1 Internal Crane Passage Maximise Cranage Radius Area 1 Area 1 Area 2 23
24 Completed External Facade 24
25 Completed Internal Views 25
26 Further Enhancement to IBS Score System 1. Prefabrication a) Bathroom Pods/Prefabricated Pre-finished Volumetric Construction (PPVC ) - Truly industrialised system of construction, prefabrication and assembled at factory. - Eliminate on-site brickworks, plastering, tilings, waterproofing, site wirings and plumbing works and fittings the smallest room with the most number of trades. - Previous IBS Score (2005) allows a maximum of 1 point at Part 3 Prefabricated Components. - Proposed to increase IBS points at Part 2 as it comes complete with wall system and finishes. 26
27 Further Enhancement to IBS Score System b) Off-site prefabrication of reinforcement cage for columns, beams and walls - To consider additional points under previous IBS Score Part 3 (Other labour saving product / solution). 27
28 2. Elimination of Labour Intensive Process a) Use of skin walls/cladding to conceal wirings and pipings, instead of traditional hacking and plastering. - Process is clean and systematic - Good quality finished surface - No hacking of RC walls and brickworks Setia Precast Sdn Bhd Further Enhancement to IBS Score System 28
29 b) Replacement of brickwalls by using Dry Wall System (including cementitious panels and gypsum boards). - Bricklaying is a labour intensive process - Involved lot of construction logistic in moving bricks, sand, cement, water, mixing equipment, scaffoldings etc. for work to be executed. - Wet & dirty - Dry wall system is clean, fast, labour efficient and quality is easily control Where apply as a full replacement for brickwalls, should be incentively considered under previous IBS Score Part 3 (Other labour saving solution). 29
30 3. Revision of IBS Score 2010 a) Propose Revision to IBS Score Part Setia Precast Sdn Bhd - Reinstate 2005 Part 3 Item 3 (Other Prefabricated Component and Labour Saving Solution) to include more prefab structural / finished components e.g. prefab staircases, prefab bathroom unit & unitized building modules
31 Conclusion To target a higher IBS Score : 1) Design shall be modular coordinated, compliance to MS1064 (Utilisation of Standardise Components). 2) Developers & Contractors to plan for the use of IBS from the beginning including any simplified construction method. 3) Prefabrications where possible. 4) Minimise labour intensive works where possible e.g. brickwork & plastering. 5) Developers should have a preference for IBS construction so that the project sites are cleaner, less labour intensive and better quality. 6) Contractors should always be looking at more efficient construction methods. 31
32 THANK YOU 32
Double Storey HC Precast System Drawing - 3D
Double Storey HC Precast System Drawing - 3D Superstructure ( Frame & Wall ) : - By HC Precast System Sub- Structure By Other : - Appointed By Client 77 % 23 % INDUSTRIALISED BUILDING SYSTEM ( IBS ) is
More informationHC Precast System ( 100 % Malaysia Technology With 6 IPs )
Choose Industrialised Building System ( IBS ) for Economical Construction Industrialised Building System ( IBS ) functions as a comprehensive superstructure construction system whereby flexibility in it's
More informationHC Precast System ( 100 % Malaysia Technology With 6 IPs ) IBS Concept
HC Precast System ( 100 % Malaysia Technology With 6 IPs ) Economical. Eco Friendly. Quality IBS Concept In the construction of a building, there are always 4 types of joint namely L-shape T-shape Cross
More informationSECOND CONSTRUCTION TECHNOLOGY FORUM CONSTRUCTION FOR SUSTAINABILITY
SECOND CONSTRUCTION TECHNOLOGY FORUM CONSTRUCTION FOR SUSTAINABILITY 18 January 2013 Strategic Implementation of Prefabrication and Modular Construction & Some Experience Sharing of Hong Kong Housing Authority
More informationWELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1
WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-2017 - Industrialised Building System ( IBS ) is a system not a machine or component. Open System and Proprietary System is a Technology.
More informationIBS IS A SYSTEM NOT A MACHINE significantly difference from traditional cast in-situ construction which relies heavily on customized site work
IBS IS A SYSTEM NOT A MACHINE significantly difference from traditional cast in-situ construction which relies heavily on customized site work HC PRECAST SYSTEM MOULD SETTING - The wall is designed to
More informationWELCOME Jabatan Penilaian dan Perkhidmatan Harta Daerah Gombak (JPPH Gombak), Kementerian Kewangan Malaysia. Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-11 Jan 2017 - Open System And Proprietary
More informationCHAPTER I INTRODUCTION
CHAPTER I INTRODUCTION 1.1 Introduction Precast concrete construction have been getting popular and being widely applied in construction sector today. The rapid growth of the building industry together
More informationPresentation on Holistic Approach to Precast Concrete Construction
Presentation on Holistic Approach to Precast Concrete Construction Monday, 12 November 2018 (8.30 a.m. 5.00 p.m.) MATRADE Exhibition and Convention Centre Menara MATRADE Jalan Sultan Haji Ahmad Shah 50480
More informationRAPID CONSTRUCTION-INOVATIVE APPROCH OF PREFABRICATED CONSTRUCTION
RAPID CONSTRUCTION-INOVATIVE APPROCH OF PREFABRICATED CONSTRUCTION Krushil K. Ponkiya 1, Dhyey K. Shah 2, Rushabh A. Shah 3 PG. Student, SNPIT & RC, Umrakh, Gujarat, India 1 PG. Student SNPIT & RC, Umrakh,
More informationGeneral Layout. Eng. Maha Moddather
General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension
More informationSubject Description Form
Subject Description Form Subject Code Subject Title Credit Value BRE222 Workshop Practices and Draftsmanship 3 Academic Credits Level 2 Pre-requisite/ Co-requisite/ Exclusion Objectives Nil 1) Provide
More informationMAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPPALLI DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK UNIT I - INTRODUCTION
MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPPALLI- 621 213 DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK UNIT I - INTRODUCTION Need for prefabrication Principles Materials Modular coordination Standardization
More informationPresentation at Show Unit : IBS Sequence of Work
Presentation at Show Unit : IBS Sequence of Work Production Sequence In-house Engineering & Accessories Fabrication Precast Staircase Mould Installation & Dismantle Demo : 5 Minutes Precast Shear Key Beam
More informationUnit 8 Precast Concrete
Part ⅠIllustrated Words and Concepts Figure 8-1 Precast Slabs on a Frame of Precast Columns Figure 8-2 Hollow-core Slabs Supported on Precast Concrete Wall Panels Part Ⅱ Passages Passage A Precast Concrete
More informationNATIONAL INNOVATION AND CREATIVE ECONOMY EXPO 2017 (NICE 17) TECHPITCH - HC PRECAST WALL PANEL - 13 th OCTOBER 2017
NATIONAL INNOVATION AND CREATIVE ECONOMY EXPO 2017 (NICE 17) TECHPITCH - HC PRECAST WALL PANEL - 13 th OCTOBER 2017 1 CONTENT No. Description Page 1 System Description 3-19 2 Project Using HC Precast System
More informationSUSTAINABLE CONSTRUCTION IN HONG KONG DEMONSTRATION PROJECT IN FU TEI
Conference on Sustainable Building South East Asia, 11-13 April 2005, Malaysia SUSTAINABLE CONSTRUCTION IN HONG KONG DEMONSTRATION PROJECT IN FU TEI D. K. L. SO 1, S. C. C. AU 2 1,2 Ove Arup & Partners
More informationCOMPARATIVE STUDY OF IPS & PPVC PRECAST SYSTEM- A CASE STUDY OF PUBLIC HOUSING BUILDINGS PROJECT IN SINGAPORE
Proceedings of the 4 th International Conference on Civil Engineering for Sustainable Development (ICCESD 2018), 9~11 February 2018, KUET, Khulna, Bangladesh (ISBN-978-984-34-3502-6) COMPARATIVE STUDY
More informationPrecast Multistorey Highrise Residential & Commercial Buildings. Buildings & Factories IC
Precast Multistorey Highrise Residential & Commercial Buildings Buildings & Factories IC LARSEN & TOUBRO LIMITED It s all about Imagineering L&T at a Glance India s largest E&C company, with interests
More informationPRECAST TO LAST. S C Lam, K C Chung and S W Sham Hong Kong Housing Department
PRECAST TO LAST S C Lam, K C Chung and S W Sham Hong Kong Housing Department Abstract: The Hong Kong Housing Authority (HA) pioneered the precast concrete construction in high-rise residential buildings
More informationPRECAST CONCRETE STRUCTURES
PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and
More informationCE2045-PREFABRICATED STRUCTURES QUESTION BANK
CE2045-PREFABRICATED STRUCTURES QUESTION BANK UNIT I - INTRODUCTION PART A 1. Define prefabrication 2. What are the types of prefabricates based on i. Plan area ii Based on weight 3. What are the types
More informationnineteen Wood Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2016 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631
APPLIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS FALL 2016 lecture nineteen wood construction and design Wood Construction 1 Timber Construction all-wood framing systems
More informationProven precast solutions for every application
Proven precast solutions for every application Seventy five years of UNDISPUTED LEADERSHIP HP shell roof, bowstring girders and trussed gantry girders for L&T Bengaluru Works Larsen & Toubro is a major
More informationFlanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND
Flanged Dowel Box INDUSTRIAL SLAB ON GROUND Designed for construction joints in Post Tension or large shrinkage specifications Large lateral movement and expansion capacity Eliminates the need to drill
More informationTECHNICAL DRAWING GUIDE
Budapest University of Technology & Economics (BME) Faculty of Architecture Department of Building Constructions 2017 + TECHNICAL DRAWING GUIDE Edited by Dr Zsuzsanna Fülöp and Aryan Choroomi based on
More informationPRECASTING IN SINGAPORE S DESIGN & BUILD PROJECTS
The International Journal Precasting of Construction in Singapore s Management Design (2002) & Build 1-12 Projects 1 PRECASTING IN SINGAPORE S DESIGN & BUILD PROJECTS LIM Jiann Yeh 1, WANG Shou Qing 2
More informationDiamond Dowel. Load Transfer System INDUSTRIAL SLAB ON GROUND
Diamond Dowel INDUSTRIAL SLAB ON GROUND Diamond Dowel designed for construction joints Tapered plate design allows for diagonal shrinkage Eliminates the need to drill or process formwork Design ensures
More informationCOLUMN 11/2013 LINEAR STRUCTURAL ELEMENT
11/2013 LINEAR STRUCTURAL ELEMENT OÜ TMB Element produces linear structural elements with the product name column in conformity with the standard EVS-EN 13225 Precast concrete products. Linear structural
More informationAbu Dhabi (Head Office) Dubai: Iraq:
PRECAST PRECAST Introduction 03 Advantages of Precast 05 Advantages of Prestressed 07 Sequence of typical Precast/Prestressed projects 09 Typical Projects 13 CONTENTS Gulf Precast 2 INTRODUCTION INTRODUCTION
More informationCASE STUDY: 4,100 PRECAST VILLAS AT AL FALAH. Presented by: MAX E. JORDAN Fluor Mideast Limited Date: 15 MAY 2012
AT AL FALAH Presented by: MAX E. JORDAN Fluor Mideast Limited Date: 15 MAY 2012 IT S ONLY VILLAS 2 AL FALAH FACTS: Housing Development for the Government of Abu Dhabi Developer: ALDAR PJSC Project Management
More informationBig expertise. Real convenience. Concrete commitment. stem
1300 659 830 www.formdirect.com.au Big expertise. Real convenience. Concrete commitment. Stee l Pre-e P n g i n eere ly Fo conc d rete form, factory rmin ing s ystem built, re-u g sy sable stem Steel-Ply
More informationNZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture
Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,
More informationDOWNLOAD OR READ : TIMBER FOR BUILDING TURNING TREES INTO HOUSES PDF EBOOK EPUB MOBI
DOWNLOAD OR READ : TIMBER FOR BUILDING TURNING TREES INTO HOUSES PDF EBOOK EPUB MOBI Page 1 Page 2 timber for building turning trees into houses timber for building turning pdf timber for building turning
More informationArchitectural Precast Concrete Presentation May 2009
Presented by Nomenclature Architectural Precast Concrete Martin Newland B.E. M.I.E. Aust CP Eng SA Precast Pty. Ltd. 72 Days Road CROYDON PARK SA 5008 Ferrule Grout tube PHONE: 8346 1771 FAX: 8340 1645
More informationfermacell Lightweight solutions for heavyweight construction January 2018
fermacell Lightweight solutions for heavyweight construction January 2018 2 3 fermacell Gypsum fibreboard the properties of solid blockwork with the speed and flexibility of traditional dry wall techniques.
More informationPrecast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6
Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its
More informationReinforced Concrete Structures
Reinforced Concrete Structures MIM 232E RC and PREFABRICATED ROOFS PURLINS FRAMES CANTILEVERS ARCHES LBSD-7 Dr. Haluk Sesigür I.T.U. Faculty of Architecture Structural and Earthquake Engineering WG RC
More informationadopted in Hong Kong
Prefabricated Construction Systems for Building and Civil works adopted in Hong Kong Presented by Raymond W M Wong Division of Building Science & Technology City University of Hong Kong The presentation
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationWhat is stairs? steps.
STAIRS What is stairs? A Stair is a system of steps by which people and objects may pass from one level of a building to another. A stair is to be designed to span large vertical distance by dividing it
More informationPRECAST CONCRETE INNOVATION BUILD WITH BISON BISON.CO.UK. brand. BP Launch Campaign Brochure V11.indd 1
PRECAST CONCRETE INNOVATION BUILD WITH BISON BISON.CO.UK BP-18-089 Launch Campaign Brochure V11.indd 1 a brand 13/11/2018 17:20 PEOPLE PASSION PRODUCTS 2 Introduction We re not a one size fits all precast
More informationWestEnd25. Final Report. Exterior Façade: Building Façade History:
Exterior Façade: Building Façade History: The original 1229 1231 buildings were constructed in the late 1960 s with a precast façade wrapping the entire buildings. For 40 years these buildings have served
More informationMANHOLES PART I: GENERAL. A. Precast Concrete Manholes
MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a
More informationPD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground
PD 3 Dowel Cradle Industrial Slab on Ground Provides the flattest joints Assists in reducing long term maintenance costs Extends the life-cycle of the floor and the asset Engineered to meet Super Flat
More informationCooke Precast Concrete
Cooke Precast Concrete INSPECTION OPENINGS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience
More informationROOM smooth cement f.f FLOOR LAYOUT
3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f 168 900 1,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1,091 900
More informationPRECAST TECHNOLOGY- INTRODUCTION AND IMPLEMENTATION IN INDIA SMART EVOLUTION
PRECAST TECHNOLOGY- INTRODUCTION AND IMPLEMENTATION IN INDIA SMART EVOLUTION Where did we come from? The only one-stop-supplier in the precast concrete industry Delivering anything from a single machine
More informationTOTAL PRECAST. A sensible way to build
TOTAL PRECAST Since 1976, BPDL has been an industry-leading partner dedicated to ensuring the end-to-end success of large-scale precast concrete-based projects throughout North America. Thanks to the soundness
More informationTotal Precast Concrete Structures
Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-22847-7 Any reference to SABS 0155 is deemed to be a reference to this standard (Government Notice No. 1373 of 8 November 2002) SOUTH AFRICAN NATIONAL STANDARD Accuracy in buildings Published
More informationPRECASTININDIA LATEST
PRECASTININDIA LATEST THINKING By: Saurabh Purandare INDIAN REALTY CURRENT SCENARIO ThefaceofrealtymarketinIndiahaschangedrapidlyoverthe past few years. The large projects comprising of Townships, Mass
More informationBreadth: Change CIP Structural Walls and Beams to Precast
Breadth: Change CIP Structural Walls and Beams to Precast Issue: One of the biggest problems facing construction companies in Richmond, Virginia is the lack of skilled labor. Currently, there are approximately
More informationChallenges for productivity and industrialized Construction Bmst. Ing. Martin Dobler Austria
Challenges for productivity and industrialized Construction Bmst. Ing. Martin Dobler Austria 26.7.2017 Structure of the talk Industrialization Building systems Building systems with precast concrete Economy
More informationPRECAST FLOOR PRODUCTION SEMI - PRO - EDGE
PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE OUR PROMISE. PROFITABLE PRECAST. WHAT IS PRECAST? A smart and safe way to build consistent high quality Beautiful and sustainable Precast is a smart, industrialized
More informationNZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns
Page 1 of 6 Title Manufacture precast concrete beams and columns Level 3 Credits 25 Purpose People credited with this unit standard are able to: prepare, set up moulds and storage areas, carry out the
More informationWisconsin Place Residential Chevy Chase, MD
Wisconsin Place Residential Chevy Chase, MD Jenna Marcolina Senior Thesis Presentation 2008 The Pennsylvania State University Presentation Outline Project Overview Project Overview WPR is part of a 1.1
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationA. Extent of structural precast concrete work is shown on drawings and in schedules.
SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification
More informationJames Luebke, PE Structural Development Engineer WisDOT Bureau of Structures
James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures 1 Highlights WisDOT s ABC Development of PBES Piers Road of Development, Implementation, and Institutionalization Lessons Learned
More informationDOCUMENTATION 2B DELIVERY SCHEDULE & ASSESSMENT PLAN (DSAP)
DELIVERY SCHEDULE & ASSESSMENT PLAN (DSAP) Unit/Module Code & Title Course Code & Title Learning Portfolio Pre-requisite Unit(s) BDCAD402A Produce technical drawings to architectural conventions using
More informationTECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints
TECHNICAL MANUAL TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Version: PEIKKO GROUP 11/2018 TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Dowels manufactured from high
More informationPRECAST WALL PRODUCTION SEMI - PRO - EDGE
PRECAST WALL PRODUCTION SEMI - PRO - EDGE OUR PROMISE. PROFITABLE PRECAST. WHAT IS PRECAST? A smart and safe way to build consistent high quality Beautiful and sustainable Precast is a smart, industrialized
More informationA Study of Cost comparison of precast concrete vs. Cast-in-Place
A Study of Cost comparison of precast concrete vs. Cast-in-Place Vaishali Turai Department of Civil Engineering Dr. D.Y. Patil, Pune, India Ashish Waghmare Department of Civil Engineering Dr. D.Y. Patil,
More informationCooke Precast Concrete
Cooke Precast Concrete STORMWATER History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within
More informationGETTING STARTED DESIGNING ARCHITECTURAL PRECAST CONCRETE. Designer s NOTEBOOK T N U I N
U I N GETTING STARTED DESIGNING ARCHITECTURAL PRECAST CONCRETE Designer s NOTEBOOK G N E D U C A T I O N I T N O C Getting Started Designing Architectural Precast Concrete Whether the project being considered
More informationPROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -
: - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY GOVERNMENT. - GARBAHAREY DISTRICT - N O : SEPT. 2016 DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT 01. 01/15 Cover Page.. /15 Drawing Index. 03.
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationCooke Precast Concrete
Cooke Precast Concrete ACCESS COVERS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within
More informationFAÇADES 2 - CT Assignment (circa 30 hours)
FAÇADES 2 - CT 4211 Assignment 1 2008 (circa 30 hours) Introduction The pictures and drawings below show a recently finished building for Stichting De Hoop in Dordrecht (Netherlands), in use as an education
More informationSUBSTATION SECURITY WALL INSTALLATION MANUAL
SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationTotal precast solution for large stadium projects meet tight schedule
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy
More informationStellenbosch University South Africa CONSTRUCTION ENGINEERING & MANAGEMENT CHAIR. Jan Wium
Stellenbosch University South Africa CONSTRUCTION ENGINEERING & MANAGEMENT CHAIR Jan Wium Pretoria Cape Town SOUTH AFRICA Johannesburg Stellenbosch 1 Academic offering (CEM) Stellenbosch University/Engineering
More informationHyper ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND
Hyper ArmourMate INDUSTRIAL SLAB ON GROUND Full system edge protection Prevents concrete spalling at construction joints High FF and FL tolerances Extends the life-cycle of the floor and the asset Provides
More informationNasri Group Hollowcore factory
About Factory... 1 Factory Attributes... 2 Precast Slabs... 3 Precast Slabs types... 4 Precast Columns... 5 Precast Beams... 6 Precast Bridges... 7 Precast Stairs... 8 Precast Wall Panels... 9 Precast
More informationDesigner s NOTEBOOK DESIGN ECONOMY, PART 3
Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process
More informationMANuFACturers industry QuALity statement.
MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off
More informationIABSE SYMPOSIUM NANTES, 2018
IABSE SYMPOSIUM NANTES, 2018 REPORT International Association for Bridge and Structural Engineering IABSE Publisher IABSE c/o ETH Hönggerberg C H - 8093 Zürich, Switzer land Tel: +41 44 633 2647 Fax: +41
More informationAddendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers
Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building
More informationINSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4
the unique loft conversion & flooring system INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 Unit 6, Devizes Trade Centre, Hopton Park, Devizes, Wiltshire, SN10 2EH t 01380 739000 e info@telebeam.co.uk
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationSKY LIVING COSMOPOLITAN. Start a brand new sky-high chapter of your life in luxury.
COSMOPOLITAN SKY LIVING Start a brand new skyhigh chapter of your life in luxury. Sales Gallery 09 88 IJM PROPERTIES SDN BHD 0080M Suite 00, Menara IJM Land,, Lebuh Tunku Kudin, 00 Gelugor, Pulau Pinang,
More informationArchitect. Architect.
The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which
More informationPAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:
EKURHULENI TECH COLLEGE. No. 3 Mogale Square, Krugersdorp. Website: www. ekurhulenitech.co.za Email: info@ekurhulenitech.co.za TEL: 011 040 7343 CELL: 073 770 3028/060 715 4529 PAST EXAM PAPER & MEMO N3
More informationTwo Louvre at Housing Project. Plain Precast Posts. Concrete Class ** Steel Reinforcing 20-24/13 6mm 4mm. Post Dimensions (mm)
erw civils ERW Precast Walls Standard Dimensions & Weights 087-255-7911 sales@erwcivils.co.za Manufacturer and Installer of Precast Concrete Products: Precast Walling, Concrete Palisade, Ranch Rails, Retaining-
More informationshawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.
shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures
More informationDesigning Precast Concrete School Buildings
Designing Precast Concrete School Buildings 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers
More informationNEW METHOD FOR THE PRODUCTION OF DECK SLABS OF STEEL-CONCRETE-COMPOSITE BRIDGES
NEW METHOD FOR THE PRODUCTION OF DECK SLABS OF STEEL-CONCRETE-COMPOSITE BRIDGES Kerstin Fuchs 1 and Johann Kollegger 2 1 PhD candidate, 2 Professor Institute for Structural Engineering, TU Wien Abstract
More informationEstimaXpro. S&R Consultants
EstimaXpro S&R Consultants Contents 1. Introduction... 5 2. Masters... 7 2.1 Project Details... 7 2.2 Storey Details... 8 2.3 Joinery Details... 8 2.4 Rate types... 9 2.5 Rates... 9 2.6 Rate Analysis Type...
More informationINNOVATION IN CONCRETE. Education OFFSITE BUILD SYSTEMS
INNOVATION IN CONCRETE Education OFFSITE BUILD SYSTEMS Structures OFFSITE CONCRETE FOR EDUCATION Creagh is a key supplier to the education market with a range of offsite concrete products for school, academy
More informationPrecast Concrete Industry Extensions for Autodesk Revit Structure 2014
Precast Concrete Industry Extensions for Autodesk Revit Structure 2014 Reinhard Lackner Managing Director - IDAT Join us on Twitter: #AU2013 Class summary This class shows how extensions to Autodesk Revit
More informationContents. Multi Functions Board
Technical Manual Contents Multi Functions Board Eco-friendly fibre cement flat sheets for ceiling, eaves & soffit lining, wall cladding, flooring, partition, roof sarking, water tank support and permanent
More informationTHE USE OF PRECAST STAIRS IN MASONRY STRUCTURES
THE USE OF PRECAST STAIRS IN MASONRY STRUCTURES Andrade, Rebecca Cardelli de 1 ; Mamede, Fabiana Cristina 2 1 Msc, Civil Engineer, Pedreira Engenharia, rebecca@pedreira.eng.br 2 Msc, Civil Engineer, Pedreira
More informationHOLLOW CORE PRODUCTS GROUNDED IN STRENGTH
HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH usable space under your garage 8 form - 8 Hollow Core 7' - 11-1/2" 3" min. topping for precast diaphragms 2-3/ 3" MIN. TOPPING FOR PRECAST DIAPHRAGMS 7' - 11-3/4"
More informationPRODUCT INFORMATION MANUAL SECTION: 16 FIXED METAL AWNINGS FIXED METAL AWNINGS
FIXED METAL AWNINGS Fixed Metal Awnings BAHAMA Maximum Width Minimum Width Minimum projection Minimum Drop TS - Truss Support Maximum Overhang Minimum Overhang Unlimited 500mm TS=1601mm PS=2847mm PS=
More informationMONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2
MONTH : December 2015 PHOTOGAPH NO: 000587 DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2 MONTH : December 2015 PHOTOGRAPH NO: 000588 DESCRIPTION : Concrete Casting for
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationWOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6
Chapter 6 WOODEN BUILDINGS 6.1 INTRODUCTION Wood has higher strength per unit weight and is, therefore, very suitable for earthquake resistant construction. But heavy cladding walls could impose high lateral
More information