Centre Georges Pompidou

Size: px
Start display at page:

Download "Centre Georges Pompidou"

Transcription

1 The international competition was launched in 1970 by the French Ministry of Culture. The call foresaw the creation of an interdisciplinary cultural institution, where contemporary art was also accompanied by literature, design, music and cinema. For this reason the Center includes the Public Information Library, the National Museum of Modern Art, and IRCAM, a center for music and acoustic research 1 / 147

2 Dati Progetto Competition Construction Renovation Site area 2 ha Total Floor Area m2 Area of each floor 166 x 45 m (open plan) Height 42 m on Rue Beaubourg, 45.5 m on the square Floors basement Credits Client Ministry of Cultural Affairs, Ministry of National Education Architects Studio Piano & Rogers, architects Consultants Structures and M.E. services: Ove Arup & Partners (P. Rice, L. Grut, R. Pierce, T. Barker); Cost control: M. Espinoza; Contractors GTM (Jean Thaury, site engineer) (main contractor); Krupp, PontàMousson, Pohlig (structure); Voyer (secondary structures); Otis (elevators and escalator); Industrielle de Chauffage, Saunier Duval (heating and ventilation); CFEM (glazing) 2 / 147

3 Immagini Subject Aerial view of the site before the project Image Code be / 147

4 Subject The Plateau Beauborg in the late Sixties. Image Code be / 147

5 Subject Renzo Piano with Susan and Richard Rogers, Gianfranco Franchini 1971/07/19 Image Code Be1 414 Rue Des Archives / AGIP 5 / 147

6 Subject Richard Rogers, Renzo Piano and Peter Rice 1974 Image Code be1 404 Rogers Stirk Harbour + Partners 6 / 147

7 Subject Meeting of the Jury 1971 Image Code be1 400 Centre Pompidou 7 / 147

8 Subject Picture's collage of the team Image Code be1 234, Rogers Stirk Harbour + Partners 8 / 147

9 Subject The Piano & Rogers team in the early From the left to right: Richard Rogers, Marco Goldschmied, Su Rogers, John Young and Renzo Piano 1971 Image Code be1 402 Centre Pompidou 9 / 147

10 Subject Philip Johnson with a presentation board 1971/07/16 Image Code be1 233 Arup 10 / 147

11 Subject The big excavation for the basement 1972 Image Code be1 184 Daniel Quesnay 11 / 147

12 Subject The big excavation for the basement with the contenitive wall on the east side 1972 Image Code be1 177 Daniel Quesnay 12 / 147

13 Subject The building site Image Code Be1 439 Bernard Vincent, Roger Stirk Harbour + Partners 13 / 147

14 Subject The production of the gerberettes in the Pohlig Heckel Bielchart factory, Krupp Group, in Rohrbach, Germany 1974 Image Code be1 311 Gianni Berengo Gardin Gianni Berengo Gardin 14 / 147

15 Subject Beams ready to be mounted in the building site Image Code Be / 147

16 Subject The 48 metres long trusses transported and delivered during the night. Image Code be1 105 Bernard Vincent, Roger Stirk Harbour + Partners 16 / 147

17 Subject First part of the framework under construction. View from rue SaintMerri Image Code be1 255, Roger Stirk Harbour + Partners 17 / 147

18 Subject The building under construction in Image Code be1 182 Bernard Vincent, Roger Stirk Harbour + Partners 18 / 147

19 Subject View of the structure on the west side from the upper levels (1975) Image Code Be1 179 Bernard Vincent 19 / 147

20 Subject View of the exavation for the IRCAM site from the top of the structure of the south façade under construction Image Code be1 329 Bernard Vincent 20 / 147

21 Subject The West Façade under construction. Image Code be1 183 Richard Ringoletti, Roger Stirk Harbour + Partners 21 / 147

22 Subject The lifting of a beam. Image Code be1 190 Bernard Vincent, Roger Stirk Harbour + Partners 22 / 147

23 Subject Men at work to complete the connection between a truss and a gerberette. Image Code Be / 147

24 Subject L'enorme trave in acciaio fuso chiamata gerberette, elemento distintivo della struttura esterna del Centre Pompidou. Ogni gerberette pesa circa dieci tonnellate. Image Code be / 147

25 Subject The system of assembly of the gerberette with the column, the tiebeam and the main truss. Erection of the first frame (august) Image Code be1 110 Bernard Vincent, Roger Stirk Harbour + Partners 25 / 147

26 Subject Detail of the connection between the gerberette and the column. Image Code Be / 147

27 Subject The assembly system of the floors' platforms Image Code Be1 516 Shunji Ishida, Roger Stirk Harbour + Partners 27 / 147

28 Subject Detail of the glass façade Image Code Be1 654 Shunji Ishida, Rogers Stirk Harbour + Partners 28 / 147

29 Subject Glass Façade structure detail. Image Code Be1 655 Shunji Ishida, Rogers Stirk Harbour + Partners 29 / 147

30 Subject The escalators structure under construction. Image Code Be1 596 Shunji Ishida, Rogers Stirk Harbour + Partners 30 / 147

31 Subject Detail of the connection elements of the external escalators structure. Image Code Be1 598 Shunji Ishida, Rogers Stirk Harbour + Partners 31 / 147

32 Subject View on the escalators during the installation. Image Code Be1 612 Shunji Ishida, Rogers Stirk Harbour + Partners 32 / 147

33 Subject Assembly of the escalators structure. Image Code Be1 606 Shunji Ishida, Rogers Stirk Harbour + Partners 33 / 147

34 Subject The assembly of the conducts on the East Façade. Image Code Be1 494, Roger Stirk Harbour + Partners 34 / 147

35 Subject Panoramic view of the cooling tower on the top Image Code Be1 623 Shunji Ishida, Rogers Stirk Harbour + Partners 35 / 147

36 Subject The cooling tower Image Code Be1 632 Shunji Ishida, Rogers Stirk Harbour + Partners 36 / 147

37 Subject 1977 Image Code Be1 064, Roger Stirk Harbour + Partners 37 / 147

38 Subject The West Façade escalators Image Code be1 070 Michel Denancé Michel Denancé 38 / 147

39 Subject (1991) Image Code be1 142 Michel Denancé Michel Denancé 39 / 147

40 Subject The nautical looking extactors on the East Façade Image Code be1 047 Michel Denancé Michel Denancé 40 / 147

41 Subject View of the Facade. Each color stands for a particular function: blue for ventilation, green for water, red for automated elevators, yellow for electricity. The main structure is white. All services and the secondary structure (service stairs, passage ways, etc.) are grey. Image Code be1 059 Michel Denancé 41 / 147

42 Michel Denancé 42 / 147

43 Subject An external deck on the East Façade. Image Code Be1 652 Shunji Ishida, Rogers Stirk Harbour + Partners 43 / 147

44 Subject The parvis seen from the atrium of the Centre Pompidou Image Code be1 151 Gianni Berengo Gardin Gianni Berengo Gardin 44 / 147

45 Subject The Sculpture terrace at the 5th floor. Image Code be1 025 Gianni Berengo Gardin Gianni Berengo Gardin 45 / 147

46 Subject The terrace at the top level Image Code be1 364 Hanry Sowden 46 / 147

47 Subject West Façade detail. Image Code be1 006 Gianni Berengo Gardin Gianni Berengo Gardin 47 / 147

48 Subject Circles of spectators around performers in the piazza Image Code be1 363 Gianni Berengo Gardin Gianni Berengo Gardin 48 / 147

49 Subject 2017/02/01 Image Code Be2 141 Francesca Avanzinelli Renzo Piano Building Workshop 49 / 147

50 Subject The Forum: Panamarenko's "The Aeromodeller (Zeppelin)" Image Code be1 383 Gianni Berengo Gardin Gianni Berengo Gardin 50 / 147

51 Subject Reflected ceiling of the Forum. Image Code Be1 471 Shunji Ishida 51 / 147

52 Subject Interiors of the gallery at the upper level. Image Code be / 147

53 Subject One of the gallery at the upper levels Image Code be1 160 Gianni Berengo Gardin Gianni Berengo Gardin 53 / 147

54 Subject View of the interiors. The library. Image Code be1 376 Gianni Berengo Gardin Gianni Berengo Gardin 54 / 147

55 Subject Interiors of the library. Image Code be / 147

56 Subject Demountable table system in standard steel angles, frictionbolted at corners Image Code Be1 668 Bernard Vincent, Rogers Stirk Harbour + Partners 56 / 147

57 Subject Fornitures leather chairs Image Code Be1 670 Bernard Vincent, Rogers Stirk Harbour + Partners 57 / 147

58 Subject The cinema/theather space. Image Code Be1 702 Shunji Ishida, Rogers Stirk Harbour + Partners 58 / 147

59 Subject Night view from the Piazza after the restoration. (2001) Image Code be2 025 Michel Denancé Michel Denancé 59 / 147

60 Subject The Forum in /07 Image Code Be2 138 Francesca Avanzinelli 60 / 147

61 Subject The Café (2001) Image Code be2 019 Michel Denancé Michel Denancé 61 / 147

62 Subject Femme (1969) Joan Miró on the Sculpture West terrace at the 5th floor after the refurbishments Image Code be2 012 Gianni Berengo Gardin Gianni Berengo Gardin 62 / 147

63 Subject The Southern Sculpture Terrace at the 5th floor in /07 Image Code Be2 155 Francesca Avanzinelli 63 / 147

64 Subject The "Grande Salle" with 384 seats, level Forum 1. Image Code be2 041 Michel Denancé Michel Denancé 64 / 147

65 Disegni Title Scale Size 14.5x27.4 cm 1971 Drawing number Drawing code be1rp_001 Renzo Piano Rogers Stirk Harbour & P. 65 / 147

66 Title Scale Size A Drawing number Drawing code be1rp_011 Renzo Piano Rogers Stirk Harbour & P. 66 / 147

67 Title Scale Size A Drawing number Drawing code be1rp_012 Renzo Piano Rogers Stirk Harbour & P. 67 / 147

68 Title Plan section Scale N/A Size 81 x 78 cm (1970) Drawing number Drawing code BE1_E_ / 147

69 Piano & Rogers Rogers Stirk Harbour & P. 69 / 147

70 Title Scale N/A Size 120 x 86 cm 1970 Drawing number Drawing code BE1_E_036 Piano & Rogers Rogers Stirk Harbour & P. 70 / 147

71 Title Scale N/A Size 114 x 51 cm 1970 Drawing number Drawing code BE1_E_ / 147

72 Piano & Rogers Rogers Stirk Harbour & P. 72 / 147

73 Title Niveau Scale 1:500 Size 63 x 45 cm 1973/01/23 Drawing number 73 / 147

74 Drawing code BE1_E_052 Piano & Rogers Rogers Stirk Harbour & P. 74 / 147

75 Title 1 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147

76 Drawing code BE1_E_053 Piano & Rogers Rogers Stirk Harbour & P. 76 / 147

77 Title 2 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147

78 Drawing code BE1_E_054 Piano & Rogers Rogers Stirk Harbour & P. 78 / 147

79 Title 3 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147

80 Drawing code BE1_E_055 Piano & Rogers Rogers Stirk Harbour & P. 80 / 147

81 Title 4 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147

82 Drawing code BE1_E_056 Piano & Rogers Rogers Stirk Harbour & P. 82 / 147

83 Title 5 étage (Fifth floor) Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/DL/ CBP / 147

84 Drawing code BE1_E_057 Piano & Rogers Rogers Stirk Harbour & P. 84 / 147

85 Title Façade Est Scale 1:200 Size x 84.5 cm 15/11/1972 Drawing number 71 CBP 2268 Drawing code BE1_E_006 Piano & Rogers Rogers Stirk Harbour & P. 85 / 147

86 Title Façade Nord Scale 1:200 Size 120 x 84 cm 15/11/1972 Drawing number 71 CBP 2269 Drawing code BE1_E_012 Piano & Rogers Rogers Stirk Harbour & P. 86 / 147

87 Title Façade Sud Scale 1:200 Size 120 x 84 cm 15/12/1973 Drawing number 71 CBP 2270 Drawing code BE1_E_013 Piano & Rogers Rogers Stirk Harbour & P. 87 / 147

88 Title Façade Ouest Scale 1:200 Size 120 x 84 cm 15/12/1972 Drawing number 71 CBP 2267 Drawing code BE1_E_014 Piano & Rogers Rogers Stirk Harbour & P. 88 / 147

89 Title Elevation and section parking Scale 1:200 Size 123 x 61 cm 1971/12/01 Drawing number CB/PC/3 Drawing code BE1_E_058 Piano & Rogers Rogers Stirk Harbour & P. 89 / 147

90 Title Section typique Vue transversale Scale 1:50 Size x 92.5 cm 1972/12/19 Drawing number 71 CBP 2285 Drawing code BE1_E_007 Piano & Rogers Rogers Stirk Harbour & P. 90 / 147

91 Title Gerberette ensemble de détails Scale 1:10 Size 85 x 60 cm 1973/01/26 Drawing number SM20 21A Drawing code BE1_E_005 Piano & Rogers Rogers Stirk Harbour & P. 91 / 147

92 Title Pignon Scale 1:100 Size A1 1972/09/25 Drawing number SZ20 05 Drawing code BE1_E_090 Piano & Rogers Rogers Stirk Harbour & P. 92 / 147

93 Title Joint de liaison entre tubes des contreventements des angles rentrants des terrasses Scale 1:10 Size 46 x 64 cm 1974/10/01 Drawing number / 147

94 Drawing code BE1_E_108 Piano & Rogers Rogers Stirk Harbour & P. 94 / 147

95 Title Façade Est sections typique des pénétration des réseaux techniques Scale 1:20 Size 86 x 55 cm 1973/11/07 Drawing number 71 BCP 2527 S126.1 Drawing code BE1_E_164 Piano & Rogers Rogers Stirk Harbour & P. 95 / 147

96 Title Façade Est plan typique (baie 6,7 level Scale 1:2 Size 58 x 88 cm 1973/11/07 Drawing number 71 BCP 2525 S / 147

97 Drawing code BE1_E_165 Piano & Rogers Rogers Stirk Harbour & P. 97 / 147

98 Title Volets roulants cas courant Scale 1:1 Size 87 x 62 cm 1974/10/07 Drawing number Drawing code BE1_E_109 Piano & Rogers Rogers Stirk Harbour & P. 98 / 147

99 Title Plate forme d'antenne + supports tuyauteries avec compensateurs Scale 1:20 Size 122 x 90 cm 1976/10/26 Drawing number Drawing code BE1_E_197 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 99 / 147

100 Title 1Facade Ovest escalier mécanique Scale 1:20 Size 88 x 56 cm 1973/11/07 Drawing number 71 BCP 2521 S120.1 Drawing code BE1_E_167 Piano & Rogers Rogers Stirk Harbour & P. 100 / 147

101 Title Escalier mécanique, supports coupe Scale N/A Size 90 x 122 cm 1974/12/12 Drawing number / 147

102 Drawing code BE1_E_194 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 102 / 147

103 Title Escalier mécanique structure détail Scale 1:5 Size 88 x 62 cm 1974/12/12 Drawing number Drawing code BE1_E_195 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 103 / 147

104 Title Centrale pour cinématheque élévation AA Scale 1:20 Size 1974/02/24 Drawing number B Drawing code BE1_E_139 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 104 / 147

105 Title Détail typique escalier garde corps Scale 1:5 Size 90 x 62 cm 1974/11/15 Drawing number Drawing code BE1_E_180 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 105 / 147

106 Title Escalier service accès pour terrasse Scale 1:20 Size 90 x 120 cm 1975/07/08 Drawing number A 106 / 147

107 Drawing code BE1_E_193 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 107 / 147

108 Title Detail 22 Scale NTS Size A3 1973/11/30 Drawing number 71 BCP 2534S149.1 Drawing code BE1_E_ / 147

109 Piano & Rogers Rogers Stirk Harbour & P. 109 / 147

110 Title Détail de liaison de raccordement gallerie/façade avec la façade partie centrale Scale 1:1 Size 124 x 88 cm 1975/01/29 Drawing number Drawing code BE1_E_113 Piano & Rogers Rogers Stirk Harbour & P. 110 / 147

111 Title Portes battantes dans les façades Scale 1:1 Size 86 x 62 cm 1975/03/21 Drawing number Drawing code BE1_E_115 Piano & Rogers Rogers Stirk Harbour & P. 111 / 147

112 Title Plan toiture et piazza Scale Photo of the original drawing not to scale 1973/11 Drawing number I/S 104 A Drawing code BE1 460 Piano & Rogers Rogers Stirk Harbour & P. 112 / 147

113 Title Poutre maitresse type élévation Scale Drawing size: A1 1:50 03/01/1973 Drawing number SZ Drawing code BE1 213 Ove Arup & Partners Ove Arup & Partners 113 / 147

114 Title Scale Photo of the original drawing Drawing size A1 N/A Drawing number Drawing code BE1 218 Piano & Rogers Rogers Stirk Harbour & P. 114 / 147

115 Title Pignon détail de contreventements Scale Drawing size: A1 1:50 1: /09/29 Drawing number SD Drawing code BE1 220 Ove Arup & Partners Ove Arup & Partners 115 / 147

116 Title Pignons contreventements entre poutre maitresses Scale Drawing size A1 1:50 1: /01/24 Drawing number SZ Drawing code BE1 207 Ove Arup & Partners Ove Arup & Partners 116 / 147

117 Title Scale N/A Drawing number SZ Drawing code BE1 697 Piano & Rogers Rogers Stirk Harbour & P. 117 / 147

118 Title Scale N/A Drawing number Drawing code BE1 563 Piano & Rogers Rogers Stirk Harbour & P. 118 / 147

119 Title Forum Beaubourg Scale Size A3 1998/01/23 Drawing number 119 / 147

120 Drawing code be2rp_002 Renzo Piano Renzo Piano Building Workshop 120 / 147

121 Title Forum Beaubourg Scale Size A3 1998/01/25 Drawing number 121 / 147

122 Drawing code be2rp_004 Renzo Piano Renzo Piano Building Workshop 122 / 147

123 Title Scale Size A3 1999/04/15 Drawing number Drawing code be2rp_016 Renzo Piano Renzo Piano Building Workshop 123 / 147

124 Title Scale Size A3 1999/10/01 Drawing number Drawing code be2rp_017 Renzo Piano Renzo Piano Building Workshop 124 / 147

125 Title Canopy entrée coupe Scale N/A Size A1 1998/07/16 Drawing number Drawing code BE2_E_011 Renzo Piano Building Workshop Renzo Piano Building Workshop 125 / 147

126 Title La Piazza Niveau 0 Scale N/A Dimensione A1 (1998/07/01) Drawing number Drawing code BE2_E_003 Renzo Piano Building Workshop Renzo Piano Building Workshop 126 / 147

127 Title La Piazza Niveau 0 Scale N/A Size A1 (1998/07/01) Drawing number Drawing code BE2_E_002 Renzo Piano Building Workshop Renzo Piano Building Workshop 127 / 147

128 Title Section forum Scale N/A Size 85 x 33 cm (1998/07/01) Drawing number Drawing code BE2_E_062 Renzo Piano Building Workshop Renzo Piano Building Workshop 128 / 147

129 Title Terrasse Nord Niveau +5 Scale N/A 1998/07 Drawing number Drawing code BE2 064 Renzo Piano Building Workshop Renzo Piano Building Workshop 129 / 147

130 Title Terrasse Scale N/A 1998 Drawing number Drawing code BE2 065 Renzo Piano Building Workshop Renzo Piano Building Workshop 130 / 147

131 Modelli Title Forum Study Model (1998) Model Code BE2_MD_001 Scale 1:100 Model RPBW Renzo Piano Building Workshop Architects 131 / 147

132 Title Forum Signage Study Model 1998 Model Code BE2_MD_007 Scale N/A Model Olivier Doizy 132 / 147

133 Title Competition Model 1971 Model Code BE1_MD_015 Scale N/A Model Ove Arup 133 / 147

134 Title Competition Model Copy (1993) Model Code BE1_MD_006 Scale 1:500 Model Ove Arup 134 / 147

135 Title "Avant Projet Sommaire" Schematic Design Presentation Model 1971 Model Code BE1_MD_016 Scale N/A Model 135 / 147

136 Title "Avant Projet Sommaire" Schematic Design Model (1972) Model Code BE1_MD_017 Scale N/A Model 136 / 147

137 Title As Built model (1975) Model Code BE1_MD_025 Scale N/A Model 137 / 147

138 Title Galleries Study Models (1972) Model Code BE1_MD_024a Scale N/A Model 138 / 147

139 Title Gerberette Beam Study Model 1972 Model Code BE1_MD_023B Scale N/A Model 139 / 147

140 Title Airconditioning system on roof Study model Model Code BE1_MD_028 Scale N/A Model Shunji Ishida 140 / 147

141 Title Airconditioning system on roof Study model Model Code BE1_MD_029 Scale N/A Model Shunji Ishida 141 / 147

142 Title General Plan Presentation Model 1997 Model Code BE2_MD_004 Scale 1:250 Model Olivier Doizy 142 / 147

143 Title Terrace Study Model Model Code BE2_MD_005 Scale N/A Model Olivier Doizy 143 / 147

144 Title Main Trusses Model As Built 1997 Scale 1:200 Model code BE1_MD_002 Renzo Piano Building Workshop Ph, Stefano Goldberg 144 / 147

145 Title General Building Competition Model (copy) 1997 Scale 1:500 Model code BE1_MD_006 Renzo Piano Building Workshop Ph, Stefano Goldberg 145 / 147

146 Title Gerberette Beam Model 1999 Scale 1:3 Model code BE1_MD_007 Renzo Piano Building Workshop Ph. Renzo Piano Building Workshop 146 / 147

147 147 / 147 Powered by TCPDF (

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

ican A Art New York, NY Memo Chang

ican A Art New York, NY Memo Chang Renzo Museu um of Ameri ican A Art New York, NY Lighting Proposal Memo September 10, 2012 Chang Liu Lighting/Electrical Option Dr. Houser Dr. Mistrick RENZO MUSEUM OF AMERICAN ART CHANG LIU LIGHTING PROPOSAL

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

214 Wilshire Blvd., Suite 102 Santa Monica California 90401

214 Wilshire Blvd., Suite 102 Santa Monica California 90401 Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE

More information

Public Art Plan for Ripley s Aquarium of Canada 301 Front Street West, Toronto, Ontario

Public Art Plan for Ripley s Aquarium of Canada 301 Front Street West, Toronto, Ontario Public Art Plan for Ripley s Aquarium of Canada 301 Front Street West, Toronto, Ontario Presented to the Toronto Public Art Commission July 20, 2010 by Rina Greer and Catherine Williams, co-consultants

More information

PROVENANCE AT THE CLEVELAND MUSEUM OF ART

PROVENANCE AT THE CLEVELAND MUSEUM OF ART PROVENANCE AT THE CLEVELAND MUSEUM OF ART Special Event Room Rental 20% Non-Profit and Corporate Partner discounts are available. Event Space Rate Seated Reception Classroom Theatre Atrium 900 2,000 430

More information

BTR 100. Blueprint Reading

BTR 100. Blueprint Reading BTR 100 Blueprint Reading Approved: December 3, 2010 EFFECTIVE DATE: Fall 2011 COURSE PACKAGE FORM Team Leader and Members Ken Kramer, Frank Port, Curtis Clough, Andra Goldberg Date of proposal to Curriculum

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

AIA ATL HSSDC KICK-OFF MEETING

AIA ATL HSSDC KICK-OFF MEETING AIA ATL HSSDC KICK-OFF MEETING WELCOME KIMBERLY STANLEY, AIA, PRINCIPAL STANLEY BEAMAN & SEARS SCHEDULE FOR TODAY 9:15 Program starts 9:30 - Break out into Advanced, Beginner and Mentor Groups 11:00 Meet

More information

University of Colorado, College Architecture and Planning. M:

University of Colorado, College Architecture and Planning. M: BIM is for Interface I is for interface: the warm up. Of course I stands for information in BIM, the first assignment however is meant to serve as a warm up and general orientation of the program and it

More information

Deck Tutorial. Chapter 8: Decks and Porches

Deck Tutorial. Chapter 8: Decks and Porches Decks and Porches Chapter 8: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase.

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Video: Design Process Architecture

Video: Design Process Architecture Design and Applied Technology Teaching Kit for Senior Secondary Curriculum Design and Innovation Video: Design Process in Architecture [Teacher notes] Organizer Sponsor Research Team Contents Preamble

More information

Deck Tutorial. Decks and Porches. Drawing Decks

Deck Tutorial. Decks and Porches. Drawing Decks Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.

More information

Deck Tutorial. Chapter 8: Decks and Porches

Deck Tutorial. Chapter 8: Decks and Porches Chapter 8: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase. You may want to

More information

Deck Tutorial. Decks and Porches. Drawing Decks

Deck Tutorial. Decks and Porches. Drawing Decks Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.

More information

Deck Tutorial. Chapter 6: Decks and Porches

Deck Tutorial. Chapter 6: Decks and Porches Chapter 6: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase. You may want to

More information

FACTORY. Presentation sketches Actual Site photographs Drawings

FACTORY. Presentation sketches Actual Site photographs Drawings FACTORY Presentation sketches Actual Site photographs Drawings Factory Presentation sketches 1) Front Façade From the Main Road side The façade of the pub showcases a complete look of a manufacturing unit

More information

Aspen Art Museum Creating Innovative Wood Structure

Aspen Art Museum Creating Innovative Wood Structure Aspen Art Museum Creating Innovative Wood Structure Tallinn Wood Architecture Conference November 25-26, 2015 Aspen Art Museum Wood Space Frame THE PLAYERS OUTLINE THE BUILDING CONCEPT THE ARCHITECT S

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

WEDNESDAY, 5 JUNE 1.00 PM 2.30 PM

WEDNESDAY, 5 JUNE 1.00 PM 2.30 PM X223/12/02 NATIONAL QUALIFICATIONS 13 WEDNESDAY, 5 JUNE 1.00 PM 2.30 PM ART AND DESIGN HIGHER There are two sections to this paper, Section 1 Art Studies; and Section 2 Design Studies. Each section is

More information

Jean-Michel Othoniel Xavier Veilhan. Courtesy of Kukje Gallery, Inc., May 22 June 26, 2010

Jean-Michel Othoniel Xavier Veilhan. Courtesy of Kukje Gallery, Inc., May 22 June 26, 2010 Jean-Michel Othoniel Xavier Veilhan May 22 June 26, 2010 Exhibition Information Artist: Jean-Michel Othoniel, Xavier Veilhan Duration: May 22 (Sat) to June 26 (Sat) Place: Kukje Gallery (K1), 1F, 2F (Tel

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

Grand Rapids History & Special Collections ARCHIVES GRAND RAPIDS PUBLIC LIBRARY. Finding Aid for the

Grand Rapids History & Special Collections ARCHIVES GRAND RAPIDS PUBLIC LIBRARY. Finding Aid for the Grand Rapids History & Special Collections ARCHIVES GRAND RAPIDS PUBLIC LIBRARY Finding Aid for the Ryerson Library Foundation / Grand Rapids Public Library Foundation Records Collection # 342 October

More information

RECORD GROUP NUMBER 156

RECORD GROUP NUMBER 156 DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services

More information

GlasRoc Sheathing Type X

GlasRoc Sheathing Type X Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity

More information

Production House, Enterprise Way,

Production House, Enterprise Way, Stock Sets Scenic Toolbox Contents: Stock Sets SS1 to SS4 Bespoke sets BS1 to BS4 Engineering EN1 to EN5 Truss TR1 to TR1 Temporary Structures TM1 to TM Exhibitions EX1 to EX3 Draughting & Design DS1 to

More information

Architectural Walking Tour

Architectural Walking Tour Architectural Awareness Activities before the walking tour: Identifying Architecture: Students view slides and/or photographs of designed places, spaces and architectural details. They consider how people

More information

WHITNEY MUSEUM UNVEILS DESIGN BY RENZO PIANO FOR NEW DOWNTOWN BUILDING

WHITNEY MUSEUM UNVEILS DESIGN BY RENZO PIANO FOR NEW DOWNTOWN BUILDING Press Release Whitney Museum of American Art 945 Madison Avenue at 75th Street New York, NY 10021 www.whitney.org/press Contact: Whitney Museum of American Art Stephen Soba, Leily Soleimani 212-570-3633

More information

ARCH 405bL SPRING 2016 LUCY EGBE + NICK HALSEY + KELLY LYNCH ERIN YAMASHITA ISSUED 04/26/16. Site Plan. Site Plan 1" = 50'-0" 1" = 50'-0" SCALE A-500

ARCH 405bL SPRING 2016 LUCY EGBE + NICK HALSEY + KELLY LYNCH ERIN YAMASHITA ISSUED 04/26/16. Site Plan. Site Plan 1 = 50'-0 1 = 50'-0 SCALE A-500 04/6/6 Site Plan " = 50'-0" Site Plan " = 50'-0" A-500 LOWLINE PARK WARHOL MUSEUM BASEMENT 6.67% Up 6.67% Down 03/0/6 Level P /3" = '-0" UP TYPICAL PARKING PLAN /3" = '-0" A-50P ESSEX ST. MARKET WARHOL

More information

WHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar

WHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar WHO WE ARE We help construction companies, general contractors, architects & engineers to seamlessly integrate BIM into their projects within their predefined timelines, standards and budget thereby helping

More information

RESIDENTIAL DEVELOPMENT 608 SPRINGBANK DRIVE 608 SPRINGBANK DRIVE LONDON, ON DESIGN BRIEF SPRINGBANK DRIVE WONDERLAND ROAD EAST ELEVATION NORTH ELEVATION WONDERLAND ROAD SPRINGBANK DRIVE SOUTH ELEVATION

More information

Method of Build 1. General

Method of Build 1. General Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed

More information

Proposed Hotel, Restaurant. and Banquet Facility

Proposed Hotel, Restaurant. and Banquet Facility Proposed Hotel, Restaurant PROJECT # : 60-0 and Banquet Facility ARCHITECTURAL 7 Logy Bay Road P.O. Box 09 St. John's, NL, Canada AA 5B T: (709) 79-80 F: (709) 7-80 E: info@fougeremenchenton.ca Issued

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

Storytellers Stories of EXCELLENCE PROJECTS. The Interior Glass Bridge, Potenza.

Storytellers Stories of EXCELLENCE PROJECTS. The Interior Glass Bridge, Potenza. Storytellers 03 2017 Stories of EXCELLENCE PROJECTS The Interior Glass Bridge, Potenza Cari Lettori, in this issue we will talk about Transparent Architectures within the MPH Informatica office in Tito,

More information

Art Exploration! A Self-Guided Tour through the Hallie Ford Museum of Art

Art Exploration! A Self-Guided Tour through the Hallie Ford Museum of Art Art Exploration! A Self-Guided Tour through the Hallie Ford Museum of Art Find these artworks in the Museum s permanent collection galleries: spend some time looking and discussing each one with your friends

More information

PRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS,

PRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS, http://oac.cdlib.org/findaid/ark:/13030/kt0h4nd9mz No online items PROJECTS, 1984-1995 Finding Aid prepared by Vladimira Stefura Getty Research Institute Research Library Special Collections and Visual

More information

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,

More information

bo laugesen ad10-ark15 nørrebro station process

bo laugesen ad10-ark15 nørrebro station process bo laugesen ad10-ark15 nørrebro station process foreword The process of the project from initial ideas and proposals to the final proposal. It also contains different excersises and studies along with

More information

ACOUSTICS IN THE MULTIPURPOSE HALLS OF THE NEW MAIN LIBRARY AND THE NEW MUNCH MUSEUM IN OSLO

ACOUSTICS IN THE MULTIPURPOSE HALLS OF THE NEW MAIN LIBRARY AND THE NEW MUNCH MUSEUM IN OSLO ACOUSTICS IN THE MULTIPURPOSE HALLS OF THE NEW MAIN LIBRARY AND THE NEW MUNCH MUSEUM IN OSLO J Olshausen J H Rindel Multiconsult as, Oslo, Norway Multiconsult as, Oslo, Norway 1 INTRODUCTION This paper

More information

Process The House of Photography Amanda H. J. Solberg

Process The House of Photography Amanda H. J. Solberg Process The House of Photography Amanda H. J. Solberg WEEK ONE AND TWO SITE WEEK THREE AND FOUR COLLAGE Fitting the pieces into a set square using only undefinable objects, filling the space. Breaking

More information

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its

More information

Back to Nature: The Life Cycle of Pottery. Yunqiao Du, Tutor: Eireen Schreurs, Susanne Pietsch, Mauro Parravicini

Back to Nature: The Life Cycle of Pottery. Yunqiao Du, Tutor: Eireen Schreurs, Susanne Pietsch, Mauro Parravicini Back to Nature: The Life Cycle of Pottery Yunqiao Du, 4301307 Tutor: Eireen Schreurs, Susanne Pietsch, Mauro Parravicini About Pottery Craft The Cycle of Pottery illustrations of Pottery Making (1743)

More information

SIMULATION OF CERTAIN ACOUSTIC PROPERTIES OF THE "KNEŽEV DVOR" IN DUBROVNIK

SIMULATION OF CERTAIN ACOUSTIC PROPERTIES OF THE KNEŽEV DVOR IN DUBROVNIK SIMULATION OF CERTAIN ACOUSTIC PROPERTIES OF THE "KNEŽEV DVOR" IN DUBROVNIK Bojan Ivančević 1, Marjan Sikora 2, Kristian Jambrošić 1 1 FER, Unska 3, Zagreb, Croatia, bojan.ivancevic@fer.hr, kristian.jambrosic@fer.hr

More information

EXHIBITION CHECKLIST WITH IMAGES

EXHIBITION CHECKLIST WITH IMAGES EXHIBITION CHECKLIST WITH IMAGES Richard Serra Sculpture: Forty Years The Museum of Modern Art, New York 2nd Floor Contemporary Galleries The Museum of Modern Art, New York 6th Floor International Council

More information

Cooper, Robertson & Partners Architecture, Urban Design. Page 1. Daylighting: Flexibility and Conservation

Cooper, Robertson & Partners Architecture, Urban Design. Page 1. Daylighting: Flexibility and Conservation Cooper, Robertson & Partners Architecture, Urban Design Page 1 Daylighting: Flexibility and Conservation Daylighting: Flexibility and Conservation COOPER ROBERTSON Historical gallery design minimized

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

PHOTOGRAPHIC ARCHIVAL RECORDING. Former Reclamation Shed. North Eveleigh

PHOTOGRAPHIC ARCHIVAL RECORDING. Former Reclamation Shed. North Eveleigh PHOTOGRAPHIC ARCHIVAL RECORDING Former Reclamation Shed North Eveleigh WEIR PHILLIPS Architects and Heritage Consultants 69 Regent Street, Chippendale NSW 2008 9310 1010 July 2012 1.0 Archival Recording

More information

DETAILS ARE OLD ARCHITECTURE.

DETAILS ARE OLD ARCHITECTURE. Project 2: LOOKING CLOSER - INTERIOR + ENVELOPE The Andy Warhol Foundation Building DETAILS ARE OLD ARCHITECTURE. Rem Koolhaas [..meaning by implication that they are not new architecture and in the best

More information

PHOTOGRAPHIC AND PLANIMETRIC DOSSIER

PHOTOGRAPHIC AND PLANIMETRIC DOSSIER PHOTOGRAPHIC AND PLANIMETRIC DOSSIER. COMPETITION FOR THE SELECTION BY A PANEL OF JUDGES OF A PROPOSAL FOR THE ARCHITECTURAL RENOVATION AND MUSEOLOGICAL ADAPTATION OF THE SALÓN DE REINOS (HALL OF REALMS

More information

Thomas Hooper fonds. Compiled by Frances Woodward (1974, revised 2002) Last revised October University of British Columbia Archives

Thomas Hooper fonds. Compiled by Frances Woodward (1974, revised 2002) Last revised October University of British Columbia Archives Thomas Hooper fonds Compiled by Frances Woodward (1974, revised 2002) Last revised October 2011 University of British Columbia Archives Table of Contents Fonds Description o Title / Dates of Creation /

More information

The University of Houston Campus Art Committee and the Public Art Collection Nathan Carter Proposal for an Outdoor Sculpture for the New University

The University of Houston Campus Art Committee and the Public Art Collection Nathan Carter Proposal for an Outdoor Sculpture for the New University The University of Houston Campus Art Committee and the Public Art Collection March 28, 2012 I would like to thank the University of Houston Campus Art Committee and the Public Art Collection for considering

More information

OJO concepts. ojo o business

OJO concepts. ojo o business ojo o business You want to get to the top with your business? There is enormous potential in. Develop unique experiences to excite, impress and retain your customers. Whatever it takes: Experienced interior

More information

Total Precast Concrete Structures

Total Precast Concrete Structures Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and

More information

Chapter 7 - Porch Framing

Chapter 7 - Porch Framing Chapter 7 - Porch Framing Contents Chapter 7 - Porch Framing... 7-1 Timing & Prerequisites... 7-2 Concrete Porches Caps (Contractor)... 7-3 Organize the Porch Framing Lumber... 7-3 Types of Porch Roofs...

More information

A-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile

A-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile Telephone 0.7.500 //0 06-G/06-G EXTERIOR RENDERINGS A-08 0 NOTE: SIGNAGE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. STREETSCAPE DETAILS ARE SHOWN IN CONCEPT FOR ILLUSTRATIVE PURPOSES. THE FINAL DETAILS OF THE

More information

Newton Suites Residential Tower

Newton Suites Residential Tower Newton Suites Residential Tower 60 Newton Road Singapore Architects WOHA Architects Pte Ltd / R Hassell, W M Summ Singapore Clients UOL Development Singapore Commission 2003 Design 2003-2004 Construction

More information

WEDNESDAY, 5 JUNE 1.00 PM 2.00 PM

WEDNESDAY, 5 JUNE 1.00 PM 2.00 PM X223/11/02 NATIONAL QUALIFICATIONS 2013 WEDNESDAY, 5 JUNE 1.00 PM 2.00 PM ART AND DESIGN INTERMEDIATE 2 There are two sections to this paper, Section 1 Art Studies; and Section 2 Design Studies. Each section

More information

Art (ART) Contact the Art Department for further information. (760) , ext Office: D-14

Art (ART) Contact the Art Department for further information. (760) , ext Office: D-14 Palomar College 2013-2014 Catalog Architecture-Art ARCH 135 Architectural Materials and Methods of Construction (3) An introduction to the use and application of building construction materials and processes.

More information

CHALET/KIT > GALINA 167,00 m²

CHALET/KIT > GALINA 167,00 m² CHALET/KIT > GALINA 167,00 m² PRÉ MONTAGE ET MARQUAGE EN USINE SURFACE : 130,2 m² + étage 37,3 m² GALINA Dwelling house GALINA RC/130,2 m² + étage/37,3 m² Nous vous proposons les matériaux suivants

More information

11SIXTY5 Weaver Dairy Road

11SIXTY5 Weaver Dairy Road SITEPLAN NOTES 2 C-2.0 BICYCLE RACK NTS Weaver Dairy Road Job Number: 1529 WLR, MTC, VJC WLR, VJC 11-30-17 STAIR SITE PLAN 1 C-2.0 SITE PLAN 1" = 30' 0 15 30 60 3 C-2.0 PLAZA DETAIL PLAN 1" = 20' 0 10

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

RESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM

RESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM RESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM 2005-2006 1.1 Enabling Works The enabling works include erecting scaffolding on the external of the facades and all around the clock tower for roof

More information

SOL LEWITT. a d a m. e: 24 CORK STREET LONDON W1S 3NJ t:

SOL LEWITT. a d a m. e:   24 CORK STREET LONDON W1S 3NJ t: SOL LEWITT a d a m g a l l e r y SOL LEWITT 24 CORK STREET LONDON W1S 3NJ t: 0207 439 6633 13 JOHN STREET BATH BA1 2JL t: 01225 480406 e: info@adamgallery.com www.adamgallery.com Adam Gallery is pleased

More information

STRUCTURAL WOOD DETAILING IN CAD FORMAT

STRUCTURAL WOOD DETAILING IN CAD FORMAT STRUCTURAL WOOD DETAILING IN CAD FORMAT STRUCTURAL WOOD DETAILING IN CAD FORMAT K.A. ZAVAT lnm51springer Science+Business ~---Media, LLC Copyright 1993 by Springer Science+Business Media New York Originally

More information

shedkm architects complete first Ruskin Square office in Croydon

shedkm architects complete first Ruskin Square office in Croydon Press release December 2016 shedkm architects complete first Ruskin Square office in Croydon One Ruskin Square by shedkm architects Jack Hobhouse London and Liverpool based practice shedkm architects has

More information

Victoria Saunders, Assoc. AIA, LEED AP BD+C phone: website: vsaunders.com

Victoria Saunders, Assoc. AIA, LEED AP BD+C   phone: website: vsaunders.com Victoria Saunders, Assoc. AIA, LEED AP BD+C email: vsaunders@icloud.com phone: 847.977.2749 website: vsaunders.com profile 5 years of workplace experience, including planning, design, and construction

More information

6 Lobby Elevators with Destination Dispatch

6 Lobby Elevators with Destination Dispatch 6 Lobby Elevators with Destination Dispatch Design Your Space 15 Slab-to-Slab with Exceptional 360 Views Relax at OFF THE GRID Tenant Lounge/Game Area Outdoor Amenity Terrace with Wi-Fi Connectivity Because

More information

Arnolfini Access Statement

Arnolfini Access Statement Arnolfini Access Statement Image 1: Arnolfini from the water About Arnolfini In a fantastic waterside location at the heart of Bristol s harbourside, Arnolfini is one of Europe s leading centres for the

More information

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. facade Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. Specification and installation guide Presentation of the system VMZ

More information

STAGE DEX STAGE DEX. Birch plywood, special water resistant quality, anti skidding top layer

STAGE DEX STAGE DEX. Birch plywood, special water resistant quality, anti skidding top layer The Stage DEX staging system consists of an aluminium frame made from a special extruded profile. The plywood top is bolted and glued to this frame to reduce noise and vibration. Several leg types and

More information

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project

More information

F I N D L AY G A L L E R I E S

F I N D L AY G A L L E R I E S FINDLAY GALLERIES Ronnie Landfield in his Studio, 2017 Ronnie Landfield in his Studio, 2017 As we continue to curate exhibitions of painting movements from the twentieth century, it is with great pleasure

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

Bentley speedikon V8i

Bentley speedikon V8i Bentley speedikon V8i Overview Bentley speedikon V8i Products of the speedikon product line Bentley speedikon Industrial V8i Bentley speedikon Architectural V8i Bentley speedikon ProjectEditor V8i Bentley

More information

Total precast solution for large stadium projects meet tight schedule

Total precast solution for large stadium projects meet tight schedule Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy

More information

*Cover Picture Hoffman House by Richard Meier. *Drawn and Rendered by. Nicole Geier

*Cover Picture Hoffman House by Richard Meier. *Drawn and Rendered by. Nicole Geier *Cover Picture Hoffman House by Richard Meier *Drawn and Rendered by Nicole Geier Design Statement Just as soul depicts the character of man, architecture portrays the character of functional space. Architecture

More information

Contents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together

Contents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together Contents OVERVIEW How this Book is Put Together Conventions Icon Key Files on the Website INTRODUCTION TO CHIEF ARCHITECT The Chief Architect Interface Working with the Toolbars Chief Architect s Views

More information

Department of Architectural Technology Spring 2018

Department of Architectural Technology Spring 2018 Department of Architectural Technology Spring 2018 ARCH 2431 BUILDING TECHNOLOGY III 1 lecture hours and 6 lab/studio hours, 4 credits Course Description: Course focus is on steel construction. This course

More information

Type 2 (Car & Bus Passengers)

Type 2 (Car & Bus Passengers) Annexure 3 (b): Sheet 1 of 22 Type 2 (Car & Bus Passengers) Setting up and operations of Way-side Amenities on National Highways in India Annexure 3 (b): Sheet 2 of 22 Type-2 Car & Bus Passengers Setting

More information

KLASSIK Extra * MAXIMA 40 Extra * CONCEPT Extra * CONCEPT LIGHT Extra*

KLASSIK Extra * MAXIMA 40 Extra * CONCEPT Extra * CONCEPT LIGHT Extra* 1.0 01 KLASSIK Extra * stand construction system OCTANORM Standard, aluminium, ceiling grid on sides open to aisle, 1 m deep carpet (rib weave) in anthracite or other standard colour furniture: 1 table

More information

The Remodel Project For ArchiCAD 15 Part 4

The Remodel Project For ArchiCAD 15 Part 4 The Remodel Project For ArchiCAD 15 Part 4 Permission to Copy or modify The CAD Academy We don t need a complete set of drawings to show our proposed addition to the CLIENT. What is really great about

More information

WINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15

WINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15 Subject Code: 17309 Model Answer- Building Drawing Page No- 01 /15 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model answers

More information

Slope Floor. Measurement Methods

Slope Floor. Measurement Methods Slope Floor Measurement Methods Many chair installations are on sloped floors. Hussey Seating uses five different feet for floor mount chairs based on the degree of slope. The slope of the floor is a critical

More information

710 AVIS DRIVE WASTEWATER TREATMENT PLANT PHONE: FAX: INCINERATOR SCRUBBER REPLACEMENT

710 AVIS DRIVE WASTEWATER TREATMENT PLANT PHONE: FAX: INCINERATOR SCRUBBER REPLACEMENT CITY OF WARREN, MI 710 AVIS DRIVE WASTEWATER TREATMENT PLANT ANN ARBOR, MI 48108 PHONE: 734.665.6000 FAX: 734.665.2570 INCINERATOR SCRUBBER REPLACEMENT www.tetratech.com SHEET INDEX VOLUME I of II (TETRA

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

NFC AT CENTRE POMPIDOU S TEEN GALLERY MAURICIO ESTRADA MUNOZ

NFC AT CENTRE POMPIDOU S TEEN GALLERY MAURICIO ESTRADA MUNOZ NFC AT CENTRE POMPIDOU S TEEN GALLERY MAURICIO ESTRADA MUNOZ I passionately want Paris to have a cultural centre [ ] that is at once a museum and a centre of creation where plastic arts develop side by

More information

LAWRENCE PUBLIC LIBRARY ADDITION/RENOVATION creating a new civic hub for the city of lawrence, kansas

LAWRENCE PUBLIC LIBRARY ADDITION/RENOVATION creating a new civic hub for the city of lawrence, kansas LAWRENCE PUBLIC LIBRARY ADDITION/RENOVATION creating a new civic hub for the city of lawrence, kansas Visibility to neighborhood The continuous wrap of the new addition is designed to respond to each of

More information

www.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete

More information

The Merging of Glass and Wood

The Merging of Glass and Wood Presseinformation Press release newsinformation de presse sedak GmbH & Co. KG Einsteinring 1 86368 Gersthofen This text can be downloaded at www.sedak.com and www.pr-nord.de Salt Lake City, 111 South Main

More information

American Institute of Architects New Hampshire Chapter High School Design Competition Program

American Institute of Architects New Hampshire Chapter High School Design Competition Program American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale

More information

M +44 (0) W E

M +44 (0) W   E London ED. Dorset workshop Manor Gardens Wootton Fitzpaine Bridport Dorset DT6 6NH T +44 (0)1297 560807 M +44 (0)7899 792810 W www.edbrooks.com E info@edbrooks.com BROOKS 2 How We Started Ed Brooks Furniture

More information

Chapter 3. Wall Layout

Chapter 3. Wall Layout Chapter 3. Wall Layout 3.1 LAYING OUT EXTERIOR WALLS 3.2 CUTTING EXTERIOR WALL PLATES 3.3 MARKING WINDOW AND DOOR LOCATIONS ON EXTERIOR WALL PLATES 3.4 MARKING STUDS ON EXTERIOR WALL PLATES 3.5 LAYING

More information

Radiused Precast Concrete

Radiused Precast Concrete Radiused Precast Concrete PCI s Architectural Precast Concrete Services Committee illustrates how radiused precast can be designed creatively and cost effectively Radiused Precast Concrete Add Interest

More information

Finding Aid to the Ghirardelli Square Architectural Records, No online items

Finding Aid to the Ghirardelli Square Architectural Records, No online items http://oac.cdlib.org/findaid/ark:/13030/kt2h4nd9tp No online items Finding Aid written by Bancroft Library staff The Bancroft Library University of California, Berkeley Berkeley, California, 94720-6000

More information

Sonoma Cheese Factory

Sonoma Cheese Factory WEST SPAIN STREET 1ST STREET WEST 1ST STREET EAST 0 10 25 2 W E S T S PA I N S T R E E T - S O N O M A, C A L I F O R N I A EXISTING AREA PLAN 50 100 w w w. s m s - a r c h. c o m WEST SPAIN STREET 1ST

More information

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL

More information