Bentley s MicroStation Hydraulic Design/Analysis Software

Size: px
Start display at page:

Download "Bentley s MicroStation Hydraulic Design/Analysis Software"

Transcription

1 Bentley s MicroStation Hydraulic Design/Analysis Software October 17, 2018

2 Update on SUDA Development from 2017 SUDA Implementation Schedule SUDA/StormCAD Tools Management Tools Scenarios vs Alternatives (Parent vs Child relationship) CivilStorm dynamic analysis Utility Clash Detection

3 Subsurface Utility Design and Analysis Two components: 1. Hydraulic design and analysis Storm-sewer StormCad is the hydraulic computational engine 2. Utility Clash Detection

4 2,762 3D Cells are complete Feature Definitions Element Templates Prototypes (Hydraulic Losses)

5 Develop Seed File (Template) 3D Cells Feature Definitions Rainfall Data Landuse Coefficients Hydraulic Losses Entrance/Exit, Junction losses Scenarios TxDOT Seed File ( Version 1 ) planned completion January 2019.

6 Geopak Drainage to be phased out in stages Bentley Phase out Schedule 1. Updates will cease in Bentley support will cease in GEOPAK will not be available (from Bentley) by TxDOT Phase out Schedule 1. Geopak to be phased out after Open Roads Designer (summer 2019) 2. Exceptions made for projects started in Geopak.

7 New Training to start with release of SUDA TxDOT seed file in January Bentley Training TxDOT Training - Step by step, hands on using TxDOT workspace, TxDOT Seed file and example corridor

8 Software Progression Spreadsheets Winstorm Automated Analysis Ease of use Freeware developed by TxDOT GEOPAK Incorporated into MicroStation Automated Design and Analysis Plan and Profile sheet generation with labeling

9 Incorporated into MicroStation Improved Automated Design and Analysis Plan and Profile sheet generation with labeling 3D models Hydraulic Model tied to 3D Roadway Corridor model Management Tools Scenario Management Dynamic Modeling Civil Storm

10 Great for visualization and presentation 3D Storm-sewer Model Tied to 3D Roadway corridor Model. Changes made to Roadway vertical and horizontal alignments reflect into storm sewer model

11 Introduction of Scenario Management What is a scenario: A series of What If situations for a model, A collection of alternatives Allows Designer to compare and manage variations in hydraulic properties and attributes Scenarios are maintained in a single Project file In GEOPAK, to change a model Copy model Edit model (slope change, pipe change, add inlets etc) Re-calculate and review results Scenario management using inheritance with parent child relationship Biggest Improvement from previous software

12 Scenarios Alternatives (Building blocks of Scenarios, Set of properties) Active Topology (Isolate areas of a network) Physical (elevations, pipe sizes, roughness coeff, etc) Headloss Boundary Condition (Tail Water etc) Rainfall Runoff (Storm Frequencies) Hydrology (hydrologic method) Design (spread width, allowable velocity, cover)

13

14 Dynamic Modeling Unsteady Analysis Depth and velocity vary with time at a given location Quantify flood storage, more accurate results Incorporated into SUDA No need to Export/Import

15 SUDA will not be able to produce and label profiles until TxDOT implements MicroStation Open Roads Designer Open Roads Designer will not be available until TxDOT implements Windows 10 in summer Use GEOPAK on projects with larger systems Use SUDA on projects with smaller systems and cut sheets manually Use SUDA as a preliminary analysis tool

16 New Rainfall Data Implementation of Atlas 14 Rainfall depths Biggest rainfall depth changes are in the50 year and greater return periods. Add freeboard to HGL and Ponded Width (Spread) Linearly Interpolate between points on NOAA Atlas 14 IDF Curve Develop IDF Equations Current RTI Project to develop IDF equations

17 Cell Library not developed for other utilities conduit/boxes etc. Planned development after hydraulic/stormsewer component. Planned completion in December 2019

18

Advantages of Implementing StormCAD for OpenRoads (SUDA)

Advantages of Implementing StormCAD for OpenRoads (SUDA) Advantages of Implementing StormCAD for OpenRoads (SUDA) Robert Garrett, Bentley Systems Inc. WWW.BENTLEY.COM I 2015 Bentley Systems, Incorporated What is Subsurface Utility Design and Analysis? What is

More information

Civil Product Update. Derricke Gray, Product Manager Bentley Civil Americas

Civil Product Update. Derricke Gray, Product Manager Bentley Civil Americas Civil Product Update Derricke Gray, Product Manager Bentley Civil Americas 1 WWW.BENTLEY.COM 2016 Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated Agenda Civil Update o Where we are at

More information

SHRP2 R15B Identifying and Managing Utility Conflicts

SHRP2 R15B Identifying and Managing Utility Conflicts SHRP2 R15B Identifying and Managing Utility Conflicts SHRP2 Peer Exchange Webinar February 5, 2019 Welcome and Agenda Introduction and Opening Remarks Overview and Status of R15B Product IAP State Challenges

More information

What's the Latest with InRoads Storm & Sanitary SS1?

What's the Latest with InRoads Storm & Sanitary SS1? What's the Latest with InRoads Storm & Sanitary SS1? Joe Waxmonsky, Bentley Civil Why implement S&S? To avoid this: 2 WWW.BENTLEY.COM Single-source it 3 WWW.BENTLEY.COM StormCAD reads S&S files! StormCAD

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

OpenRail SELECTseries 4 - Managing Geometry and Corridor Modeling

OpenRail SELECTseries 4 - Managing Geometry and Corridor Modeling 2015 Bentley Systems, Incorporated OpenRail SELECTseries 4 - Managing Geometry and Corridor Modeling Robert Nice Senior Application Engineer Agenda: Why work in SELECTseries 4? Moving to SELECTseries 4

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Ohio Department of Transportation, VBA Documentation

Ohio Department of Transportation, VBA Documentation Contents 1.1 Current Versions... 2 1.2 Overview... 3 1.3 Supporting Files and Standards... 4 1.3.1 ODOT_Drainage.cel... 4 1.3.2 ODOT2013.ddb... 5 1.4 ODOT_StormSewerPlan2013.mvba... 6 1.4.1 Mode: Place

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Best Practice: Corridor Modeling

Best Practice: Corridor Modeling 2014 Bentley Systems, Incorporated Best Practice: Corridor Modeling Presented by: Joe Waxmonsky PE, Bentley Civil 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated Best Practice: Corridor Modeling Agenda

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

8.1 Control. 8.2 Sheet Setup

8.1 Control. 8.2 Sheet Setup 8.1 Control Responsibility for development of the pipe data sheets is in the hands of the project s drainage or roadway designer. Pipe data sheets should be developed after the drainage design is fairly

More information

Bentley Civil Update and Direction

Bentley Civil Update and Direction www. bentley. com Bentley Civil Update and Direction Mike Wilson Director, Software Development, Bentley Civil The cast of characters this year Bentley Civil Mike Wilson that would be me Director, Software

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

2014 NCLUG Summer Conference. Workshops

2014 NCLUG Summer Conference. Workshops Workshops [CM Workshop] NCDOT Corridor Modeler (CM) Delta Training (3 Day) [SS2] Oak Thammavong, NCDOT Creating & Customizing templates presented by NCDOT, Oak Thammavong. The Advanced OpenRoads Technology

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

Developments in BIM Infrastructure Design. Barry Blake 3 rd June 2014

Developments in BIM Infrastructure Design. Barry Blake 3 rd June 2014 Developments in BIM Infrastructure Design Barry Blake 3 rd June 2014 BIM Infrastructure Design BIM Collaboration / Sharing / Design validation / Integrating various elements of design What are we delivering

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer

Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer Joe Waxmonsky, Bentley Civil 2 WWW.BENTLEY.COM Why Overlay? Why Overlay? Accommodate wedging / leveling Milling Widening Crown

More information

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Appendix E-4. City of Fort Collins. Requirements for Utility Plans Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources

3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources 3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources Brief History 2 Conveying the Design Old Way Reviewing Changes Schematic Intent Design Change 3 4 Conveying the

More information

OpenRoads Best Practice - Civil Cells

OpenRoads Best Practice - Civil Cells OpenRoads Best Practice - Civil Cells Presented by: Ian Rosam, Director Civil Product Management, Bentley Systems, Inc. 1 WWW.BENTLEY.COM 2017 Bentley Systems, Incorporated 2017 Bentley Systems, Incorporated

More information

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

OpenBridge Modeler: What is it and how can I use it today?

OpenBridge Modeler: What is it and how can I use it today? 2015 Bentley Systems, Incorporated OpenBridge Modeler: What is it and how can I use it today? Steve Willoughby, Senior Application Engineer Agenda: Introducing OpenBridge Modeler OpenBridge Modeler Features

More information

Bestall Collaborative Limited Planning Environment Construction Management Development

Bestall Collaborative Limited Planning Environment Construction Management Development November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley

More information

GEOPAK V8i SELECTseries 1, Road 2

GEOPAK V8i SELECTseries 1, Road 2 GEOPAK V8i SELECTseries 1, Road 2 Ohio Department of Transportation October, 2012 Ohio Department of Transportation GEOPAK Road Training Guide for MicroStation V8i SELECTseries 1, October, 2012 The information

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

AutoCAD Civil 3D Fundamentals

AutoCAD Civil 3D Fundamentals AutoCAD Civil 3D Fundamentals Course Length: 4 days The AutoCAD Civil 3D Fundamentals training course is designed for Civil Engineers and Surveyors who want to take advantage of the AutoCAD Civil 3D software

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

AECOsim Building Designer. Quick Start Guide. Chapter 2 Making the Mass Model Intelligent Bentley Systems, Incorporated.

AECOsim Building Designer. Quick Start Guide. Chapter 2 Making the Mass Model Intelligent Bentley Systems, Incorporated. AECOsim Building Designer Quick Start Guide Chapter 2 Making the Mass Model Intelligent 2012 Bentley Systems, Incorporated www.bentley.com/aecosim Table of Contents Making the Mass Model Intelligent...3

More information

10010 RECORD DRAWING INFORMATION

10010 RECORD DRAWING INFORMATION SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering

More information

Integrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems

Integrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems Integrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems Robert Mankowski, P.E. Vice President, Water Infrastructure Asset Performance 1 WWW.BENTLEY.COM 2017

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Bentleyuser.dk Årsmøde 2010 Nordic Civil 2010

Bentleyuser.dk Årsmøde 2010 Nordic Civil 2010 Bentleyuser.dk Årsmøde 2010 Nordic Civil 2010 8.-10. November 2010, Munkebjerg Hotel, Vejle Workshop - X9 Resurfacing and Overlay Tools InRoads V8i Presenter: Joe Waxmonsky, P.E., Bentley Systems USA Bentley

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

Commonwealth of Virginia Survey Manual. Date: _ Commonwealth of Virginia

Commonwealth of Virginia Survey Manual. Date: _ Commonwealth of Virginia Commonwealth of Virginia Survey Manual Date:1-07-2013_ 2013 Commonwealth of Virginia FOREWORD This manual has been prepared for the guidance of all personnel engaged in securing and using s urvey da ta.

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Automated Machine Guidance

Automated Machine Guidance Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,

More information

How to Design and Submit a DOT Project with Civil 3D

How to Design and Submit a DOT Project with Civil 3D 11/30/2006-5:00 pm - 6:30 pm Room:San Polo - 3503 (ISD Campus) How to Design and Submit a DOT Project with Civil 3D Seth Cohen - ProSoft NET CV35-2 This lab will delve into the workflows and processes

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

Detail Design for State Project

Detail Design for State Project Introduction and Project Information Detail Design for State Project 4210-49 Introduction This contract includes detailed design to letting for the shoulder widening of Trunk Highway (TH) 68 between the

More information

Design Data 12M. Hydraulic Capacity of Precast Concrete Boxes. RISE, Millimeters. Span Millimeters

Design Data 12M. Hydraulic Capacity of Precast Concrete Boxes. RISE, Millimeters. Span Millimeters Design Data 12M Hydraulic Capacity of Precast Concrete Boxes Under certain conditions the hydraulic or structural characteristics of reinforced concrete box sections offer advantages over the circular

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST Tract Number and Subdivision Name: Engineering Firm: Contact Person: Address: City: State: Zip: Phone No. Fax No. Assessor s Parcel Number(s) Tentative

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches

Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches PROJECT OVERVIEW S.P. 6929-21 is on T.H. 73 in St. Louis County. The project includes replacement of existing Bridge #9262

More information

RRR Design & Modeling with the FDOT Civil 3D State Kit

RRR Design & Modeling with the FDOT Civil 3D State Kit RRR Design & Modeling with the FDOT Civil 3D State Kit Mike Racca - CADD Applications Development Specialist Production Support Office CADD 605 Suwannee St - MS 40, Tallahassee, Florida 32399 Session Objectives:

More information

Any student may retake any class at any time and for any reason without additional charge.

Any student may retake any class at any time and for any reason without additional charge. 1 ENVISIONCAD ABOUT US Guaranteed Training 1 ENVISIONCAD ABOUT US EnvisionCAD is a provider of training solutions for MicroStation and select InRoads products. We also use our expertise to assist organizations

More information

MnDOT Contract Exhibit A - Scope of Services

MnDOT Contract Exhibit A - Scope of Services Introduction Information Introduction This Scope of Services represents work on two individual highway improvement projects as described below. The State intends to let two of the projects as separate

More information

3D Modeling Demonstration

3D Modeling Demonstration 2014 Bentley Systems, Incorporated 3D Modeling Demonstration Derricke Gray, Product Manager Bentley Civil Americas ESS Statewide Rollouts: 3D Modeling Engineering Content Management (ProjectWise) 2 WWW.BENTLEY.COM

More information

Record Drawing Standards for Projects Version 2.1

Record Drawing Standards for Projects Version 2.1 for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission

More information

The Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output

The Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output The Basics HECRAS Basis Input Geometry Data. Flow Data. Perform Hydraulic Computations by G. Parodi WRS ITC The Netherlands Viewing the Output ITC Faculty of Geo-Information Science and Earth Observation

More information

Full Contents. InRoads Essentials

Full Contents. InRoads Essentials Section 1: Overview Essentials 1.1 Introduction... 3 Learning InRoads... 3 Basic Rules... 3 How to Use This Guide... 4 Section Breakdown... 5 Section 1: Overview Essentials... 5 Section 2: Production Essentials...

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 Checklists Township of King Design Criteria and Standard Detail Drawings Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 CHECKLISTS Engineering Submissions : The following

More information

Full Contents. Essentials, Workbook

Full Contents. Essentials, Workbook Section 1: Overview Essentials 1.1 Introduction... 3 Learning InRoads... 3 Basic Rules... 3 How to Use This Guide... 4 Section Breakdown... 5 Section 1: Overview Essentials... 5 Section 2: Production Essentials...

More information

Design of Sanitary Sewer Network using Sewer GEMS V8i Software

Design of Sanitary Sewer Network using Sewer GEMS V8i Software IJSTE - International Journal of Science Technology & Engineering Volume 2 Issue 01 July 2015 ISSN (online): 2349-784X Design of Sanitary Sewer Network using Sewer GEMS V8i Software Murugesh Katti Krishna

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

Chapter 13 Plan Submittals

Chapter 13 Plan Submittals Chapter 13 Plan Submittals U30013.DOC 02/01/07 Chapter 13 Plan Submittals Section Topic Page 13.1 General 13.1 13.2 Subdivision Plans 13.1 13.3 Capital Improvement Project Plans 13.12 U30013.DOC 02/01/07

More information

BIM Workflow for Roads and Highways Using the Autodesk Portfolio

BIM Workflow for Roads and Highways Using the Autodesk Portfolio BIM Workflow for Roads and Highways Using the Autodesk Portfolio Course Length: 2 days Important note: This training guide is based on the Autodesk 2014 Infrastructure software portfolio, including Autodesk

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

Practice Workbook. Cross Sections: Creating, Annotating, and Volumes

Practice Workbook. Cross Sections: Creating, Annotating, and Volumes Practice Workbook This workbook is designed for use in Live instructor-led training and for OnDemand selfstudy. The explanations and demonstrations are provided by the instructor in the classroom, or in

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

AGENDA: BIM Introduction. Large-Scale Value. Value for Architects. Conceptual BIM / Small BIM. All-Out BIM. BIM Introduction

AGENDA: BIM Introduction. Large-Scale Value. Value for Architects. Conceptual BIM / Small BIM. All-Out BIM. BIM Introduction From Conceptual BIM to All-Out BIM Brent Mauti, Architect BARCH, OAA, MAA, SAA, AAA, MRAIC, NCARB, AIA, LEED-AP CH2M HILL CANADA ARCHITECTS INC. brent.mauti@ch2m.com Member of the Manitoba Association

More information

North Carolina No-Rise Guidance Document

North Carolina No-Rise Guidance Document North Carolina No-Rise Guidance Document June 4, 2015 Atlanta, GA Dan Brubaker, PE, CFM NFIP Engineer (919) 825-2300 Dan.Brubaker@ncdps.gov Purpose Provide guidance for No-Rise preparation Engineers Provide

More information

Clarifications in italics added July 2018

Clarifications in italics added July 2018 SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

Floodplain Modeling 101. Presentation Goals

Floodplain Modeling 101. Presentation Goals Floodplain Modeling 101 Presenter: Joseph L. Miller, P.E., CFM 2016 INAFSM Conference Presentation Goals Introduction to Indiana s and FEMA s floodplain modeling technical requirements for riverine modeling

More information

Subsurface Utility Engineering and 3D Utility Mapping

Subsurface Utility Engineering and 3D Utility Mapping Subsurface Utility Engineering and 3D Utility Mapping Subsurface Utility Engineering: A branch of engineering practice that involves managing certain risks associated with utility mapping and appropriate

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

2.5 Design of Channels

2.5 Design of Channels 2.6 Design of Open Channels Open channels have uses in urban stormwater drainage urban sanitary-sewer systems irrigation delivery systems In the next few lectures, we'll discuss the design procedure for

More information

CHAPTER 8 Electronic Deliverables TABLE OF CONTENTS

CHAPTER 8 Electronic Deliverables TABLE OF CONTENTS CHAPTER 8 Electronic Deliverables TABLE OF CONTENTS CHAPTER 8... 3 8.1 Specifications for Electronic Data Deliverables... 3 8.1.1 Introduction / Purpose... 3 8.2 Background... 4 8.3 Scope... 5 8.4 File

More information

Radius Return Select this option to annotate the elevations along the radius return of the intersection.

Radius Return Select this option to annotate the elevations along the radius return of the intersection. ODOT_IntersectionDetail.mvba Application Name: Current version: Required MicroStation Version: Required GEOPAK Version: Video Documentation ODOT_IntersectionDetail.mvba V11.07.15 MicroStation XM or V8i

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but

More information

1 MUNICIPAL INFRASTRUCTURE

1 MUNICIPAL INFRASTRUCTURE Engineering Design Criteria & Standard Drawings Page 5 1 MUNICIPAL INFRASTRUCTURE 1.1 Drawing & Submission Requirements 1.1.1 General This section discusses the requirements for the submission of engineering

More information

Practice Workbook. Cross Sections: Creating, Annotating, and Volumes. SELECTseries 4 ( ) or newer

Practice Workbook. Cross Sections: Creating, Annotating, and Volumes. SELECTseries 4 ( ) or newer Practice Workbook This workbook is designed for use in Live instructor-led training and for OnDemand self study. The explanations and demonstrations are provided by the instructor in the classroom, or

More information

Module 10. Assemblies and Corridors. Objectives

Module 10. Assemblies and Corridors. Objectives NOTES Module 10 Assemblies and Corridors In this module, you learn to work with assemblies and corridors in AutoCAD Civil 3D. Corridor models are used to represent road designs in Civil 3D. An assembly

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information