Centre Georges Pompidou
|
|
- Florence Patrick
- 5 years ago
- Views:
Transcription
1 The international competition was launched in 1970 by the French Ministry of Culture. The call foresaw the creation of an interdisciplinary cultural institution, where contemporary art was also accompanied by literature, design, music and cinema. For this reason the Center includes the Public Information Library, the National Museum of Modern Art, and IRCAM, a center for music and acoustic research 1 / 147
2 Dati Progetto Competition Construction Renovation Site area 2 ha Total Floor Area m2 Area of each floor 166 x 45 m (open plan) Height 42 m on Rue Beaubourg, 45.5 m on the square Floors basement Credits Client Ministry of Cultural Affairs, Ministry of National Education Architects Studio Piano & Rogers, architects Consultants Structures and M.E. services: Ove Arup & Partners (P. Rice, L. Grut, R. Pierce, T. Barker); Cost control: M. Espinoza; Contractors GTM (Jean Thaury, site engineer) (main contractor); Krupp, PontàMousson, Pohlig (structure); Voyer (secondary structures); Otis (elevators and escalator); Industrielle de Chauffage, Saunier Duval (heating and ventilation); CFEM (glazing) 2 / 147
3 Immagini Subject Aerial view of the site before the project Image Code be / 147
4 Subject The Plateau Beauborg in the late Sixties. Image Code be / 147
5 Subject Renzo Piano with Susan and Richard Rogers, Gianfranco Franchini 1971/07/19 Image Code Be1 414 Rue Des Archives / AGIP 5 / 147
6 Subject Richard Rogers, Renzo Piano and Peter Rice 1974 Image Code be1 404 Rogers Stirk Harbour + Partners 6 / 147
7 Subject Meeting of the Jury 1971 Image Code be1 400 Centre Pompidou 7 / 147
8 Subject Picture's collage of the team Image Code be1 234, Rogers Stirk Harbour + Partners 8 / 147
9 Subject The Piano & Rogers team in the early From the left to right: Richard Rogers, Marco Goldschmied, Su Rogers, John Young and Renzo Piano 1971 Image Code be1 402 Centre Pompidou 9 / 147
10 Subject Philip Johnson with a presentation board 1971/07/16 Image Code be1 233 Arup 10 / 147
11 Subject The big excavation for the basement 1972 Image Code be1 184 Daniel Quesnay 11 / 147
12 Subject The big excavation for the basement with the contenitive wall on the east side 1972 Image Code be1 177 Daniel Quesnay 12 / 147
13 Subject The building site Image Code Be1 439 Bernard Vincent, Roger Stirk Harbour + Partners 13 / 147
14 Subject The production of the gerberettes in the Pohlig Heckel Bielchart factory, Krupp Group, in Rohrbach, Germany 1974 Image Code be1 311 Gianni Berengo Gardin Gianni Berengo Gardin 14 / 147
15 Subject Beams ready to be mounted in the building site Image Code Be / 147
16 Subject The 48 metres long trusses transported and delivered during the night. Image Code be1 105 Bernard Vincent, Roger Stirk Harbour + Partners 16 / 147
17 Subject First part of the framework under construction. View from rue SaintMerri Image Code be1 255, Roger Stirk Harbour + Partners 17 / 147
18 Subject The building under construction in Image Code be1 182 Bernard Vincent, Roger Stirk Harbour + Partners 18 / 147
19 Subject View of the structure on the west side from the upper levels (1975) Image Code Be1 179 Bernard Vincent 19 / 147
20 Subject View of the exavation for the IRCAM site from the top of the structure of the south façade under construction Image Code be1 329 Bernard Vincent 20 / 147
21 Subject The West Façade under construction. Image Code be1 183 Richard Ringoletti, Roger Stirk Harbour + Partners 21 / 147
22 Subject The lifting of a beam. Image Code be1 190 Bernard Vincent, Roger Stirk Harbour + Partners 22 / 147
23 Subject Men at work to complete the connection between a truss and a gerberette. Image Code Be / 147
24 Subject L'enorme trave in acciaio fuso chiamata gerberette, elemento distintivo della struttura esterna del Centre Pompidou. Ogni gerberette pesa circa dieci tonnellate. Image Code be / 147
25 Subject The system of assembly of the gerberette with the column, the tiebeam and the main truss. Erection of the first frame (august) Image Code be1 110 Bernard Vincent, Roger Stirk Harbour + Partners 25 / 147
26 Subject Detail of the connection between the gerberette and the column. Image Code Be / 147
27 Subject The assembly system of the floors' platforms Image Code Be1 516 Shunji Ishida, Roger Stirk Harbour + Partners 27 / 147
28 Subject Detail of the glass façade Image Code Be1 654 Shunji Ishida, Rogers Stirk Harbour + Partners 28 / 147
29 Subject Glass Façade structure detail. Image Code Be1 655 Shunji Ishida, Rogers Stirk Harbour + Partners 29 / 147
30 Subject The escalators structure under construction. Image Code Be1 596 Shunji Ishida, Rogers Stirk Harbour + Partners 30 / 147
31 Subject Detail of the connection elements of the external escalators structure. Image Code Be1 598 Shunji Ishida, Rogers Stirk Harbour + Partners 31 / 147
32 Subject View on the escalators during the installation. Image Code Be1 612 Shunji Ishida, Rogers Stirk Harbour + Partners 32 / 147
33 Subject Assembly of the escalators structure. Image Code Be1 606 Shunji Ishida, Rogers Stirk Harbour + Partners 33 / 147
34 Subject The assembly of the conducts on the East Façade. Image Code Be1 494, Roger Stirk Harbour + Partners 34 / 147
35 Subject Panoramic view of the cooling tower on the top Image Code Be1 623 Shunji Ishida, Rogers Stirk Harbour + Partners 35 / 147
36 Subject The cooling tower Image Code Be1 632 Shunji Ishida, Rogers Stirk Harbour + Partners 36 / 147
37 Subject 1977 Image Code Be1 064, Roger Stirk Harbour + Partners 37 / 147
38 Subject The West Façade escalators Image Code be1 070 Michel Denancé Michel Denancé 38 / 147
39 Subject (1991) Image Code be1 142 Michel Denancé Michel Denancé 39 / 147
40 Subject The nautical looking extactors on the East Façade Image Code be1 047 Michel Denancé Michel Denancé 40 / 147
41 Subject View of the Facade. Each color stands for a particular function: blue for ventilation, green for water, red for automated elevators, yellow for electricity. The main structure is white. All services and the secondary structure (service stairs, passage ways, etc.) are grey. Image Code be1 059 Michel Denancé 41 / 147
42 Michel Denancé 42 / 147
43 Subject An external deck on the East Façade. Image Code Be1 652 Shunji Ishida, Rogers Stirk Harbour + Partners 43 / 147
44 Subject The parvis seen from the atrium of the Centre Pompidou Image Code be1 151 Gianni Berengo Gardin Gianni Berengo Gardin 44 / 147
45 Subject The Sculpture terrace at the 5th floor. Image Code be1 025 Gianni Berengo Gardin Gianni Berengo Gardin 45 / 147
46 Subject The terrace at the top level Image Code be1 364 Hanry Sowden 46 / 147
47 Subject West Façade detail. Image Code be1 006 Gianni Berengo Gardin Gianni Berengo Gardin 47 / 147
48 Subject Circles of spectators around performers in the piazza Image Code be1 363 Gianni Berengo Gardin Gianni Berengo Gardin 48 / 147
49 Subject 2017/02/01 Image Code Be2 141 Francesca Avanzinelli Renzo Piano Building Workshop 49 / 147
50 Subject The Forum: Panamarenko's "The Aeromodeller (Zeppelin)" Image Code be1 383 Gianni Berengo Gardin Gianni Berengo Gardin 50 / 147
51 Subject Reflected ceiling of the Forum. Image Code Be1 471 Shunji Ishida 51 / 147
52 Subject Interiors of the gallery at the upper level. Image Code be / 147
53 Subject One of the gallery at the upper levels Image Code be1 160 Gianni Berengo Gardin Gianni Berengo Gardin 53 / 147
54 Subject View of the interiors. The library. Image Code be1 376 Gianni Berengo Gardin Gianni Berengo Gardin 54 / 147
55 Subject Interiors of the library. Image Code be / 147
56 Subject Demountable table system in standard steel angles, frictionbolted at corners Image Code Be1 668 Bernard Vincent, Rogers Stirk Harbour + Partners 56 / 147
57 Subject Fornitures leather chairs Image Code Be1 670 Bernard Vincent, Rogers Stirk Harbour + Partners 57 / 147
58 Subject The cinema/theather space. Image Code Be1 702 Shunji Ishida, Rogers Stirk Harbour + Partners 58 / 147
59 Subject Night view from the Piazza after the restoration. (2001) Image Code be2 025 Michel Denancé Michel Denancé 59 / 147
60 Subject The Forum in /07 Image Code Be2 138 Francesca Avanzinelli 60 / 147
61 Subject The Café (2001) Image Code be2 019 Michel Denancé Michel Denancé 61 / 147
62 Subject Femme (1969) Joan Miró on the Sculpture West terrace at the 5th floor after the refurbishments Image Code be2 012 Gianni Berengo Gardin Gianni Berengo Gardin 62 / 147
63 Subject The Southern Sculpture Terrace at the 5th floor in /07 Image Code Be2 155 Francesca Avanzinelli 63 / 147
64 Subject The "Grande Salle" with 384 seats, level Forum 1. Image Code be2 041 Michel Denancé Michel Denancé 64 / 147
65 Disegni Title Scale Size 14.5x27.4 cm 1971 Drawing number Drawing code be1rp_001 Renzo Piano Rogers Stirk Harbour & P. 65 / 147
66 Title Scale Size A Drawing number Drawing code be1rp_011 Renzo Piano Rogers Stirk Harbour & P. 66 / 147
67 Title Scale Size A Drawing number Drawing code be1rp_012 Renzo Piano Rogers Stirk Harbour & P. 67 / 147
68 Title Plan section Scale N/A Size 81 x 78 cm (1970) Drawing number Drawing code BE1_E_ / 147
69 Piano & Rogers Rogers Stirk Harbour & P. 69 / 147
70 Title Scale N/A Size 120 x 86 cm 1970 Drawing number Drawing code BE1_E_036 Piano & Rogers Rogers Stirk Harbour & P. 70 / 147
71 Title Scale N/A Size 114 x 51 cm 1970 Drawing number Drawing code BE1_E_ / 147
72 Piano & Rogers Rogers Stirk Harbour & P. 72 / 147
73 Title Niveau Scale 1:500 Size 63 x 45 cm 1973/01/23 Drawing number 73 / 147
74 Drawing code BE1_E_052 Piano & Rogers Rogers Stirk Harbour & P. 74 / 147
75 Title 1 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147
76 Drawing code BE1_E_053 Piano & Rogers Rogers Stirk Harbour & P. 76 / 147
77 Title 2 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147
78 Drawing code BE1_E_054 Piano & Rogers Rogers Stirk Harbour & P. 78 / 147
79 Title 3 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147
80 Drawing code BE1_E_055 Piano & Rogers Rogers Stirk Harbour & P. 80 / 147
81 Title 4 étage Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/AL/ CBP / 147
82 Drawing code BE1_E_056 Piano & Rogers Rogers Stirk Harbour & P. 82 / 147
83 Title 5 étage (Fifth floor) Scale 1:500 Size 63 x 44 cm 1973/01/23 Drawing number A/M/01.14/DL/ CBP / 147
84 Drawing code BE1_E_057 Piano & Rogers Rogers Stirk Harbour & P. 84 / 147
85 Title Façade Est Scale 1:200 Size x 84.5 cm 15/11/1972 Drawing number 71 CBP 2268 Drawing code BE1_E_006 Piano & Rogers Rogers Stirk Harbour & P. 85 / 147
86 Title Façade Nord Scale 1:200 Size 120 x 84 cm 15/11/1972 Drawing number 71 CBP 2269 Drawing code BE1_E_012 Piano & Rogers Rogers Stirk Harbour & P. 86 / 147
87 Title Façade Sud Scale 1:200 Size 120 x 84 cm 15/12/1973 Drawing number 71 CBP 2270 Drawing code BE1_E_013 Piano & Rogers Rogers Stirk Harbour & P. 87 / 147
88 Title Façade Ouest Scale 1:200 Size 120 x 84 cm 15/12/1972 Drawing number 71 CBP 2267 Drawing code BE1_E_014 Piano & Rogers Rogers Stirk Harbour & P. 88 / 147
89 Title Elevation and section parking Scale 1:200 Size 123 x 61 cm 1971/12/01 Drawing number CB/PC/3 Drawing code BE1_E_058 Piano & Rogers Rogers Stirk Harbour & P. 89 / 147
90 Title Section typique Vue transversale Scale 1:50 Size x 92.5 cm 1972/12/19 Drawing number 71 CBP 2285 Drawing code BE1_E_007 Piano & Rogers Rogers Stirk Harbour & P. 90 / 147
91 Title Gerberette ensemble de détails Scale 1:10 Size 85 x 60 cm 1973/01/26 Drawing number SM20 21A Drawing code BE1_E_005 Piano & Rogers Rogers Stirk Harbour & P. 91 / 147
92 Title Pignon Scale 1:100 Size A1 1972/09/25 Drawing number SZ20 05 Drawing code BE1_E_090 Piano & Rogers Rogers Stirk Harbour & P. 92 / 147
93 Title Joint de liaison entre tubes des contreventements des angles rentrants des terrasses Scale 1:10 Size 46 x 64 cm 1974/10/01 Drawing number / 147
94 Drawing code BE1_E_108 Piano & Rogers Rogers Stirk Harbour & P. 94 / 147
95 Title Façade Est sections typique des pénétration des réseaux techniques Scale 1:20 Size 86 x 55 cm 1973/11/07 Drawing number 71 BCP 2527 S126.1 Drawing code BE1_E_164 Piano & Rogers Rogers Stirk Harbour & P. 95 / 147
96 Title Façade Est plan typique (baie 6,7 level Scale 1:2 Size 58 x 88 cm 1973/11/07 Drawing number 71 BCP 2525 S / 147
97 Drawing code BE1_E_165 Piano & Rogers Rogers Stirk Harbour & P. 97 / 147
98 Title Volets roulants cas courant Scale 1:1 Size 87 x 62 cm 1974/10/07 Drawing number Drawing code BE1_E_109 Piano & Rogers Rogers Stirk Harbour & P. 98 / 147
99 Title Plate forme d'antenne + supports tuyauteries avec compensateurs Scale 1:20 Size 122 x 90 cm 1976/10/26 Drawing number Drawing code BE1_E_197 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 99 / 147
100 Title 1Facade Ovest escalier mécanique Scale 1:20 Size 88 x 56 cm 1973/11/07 Drawing number 71 BCP 2521 S120.1 Drawing code BE1_E_167 Piano & Rogers Rogers Stirk Harbour & P. 100 / 147
101 Title Escalier mécanique, supports coupe Scale N/A Size 90 x 122 cm 1974/12/12 Drawing number / 147
102 Drawing code BE1_E_194 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 102 / 147
103 Title Escalier mécanique structure détail Scale 1:5 Size 88 x 62 cm 1974/12/12 Drawing number Drawing code BE1_E_195 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 103 / 147
104 Title Centrale pour cinématheque élévation AA Scale 1:20 Size 1974/02/24 Drawing number B Drawing code BE1_E_139 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 104 / 147
105 Title Détail typique escalier garde corps Scale 1:5 Size 90 x 62 cm 1974/11/15 Drawing number Drawing code BE1_E_180 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 105 / 147
106 Title Escalier service accès pour terrasse Scale 1:20 Size 90 x 120 cm 1975/07/08 Drawing number A 106 / 147
107 Drawing code BE1_E_193 Piano & Rogers/ Shunji Ishida Rogers Stirk Harbour & P. 107 / 147
108 Title Detail 22 Scale NTS Size A3 1973/11/30 Drawing number 71 BCP 2534S149.1 Drawing code BE1_E_ / 147
109 Piano & Rogers Rogers Stirk Harbour & P. 109 / 147
110 Title Détail de liaison de raccordement gallerie/façade avec la façade partie centrale Scale 1:1 Size 124 x 88 cm 1975/01/29 Drawing number Drawing code BE1_E_113 Piano & Rogers Rogers Stirk Harbour & P. 110 / 147
111 Title Portes battantes dans les façades Scale 1:1 Size 86 x 62 cm 1975/03/21 Drawing number Drawing code BE1_E_115 Piano & Rogers Rogers Stirk Harbour & P. 111 / 147
112 Title Plan toiture et piazza Scale Photo of the original drawing not to scale 1973/11 Drawing number I/S 104 A Drawing code BE1 460 Piano & Rogers Rogers Stirk Harbour & P. 112 / 147
113 Title Poutre maitresse type élévation Scale Drawing size: A1 1:50 03/01/1973 Drawing number SZ Drawing code BE1 213 Ove Arup & Partners Ove Arup & Partners 113 / 147
114 Title Scale Photo of the original drawing Drawing size A1 N/A Drawing number Drawing code BE1 218 Piano & Rogers Rogers Stirk Harbour & P. 114 / 147
115 Title Pignon détail de contreventements Scale Drawing size: A1 1:50 1: /09/29 Drawing number SD Drawing code BE1 220 Ove Arup & Partners Ove Arup & Partners 115 / 147
116 Title Pignons contreventements entre poutre maitresses Scale Drawing size A1 1:50 1: /01/24 Drawing number SZ Drawing code BE1 207 Ove Arup & Partners Ove Arup & Partners 116 / 147
117 Title Scale N/A Drawing number SZ Drawing code BE1 697 Piano & Rogers Rogers Stirk Harbour & P. 117 / 147
118 Title Scale N/A Drawing number Drawing code BE1 563 Piano & Rogers Rogers Stirk Harbour & P. 118 / 147
119 Title Forum Beaubourg Scale Size A3 1998/01/23 Drawing number 119 / 147
120 Drawing code be2rp_002 Renzo Piano Renzo Piano Building Workshop 120 / 147
121 Title Forum Beaubourg Scale Size A3 1998/01/25 Drawing number 121 / 147
122 Drawing code be2rp_004 Renzo Piano Renzo Piano Building Workshop 122 / 147
123 Title Scale Size A3 1999/04/15 Drawing number Drawing code be2rp_016 Renzo Piano Renzo Piano Building Workshop 123 / 147
124 Title Scale Size A3 1999/10/01 Drawing number Drawing code be2rp_017 Renzo Piano Renzo Piano Building Workshop 124 / 147
125 Title Canopy entrée coupe Scale N/A Size A1 1998/07/16 Drawing number Drawing code BE2_E_011 Renzo Piano Building Workshop Renzo Piano Building Workshop 125 / 147
126 Title La Piazza Niveau 0 Scale N/A Dimensione A1 (1998/07/01) Drawing number Drawing code BE2_E_003 Renzo Piano Building Workshop Renzo Piano Building Workshop 126 / 147
127 Title La Piazza Niveau 0 Scale N/A Size A1 (1998/07/01) Drawing number Drawing code BE2_E_002 Renzo Piano Building Workshop Renzo Piano Building Workshop 127 / 147
128 Title Section forum Scale N/A Size 85 x 33 cm (1998/07/01) Drawing number Drawing code BE2_E_062 Renzo Piano Building Workshop Renzo Piano Building Workshop 128 / 147
129 Title Terrasse Nord Niveau +5 Scale N/A 1998/07 Drawing number Drawing code BE2 064 Renzo Piano Building Workshop Renzo Piano Building Workshop 129 / 147
130 Title Terrasse Scale N/A 1998 Drawing number Drawing code BE2 065 Renzo Piano Building Workshop Renzo Piano Building Workshop 130 / 147
131 Modelli Title Forum Study Model (1998) Model Code BE2_MD_001 Scale 1:100 Model RPBW Renzo Piano Building Workshop Architects 131 / 147
132 Title Forum Signage Study Model 1998 Model Code BE2_MD_007 Scale N/A Model Olivier Doizy 132 / 147
133 Title Competition Model 1971 Model Code BE1_MD_015 Scale N/A Model Ove Arup 133 / 147
134 Title Competition Model Copy (1993) Model Code BE1_MD_006 Scale 1:500 Model Ove Arup 134 / 147
135 Title "Avant Projet Sommaire" Schematic Design Presentation Model 1971 Model Code BE1_MD_016 Scale N/A Model 135 / 147
136 Title "Avant Projet Sommaire" Schematic Design Model (1972) Model Code BE1_MD_017 Scale N/A Model 136 / 147
137 Title As Built model (1975) Model Code BE1_MD_025 Scale N/A Model 137 / 147
138 Title Galleries Study Models (1972) Model Code BE1_MD_024a Scale N/A Model 138 / 147
139 Title Gerberette Beam Study Model 1972 Model Code BE1_MD_023B Scale N/A Model 139 / 147
140 Title Airconditioning system on roof Study model Model Code BE1_MD_028 Scale N/A Model Shunji Ishida 140 / 147
141 Title Airconditioning system on roof Study model Model Code BE1_MD_029 Scale N/A Model Shunji Ishida 141 / 147
142 Title General Plan Presentation Model 1997 Model Code BE2_MD_004 Scale 1:250 Model Olivier Doizy 142 / 147
143 Title Terrace Study Model Model Code BE2_MD_005 Scale N/A Model Olivier Doizy 143 / 147
144 Title Main Trusses Model As Built 1997 Scale 1:200 Model code BE1_MD_002 Renzo Piano Building Workshop Ph, Stefano Goldberg 144 / 147
145 Title General Building Competition Model (copy) 1997 Scale 1:500 Model code BE1_MD_006 Renzo Piano Building Workshop Ph, Stefano Goldberg 145 / 147
146 Title Gerberette Beam Model 1999 Scale 1:3 Model code BE1_MD_007 Renzo Piano Building Workshop Ph. Renzo Piano Building Workshop 146 / 147
147 147 / 147 Powered by TCPDF (
Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More informationican A Art New York, NY Memo Chang
Renzo Museu um of Ameri ican A Art New York, NY Lighting Proposal Memo September 10, 2012 Chang Liu Lighting/Electrical Option Dr. Houser Dr. Mistrick RENZO MUSEUM OF AMERICAN ART CHANG LIU LIGHTING PROPOSAL
More information11/29/12. Des Moines Social Club Urban Design Review Project Narrative
11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More information214 Wilshire Blvd., Suite 102 Santa Monica California 90401
Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE
More informationPublic Art Plan for Ripley s Aquarium of Canada 301 Front Street West, Toronto, Ontario
Public Art Plan for Ripley s Aquarium of Canada 301 Front Street West, Toronto, Ontario Presented to the Toronto Public Art Commission July 20, 2010 by Rina Greer and Catherine Williams, co-consultants
More informationPROVENANCE AT THE CLEVELAND MUSEUM OF ART
PROVENANCE AT THE CLEVELAND MUSEUM OF ART Special Event Room Rental 20% Non-Profit and Corporate Partner discounts are available. Event Space Rate Seated Reception Classroom Theatre Atrium 900 2,000 430
More informationBTR 100. Blueprint Reading
BTR 100 Blueprint Reading Approved: December 3, 2010 EFFECTIVE DATE: Fall 2011 COURSE PACKAGE FORM Team Leader and Members Ken Kramer, Frank Port, Curtis Clough, Andra Goldberg Date of proposal to Curriculum
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationAIA ATL HSSDC KICK-OFF MEETING
AIA ATL HSSDC KICK-OFF MEETING WELCOME KIMBERLY STANLEY, AIA, PRINCIPAL STANLEY BEAMAN & SEARS SCHEDULE FOR TODAY 9:15 Program starts 9:30 - Break out into Advanced, Beginner and Mentor Groups 11:00 Meet
More informationUniversity of Colorado, College Architecture and Planning. M:
BIM is for Interface I is for interface: the warm up. Of course I stands for information in BIM, the first assignment however is meant to serve as a warm up and general orientation of the program and it
More informationDeck Tutorial. Chapter 8: Decks and Porches
Decks and Porches Chapter 8: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase.
More informationHall of Waters List of Historic Drawings
List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral
More informationVideo: Design Process Architecture
Design and Applied Technology Teaching Kit for Senior Secondary Curriculum Design and Innovation Video: Design Process in Architecture [Teacher notes] Organizer Sponsor Research Team Contents Preamble
More informationDeck Tutorial. Decks and Porches. Drawing Decks
Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.
More informationDeck Tutorial. Chapter 8: Decks and Porches
Chapter 8: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase. You may want to
More informationDeck Tutorial. Decks and Porches. Drawing Decks
Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.
More informationDeck Tutorial. Chapter 6: Decks and Porches
Chapter 6: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase. You may want to
More informationFACTORY. Presentation sketches Actual Site photographs Drawings
FACTORY Presentation sketches Actual Site photographs Drawings Factory Presentation sketches 1) Front Façade From the Main Road side The façade of the pub showcases a complete look of a manufacturing unit
More informationAspen Art Museum Creating Innovative Wood Structure
Aspen Art Museum Creating Innovative Wood Structure Tallinn Wood Architecture Conference November 25-26, 2015 Aspen Art Museum Wood Space Frame THE PLAYERS OUTLINE THE BUILDING CONCEPT THE ARCHITECT S
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationWEDNESDAY, 5 JUNE 1.00 PM 2.30 PM
X223/12/02 NATIONAL QUALIFICATIONS 13 WEDNESDAY, 5 JUNE 1.00 PM 2.30 PM ART AND DESIGN HIGHER There are two sections to this paper, Section 1 Art Studies; and Section 2 Design Studies. Each section is
More informationJean-Michel Othoniel Xavier Veilhan. Courtesy of Kukje Gallery, Inc., May 22 June 26, 2010
Jean-Michel Othoniel Xavier Veilhan May 22 June 26, 2010 Exhibition Information Artist: Jean-Michel Othoniel, Xavier Veilhan Duration: May 22 (Sat) to June 26 (Sat) Place: Kukje Gallery (K1), 1F, 2F (Tel
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationGrand Rapids History & Special Collections ARCHIVES GRAND RAPIDS PUBLIC LIBRARY. Finding Aid for the
Grand Rapids History & Special Collections ARCHIVES GRAND RAPIDS PUBLIC LIBRARY Finding Aid for the Ryerson Library Foundation / Grand Rapids Public Library Foundation Records Collection # 342 October
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More informationGlasRoc Sheathing Type X
Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity
More informationProduction House, Enterprise Way,
Stock Sets Scenic Toolbox Contents: Stock Sets SS1 to SS4 Bespoke sets BS1 to BS4 Engineering EN1 to EN5 Truss TR1 to TR1 Temporary Structures TM1 to TM Exhibitions EX1 to EX3 Draughting & Design DS1 to
More informationArchitectural Walking Tour
Architectural Awareness Activities before the walking tour: Identifying Architecture: Students view slides and/or photographs of designed places, spaces and architectural details. They consider how people
More informationWHITNEY MUSEUM UNVEILS DESIGN BY RENZO PIANO FOR NEW DOWNTOWN BUILDING
Press Release Whitney Museum of American Art 945 Madison Avenue at 75th Street New York, NY 10021 www.whitney.org/press Contact: Whitney Museum of American Art Stephen Soba, Leily Soleimani 212-570-3633
More informationARCH 405bL SPRING 2016 LUCY EGBE + NICK HALSEY + KELLY LYNCH ERIN YAMASHITA ISSUED 04/26/16. Site Plan. Site Plan 1" = 50'-0" 1" = 50'-0" SCALE A-500
04/6/6 Site Plan " = 50'-0" Site Plan " = 50'-0" A-500 LOWLINE PARK WARHOL MUSEUM BASEMENT 6.67% Up 6.67% Down 03/0/6 Level P /3" = '-0" UP TYPICAL PARKING PLAN /3" = '-0" A-50P ESSEX ST. MARKET WARHOL
More informationWHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar
WHO WE ARE We help construction companies, general contractors, architects & engineers to seamlessly integrate BIM into their projects within their predefined timelines, standards and budget thereby helping
More informationRESIDENTIAL DEVELOPMENT 608 SPRINGBANK DRIVE 608 SPRINGBANK DRIVE LONDON, ON DESIGN BRIEF SPRINGBANK DRIVE WONDERLAND ROAD EAST ELEVATION NORTH ELEVATION WONDERLAND ROAD SPRINGBANK DRIVE SOUTH ELEVATION
More informationMethod of Build 1. General
Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed
More informationProposed Hotel, Restaurant. and Banquet Facility
Proposed Hotel, Restaurant PROJECT # : 60-0 and Banquet Facility ARCHITECTURAL 7 Logy Bay Road P.O. Box 09 St. John's, NL, Canada AA 5B T: (709) 79-80 F: (709) 7-80 E: info@fougeremenchenton.ca Issued
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationStorytellers Stories of EXCELLENCE PROJECTS. The Interior Glass Bridge, Potenza.
Storytellers 03 2017 Stories of EXCELLENCE PROJECTS The Interior Glass Bridge, Potenza Cari Lettori, in this issue we will talk about Transparent Architectures within the MPH Informatica office in Tito,
More informationArt Exploration! A Self-Guided Tour through the Hallie Ford Museum of Art
Art Exploration! A Self-Guided Tour through the Hallie Ford Museum of Art Find these artworks in the Museum s permanent collection galleries: spend some time looking and discussing each one with your friends
More informationPRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS,
http://oac.cdlib.org/findaid/ark:/13030/kt0h4nd9mz No online items PROJECTS, 1984-1995 Finding Aid prepared by Vladimira Stefura Getty Research Institute Research Library Special Collections and Visual
More informationNZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture
Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,
More informationbo laugesen ad10-ark15 nørrebro station process
bo laugesen ad10-ark15 nørrebro station process foreword The process of the project from initial ideas and proposals to the final proposal. It also contains different excersises and studies along with
More informationACOUSTICS IN THE MULTIPURPOSE HALLS OF THE NEW MAIN LIBRARY AND THE NEW MUNCH MUSEUM IN OSLO
ACOUSTICS IN THE MULTIPURPOSE HALLS OF THE NEW MAIN LIBRARY AND THE NEW MUNCH MUSEUM IN OSLO J Olshausen J H Rindel Multiconsult as, Oslo, Norway Multiconsult as, Oslo, Norway 1 INTRODUCTION This paper
More informationProcess The House of Photography Amanda H. J. Solberg
Process The House of Photography Amanda H. J. Solberg WEEK ONE AND TWO SITE WEEK THREE AND FOUR COLLAGE Fitting the pieces into a set square using only undefinable objects, filling the space. Breaking
More informationPrecast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6
Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its
More informationBack to Nature: The Life Cycle of Pottery. Yunqiao Du, Tutor: Eireen Schreurs, Susanne Pietsch, Mauro Parravicini
Back to Nature: The Life Cycle of Pottery Yunqiao Du, 4301307 Tutor: Eireen Schreurs, Susanne Pietsch, Mauro Parravicini About Pottery Craft The Cycle of Pottery illustrations of Pottery Making (1743)
More informationSIMULATION OF CERTAIN ACOUSTIC PROPERTIES OF THE "KNEŽEV DVOR" IN DUBROVNIK
SIMULATION OF CERTAIN ACOUSTIC PROPERTIES OF THE "KNEŽEV DVOR" IN DUBROVNIK Bojan Ivančević 1, Marjan Sikora 2, Kristian Jambrošić 1 1 FER, Unska 3, Zagreb, Croatia, bojan.ivancevic@fer.hr, kristian.jambrosic@fer.hr
More informationEXHIBITION CHECKLIST WITH IMAGES
EXHIBITION CHECKLIST WITH IMAGES Richard Serra Sculpture: Forty Years The Museum of Modern Art, New York 2nd Floor Contemporary Galleries The Museum of Modern Art, New York 6th Floor International Council
More informationCooper, Robertson & Partners Architecture, Urban Design. Page 1. Daylighting: Flexibility and Conservation
Cooper, Robertson & Partners Architecture, Urban Design Page 1 Daylighting: Flexibility and Conservation Daylighting: Flexibility and Conservation COOPER ROBERTSON Historical gallery design minimized
More informationTo the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603
ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,
More informationPHOTOGRAPHIC ARCHIVAL RECORDING. Former Reclamation Shed. North Eveleigh
PHOTOGRAPHIC ARCHIVAL RECORDING Former Reclamation Shed North Eveleigh WEIR PHILLIPS Architects and Heritage Consultants 69 Regent Street, Chippendale NSW 2008 9310 1010 July 2012 1.0 Archival Recording
More informationDETAILS ARE OLD ARCHITECTURE.
Project 2: LOOKING CLOSER - INTERIOR + ENVELOPE The Andy Warhol Foundation Building DETAILS ARE OLD ARCHITECTURE. Rem Koolhaas [..meaning by implication that they are not new architecture and in the best
More informationPHOTOGRAPHIC AND PLANIMETRIC DOSSIER
PHOTOGRAPHIC AND PLANIMETRIC DOSSIER. COMPETITION FOR THE SELECTION BY A PANEL OF JUDGES OF A PROPOSAL FOR THE ARCHITECTURAL RENOVATION AND MUSEOLOGICAL ADAPTATION OF THE SALÓN DE REINOS (HALL OF REALMS
More informationThomas Hooper fonds. Compiled by Frances Woodward (1974, revised 2002) Last revised October University of British Columbia Archives
Thomas Hooper fonds Compiled by Frances Woodward (1974, revised 2002) Last revised October 2011 University of British Columbia Archives Table of Contents Fonds Description o Title / Dates of Creation /
More informationThe University of Houston Campus Art Committee and the Public Art Collection Nathan Carter Proposal for an Outdoor Sculpture for the New University
The University of Houston Campus Art Committee and the Public Art Collection March 28, 2012 I would like to thank the University of Houston Campus Art Committee and the Public Art Collection for considering
More informationOJO concepts. ojo o business
ojo o business You want to get to the top with your business? There is enormous potential in. Develop unique experiences to excite, impress and retain your customers. Whatever it takes: Experienced interior
More informationTotal Precast Concrete Structures
Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and
More informationChapter 7 - Porch Framing
Chapter 7 - Porch Framing Contents Chapter 7 - Porch Framing... 7-1 Timing & Prerequisites... 7-2 Concrete Porches Caps (Contractor)... 7-3 Organize the Porch Framing Lumber... 7-3 Types of Porch Roofs...
More informationA-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile
Telephone 0.7.500 //0 06-G/06-G EXTERIOR RENDERINGS A-08 0 NOTE: SIGNAGE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. STREETSCAPE DETAILS ARE SHOWN IN CONCEPT FOR ILLUSTRATIVE PURPOSES. THE FINAL DETAILS OF THE
More informationNewton Suites Residential Tower
Newton Suites Residential Tower 60 Newton Road Singapore Architects WOHA Architects Pte Ltd / R Hassell, W M Summ Singapore Clients UOL Development Singapore Commission 2003 Design 2003-2004 Construction
More informationWEDNESDAY, 5 JUNE 1.00 PM 2.00 PM
X223/11/02 NATIONAL QUALIFICATIONS 2013 WEDNESDAY, 5 JUNE 1.00 PM 2.00 PM ART AND DESIGN INTERMEDIATE 2 There are two sections to this paper, Section 1 Art Studies; and Section 2 Design Studies. Each section
More informationArt (ART) Contact the Art Department for further information. (760) , ext Office: D-14
Palomar College 2013-2014 Catalog Architecture-Art ARCH 135 Architectural Materials and Methods of Construction (3) An introduction to the use and application of building construction materials and processes.
More informationCHALET/KIT > GALINA 167,00 m²
CHALET/KIT > GALINA 167,00 m² PRÉ MONTAGE ET MARQUAGE EN USINE SURFACE : 130,2 m² + étage 37,3 m² GALINA Dwelling house GALINA RC/130,2 m² + étage/37,3 m² Nous vous proposons les matériaux suivants
More information11SIXTY5 Weaver Dairy Road
SITEPLAN NOTES 2 C-2.0 BICYCLE RACK NTS Weaver Dairy Road Job Number: 1529 WLR, MTC, VJC WLR, VJC 11-30-17 STAIR SITE PLAN 1 C-2.0 SITE PLAN 1" = 30' 0 15 30 60 3 C-2.0 PLAZA DETAIL PLAN 1" = 20' 0 10
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationRESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM
RESTORATION OF DAVID SASSOON LIBRARY AND READING ROOM 2005-2006 1.1 Enabling Works The enabling works include erecting scaffolding on the external of the facades and all around the clock tower for roof
More informationSOL LEWITT. a d a m. e: 24 CORK STREET LONDON W1S 3NJ t:
SOL LEWITT a d a m g a l l e r y SOL LEWITT 24 CORK STREET LONDON W1S 3NJ t: 0207 439 6633 13 JOHN STREET BATH BA1 2JL t: 01225 480406 e: info@adamgallery.com www.adamgallery.com Adam Gallery is pleased
More informationSTRUCTURAL WOOD DETAILING IN CAD FORMAT
STRUCTURAL WOOD DETAILING IN CAD FORMAT STRUCTURAL WOOD DETAILING IN CAD FORMAT K.A. ZAVAT lnm51springer Science+Business ~---Media, LLC Copyright 1993 by Springer Science+Business Media New York Originally
More informationshedkm architects complete first Ruskin Square office in Croydon
Press release December 2016 shedkm architects complete first Ruskin Square office in Croydon One Ruskin Square by shedkm architects Jack Hobhouse London and Liverpool based practice shedkm architects has
More informationVictoria Saunders, Assoc. AIA, LEED AP BD+C phone: website: vsaunders.com
Victoria Saunders, Assoc. AIA, LEED AP BD+C email: vsaunders@icloud.com phone: 847.977.2749 website: vsaunders.com profile 5 years of workplace experience, including planning, design, and construction
More information6 Lobby Elevators with Destination Dispatch
6 Lobby Elevators with Destination Dispatch Design Your Space 15 Slab-to-Slab with Exceptional 360 Views Relax at OFF THE GRID Tenant Lounge/Game Area Outdoor Amenity Terrace with Wi-Fi Connectivity Because
More informationArnolfini Access Statement
Arnolfini Access Statement Image 1: Arnolfini from the water About Arnolfini In a fantastic waterside location at the heart of Bristol s harbourside, Arnolfini is one of Europe s leading centres for the
More informationOverlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.
facade Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. Specification and installation guide Presentation of the system VMZ
More informationSTAGE DEX STAGE DEX. Birch plywood, special water resistant quality, anti skidding top layer
The Stage DEX staging system consists of an aluminium frame made from a special extruded profile. The plywood top is bolted and glued to this frame to reduce noise and vibration. Several leg types and
More informationPROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project
More informationF I N D L AY G A L L E R I E S
FINDLAY GALLERIES Ronnie Landfield in his Studio, 2017 Ronnie Landfield in his Studio, 2017 As we continue to curate exhibitions of painting movements from the twentieth century, it is with great pleasure
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationBentley speedikon V8i
Bentley speedikon V8i Overview Bentley speedikon V8i Products of the speedikon product line Bentley speedikon Industrial V8i Bentley speedikon Architectural V8i Bentley speedikon ProjectEditor V8i Bentley
More informationTotal precast solution for large stadium projects meet tight schedule
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy
More information*Cover Picture Hoffman House by Richard Meier. *Drawn and Rendered by. Nicole Geier
*Cover Picture Hoffman House by Richard Meier *Drawn and Rendered by Nicole Geier Design Statement Just as soul depicts the character of man, architecture portrays the character of functional space. Architecture
More informationContents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together
Contents OVERVIEW How this Book is Put Together Conventions Icon Key Files on the Website INTRODUCTION TO CHIEF ARCHITECT The Chief Architect Interface Working with the Toolbars Chief Architect s Views
More informationDepartment of Architectural Technology Spring 2018
Department of Architectural Technology Spring 2018 ARCH 2431 BUILDING TECHNOLOGY III 1 lecture hours and 6 lab/studio hours, 4 credits Course Description: Course focus is on steel construction. This course
More informationType 2 (Car & Bus Passengers)
Annexure 3 (b): Sheet 1 of 22 Type 2 (Car & Bus Passengers) Setting up and operations of Way-side Amenities on National Highways in India Annexure 3 (b): Sheet 2 of 22 Type-2 Car & Bus Passengers Setting
More informationKLASSIK Extra * MAXIMA 40 Extra * CONCEPT Extra * CONCEPT LIGHT Extra*
1.0 01 KLASSIK Extra * stand construction system OCTANORM Standard, aluminium, ceiling grid on sides open to aisle, 1 m deep carpet (rib weave) in anthracite or other standard colour furniture: 1 table
More informationThe Remodel Project For ArchiCAD 15 Part 4
The Remodel Project For ArchiCAD 15 Part 4 Permission to Copy or modify The CAD Academy We don t need a complete set of drawings to show our proposed addition to the CLIENT. What is really great about
More informationWINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15
Subject Code: 17309 Model Answer- Building Drawing Page No- 01 /15 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model answers
More informationSlope Floor. Measurement Methods
Slope Floor Measurement Methods Many chair installations are on sloped floors. Hussey Seating uses five different feet for floor mount chairs based on the degree of slope. The slope of the floor is a critical
More information710 AVIS DRIVE WASTEWATER TREATMENT PLANT PHONE: FAX: INCINERATOR SCRUBBER REPLACEMENT
CITY OF WARREN, MI 710 AVIS DRIVE WASTEWATER TREATMENT PLANT ANN ARBOR, MI 48108 PHONE: 734.665.6000 FAX: 734.665.2570 INCINERATOR SCRUBBER REPLACEMENT www.tetratech.com SHEET INDEX VOLUME I of II (TETRA
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationNFC AT CENTRE POMPIDOU S TEEN GALLERY MAURICIO ESTRADA MUNOZ
NFC AT CENTRE POMPIDOU S TEEN GALLERY MAURICIO ESTRADA MUNOZ I passionately want Paris to have a cultural centre [ ] that is at once a museum and a centre of creation where plastic arts develop side by
More informationLAWRENCE PUBLIC LIBRARY ADDITION/RENOVATION creating a new civic hub for the city of lawrence, kansas
LAWRENCE PUBLIC LIBRARY ADDITION/RENOVATION creating a new civic hub for the city of lawrence, kansas Visibility to neighborhood The continuous wrap of the new addition is designed to respond to each of
More informationwww.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete
More informationThe Merging of Glass and Wood
Presseinformation Press release newsinformation de presse sedak GmbH & Co. KG Einsteinring 1 86368 Gersthofen This text can be downloaded at www.sedak.com and www.pr-nord.de Salt Lake City, 111 South Main
More informationAmerican Institute of Architects New Hampshire Chapter High School Design Competition Program
American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale
More informationM +44 (0) W E
London ED. Dorset workshop Manor Gardens Wootton Fitzpaine Bridport Dorset DT6 6NH T +44 (0)1297 560807 M +44 (0)7899 792810 W www.edbrooks.com E info@edbrooks.com BROOKS 2 How We Started Ed Brooks Furniture
More informationChapter 3. Wall Layout
Chapter 3. Wall Layout 3.1 LAYING OUT EXTERIOR WALLS 3.2 CUTTING EXTERIOR WALL PLATES 3.3 MARKING WINDOW AND DOOR LOCATIONS ON EXTERIOR WALL PLATES 3.4 MARKING STUDS ON EXTERIOR WALL PLATES 3.5 LAYING
More informationRadiused Precast Concrete
Radiused Precast Concrete PCI s Architectural Precast Concrete Services Committee illustrates how radiused precast can be designed creatively and cost effectively Radiused Precast Concrete Add Interest
More informationFinding Aid to the Ghirardelli Square Architectural Records, No online items
http://oac.cdlib.org/findaid/ark:/13030/kt2h4nd9tp No online items Finding Aid written by Bancroft Library staff The Bancroft Library University of California, Berkeley Berkeley, California, 94720-6000
More informationSonoma Cheese Factory
WEST SPAIN STREET 1ST STREET WEST 1ST STREET EAST 0 10 25 2 W E S T S PA I N S T R E E T - S O N O M A, C A L I F O R N I A EXISTING AREA PLAN 50 100 w w w. s m s - a r c h. c o m WEST SPAIN STREET 1ST
More informationCOVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS
TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL
More information