Substation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm.

Size: px
Start display at page:

Download "Substation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm."

Transcription

1 General Notes Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. All structural drawings should be read in conjunction with the specifications,architectural, mechanical, plumbing, and electrical drawings. Concrete Code : ACI Code Reinforcement details should be according to ACI Detailing Manual Concrete compressive strength for cubes of (15cm x 15cm x 15cm ),at age of (28 days), should not be less than30 (Mpa) for columns and foundations and 25(Mpa) for beams, slabs,...etc. Yield strength of reinforcment bars should not be less than (413 MPa),(Grade 60 ). Minimum concrete cover for the reinforcement should be : A-For slabs & walls = 20 mm. B-For beams & columns = 40 mm. C-For footings = 75 mm. D-For footing on lean concrete 50= mm. Substation 33/11kV Drawn by: Soran Rostam Aziz Hewa Qader Mustafa Date: April 6, 2017 Sheet No. 0 Sheet Title: List of Drawings Scale: NTS

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31 W1 W2 W3 D1 D sandstonecasing sandstone casing marblecasing finish floorlevel Marble casing for all doors & sandstone casing windows 2.00 General Notes All structural drawings should be read in conjunction with the specifications,architectural, mechanical, plumbing, and electrical drawings. Concrete Code : ACI Code Reinforcement details should be according to ACI Detailing Manual Concrete compressive strength for cubes of (15cm x 15cm x 15cm ),at age of (28 days), should not be less than30 (Mpa) for columns and foundations and 25(Mpa) for beams, slabs,...etc. Yield strength of reinforcment bars should not be less than (413 MPa),(Grade 60 ). Minimum concrete cover for the reinforcement should be : A-For slabs & walls = 20 mm. B-For beams & columns = 40 mm. C-For footings = 75 mm. D-For footing on lean concrete 50= mm. Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. Substation 33/11kV Drawn by: Soran Rostam Aziz Hewa Qader Mustafa Sheet Title: Door and Window Details Scale: NTS Date: April 6, 2017 Sheet No. GH7

32 decorative square steel bar c/c steel hot rolled decore See Detail-A See Detail-A BURGLAR BAR (STEEL) See Detail-A Screw Screw Bed (Plastic expansion anchor) Typical Drawings for Renovation Detail-A Drawn by: Soran Rostam Aziz Sheet Title: Burglar Bar Details Scale: NTS Date: DWG No.

33 L Ventilation Pipe 3" Dia. Galvanized pipe A 0.4m 0.4m A PVC pipe 6'' PVC pipe 6'' 0.2m 4No.12mm Dia. 1m l. Manhole 0.6X0.6 m 0.4m Reinforcement 12mm 40 c/c Reinforcement 12mm 40 c/c B 0.4m Septic Tank Floor 1.5m highest from the building 0.6m Manhole cover60x60 cm R.C with BRC Using Angle Iron 2.5"X2.5" for Both Base and Cover R.C Wall Reinforced concrete (1:2:4) 12mm 30 cm c/c in both direction 0.2m 0.6m Air Space 0.6m 0.15m PVC pipe 6'' PVC pipe 4'' PVC pipe 4'' 4" PVC Pipe L=40cm 2.0m Cement plastering both Faces (2cm thick.) Cement plastering both Faces (2cm thick.) Concrete Block 40cm thick 0.3m 0.4m Ord. Concrete (1:2:4) 0.2m concrete 1:2:4 0.25m 0.8m Section A-A Crushed stone Typical Drawings for Renovation Drawn by: Soran Rostam Aziz *Ventilation pipe G.S 3'' diameter is 1.5 m higher the high of the building Standard Detail Sheet Title: Sandwich panel Roof Detail Scale: NTS Date: DWG No.

34

35

36

37

38

39

40

41

42

43

44 Bedroom Kitchen 3.80 Guard House Plan bathroom w.c General Notes All structural drawings should be read in conjunction with the specifications,architectural, mechanical, plumbing, and electrical drawings. Concrete Code : ACI Code Reinforcement details should be according to ACI Detailing Manual Concrete compressive strength for cubes of (15cm x 15cm x 15cm ),at age of (28 days), should not be less than30 (Mpa) for columns and foundations and 25(Mpa) for beams, slabs,...etc. Yield strength of reinforcment bars should not be less than (413 MPa),(Grade 60 ). Minimum concrete cover for the reinforcement should be : A-For slabs & walls = 20 mm. B-For beams & columns = 40 mm. C-For footings = 75 mm. D-For footing on lean concrete 50= mm. Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. Substation 33/11kV Drawn by: Soran Rostam Aziz Hewa Qader Mustafa Sheet Title: Guard House Plan Scale: NTS Date: April 6, 2017 Sheet No. GH1

45 3.00 Mat Foundation Stirrups c/c 10Ø16mm(Top, Bottom and Sides) 1.5 Solid Concrete Block 20cm width 0.80 Finish Floor Level 6Ø12mm 0.20 Stirrups c/c Solid Concrete Block 40cm width Section through the Window 3.00 Mat Foundation Stirrups c/c Ø16mm(Top and Bottom) 2.60 Solid Concrete Block 20cm width Finish Floor Level 6Ø12mm 0.20 Stirrups c/c Solid Concrete Block 40cm width Section of the Wall General Notes All structural drawings should be read in conjunction with the specifications,architectural, mechanical, plumbing, and electrical drawings. Concrete Code : ACI Code Reinforcement details should be according to ACI Detailing Manual Concrete compressive strength for cubes of (15cm x 15cm x 15cm ),at age of (28 days), should not be less than30 (Mpa) for columns and foundations and 25(Mpa) for beams, slabs,...etc. Yield strength of reinforcment bars should not be less than (413 MPa),(Grade 60 ). Minimum concrete cover for the reinforcement should be : A-For slabs & walls = 20 mm. B-For beams & columns = 40 mm. C-For footings = 75 mm. D-For footing on lean concrete 50= mm. Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. Substation 33/11kV Drawn by: Soran Rostam Aziz Hewa Qader Mustafa Sheet Title: Guard House-Wall Section Scale: NTS Date: April 6, 2017 Sheet No. GH3

Typical Drawings for Schools

Typical Drawings for Schools 0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

bedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.

bedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8 x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev. 0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.

More information

ROOM smooth cement f.f FLOOR LAYOUT

ROOM smooth cement f.f FLOOR LAYOUT 3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f 168 900 1,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1,091 900

More information

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) 3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"

More information

Architect. Architect.

Architect. Architect. The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which

More information

Job no. 5241_Accessories Brochure_Size: 8.2 x 8.2 _ KOHLER Genuine Accessories

Job no. 5241_Accessories Brochure_Size: 8.2 x 8.2 _ KOHLER Genuine Accessories KOHLER Genuine Accessories CHOOSING THE PERFECT WALL-HUNG TOILET FOR YOUR BATHROOM IS N0T ENOUGH. KOHLER presents a range of accessories to enhace your bathroom experience. INSTAFIT+ Specially designed

More information

PROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -

PROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT - : - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY GOVERNMENT. - GARBAHAREY DISTRICT - N O : SEPT. 2016 DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT 01. 01/15 Cover Page.. /15 Drawing Index. 03.

More information

East African Roofing Systems Ltd.

East African Roofing Systems Ltd. East African Roofing Systems Ltd. Iron Sheet Super Tiger sheets are made from pre-painted galvanized iron sheets and combines increased longevity with low maintenance costs. Super Tigersheets are suitable

More information

GRINDERS 86 SAWS 86-90

GRINDERS 86 SAWS 86-90 sawing, cutting & grinding GRINDERS 86 SAWS 86-90 MINI GRINDER Cuts and grinds masonry, concrete and metal. Cuts to a depth of 25mm Can be fitted with surface grinding wheel for facing and grinding Powerful

More information

Nandadeep Door Frames

Nandadeep Door Frames Advantages. Save Tree Save Nature. 1. Door frames are corrosion Resistant proof. 2. Door frames are Environmental friendly 3. Door frames are durable. 4. Door frames are fire resistant 5. Door frames are

More information

CIVIL TECHNOLOGY. 9. For the purpose of this paper, the size of a brick should be taken as 220 mm 110 mm 75 mm.

CIVIL TECHNOLOGY. 9. For the purpose of this paper, the size of a brick should be taken as 220 mm 110 mm 75 mm. NATIONAL SENIOR CERTIFICATE EXAMINATION NOVEMBER 2014 CIVIL TECHNOLOGY Time: 3 hours 200 marks PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY 1. This question paper consists of 12 pages, a Formula Sheet

More information

Scheme - G Sample Test Paper - I. Course Name : Civil Engineering Group Course Code : CE/ CS/ CR/ CV

Scheme - G Sample Test Paper - I. Course Name : Civil Engineering Group Course Code : CE/ CS/ CR/ CV Scheme - G Sample Test Paper - I Course Name : Civil Engineering Group Course Code : CE/ CS/ CR/ CV 17309 Semester : Third Subject Title : Building Drawing Marks : 25 Time: 1.30 hour Instructions: 1. All

More information

WALL TO FABRICATED FLOOR

WALL TO FABRICATED FLOOR WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN

More information

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

Index Terms: Lathe waste concrete; Shear and bending; Shear strength; Stirrups; Simply supported beams.

Index Terms: Lathe waste concrete; Shear and bending; Shear strength; Stirrups; Simply supported beams. TASC- 15, 1-11 June 15 Effect of Lathe Waste in Concrete as Reinforcement Prof. Kumaran M 1,Nithi M. 2, Reshma, K. R. 3 Civil Engineering 1, Professor1, Universal Engineering College, Thrissur, Kerala,

More information

GSPublisherVersion PROPOSED REHABILATATION DR.AYUB FOOTBALL STADIUM IN - BAIDOA -

GSPublisherVersion PROPOSED REHABILATATION DR.AYUB FOOTBALL STADIUM IN - BAIDOA - GSPublisherVersion 0.0.00.00 PROPOSED REHILTTION DR.YU FOOTLL STDIUM IN - IDO - PROPOSED REHILITTION DR.YU FOOTLL STDIUM IN - IDO - 0. 0. 0. 04. SHEET N O 0/4 0/4 0/4 04/4 DRWING N O June 08 DRWING INDEX

More information

Nepal Housing Reconstruction Programme

Nepal Housing Reconstruction Programme Nepal Housing Reconstruction BUILDING DESIGN Submitted By Nepal Housing Reconstruction September, 2016 MODEL SMC None TECHNICAL DETAIL (Progressive Expansion Provision) Build Change FRONT ELEVATION RIGHT

More information

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

SYARIKAT BEKALAN AIR SELANGOR SDN BHD NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

PROPOSED REHABILATION FOR DEYNILE POLICE STATION CENTER PROPOSED REHABILATATION POLICE STATION CENTER IN -DEYNILE- DISTRICT PROJECT: IMPLEMENTED BY:

PROPOSED REHABILATION FOR DEYNILE POLICE STATION CENTER PROPOSED REHABILATATION POLICE STATION CENTER IN -DEYNILE- DISTRICT PROJECT: IMPLEMENTED BY: PROJECT: PROPOSED REHABILATATION CENTER IN -DEYNILE- DISTRICT IMPLEMENTED BY: CLIENT: PROPOSED REHABILATION FOR DEYNILE CENTER PROPOSED REHABILATION CENTER IN - DEYNILE DISTRICT - MAY 2018 DRAWING INDEX

More information

Section 1 REBAR ARRANGEMENT & CONSTRUCTION CARRYOUT

Section 1 REBAR ARRANGEMENT & CONSTRUCTION CARRYOUT Section 1 REBAR ARRANGEMENT & CONSTRUCTION CARRYOUT 1. Understanding of Drawing 1) Examination of drawing When construction contract is completed, the contents of the drawings are surveyed and checked

More information

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste

More information

L1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3)

L1702D-SW-PL-01 STORM LINES - PLANS (1 OF 3) L1702D-WW-PL-03 SEWER LINES - PLANS (3 OF 3) L1702D-SW-PL-02 STORM LINES - PLANS (2 OF 3) GENERAL DWG Nb. DRAWING TITLE L1702D-LOD- LIST OF DRAWINGS L1702D-GN- GENERAL & L1702D-WW-GNL-01 SEWER LINES - GENERAL LAYOUT L1702D-WW-KPL-01 SEWER LINES - GENERAL KEY PLAN L1702D-SW-GNL-01 STORM LINES

More information

Installation Instructions

Installation Instructions Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The

More information

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground PD 3 Dowel Cradle Industrial Slab on Ground Provides the flattest joints Assists in reducing long term maintenance costs Extends the life-cycle of the floor and the asset Engineered to meet Super Flat

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

EstimaXpro. S&R Consultants

EstimaXpro. S&R Consultants EstimaXpro S&R Consultants Contents 1. Introduction... 5 2. Masters... 7 2.1 Project Details... 7 2.2 Storey Details... 8 2.3 Joinery Details... 8 2.4 Rate types... 9 2.5 Rates... 9 2.6 Rate Analysis Type...

More information

midas DShop Reinforcement Edit Function reflecting Constructability

midas DShop Reinforcement Edit Function reflecting Constructability 01 Auto-generation of Structural Drawings 02 Structural drawings such as Framing plans, Sectional elevations, Beam/Column schedules, etc., are generated from the analysis & design results of midas Gen.

More information

ARCHITECTURE CADD Course Syllabus

ARCHITECTURE CADD Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing

More information

STRUCTURAL ATTACHMENTS

STRUCTURAL ATTACHMENTS Brace Structural Attachment Selection Procedure ) Determine structure to be attached to from the following: A) Concrete B) Wood Beam C) Structural Steel 2) Reference structure connection type from Appendix

More information

Standard Details Index NWTP Improvements and MF System Installation

Standard Details Index NWTP Improvements and MF System Installation Detail Standard Details Index NWTP Improvements and MF System Installation Marco Island, Florida Description 0315-001 PLASTIC WATERSTOP 0315-003 HYDROPHILIC/GROOVE WATERSTOP 0315-011 WATERSTOP JOINT 0315-154

More information

GUYANA POWER AND LIGHT INC PROJECT MANAGEMENT DEPARTMENT. APPENDIX B Drawings

GUYANA POWER AND LIGHT INC PROJECT MANAGEMENT DEPARTMENT. APPENDIX B Drawings GUYANA POWER AND LIGHT INC PROJECT MANAGEMENT DEPARTMENT PROCUREMENT OF WORKS ITB #GPL-PI--7-6 APPENDIX B Drawings PROJECTS DEPARTMENT 7-9 MIDDLE STREET SOUTH CUMMINGSBURG GEORGETOWN GUYANA TEL: 9-6-86

More information

Midwest Roadside Safety Facility

Midwest Roadside Safety Facility 19'-11 1/2" 6083 239'-11 1/2" 73139 Impact 1100C 25 43 5/16" 1100 upstream from the upstream face of the first shear fender downstream of the joint between barrier nos. 7 and 8 Upstream End Downstream

More information

Shear force transmission in expansion joints

Shear force transmission in expansion joints for better solutions Shear dowel Shear force transmission in expansion joints Reliable expansion joint dowelling in concrete structural elements General Single shear dowel HED Expansion joint dowelling

More information

DESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations

DESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations ELEMENT NO.1 SUBSTRUCTURES Excavations B Clear site of all shrubs and undergrowth including grubbing up of roots and dispose off as directed. Excavate oversite average 150mm deep and cart away as directed

More information

Football Goals 7,32x2,44 m

Football Goals 7,32x2,44 m Football Goals 7,32x2,44 m 120x100 mm Professional aluminum football goals 7,32x2,44 m Made of special oval aluminum profile 120x100 mm with double reinforcing ribs. The main frame of the goal powder coated

More information

How-To-build guide carport

How-To-build guide carport How-To-build guide carport What you can build using this guide This guide will show you how to build a free-standing, open-sided single carport. Before you begin building Contact your local territorial

More information

General Layout. Eng. Maha Moddather

General Layout. Eng. Maha Moddather General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension

More information

Ultra Space Saver American Bicycle Security Company

Ultra Space Saver American Bicycle Security Company The Ultra Space Saver is userfriendly and allows easy access to bikes. It provides convenient space for u-lock security on nearly any bike, including bikes with fenders and fork shocks. The double-sided

More information

Products for fixing to Steelwork and Decking

Products for fixing to Steelwork and Decking Products 8.0 Beam Clamp - Single Support 8.1 Universal Joint for any variable Angle Adjustment 8.2 Beam Clamp TCS for Header Rails 8.3 Beam Clip for Cross Support/ Dimensioning of Bolts 8.4 Beam Clip for

More information

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints Easy Step by Step Guide DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints TIMBERLINK. MADE OF TASMANIA. DIY Shed Guide Timberlink Green Outdoor Structural Range Timberlink Green Outdoor

More information

Installation Instructions

Installation Instructions Contemporary Square Floor Mounted Tub Filler Thank you for selecting American-Standard... the benchmark of fine quality for over 00 years. To ensure that your installation proceeds smoothly-- please read

More information

Installation Instructions

Installation Instructions Contemporary Round Floor Mounted Tub Filler Thank you for selecting American-Standard... the benchmark of fine quality for over 00 years. To ensure that your installation proceeds smoothly-- please read

More information

TECHNICAL DRAWING GUIDE

TECHNICAL DRAWING GUIDE Budapest University of Technology & Economics (BME) Faculty of Architecture Department of Building Constructions 2017 + TECHNICAL DRAWING GUIDE Edited by Dr Zsuzsanna Fülöp and Aryan Choroomi based on

More information

KO LO SH E LT E R. High Capacity and Flexibility

KO LO SH E LT E R. High Capacity and Flexibility KO LO SH E LT E R High Capacity and Flexibility The unique styling of our redesigned Dero Kolo Shelter will help beautify your facility and provide secure, covered bike parking for cyclists. The Kolo is

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:

PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS: EKURHULENI TECH COLLEGE. No. 3 Mogale Square, Krugersdorp. Website: www. ekurhulenitech.co.za Email: info@ekurhulenitech.co.za TEL: 011 040 7343 CELL: 073 770 3028/060 715 4529 PAST EXAM PAPER & MEMO N3

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

SYARIKAT BEKALAN AIR SELANGOR SDN BHD NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1

More information

Accessory Dwelling Unit Prototype 4 Plan Sets. Prototype 4: Detached 1- Story ADU using alternate materials and techniques

Accessory Dwelling Unit Prototype 4 Plan Sets. Prototype 4: Detached 1- Story ADU using alternate materials and techniques Accessory Dwelling Unit Prototype 4 Plan Sets Prototype 4: Detached 1- Story ADU using alternate materials and techniques Prototype Design Firm Prototype 4: Detached Singly Story ADU Alternative Materials

More information

Sigma Fasteners, Inc. Section 7

Sigma Fasteners, Inc. Section 7 DESCRIPTION PAGE s Wedge s 7-1 Drop-In s 7-2 Single Expansion s 7-2 Machine Screw s 7-2 Lag Shields 7-3 Lead Wood Screw s 7-3 Hammer Drive s 7-4 Hollow Wall Fasteners 7-5 Toggle Bolts 7-6 Toggle Wings

More information

DESIGN OF IRRIGATION CHANNELS IN MOHAMMARA AKKAR MOHAFAZA

DESIGN OF IRRIGATION CHANNELS IN MOHAMMARA AKKAR MOHAFAZA DESIGN OF IRRIGATION CHANNELS IN MOHAMMARA AKKAR MOHAFAZA VOLUME 1 DETAILED DESIGN DRAWINGS JULY, 2017 X= 293500 Y=39500 X= 293000 X= 292500 X= 292000 X= 291500 X= 291000 X= 290500 PROPOSED IRRIGATION

More information

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY. . PREPARATION. INSTALLATION. FINISHING. MAINTENANCE INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS

More information

Roof-Top Applications

Roof-Top Applications Roof-Top Non-Penetrating Flat Roof Mounts Pre galvanized mast, base and Rubber Mat Designed for DSS support 103489 103490 103491 103492 103493 FRM Non-Penetrating Roof Mount (1.25" O.D. Tubing, 60" Overall

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

GlasRoc Sheathing Type X

GlasRoc Sheathing Type X Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity

More information

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN -2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14

More information

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting INSTALLATION GUIDE Gable HomeshedsTM LARGE SPAN BEFORE YOU START Council Approval It is important to contact your local council before building your Stratco Gable Homeshed. You will have already received

More information

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do. MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if

More information

Max. Rec. Load. Wt. Per Inch lbs. kn lbs. kn lbs. kg. Wt. Per Inch lbs. kn lbs. kn lbs. kg 750 F (399 C)

Max. Rec. Load. Wt. Per Inch lbs. kn lbs. kn lbs. kg. Wt. Per Inch lbs. kn lbs. kn lbs. kg 750 F (399 C) FIG. 10 FIG. 15 & 15L Function: Designed for use in pipe hanger assemblies. (Type 304 or 316 Stainless Steel upon request) Ordering: Specify figure number, rod size, length (), material, and finish. 650

More information

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / NO. PS20152055 QUESTIONS AND ANSWERS NO. 1 ISSUED ON MARCH 4, 2016 Q1 Would it be possible to schedule another site visit to allow

More information

Nasri Group Hollowcore factory

Nasri Group Hollowcore factory About Factory... 1 Factory Attributes... 2 Precast Slabs... 3 Precast Slabs types... 4 Precast Columns... 5 Precast Beams... 6 Precast Bridges... 7 Precast Stairs... 8 Precast Wall Panels... 9 Precast

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

C-M TMR Products Index

C-M TMR Products Index C-M TMR Products Index TMR Dwg. No. Grate/Frames 9x6 Dwg. AS3996 Recessed Road Gully Units Dwg. 1443, 1444 Protruded Road Gully Units Dwg. 1443, 1444 1220 Road Gully Units Dwg. 1459 7x4 Road Gully Units

More information

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND Flanged Dowel Box INDUSTRIAL SLAB ON GROUND Designed for construction joints in Post Tension or large shrinkage specifications Large lateral movement and expansion capacity Eliminates the need to drill

More information

Khathij Industrial Fasteners

Khathij Industrial Fasteners Dear Sir/Madam, Khathij Industrial Fasteners This is Saqubar Sadique representing 'KHATHIJ INDUSTRIAL FASTENERS' from Chennai, India. We 'Khathij industrial fasteners' like to introduce us as a Stockist

More information

B. See Division 05 Section "Pipe and Tube Railings" for metal pipe and tube railings.

B. See Division 05 Section Pipe and Tube Railings for metal pipe and tube railings. SECTION 055000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following, applicable: 1. Miscellaneous steel framing and supports. 2. Prefabricated building columns. 3. Shelf

More information

WALCOOM. Walcoom Corporation POST ANCHOR.

WALCOOM. Walcoom Corporation POST ANCHOR. WALCOOM Walcoom Corporation Walcoom is a corporate that specialized in producing and selling various wire mesh and relative accessories. The production base of Walcoom Corp. is located in Anping county,

More information

H O O P RAC K. Simple Security

H O O P RAC K. Simple Security H O O P RAC K Simple Security The Hoop Rack is a proven design that provides high security and easy bike parking. The Hoop Rack uses thick pipe construction and the full radius of the bend makes the Hoop

More information

FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions

FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions Thermal Structures Inc. FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions FLOOR TO FLOOR (F) ROOF TO ROOF (R) FLOOR TO WALL (FW) ROOF TO WALL (RW) WALL TO WALL (W) CORNER WALL (CW) FLOOR

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

SAUDI COMMITTEE FOR PALESTINIAN RELEIF

SAUDI COMMITTEE FOR PALESTINIAN RELEIF SAUDI COMMITTEE FOR PALESTINIAN RELEIF ITB 2014-042 PAL 10-49740 /Construction of 300 Residential Units in Rafah Package #12: Electrical and Telecommunication Works Part C. SECTION 9: PRICE SCHEDULE (Bill

More information

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF

More information

CIVIL CONSTRUCTION PRODUCT CATALOG VOL. I

CIVIL CONSTRUCTION PRODUCT CATALOG VOL. I CIVIL CONSTRUCTION PRODUCT CATALOG VOL. I Table of Contents Section Description A page CHANCE Helical Round Corner Square Shaft Products Introduction to Round and Square Shaft 3 Square Shaft (SS) Product

More information

Al Keller s Inexpensive Backyard Greenhouse Plans

Al Keller s Inexpensive Backyard Greenhouse Plans Al Keller s Inexpensive Backyard Greenhouse Plans There are many ways to construct low cost greenhouses for your property. This is just one man s design, using easily obtainable and fairly inexpensive

More information

Acceptable Standards of Domestic Construction

Acceptable Standards of Domestic Construction Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers

More information

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Where rustic meets modern, New York style loft

Where rustic meets modern, New York style loft Home Summary for 35 Crestwood Drive, Watchung NJ Featured on NBC s Open House NYC, awarded The House of The Season 2009 Where rustic meets modern, New York style loft General Highlights Custom built Southern

More information

Wash basin and urinal fixings Complete fixing sets.

Wash basin and urinal fixings Complete fixing sets. 123 Wash basin and urinal fixings... page 124 WC and sanitary fixings... page 127 Accessories for sanitary fixings... page 129 WC fixing WB... page 131 On wall installation... page 132 124 SANITARY FIXINGS

More information

Double Beam Freestanding Pergola Installation Guide

Double Beam Freestanding Pergola Installation Guide Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc

More information

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY. . PREPARATION. INSTALLATION. FINISHING. MAINTENANCE INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS

More information

Site plan. Water tapping. Water Main. Property boundary. Guru Gully Road. Portico. Scale example:

Site plan. Water tapping. Water Main. Property boundary. Guru Gully Road. Portico. Scale example: Site plan Side A Water tapping 80 mm Srage water heaters Guru Gully Road Water Main Property boundary 100 mm Portico Instructions 1. Cut and fold along lines. 2. Slide side A and Side B gether. 3. Ensure

More information

KOLO SHELTER Installation Instructions Parts List

KOLO SHELTER Installation Instructions Parts List Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

Bollards, Column Guards, Corner Guards, Wheel Stops, Speed Humps & Fixings. Lockinex. ea i, ea u i

Bollards, Column Guards, Corner Guards, Wheel Stops, Speed Humps & Fixings. Lockinex. ea i, ea u i Bollards, Column Guards, Corner Guards, Wheel Stops, Speed Humps & Fixings Lockinex ea i, ea u i INTRODUCTION Protecting Building Curtilage, Assets & Personnel the Lockinex range of Bollards & Guards are

More information

Standard program overview Steel smoke-proof doors

Standard program overview Steel smoke-proof doors Smoke-proof doors Standard program overview Steel smoke-proof doors Pos. Product 1 RS-1 Steel door (thin rebated) Smoke-proof door in accordance EN 1634-3 / DIN 18095 Dimensions W 625-1350 H 1750-2500

More information

CWM. Agricultural, Commercial, Industrial Product Brochure.

CWM. Agricultural, Commercial, Industrial Product Brochure. CWM Agricultural, Commercial, Industrial Product Brochure 1688 West 75 th Avenue Vancouver, BC V6P 6G2 Canada Canada Wire & Metal Inc is a Canadian based entity that was founded in 1994. We have been serving

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

Proposed Hotel, Restaurant. and Banquet Facility

Proposed Hotel, Restaurant. and Banquet Facility Proposed Hotel, Restaurant PROJECT # : 60-0 and Banquet Facility ARCHITECTURAL 7 Logy Bay Road P.O. Box 09 St. John's, NL, Canada AA 5B T: (709) 79-80 F: (709) 7-80 E: info@fougeremenchenton.ca Issued

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information